Skip to main content

D'Marco Williams' Portfolio

Page 1

D’MARCO WILLIAMS Born and raised in Saint Louis, MO, I am a 5th year Architectural Design student in the 6 year B.A. - M.Arch Program at the University of Kansas. This portfolio is a collection of my recent design projects inspired by site context, research and concepts.


D’MARCO WILLIAMS CONTACTS Lawrence, KS ddwill@ku.edu (314) 216 0009

EDUCATION 2019 - Present

The University of Kansas, School of Architecture & Design (M. Architecture)

2015 - 2019

The University of Kansas, School of Architecture & Design (B.A. Architectural Studies)

WORK EXPERIENCE 05/2017 - 05/2019

Senior Success Coach Adidas Leadership Scholars Program Train peer mentors to best advise their assigned cohorts Facilitate programs/workshops designed for the students Develop schedules

03/2016 - Present

Residential Desk Assistant The University of Kansas Student Housing Document Management Customer Service Communication throughout several departments


INVOLVEMENT 08/2019 - Present

American Institute of Architecture Students National Member

03/2017 - Present

Alpha Phi Alpha Fraternity, Inc.

09/2017 - Present

Big XII Council on Black Student Government

08/2019 - Present

National Organization of Minority Architecture Students

Chapter President Delegate

General Member

STUDY ABROAD 12/2018 - 01/2019

The University of Kansas, School of Architecture & Design Winter Break - Asia Singapore, Singapore Kuala Lumpur, Malaysia Tokyo, Japan

SKILLS COMPUTER SKILLS design/drafting 3d modeling rendering graphic editing microsoft office

SketchUP, Rhino, Revit, AutoCAD SketchUP, Rhino, Revit VRay, Lumion Illustrator, InDesign, Photoshop Word, Powerpoint, Excel

REFERENCES Michael Swann KU School of Architecture & Design - Associate Dean mmswann@ku.edu 785.864.3180 Paola Sanguinetti KU School of Architecture & Design - Professor paolas@ku.edu 785.864.3862


CONTENT


WELLNESS

01 SUMMER 2019 STUDIO 602

LANDSCAPE

02 FALL 2019 STUDIO 600

RESIDENTIAL

DESIGN-BUILD

03

04

FALL 2019 STUDIO 608

FALL 2018 STUDIO 509


INTRODUCTION STUDIO 602. SUMMER 2019 PROFESSOR PROJECT SCALE STATUS CONTEXT PROGRAMS

01

In this project, the objective was to design a

Jae Chang Wellness Center 20,450 sq. ft. Student project Individual work Urban Revit, Lumion, Photoshop, Illustrator

Key Design Considerations:

Wellness Center in the Downtown Lawrence, KS. The site is located on the corner of Massa-

Inspired by the urban environment, my design

chussetts Street and 11th Street.

enhances pedestrian-frieldly activity into what can be considered the ‘gateway’ into downtown

The focus on this project was to promote active

Lawrence. With two historic landmarks’ green

and health-conscious lifestyles and self- care.

spaces nearby, the Courthouse Yard and the

Although located in a busy area, the ambiance

Japanese Friendship Garden north of Watkins

of the place is to be active yet relaxing. The

museum serve as importance sites that deter-

relationship between each of the spaces in my

mine my center’s form and function.

design is a response to this focus.


HOW CAN I CREATE A BALANCE BETWEEN PRIVATE (QUIET) AND PUBLIC (NOISY) AREAS? HOW TO IMPROVE THE USER’S WELLNESS WITH NEARBY URBAN GREEN SPACES ?


SITE


CONCEPT Main Curculation

Maintain Urban Edge

Access/Views to Nearby Green Spaces

Gateway to Downtown Lawrence, KS

01


FLOOR PLANS PLAN | second level

PLAN | main level

PLAN | basement level


RENDERS

01


RENDERS LOBBY

GARDEN


SECTION - DETAIL METAL FINISH PLYWOOD VAPOR AIR BARRIER INSULATION METAL DECK CONCRETE SLAB CARPET FINISH

PARAPET FLASHING WATER CONTROL MEMBRANE 4” BRICK CLADDING AIR 3” RIGID INSULATION AIR INFULTRADED BARRIER 3/4” PLYWOOD SHEATHING INSULATION VAPOR BARRIER

DETAIL A

EPDM FINISH BACKER ROD METAL FINISH VAPOR MEMBRANE PLYWOOD SHEATHING VENEER LUMBER STRUCTURAL BEAM INSULATION STRUCTURAL BEAM

4” BRICK CLADDING AIR 3” RIGID INSULATION AIR INFULTRADED BARRIER 3/4” PLYWOOD SHEATHING INSULATION VAPOR BARRIER PAVEMENT GRAVEL

INSULATION AIR CONTROL MEMBRANE CONCRETE SLAB METAL DECK

SEALANT 4” BRICK CLADDING AIR 3” RIGID INSULATION AIR INFULTRADED BARRIER 3/4” PLYWOOD SHEATHING INSULATION VAPOR BARRIER

DETAIL B

WALL SECTION

DETAIL C

01 1” RUBBER FINISH 5” CONCRETE SLAB METAL DECK


INTRODUCTION STUDIO 600. FALL 2019 PROFESSOR PROJECT LOCATION STATUS CONTEXT PROGRAMS

Josh Erhart Landscape Redevelopment Jayhawker Towers Apartments Student Project Individual Work University, Residence SketchUP, Revit, Lumion, Photoshop, Illustrator

02

Revit, Lumion, Photoshop, Illustrator

In this project, the objective was to chose an

Three main entrance points into the courtyard, which are poorly designed and inaccessible.

underdeveloped site to repurpose with lanscape design. My site chosen was the Jayhawker Towers Courtyard. The site is located on 1603 W 15th St on the campus of the University of Kansas. There are 5 building that form the courtyard: Towers A, B, C, D, & E.

The current layout of the courtyard mimics the jagged edges from the towers. a large portion of the site is prosed for on emergency parking and the other portion for a private residence garden.


HOW CAN I INTEGRATE MOBILITY AND ACCESSIBLILTY INTO THE SITE? HOW TO BETTER THE INTERACTION WITHIN THE CURRENT SPACES?


ANALYSIS

CIRCULATION

GRADING (FT)


02

SITE

E B

C

A D


SECTION

A

B

E

C

AMPHITHEATER GARDEN

D


02

RENDERS

11

1 2 3 4 5

-

2

Amphitheater Central Access Overview Residence Garden Tower E Access

3

44

5


INTRODUCTION STUDIO 608. FALL 2019 PROFESSOR PROJECT

Steve Padget Large-scale; Mixed-use housing

SCALE

118,019 sq. ft.

STATUS

Student Project Individual Work

CONTEXT PROGRAMS

03

The objective of this studio was to design a low-

Urban SketchUP, Revit, Lumion, Photoshop, Illustrator

Key Design Considerations:

rise high-density housing community located at the end of 6th Street and Massachussetts

Sustainable design principles were studied to

Street in Downtown Lawrence, KS.

influence the overall structure, building service, and construction (wall assembly and materiali-

The focus of this project was to use site context and coding as inspiration for design. With the knowledge of the related building codes of the urban location, specific heights, fire safety, accessible, etc. needed to be properply represented.

ty).


HOW TO PRESERVE AND SHARE EXISTING RESOURSES? HOW TO MAXIMIZE SUSTAINABLILITY ? HOW TO CONNECT THE SITE TO DOWNTOWN LAWRENCE?


SITE


03

ANALYSIS

FUNCTION

CIRCULATION

BUILDING HEIGHT (FT)


RENDERS


FLOOR PLANS

03 PLAN | fourth level

PLAN | third level

PLAN | main level


INTRODUCTION STUDIO 509. FALL 2018 PROFESSOR PROJECT SCALE STATUS KEY ROLE CLIENT

04

ENGINEERING CONSULTANT ARCHITECTURE STUDENTS

In this architectural based design-build studio,

Paola Sanguinetti Information Pavilion 225 sq. ft. Built Collaborative Lead Presenter Project Lead The University of Kansas Enivronmental Studies Program Thorton Tomasetti - KC Zack Braun, James Bibens, Max Gendler, Bethany Hurd, Griffin Katzenmeier, Andrew Klenke, Van Lian, Ayla Mellott, Tiarra Norwood, Connor O’Quinn, Tommy O’Shea, Renaldo Rivera, Noah Wing

Key Design Considerations:

twelve other students and I were assigned a task to construct an information pavilion at the

The concept for the design of the information

Prairie Acre Restoration site on campus.

pavilion was determined by the ribbon-like form of the seating. The pavilion needed to mimic the

The previous Arch 509 studio completed phase

form as well as allow the best access and viewa

I of the outdoor classroom. The classroom was

from either side of the site.

designed and built for public use and to serve as an alternate class room for Envirornmental Studies Courses.


HOW TO CREATE NATURAL RELATIONSHIP BETWEEN THE PAVILION & SEATING? HOW CAN THE CAN PHASE II IMPROVE BOTH THE SITE’S ACCESSIBLILTY AND VISIBILITY?


3DSITE VIEWS


04

APPLICATION

OBJECTIVE

To Build an information pavilion with donor wall To pave phases I & II of the Prairie Acre Restoration site

FORM A structure that can mimic phase I ribbon seating PLAN Design Concept & Considerations

FUNCTION Opening up the pavilion to allow access to outdoor classroom TIME Structure must be durable and requires low maintenance ECONOMY Choosing materials that are cost efficient

Begin Schematic Design Process

Design Approved

SCHEDULE Client Meeting

Conrete Poured

Construction Docs. approved by Engineers

Begin Pavilion Construction

Construction Complete


PHOTOS


04

1

2

Although assigned different tasks throughout the design process, each student worked together during the construction process. 1 2 3 4 5

-

Setting wood roof beams Installing wall frames Part I of II concrete pours Excavating for gravel & concrete pour Concrete post troweling/leveling

3

4

5


Turn static files into dynamic content formats.

Create a flipbook
D'Marco Williams' Portfolio by DmarcoWill - Issuu