1 minute read

Proposed Infrastructure Improvements

Next Article
Option 2

Option 2

DEEP ELLUM DALLAS SERVICE CENTER

Proposed Infrastructure Improvements

DEEP ELLUM FOUNDATION

ANTICIPATED INFRASTRUCTURE IMPROVEMENTS AFFECTING DEEP ELLUM CITY SERVICE CENTER

• 2030s - “Trenching” I-30 from Good Latimer to Dolphin Road. Fundraising to cap a portion of I-30 with a deck park. • 2020s - Extending the Santa Fe Trail into trailhead into Ellum. • 2020s - Constructing an additional Deep Ellum DART rail station east of the Baylor University Medical Center station. • 2020s - Consult with Oncor, Atmos to determine. Power distribution could be 2-3% of construction cost.

ADDITIONAL NOTES

1. D2 Subway alignment does not directly affect this site, and therefore, is not addressed. 2. Be mindful of pedestrian scale massing on the Deep Ellum side of the property (i.e. four stories), or concentrate taller office buildings on the “highway side” of the property. Consider the City’s thoughts on retaining control of the land/ office buildings as landlords, vs control via ground lease, vs. control via zoning/incentives.

This article is from: