R E S U LT S B E YO N D ARCHITECTURE
AMBULATORY SURGERY CENTERS & OUTPATIENT CLINICS
AMBULATORY SURGERY CENTERS & OUTPATIENT CLINICS Little is well versed in the full spectrum of the healthcare deliver system – from acute care to ASC’s and outpatient clinics. With more procedures moving to an outpatient setting, we have seen an increase in these facilities. Our team understands the unique needs of each and is dedicated to delivering state-of-the-art surgical suites and ancillary spaces that support a hopeful, healing, and healthy experience for patients.
Results Beyond Architecture
1
2600 457 GROSS SF PER SURGICAL SPACE
SF AVERAGE O.R. SIZE
AVERAGE SPACE USE PER SURGICAL SPACE
200 SF
230 SF
170 SF
165 SF
WAITING / RECEPTION
DECONTAMINATION
2
ASC / Outpatient Centers
STERILE STORAGE
STERILE PROCESSING
AMBUL ATORY SURGERY CENTERS Net sf Percentage of Gross
BUILDING SUPPORT
3%
P R E P / R E C O V E RY
16%
SURGICAL
30%
WA I T I N G / R E C E P T I O N
8%
A D M I N I S T R AT I O N
6%
NET TO GROSS
37%
Results Beyond Architecture
3
Carnegie Development: Fredericksburg VA Healthcare Clinic
SELE C T E XPER I ENC E
6
ASC / Outpatient Centers
S U M M I T H E A LT H G R O U P : W I L M I N G T O N H E A LT H AMBUL ATORY SURGERY CENTER Wilmington, NC 19,500 sf The Wilmington Health Ambulatory Surgery Center is a multi-specialty center allowing area residents to have a new option for outpatient surgery. Located on a greenfield site, just a few miles away from the regions major medical center in downtown Wilmington, the 19,500 SF facility will be developed in two phases, phase one includes four operating rooms and sixteen prep-post stations with separate drop-off and discharge canopies. Phase two will consist of a 5,000 SF expansion that includes two operating rooms and associated support space. The building’s design is in align with other medical facilities within Wilmington Health’s network.
Results Beyond Architecture
7
WA K E M E D H E A LT H: 5 0 5 O B E R L I N M E D I C A L OFFICE BUILDING Raleigh, NC 40,000 sf The two-story, 505 Oberlin medical office building is located adjacent to one of Raleigh’s most prestigious urban retail centers. The site was selected to help WakeMed reach a new demographic of patients and serve as a “brand-ambassador” for the Health System. The building showcases a variety of outpatient clinics, including an Imaging Suite that will serve for outpatient services as well as support the adjacent Urgent Care Clinic and Orthopedic Clinic space.
8
ASC / Outpatient Centers
Results Beyond Architecture
9
10
ASC / Outpatient Centers
D U K E H E A LT H: C O L E Y H A L L A M B U L AT O RY SURGICAL CENTER Chapel Hill, NC 15,000 sf Part of the Duke Health network, this multi-disciplinary clinic provides patients and caregivers with a warm, caring environment that offers efficient and safe healthcare while enhancing the patient experience. The facility expands Duke Health’s state-of-the-art care to the communities outside of their main campus in Durham, NC and provides a new vision for outpatient care in Orange County. The Ambulatory Surgery Center at the clinic features two operating rooms and two procedure rooms in addition to the required pre-and-post-op support spaces. Little also designed a Physical Therapy and Mammography clinic on the second floor.
Results Beyond Architecture
11
N O VA N T H E A LT H: SENSUSONE MOB & FREESTANDING ED Summerville, SC 30,000 sf
Located in a rapidly growing community just 40 minutes north of Charleston off I-26, this new healthcare facility integrates an 11,000 SF Freestanding Emergency Department (FSED) with a two-story, 30,000 SF Medical Office Building (MOB). The project emphasizes seamless site integration and accommodates future growth. Site planning carefully balances connectivity, providing direct links to an adjacent Publix to the east and allowing for future development to the west. Architecturally, the design draws from traditional Lowcountry aesthetics, incorporating regionally inspired materials and color palettes. The FSED includes nine exam rooms, an isolation exam room, a trauma room, and imaging services such as X-ray and CT. Clerestory windows above the team station introduce abundant natural light into the space, promoting a calming and stress-reducing environment for both patients and staff.
12
ASC / Outpatient Centers
Results Beyond Architecture
13
14
ASC / Outpatient Centers
GASTRO MD AMBUL ATORY SURGERY CENTER & MEDICAL OFFICE BUILDING Orange City, FL ASC: 12,500 sf Offices: 3,500 sf In addition to the Lake Mary Ambulatory Surgery Center and GI Clinic, Gastro MD reached out to us to design a second Ambulatory Surgery which would also house their regional business offices. The wood and glass natural design elements continued on to this project. Creating a modern yet holistic atmosphere. Unlike the Lake Mary ASC, Orange City has two canopies, one for receiving and one for discharge creating a seamless flow for patients and visitors. The ASC is comprised of one operating room, three GI procedure rooms and 16 swing prep and recovery bays. The new business section of building allows Gastro MD to centralize all their business operations, allowing the nearby clinics to now focus on increasing patient volumes.
Results Beyond Architecture
15
GASTRO MD AMBUL ATORY SURGERY CENTER Lake Mary, FL ASC: 9,100 sf Clinic: 4,900 sf Offering patients high quality care in gastroenterology, this modern Ambulatory Surgery Center and Gastrointestinal Clinic was designed with the healing elements of nature in mind. Little’s design teams use of wood and glass brings in a bright and airy natural environment. The drop-off canopy at the surgery center provides patients and visitors with a dry and shaded entry. The surgery center consists of one operating room, two GI procedure rooms, and twelve pre/recovery bays. The space was designed to allow separate access from pre-post-recovery to the GI procedure and Operating Room suites. The new GI Clinic includes twelve exam rooms, an infusion bay, three provider offices and support spaces. The Clinic has direct access to the surgery center to allow for convenient access to the procedure rooms.
16
ASC / Outpatient Centers
Results Beyond Architecture
17
H A R R O D H E A LT H C A R E & M I L L E N I U M P H Y S I C I A N S G R O U P : AMBUL ATORY SURGER CENTER & MEDICAL OFFICE BUILDING Fort Myers, FL 56,000 sf Redefining the tradtional patient experience through an emphasis on wellness, technology and community engagement. The ground floor provides direct access to Urgent Care with a back-of-house connection to the adjacent Imaging Department. Imaging modalities include X-ray, CT, MRI and Ultrasound. The second level consists of primary and specialty clinic space, while the third level houses the Ambulatory Surgery Center. The ASC is made up of four, 450sf Operating Rooms, one Procedure room, and 16 flex Pre-Post Op Bays, with Decontamination and Sterilization occurring on site. Visitors arrive to a central, multipurpose atrium space through distinct landscaped areas, embodying the concept of a town square.
18
ASC / Outpatient Centers
RATED WALLS AND P RATED WALLS AND P RATED WALLS AND P RATED WALLS AND P RATED WALLS AND P RATED WALLS WALLS AND AND P P RATED 1-HOUR 1-HOUR 2-HOUR 2-HOUR 3-HOUR 1-HOUR 3-HOUR 2-HOUR 1-HOUR 3-HOUR 1-HOUR 2-HOUR 1-HOUR 2-HOUR 3-HOUR 3-HOUR 1-HOUR 2-HOUR 3-HOUR 2-HOUR 4-HOUR 2-HOUR 3-HOUR 4-HOUR 3-HOUR 3-HOUR 2-HOUR 4-HOUR 2-HOUR 3-HOUR 2-HOUR 0-HOUR 3-HOUR 4-HOUR 2-HOUR 0-HOUR 3-HOUR 4-HOUR 3-HOUR 4-HOUR 0-HOUR 4-HOUR
D D D D D D D
C C C C C C
STAIR STAIR 207 207 Not Enclosed NotSTAIR Enclosed 207 NotSTAIR Enclosed 207 STAIR NotSTAIR Enclosed 207 207 NotSTAIR Enclosed 207 Not Enclosed Not Enclosed
BAY 8 BAY 357 8 357SF 75 75 SF8 BAY 357 75 SF8 BAY 357 8 BAY 75 BAY 357SF8 BAY 357SF8 75 357SF 75 75 SF
BAY 7 BAY 356 7 356SF 75 75 SF7 BAY 356 75 SF7 BAY 356 7 BAY 75 BAY 356SF7 BAY 356SF7 75 356SF 75 75 SF
BAY 10 BAY 36010 360SF 70 70 SF BAY 10 360 70 SF BAY 10 36010 BAY 70 BAY 10 360SF BAY 10 11 360SF 70 360SF BAY 11 361 70 70 361SF 94 94 SF BAY 11 361 94 SF BAY 11 36111 BAY 94 BAY 11 361SF 12 BAY 11 361 BAY 12 94 362SF 361SF 94 362 87 94 SF SF 87 BAY 12 362 87 SF BAY 12 36212 BAY 87 BAY 12 362SF BAY 13 12 362SF 87 BAY 13 363 362SF 87 363SF 74 87 74 SF BAY 13 363 74 SF BAY 13 BAY 14 36313 BAY BAY 36414 74 SF BAY 13 363SF 364 95 BAY 13 363SF 74 SF 95 BAY 14 363SF 74 364SF 74 95 SF BAY 14 36414 BAY 95 BAY 14 364SF BAY 14 364SF 95 364SF 95 95 SF
EMER. EMER. ELEC ELEC 343 343SF 77 EMER. 77 SF ELEC 343 EMER. 77 SF ELEC EMER. 343 EMER. ELEC EMER. 77 ELEC 343SF ELEC 343SF 77 ELEC 343SF 342 77 77 342SF 70 70 SF ELEC 342 70 SF ELEC 342 ELEC 70 SF ELEC 342 BIO ELEC 342 70 SF BIO 341 342SF 70 341SF 84 70 SF 84BIO SF 341 84BIO SF 341 BIO 84 SF BIO 341 BIO 341 84 SF BREAK 341SF 84 BREAK DOWN 84 SF DOWN 339 339SF 140 BREAK 140 SF DOWN 339 BREAK 140 SF DOWN BREAK 339 BREAK DOWN BREAK 140 DOWN 339SF DOWN 339SF 140 339SF 140 140 SF
PASSAGE PASSAGE C-303 C-303 313 SF 313 SF PASSAGE C-303 313 SF PASSAGE C-303 PASSAGE 313 SF PASSAGE C-303 PASSAGE C-303 313 SF C-303 313 SF 313 SF
C
C:\Revit C:\Revit C:\Revit C:\Revit Local\8721823200 C:\Revit Local\8721823200 Local\8721823200 C:\Revit Local\8721823200 C:\Revit Local\8721823200 Local\8721823200 Local\8721823200 Harrod Harrod Harrod Harrod Millennium Millennium Harrod Millennium Millennium Harrod Harrod Millennium FtFtMyers_v2022_MOB_maite.bruno1907.rvt Millennium Ft Myers_v2022_MOB_maite.bruno1907.rvt Millennium Ft Myers_v2022_MOB_maite.bruno1907.rvt Myers_v2022_MOB_maite.bruno1907.rvt Ft Myers_v2022_MOB_maite.bruno1907.rvt FtFt Myers_v2022_MOB_maite.bruno1907.rvt Myers_v2022_MOB_maite.bruno1907.rvt
BAY 8 BAY 358 8 358SF 75 75 SF8 BAY 358 75 SF8 BAY 358 8 BAY 75 BAY 358SF8 BAY 358SF8 75 358SF 75 75 SF
BAY 9 BAY 359 9 359SF 94 94 SF9 BAY 359 94 SF9 BAY 359 9 BAY 94 BAY 359SF9 BAY 359SF9 94 359SF 94 94 SF
BAY 6 BAY 355 6 355SF 75 75 SF6 BAY 355 75 SF6 BAY 355 6 BAY 75 BAY 355SF6 BAY 355SF6 75 355SF 75 75 SF
BAY 4 BAY 353 4 353SF 75 75 SF4 BAY 353 75 SF4 BAY 353 4 BAY 75 BAY 353SF4 PASSAGE BAY 353SF4 75 PASSAGE C-304 353 75 SF C-304 750 SF 75 SF 750 SF PASSAGE C-304 750 SF PASSAGE C-304 PASSAGE 750 SF PASSAGE C-304 TEAM PASSAGE C-304 750 SF TEAM C-304 750 SFSTATION 350 750 SFSTATION 350SF 710 TEAM 710 SF STATION 350 TEAM 710 SF TEAM STATION 350 TEAM STATION TEAM 710 NOURISH STATION 350SF NOURISH 366STATION 350SF 710 350SF 366SF710 63 63 SF710 SF NOURISH 366 63 SF NOURISH 366 NOURISH 63 NOURISH 366SF NOURISH 366SF 63 366SF 63 63 SF
BAY 5 BAY 354 5 354SF 74 74 SF5 BAY 354 74 SF5 BAY 354 5 BAY 74 BAY 354SF5 BAY 354SF5 74 354SF 74 74 SF
PASSAGE PASSAGE C-305 C-305 341 SF 341 SF PASSAGE C-305 341 SF PASSAGE C-305 PASSAGE 341 SF PASSAGE C-305 PASSAGE C-305 341 SF C-305 341 SF 341 SF
PATIENT PATIENT TLT TLT 365 365SF 47 PATIENT 47 SF TLT 365 PATIENT 47 SF TLT PATIENT 365 PATIENT TLT SOILED PATIENT 47 SF TLT SOILED 365 334 TLT 365 47 SF 334 81 365SF 47 81 SOILED 47 SF 334 81 SF SOILED 334 SOILED 81 SOILED 334SF SOILED 334SF 81 334 81 SF 81 SF
B B B B
BULK BULK STORAGE STORAGE 338 338SF 212 BULK 212 SF STORAGE 338 BULK 212 SF STORAGE BULK 338 BULK STORAGE BULK 212 STORAGE 338SF STORAGE 212 338SF 338SF 212 212 SF
WAITING AND RECEPTION WAITING AND RECEPTION WAITING AND RECEPTION PATIENT ROOM PATIENT ROOM WAITING AND RECEPTION PATIENT ROOM WAITING AND RECEPTION PATIENT SUPPORT WAITING SUPPORT AND RECEPTION PATIENT WAITING ROOM AND RECEPTION PATIENT SUPPORT PATIENT SURGERYROOM PATIENT ROOM SURGERY PATIENT ROOM PATIENT SUPPORT SURGERYSUPPORT PATIENT SURGERY SUPPORT PATIENT SUPPORT SURGERY SUPPORT PATIENT SUPPORT SURGERY
W
SUPPORT SURGERY STAFF SUPPORT SURGERY STAFF SUPPORT SURGERY SURGERY SUPPORT STAFFBUILDING SUPPORT SURGERY SUPPORT BASE SURGERY SUPPORT BASE BUILDING SURGERY SUPPORT STAFF SUPPORT
A
1/11/2023 1/11/2023 1/11/2023 1/11/2023 1/11/2023 9:47:07 9:47:07 9:47:07 1/11/2023 1/11/2023 9:47:07 AM AM 9:47:07 AM AM 9:47:07 9:47:07 AM AM AM
A A A A
CIRCULATION BASE BUILDING BASE BUILDING BASE BUILDING CIRCULATION CIRCULATION CIRCULATION CIRCULATION
1 1
A103 A103
1
A103
1 1 1
A103 A103 1 A103 A103
BAY 1 BAY 351 1 351SF 88 88 SF1 BAY 351 88 SF1 BAY 351 1 BAY 88 BAY 351SF1 BAY 351SF1 88 351SF 88 88 SF
CLEAN CLEAN 367 367SF 151 151 SF CLEAN 367 151 SF CLEAN
CONSULT CONSULT 304 304SF 111 111 SF CONSULT 304 111 SF CONSULT 304 CONSULT 111 CONSULT 304SF PRIVATECONSULT 304SF 111 PRIVATE BAY 15 111 304SF BAY 37315 111 SF 373SF 111 PRIVATE 111 SF BAY 15 373 PRIVATE 111 SF BAY 15 PRIVATE PASSAGE 37315 PRIVATE BAY PASSAGE C-307 PRIVATE 111 BAY 15 373SF C-307 120 BAY 15 373SF 111 SF 120 373SF PASSAGE 111 SF 111 SF C-307 120 SF PASSAGE C-307 PASSAGE 120 SF PASSAGE C-307 PRIVATE PASSAGE C-307 120 SF PRIVATE BAY 16 C-307 120 BAY 16 372SF 120 372SF 114 SF PRIVATE 114 SF BAY 16 372 PRIVATE 114 SF BAY 16 PRIVATE 37216 ANESTHESIA PRIVATE BAY PRIVATE ANESTHESIA 114 WORK BAY 16 372SF BAY 16 WORK 329 372SF 114 372SF 329 87 114 SF ANESTHESIA 114 SF 87 SF WORK 329 ANESTHESIA 87 SF WORK ANESTHESIA 329 ANESTHESIA WORK ANESTHESIA 87 WORK 329SF WORK 87 SF 329 329SF 87 87 SF
PASSAGE PASSAGE C-306 C-306 355 SF 355 SF PASSAGE C-306 355 SF PASSAGE C-306 PASSAGE 355 SF PASSAGE C-306 PASSAGE C-306 355 SF C-306 355 SF 355 SF
CONTROL CONTROL 370 370SF 72 72 SF CONTROL 370 72 SF CONTROL 370 CONTROL 72 CONTROL 370SF CONTROL 370SF 72 SOILED 370 72 SF 371 72SOILED SF 371SF 67 67 SF SOILED 371 67 SF SOILED 371 SOILED 67 SOILED 371SF SOILED 67 371SF 371SF 67 67 SF
MEDS MEDS 368 368SF 134 134 SF MEDS 368 134 SF MEDS 368 MEDS 134 MEDS 368SF MEDS 368SF 134 368SF 134 134 SF
SEMI-STERILE SEMI-STERILE CORRIDOR CORRIDOR C-302 C-302SF 1894 SEMI-STERILE 1894 SF CORRIDOR C-302 SEMI-STERILE 1894 SF CORRIDOR SEMI-STERILE C-302 SEMI-STERILE CORRIDOR SEMI-STERILE 1894 CORRIDOR C-302SF CORRIDOR C-302SF 1894 C-302SF 1894 1894 SF
HSKP HSKP 374 374SF 57 57 SF HSKP 374 57 SF HSKP 374 HSKP 57 HSKP 374SF HSKP 374SF 57 374SF 57 57 SF
STAFF STAFF TLT TLT 375 375SF 55 STAFF 55 SF TLT 375 STAFF 55 SF TLT STAFF 375 STAFF TLT CLEAN STAFF 55 SF TLT 375 CLEAN LINEN TLT 375 55 LINEN 327SF 375 55 327SF 148 SF CLEAN 55 SF 148 SF LINEN 327 CLEAN 148 SF LINEN CLEAN 327 CLEAN LINEN CLEAN 148 LINEN 327SF LINEN 327SF 148 327SF 148 148 SF
STORAGE STORAGE 376 376SF 96 96 SF STORAGE 376 96 SF STORAGE 376 STORAGE 96 STORAGE 376SF HSKP STORAGE 376SF 96 HSKP 326 376SF 326SF96 54 96 54 SF SF HSKP 326 54 SF HSKP 326 HSKP 54 HSKP 326SF HSKP 326SF 54 326 54 SF 54 SF
RECEPTION RECEPTION 301 301SF 115 115 SF RECEPTION 301 115 SF RECEPTION 301 RECEPTION 115 RECEPTION 301SF RECEPTION 301SF 115 301SF 115 115 SFTLT TLT 302 302SF 51 51TLT SF 302 TLT 51TLT SF 303 302 303 TLT 57 SF 51 302 TLT 57 SF TLT TLT 302 51 SF 303 302SF 51 SF 57 51TLT SF 303 TLT 57 SF TLT 303 TLT 303 57 SF 303SF 57 57 SF
PASSAGE PASSAGE C301 C301 230 SF 230 SF PASSAGE C301 230 SF PASSAGE C301 PASSAGE 230 SF PASSAGE C301 PASSAGE C301 230 SF C301 230 SF 230 SF
W. W. HEATER HEATER 377 377 46 W.SF 46 SF HEATER 377 W. 46W.SF HEATER 377 W. HEATER W.SF 46 HEATER 377 DICTATION 377SF 46 DICTATION ALCOVEHEATER 377SF ALCOVE 324 46 46 SF 324SF 107 DICTATION 107 SF ALCOVE 324 DICTATION 107 SF ALCOVE DICTATION 324 DICTATION ALCOVE DICTATION 107 ALCOVE 324SF ALCOVE 107 SF 324 324SF 107 107 SF
IT IT 378 378SF 80 80ITSF 378 80ITSF 378 IT 80 ITSF 378 VAC ITSF 378 80 VAC 323 378SF 80 323 88 SF 80 SF 88 SF VAC 323 88 SF VAC 323 VAC 88 VAC 323SF VAC 323SF 88 323 88 SF 88 SF
OFFICE OFFICE 311 311SF 129 129 SF OFFICE 311 129 SF OFFICE 311 OFFICE 129 OFFICE 311SF OFFICE 311SF 129 311SF 129 129 SF
STAFF STAFF BREAK BREAK 312 312SF 407 STAFF 407 SF BREAK 312 STAFF 407 SF BREAK STAFF 312 STAFF BREAK STAFF 407 BREAK 312SF BREAK 312SF 407 312SF 407 407 SF
COPY COPY SUPPLIES SUPPLIES 230 230SF 281 COPY 281 SF SUPPLIES 230 COPY 281 SF COPY SUPPLIES 230 COPY SUPPLIES COPY 281 230SF SUPPLIES SUPPLIES 230SF 281 230SF 281 281 SF
0-HOUR 0-HOUR 0-HOUR 0-HOUR
W
STAGING STAGING 331 331SF 211 211 SF STAGING 331 211 SF STAGING 331 STAGING 211 331SF STAGING STAGING 331SF 211 331SF 211 211 SF
OR 3 OR 3223 322SF 459 459 OR SF 3 322 459 OR SF 3 3223 OR 459 OR 3 322SF OR 3 322SF 459 322SF 459 459 SF
OR 2 OR 3282 328SF 457 457 OR SF 2 328 457 OR SF 2 3282 OR 457 328SF OR 2 OR 2 328SF 457 328SF 457 457 SF
STAIR 227 227 Not Enclosed NotSTAIR Enclosed 227 NotSTAIR Enclosed 227 STAIR NotSTAIR Enclosed 227 227 NotSTAIR Enclosed 227 Not Enclosed Not Enclosed
OR 4 OR 3214 321SF 456 456 OR SF 4 321 456 OR SF 4 3214 OR 456 321SF OR 4 OR 4 321SF 456 321SF 456 456 SF
FLOOR PLAN - LEVEL 03 FLOOR PLAN - LEVEL 03 1/8" = 1'-0" 1/8" = 1'-0" FLOOR PLAN - LEVEL 03 1/8" = 1'-0" FLOOR PLAN - LEVEL 03 FLOOR 1/8" = 1'-0" PLAN - LEVEL 03 FLOOR PLAN - LEVEL 03 1/8" = 1'-0" PLAN - LEVEL 03 FLOOR
STAIR N ot Enc los ed
2 2
3 3
4 4
5 5
2
3
4
5
2 2 2 2
3 3 3 3
4 4 4 4
5 5 5 5
OPEN TO BELOW
6 6 6 6 6 6 6
NOT FOR CONSTRUCTION NOT FOR CONSTRUCTION
ELEC
TLT 253 48 SF
TLT 282 51 SF
PASSAGE C-225 200 SF
PROCEDURE 284 171 SF
EXAM 291 144 SF
TLT 263 51 SF
PROCEDURE 281 149 SF
PASSAGE C-220 C 186 SF
LAB 254 148 SF
PASSAGE C-204 66 SF
TLT
PROCEDURE 236 144 SF
RECEPTION 205 126 SF
RECEPTION 206 237 SF
PROCEDURE 231 144 SF
PASSAGE C-202 109 SF
EXAM 219 110 SF
EXAM 220 110 SF
238 49 SF
X
EXAM
211 123 SF
TLT
EXAM
EXAM
286 110 SF
EXAM 288 110 SF
EXAM 265 110 SF
W
EXAM 287 110 SF
EXAM 270 110 SF
212 61 SF
TEAM WORK 210 236 SF
TEAM WORK 230 239 SF
EXAM 241 112 SF
X X
SHEET KEYED NOTE NOTE SHEET SHEET KEYED KEYED NOTE XSHEET SHEET SHEET KEYED KEYED KEYED NOTES NOTE NOT
X X X X
SHEET KEYED NOTES
STAIRS 124 Not Enclosed
EXAM 268 110 SF
EXAM 269 110 SF
PASSAGE C-224 123 SF
PROCEDURE 277 173 SF
EXAM 264 111 SF
PASSAGE C-222 180 SF
PASSAGE C-226 177 SF
289 110 SF
1-HOUR
PASSAGE C-203 467 SF
TEAM WORK 260 231 SF
TEAM WORK 280 117 SF
EXAM 290 110 SF
ADMIN SUPPORT
STORAGE 239 45 SF
TLT 255 50 SF
CHECK-OUT C-201 133 SF
TLT 203 50 SF CASE MGR 237 82 SF
PROCEDURE 262 149 SF
PASSAGE C-221 345 SF
NOT FOR CONSTRUCTION NOT NOT NOTFOR FOR FORCONSTRUCTION CONSTRUCTION CONSTRUCTION NOT FOR CONSTRUCTION TLT 278 61 SF
1-HOUR
SM OKE PARTITION
CLINIC WAIT 204 594 SF
TLT 202 49 SF PASSAGE 172 102 SF
EXAM 292 118 SF
EXAM 279 139 SF
0.5-HOUR
4-HOUR
RECEPTION 252 206 SF
TLT 285 52 SF
293 70 SF
STAIRS 139 Not Enclosed
2-HOUR
LOBBY 201 494 SF
SCHEDULER 283 112 SF
IT 294 63 SF
PASSAGE C-227 348 SF
FIRE
1-HOUR 2-HOUR 3-HOUR
FIRE W ALL
0-HOUR
HSKP 295 36 SF
W. HEATER 296 39 SF
STOR. 297 50 SF
FIRE BARRIER
1-HOUR 2-HOUR 3-HOUR
3-HOUR
UROLOGY WAITING 250 725 SF SCHEDULERS 251 586 SF
WAITING AND RECEPTION
SHEET GENERAL NOTES
A. PROVIDE CONTROL JOINTS ON GYPSUM BOARD SPECIFICATIONS AND W HERE SHOW N. B. EXTEND W ALLS TO DECK ABOVE STOREFRONT GLASS W ALL PARTITIONS. C. PARTITIONS AT BUILDING PERIMETER SHALL BE CENTER LINE OF COLUMN OR W INDOW M ULLIO OTHERW ISE NOTED. D. ALIGN FINISHES ON EXPOSED SIDE OF PARTITIO CONCEALED SIDE OF PARTITION AS REQUIRED INSTALLATION WHERE ADJACENT PARTITION TY OVERALL THICKNESS. E. PROVIDE TOOLED SEALANT JOINT AT DISIM ILAR AS M ILLW ORKOR DOOR FRAME AT A W ALL. F. ALL PIPING, CONDUITS, AND RELATED M EP ITEM CONCEALED WITHIN DRYW ALL FURRING AS RE AREAS W HETHER SHOW N ON DRAW INGS OR N
RATED WALLS AND PARTITIONS
1 1 1 1
F
SM OKE PARTITION SM OKE PARTITION SM OKE PARTITION SM OKE PARTITION
NOT FOR CONSTRU NOT NOT FOR FOR CONSTRU CONSTRU NOT NOT FOR FOR CONSTRU CONSTRU
1/8" = 1'-0" 1/8" = 1'-0"
F F F F F F
SM OKE PARTITION
KEY PLAN KEY PLAN KEY PLAN KEY PLAN KEY PLAN KEY KEY PLAN PLAN
1
F
FIRE W ALL
FIRE W ALL FIRE W ALL FIRE W ALL SM OKE FIREPARTITION W ALL SM OKE PARTITION
1/8" = 1'-0" 1/8" = 1'-0"
STERILE STERILE CORE CORE 325 325SF 1334 STERILE 1334 SF CORE 325 STERILE 1334 SF CORE STERILE 325 STERILE CORE STERILE 1334 CORE 325SF CORE 325SF 1334 325SF 1334 1334 SF
1 1
F
FIRE BARRIER FIRE BARRIER FIRE W ALL FIRE BARRIER FIRE W ALL FIRE BARRIER
RATED WALL TYPES RATED WALL TYPES 1/8" = 1'-0" 1/8" = 1'-0" RATED WALL TYPES 1/8" = 1'-0" RATED WALL TYPES RATED 1/8" = 1'-0" WALL TYPES RATED WALL TYPES 1/8" = 1'-0" WALL TYPES RATED
ADMIN ADMIN OFFICE OFFICE 313 313SF 156 ADMIN 156 SF OFFICE 313 ADMIN 156 SF OFFICE ADMIN 313 ADMIN OFFICE ADMIN 156 OFFICE 313SF OFFICE 313SF 156 LOCKERS 313SF 156 LOCKERS 314 156 SF 314SF 252 252 SF LOCKERS 314 252 SF LOCKERS 314 LOCKERS 252 LOCKERS 314SF CHANGE LOCKERS 314SF 252 CHANGE 319 TLT 314SF 252 319SF 32 TLT SF 318 252 32 SF CHANGE 318SF 61 319 61 SF TLT 32 SF CHANGE 318 319 CHANGE 61 SF TLT 32 CHANGE 319SF 318 TLT CHANGE 319SF 32 61 SF TLT 318 319SF 32 TLT 318 61 SF 32 SF 318SF 61 61 SF
CHANGE CHANGE 315 315SF 35 35 SF CHANGE CHANGE 315 CHANGE 316SF 35 CHANGE 316SF 28 315SF CHANGE 28 CHANGE 35 CHANGE 315SF 316 CHANGE 315SF 35 28 SF CHANGE 315SF 35 316SF 35 CHANGE 28 SF CHANGE 316 TLT CHANGE 316 TLT 28 SF 317 316 28 317SF 65 28 SF 65 SF TLT 317 65 SF TLT 317 TLT 65 SF TLT 317 TLT 317 65 SF 317SF 65 65 SF
FIRE BARRIER
STAIR
OR 1 OR 3321 332SF 452 452 OR SF 1 332 452 OR SF 1 3321 OR 452 332SF OR 1 OR 1 332SF 452 332SF 452 452 SF
PROCEDURE PROCEDURE 333 333SF 293 293 SF PROCEDURE 333 293 SF PROCEDURE 333 PROCEDURE 293 333SF PROCEDURE PROCEDURE 333SF 293 333SF 293 293 SF
ASC ASC WAIT WAIT 300 300SF 1286 ASC 1286 WAITSF 300 ASC 1286 WAIT ASCSF 300 ASC WAIT ASC 1286 WAIT 300SF WAIT 300SF 1286 300SF 1286 1286 SF
STERILE STERILE PROCESS PROCESS 336 336SF 693 STERILE 693 SF PROCESS 336 STERILE 693 SF PROCESS STERILE 336 STERILE PROCESS STERILE 693 PROCESS 336SF PROCESS 336SF 693 336SF 693 693 SF
EQUIP EQUIP STORAGE STORAGE 337 337SF 324 EQUIP 324 SF STORAGE 337 EQUIP 324 SF STORAGE EQUIP 337 EQUIP STORAGE EQUIP 324 STORAGE 337SF STORAGE 337SF 324 337SF 324 324 SF
BASE BUILDING STAFF SUPPORT CIRCULATION STAFF SUPPORT CIRCULATION STAFFBUILDING SUPPORT BASE
A A
DECONT. DECONT. 335 335SF 315 315 SF DECONT. 335 315 SF DECONT. 335 DECONT. 315 335SF DECONT. DECONT. 335SF 315 335SF 315 315 SF
BAY 2 BAY 352 2 352SF 75 75 SF2 BAY 352 75 SF2 BAY 352 2 BAY 75 BAY 352SF2 BAY 352SF2 75 352SF 75 75 SF
PATIENT PATIENT TLT TLT 369 369SF 48 PATIENT 48TLT SF 369 PATIENT 48TLT SF PATIENT 369 PATIENT TLT PATIENT 48 SF TLT 369 TLT 369 48 SF 369SF 48 48 SF
367 CLEAN 151 CLEAN 367SF CLEAN 367SF 151 367SF 151 151 SF
B B B
BAY 3 BAY 352 3 352SF 75 75 SF3 BAY 352 75 SF3 BAY 352 3 BAY 75 BAY 352SF3 BAY 352SF3 75 352SF 75 75 SF
FIRE BARRIER FIRE BARRIER
EXAM 266 111 SF
EXAM 267 110 SF
EXAM
EXAM 242 112 SF
EXAM 221 110 SF
EXAM 232 110 SF
235 110 SF
PASSAGE C-205 175 SF
EXAM
EXAM 218 110 SF
213 121 SF
PASSAGE C-207 182 SF
PASSAGE C-208 232 SF
W EXAM 234 110 SF
EXAM 243 112 SF
EXAM 233 110 SF
EXAM 222 110 SF
EXAM
214 121 SF
EXAM 217 110 SF
PATIENT ROOM
PASSAGE C-206 511 SF
PASSAGE C-223 437 SF
PATIENT SUPPORT STAFF SUPPORT
E
STAFF BREAK 276 239 SF
BASE BUILDING CIRCULATION
E
TLT 274 54 SF
OFFICE MGR 275 113 SF
TLT 271 55 SF
CALL 273 44 SF
STAFF BREAK 247 315 SF
CALL 272 45 SF
TLT 227 51 SF
OFFICE MGR 246 112 SF
OFFICE 244 134 SF
OFFICE 245 131 SF
CALL 226 42 SF
OFFICE 223 126 SF
TLT 225 51 SF
EXAM 216 115 SF
GLASS WW ALL PARTITIONS. SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS ANTO DAN W DHERE AN WD WSHOW HERE SHOW N. SH B. EXTEND ALLS DEC KHERE ABOVE STO GLASS W ALL PARTITIONS. C. PARTITIONS AT BUILDING PERIMETE B. B. EXTEND EXTEND B. CEXTEND WTROL ALLS W ALLS W TO ALLS TO DECDEC TO K ABOVE DEC K ABOVE K ABOVE STORE STO GLASS W ALL PARTITIONS. A. PROVIDE ON JOINTS ON GYPSUM BOA BO D. C. PARTITIONS AT BUILDING PERIMETE CENTER LINE OF COLUMN OR W IND O GLASS GLASS GLASS W ALL WLINE ALL PARTITIONS. WAT ALL PARTITIONS. PARTITIONS. C. PARTITIONS PERIMETE SPECIFICATIONS AN D WBUILDING HERE SHOW CENTER OF COLUMN ORN.W IND O OTHER WLINE ISE N OTED. C. C. PARTITIONS PARTITIONS C.W ALLS PARTITIONS AT DEC BUILDING AT BUILDING AT BUILDING PERIMETER PERIMETE CENTER ORPERIM W INDSOO B. EXTEND KCOLUMN ABOVE STOREFR OTHER WTO ISE NOF OTED. D. ALIGN FINISH ON SIDE CENTER CENTER CENTER LINE OFLINE OF COLUMN COLUMN OFEXPOSED COLUMN OR OR W IND W OR IND OW WO OTHER WLINE ISE NES OTED. GLASS W ALL PARTITIONS. D. ALIGN FINISH ES ON EXPOSED SIDE O CONC EALED SIDE OF PARTITION AS OTHER OTHER OTHER W ISE WBUILDING ISE NW OTED. ISE NES OTED. N OTED. D. ALIGN FINISH ON EXPOSED SIDE C. PARTITIONS PERIMETER SHALL CONCAT EALED SIDE OF PARTITION ASO INSTALLATION WON HERE ADJACENT PA D. D. ALIGN ALIGN D.LINE FINISH ALIGN FINISH ES FINISH ON ES EXPOSED ESOF EXPOSED ON EXPOSED OF SI P CONC EALED SIDE PARTITION AS CENTER OF COLUMN OR W INDSIDE OWSIDE MU LO INSTALLATION W HERE ADJACENT PA E. OVER ALL THICKNESS. CONC CONC EALED CONC EALED EALED SIDE SIDE OFHERE SIDE PARTITION OF PARTITION OF PARTITION AS REQ AS OTHER W ISE N OTED. INSTALLATION W ADJACENT PA OVER ALL THICKNESS. E. PROVIDE TOOLED SEALANT JOINT A INSTALLATION INSTALLATION INSTALLATION WEXPOSED HERE W HERE WADJACENT HERE ADJACENT ADJACEN PART PA D. ALIGN FINISH ES ON SIDE OF PART OVER ALL THICKNESS. E. PROVIDE TOOLED SEALANT JOINT A AS MILLW ORKOR DOOR FRAME AT F.AAA OVER OVER ALL OVER ALL THICKNESS. ALL THICKNESS. CONC EALED SIDE OFTHICKNESS. PARTITION AS JOINT REQUIR E. PROVIDE TOOLED SEALANT AS MILLW ORKOR DOOR FRAME AT F. ALL PIPIN G, C ON DUITS, AND RELATE E. F. E. PROVIDE PROVIDE E. MILLW PROVIDE TOOLED TOOLED SEALANT SEALANT SEALANT JOINT JOINT AT JOIN AA INSTALLATION WG, HERE ADJACENT PARTITION AS ORKOR DOOR FRAME ATD ALL PIPIN CTOOLED ON DUITS, AND RELATE CONC EALED W ITHIN DR YW ALL FU RR OVER THICKNESS. ASALL MILLW AS MILLW AS ORKOR MILLW ORKOR ORKOR DOOR DOOR FRAME DOOR FRAME FRAME AT FU A ATW AA F. ALL PIPIN G, CW ON DUITS, AND RELATE CONC EALED ITHIN DR YW ALL RR AREAS W HETH ER SHOW N ON DRAW E. PROVIDE TOOLED SEALANT JOINT AT DISIMI F. F. ALLAREAS ALL F. PIPIN ALL PIPIN G, PIPIN CG, ON CG, DUITS, ON CDUITS, ON DUITS, AND AND RELATE REL M CONC EALED W ITHIN DRAND YW ALL FU RR W HETH ER SHOW NRELATED ON DRAW AS MILLW ORKOR DOOR FRAME AT A WDRAW ALL. CONC CONC EALED CONC EALED EALED W ITHIN WER ITHIN W DR ITHIN YW DR ALL YW DR ALL YW FU RRIN ALL FU RR FG AREAS W HETH SHOW N ON F. ALL AREAS PIPIN G, C ON DUITS, AND RELATED MEP I AREAS AREAS W HETH W HETH W ER HETH SHOW ER SHOW ERNSHOW ON N ON DRAW N DRAW ONINDR G CONC EALED W ITHIN DR YW ALL FU RRIN G AS AREAS W HETH ER SHOW N ON DRAW IN GS OR O
5 1/16"
E
1
FLOOR PLAN - LEVEL 02 1/8" = 1'-0"
2
3
4
NOTFOR FOR CONSTRUCT NOT NOT FORCONSTRUCT CONSTRUCT NOT FOR CONSTRUCT
5
6
7
RATED WALLS WALLS AND PART PART RATED RATED WALLS AND AND PART RATED RATED RATED WALLS WALLS WALLS AND AND AND PARTIT PART PA RA RATED WALLS AND PARTITION PARTITIO
WA NG AND RECEP ON WA T NG & RECEPT ON D
D D D D D D D
ADM N SUPPOR ADM N SUPPORT
SICK WAIT 151 144 SF
D
DISCHARGE DISCHARGE
C C C C C C C
DISCHARGE 140 457 SF ELEC 141 89 SF
C SUPPOR
STAFF SUPPORT
SURGERY B
SURGERY SUPPORT 1
WAITING AND RECEPTION
B
ADMIN SUPPORT WAITING ANDROOM RECEPTION PATIENT
ELEC
141MDF 142 89 SF 49 SF
IT MDF 143 142 39 SF 49 SF
PATIENT ROOM STAFF SUPPORT PATIENT SUPPORT IMAGING
STAFF SUPPORT BASE BUILDING IMAGING CIRCULATION
A
BASE BUILDING
CIRCULATION
COFFEE 152 109 SF EXAM 189 109 SF
STAIR 27 2 SF
CHECK-OUT 153 111 SF EXAM 182 109 SF
EXAM 189 109 SF
EXAM 182 109 SF
B B B B B BB
C-108 171 SF
188 ADMIN SUPPORT ADMIN SUPPORT 240 SF
ELEC ELEC 141 ELEC 141 89 SF ELEC89 ELEC 141 SFELEC ELEC SF 141 14189 141 SF89 SF 89 SF89141 89 SF MDF MDF 142 MDF 142SF MDF49 MDF 142SFMDF 49 MDF SF142 14249 142 49 SF49142 SF49 SF 49 SF IT IT 143 IT 143 39 SF IT IT PASSAGE ITSF 143 39 ITSF143 14339 143 C-110 39 SF39143 SF39 SF SF 39143 SF
ADMIN ADMIN SUPPORT ADMIN SUPPORT SUPPORT ADMIN SUPPORT PATIENT ROOM PATIENT ROOM PATIENT ROOM PATIENT ROOM PATIENT PATIENT PATIENT ROOM ROOM ROOM PATIENT SUPPORT OBSERVATION PATIENT SUPPORT PASSAGE PATIENT 188 SUPPORT C-108 PATIENT SUPPORT PATIENT PATIENT PATIENT SUPPORT SUPPORT 171 SF 240 SFSUPPORT STAFF SUPPORT STAFF SUPPORT STAFF SUPPORT STAFF SUPPORT STAFF STAFF SUPPORT STAFF SUPPORT SUPPORT IMAGING IMAGING IMAGING IMAGING IMAGING IMAGING IMAGING BASE BUILDING BASERECEIVING BUILDING BASE BUILDING 139 BASE BUILDING BASE BASE BUILDING BASE BUILDING BUILDING 118 SF CIRCULATION CIRCULATION CIRCULATION CIRCULATION CIRCULATION CIRCULATION CIRCULATION
EXAM 186 110 SF
RECEIVING 139 118 SF
FIRE PUMP 138 87 SF FIRE PUMP 138 87 SF
EXAM 187 106 SF EXAM 186 110 SF
MED GAS 137 107 SF
OFFICE 136 139 SF
1 1 11 1 1 1 MED GAS 137 107 SF
OFFICE 136 139 SF
EXAM 183 106 SF
FIRE
FIRE EXAM PUMP FIRE TLT PUMP FIRE 138 183 FIRE FIRE PUMP 184 138SFFIRE 87 PUMP 138SFPUMP PUMP PUMP 106 SF 87 47 SF 138 SF138 13887 138 87SF SF 87 SF87 87 SF
COFFEE CHECK-OUT COFFEE CHECK-OUT 152 153 COFFEE CHECK-OUT 152SF 153SF 109 111 COFFEE COFFEE CHECK-OUT CHECK-OUT CHECK-OUT 152COFFEE 153 109 SF 111 SF COFFEE CHECK-OUT 109 152 152SF152 153SF153 153111 152SF 153SF 109 SF 109 SF 109 111 111 SF 111 SF 109 SF 111 SF
TEAM TEAM
EXAM EXAM 186 EXAM 186SF 110 EXAM EXAM 186SF EXAM 110 186110 186SF186 110 SF 110 SF 110 SF
EXAM 175 111 SF
PASSAGE C-107 210 SF MED GAS MED GAS 137 MED 137GAS MED GAS 107 SF MEDMED GAS MED GAS 137 107 SF GAS 137SF 137107 137 137 107 SF SF 107 SF 107 107 SF
OFFICE EXAM OFFICE 136 OFFICE 175 136 OFFICE 139 SF OFFICE OFFICE OFFICE 136SF 139 111 SF 136 136139 136SF 136 EXAM 139 139 SF 139 SF SF 139 SF
TLT 134 63 SF
174 110 SF
PASSAGE PASSAGE
C-110 PASSAGE C-110 143 SF PASSAGE PASSAGE PASSAGE C-110 143 SF PASSAGE 143 SF C-110 C-110 C-110 143 C-110 SF 143 SF 143 SF 143 SF
PASSAGE PASSAGE
EXAM EXAM 183 EXAM 183SF 106 EXAM EXAM EXAM TEAM 183SF EXAM 106 183106 183SF183 183 STATION 106 106 SF 106 SF 106 SF SF
170 233 SF
30 SF 18530 185SF185 185 30 30 SF 30 SF SF30 SF
PASSAGE EXAM EXAM 174 C-106 EXAM 174SF 110 EXAM EXAM 174 210EXAM SFSFEXAM 110
174110 174SF174 174 110110 SF 110 SF 110SFSF
EXAM 172 111 SF
EXAM PASSAGE 173 C-103 110 SF661 SF
PASSAGE STAFF C-103 BREAK 661 SF 133 315 SF
2 2 22 2 2 2
STAFF BREAK 133 315 SF
SF 233SFSF 233 SF PASSAGE 233233 C-105 642 SF
642 SF
TLT TLT 135 TLT 135 SF TLT TLT TLT52 TLT 135 52 SF EXAM 135 SF 135 13552 135 172 52 52 SF 52 SF SF52 SF 111 SF TLT TLT EXAM 134 TLT 134 TLT 63 SF TLT63 TLT 134 173 SF TLT 134 SF 134 110 SF 13463 134 63 63 SF SF63 SF 63 SF
EXAM 174 110 SF
PASSAGE PASSAGE
PASSAGE C-106 210 SF
TLT TLT
STAIR
LAB 158 188 SF 27 2 SF
LAB PHLEBOTOMY
X-RAY X-RAY 120 X-RAY 120SF 371 X-RAY X-RAY X-RAY 120SF 371 X-RAY 120371 120SF120 120SF 371 371 SF 371 SF 371 SF
TEAM TEAM STATION TEAM STATION 160 TEAM TEAM TEAM STATION 160SF TEAM 233 STATION STATION 160STATION 233 SF STATION 233 SF 160 160160 160 233 233 233 SF 233SF SF SF
PASSAGE PASSAGE
160 233 SF
EXAM EXAM TEAM 173 EXAM 173SF 110 STATION EXAM EXAM EXAM 173SF EXAM 110 110 173173 173SF173 160 110110 SF 110 SF 110SFSF
233 SF EXAM PASSAGE PASSAGE C-103 167 PASSAGE C-103 661 SF PASSAGE PASSAGE PASSAGE C-103 106 SFPASSAGE 661 SF
EXAM EXAM 167 EXAM 167SF 106 EXAM EXAM EXAM 167SF EXAM 106 106 167 167SF167 167 106 106 106 SF 106SF SFSF
WATER H. TLT 169 168 30 SF 47 SF WATER H. 169 30 SF RAD TECH TOUCH DOWN 132 318 SF 3 3 RAD 33 TECH 3 3 3
EXAM EXAM 166 EXAM 166SF 106 EXAM EXAM EXAM 166SF EXAM 106 106 166 166SF166 166 106 106 106 SF 106SF SF SF
PASSAGE C-104 172 SF
106 SF
DOWN 132 DOWN 318 132SF
DOWN DOWN DOWN 318 SF EXAM 132 318 132 132SF132 SFSF 165318318SF 318 318 SF 110 SF
EXAM 165 110 SF
WAIT WAIT 121 WAIT 121SF 64 WAIT WAIT 121SFWAIT WAIT64 121 121SF121 12164 64 64 SF SF64 SF64 SF
WAIT 121 64 SF
HSKP 130 38 SF
HSKP 130 38 SF
CLEAN. L 131 126 SF
CLEAN. L 131 126 SF
PASSAGE C-102 594 SF
BULK BULK CLEAN. LWAIT STOR. BULK CLEAN. L STOR. BULK 128 131 L 121 BULK BULK CLEAN. STOR. 128SFBULK 131 CLEAN. 126 SF 146 STOR. CLEAN. CLEAN. LLCLEAN. L 128SF 131 STOR. STOR. STOR. 126 SF L64 SF 128146 131126 146 128SF128 131 131SF131ULTRA S. 128 126 SF SF SF 146 SF SF 126 126 126 SF 123 146 146 SF 146 SF
EXAM 163 MEDS 112 164 SF 35 SF
MEDS 164 35 SF
ULTRA S. ULTRA S. 122 ULTRA 122SFS. 126 ULTRA ULTRA S. 122 126 SFS. S. ULTRA S.ULTRA 126 SF 122 122 122 122 126 126 SF 126 SF 126 SF SF
ULTRA S. ULTRA S. 123 S. ULTRA MEDS HSKP 123SF MEDS HSKP 126 ULTRA ULTRA S.ULTRA 123 164 130 MEDS HSKP 126 SFS. S. 164SF ULTRA 130SF S.HSKP 123126 123SF123 38 35 MEDS MEDS HSKP HSKP MEDS HSKP 164SFMEDS 130SF 38 35 126 SF 126 SF 126 SF 122 164 164SF164 130 130SF130 16435 13038 38 35 35 SF35 SF 38 38 SF SF 35SF SF 126 SFSF38 SF
EXAM 163 112 SF
RAD RAD
TECH EXAM RAD TECH RAD TOUCH RAD RAD RAD TECH 166 TOUCH TECH DOWN TECH TECHTECH TOUCH DOWN 106 SF TOUCH TOUCH 132TOUCH TOUCH
127 127 127 SF 127 SF SF SF
EXAM EXAM 163 EXAM 163SFULTRA S. 112 EXAM EXAM EXAM122 163SF EXAM 112 163 163SF163 163112 126 SF 112 112 112 SF 112 SF SF SF
PROCEDURE 162
TLT 127 SF TLT 168 TLT 168 47 SF TLT TLT 168 TLT 47 SF TLT PASSAGE EXAM 47 168 168SF168 168 EXAM 165 4747SF 47 SFSF47 SF C-104 EXAM 165SF WATER 110 EXAM EXAM 165SF EXAM WATER 172 EXAM SF 110 H. WATER 110 165 165SF 165 PROCEDURE 165 H. 169 WATER WATER WATER H.WATER 110 110 110 SF162 110SF SF SF 169 30 SF H. H.H. H.SF 169 30 EXAM 169 127 SF 30 169SF169 169 SFSF30 SF 166 3030SF30
C-103 661 SF C-103 C-103 C-103 661661 SF 661 SF 661SFSF
STAFF
STAFF EXAM TLT
BREAK STAFF BREAK STAFF 133STAFF 167 STAFF STAFF BREAK 168 133SF 315 BREAK 133SF BREAK BREAK BREAK 106 315 SF 47 SF 315 133133 133SF133 315315 SF 315SFSF 315 SF
PROCEDURE
X-RAY PROCEDURE 162 PROCEDURE 162SF 127 120PROCEDURE PROCEDURE PROCEDURE 162SF 127 PROCEDURE 162SF162 371 SF 162 162127
PASSAGE PASSAGE
C-104 PASSAGE C-104 172 SF PASSAGE PASSAGE PASSAGE C-104 PASSAGE 172 SF 172 SF C-104 C-104 C-104 C-104 172 172 SF 172 172SF SF SF
126 SF
BULK STOR. 128 146 SF 4 4 4 4 4 4 4 BULK
STOR. 128 146 SF
IMAGING WAIT 105 762 SF
TLT
RECEPTION RECEPTION 106 RECEPTION 106SF 176 RECEPTION RECEPTION RECEPTION 106 176 SF RECEPTION 106176 106SF106 106 176 SF 176 SF 176 SF 176 SF
102TLT 48 SF 103 54 SF
111SF CHANGE 46 RM RM46 111 SF RM RM 46 111 111SF111 111SF46 SF46 SF 46 46 SF
RECEPTION 106 176 SF TLT TLT 113 TLT 113 SF TLT TLT50 TLT 113 TLT 50 SF 11350 113SF113 113 50 SF50 SF50 SF 50 SF
CHANGE CHANGE WAIT CHANGE WAIT 110CHANGE CHANGE CHANGE WAIT 110 CHANGE SFWAIT WAIT90 WAIT 110
CT
CT RECEPTION 114 CT 114 SF106 CT422 CTSF CT 114 CT 422 SF114SF 114422 114176
PASSAGE PASSAGE C-103 PASSAGE
114 422 SF 422 SF 422 SF 422 SF
CHANGE RM 111 46 SF
CHANGE116 124SF 34 SF TLT51 TLT RM34 RM 116 124 TLT RM 51 SF TLT SF RM SF 116 11634 116 12451 124SF124 124 116 51SF SF51 SF51 SF 34 34SF SF34 SF34 SF 51
CHANGE TLT WAIT113 11050 SF 90 SF
PASSAGE C-103 262 SF
OFFICE CHANGE OFFICE
126 OFFICE 126SFRM 89 OFFICE OFFICE OFFICE OFFICE 126SF 89 126 126SF116 12689 126 89 89SF SF89 SF SF 3489 SF
EQUIP EQUIP 119 EQUIP 119SF 123 EQUIP EQUIP EQUIP EQUIP 119SF 123 119 119123 119SF119 123 123SF SF 123 SF 123 SF SOILED SOILED 127 SOILED 127SF SOILED 82 SOILED SOILED SOILED 127SF 82 127 OFFICE 12782 127SF127 82 ANTE 82SF SF82 SF82 SF 125
OFFICE 125OFFICE 90 SF126 89 SF
25 4 SF
25 4 SF
CT 114
SHARED 422 SF SHARED CONTROL SHARED CONTROL 115 SHARED SHARED CONTROL SHARED 115SHARED 202 SF 115 CONTROL CONTROL CONTROL CONTROL 202 SF 115202 115SF115 115 202SFSF 202 SF 202 SF 202
CT 114 422 SF
OFFICE CHANGE CHANGE OFFICE ANTE 125 OFFICE TLT WAIT RM ANTE 125SF 117 ANTE 90 OFFICE OFFICE OFFICE 125SF 117 90 124 OFFICE 116ANTE 63 SFANTE ANTE ANTE 117 110 PASSAGE 12590 125SF125 125 63 SF 51 SF 90 SF 117 117 11763 90SF SF90 SF90 SF34 SF117 90 SF SF63 SF SF63C-103 6363SF 262 SF
TLT 124 51 SF
STAIR
STAIR
90 SF C-103 CHANGE WAIT 262 SF SF 110 11090 110 PASSAGE PASSAGE PASSAGE C-103 110 262 SF PASSAGE 90SF SF90 SF90 TLT SF 262 SF C-103 C-103 C-103 RM 90 C-103 CHANGE 262SFSF 262 SF 262 SF 113 262 CHANGE 111 TLT RM CHANGE 50116 SF TLT RM 46 SF 124 CHANGE CHANGE TLT RMCHANGE
90 SF
ULTRA S. 123 126 SF
762 SF
102 48 SF TLT
PASSAGE PASSAGE PASSAGE C-102 PASSAGE C-102 C-101 PASSAGE 594 SF PASSAGE PASSAGE C-102 594 SF 119 SF PASSAGE 594 SF C-102 C-102 C-102 C-102 594 SF 594 SFTLT 594 SF 594 SF CHANGE 103 CHANGE RM CHANGE RM 54 CHANGE SF111 CHANGE RMCHANGE
PASSAGE C-102 594 SF
IMAGING IMAGING WAIT IMAGING WAIT 105IMAGING IMAGING IMAGING WAIT 105SF 762 105SF WAIT WAIT WAIT IMAGING IMAGING 762 105762 105SF105 WAIT 762 SF 762WAIT SF 762 SF 105 105 762 SF
TLT TLT 102 TLT 102 48 SF TLT48 TLT 102 SF TLT SF 102 TLT 10248 102 48 SF48 SF48 SF 102 TLT 48 SF
103 TLT 103 54 SF TLT54 TLT 103 SF TLT TLT SF 103 10354 103 103SF54 SF54 SF 54 TLT54 SF
PASSAGE C-101 119 SF
X-RAY 120 371 SF
LAB PHLEBOTOMY 157 349 SF
C-106 PASSAGE C-106 210 SF PASSAGE PASSAGE PASSAGE C-106 PASSAGE 210 SF 210 SF C-106 C-106 C-106 C-106 210210 SF 210 SF 210 SFSF
PASSAGE PASSAGE C-101 PASSAGE C-101 119 SF PASSAGE PASSAGE PASSAGE C-101 119 SF PASSAGE 119 SF C-101 C-101 C-101 C-101 119 SF 119 SF 119 SF 119 SF
LAB LAB PHLEBOTOMY LAB PHLEBOTOMY LAB 157 LAB LAB PHLEBOTOMY 157 LAB 349 SF PHLEBOTOMY PHLEBOTOMY PHLEBOTOMY 157SF 349 PHLEBOTOMY 157349 157SF157 349157 SF 349 SF 349 SF 349 SF
PASSAGE 157 PASSAGE C-105 PASSAGE C-105 349 642 SFSF PASSAGE PASSAGE PASSAGE C-105 642 SF PASSAGE 642 SF C-105 C-105 C-105 642C-105 SF 642 SF 642 SF 642 SF
EXAM EXAM 172 EXAM 172SF 111 EXAM EXAM EXAM TEAM 172SF EXAM 111 111 172172 172SF172 STATION 111111 SF 111SFSF 111 SF
TOUCH DOWN 132 318 SF
LAB LAB LOBBY 158 LAB 158SF 188 LAB188 LAB LAB 158SF 101 LAB 188 158 158SF158 1560 SF 188 SF 188158 SF 188 SF 188 SF
156 TLT 156 49 SF TLTLAB TLT 156 49 SF TLT TLT 49 156 156SF156 158 156 49188 SF49 SF49 SF 49 SFSF
TLT
TLT 156 49 SF
EXAM EXAM 175 EXAM 175SF 111 EXAM EXAM EXAM 175SF PASSAGE EXAM 111 175111 175SF175 175 C-105 111111 SF 111SFSF 111 SF
155 TLT 155 SF TLT TLT TLT52 155 52 SF TLT 52 155SF155 155 52 155 SF52 SF52 SF 52 SF
C-111 PASSAGE C-111 165 SF PASSAGE PASSAGE PASSAGE C-111 165 SF PASSAGE 165 SF C-111 C-111 C-111 165C-111 SF 165 SF 165 SF 165 SF
EXAMTLT 155 EXAM 171156 EXAM 52129 SFSF 171 EXAM EXAM EXAM 17149 SF 129 SF EXAM 129 171 171SF171 129 171 SF 129 SF 129 SF 129 SF
TEAM TEAM STATION TEAM STATION 170 TEAM TEAM TEAM STATION 170SF TEAM 233 STATION STATION 170STATION 233 SF STATION 233 170170 170SF170
C-107 PASSAGE C-107 210 SF PASSAGE PASSAGE PASSAGE C-107 PASSAGE 210 SF 210 SF C-107 C-107 C-107 C-107 210210 SF 210 SF 210SF SF
TLT TLT 184 TLT 184 47 SF TLT47 TLT 184 TLT SF TLT
18447 184SF184 184 TEAM 47 SF 47 SF SF47 SF 47 STATION SOIL 170 SOIL 185 SOIL 185SF 233SOIL SF 30 SOIL SOIL 185 SOIL
PASSAGE C-111
165 SF EXAM EXAM 176 EXAM 176SF 129 EXAM EXAM EXAM 176SF 129 EXAM 129 176 176SF176 176 SF 129 SF 129 SF 129 129 SF
PASSAGE C-111 165 SF
EXAM 171 129 SF
180 233 SF SF 233 233 SF 233 SF
EXAM EXAM 187 EXAM 187SF 106 EXAM EXAM EXAM 187SF EXAM 106 187106 187SF187 187 106 SF 106 SF 106 SF SF 106
TLT
RECEPTION 155 RECEPTION 154 RECEPTION 154SF 52 SF 217 RECEPTION RECEPTION RECEPTION 154 217 SF RECEPTION 154SF154 154217 154 217 SF 217 SF 217 SF 217 SF
EXAM 171 129 SF
STATION TEAM EXAM STATION 180 TEAM TEAM TEAM STATION 180SF TEAM 176STATION 233 STATION 180STATION 233 SF STATION 129 SF180 233 180SF180
TLT 135 52 SF
TLT TLT 134 135 63 SF 52 SF
182SF 109 EXAM EXAM EXAM 182SF 109 109 182EXAM 182SF182 182SF 109 SF 109 109 SF 109 SF
RECEPTION 154 EXAM 217 SF 176 129 SF
SOIL TLT 185 184 30 SF 47 SF SOIL 185 30 SF
RECEPTION 154 EXAM 217EXAM SF 182 EXAM
EXAM EXAM 189 EXAM 189SF 109 EXAM EXAM EXAM 189SF 109 EXAM 189109 189SF189 189SF 109 SF 109 109 SF 109 SF
PASSAGE C-110 143 SF
PASSAGE RECEIVING RECEIVING 139 C-107 RECEIVING 139SF 118 RECEIVING RECEIVING RECEIVING 139 RECEIVING 210 SF 118 SF SF139 139118 139 139 118 SF 118 118 118 SF SF SF
TEAM STATION 180 233 SF EXAM 187 106 SF
LOBBY LOBBY 101 LOBBY 101SF 1560 LOBBY LOBBY LOBBY 101SF 1560 1011560 101SF101 LOBBY 1560 1560 SF 1560 SF SF 101 1560 SF
LOBBY 101 1560 SF TLT TLT
TEAM STATION 180 233 SF WAITING AND RECEPTION WAITING AND RECEPTION WAITING AND RECEPTION PASSAGE OBSERVATION WAITING WAITING WAITING ANDAND RECEPTION AND RECEPTION RECEPTION WAITING AND RECEPTION ADMIN SUPPORT
A A A A A AA
URGENT CARE
PASSAGE OBSERVATION PASSAGE OBSERVATION C-108 188 PASSAGE OBSERVATION C-108 188SF 171 SF 240 PASSAGE PASSAGE PASSAGE OBSERVATION OBSERVATION OBSERVATION C-108 188SF PASSAGE OBSERVATION 171 SF 240 171 SF SF188 C-108 C-108 C-108 188240 188 C-108 188 171 SF 171 240 240 SF 240 171 SF SF 240 SF SF SF 171 SF
IT 143 39 SF
ADMIN SUPPORT PATIENT SUPPORT
FLOOR PLAN LEVEL 02
CHECK-OUT 153 111 SF 27 2 SF
C:\Revit Local\8721823200 Harrod Millennium Ft Myers_v2022_MOB_maite.bruno1907.rvt C:\Revit C:\Revit C:\Revit C:\Revit Local\8721823200 Local\8721823200 Local\8721823200 Local\8721823200 Harrod Harrod Harrod Harrod Millennium Millennium Millennium Millennium FtFt Myers_v2022_MOB_maite.bruno1907.rvt FtFt Myers_v2022_MOB_maite.bruno1907.rvt Myers_v2022_MOB_maite.bruno1907.rvt Myers_v2022_MOB_maite.bruno1907.rvt C:\Revit Local\8721823200 Local\8721823200 Harrod Harrod Millennium C:\Revit Millennium Ft Ft Myers_v2022_MOB_maite.bruno1907.rvt Myers_v2022_MOB_maite.bruno1907.rvt
A ONON CC RCU RCULAT
COFFEE 152 109 SF STAIR
1/11/2023 9:49:52 AM 1/11/2023 1/11/2023 1/11/2023 1/11/2023 9:49:52 9:49:52 9:49:52 9:49:52 AM AM AM AM 1/11/20239:49:52 9:49:52AM AM 1/11/2023
C:\Revit Local\8721823200 Harrod Millennium Ft Myers_v2022_MOB_maite.bruno1907.rvt C:\Revit Local\8721823200 Harrod Millennium Ft Myers_v2022_MOB_maite.bruno1907.rvt
BASE BU D NG BASE BU LD NG
URGENT URGENT CARE URGENT CARE WAIT URGENT URGENT URGENT CARE WAIT 150 CARE CARE CARE WAIT URGENT 150SF 1373 WAIT WAIT WAIT 150SF CARE 1373 1501373 150SF150 WAIT 13731373 SF SF SF 150 1373 1373 SF
URGENT CARE WAIT 150 1373 SF
140 DISCHARGE 140SF 457 DISCHARGE DISCHARGE DISCHARGE 140 WAIT 457 SF 457 140 140SF140 DISCHARGE 150 457 SF 457 457 SF 140SF 1373 SF 457 SF
DISCHARGE 140 457 SF
PA EN SUPPOR PAT ENT SUPPORT
C
SICK SICK WAIT SICK WAIT 151 SICKWAIT SICK 151SFSICK 144 WAIT WAIT 151 SICK 144 SFWAIT SF151 151144 151 WAIT 144 SF 144 144 SF 151SF 144 SF
SICK WAIT 151 144 SF
PA EN ROOM PAT ENT ROOMS
S A
A.
SHEET GENERAL NOTES NOTES SHEET B. SHEET GENERAL GENERAL NOTES SHEET SHEET SHEET GENERAL GENERAL GENERAL NOTES NOTES NOTE A. PROVIDE C ON TROL JOINTS ON GYPS A. PROVIDE C ON TROL JOINTS ON GYPS C. SPECIFICATIONS AN JOINTS D W HERE SHOW A. SPECIFICATIONS PROVIDE C ON TROL ONSHOW GYPS AN D W HERE SHEET NOTES B. EXTEND W ALLS TO DEC KON ABOVE STO A. A. PROVIDE PROVIDE A.GENERAL PROVIDE C ON TROL ONCTROL ON JOINTS TROL JOINTS ON GYPSUM GYPS ON G SPECIFICATIONS AN D WJOINTS SHOW B. EXTEND WCALLS TO DEC KHERE ABOVE STO
EXAM 215 117 SF
E E E E E E
A102
SH
KEY PLAN
MEDS 224 39 SF
SHARED CONTROL
MRI 115 MRI 118 MRI 202 SF 118 MRI MRI516 MRISF 118 516 SFMRI 118 118516 118SF118 516 516SFSF 516 SF 516 SF
KEY PLAN PLAN KEY KEY PLAN KEY PLAN KEY KEY KEY PLAN PLAN PLAN
SHARED CONTROL 115 202 SF
117 63 SF
ANTE 117 63 SF
MRI 118 516 SF
EQUIP 119 123 SF
NOT FOR CONSTRU 19 Results Beyond Architecture NOT FOR CONSTRUC KE NOT NOT NOT FOR FOR FOR CONSTRUC CONSTRU CONSTRU OFFICE 126SOILED 89 SF127 82 SF
SOILED 127 82 SF
EQUIP 119 123 SF
5 5 5 5 5 5 5
MRI 118 516 SF
6
6 6 6 6 6 6
7
7 7 7 7 7
OV PR
SE CA
, CO LISTIC ORDINA HO TE E D ID
93% CLINICIANS RANKED CLINICAL CARE MODEL AS BETTER THAN PRIOR PLACES OF EMPLOYMENT
20
ASC / Outpatient Centers
NO HO
R MIN
D-BODY-S
PIR I
T
100% RANKED LCI AESTHETICS BETTER THAN PRIOR PLACES OF EMPLOYMENT
First cancer network in the world to earn the top distinction in patient-centered care. Best at putting patients first.
LEVINE CANCER INSTITUTE EXPANSION Charlotte, NC 260,000 sf The Levine Cancer Institute, the first multi-site cancer center in the world to be certified by the Planetree Organization, has a mission of providing a comforting experience for patients, families, and caregivers as they journey toward healing. Patient experience workshops, facilitated in collaboration with the Patient/Family Advisory Council, informed the design’s guiding principles of celebrating interaction, supporting the journey, providing holistic care, and honoring mind/body/spirit. These principles are embodied in the numerous experience elements found throughout, namely the interfaith chapel, centralized lab/registration area, improved dining facilities, infusion bays with vegetative roof views, and extensive natural light.
Results Beyond Architecture
21
AT R I U M H E A LT H: L E V I N E CHILDREN’S MCP OUTPATIENT S P E C I A LT Y C E N T E R Charlotte, NC 150,000 sf In January of 2019, Little began partnering with Atrium Health to develop a 10-15 year Master Facility Plan to co-locate and expand the existing Levine Children’s Specialty clinics. This outpatient center provides a central multi-specialty pediatric facility on Atrium’s main campus, providing a “one stop shop” for patients who currently visit a number of decentralized locations. In addition, the focus of medical services for children has shifted from general pediatrics to multi-specialty care pediatrics. Patients with complex illnesses require care from a care team rather and a single physician. This single healthcare destination provides an improved patient/family experience and the opportunity to recruit the best staff and physicians.
22
ASC / Outpatient Centers
Results Beyond Architecture
23
LE VINE CHILDREN’S MCP OUTPATIENT S P E C I A LT Y C E N T E R : T H E H E A R T E S T YA R D C ONGENI TA L HE A R T CEN T ER Charlotte, NC 25,000 sf The Pediatric Cardiac Center at Atrium Health is setting a new standard for multi-disciplinary outpatient care. A critical component to the overall facility is the Heartest Yard Congenital Center, made possible by Greg Olsen, former Tight End for the Carolina Panthers, through Receptions of Research: The Greg Olsen Foundation. With central goals of enhancing patient/family experience, increasing staff efficiency, and enhancing multi-disciplinary sub-specialty care, the design team developed an internal on stage / off stage concept, with emphasis on positive distraction, wayfinding and natural light. The clinic includes 25 exam rooms housed in three neighborhood clinic modules.
24
ASC / Outpatient Centers
Results Beyond Architecture
25
26
ASC / Outpatient Centers
L E V I N E C H I L D R E N’ S M C P O U T PAT I E N T S P E C I A LT Y CENTER: LEVEL 3 & 4 Charlotte, NC L3: Preceded by the successful design and opening of the first phase (The HEARTest Yard) of the Levine Children’s Outpatient Specialty Center Master Plan, Levels 3 and 4 brings the same goals of enhancing the customer experience, increasing staff efficiency, and enhance multi-disciplinary sub-specialty care to each floor. Similarly to Level 5, Level 3 and 4 use themed graphics for playful distractions and way finding. Level 3 incorporates the “city” theme into it’s graphics throughout. The Cancer and Blood Disorder Clinic, which consists of 18 exam rooms, 25 private infusion rooms, 1 infusionarium, lab, and pharmacies. Level 4’s use of organic curving walls complements the theme of mountains, forest, and lakes creating a calming atmosphere for patients, families, and staff. Three clinical neighborhoods consisting of 33 exam rooms and 2 therapy gyms support Surgery, Urology, Plastics, OB-GYN, Neurology, Epilepsy and NICU Follow Up. The main corridors on Level 4 are placed along the window walls to elevate patient and family experience through the use of natural light.
Results Beyond Architecture
27
28
ASC / Outpatient Centers
C A R N E G I E D E V E L O P M E N T: H E A LT H C A R E C L I N I C Fredericksburg, VA 456,000 sf Veterans Affairs Outpatient Clinic is expected to be one of the largest privately-owned VA medical centers in the country. Located near Interstate 95 on a carefully crafted 48-acre site, the new stateof-the-art facility focuses on elevating the quality of life and productivity of veterans while also protecting the health, safety and welfare of veterans, visitors and staff. Surrounded by a healing garden and veterans memorial, the building is inspired by the old town of Fredericksburg, VA, acting as a neighborhood or village and creating a sense of comfort, familiarity and welcomeness.
Results Beyond Architecture
29
30
ASC / Outpatient Centers
A D V E N T H E A LT H: H E A LT H PA R K AT PA R T I N S E T T L E M E N T Orlando, FL 36,417 sf This design for a new regional Health Park redefines the traditional medical office environment and patient experience. A rich sequence of shared and social spaces achieve AdventHeath’s goal of promoting a strong sense of community and patient interaction. Places of collaboration, comfort, and contemplative solitude are created through thoughtful spaces and control of light. With this unique focus on wellness, as opposed to a traditional medical planning with a clinical tenant, the paradigm of sterile and often uninviting medical clinics shifts by introducing experiential and programmatic elements throughout the patient’s journey. This promotes better interactions with caregivers, transforming an otherwise often anxious moment, into a calmer, more beneficial one.
Results Beyond Architecture
31
A D V E N T H E A LT H: H E A LT H PA R K AT C L E R M O N T Clermont, NC 36,000 sf AdventHealth Health Park at Clermont is the second of a prototypical series that redefines the traditional medical office building and customer experience at the traditional medical office building. The architectural and interior design promotes WELLNESS and client branding while inviting the community to engage into its rich variety of program. Its visitors are welcomed first by a furnished exterior patio and then greeted by a desk-less concierge at the lobby. While they wait, a local branded coffee shop is at its service along with a comfortable “Living Room” area on Level 1 and 2, which are connected by an alluring communicating stair, encouraging one to venture on foot rather than using the elevator. The ground floor also hosts a conference room, which is shared with the community. Patient services include primary care, specimen lab, as well as specialty care such as, cardiology, physical therapy, imaging services, sleep studies, ultrasound, and urodynamics.
32
ASC / Outpatient Centers
Results Beyond Architecture
33
H O A G : P I C K U P FA M I LY N E U R O S C I E N C E C E N T E R Newport Beach, CA 61,000 sf Building on Hoag Memorial Hospital Presbyterian’s legacy of excellence, innovation, and compassionate care, this renovation reimagines the Conference Center Building into a state-of-the-art home for the Pickup Family Neurosciences Center and Center for Brain Health. Designed under OSHPD-3 outpatient clinic standards, the project transforms 61,000 square feet to advance neurological and psychiatric care within a setting that embodies calm, comfort, and renewal. Guided by a “Coastal Retreat” design concept, the interiors draw inspiration from the natural beauty of the Southern California coast—featuring soft tones, organic textures, and a sense of connection to light and nature—to foster healing and serenity for patients and staff alike.
34
ASC / Outpatient Centers
Results Beyond Architecture
35
36
ASC / Outpatient Centers
CHARLESTON CANCER CENTER Las Vegas, NV 57,000 sf This project, for a confidential Fortune 10 healthcare client, is a 57,000 sf clinic renovation featuring Medical Oncology, Radiation Oncology, Surgical Oncology, a Breast Center, General Imaging, a 26-chair infusion clinic, and a 1,125 sf USP 800 Pharmacy. The Radiation Oncology area contains both a large-bore CT Simulator as well as a PET/CT while a future LINAC vault is planned to integrate seamlessly into the building. The project also utilized LEAN design principles for increased operational efficiency and patient satisfaction.
Results Beyond Architecture
37
LEVINE CANCER INSTITUTE – PINEVILLE Pineville, NC 56,000 sf LCI Pineville, a satellite pharmacy for the Levine Cancer Institute, incorporates both functional programming and brand elements for radiation oncology, medical and surgical oncology and clinical trials administration along with its infusion services. The project aimed to relocate an existing 9-chair, 600 sf pharmacy into a new medical office building, and expand to approximately 61,350 sf in order to support up to 40 infusion chairs as the program continues to grow. The pharmacy includes a threehood chemo clean room and two-hood non chemo clean room, with workroom for 12, ante room, meds pickup, bulk storage and dedicated electrical room. A hands-free functionality for intercom, doors and phone systems, pass-thru windows and pass-thru refrigerators offer efficiency and convenience for staff while visually delineated PPE zones help reinforce operational USP 800 protocols.
38
ASC / Outpatient Centers
Results Beyond Architecture
39
LEVINE CANCER INSTITUTE – HUNTERSVILLE OUTPATIENT CLINIC Huntersville, NC 20,915 sf LCI Huntersville, a satellite pharmacy for the Levine Cancer Institute, was designed to support up to 12 infusion chairs. It also includes a three-hood chemo clean room and two-hood non chemo clean room, with workroom for 12, ante room, meds pickup, bulk storage and a dedicated electrical room. A hands-free functionality for intercom, doors and phone systems, pass-thru windows and pass-thru refrigerators offer efficiency and convenience for staff while visually delineated PPE zones help reinforce operational USP 800 protocols.
40
ASC / Outpatient Centers
Results Beyond Architecture
41
42
ASC / Outpatient Centers
G O O DY E A R C O M M U N I T Y H E A LT H C E N T E R Goodyear, AZ 5,872 sf The first in a series of community center projects, this prototype combines a preventative care clinic and a community center for local insurance members to gather, exercise and participate in recreational classes ranging from nutrition to Zumba. The design features four exam rooms for preventative care such as blood pressure screenings, an exercise room with weights, cardio equipment and strength training, a Living Room for meetings and a multipurpose room for both classes and meetings.
Results Beyond Architecture
43
HEMET NAMM DENOVO C O M M U N I T Y H E A LT H CLINIC Hemet , CA 19,587 sf Our client requested a new Primary Care / Community Center hybrid clinc. The purpose of the clinic was to create a space for preventive care while dually serving the community as a place to meet, play games, exercise, and take classes, such as yoga, cooking, and dancing. This clinic was designed as on stage / off stage and includes an on stage x-ray, 15 exam rooms, a procedure room, with a 3:1 provider ratio, and a 2:1 mid level ratio.
44
ASC / Outpatient Centers
Results Beyond Architecture
45
2
40
AMERICAN C OLLEG E OF HE ALTHCARE AR CHITECTS MEMBERS
Y E A R S O F H E A LT H CA R E E X P E R I E NCE
2 0 25 BUILDIN G DE SIG N + C ON STRUC TION OU TPATIEN T FACILIT Y R ANKIN G
MO DE R N H E A LT H CA R E R A NKI NG 2 024
6
MODERN HE ALTHCARE R AN KIN G 2025
16
25
35 H E A LT H CA R E A R CH I T E CT S & DE S I G NE R S
NUMBER OF EMPLOYEES
PRACTICES
440
+
LEED & WELL ACCREDITED PROFESSIONALS
114 LEED & WELL PROJECTS
115
+
Certified or Pursuing Certification
OFFICE LOCATIONS
CHARLESTON, SC CHARLOTTE, NC DURHAM, NC NEWPORT BEACH, CA ORLANDO, FL WASHINGTON, DC
COMMUNITY
RETAIL
• Civic • Justice • Schools • Higher Education
• Food • Service • Store Design • Multi-Use & Adaptive Reuse
HEALTHCARE
WORKPLACE
• Acute Care • Specialty Centers • Medical Office Buildings & Clinics
• Office • Interiors • Mixed-Use • Critical Facilities • Science & Technology
SERVICES
ARCHITECTURE
SITE DESIGN
• Design • Construction Administration • Project Execution & Program Management • Quality Assurance
• Landscape Architecture • Civil Engineering • Land & Master Planning • Urban Design • Site Development / Entitlements Consulting
INTERIOR ARCHITECTURE • Interior Design • Programming • Space Planning • Occupancy Strategy • Change Management BRAND EXPERIENCE • Branding & Marketing • Branded Environments • Signage & Wayfinding ENGINEERING • Structural Engineering • Mechanical Engineering • Electrical Engineering • Lighting Design • Low Voltage Engineering PLANNING • Master Planning • Feasibility / Yield Studies • Development Strategy
SMART BUILDING TECHNOLOGIES • IWMS Implementation & Support • IoT Sensor Deployment & Integration • Workplace / Tenant Experience Apps • Building Analytics & Operational Insights SUSTAINABILITY • Sustainability Consulting • Certification Management • Building Performance Optimization • Energy Modeling • Daylight Modeling • Embodied Carbon Analysis • Life Cycle Analysis • Life Cycle Cost Analysis • Corporate & Building Feasibility Studies VISUAL IMPACT • Cinematic Storytelling • Immersive Experiences • Virtual Placemaking
www.littleonline.com