Skip to main content

Part II Application Portfolio (Extended)

Page 1

N O P H I L L D A M A N I YA RIBA Part 2 - Architectural Portfolio CV and selected Projects


N O P H I L L . D A M A N I Y A . Part II Architectural Designer 9th June 1995 DEWSBURY, WAKEFIELD 07494431366 n.damaniya1@gmail.com nmd9695

E D U C AT I O N UNIVERSITY OF GREENWICH, (LONDON) MArch Architecture (Part 2) 2019 - 2021 NEWCASTLE UNIVERSITY, (NEWCASTLE) BA Architecture (Part 1) 2015 - 2018 KIRKLEES COLLEGE, (DEWSBURY) Foundation diploma in ART&DESIGN 2014 - 2015 WOODKIRK ACADEMY, (WAKEFIELD) - A LEVELS / GCSE’s A Levels - A, Distinction, C 8 GCSE’s 2009 - 2013

ABOUT From an early age, I have shown a creative passion for designing and building structures of any form. As a child, I would assemble and design famous architecture using any material available. I found the challenge of making the structures durable intriguing. Ensuring that readily available materials were only used was imperative and this philosophy has stood by me. This nurtured me to become detail oriented and focused. Architecture education has encouraged me to design proposals that consider cultural and social issues of the users. This cultivated desire to improve the local area and enhance the lives of the residents. I am fond of proposals that are delicate to their local context and involve the collaboration of immediate businesses. My approach to architecture focuses on designing the urban environment through process of analysing the areas qualities, layers, and historical past. From this, unique elements can be formed.

WORK EXPERIENCE ORBIT ARCHITECTS | LONDON (3 MONTHS) Part 1 Architectural designer (May ‘19 - August ‘19) Work profile - Concept Design, Design Development, Planning applications and Specification. Worked on various projects based in central london. BRIFFA PHILLIPS ARCHITECTS | ST ALBANS (6 MONTHS) Part 1 Architectural designer (December ‘18 - April ‘19) Work profile - Concept Design, Design Development, Planning

applications and Specification - Oak Farm, Maldon. Essex. (Change of Use) - Grimston Road. St Albans (Rear Extension) - Lower Dagnall Street. St Albans (Rear Extension) - Packhorse Place, Dunstable. Bedfordshire. (New Built) - Mayflower Road, Kensworth. (New Built) - Holywell Hill, St Albans. Grade 2 Listed (Refurbish/develop) FOX’s BISCUITS | BATLEY Production Operative • Packing and labelling biscuits • Ensuring that health and safety standards are met always • Maintaining housekeeping standards • Carrying out general duties around the factory as and when required TASTE OF INDIA | DEWSBURY Catering volunteer at a family food trading business.

REFERENCES Mike Aling Senior Lecturer - MArch programme leader. University of Greenwich. m.aling@greenwich.ac.uk 10 Stockwell St, London SE10 9BD Ifigeneia Liangi and Daniel Wilkinson Design tutors - MArch Architecture year two. University of Greenwich. ifigeneia.liangi.10@ucl.ac.uk d.wilkinson.12@ucl.ac.uk 10 Stockwell St, London SE10 9BD

S O F T WA R E AutoCad Rhino SketchUp Pro - VRay Gravity Sketch (VR) DIAlux Adobe Photoshop Adobe InDesign Adobe Illustrator Microsoft suit

LANGUAGES English Gujarati Hindi/Urdu

INTERESTS Gaming Virtual Reality Sketching Photography Bodybuilding Cycling


ARCT1063 - Design Realisation Report

Nophill M Damaniya

C O N T E N T S SECTION i3

01 - MArch - FREEMIUM ISLAND (Y5)

02 - MArch - MENTAL HEALTH CLINIC (Y4)

03 - MArch - DESIGN REALISATION (Y4)

Section : AA

SECTION 1.04 - SITE LOCATION - SURROUNDING CONTEXT

C

Section : BB

B

C

A CC

A

B AA

29

Nophill Damaniya- UNIT 13 | 45

04 - YEAR OUT PROJECTS

05 - BA - NCL ISLAMIC CENTRE (Y3)

06 - BA - DWELLING PLUS (Y2)

Inhabit

ISOMETRIC RENDERED IMAGE

07 - BA - EXPLORING EXPERIENCE (Y2)

62

Section : CC

BB

These section show the context building height of the adjacent building surrounding the site as well as the facade detail. The red dashed line is where my proposed design will sit, as there could be a problem with the height of the buidling theres a possiblity of digging and having few spaces below ground level. All the drawing are to a diagramatic scale.

= Site = Building height Building A:13m Building B: 18m Building C: 22m A: Office/Mixed use B: Residential C: Office

7


Gunkanjima i(Hashima) The iIsland iof iShips

1.0

FREEMIUM ISLAND - THESIS PROJECT GUNKENJIMA - JAPAN University of Greenwich - MArch YEAR 2

Gunkanjima i(Hashima) An iIsland iLeft ito iRot

This project focuses on the discipline of video games and the design methods used to create a virtual world for its users. After analysing different level design methods, a Utopian world is recreated on an abandoned island in Japan. Hashima Island, better known as Gunkanjima (battleship) island was a coal mining site used by the Japanese government in the late 18th to early 19th century. The island has a rich history which includes the first ever concrete building to be erected in Japan, slavery, and human trafficking. The use of the island changes over time from being joyful place where communities lived together to Vietnamese and Chinese prisoners being enslaved to forced labour. Looking at the same concept of mining (gold farming) in video games such as World of Warcraft I decided to keep the mining history of the island alive. As opposed to late 19th century, people will willing migrate in this Utopian world where they will make a living by generating digital currency by playing video games. Political and financial side of the video game industry is also examined to create a society where play is the new work.

At ithe iend iof ithe i19th icentury iFukahori isold ithe iisland ito iMitsubishi, iwhich iwas ia ishipping ienterprise iat ithe itime. iThe inew iowner ibuilt idwelling ihouses ifor iworkers iand imade ifortifications, iwhich ihad ithe iisland ilooking isimilar ito ia ibattleship igliding ion ithe iwaves. i i

Nophill Damaniya- UNIT 13 | 22

Hashima Island - The abondoned site 4

RIBA Part II Portfolio | Nophill Damaniya Nophill Damaniya- UNIT 13 | 27


Site iPlan 1887 i- i1974

HASHIMA iISLAND

JAPAN

KYUSHU

I

H

A

E

J

160m

G B

F C

D

480m i

Legend: i iA i- iPool i iB i- iMine iresidences iand ioffice i(power igenerator) iC i- iMining iarea iD i- iSchools i(rooftop ialotment) i

i iE i- iHospital i iF i- iSports iground i(shooting irange) iG i- iShrine i iH i- iNikkyu iflats (minho) i

i

i iI i- iCinema i(camilla) iJ i- iLight ihouse i iK i- iDolphine ipier

Site Plan of Hashima Island from 1887 -1974 RIBA Part II Portfolio | Nophill Damaniya

Nophill Damaniya- UNIT 13 | 23

5


Social iHierarchy iand iHousing iArrangement

Flat ifor isubcontracted iworkers. i iFirst iever iconcrete ibuilding iconstructed iin iJapan, iblock iof i30 iconsisting ian iinner icourtyard iand ishopping icentre iat ithe ibasement. i

Swimming ipool ifor iHashima iinhabitants i Fixed iconveyor ibelt ifor icoal transfer

i

Coal icar irepair iplant

Mine idirector iand ihis ifamily. i i iThe ionly iprivate iresidence iof iwooden iconstruction ion ithe iisland. iA ihouse ilocated isymbolically iat ithe isummit iof iGunkanjima’s ioriginal irock. i

Post ioffice ilocated iin imixed iused iresidential iblock i31. i iPublic iphone iis ilocated iin ithe ipost ioffice ito icontact ithe ioutside iworld.

Daily imarket i ievery imorning i i08:00 i- i12:00

Weekend imarket i ispace

Coal imining iarea i iInstitutional i i Recreation i i iCoal iminer’s iaccomodation i iCompany idirector’s ihouse i iCompany iofficer’s iaccomodation i iShrine iand itemple i i iOpen ipublic ispaces i i

Passenger i& isupply ipier. i i iMitsubishi iminers, iworkers iand itheir ifamilies iarrived ito iHashima iisland ion ithis ipier. iThe

population ireached ia ipeak iof i5,259 iin

i

1969, iclaiming ithe imost idensely ipopulated iplace iin ithe iworld. i i iFood, ifresh iwater iand iclothing iwere itransported ifrom iNagasaki ito iHashima iisland ion ia idaily ibasis. iHowever, iwhen ityphoon ihits ithe iarea, ithere icould ibe ia ishortage iof isupply ifor ifew idays. i i

Coal iexport ipier. i i iHashima icoal iexports reached iup ito i410,000 itons iin

i

1941. iExtracted icoal iwas itransferred towards ithis ipier ialong ithe iconveyor ibelt ibefore ibeing iexported ito ithe icompany iowned isteel ifactory, inationally iand iinternationally. i i

i

Company iflats ifor iminers iand ifamily. i i Each iapartment iconsisted iof isingle i6 itatami-mat iroom iand ia ibalcony ias ian iextension iof ithe ihousehold. iBathroom ikitchen ifacilities iare ishared iamongst iseveral ifamilies iand ilocated ioutside ithe iflat.

i

Company iflats ifor iminers. i iEach iapartment iconsisted iof isingle i6 itatami-mat iroom. iWith iwindow iand idoor. iMore ilike ia imonks icell ithan ian iapartment ibut istill ia imajor iimprovements iover iprevious iliving iquarters. i

Nophill Damaniya- UNIT 13 | 24

Social Hierarchy and Housing Arrangement of Hashima Island RIBA Part II Portfolio | Nophill Damaniya

6


Coal imining isequence

Coal imining itools i& iequipement. Axe i iPickaxe i iMining ispade iWater iproof ijacket i iMining iboots iWaterproof ilong itrouser i iCoal imining i& ihealth ieffects i iLoss iof iintelactual icapacity iprimarily ithrough imercury. iReduces iIQ iscores iand icause ilifelong iloss iof iintelegence. i i iHeart iattacks iand itissue ideaths idue ito ioxygen ideprivation, ileading ito ipermanent iheart idamage. i i iAsthma, iung idiseases, iblack ilung ifrom icoal idust iand ilung icancer. iii

At iHashima, iMitsubishi ilaunced ia iproject ito itap ithe icoal iresources iunder ithe isea ibottom, isuccessfully i

sinking ia i199 i- imeter

- ilong iverticle ishaft iin 1895 iand istill ianother ishaft iin i1898. iWith ithe imine irei

i

aching ito i1000 im ibelow

i i

sea ilevel. i i iHashima iwas

producing iabout i150, i000

tons iof icoal iannually

i

and iit’s ipopulation isoared ito iover i3,000 iwhen, iin i1961 iHashima’s icoal iproduction

i

i

reached ia ipeak iof i410,

000 itons iin i1941. i

i

Firgure: iA

Section itaken ifrom iFigure iA i

00:00

01:00

02:00

02:00 i- i05:00

Registeration ifor inew ishift. i i

Entering imine ishaft.

Descending iinto iunderground imine.

Coal iextraction. i

05:00 i- i06:00

07:00

Transter iof iextracted icoal ito main ishaft

Transter iof iunderground icoal ito iground isurface.

i

Miners iidentity iis iregistered at ithe ientrance ibefore ientering ithe imine. iIt irecords iwork ihours ifor isalary ipayment. i i

Entering ifrom ifloor ilevel i0m ito -1000m iunderground ifor imine iextraction. i

i

Nophill Damaniya- UNIT 13 | 25

Coal mining sequence

RIBA Part II Portfolio | Nophill Damaniya

7


Merging iBarcelona iwith iFreemium iIsland

Merging theNophill plan of BarcelonaUNIT with13Freemium Island Damaniya| 36 RIBA Part II Portfolio | Nophill Damaniya

8


FREEMIUM iISLAND

Working idrawings

Working idrawings

Nophill Damaniya- UNIT 13 | 39

Developing the “Blocks” of Freemium Island Nophill Damaniya- UNIT 13 | 38

RIBA Part II Portfolio | Nophill Damaniya

9


FREEMIUM iISLAND Working idrawings

FREEMIUM iISLAND Working idrawings

FREEMIUM iISLAND Working idrawings

FREEMIUM iISLAND Working idrawings FREEMIUM iISLAND Working idrawings

Nophill Damaniya- UNIT 13 | 42

Nophill Damaniya- UNIT 13 | 38

Nophill Damaniya- UNIT 13 | 43 Nophill Damaniya- UNIT 13 | 41

RIBA Part II Portfolio | Nophill Damaniya

Nophill Damaniya- UNIT 13 | 40

Developing the “Blocks” of Freemium Island 10


SECTION i3

Nophill Damaniya- UNIT 13 | 46

Nophill Damaniya- UNIT 13 | 45

Freemium Island - Isometric view RIBA Part II Portfolio | Nophill Damaniya

11


Nophill Damaniya- UNIT 13 | 48

Nophill Damaniya- UNIT 13 | 49

Nophill Damaniya- UNIT 13 | 50

Renders of the Utopian Island RIBA Part II Portfolio | Nophill Damaniya

12


Nophill Damaniya- UNIT 13 | 52

Nophill Damaniya- UNIT 13 | 53

Nophill Damaniya- UNIT 13 | 51

Nophill Damaniya- UNIT 13 | 55

Renders of the Utopian Island RIBA Part II Portfolio | Nophill Damaniya

13


2.0

MENTAL HEALTH CLINIC - DESIGN PROJECT Smiths’ Wharf - London University of Greenwich - MArch YEAR 1

Smiths’ Wharf Site Plan - London RIBA Part II Portfolio | Nophill Damaniya

14


01

02

03

04

06

01

02

04

03 06

SIte pictures and readings RIBA Part II Portfolio | Nophill Damaniya

15


Initial project development RIBA Part II Portfolio | Nophill Damaniya

16


ISOMETRIC EXTERNAL RENDER - SHOWING THE ADJACENT BUILDING

Initial vs Final Projects RIBA Part II Portfolio | Nophill Damaniya

17


Floor Plans RIBA Part II Portfolio | Nophill Damaniya

18


SECTION AA - 1:150 @ A2 Long Section showing the existing context RIBA Part II Portfolio | Nophill Damaniya

19


EXTERNAL RENDERING - SHOWING ENTRANCE FROM NEW PIER

EXTERNAL RENDERING - SHOWING MAIN ENTRANCE FROM UPPER THAMES STREET

EXTERNAL RENDERING - SHOWING THE NARROW QUEENHITHE STREET

ELEVATION SHOWING THE FACADE AND THE HEIGHT OF THE PROPOSED BUIDLING

Final project renders and elevation RIBA Part II Portfolio | Nophill Damaniya

20


A

3.0

MENTAL HEALTH CLINIC - DESIGN REALISATION B

RIBA Part II Portfolio | Nophill Damaniya

Smiths’ Wharf - London University of Greenwich - MArch

21


Section : AA

C

Section : BB

B

C

A CC

A

B AA

Section : CC

BB

These section show the context building height of the adjacent building surrounding the site as well as the facade detail. The red dashed line is where my proposed design will sit, as there could be a problem with the height of the buidling theres a possiblity of digging and having few spaces below ground level. All the drawing are to a diagramatic scale.

= Site = Building height Building A:13m Building B: 18m Building C: 22m A: Office/Mixed use B: Residential C: Office

Site location and surrounding context RIBA Part II Portfolio | Nophill Damaniya

22


ARCT1063 - Design Realisation Report

ARCT1063 - Design Realisation Report

Nophill M Damaniya

SECTION 2.04 - SITE CONSTRAINTS

SECTION 2.05 - SUN PATH ANALYSIS

ARCT1063 - Design Realisation Report

Nophill M Damaniya

ARCT1063 - Design Realisation Report

SECTION 2.07- LISTED BUILDING AND CONSERVATION AREA

SECTION 2.06 - WIND ANALYSIS

One of the biggest site contraint is that part of the site is in River Thames which is also a Schedule Monumental site. To build lat: 51.5102472 lon: -0.0953186

Nophill M Damaniya

Figure on the left shows my design intentions which will be a combination of architectural and therapy spaces. Identifying sites spatial atmosphere is important when designing a space as it will determine how much daylight and artificial light will be needed to sufficiently lit the spaces within.

The diagram shows the highest percent of prevailing will be coming from south west of Queenhithe.

Conserva An area o importanc changes.

The orientation of the proposed development will be in line with the prevailing wind direction, therefore the wind will be a key site force for the design. The site is also located on the riverfront which means the tides will increase the wind speed on the site.

Intial observation: From the model on the left we can see the south of the site will be well lit during the day as it will get direct southern light, however, the north of the site will need artificial lighting and its surrouded by buildings roughly 20 meters in height.

As you ca area so I d to get a pl

An advantage of the prevailing on site will be that the building will be naturally ventilated in summer, however it will be extremely cold in winter due to the site being next to the river.

The close a Grade O tal Site. M which men to develop

In terms of design, strong materials such as concrete or steel will be needed for the structure of the building to withstands the force of the prevailing wind on site.

Risk/Cons I will have would just do so mig

Grade Site for new development

Grade

Direction of solar gains Summer Solstice path

Grade

Winter Solstice path

Site

Year round path

Queen

Contextual shields ARCT1063 - Design Realisation Report

SECTION 2.08 - SITE GEOLOGY

ARCT1063 - Design Realisation Report

Nophill M Damaniya

SECTION 2.09 - HYDROLOGY STUDY

15

Another Site force to consider is the geology of the chosen site. This will help decide on the type of foundation to use for the buidling. The geology of my chosen site is primarily ALLUVIUM: CLAY & SLIT

Summer sun ARCT1063 - Design Realisation Report Winter sun

Site for new development

Nophill M Damaniya

SECTION 2.10 - TRANSPORT ON SITE

ARCT1063 - Design Realisation Report

One the biggest drawback when is comes to developing in London is the flood risk. With river thames running across the City of London, flood risk levels are very high and precautions has to be taken when designing in these areas.

4

Provide excellent view of Shakespeare globe on the south side of the river, inviting more people and making them aware that mental health matters.

Bedrock Clay

1 - Uppe north of on this s

Closest travel options from the chosen site: 3

2/3 - Th Trinity L

2 - Underground Route Mansion House 0.2 miles - 5 mins walk. Circle and District line - towards, Edgware Road, Liverpool Street - Barking, Ealing Broadway, Richmond, Tower Hill, Upminster, Wimbledon

Con: As the site is in Flood Zone 3 it might be difficult to get planning permission for the site.

1 Pro: The river could be used as a source of energy to generate power of the building which would reduce the carbon footprint of the proposed building.

17

1 - Bus Route Queen Street Place 0.1 miles - 3 mins walk. 344 towards Clapham Junction

As you can see in the flood map, my site is located on the bank of river Thames, which is in Flood Zone 3. The site cur2 rently has flood defense walls which protects the city of london form floods when the tide levels are high.

A new flood defense barrier will have to be installed to stop the flood or even consider having some spaces below ground level.

Sched

SECTION 2.11 - SITE ACCESS

16

Bow L

Nophill M Damaniya

Border of prevailing wind

3

4 - The Street P

2

5 - Sout south si spots ar tients an

1

3 - Railway Route Cannon Street 0.3 miles - 6 mins walk. Southeastern railway

6 - Boat can get nium br

7

4 - DLR Route Bank 0.5 miles - 5 mins walk. towrads Lewisham and Woolwich Arsenal.

7 - At th ends at I want to Southw School students

4

8

6

8 - This design. site whi Thames

City of

Superficial Deposits

6

5

Site

Hollow filled with Superficial Deposits Silt ALLUVIUM: Clay and Slit Sand and Gravel

High Tide

19

Low Tide

20

21

Site research and analysis RIBA Part II Portfolio | Nophill Damaniya

23


ARCT1063 - Design Realisation Report

Nophill M Damaniya

SECTION 3.03 - THE LOCAL PLAN - AWARENESS OF POLICIES - POLICY MAP A

ARCT1063 - Design Realisation Report

KEY

Administrative Boundary of the City of London Historic Environment Conservation Areas

Policy No.

SECTION 3.12 - PROCUREMENT - UNDERSTANDING PROCUREMENT S11 - HE1

Tower of London World Heritage Site - Local Settings Area

S11 & S13 HE3

Procurement in property development is a fairly straight London View Management Framework - Protected Vista Landmark & S13 forwardS12concept, but one Viewing Corridors which needs a bit of thought London View Management Framework - Protected Vista Wider Set- planning S12 & S13 way ahead and ting Consultation Areas of placing a contract with a St Paul’s Heights Policy Area S12 & S13 builder. The procurement Monument Views and Setting S12 & S13 method must be decided London City Airport Safeguarding S12 Area upon at an early stage of a London Heathrow Airport SafeprojectS12 as this will help the guarding Area entire development process and create a solid place to start from.

Quality

Tall Buildings and Protected Views

ARCT1063 - Design Realisation Report

SECTION 3.04 - THE LOCAL PLAN - AWARENESS OF POLICIES - POLICY MAP B

There are different routes Nophill M Damaniya Chosen site to procurement in property Policies that apply to my site development. The choice of your procurement method Policy No. will be vital to the success 27 S17 Thames Policy Area of your project, therefore S17 Thames Tideway/Tunnel Safeguarding Area making an informed choice S17 Riverside Walkway is the key to making a profit Vehicular Transport and Servicing from your project. Crossrail Safeguarding Area

S9

Bank Station / Northern Line Upgrade Safeguarding Area

S9

London Access

S9

City Access

S9

TRADITIONAL Cost

OS3

Site of Borough Importance for Nature Conservation

OS3

Site of Local Importance for Nature Conservation

OS3

Pro:

Circular Economy and Waste

Quality – full design pre tender

•

•

Design flexibility – variations & instructions

Time – Fast track, ov and construction

•

•

Specialist subcontractors – Named specialist update to standard building contract sbc11

Cost – lump sum / Gu mum price

•

Single point of respon tractor design and bu

•

Design control – through the architect / contract administrator

•

Has good price certa

•

Contractor’s Designed Portion – such as mechanical and electrical engineering

•

Novation – can bene

•

Low risk for the client

•

Variations can be acc

Cost – there may be lump sum cost benefits unless are multiple changes made

S5 RE1

Principle Shopping Centre

HS7

Retail

Cons: •

Quality – cheapest ro contract specification quality products/ build

Cons:

S15 CR2

Safeguarded Wharf

Pro:

•

•

Climate Resilience and Flood Risk City Flood Risk Area

DESIGN&BU Time Cost

Open Spaces and Green Infrastructure Site of Metropolitan Importance for Nature Conservation

Quality

•

Time – require full detailed pack pre tender

•

Design flexibility – re es will have cost/time

•

Cost – not a benefit if many changes made post tender

•

Contractor carries ris

•

Incomplete drawings – lead to delay, costs and claims of negligence

•

Client exposed to cla ity

•

Design could affect th the project

28

Awareness of the site policies and the final procurement method RIBA Part II Portfolio | Nophill Damaniya

24


01 - Steel frame for timber CLT structure 02 - Glue-Lam main girder

01

03 - Corten steel grating 04 - Glue-Lam beam 05 - Vertical timber support 04

06 - Corten steel angle lateral bracing 07 - Corten steel grating opening 08 - Standing seam metal roof 09 - intergrated LED linear lighting system

08

10 - IG Unit with laminated skylight 11 - Shelving units

10

[ Detail C ]

12 - Storage units

[ Detail D ]

05

13 - Raised floor utility cavity 14 - Decking with drainage cavity below

03

09

15 - 5 Ply CLT base panel

09 17

16 - Rolling and Locking track for modules

06 07

17 - 3 Ply CLT wall structural panel 18 - CLT electrical chase 19 - Sloped rigid foam

11

20 - Raised floor support system 21 - Notched plumbing chase 22 - HVAC Ductwork

18

PRODUCED BY AN AUTODESK STUDENT VERSION

12

[ Detail A ]

14

22

21

13

20 15

16

19 [ Detail B ] 16

Cross section detail drawing RIBA Part II Portfolio | Nophill Damaniya

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

02

25


SNOW/RAIN

WIND

WEIGHT OF BUILDING

LOAD CARRIED VERTICALLY THROUGH STRUCTURE

VERTICAL LIVE LOAD

LOAD CARRIED HORIZONTALLY THROUGH STRUCTURE

DEAD LOAD

LIVE LOAD - FURNITURE/EQUIPMENT/OCCUPANTS

LATERAL LOAD

Structure and load stratergy RIBA Part II Portfolio | Nophill Damaniya

26


Exist 1 Exist 2

Public Private

MEP , ventilation, fire and accessibility stratergy RIBA Part II Portfolio | Nophill Damaniya

27


4.0

YEAR OUT IN PRACTICE PROJECTS Resident Project - Grimston Road, St Albans. Oak Farm - Woodham Walter. Resident Project - Lower Dagnall Street, St Albans. BRIFFA PHILLIPS ARCHITECTS - St Albans

RIBA Part II Portfolio | Nophill Damaniya

28


Grimston road existing and proposed elevation - submitted for planning approval RIBA Part II Portfolio | Nophill Damaniya

29


Grimston road existing and proposed plans with isometric drawing - submitted for planning approval RIBA Part II Portfolio | Nophill Damaniya

30


105

Oak farm project plans and elevations - submitted for planning approval RIBA Part II Portfolio | Nophill Damaniya

31


PRELIMINARY

3D VIEWS

Lower dagnall street elevations RIBA Part II Portfolio | Nophill Damaniya

SK104

B

32


FIRST

3

PRELIMINARY

A

Lower dagnall street plans and renders - Sketchup Pro RIBA Part II Portfolio | Nophill Damaniya

33


5.0

ENCLOSED ORDER - GRADUATION PROJECT Ouse St, Byker, Newcastle upon Tyne NE1 2PF Newcastle University - BA Architecture YEAR 3

The Protagonist with young apprentice

The ritual of Salah (Prayer)

16

18

Muslims Apprentice Photomontage.

Muslims Apprentice Photomontage.

Photo montage and project vision for the new Islamic Community Centre in Ouseburn Valley, Newcastle. RIBA Part II Portfolio | Nophill Damaniya

34


CELL DEVELOPMENT

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT DESIGN DEVELOPMENT

3 3 Design development 2. Here I have tried to separate each block Design development for male and female 2. Here separation withing the I have tried to separate each block building. for male and female separation withing the building.

Changing the exiting river bank to suit the developed design Changing the exiting river bank to suit the developed design

52 52

4

This was my final developed design at the end realisation phase. Here I have separated each activity happening in the building with different block. This design uses the same structure as my precedent. The Masjid is located in the centre of the site with two minarets which help locate the site from a distance. The male and female living, eating and praying spaces are seperated and each one having its own entrance to the building.

23

53

Initial project development and sketches - individual cells and site formation RIBA Part II Portfolio | Nophill Damaniya

35


2 3 4 22 1

15 5

31

14 16 6

21

17

14

34

Z 21 10

18 20

9

33

34

19 7

35

11

8

x

32

20 13

12

24 30

28 25 27

23

58

26

29

26

59

FInal design floor plan for the Islamic community centre - showing the living, praying and working area of the building. RIBA Part II Portfolio | Nophill Damaniya

36


Final design sections - showing the site gradient and the surrounding context RIBA Part II Portfolio | Nophill Damaniya

37


Living (Protagonist and the apprentice), Praying (Salah) and Working (Rug making). RIBA Part II Portfolio | Nophill Damaniya

38


Rear (private) and front (public) entrances renders RIBA Part II Portfolio | Nophill Damaniya

39


Internal Render of the Female Praying Space.

55

Internal renders/sketches for the male/female praying spaces RIBA Part II Portfolio | Nophill Damaniya

40


6.0

DWELLING PLUS - LEITH 2026

Leith, Edinburgh. Mitchell St, Leith, Edinburgh EH6 7BD Newcastle University - BA Architecture YEAR 2 - SEM 1 DESIGN PROJECT

䔀氀攀瘀愀琀椀漀渀 漀昀 琀栀攀 漀昀 戀甀椀氀搀椀渀最⸀

Draft plans showing the design

Final 1:100 model

Dwelling Plus - co-living student project. Plans and final design model RIBA Part II Portfolio | Nophill Damaniya

41


21 EXTERNAL AND INTERNAL WALL DETAIL SHOWING CONSTRUCTION TYPE AND MATERIALS

BRICK

HARDWOOD

CONCRETE BLOCK

WOOL INSULATION

TIMBER CLADDING

bit CHIPBOARD

HARDWOOD

TIMER FLOOR

INSULATION

CONCRETE

ISOMETRIC RENDERED IMAGE

Dwelling Plus - wall detail and exploded isometric model RIBA Part II Portfolio | Nophill Damaniya

42


27

33 EXTERNAL V-RAY RENDERED IMAGE 2

EXTERNAL V-RAY RENDERED IMAGE 1 EXTERNAL SITE MONTAGE SHOWING CIRCULATION WITHIN THE SITE

VRAY RENDERED IMAGES SHOWING SITE WITH PROPOSED DESIGN 26

Renders and photomontage for the final design RIBA Part II Portfolio | Nophill Damaniya

43


55

7.0

EXPLORING EXPERIENCE

Photo montage showing site study

Berwick - upon - Tweed Ness St, Berwick-upon-Tweed TD15 1HY Newcastle University - BA Architecture YEAR 2 - SEM 2 DESIGN PROJECT

54

Exploring experience - creating a work/live environment for the famous glass sculpture Dave Chihuly. RIBA Part II Portfolio | Nophill Damaniya

44


61

61

60 Final design plans - showing the work, live and exhibition space within the building RIBA Part II Portfolio | Nophill Damaniya

45


63 63

Perspective section south Perspective section south

Perspective section north Perspective section north

62 62 RIBA Part II Portfolio | Nophill Damaniya

Final design sections with the existing site context 46


act Study.

a Savings Bank / Alberto Campo Baeza

he tectonic of Caja Granada Savings bank, focuseriality and the structure of the building. The most ment I found of the building was the varied sizes d the use of concrete colums. the central atrium s open to sun by skylight which inverst the gaze ng offices to open space within. From this point uctural elements - the strong lines of the ceiling are supported by the might concrete columns and le walls of stone is moving. Here the architect tries reconciliation of cleanliness, order, complexity ructural honestly. Minimalism, perhaps, but with a

ocusmost es um RIBA Part II Portfolio | Nophill Damaniya aze int

21

Concrete structural model (Year Three) and Concrete, timber and glass structural model (Year Four) 47


N O P H I L L D A M A N I YA RIBA Part 2 - Architectural Portfolio


Turn static files into dynamic content formats.

Create a flipbook
Part II Application Portfolio (Extended) by n.damaniya1 - Issuu