COORDINATING CULTURES NEW CHAMPLAIN BRIDGE MONTREAL QUEBEC CANADA
Guillem Collell i Mundet M.Sc. Civil Engineer - IDEAM Project Manager NBSL Bridge Design Coordinator & QA Surveillance www.dobooku.com coFounder, partner & collaborator
P3 PROJECT
DESIGN & BUILD
INTERNATIONAL
COORDINATION
CANADA
AESTHETICS & ENVIROMENT
PERSONAL APPROACH
CULTURE
4.0
http://www.newchamplain.ca A NEW BRIDGE IN MONTREAL, QUÉBEC DESIGNED FOR QUALITY, BUILT TO LAST DESIGNED FOR PUBLIC TRANSPORT MEETING THE HIGHTEST STANDARDS OPEN TO CYCLISTS AND PEDESTRIANS THAT RESPECTS THE COMMUNITY CHANGING MONTREAL’S SKYLINE
https://youtu.be/YlLfob0ouJ4
SAMUEL CHAMPLAIN (1567-1635) "The Father of New France� French navigator, cartographer, draftsman, soldier, explorer, geographer, ethnologist, diplomat, and chronicler. He founded Quebec City on July 3, 1608. He drafted an accurate map of the coast.
CONCEPT DESIGN ARUP + DISSING & WEITLING+ ROY ASSOCIÉS ARCHITECTES + GROUPE SM • USA: The Champlain Bridge is used by up to 60 million vehicles per year and is one of the busiest vehicle crossings in Canada, vital to the economy of both Quebec and Canada. • CITY: The New Champlain Bridge will replace the existing Champlain Bridge and connect the Island of Montreal with the South Shore through complex highway junctions and smaller bridges including a new Ile des Soeurs bridge. • TRANPORT: The design accommodates future public transport plans by retaining the flexibility of running buses or a light rail train on a central transit corridor. • LANDSCAPE: A unique signature bridge design, sensitive to the needs of Montreal and with the appeal to become a new icon for the St. Lawrence River, Montreal, and Canada as a whole. • LENGTH: The architectural features of the new 3 km long bridge have been developed alongside rigorously defined technical criteria that will achieve a 125-year design life. • VIEWS: Connectivity between the South Shore and Montreal is further enhanced by a multiple-use path over the bridge and by viewing platforms both on and near the bridge that will showcase views of the city and the Saint Lawrence River. • FORM: The curved alignment and sculptural piers create an instantly recognizable shore-to-shore design with the elegant main tower and its harp of cables adding a unique accent to the bridge. • P3: The team has also contributed to a new procurement approach with Canada as this will be the first time that a Canadian public private-partnership procurement will include a definition design for a bridge which ensures that the architectural vision is realized in the finished product while leaving the freedom of innovation to the short listed consortia bidding to design, construct, and operate the new bridge.
P3 PROJECT A Public-Private Partnership (PPP, 3P or P3) is a cooperative arrangement between two or more public and private sectors, typically of a long-term nature. Governments have used such a mix of public and private endeavors throughout history. However, the past few decades have seen a clear trend towards governments across the glove making greater use of various P3 arrangements. There is no consensus about how to define a P3. Infraestructure P3 as a phenomenon can be understood at five different levels: • • • • •
Particular project or activity. Form of project delivery. Statement of government policy. Tool of government. Wider cultural phenomenon.
Common themes of P3 are the sharing of risk and the development of innovative, long-term relationships between public and private sectors. The use of private finance is another key dimension of many P3. A P3 typically involves a private financing, constructing, or managing a project in return for a promised stream of payments directly from government or indirectly from users over the projected life of the project or some other specified period of time.
PROJECT AGREEMENT
CANADA
Signature on the Saint Lawrence Group was chosen to carry out the design, construction, financing, operations, maintenance and rehabilitation of the New Champlain Bridge Corridor Project. This initiative is being conducted under a public-private partnership agreement with the Government of Canada
SSLG
Signature on the Saint Lawrence Group is comprised of: SNC-Lavalin + ACS + HOCHTIEF
SSLC
The Group has given the responsibility of the design and construction of the New Champlain Bridge Corridor Project to the Design and Construction Group comprised of: SNC-Lavalin + Dragados Canada + Flatiron Constructors Canada + EBC Inc.
EJV
Within the Design and Construction Group, there are two design teams, one responsible for the new Champlain Bridge, the other one for the highway portion of the project. Bridge Design Team: SNC-Lavalin + TY Lin International + International Bridge Technologies Highway Design Team: SNC-Lavalin + MMM Group Following the completion of the construction of the new Champlain Bridge and its accesses, Signature on the Saint Lawrence Group will operate, maintain and rehabilitate the new bridge for a period of 30 years.
VIGO OFF SITE STEEL FABRICATION CSB SUPERSTRUCTURE 37 PIER CAPS
VITORIA
SEVILLE
OFF SIDE – SEVILLE PIER CAP FABRICATION – MEGUSA http://sevilla.abc.es/sevilla/sevi-piezas-nuevomegapuente-canada-cruzan-atlantico-tras-salir-desdepuerto-sevilla-201704262155_noticia.html BRIDGE FABRICATION – TECADE https://youtu.be/f9UgM6N0_Ao LOADING MANOUVER – PONTEM https://youtu.be/RsUpGYLjs5I
ON SITE - MONTREAL RIVER FOUNDATIONS – JULY 2016 https://youtu.be/2g5S9Av-nSM THE MAIN PYLON– NOVEMBER 2016 https://youtu.be/yYQg6ewfRB4 PIER CAP INSTALLATION – OCTOBER 2017 https://youtu.be/PvAWQc7LnUU DRIVE THROUGH– JANUARY 2018
https://youtu.be/C-WOCY_cmTc
MERCI – THANKS TO IDEAM & BEJV (TYLI, IBT, SNC LAVALIN), TO SSLC (SNC LAVALIN, DRAGADOS, FLATIRON), TO STEEL FABRICATORS (TECADE/PONTEM, MEGUSA, DIZMAR), TO DOBOOKU & CAMINS.CAT, TO MONTREAL & SEVILLE, GREAT CITIES.
OPEN DEBATE #ChamplainCamins