Skip to main content

20 Suffolk Road- Drawings for the Party Wall Surveyor

Page 1

20 Suffolk Road, Harrow, HA2 7QQ Stage 6- Building Regulations

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Title Sheet - 20 Suffolk

Road Stage 6- Buliding Regulations

Scale :

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


New Wall Demolition Plan

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Title Sheet - New Wall

Demolition Plan

Scale :

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6A

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Living

Porch

Demolished Chimney

Kitchen

Hallway

Garage

DEMOLITION SYMBOL LEGEND Wall Types Tag- See drawing for Wall Types

Dashed line indicates Walls and Windows to be demolished

2

Ground Floor New Wall and Demolition Plan 1 : 25

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Ground Floor New Wall &

Demolition Plan

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6A-01-6102

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Bedroom 2 Bedroom 3

1

LPW-6C-01-6146

Hallway

Bedroom 1

Bathroom

1

LPW-6C-01-6145

DEMOLITION SYMBOL LEGEND Wall Types Tag- See drawing for Wall Types

Dashed line indicates Walls and Windows to be demolished

1

First Floor New Wall and Demolition Plan 1 : 25

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : First Floor New Wall &

Demolition Plan

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6A-01-6103

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

LPW-6C-01-6147

1

LPW-6C-01-6146

No Brickwork Should be Visible on other Partition Wall Please make Insulated Wall

ETS.II-061

INW-14

INW-14 INW-14

IW-12

Demolish Existing Wall & Chimney Wall 2

LPW-6A-01-6104

1

ST-DR-P2-XX-412

Bedroom INW-11

1

LPW-6C-01-6144

Demolish Existing Roof & Gutter and replace with new Roof & Gutter

ETS.II-065

Bathroom

INW-11

INW-11 INW-11

INW-11

INW-11

Storage

ETS.II-065

1

ST-DR-P2-XX-411

ETS.II-065

1

Demolish Existing Roof & Gutter and replace with new roof

1

Loft Floor New walls and Demolition plan 1 : 25

Dashed line indicates Walls and Windows to be demolished 2

Retain Chimney Wall

Wall Types Tag- See drawing for Wall Types

ST-DR-P2-XX-410

2157

DEMOLITION SYMBOL LEGEND

Roof

Demolish Chimney Wall

7350

1753

LPW-6C-01-6145

IW-12

Demolition Plan

5440

2

1 : 25

HA2 7QQ

Drawing : Loft Floor New Wall &

Loft

Chimney Retention Section

Project : 20 Suffolk Road, Harrow,

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6A-01-6104

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

LPW-6C-01-6147

1

LPW-6C-01-6146

1

LPW-6C-01-6144

1

2

1

LPW-6C-01-6145

LPW-6A-01-6104

ST-DR-P2-XX-412

1

ST-DR-P2-XX-411

DEMOLITION SYMBOL LEGEND Wall Types Tag- See drawing for Wall Types

Dashed line indicates Walls and Windows to be demolished

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

1

Roof Floor New walls and Demolition plan

Drawing : Roof Floor New walls and

1 : 25

Demolition plan

2

ST-DR-P2-XX-410

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6A-01-6105

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Setting-Out Sheets- Plan, Sections & Elevations

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Title Sheet- Setting-Out

Sheets- Plan, Sections & Elevations

Scale :

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Living Kitchen

LEGEND

Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings Double/Triple Trimmers As shown in the Drawings

Hallway Porch

Roof Slope Direction in Decimal Degree

Hallway

Direction of Beam & Block Floor

VFS(Vertical Fire Stop) UP

Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

Garage

SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details

No Change to Plan

Window Type & Number- See Window Schedule for futher details Roof Tag

1t

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Setting-Out Plans- Proposed

Ground Floor Plan

Note: Front and back watering taps to be agreed by contractor with client. Contractor to agree suitable spot for car charging point in the fornt with client

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6122

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Bedroom 2 Bedroom 3

LEGEND

Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings Double/Triple Trimmers As shown in the Drawings

Hallway

Roof Slope Direction in Decimal Degree 13

UP

Direction of Beam & Block Floor DN

1

12

Bedroom 1

11

2

Bathroom

9 8

7

6

3 4

10

VFS(Vertical Fire Stop)

5

Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details Roof Tag

1t

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Setting-Out Plans- Proposed

First Floor Plan

Note: Front and back watering taps to be agreed by contractor with client. Contractor to agree suitable spot for car charging point in the fornt with client

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6123

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


0x

80

x8

0x

80

Neighbours Dormer

x8

8086 INW-14

113

1291

73

1500 653

1645

A

1291

5943 3003

INW-14

LEGEND

Existing Lintel/Beam Retain

IW-12

113

1351

700

76 24

808

100

2885

B

EDL.03 Type EDC

ETS.II-065

1

271

830

3900

830

850

36°

3066

W2.21 Stair Void Type WE

4

271

ETS.II-065

183

271

2018

100 mmø SWP

ST-DR-P2-XX-411

275

590

2880

1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

1639

2885

100

Notes:

1525

2705

100

1460

808 2018

5923

VFS(Vertical Fire Stop)

Stair Void

2185

1210 IW-12

800

1460

113

Direction of Beam & Block Floor

790

790

Stair Void

790

1425

1

NC-6C-YY-6161

113

113

100

710

Storage

963

Stair Void

Roof Slope Direction in Decimal Degree

INW-11

670

388

Stair Void

100

INW-11

1403 2501

1219

ETS.II-065

INW-11

Stair Void

INW-11

ID2.23 Type IDE

100 503

100 mmø SWP

1918

Bathroom

1918

40 mmø SWP

Double/Triple Trimmers As shown in the Drawings

1018

520

975

2834

ID2.21 Type IDB

Rafter Direction & Size As shown in the Drawings

271 5449

100 INW-11

INW-11

Joist Direction & Size As shown in the Drawings

2

3704

ID2.24 Type IDC

NC-6C-YY-6160

1525

EDL.04 Type EDC

Bedroom

Existing Joist Direction & Size Retain

2

2235

ID2.25 Type IDD

2848

1000

1

ST-DR-P2-XX-412

5939

NC-6A-01-6103

5440

FL-TM-02A

792

73

830

1673

3003

433

767

266

113

73

ETS.II-061

204

73

0 1560

ETS.II-061

300

1560

Lead finish to return Dormer cheek next to boundary

4 8 C HS S

3 8 C HS S

No Brickwork Should be Visible on other Partition Wall Please make Insulated Wall

1

NC-6C-YY-6163

1

NC-6C-YY-6162

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

8086

SYMBOL LEGEND

x8 80 0x 1 8 C HS S

1216

2827

964

Denotes Span of block on beam floor at ground floor level.

RF 05

3139

Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details

1

NC-6I-YY-6315

Roof Tag

1t

Project : 20 Suffolk Road, Harrow,

2

ST-DR-P2-XX-410

3

1 : 25

2

1

1

Loft floor Setting out plan

HA2 7QQ

Drawing : Setting-Out Plans- Proposed

Loft Floor Plan

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6124

Rev :

1

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

NC-6C-YY-6163

1

NC-6C-YY-6162

0

2x Trimmers

1

NC-6C-YY-6160

A

1006 2

NC-6A-01-6103

1:0

1

1140

ST-DR-P2-XX-412

Existing Joist Direction & Size Retain Existing Lintel/Beam Retain

2

3704

1:40

NC-6C-YY-6160

SW.09 Type SWA

LEGEND

Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings

907

1:0 1:0

5958

Double/Triple Trimmers As shown in the Drawings

RF 05

RF01

Roof Slope Direction in Decimal Degree

780

SW.10 Type SWC

Direction of Beam & Block Floor

27

VFS(Vertical Fire Stop)

B

780

SW.08 Type SWC

4018

Notes:

1639

1318 1

4

ST-DR-P2-XX-411

1

NC-6C-YY-6161

1:0

RF 05

1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details

1

NC-6I-YY-6315

Window Type & Number- See Window Schedule for futher details Roof Tag

1t

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

3

Roof Plan

2

ST-DR-P2-XX-410

1 : 25

2

1

1

Proposed Roof Plan

Drawing : Setting-Out Plans- Proposed

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6125

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


A

B

4

2 LPW-6A-01-6104

3704

1639 RF 05

SW.09 Type SWA

Top of Roof= 8515

SW.10 Type SWC

SW.08 Type SWC Roof 7350 36.1°

0

Top of Roof= 6401

°

36

36 °

Top of Roof= 5643 Top of Roof Edge= 5428

RF 05 36 Top of Roof Edge= 5040 °

Loft 5440 First Floor Ceiling 5160

First Floor 2785 Ground Floor Ceiling 2540

Ground Floor 0

Garden LVL -600

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Setting-Out Elevations-

Proposed Front Elevations

Scale : 1 : 25

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6140

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


4

B

A

0

2 LPW-6A-01-6104

1639

3704

398

RF01

Top of Roof= 8493

528

528

Glass Juliet Balcony

Roof

EDL.03 Type EDC

7350

EDL.04 Type EDC

ETS.II-065

1000

1000

1913

1913

Air Admittance Valve 100 mmø VP

300

238

Top of Roof Edge= 5040 ° 36

213 392

233

240

RF 05

240

Top of Roof= 5643

Loft 5440 First Floor Ceiling 5160

First Floor 2785 Ground Floor Ceiling 2540

Ground Floor 0

Garden LVL

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

-600

Drawing : Setting-Out Elevations-

Proposed Rear Elevations

Scale : 1 : 25

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6141

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


3

3079

Top of Roof Edge= 8593

1.4°

2

964

1

2827

1966

RF01

ETS.II-061

Roof 7350

36

Lead finish to return Dormer cheek next to boundary

.1°

100 mmø VP

RF 05

36

Top of Roof= 6401

Loft

233

Top of Roof Edge= 5428

36°

987

.1°

5440

First Floor Ceiling 5160

First Floor 2785 Ground Floor Ceiling 2540

Ground Floor 0

Garden LVL -600

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Drawing : Setting-Out Elevations-

Proposed LHS Elevations

Scale : 1 : 25

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6142

Rev :

1

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

2

1966

2827

3

964

3079

Top of Roof= 8493

Roof

C SH 1 S8

0x

80

RF 05

SW.10 Type SWC

Top of Roof Edge= 8493

x8

1.4°

RF01

SW.08 Type SWC

ETS.II-065

850 3153

7350

RF 05

.1° 36

Top of Roof Edge= 5428

W2.21 Type WE

Top of Roof= 5643

36 36°

Loft 5440

RF 05

36°

1200

Top of Roof= 6401

° Top of Roof Edge= 5040

First Floor Ceiling 5160

17°

First Floor 2785 Ground Floor Ceiling 2540

Ground Floor 0

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

Garden LVL -600

Drawing : Setting-Out Elevations-

Proposed RHS Elevations

Scale : 1 : 25

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6143

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

1

2

3 1

2

NC-6C-YY-6163

ST-DR-P2-XX-410

Membrane Legend

C SH 2 S8

0x

80

x8

NC-6C-YY-6162

Breather Membrane ( Ext wall, Sloping Roof)

RF01 Top of Roof Edge= 8593

988

15 13

178

409

1165

.1°

36

ETS.II-065

B2.23 / UB203x133x30

Top of Beam= 7176

1100

/ Structural Framing 1

Cavity Membrane ( Lintel)

ETS.II-065

Top of Roof Eaves= 5416 Top of Roof Edge= 5432

5440 First Floor Ceiling

225

25

Waterproof Membrane(Roof, Floor)

Loft

5160

13

285

22

Top of Beam= 5400

285

1925

2666

x8

2666

EDL.04 Type EDC

FL-TM-02A

600 285

80 Bedroom

Vapour Barrier - 1200 Guage( Roof, Walls) Vapour Barrier - 2000 Guage ( Roof, Walls)

240

Top of Roof Edge= 6098

Top of Beam= 5400

0x C SH 4 S8

INW-14

2666

8 0x x8 C SH 3 S8 0

°

.1 36

ID2.25 Type IDD

7350

LPW-6A-01-6104 NC-6A-01-6103

IW-12

Damp Proof Course(Wall)

Roof

2

/ Structural Framing 1

RF 05

Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)

1.4°

Top of Beam= 8295

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

SW.09 Type SWA

BR.30 / UC152x152x30

150 310

Top of Roof= 8515

RF 05 B2.20 / UKC152x152x44

B2.21 / UKC152x152x44

LEGEND

Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings

Red Line indicates Chimney Zone

Rafter Direction & Size As shown in the Drawings

1

Proposed Sections BB

Double/Triple Trimmers As shown in the Drawings

1 : 25

Roof Slope Direction in Decimal Degree Direction of Beam & Block Floor

VFS(Vertical Fire Stop)

Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details

1t

Roof Tag

Drawing : Setting-Out Sections-

Proposed Sections

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6144

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

2

3

Membrane Legend 1 NC-6C-YY-6162

BR.30 / UC152x152x30

1

2

NC-6C-YY-6163

ST-DR-P2-XX-410

Breather Membrane ( Ext wall, Sloping Roof)

RF01

Top of Roof= 8515

13

531

SW.08 Type SWC

Hot Water Tank

988

360 15

Top of Beam= 8295

Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)

Top of Roof Edge= 8493

1.4°

ETS.II-065

Roof

INW-11

1645

IW-12

Bedroom

11

Headroom

2000

B2.20 / UKC152x152x44

6 5 4 3

9 8 7

240

285

19819819819819819819819819819880

12 / 900x100x40 Steel Plate B2.21 / UKC152x152x44

Waterproof Membrane(Roof, Floor)

Top of Roof Edge= 5428

233

22

13

10

Bedroom 1

RF 05 FL-TM-02A

25

13 200

25

Top of Beam= 5400

Cavity Membrane ( Lintel)

Top of Beam= 5400

Storage

Vapour Barrier - 2000 Guage ( Roof, Walls)

1000

1166

36° Top of Roof Edge= 5428

ID2.21 Type IDB

LPW-6F-6230

1925

ID2.23 Type IDE

2135

.1°

3

2666

Boiler 36

Vapour Barrier - 1200 Guage( Roof, Walls)

7350

RF 05

Top of Roof= 6401

Damp Proof Course(Wall)

36

Loft

°

5440 First Floor Ceiling 5160

200 / 300x100x15 Steel Plate

LEGEND

Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings

Hallway

Rafter Direction & Size As shown in the Drawings

594

2 1

Existing Joist Direction & Size Retain

Double/Triple Trimmers As shown in the Drawings

First Floor

Top of Roof Edge= 2555

2785 Ground Floor Ceiling

Roof Slope Direction in Decimal Degree

2540

Direction of Beam & Block Floor

VFS(Vertical Fire Stop)

Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

Ground Floor 0 Top of Foundation= -600

Garden LVL -600

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

SYMBOL LEGEND

1

Denotes Span of block on beam floor at ground floor level.

Proposed Section BB

Wall Types Tag- See drawing for Wall Types

1 : 25

Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details

1t

Roof Tag

Drawing : Setting-Out Sections-

Proposed Sections

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6145

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1 ST-DR-P2-XX-411

1 1

ST-DR-P2-XX-412

NC-6C-YY-6160

0

NC-6C-YY-6160

A

Membrane Legend

2

B

4

2

1

NC-6A-01-6103

NC-6C-YY-6161

RF01

RF 05

Breather Membrane ( Ext wall, Sloping Roof) Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)

Top of Roof= 8593

x8

B2.23 / UB203x133x30

C SH 2 S8

380

0x

80

Damp Proof Course(Wall)

248

Party Wall Top of Beam= 7193

ID2.24 Type IDC

2100

Cavity Membrane ( Lintel)

INW-11

FL-TM-02A

Headroom

240

22

INW-11

2000

240 25

Top of Beam= 5400

ETS.II-065

36

Top of Roof Edge= 5040

486

LEGEND

5160

198198198198198

11

10

B2.22 / UC152x152x30

5440 First Floor Ceiling

1467

13 25

200

B2.26 / UC152x152x30

Loft

°

13

12

Waterproof Membrane(Roof, Floor)

1200

W2.21 Type WE

x8 0x C SH 4 S8 0

Top of Beam= 5400

Vapour Barrier - 2000 Guage ( Roof, Walls)

7350

Bathroom

8

1925

Bedroom

1913

EDL.04 Type EDC

Roof

1201

/ 100x150mm Conc. Padstone INW-14

Vapour Barrier - 1200 Guage( Roof, Walls)

INW-11

9

Existing Joist Direction & Size Retain Existing Lintel/Beam Retain

8

7

Joist Direction & Size As shown in the Drawings

6

Rafter Direction & Size As shown in the Drawings

5

4

2

1

Double/Triple Trimmers As shown in the Drawings

1188

3

Hallway

Roof Slope Direction in Decimal Degree

First Floor

Direction of Beam & Block Floor

2785

VFS(Vertical Fire Stop)

1

Section CC

Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

1 : 25

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Concrete encased around Ground Bearing Steel

Window Type & Number- See Window Schedule for futher details

1t

Roof Tag

Drawing : Setting-Out Sections-

Proposed Sections

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6146

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Membrane Legend 1

1

NC-6I-YY-6315

ST-DR-P2-XX-412

4

B

A

1

2

2

1

NC-6C-YY-6161

NC-6C-YY-6160

NC-6A-01-6103

NC-6C-YY-6160

Breather Membrane ( Ext wall, Sloping Roof)

0

Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)

1 ST-DR-P2-XX-411

RF01

Damp Proof Course(Wall) Vapour Barrier - 1200 Guage( Roof, Walls)

459

Top of Roof Edge= 8564

Vapour Barrier - 2000 Guage ( Roof, Walls)

ETS.II-061 INW-11

ETS.II-065

B2.23 / UB203x133x30

Top of Beam= 7193

Roof

Cavity Membrane ( Lintel)

7350

Waterproof Membrane(Roof, Floor)

C SH 4 S8 0x 8

INW-11

119

INW-11

2666

0x 8

SW.09 Type SWA

25

ID2.25 Type IDD

1 LPW-6F-6232

FL-TM-02A

22

LEGEND

Existing Joist Direction & Size Retain

Loft

285 13

200 25

Bedroom

285

B2.27 / UB203x133x30

1116

1100

Top of Beam= 5400

5440 First Floor Ceiling

Existing Lintel/Beam Retain

5160

Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings Double/Triple Trimmers As shown in the Drawings Roof Slope Direction in Decimal Degree

1

Direction of Beam & Block Floor

Section DD 1 : 25

VFS(Vertical Fire Stop)

Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

Project : 20 Suffolk Road, Harrow,

HA2 7QQ

SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details

1t

Roof Tag

Drawing : Setting-Out Sections-

Proposed Sections

Scale : As indicated

Status : Construction

Date : 09/10/2026

Dwg No : LPW-6C-01-6147

Rev :

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Construction Details

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Title Sheet - Construction

Details

Scale : Date : 09/10/2026

Status : Construction

Rev :

Dwg No : LPW-6F

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


NEIGHBOURING PROPERTY

high performance PIR insulation board fitted between rafters to maintain a 50mm min. air gap over insulation for ventilation purposes & underdrawn with a thicker amount of the same board with taped joints to provide a vapour control layer & air leakage barrier. 25 x 47mm fixing batten between plasterboard & under rafter insulation, lined internally with 12.5mm thick plasterboard & 3mm thick skim coat finish typical thickness between rafters is 25-50mm & underdrawn with 75-90mm - U-value not to exceed 0.18W/m²K

10mm min. air space between back of new internal lining & existing party wall existing roof tiling, battens & roofing felt left in-situ

vertical height of stud wall typically 900-1200mm above finished floor level space behind used for storage accessed via hinged or sliding doors. note:- the stud wall is non-loadbearing unless designed otherwise by a structural engineer

50mm min. clear airgap over rafter insulation ensure top of cavity is fire stopped with a noncombustible board & maintain a continuity of insulation to prevent cold bridging 25mm continuous ventilation provided at eaves level by proprietory soffit or over gutter fascia vent

LOFT CONVERSION 50mm thick glass mineral wool or rock mineral wool slab insulation fitted between 50 x 75mm timber stud partition lining or 50mm metal "I" studs at 600mm max. c/c's for fire & sound purposes - this system will vary dependant on insulation manufacturer chosen studs finished internally with 2 layers of 12.5mm thick plasterboard with joints staggered between layers & all gaps sealed with acoustic sealant, finished internally with 3mm skim coat all to comply with Part E of the current Building Regulations. U-value not to exceed 0.30W /m²K

existing party wall construction - typically 215mm solid brickwork found on older properties with a traditional rafter & purlin roof. Newer properties have cavity party walls but are usually unsuitable for a loft conversion due to having a trussed rafter roof construction.

provide strutting by herringbone, solid or pre-galvanised mild steel as previously detailed

existing first floor ceiling / new second floor construction with stud wall as Details 2 & 3

5mm thick acoustic isolation strip screwed or glued at base of plasterboard for sound deadening purposes

existing first floor ceiling / new second floor construction as previously detailed seal gap between sloping ceiling & floor insulation to roof storage area as a continuation of rafter insulation or in floor space - agree this with your Local Authority Building Control Officer

LC-04

provide strutting by herringbone, solid or pre-galvanised mild steel - 1 row at midspan of floor span between 2.5-4.5m, with 2 rows equally spaced above a 4.5m span

LC-09

Party wall upgrade detail

Drawing note: this is a typical existing party wall upgrade detail showing an insulated wall to meet fire & sound purposes; the detail will vary depending on the construction of the party wall which are typically 215mm solid brickwork in older properties or cavity construction in newer houses. it is essential to make good the mortar pointing on the wall & fit a fire stop barrier at the existing wall / roof junction before fitting the new insulation & plasterboard.

Front Eaves detail - cold roof

Drawing note: this is a "cold" roof situation that is typically used in a loft conversion when the roof tiles are being left insitu. See Detail LC5 for "warm" roof detail that can be used when the roof tiles & roofing felt are being replaced ensure 50mm continuous ventilation is provided at ridge / high level by proprietory ridge vent or tile vents - this maintains cross ventilation throughout the roofspace

A

0 RF01

2x50mm mineral wool insulation

96

150 21

Code 4 Lead Flashing Dress over party wall upstand

13 150

442

12

Waterproofing Membrane

13

10025

25

Plain Tile to match Roof ETS.II-061

7350

Breather membrane Kingspan K116 100mmInsulation between 140mm s/w timber framework

1

Flashing Detail 1 : 10

Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)

ETS.II-065 Tile Faced Timber Wall(U-Value 0.14 W/m2k) External to Internal Finish: - 44 mm Matching Tile - 25X38mm Horizontal Timber Battens over, - 25X38mm Vertical Timber Battens over, - Tyvek Breathable Moisture Barrier Membrane with minimum 300mm overlapping between joints, over, - 15mm External Grade Plywood over Or use 12mm Promat Supalux Non-combustible/Fire-Rate Board where walls are within 1 meter of the boundry wall. over - 50x140mm C16 Tanalized Timber structure filled with 120mm Kigspan K112 insulation between studs over, - Vapour barrier membrane over, - 37.5 mm Kingspan K118 insulated plasterboard skimmed finished. MR Plasterboard in Wet Zone

Vapour Barrier - 1200 Guage( Roof, Walls) Vapour Barrier - 2000 Guage ( Roof, Walls) Cavity Membrane ( Lintel) Waterproof Membrane(Roof, Floor)

Project : 20 Suffolk Road, Harrow, HA2

7QQ

20mm Kingspan K112 Insulated Plaster board

Code 4 Lead Flashing Dress over party wall upstand

Breather Membrane ( Ext wall, Sloping Roof)

Damp Proof Course(Wall)

14 32 183

Vapor Barrier membrane

Membrane Legend

Boundary Line

20

25x38mm vertical Timber batten @ 400mm Centres

RF01- Extension Flat Warm Deck Roof Construction with GRP Waterproofing & 50x150mm Joists (U-Value 0.14 W/m2k) - 5mm Fire Rated Kemrol Water Proofing or White-Knight® Cold Applied Liquid Flat Roofing (Reaction to fire BRoofT4) - over 18mm OSB T&G Board with staggered joints. - over 150mm Celotex XR4000 Thermal Insulation mechanically fixed. Insulation laid 90 degrees to OSB Board Joints below, - over Vappour Barrier (Minimum 1200 Gauge Polythebe) stand over Plywood - over 12mm OSB Board with staggered joints. - over (25mm) reducting height firrings dropping in desired direction - over 50x150mm Tanalised Timber Joist @400 centers filled with 100mm of mineral wool insulation in joists gaps at roof & external wall junction. - over 12.5mm Plasterboard.

Drawing : Loft & Stair Details Metal Soakers

Scale : As indicated Date : 09/10/2026

Status : Construction

Rev :

Dwg No : LPW-6F-6232

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


18-25mm thick external grade timber fascia / upvc fascia fixed to battens screwed to wall and roof silcone mastic seal to window / head plate caulking / mastic seal to ceiling & wall plasterboard junction

LC-17

10 0

typical "warm" pitched roof as show on drawing number LC05

50

50

fascia edging / roofing edge finished with pre-formed galvanised mild steel roofing trim as detailed in your chosen flat roofing membrane / felt manufacturers guidance notes - this will vary slightly between different manufacturers VCL sealed at edge with jointing tape or welt as chosen manufacturers details

0 10

high performance single ply roofing membrane / finish shown fully adhered to top of insulation with hot air welds - this can also be mechanically fixed & the detail will vary between manufacturers, typically with 100-150mm laps

high performance PIR insulation board fitted over the VCL - use a tapered board or construct flat roof with firrings to achieve a 1:80 min. fall to BS 6229: 2018 for single ply membranes or BS 8217: 2005 for bitumen / built-up felt roofing. typical overall thickness is 150mm dependent on the thermal resistance value of the insulation used. U-value not to exceed 0.14W /m²K for new build construction

150 mm

900

single ply roofing membrane to be extended and secured under timber fillet. abutment membrane to extend over timber fillet and secured under lead flashing or suitable non-toxic alternative min. requirement of 150mm above the finished roof level and detail varies depending on manufacturers requirements

18-25mm thick external grade ply decking 500 gauge min. vapour control layer & air leakage barrier nailed or stapled to decking with 100mm min. laps flat roof joists at 400mm max. c/c's - sizing taken from span charts / BS 5268-2: 2002 or calculated by structural engineer if overspanned

typical "warm" flat roof as drawing number LC17 with high performance single ply roofing membrane

12.5mm thick plasterboard internal lining with 3mm thick skim coat finish

Flat roof eaves detail - warm roof

Drawing note: this is a "warm" roof situation which is becoming the most common finish for flat roof extensions, a warm roof has less chance of thermal movement, condensation & cold bridging. please note most flat roofs must be laid to a fall to avoid water pooling, check manufacturers and installers recommendations. the window head is shown with the ceiling running through at the same level - it is also common to have a section of wall above the head to the ceiling level depending on what is the required height, minimum recomended FFL to ceiling height should be 2.3m

LC-18

new flat roof / ceiling joists supported off galvanised mild steel joist hangers or into the web of the steel beam - detail to be designed and agreed by the structural engineer & will vary from project to project

new steel beam built in, blocked-out with timber noggins & bolted thru typically with M10 or M12 diameter bolts at 500mm max. c/c's - dependant on the ceiling level required & the height of the existing ridge, additional timber beams may be required to support the underside of the existing ridge - the beam size & detail must be calculated & designed by structural engineer & will vary from project to project

Dormer - flat roof / ridge abutment Drawing note: this is a single ply roofing membrane flat roof / ridge junction detail that is typical on many domestic loft conversions - there are many variants on this theme & they will vary depending on the height of the existing ridge & the ceiling height required for the project; sometimes the flat roof will come directly off the ridge & may require removal of the ridge board with a new ridge beam, or the new beam will be positioned directly under the existing ridge board each project will be individually designed & calculated by a structural engineer. ensure flashing between the new flat roof & the existing sloping roof has adequate laps to ensure it is watertight & prevents any driving rain from getting into the structure.

Membrane Legend Breather Membrane ( Ext wall, Sloping Roof) Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Damp Proof Course(Wall) Vapour Barrier - 1200 Guage( Roof, Walls) Vapour Barrier - 2000 Guage ( Roof, Walls) Cavity Membrane ( Lintel) Waterproof Membrane(Roof, Floor)

Drawing : Loft & Stair Details

Scale : As indicated Date : 09/10/2026

Status : Construction

Rev :

Dwg No : LPW-6F-6233

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


Proposed Structural Drawings & Calcs Set

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Proposed Structural

Drawings & Calcs Title

Scale : Date : 12/06/2026

Status : Construction

Rev :

Dwg No : ST-DR-

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

4 8 C HS S

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

Masonary Wall

0x 80

3 8 C HS S

x8

External Timber Wall

0x

/ 700x100x30 Steel Plate 2

NC-6C-YY-6163

1

NC-6C-YY-6162

Internal Timber Stud Wall

80 x8

B2.22 / UC152x152x30

/ 900x100x40 Steel Plate

0 433 1

NC-6C-YY-6160

2

2

NC-6A-01-6103

B2.20 / UKC152x152x44

1

ST-DR-P2-XX-412

50x200,C24 @ 400 c/c

NC-6C-YY-6160

A

298

653

B2.21 / UKC152x152x44

767

50x200,C24 @ 400 c/c

3704

Existing lintel or beam to be retain 100x100 Stair Newel post as per Stair case designer's requirements.

B2.26 / UC152x152x30

Existing ceiling joists to be retain

LEGEND

Existing Joist Direction & Size Retain

B

Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings

B2.27 / UB203x133x30

1822

1639

1639

Stair Void

1

ST-DR-P2-XX-411

4

183

140

Direction of Beam & Block Floor

VFS(Vertical Fire Stop)

x8 80 0x 1 8 C HS S

Steel Base Plate

2827

/ 400x225x20 Steel Plate

Notes:

964

3079

Loft floor Strcuctural Showing Below 1 : 25

1

NC-6I-YY-6315

1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

Base Level

Base Offset Top Level

Top Offset

1753 -40 -40 0

787 -364 -364 787

Roof Roof Roof Roof

Mark C2 C4 C3 C1

Type

Column Location Mark

SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8

A-2 A-3(-312) A-2(-767) 2-4

Reference Level

Length 944 1586 1586 2697

Type Comments

Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³

Comments

Roof Roof Loft Loft Loft Loft Loft

Mark

Type

BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30

Cut Length 5423 1500 5808 5693 3534 3534 3098

Volume 0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³

2

ST-DR-P2-XX-410

3

2

1 Proposed Steel Column Schedule

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Proposed Loft Plan Structure

Proposed Steel Beam Schedule

Loft Loft Loft Loft

Roof Slope Direction in Decimal Degree

2x Trimmers

1216

1

Double/Triple Trimmers As shown in the Drawings

/ 300x100x15 Steel Plate

1

NC-6C-YY-6161

/ 550x100x25 Steel Plate

Rafter Direction & Size As shown in the Drawings

Start Level Offset 945 -157 0 0 0 0 0

End Level Offset 945 -157 0 0 0 0 0

Comments

Scale : 1 : 25 Date : 12/06/2026

Status : Construction

Rev :

Dwg No : ST-DR-P2-02-402

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


/ 100x150mm Conc. Padstone

B2.23 / UB203x133x30

1

NC-6C-YY-6163

1

NC-6C-YY-6162

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

TB-01 (Slopping rafters): 2/50x225, C24 bolted together

/ 100x150mm Conc. Padstone

0

2x Trimmers

NC-6C-YY-6160

1

NC-6C-YY-6160

2

A

2

NC-6A-01-6103

BR.30 / UC152x152x30

1

ST-DR-P2-XX-412

50x175,C24 @ 400 c/c

50x150,C24 @ 400 c/c

LEGEND DN

B

Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings

4

1

ST-DR-P2-XX-411

1

NC-6C-YY-6161

Double/Triple Trimmers As shown in the Drawings Roof Slope Direction in Decimal Degree Direction of Beam & Block Floor

VFS(Vertical Fire Stop)

Notes:

2

ST-DR-P2-XX-410

Proposed Steel Beam Schedule 1

NC-6I-YY-6315

1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10

Reference Level

3

2

1

Roof Roof Loft Loft Loft Loft Loft

Mark

Type

BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30

Cut Length 5423 1500 5808 5693 3534 3534 3098

Volume

Start Level Offset

End Level Offset

0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³

945 -157 0 0 0 0 0

945 -157 0 0 0 0 0

Comments

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Proposed Roof Plan

Structure

Proposed Steel Column Schedule

1

Roof Plan Showing Structures Below 1 : 25

Base Level Loft Loft Loft Loft

Base Offset Top Level

Top Offset

1753 -40 -40 0

787 -364 -364 787

Roof Roof Roof Roof

Mark C2 C4 C3 C1

Type

Column Location Mark

SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8

A-2 A-3(-312) A-2(-767) 2-4

Length 944 1586 1586 2697

Type Comments

Scale : 1 : 25 Date : 12/06/2026 Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³

Comments

Status : Construction

Rev :

Dwg No : ST-DR-P2-RL-403

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1 1 ST-DR-P2-XX-411 NC-6C-YY-6161

1 NC-6I-YY-6315

1

2 NC-6C-YY-6160

ST-DR-P2-XX-412

1 NC-6C-YY-6160

2 NC-6A-01-6103

BR.30 / UC152x152x30

x8

x8 80 0x 2 8 C HS S

1607

Top of Beam= 8295

Roof

B2.23 / UB203x133x30

7350

/ Structural Framing 1

600

60

x8 80 0x 4 8 C HS S

0x

80

Top of Beam= 6997

C SH 1 S8

/ 100x150mm Conc. Padstone

60

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

600

/ 300x100x15 Steel Plate

Loft 5440 First Floor Ceiling 5160 B2.27 / UB203x133x30

/ 900x100x40 Steel Plate B2.20 / UKC152x152x44

Proposed Steel Beam Schedule

Reference Level Roof Roof Loft Loft Loft Loft Loft

Mark

Type

BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30

Cut Length

Volume

Start Level Offset

5423 1500 5808 5693 3534 3534 3098

0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³

945 -157 0 0 0 0 0

End Level Offset 945 -157 0 0 0 0 0

Comments

Proposed Steel Column Schedule

Base Level Loft Loft Loft Loft

Base Offset Top Level

Top Offset

1753 -40 -40 0

787 -364 -364 787

Roof Roof Roof Roof

Mark C2 C4 C3 C1

Type

Column Location Mark

SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8

A-2 A-3(-312) A-2(-767) 2-4

Length

Type Comments

944 1586 1586 2697

Volume

Comments

0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Proposed Structural Sections

Scale : 1 : 25 Date : 12/06/2026

Status : Construction

Rev :

Dwg No : ST-DR-P2-XX-410

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

1

2

NC-6C-YY-6162

NC-6C-YY-6163

ST-DR-P2-XX-410

8295 mm Top of Beam BR.30 / UC152x152x30

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

7350 mm Top of Beam

B2.23 / UB203x133x30

7350

4 8 C HS S x8

80

0x

x8

x8

80

80

0x

0x

3 8 C HS S

1 8 C HS S

Roof

5400 mm Top of Beam

5400 mm Top of Beam

Top of Base Plate= 5440

B2.26 / UC152x152x30

Top of Steel Plate= 5194

Top of Steel Plate= 5242

Top of Steel Plate= 5193

Loft 5440 First Floor Ceiling

B2.20 / UKC152x152x44

5160 Steel Base Plate

/ 550x100x25 Steel Plate

/ 900x100x40 Steel Plate

/ 400x225x20 Steel Plate

B2.27 / UB203x133x30

/ 300x100x15 Steel Plate

Existing Foundation

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Proposed Structural Sections Proposed Steel Beam Schedule

Proposed Steel Column Schedule

Base Level Loft Loft Loft Loft

Base Offset Top Level 1753 -40 -40 0

Roof Roof Roof Roof

Top Offset 787 -364 -364 787

Mark C2 C4 C3 C1

Type SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8

Column Location Mark A-2 A-3(-312) A-2(-767) 2-4

Length 944 1586 1586 2697

Type Comments

Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³

Comments

Reference Level Roof Roof Loft Loft Loft Loft Loft

Mark

Type

BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30

Cut Length

Volume

Start Level Offset

5423 1500 5808 5693 3534 3534 3098

0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³

945 -157 0 0 0 0 0

End Level Offset 945 -157 0 0 0 0 0

Comments

Scale : 1 : 25 Date : 12/06/2026

Status : Construction

Rev :

Dwg No : ST-DR-P2-XX-411

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


1

1

2

NC-6C-YY-6162

NC-6C-YY-6163

ST-DR-P2-XX-410

Chimney To be Retained 8295 mm Top of Beam

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

0x

80

x8

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

1322

C SH 2 S8

BR.30 / UC152x152x30

7350 mm Top of Beam

Roof 7350

0x x8 C SH 4 S8 0

2038

C SH 3 S8

0x

8

80

x8

B2.23 / UB203x133x30

5400 mm Top of Beam 5400 mm Top of Beam Top of Base Plate= 5234

Top of Steel Plate= 5233

Loft 5440 First Floor Ceiling

/ 700x100x30 Steel Plate 2

B2.22 / UC152x152x30

B2.20 / UKC152x152x44

B2.21 / UKC152x152x44

5160

/ 900x100x40 Steel Plate

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Proposed Steel Beam Schedule

Reference Level

Proposed Steel Column Schedule

Base Level Loft Loft Loft Loft

Base Offset Top Level

Top Offset

1753 -40 -40 0

787 -364 -364 787

Roof Roof Roof Roof

Mark C2 C4 C3 C1

Type

Column Location Mark

SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8

A-2 A-3(-312) A-2(-767) 2-4

Length 944 1586 1586 2697

Type Comments

Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³

Comments

Roof Roof Loft Loft Loft Loft Loft

Mark

Type

BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30

Cut Length 5423 1500 5808 5693 3534 3534 3098

Volume

Start Level Offset

End Level Offset

0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³

945 -157 0 0 0 0 0

945 -157 0 0 0 0 0

Drawing : Proposed Structural Sections Comments

Scale : 1 : 25 Date : 12/06/2026

Status : Construction

Rev :

Dwg No : ST-DR-P2-XX-412

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


25 0x 10 late x 50 P / 5 teel S

0x 1 8 C HS S x8 80

UC BR 15 .30 2x 15 / 2x 3

0

U

U

x8 80

/ 0 .26 2x3 B2 x15 2 15 UC

/ Co 100x nc 15 . P 0m ad m sto ne

0x 2 8 C HS S

/ 0 .27 x3 B2 x133 03 B2

/9 0 Ste 0x10 el 0x4 Pla 0 te

/ 0 .23 x3 B2 x133 03 B2

UK

x 80 0x 3 8 C HS S

4

8

x 80 0x 4 8 C HS S

20 5x 22 late x 00 P / 4 teel S

B C1 2.20 52 x1 / 52 x4

8

/3 0 Ste 0x10 el 0x1 Pla 5 te

/ 0 .22 2x3 B2 x15 2 15 UC

30 0x 10 te 2 x la 00 / 7 eel P St

/ Co 100x nc 15 . P 0m ad m sto ne

UK B2 C1 .21 52 x1 / 52 x

44 0 x4 00 te 1 x 00 Pla / 9 teel S

L-Shaped Steel Straps @ 600mm centres to hold steel columns in place

Project : 20 Suffolk Road, Harrow, HA2

7QQ

Drawing : Loft Floor 3Ds

Scale : Date : 12/06/2026

Status : Construction

Rev :

Dwg No : ST-DR-P2-XX-423

DESIGNLABS LONDON

ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.


17/06/2026

STRUCTURAL CALCUALTION FOR 20 Suffolk Road, Harrow, HA2 7QQ

KUNTAL PATEL SAI STRUCTURES LIMITED STRUCTURE ENGINEER, PLANNER & CONTRACTOR Mobile: (+44) 794 772 3532, Email: info@saistructures.co.uk Website: https://saistructures.co.uk & https://saidevelopers.co.uk


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

1 Date

App'd

Date

17/06/2026

INTRODUCTION: The following document is associated with the construction work to take place at the above mentioned address and contains design calculations for structural elements, as well as approximate schematic arrangements of those elements. IMPORTANT GUIDANCE ON THE USE OF THIS DOCUMENT (TO BE READ BY ALL PARTIES): This document is intended to be accompanied by all relevant architect’s and engineer's drawings, and all relevant documentation should be considered prior to commencement of the work. Engineer's drawings relating to this document will be explicitly outlined herein. This document should be reviewed in its entirety (along with any other relevant documentation) by the builder, architect (if applicable) and client, prior to commencement of the work. Any layouts, instructions or recommendations should be considered. Any deviations from the proposals outlined herein are to be approved by the engineer prior to the work being undertaken. Any deviations from the proposals made without the engineer's consent are beyond the scope of this document and the engineer cannot be held liable for any adverse consequences of such deviations. The calculations within this document have been carried out in good faith based on the data provided by the client and/or builder/architect. Extracts of the information provided will be included within this document for reference where appropriate. It is the responsibility of the architect (where applicable) or client to notify the engineer when changes are made to the information. This will enable the design to be reviewed and, where necessary, changes made. Approval of these calculations and drawings by the Local Authority Building Control should be obtained prior to any ordering of material or fabrication. No liability is accepted for any changes that may be required as a result of work having commenced prior to such an approval having been obtained. Where information about the existing arrangements of buildings is not available (e.g. floor / roof span orientations or load-bearing wall arrangements) the engineer will use their judgement to make assumptions. These (generally conservative) assumptions will be clearly outlined within the document, and should be confirmed by a suitably qualified individual on site. The engineer is then to be notified of any discrepancies prior to commencement of the work as design changes may be necessary. Where drawings, construction specifications, method statements or additional design calculations are omitted and are not referenced it is because these have not been requested by the client. These can be made available by the engineer at the client's request. IF IN DOUBT: ASK!! It should be noted that until the existing structure has been exposed it is not always possible to foresee what the existing structural arrangement will be. This may include floor and roof span directions, construction materials and existing beam locations among other aspects. It is therefore advised to remove finishes from areas being modified as early as possible to avoid any delays on site that the untimely discovery of such information can lead to. In addition, it is advised to carry out some form of ground investigation as early as possible to avoid any unexpected construction requirements which may cause delays on site e.g. piled foundations. Wherever there is any uncertainty we will make every effort to highlight where this lies, however suitable project planning / management by the contractor/client are essential to the smooth execution of any construction project.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

2 Date

App'd

Date

17/06/2026

HEALTH & SAFETY It should be noted that structural work, particularly where this involves the transit and installation of large, heavy structural elements, has the potential to be hazardous. Where possible any specific risks are identified either within these calculations or drawings related to this document. An overview of the health and safety risks which may result from the undertaking of instructions noted in this document (and related documents), and possible means of mitigating these risks are noted in the table below. If you would like any guidance on the table below please ask the engineer. Description of Risk

Risk of Occurance

Possible Consequence(s)

1

Crushing due to falling structural elements

High

Death Serious Injury Damage to Property

a) Reduce weight of elements. b) Find alternative method of construction. c) Splicing of large / heavy structural elements to reduce handling weights. d) Produce method statement for installation. e) Use of suitable lifting equipment. f) Ensure suitable temporary works in place

2

Collapsing trenches / banks or retained earth

High

Death Serious Injury

a) Stabilise earth using box shutters / raking shores / sheet piles or other during construction. b) Restricting persons from working in deep trenches or adjacent to steep banks of un-retained earth

3

Rupture of Concrete Shuttering

Medium

Serious Injury Damage to Property

a) Ensure concrete pour heights of not more than 0.75m b) Ensure suitable shuttering in place

4

Fire from Site Welding

High

Death Serious Injury Damage to Property

a) Check for combustible materials in vicinity. Implement suitable precautionary measures. e.g. removal or shielding of combustible materials b) Avoid shot firing except where absolutely necessary

5

Fire from Shot-Firing

Medium

Death Serious Injury Damage to Property

a) Check for combustible materials in vicinity. Implement suitable precautionary measures. e.g. removal or shielding of combustible materials b) Avoid shot firing except where absolutely necessary

6

General Site Risk i.e. Falls from height, falling objects, hazardous/heavy machinery etc

High

Death Serious Injury Damage to Property

a) Use PPE (i.e. hard hat, gloves, goggles, hi-viz clothing, earplugs, site boots et al) b) Implement general precautionary measures (i.e. installation of necessary barriers, signage, alarms) c) Conduct site-specific H&S assessments d) Produce Method Statements

Possible Mitigation Measures

PARTY WALL AGREEMENTS If the building work involves: ➢ ➢ ➢

work on an existing wall which is shared with another property, or building on the boundary with a neighbouring property, or excavating near a neighbouring building,

then the client must find out whether the work falls under the Party Wall Act. If it does, the Act requires the client to notify all affected neighbours of proposed works. Refer to your architect for guidance, or see this website for guidance:https://www.gov.uk/guidance/party- wall-etc-act-1996-guidance.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

3 Date

App'd

Date

17/06/2026

CONSTRUCTION NOTES GENERAL NOTES 1.

Any SPAN / HEIGHT DIMENSIONS shown in this document are for CALCULATION PURPOSES ONLY and are not to be used as a final dimension for the fabrication / machining of structural elements.

2.

All dimensions are to be checked on site by the builder / contractor / fabricator prior to commencement of fabrication / machining / construction. Any discrepancies between the information outlined herein and the dimensions on site are to be reported to the engineer.

3.

Temporary works are the sole responsibility of the builder / contractor. Temporary works method statements are to be provided to the engineer by the builder / contractor prior to commencement of the work.

4.

All parties are assumed to be aware of their responsibilities under the Construction Design and Management (CDM) Regulations 2015. If you are unsure ofthis please contact the engineer.

5.

SAI Structures Limited take no responsibility for any elements outside of the scope of these calculations. For structural elements not covered by this document it is assumed that a design is being prepared / provided by others, if additional calculations / drawings / specifications are required then please contact SAI Structures Limited and we can provide a fee for their design.

6.

All structural work has to be carried out by a competent builder in accordance with the requirements of The Building Regulations Part A and the recommendations set out in BS8103 Parts 1-3.

7.

This document is to be read in conjunction with the architectural drawings / details, and any discrepancies reported to the engineer immediately. Final steel levels and dimensions are to be confirmed by the architectural consultant.

8.

SAI Structures Limited have not visited site and therefore take no responsibility for the quality of construction nor its compliance with this document. It is the contractor's responsibility to ensure that all works comply with the drawings, notes and assumptions made within these calculations.

9.

The client / contractor should be aware of beam, frame and column deflections and their impact on existing or adjacent elements, for example beam deflection on bi-fold doors. Typical beam deflections will be span/200 total (Dead+Live) for beams and height/300 (Wind) for columns. The following calculations provide anticipated deflections within the relevant sections.

10. The client should be aware that where beams are installed within existing masonry structures it is likely that minor cracking will occur within the masonry above due to the load redistribution. It is recommended that the contractor allows to make suitable repairs within their contract. 11. All proprietary (i.e. off-the-shelf) items specified within this document are to be installed in strict accordance with the manufacturer's recommendations. This includes, but is not limited to restraint straps, lintels, chemical / resin anchors and fixing brackets. 12. For structural elements not considered within the scope of this document it is assumed that a suitable specification is to be made by others. If additional calculations, specifications or drawings are required then please contact SAI Structures Limited and we can provide a fee for their design. 13. At locations where beam bearing information is provided on the layout this will be in a position where load-bearing masonry (with foundations / support) has been assumed. It should be confirmed by a suitably qualified individual that these walls are load-bearing, and the masonry is to be inspected for suitability prior to commencement of the work.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

4 Date

App'd

Date

17/06/2026

FOUNDATION / CONCRETE / DRAINAGE NOTES: 1. 2.

Unless noted otherwise: All concrete is to be Grade C28/35 to BS8500-1. All reinforcement for concrete is to be high yield (fy = 500 N/mm2) to BS4449:2005. 3. All strip / pad foundations are to be reinforced concrete construction with minimum 2 layers A393 mesh (1 top, 1 bottom) ▪ Minimum cover to reinforcement is to be:- 25mm in slabs (top) ▪ 50mm in pad foundations / footings / ground beams / rafts / basement slabs (bottom) ▪ 40mm in retaining walls, slabs (bottom) 4. Where existing loadbearing walls have been assumed in this calculation document, the foundation supporting the wall should be exposed and checked/approved by the Building Inspector prior to commencement of works. This includes areas where openings are to be created which may reduce the effective area of the foundations, or where the load is to be focused on a particular area of existing foundations e.g. where there is a column or pier. 5. Any foundation design calculations will, unless noted otherwise, be based on an assumed bearing capacity of 100kN/m2. For the design to be valid it should be ensured that the formation level bearing stratum is inspected for suitability on site by an approved Building Control Officer (BCO) or other suitably qualified individual prior to commencement of the work. 6. Where the thickness of concrete specified in spread foundations is not sufficient to reach a suitable bearing stratum the excavation can be filled using either well compacted crushed hardcore or lean-mix concrete up to foundation formation level. If the formation level stratum is deemed not to be suitable by the BCO for any reason then the engineer is to be notified immediately as a design review will be required. 7. Columns / posts / piers / walls / must be placed CENTRALLY on any new foundation (including padstones) unless specifically noted otherwise. Padstones should be placed immediately below the lower point at which it is indicated that the column terminates on the layout. The under-build to existing masonry walls may need to be extended, or the cavity fillled with concrete (where applicable) to provide a suitable seating for the padstone. 8. Where extra load or an additional storey is to be added onto an existing wall / foundation, the existing foundation is to be exposed and inspected by the BCO to check it is adequate to support the new loads. Contact the engineer if further guidance is needed, or if the BCO requests calculations to be provided. 9. Unless detailed site investigation permits, final foundation depths will not be specified within this document. This is because itbis not possible without such information to know what the ground conditions will be at a particular location. 10. Specified minimum footing depths are generally to be taken from ground floor level. Where the limiting criteria noted in the calculations may relate to existing foundations the foundations are to be inspected prior to commencement of the work to ensure that the limiting geometry can be achieved. 11. If new pad foundations are required adjacent to existing strip footing or brick spread foundations then the new pad should extend to at least as deep as the existing adjacent footing. If the existing adjacent footing is shallower than the proposed pad formationlevel then local underpinning may be required to prevent undermining. 12. General minimum depths for strip footings / spread foundations are not less than 450mm for bearing strata other than clay, and not less than 900mm for footings in shrinkable clay with no nearby vegetation. For foundations in shrinkable clays the proximity of nearby vegetation should be carefully considered and the guidance of the engineer and/or BCO should be sought as spread foundations may not be suitable or the footing depth may need to be calculated. 13. Unless specified within the document the width of new strip footing foundations are to be sized / installed as per the requirements set out in the Building Regulations Part A Document. The width of footing is to be agreed on-site with the BCO prior to pouring concrete. 14. For foundations in chemically aggressive soil conditions the guidance in BS8500-1 and BRE Special Digest 1 should be followed, if in doubt chemical testing should be undertaken by a suitably qualified geotechnical engineer and provided to the LABC officer for further consideration. 15. It is to be ensured that ground bearing foundations do not surcharge drains or manholes. This is usually acheived by ensuring that the formation level is not above the invert level of adjacent drains. An appropriate lintelling detail should be adopted when bridging over drains. In the Greater London Area, if an existing drain passes through your proposed development, it is advised you consult with your Architect to see whether a Thames Water Build-Over Agreement is required.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

5 Date

App'd

Date

17/06/2026

DESIGN PHILOSOPHY: All structural members are designed to be capable of withstanding applied loads during construction, operation and maintenance of the building without any distress, failure, loss of function, damage or durability problems. They are to support the most onerous combinations of dead, imposed and (where applicable) wind loads tending to produce either maximum ultimate stresses or deflection. For this project the stability is to be provided by the following structural systems or a combination thereof: Global Lateral Stability: masonry piers or shear walls with dead load restoring moment / floors or ceilings to provide diaphragm (boarded & strapped where critical) Wall Panel Local Lateral Stabilty: masonry piers or walls/floors, ceilings or rafters (boarded & strapped where critical)/timber stud walls Vertical Loads: masonry walls, piers or columns with padstones for concentrated loads where necessary/strip footings/timber stud walls/steel beams/timber beams


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

6 Date

App'd

Date

17/06/2026

GENRAL SPECIFICATIONS:

Structural Steelwork: 1. 2.

All Materials and workmanship to be in accordance with BS5950 Structural Steelwork sections to be Grade S275JR for internal steel and S275J2 for external steel in accordance with EN10025:Part 2:2004 3. Bolts to be Grade 8.8 unless noted otherwise 4. Welds to be 6mm continuous fillet, unless noted otherwise 5. Contractor to varify all dimensions on site before commencing any work or making fabrication drawings which are to be issued to the engineer for approval. No dimensions are to be taken from drawings. Discrepencies are to be reported to teh engineer prior to proceeding. The engineer requires 7 working days to check and make comments on any fabrication drawings. 6. Steel fabricator to design all connetions for maximum moments and reactions indicated on drawings or within the calculation document issued to the contractor unless part of the engineers design brief. 7. Steelwork which is not required to be galvanised or encased in concrete to be blast cleaned/wire brushed free from mill scale, rust and other contaminants and painted with two coats of approved primer as soon as possible but no longer than 4 hours after cleaning. 8. Uncased columns and beams loacated within an external wall to have a minimum gap of 40mm from face of external or alternately 25mm minimum impermeable insulation from the face of the steel the the rxternal wall, unless galvalised. 9. All steel encased in concrete to be unpainted. 10. All pockets formed in brickwork or blockwork for steel beams to be made good in C35 Concrete. 11. Bolted connections to have a minimum of 4 M16 Bolts per member, unless noted otherwise 12. Steels to have a minimum bearing of 100mm 13. External Steelwork and where otherwise noted to be galvanised to a minimum of 140 microns thickness unless noted otherwise and in accordance with BS728. 14. HSFG bolt connections are to be metal to metal and painted on site after the connection has been completed and load indicating washers are in their final position 15. Where cranked elements are specified these should be full-strength butt-welded at the cranked joint by a suitably qualified steel fabricator. Joints should be tested in accordance with the relevant British or European standards. 16. Where columns / posts are situated adjacent to a wall (as shown on the indicative layouts) they are to be fixed back to the wall. This can be achieved by either welding / shot-firing frame cramps to the web / flange @ 450mm vertical centres and coursing into the masonry bed joints. Alternatively bolt to the face of the wall by welding mild steel brackets to the flanges of the column @ 450mm vertical centres and bolting through using chemically bonded M12 anchors. 17. Beams and posts are to be seated centrally on padstones and posts unless noted otherwise. Generally, the beam location relative to the supported wall will be dictated by the padstone or post location as indicated on the element layouts. If there is any doubt about the location of the padstone or post contact the engineer immediately. Final locations are to be confirmed in conjunction with the architectural consultant and contractor. In most instances the beam will be central to the wall, or cavity wall, above except in some cases where acting as a lintel in an external facing cavity wall. 18. If a column is indicated as going from "ground floor level" this may also indicate that the column needs to extend further below ground floor level to the top surface of a pad foundation. This depends on the appropriate foundation type. 19. Unless noted otherwise in the design or layout information beams are to bear over the full width of any spreader or post. This does not apply when a supporting padstone runs in line with the beam - in which case see shim detail in padstone notes. 20. Ensure clearance is provided to under-side of steelwork at interesecting wall locations where no bearing information is shown so as to prevent unintended load transfer to non load-bearing walls. 21. Steelwork finish / paint systems shall be in accordance with the recommendations of the Corus / Tata guide; "The Prevention of Corrosion on Structural Steelwork". For typical situations we recommend the following; Internal Steelwork in a heated building with clean atmosphere - typically primer only. For steelwork in environments which may be subject to moisture variations (e.g. within a cavity, with outer leaf shelf plates, or external steelwork) consideration should be given to the use of galvanizing to the relevant European Standards (typically 85m galvanised or paint applied system to the approval of Building Control). 22. Fire protection of steelwork is to be specified by the architect, if intumescent painting is required (e.g.; columns) then the


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

7 Date

App'd

Date

17/06/2026

paint system should be compatible with the primer / underlying corrosion protection system. 23. Where possible beams installed in PAIRS should be bolted together through the centre of the webs using M12 bolts @ 500mm centres with spacer tubes in between. 24. Where possible beams are to be bolted to the centreline of the supporting masonry wall / column / padstone using 2 No. M12 chemically bonded anchors, and the padstone strapped down to the adjacent masonry using 2 No. mild steel restraint straps. DO NOT BOLT AWAY FROM THE CENTRE LINE OF THE MASONRY / PADSTONE. Where the centre line of the masonry / padstone is not accessible the beam itself is to be strapped. 25. Shelf plates will be required in certain instances to be agreed with the architectural consultant and contractor. Shelf plates should extend for the full beam length (including bearings) and be grouted into the masonry bed joints at the bearings. The following are typical shelf plate arrangements: a) Single Beams supporting cavity Walls

b) Beams acting as lintels in external walls

Concrete: 1. 2.

All Materials and workmanship to be in accordance with BS8110 parts 1 & 2 – The structural use of concrete Concrete quality to be 35N/mm2 at 28 Days unless noted otherwise, Max aggrigate to be 20mm, Min Cement content 330kg/m3, max water to cement ratio 0.6 3. Reinforcement to be placed in accordance with BS8110 4. Concrete cubes to be taken at 7 & 28 Days to obtain required crushing strengths 5. Concrete quality for mass concrete foundations in non aggressive soils to be 25N/mm2 6. No reinforcement to be cut displaced or omitted without prior written agreement of the engineer. 7. Cover to reinforcement to be in accordance with BS8110 Part 1 tables 3.3 & 3.4 8. Ground Slab to be blinded into 50mm of lean mix prior to reinforcement being placed in position, blinding concrete mix to be 1/10 to all reinforcement bases except for water resisting structures. 9. If no soil investigation and been carried out then sulphate – resisting cement should be used within the ground. 10. For below ground structures provide waterproof concrete installed and detailed to specialist specifications.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

8 Date

App'd

Date

17/06/2026

Timber: 1. 2.

All Materials and workmanship to be in accordance with BS5268: Part 2 - Structural Use of Timber Roof Trusses and bracing to be designed and detailed by specialist subcontractor. Trusses to be designed and fabricated in accordance with BS5268: Parts 2 & 3 3. All timbers to have a minimum grade of C16 (unless noted otherwise) and to have maximum moisture content of 18% 4. Joists to have a minimum end bearing of 50mm 5. Ends of joists built into cavity walls should not project into the cavity, and should be painted with two coats of bituminous primer 6. Multiple timber members to be bolted together at 600c.c. with M12 Bolts and 50x50x3mm washers unless noted otherwise. 7. No notches, holes or rebates etc. to be cut in any member without the written consent of the engineer 8. All structural timber to be adequately protected against adverse weather conditions during stacking and after erection 9. All structural timber to be treated by vacuum pressure impregnation of organic or waterborne preservative, to a dry salt retention in accordance with the manufacturer’s recommendations. Type of treatment may be: - ‘Tanalith’, ‘Celcure’, ‘Promtim’, or other only with the prior approval of the Architect. 10. All fixings in the roof space are to be galvanised unless noted otherwise 11. Strutting Requirement <2.5m non required 2.5m – 4.5m at mid-span >4.5m at 1/3 span points 12. Where strutting is required provide solid strutting with a minimum thickness of 38mm and a depth no less than ¾ of the joist depth and strutting should be blocked solidly to perimeter walls. 13. Strutting or blocking should not block the ventilation space in cold deck flat roofs 14. Restraint strapping - 100mm x 50mm wall plate strapped down to walls. Ceiling joists and rafters to be strapped to walls and gable walls, straps built into cavity, across at least 3 timbers with noggins. All straps to be 1000 x 30 x 5mm galvanized straps or other approved to BSEN 845-1 at 2m centres, in accordance with CP111 Part 2. 15. Where purlins are designed to support the rafters, rafters are to be birdsmouthed to the purlin. 16. Where supported by timber posts, the bearing should be the full width of any such supporting post. Where beams are to be seated on posts they are to be positioned centrally on the posts unless noted otherwise. 17. Where members are notched at the supports to a depth greater than 1/3 depth of the member the engineer is to be notified. 18. At the top and bottom of timber column / post positions a minimum of 2No horizontal restraint straps and noggins should be provided running orthogonally to the joist / rafter to provide restraint. These straps should be a minimum of 1200mm long x 30mm wide by 5mm thick in galvanised mild steel (or similar proprietary product). Straps will be suitably fixed to both the column and noggin. 19. For columns / posts directly adjacent to existing masonry, these should be resin anchored into the masonry using M12 HiltiHY70 anchors (or similar) @ 450mm vertical centres. Angle brackets may be used if preferred to direct fixing. 20. Where steelwork is to be installed in loft conversions ensure there is a 25mm gap between the top of the existing ceiling joist and the underside of the steel beam to avoid unintended load transfer. 21. Joints between members are to be created using either traditional joinery techniques or proprietary fixings. Where input is required contact the engineer.

22. Insulation and Ventilation requirements will not have been considered within this document when specifying joists/rafter sizes. The joist/rafter sizes mentioned might need to be increased in depth to allow for the relevant insulation/ventilation to be provided. Refer to architects details for minimum joist/rafter depth requirements for insulation/ventilation purposes.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

9 Date

App'd

Date

17/06/2026

Masonry: 23. All Materials and workmanship to be in accordance with BS5628 Code of Practice for the Structural Use of Brickwork 24. Brickwork to have average crushing strength of 20.5N/mm2 unless noted otherwise 25. Blockwork belowground to be high density concrete blocks with a minimum compressive strength of 10N/mm2, above ground provide aerated lightweight blocks with a minimum compressive strength of 7.3N/mm2 unless nother otherwise 26. Mortar to be Class ii below ground and Class iii above ground unless noted otherwise. 27. ‘Hyload’ DPC or similar approved to all walls. 28. Wall ties to be stainless steel vertical twist type ties to comply with BS1243 at a maximum spacing of 900mm horzonatally and 450mm vertically with a minimum embedment of 50mm in the mortar joint unless noted otherwise. Where cavity width is >90mm ties to be placed 450mm vertically and horizontally. Additional ties to be provided at the sides of all openings so that there is at least one tie at 300mm c/c maximum 29. Wall ties shall not slop inwards 30. Brickwork restraints to be in accordance with BS5628 PT 1 at 1200mm c/c restraints to brickwork and 1200mm c/c for vertical straps. 31. Joints to masonry to be a minimum of 6m centres for blockwork and with a minimum distance of 3m from the end of any wall in accordance with BS5628 and a maximum of 12m centres for brickwork. 32. At brick/block junctions, brickwork is to be block bonded into blockwork unless noted otherwise. 33. Where blocks are laid flat they are to be solid concrete blocks. 34. Lintel Bearings to be in accordance with manufacturers recommendations. 35. Where existing masonry is deemed to be of poor quality, or where the mortar has degraded significantly, the brickwork should be either re- pointed or replaced in its entirety as appropriate prior to loading. 36. Unless noted otherwise all concrete blocks are to be bedded on narrow edge i.e. NOT laid flat. 37. Horizontal / Vertical restraint strapping to floors and roofs as indicated in the Building Regulations Part A "Lateral support by roofs and floors" [Diagrams 15 and 16] must be provided. 38. Ties movement joints should be provided at the following maximum centres; 6m centres in blockwork, 12m centres in brickwork. Joint locations should be as per the architects recommendations but our recommendation is that they are positioned adjacent to wind-posts, columns or buttressing walls, joint spacing should be reduced at positions of restraint i.e. cranks & corners. If joint centres cannot be achieved then we recommend that bed joint reinforcement is used at 450mm vertical centres.


Project:

Job Ref.

20 Suffolk Road, Harrow, HA2 7QQ Section:

Sheet no./Rev.

Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk

Calc. by

KP

Date

Chk'd By

10 Date

App'd

Date

17/06/2026

PADSTONE NOTES 1. 2.

3.

Where steel beams bear directly onto masonry (i.e. no padstones) they are to be bedded onto a dry / level mortar bed. Unless noted otherwise all concrete blocks are to be bedded on narrow edge i.e. NOT laid flat. In many instances historic buildings, particularly in the south east, will have poor quality masonry and degrading mortar capable of sustaining only a limited amount of compressive force. In such cases the engineer should be notified as the padstone sizes specified may need to be increased in size. All padstones specified are to be C35 concrete. Where it is not possible to find "off the shelf" padstone sizes it may be necessary to cast in- situ padstones, or to cut/stack lintels to give the correct padstone dimension requirements. Lintels can be stacked as shown below, if a padstone with significant depth is required (example below shows two 800mm long 140x100 pre-cast concrete lintels stacked on top of eachother to create an 800x100x300 padstone). Lintels can be stacked to achieve the required depth, but must not be positioned side-by-side in any circumstances.

4.

Mild steel spreader plates may be used as an alternative to padstones providing the following detail, with stiffeners to prevent the bearing plates from bending, is applied:

5.

Where beams are oriented in the same direction of the padstone (i.e. parrallel), then mild steel shims must be used, as per the detail below, to ensure even pressure distribution on the padstone.

Padstone specifications are called-up thus:

6. 7. 8.

440 x 100 x 215 (LENGTH) (WIDTH) (HEIGHT) If the padstone width is referred to as "(wall width)" this means that the padstone width is to be equal to the full supporting wall width, including the cavity where appropriate. In no case should the padstone width be less than 200mm. Padstones should in no case be wider than the wall (or single leaf of a cavity wall) upon which they are supported. If the supporting wall width is found to be less than the width of the specified padstone the engineer should be notified immediately. Where two beams share the same padstone they are to be arranged symmetrically on the padstone, so that (unless noted otherwise) neither padstone is offset from the centre of the padstone more or less than the other.


Project:

No.

20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build

Section

Location

BASIC LOADS Prep by

Email:

KP

Date

June ' 26

BASIC LOADS

Check by

Sheet No.

1 Date


Project:

No.

20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build

Section

Location

Sheet No.

BASIC LOADS Prep by

Date

KP

Email:

Check by

1 Date

June ' 26

A ROOF AND CEILING LOADS Pitch 45 ° Tile type : Concrete Tiles (assumed) 1.22

0.86 (a) ROOF DEAD LOAD

Clay Tiles (Plain - Machine Made 101.6 mm gauge) Clay Tiles (Single Lap Interlocking) Concrete Tiles (Plain - Stone Aggregate 101.6 mm gauge) Concrete Tiles (Single Lap Interlocking) Slates (Including 76.2 mm Lap + Nails) DPM Membrane + Insulation Boarding (Battenboard, blockboard, laminboard) Battens + Felt Timber Rafters + Insulation

(b) FLAT ROOF DEAD LOAD

Roof Finish (2 Layers, 19.1mm) Insulation Ply deck Bitumen Felt (3 Layer) Boarding (Battenboard, blockboard, laminboard) Plasterboard + Skim (12.7mm) Timber Joists + Insulation

Sloping kN/m² 0.640 0.440 0.740 0.560 0.340 0.080 0.090 0.070 0.200

Applicabel kN/m²

0.440

0.080 0.100 0.070 0.200 0.890

In Plan kN/m² 0.00 0.62 0.00 0.00 0.00 0.11 0.14 0.10 0.28 1.26

1.30

kN/m²

0.20 0.03 0.10 0.09 0.20 0.15 0.20 0.97

1.00

kN/m²

kN/m² 0.05 0.15 0.15 0.35

0.35

kN/m²

kN/m² 0.60 0.75

0.60 0.75

kN/m² kN/m²

In Plan kN/m²

(c) CEILING DEAD LOAD Insulation Joists Plasterboard + Skim

(e) ROOF AND CEILING IMPOSED LOADS Pitch Roof Flat roof


Project:

No.

20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build

Section

Location

BASIC LOADS Prep by

Email: B

Sheet No.

Date

Check by

KP

June ' 26

kN/m² 100mm 1.00 1.60 2.00

140mm 1.40 2.24 2.80

215mm 2.15 3.44 4.30

102.5mm 2.46 2.26 1.85 1.95 2.15

225.00 5.54 5.09 4.16 4.39 4.84

300mm 7.38 6.78 5.55 5.85 6.45

1 Date

WALL LOADS

(a) WALLS LOADINGS

(100mm Inner Leaf)

Blockwork Blockwork (Light ~ 100 mm thick) Blockwork (Medium ~ 100 mm thick) Blockwork (Dense ~ 100 mm thick) Brickwork Brickwork (Blue ~ 102.5 mm thick) Brickwork (Engineering ~ 102.5 mm thick) Brickwork (Fletton ~ 102.5 mm thick) Brickwork (London Stock ~ 102.5 mm thick) Brickwork (Sand Lime ~ 102.5 mm thick) Finishes + Mortar Mortar (10mm thick) Render (12.7mm thick) Plaster Coat (13mm thick) Cavity Insulation (100mm thick)

(b) EXTERNAL CAVITY WALLS

0.18 0.29 0.15 0.02

kN/m²

(100mm Inner Leaf)

1.95 1.00 0.35 3.30

102.5mm Brickwork Blockwork (medium density-1800 kg /m3) Cavity Insulation & 12.5mm Plasterboard on dabs

(c) PARTY WALLS (per leaf) 100mm Blockwork (medium density-1800 kg /m3) Cavity Insulation & 12.5mm Plasterboard on dabs

(100mm cavity)

3.30

kN/m²

2.35

2.35

kN/m²

1.60 0.50 2.10

2.10

kN/m²

2.24 0.50 2.74

2.75

kN/m²

4.16 4.16

4.20

kN/m²

0.40 0.08 0.15 0.50 0.16 1.29

1.30

kN/m²

0.08 0.15 0.50 0.16 0.89

0.90

kN/m²

kN/m² 2.00 0.35

(d) INTERNAL LOADBEARING MASONRY WALLS 100mm Blockwork (medium density-1800 kg /m3) 2 No.12.5mm Plasterboard on dabs

140mm Blockwork (medium density-1800 kg /m3) 2 No.12.5mm Plasterboard on dabs

(d) INTERNAL LOADBEARING MASONRY WALLS 225mm thick solid existing brickwork

(e) TIMBER WALLS kN/m² e.1

e.2

Timber stud - Dormer Cheek - (1.0 Hr Fire Resistance) Wood /tile cladding Insualtion 100x50 Timber stud 2 No.12.5mm Plasterboard on dabs Multi plaster finish

Internal timber stud partition- (1.0 Hr Fire Resistance) Insualtion 100x50 Timber stud 2 No.12.5mm Plasterboard on dabs Multi plaster finish


Project:

No.

20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build

Section

Location

BASIC LOADS Prep by

KP

Email: (f) SUB-STRUCTURE WALLS

Date

Check by

1 Date

June ' 26

(600mm high) kN/m 1.42

External

C

Sheet No.

1.45

kN/m²

0.75

kN/m²

1.75

kN/m²

FLOOR LOADS kN/m²

(b) UPPER FLOORS : DEAD LOADS (HOUSES)

0.15 0.13 0.12 0.15 0.15 0.70

Boarding (boards/plywood ~ 22mm thick) SoundBloc Plasterboard (15mm thick) FireBloc Plasterboard (12mm thick) Timber Joists + Insulation Ceiling & Services

kN/m² Partitions (Timber)

1.00 1.70 kN/m²

(c) UPPER FLOORS : IMPOSED LOADS General - Houses & Flats - Load bearing partitions

1.50

1.50

kN/m²

Corridors/Lobbies/Communal Areas

3.00

3.00

kN/m²

Garages & Cycle store Bin soters

2.50 3.00

2.50 3.00

kN/m² kN/m²

4.85

kN/m²

(d) GROUND FLOOR : DEAD LOADS 150dp B & B floor 75mm Screed (22kN/m³) 75/100mm Insulation Partitions

(d) GROUND FLOOR : DEAD LOADS 200mm RC Insitu Slab 75mm Screed (20kN/m³) 75/100mm Insulation Partitions

Flats kN/m² 2.18 1.65 0.02 1.00

Houses kN/m² 2.18 1.65 0.02 1.00

4.85

4.85 kN/m² 4.80 1.50 0.02 0.50 6.82


Project:

No.

20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build

Section

Location

Sheet No.

BASIC LOADS Prep by

KP

Email:

Date

Check by

1 Date

June ' 26

D STAIR LOADS FOR HOUSES DEAD LOAD (a) FLIGHTS (Timber) Flights with Risers and 12.5mm plasterboard Screen/Balustrade

kN/m² kN/m² 0.50 0.00 0.50

(b) IMPOSED LOADS (Hosues)

kN/m²

Timber Flights

1.50

(c) FLIGHTS (Precast Concrete)

kN/m²

P.C. Units Finishes

(d) LANDINGS/LOBBY AREAS (Precast Concrete) 200mm P.C. Units 50mm Screed (22 kN/m³) Finishes

(e) IMPOSED LOADS (Apartments) P.C. Flights and Landings (For less than 3.0 storey) (for more than 3 story) E

6.72 0.30 7.02

4.80 1.10 0.30 6.20

1.50

kN/m²

7.05

kN/m²

6.20

kN/m²

1.50 3.00

kN/m² kN/m²

kN/m² 1.50 3.00

(a) UPPER FLOORS : DEAD LOADS (PC PLANKS)

200mm Hollowcore Slab 75mm Screed (20kN/m³) Deck (18mm chipboard , battens at 400c/c) Partitions Ceiling (12.5 Plasterboard + metal)

kN/m²

kN/m²

CONCRETE FLOOR LOADS

150mm Hollowcore Slab 75mm Screed (20kN/m³) Deck (18mm chipboard , battens at 400c/c) Partitions Ceiling (12.5 Plasterboard + metal)

0.50

kN/m² 3.19 1.50 0.15 0.50 0.18 5.52 3.42 1.50 0.15 0.50 0.18 5.75


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

EuroBeam Project Summary Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: Job number: ITEMS: 1: Beam: Flat roof joists Span: 3.9 m. Reactions (unfactored/factored): R1: 1.25/1.76 kN; R2: 1.25/1.76 kN Use 50 x 175 C24 2: Beam: Rafters Span: 2.3 m. Reactions (unfactored/factored): R1: 0.87/1.22 kN; R2: 0.87/1.22 kN Use 50 x 150 C24 3: Beam: TB-01(Slopping rafter) Span: 3.9 m. Reactions (unfactored/factored): R1: 2.86/3.90 kN; R2: 5.10/6.92 kN Use 2no 50 x 225 C24 4: Beam: BR.30 Span: 5.3 m. Reactions (unfactored/factored): R1: 15.84/22.18 kN; R2: 17.05/23.87 kN Use 152 x 152 x 30 UKC S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 5: Column: C1 Section: 80 x 80 x 8.0 SHS Grade S355 Sum of stress ratios = 0.049 OK 6: Column: C2 Section: 80 x 80 x 8.0 SHS Grade S355 Sum of stress ratios = 0.035 OK 7: Beam: BR.23 Span: 1.7 m. Reactions (unfactored/factored): R1: 14.09/19.45 kN; R2: 14.09/19.45 kN Use 203 x 133 x 25 UKB S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 8: Column: C3 & C4 Section: 80 x 80 x 8.0 SHS Grade S355 Sum of stress ratios = 0.028 OK 9: Beam: Loft floor joists Span: 3.0 m. Reactions (unfactored/factored): R1: 1.35/1.96 kN; R2: 1.35/1.96 kN Use 50 x 200 C24 10: Beam: Loft floor joists Span: 3.6 m. Reactions (unfactored/factored): R1: 2.50/3.55 kN; R2: 1.88/2.66 kN Use 50 x 200 C24 11: Beam: Loft floor joists Span: 1.5 m. Reactions (unfactored/factored): R1: 1.34/1.89 kN; R2: 1.06/1.50 kN

Job number: Made by: KP Page: 1 Printed 17 Jun 2026 15:09


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

12: Beam: Typical Double-up Trimmer to support partition` Span: 1.6 m. Reactions (unfactored/factored): R1: 4.73/6.59 kN; R2: 4.73/6.59 kN Use 2no 50 x 200 C24 13: Beam: TB-02 Span: 1.6 m. Reactions (unfactored/factored): R1: 4.61/6.42 kN; R2: 4.53/6.36 kN Use 2no 50 x 200 C24 14: Beam: B2.26 Span: 3.6 m. Reactions (unfactored/factored): R1: 6.44/9.03 kN; R2: 5.44/7.70 kN Use 152 x 152 x 30 UKC S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 15: Beam: BR.22 Span: 3.6 m. Reactions (unfactored/factored): R1: 7.39/10.19 kN; R2: 21.89/30.20 kN Use 152 x 152 x 30 UKC S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 16: Beam: B2.21 Span: 5.65 m. Reactions (unfactored/factored): R1: 24.60/34.66 kN; R2: 45.22/63.37 kN Use 152 x 152 x 44 UKC S275 Bearing R1: 25 mm S275 bearing plate, size 500 x 100 mm Bearing R2: 40 mm S275 bearing plate, size 900 x 100 mm 17: Beam: BR.27 Span: 3.4 m. Reactions (unfactored/factored): R1: 28.32/39.53 kN; R2: 8.78/12.00 kN Use 203 x 133 x 30 UKB S275 Bearing R1: 10 mm S275 bearing plate, size 250 x 225 mm Bearing R2: 6 mm S275 bearing plate, size 175 x 100 mm 18: Beam: B2.22 Span: 5.65 m. Reactions (unfactored/factored): R1: 26.10/36.76 kN; R2: 33.68/47.33 kN Use 152 x 152 x 44 UKC S275 Bearing R1: 25 mm S275 bearing plate, size 550 x 100 mm Bearing R2: 30 mm S275 bearing plate, size 700 x 100 mm 19: Web cleat connection Beam [Item 14]: 152x152x30 UC connects to web of beam [Item 16]: 152x152x44 UC Factored load carried by connection = 9.026 kN Use 100mm long S275 angle cleats with 2 rows of M16 bolts at 50 c/s Connection resistance: 49.9kN OK 20: Web cleat connection Beam [Item 16]: 152x152x44 UC connects to web of beam [Item 17]: 203x133x30 UB Factored load carried by connection = 34.66 kN Use 100mm long S275 angle cleats with 2 rows of M16 bolts at 50 c/s Connection resistance: 71.4kN OK

Job number: Made by: KP Page: 2 Printed 17 Jun 2026 15:09


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 3

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: Flat roof joists Load name U G roof U QA roof

Printed 17 Jun 2026 15:09

Loading w1 1.00*0.40 0.60*0.40

Start x1 Loading w2 End x2 0 L 0 L Total load (unfactored): 2.50 kN Dead/Permanent (unfactored): 1.56 kN Live/Variable (unfactored): 0.94 kN Factored (6.10): 3.51 kN

R1comp 0.78 0.47 1.25 0.78 0.47 1.76

Span: 3.9 m. R2comp Defl. 0.78 1.20 0.47 0.72 1.25 1.93 0.78 1.20 0.47 0.72 1.76

Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 1.71 kNm (6.10) at 1.95 m. from R1 Maximum S.F. = 1.76 kN (6.10) at R1 Mid-span deflections: Dead: 1.20 x 108/EI (E in N/mm2, I in cm4) Live: 0.72 x 108/EI Total: 1.93 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 50 x 175 C24 3.7 kg/m approx W el,y = 255.2 cm3 Iy = 2,233 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 1.71 x 1000/255 = 6.70 N/mm2 OK Bending resistance = 12.18 x 255/1000 = 3.11 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 1.76 x 1000 x (3/2)/(33.5 x 175) = 0.45 N/mm2 OK Shear resistance = 2.03 x 33.5 x 175 x (2/3)/1000 = 7.94 kN

Deflection Final deflection limit = 0.003L = 11.70 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.22 x 106/((11,000/16) x 50 x 175) = 0.24 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 1.20 0.72

Inst. mm 4.91 2.94 0.24 8.09

kdef 0.60 0.60

y2 1.00 0.30

Final mm 7.85 3.47 0.35 11.67

OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 4

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: Rafters Load name U G roof U QA roof

Printed 17 Jun 2026 15:09

Loading w1 1.30*0.40 0.60*0.40

Start x1 Loading w2 End x2 0 L 0 L Total load (unfactored): 1.75 kN Dead/Permanent (unfactored): 1.20 kN Live/Variable (unfactored): 0.55 kN Factored (6.10): 2.44 kN

R1comp 0.60 0.28 0.87 0.60 0.28 1.22

Span: 2.3 m. R2comp Defl. 0.60 0.19 0.28 0.09 0.87 0.28 0.60 0.19 0.28 0.09 1.22

Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 0.702 kNm (6.10) at 1.15 m. from R1 Maximum S.F. = 1.22 kN (6.10) at R1 Mid-span deflections: Dead: 0.19 x 108/EI (E in N/mm2, I in cm4) Live: 0.09 x 108/EI Total: 0.28 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 50 x 150 C24 3.2 kg/m approx W el,y = 187.5 cm3 Iy = 1,406 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 0.70 x 1000/188 = 3.75 N/mm2 OK Bending resistance = 12.18 x 188/1000 = 2.28 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 1.22 x 1000 x (3/2)/(33.5 x 150) = 0.36 N/mm2 OK Shear resistance = 2.03 x 33.5 x 150 x (2/3)/1000 = 6.80 kN

Deflection Final deflection limit = 0.003L = 6.90 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 0.50 x 106/((11,000/16) x 50 x 150) = 0.12 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 0.19 0.09

Inst. mm 1.22 0.57 0.12 1.91

kdef 0.60 0.60

y2 1.00 0.30

Final mm 1.96 0.67 0.17 2.80

OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 5

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: TB-01(Slopping rafter) Load name Loading w1 U G roof 1.00*0.20 U QA roof 0.60*0.20 V G stud partition 0

Start x1 Loading w2 End x2 0 L 0 L 0 1.35*2.55 L Total load (unfactored): 7.96 kN Dead/Permanent (unfactored): 7.49 kN Live/Variable (unfactored): 0.47 kN Factored (6.10): 10.82 kN

R1comp 0.39 0.23 2.24 2.86 2.63 0.23 3.90

Span: 3.9 m. R2comp Defl. 0.39 0.60 0.23 0.36 4.48 5.18 5.10 6.15 4.87 5.79 0.23 0.36 6.92

Load types: U:UDL; V:Variable load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 5.37 kNm (6.10) at 2.21 m. from R1 Maximum S.F. = -6.92 kN (6.10) at R2 Mid-span deflections: Dead: 5.79 x 108/EI (E in N/mm2, I in cm4) Live: 0.36 x 108/EI Total: 6.15 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 2no 50 x 225 C24 9.4 kg/m approx W el,y = 843.8 cm3 Iy = 9,492 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.0 Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.0/1.30 = 11.08 N/mm2 Design bending stress, sm,y,d = 5.37 x 1000/844 = 6.37 N/mm2 OK Bending resistance = 11.08 x 844/1000 = 9.35 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 100 = 67 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.0/1.30 = 1.85 N/mm2 Design shear stress, sv,y,d = 6.92 x 1000 x (3/2)/(67.0 x 225) = 0.69 N/mm2 OK Shear resistance = 1.85 x 67 x 225 x (2/3)/1000 = 18.55 kN

Deflection Final deflection limit = 0.003L = 11.70 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 3.88 x 106/((11,000/16) x 100 x 225) = 0.30 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 5.79 0.36

Inst. mm 5.54 0.35 0.30 6.19

kdef 0.60 0.60

y2 1.00 0.30

Final mm 8.87 0.41 0.47 9.75

OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 6

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: BR.30 Load name O G o.w. U G Roof U QA Roof U G Roof U QA Roof P G Bm: Flat roof joists: R1 P QA Bm: Flat roof joists: R1

Loading w1 0.3 1.30*1.30 0.60*1.30 1.00*2.00 0.60*2.00 0.78 0.47

Start x1 Loading w2 End x2 0 L 0 L 0 L 0 L 0 L 5.20 5.20 Total load (unfactored): 32.89 kN Dead/Permanent (unfactored): 21.93 kN Live/Variable (unfactored): 10.96 kN Factored (6.10): 46.05 kN

R1comp 0.80 4.48 2.07 5.30 3.18 0.01 0.01 15.84 10.59 5.26 22.18

Span: 5.3 m. R2comp Defl. 0.80 3.1 4.48 17.4 2.07 8.0 5.30 20.5 3.18 12.3 0.77 0.1 0.46 0.1 17.05 61.6 11.34 41.1 5.71 20.4 23.87

Load types: O:Beam o.w.; U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 29.43 kNm (6.10) at 2.65 m. from R1 Maximum S.F. = -23.9 kN (6.10) at R2 Mid-span deflections: Dead: 41.1 x 108/EI (E in N/mm2, I in cm4) Live: 20.4 x 108/EI Total: 61.6 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 30 UKC S275 D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y=222 cm3 Classification: Flange: c/t = 65.6/9.4 = 6.98 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/6.5 = 19.0 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 23.87 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.3x100 - 2x153x9.40 + (6.50+2x7.60) x9.40 = 1,159 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,159 x (275/ 3)/(1.0 x 1000) = 184 kN (>=23.87) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/6.5 = 21.35 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 29.4 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 248/1000 = 68.2 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 248.0 cm3 Iw = 0.031 dm6 IT = 10.5 cm4 Iz = 560 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr 0.00-5.30 6.68 29.4 1.00d 1.00 50.8 C1 derivation: d: taken as 1.0 (conservative)

lz 2.008

l LT 1.158

f LT 1.132

c LT c LT, mod 0.604 0.604

M c,Rd 68.2

M b,Rd 41.2 OK


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

Deflection LL deflection = 20.4 x 1e8/(210,000 x 1,750) = 5.6 mm (L/953) OK TL deflection = 61.6 x 1e8/(210,000 x 1,750) = 16.8 mm (L/316)

Bearings R1 (22.18 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

R2 (23.87 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

Job number: Made by: KP Page: 7 Printed 17 Jun 2026 15:09


SAI Structrues Limited

KP

Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Job number: Made by: KP Page: 8 Printed 17 Jun 2026 15:09

Column calculation to EN1993-1-1 using S355 steel Location: C1 Length: 2.55 m. Pos Dur

Load

kN

A G B/F Bm: BR.30 [5.3 m.] : R1 A QA B/F Bm: BR.30 [5.3 m.] : R1 Total load kN

10.59 5.26 15.85

Fact 6.10 14.30 7.89 22.19

Load durations: G: Dead; Qx: Imposed; QA: Residential

SECTION SIZE : 80 x 80 x 8.0 HF SHS S355 (17.6 kg/m) Section properties: Ag = 22.4cm2 iz = 2.91 cm Design strength, fy = 355 N/mm2 e = 0.814 Classification: Flange: c/t = 56.0/8.0 = 7.00 <= 33e (26.8): Class 1, plastic [Table 5.2] Web: c/t = 56.0/8.0 = NAN <= 33e (26.8): Class 1, plastic Major axis: LEy = 1.0L = 2.55 m. Slenderness, ly = 2.55 x 100/2.91 = 87.6 Minor axis: LEz = 1.0L = 2.55 m. Slenderness, lz = 2.55 x 100/2.91 = 87.6 Compression Design axial load, NEd = 22.19 kN Design compression resistance, Nc,Rd = A.fy/gM0 = 22.40 x 100 x 355/(1.0 x 1000) = 795 kN OK Calculate flexural buckling resistances, Nb,Rd l1 = 93.9e = 93.9 x 0.814 = 76.4 Buckling about y-y (major) axis ly = ly/l1 = 87.6/76.4 = 1.15 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(ly - 0.2) + ly2) = 1.26 [EC3 (6.49)] Flexural buckling reduction factor, cy = 1/(f + (f2 -ly2)) = 0.56 [EC3 (6.49)] Design buckling resistance, Nb,y,Rd = cyA.fy/gM1 = 0.56 x 22.40 x 100 x 355/(1.0 x 1000) = 449 kN OK [EC3 (6.47)] Buckling about z-z (minor) axis lz = lz/l1 = 87.6/76.4 = 1.15 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(lz - 0.2) + lz2) = 1.26 [EC3 Table 6.2] Flexural buckling reduction factor, cz = 1/(f + (f2 - lz2)) = 0.56 [EC3 (6.49)] Design buckling resistance, Nb,z,Rd = czA.fy/gM1 = 0.56 x 22.40 x 100 x 355/(1.0 x 1000) = 449 kN OK [EC3 (6.47)] Bending about y-y (major) axis: N/A Bending about z-z (minor) axis: N/A


SAI Structrues Limited

KP

Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Job number: Made by: KP Page: 9 Printed 17 Jun 2026 15:09

Column calculation to EN1993-1-1 using S355 steel Location: C2 Length: 1.5 m. Pos Dur

Load

kN

A G B/F Bm: BR.30 [5.3 m.] : R2 A QA B/F Bm: BR.30 [5.3 m.] : R2 Total load kN

11.34 5.71 17.05

Fact 6.10 15.31 8.57 23.87

Load durations: G: Dead; Qx: Imposed; QA: Residential

SECTION SIZE : 80 x 80 x 8.0 HF SHS S355 (17.6 kg/m) Section properties: Ag = 22.4cm2 iz = 2.91 cm Design strength, fy = 355 N/mm2 e = 0.814 Classification: Flange: c/t = 56.0/8.0 = 7.00 <= 33e (26.8): Class 1, plastic [Table 5.2] Web: c/t = 56.0/8.0 = NAN <= 33e (26.8): Class 1, plastic Major axis: LEy = 1.0L = 1.50 m. Slenderness, ly = 1.50 x 100/2.91 = 51.5 Minor axis: LEz = 1.0L = 1.50 m. Slenderness, lz = 1.50 x 100/2.91 = 51.5 Compression Design axial load, NEd = 23.87 kN Design compression resistance, Nc,Rd = A.fy/gM0 = 22.40 x 100 x 355/(1.0 x 1000) = 795 kN OK Calculate flexural buckling resistances, Nb,Rd l1 = 93.9e = 93.9 x 0.814 = 76.4 Buckling about y-y (major) axis ly = ly/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(ly - 0.2) + ly2) = 0.78 [EC3 (6.49)] Flexural buckling reduction factor, cy = 1/(f + (f2 -ly2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,y,Rd = cyA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Buckling about z-z (minor) axis lz = lz/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(lz - 0.2) + lz2) = 0.78 [EC3 Table 6.2] Flexural buckling reduction factor, cz = 1/(f + (f2 - lz2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,z,Rd = czA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Bending about y-y (major) axis: N/A Bending about z-z (minor) axis: N/A


KP

SAI Structrues Limited Structural Engineer & Planner

Job number: Made by: KP Page: 10

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: BR.23 Load name O G o.w. U G Chimney wall P G Column: C2 P QA Column: C2

Printed 17 Jun 2026 15:09

Loading w1 0.3 2.50*2.50 11.34 5.71

Start x1 Loading w2 End x2 0 L 0 L 0.85 0.85 Total load (unfactored): 28.18 kN Dead/Permanent (unfactored): 22.48 kN Live/Variable (unfactored): 5.71 kN Factored (6.10): 38.91 kN

R1comp 0.26 5.31 5.67 2.86 14.09 11.24 2.86 19.45

Span: 1.7 m. R2comp Defl. 0.26 0.03 5.31 0.68 5.67 1.16 2.86 0.58 14.09 2.46 11.24 1.87 2.86 0.58 19.45

Load types: O:Beam o.w.; U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed:

Maximum B.M. = 13.34 kNm (6.10) at 0.85 m. from R1 Maximum S.F. = 19.45 kN (6.10) at R1 Mid-span deflections: Dead: 1.87 x 108/EI (E in N/mm2, I in cm4) Live: 0.58 x 108/EI Total: 2.46 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 203 x 133 x 25 UKB S275 D=203.2 mm B=133.2 mm t=5.7 mm T=7.8 mm Iy=2,340 cm4 iz=3.10 cm W pl,y=258 cm3 W el,y=230 cm3 Classification: Flange: c/t = 56.1/7.8 = 7.20 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 172.4/5.7 = 30.2 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 19.45 kN Shear area, Av = A - 2btf + (tw+2r)tf = 32.0x100 - 2x133x7.80 + (5.70+2x7.60) x7.80 = 1,285 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,285 x (275/ 3)/(1.0 x 1000) = 204 kN (>=19.45) OK [EC3 6.2.6] Shear buckling: hw/tw = 187.6/5.7 = 32.91 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 13.34 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 258/1000 = 70.9 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 258.0 cm3 Iw = 0.029 dm6 IT = 5.96 cm4 Iz = 308 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-1.70 2.45 13.3 1.00d 1.00 126.5 0.909 0.749 0.770 0.845 0.845 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

M c,Rd 70.9

M b,Rd 59.9 OK


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Deflection LL deflection = 0.58 x 1e8/(210,000 x 2,340) = 0.1 mm OK TL deflection = 2.46 x 1e8/(210,000 x 2,340) = 0.5 mm (L/3399)

Bearings R1 (19.45 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

R2 (19.45 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

Job number: Made by: KP Page: 11 Printed 17 Jun 2026 15:09


SAI Structrues Limited

KP

Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Job number: Made by: KP Page: 12 Printed 17 Jun 2026 15:09

Column calculation to EN1993-1-1 using S355 steel Location: C3 & C4 Length: 1.5 m. Pos Dur

Load

kN

A G B/F Bm: BR.23 [1.7 m.] : R1 A QA B/F Bm: BR.23 [1.7 m.] : R1 Total load kN

11.24 2.86 14.10

Fact 6.10 15.17 4.29 19.46

Load durations: G: Dead; Qx: Imposed; QA: Residential

SECTION SIZE : 80 x 80 x 8.0 HF SHS S355 (17.6 kg/m) Section properties: Ag = 22.4cm2 iz = 2.91 cm Design strength, fy = 355 N/mm2 e = 0.814 Classification: Flange: c/t = 56.0/8.0 = 7.00 <= 33e (26.8): Class 1, plastic [Table 5.2] Web: c/t = 56.0/8.0 = NAN <= 33e (26.8): Class 1, plastic Major axis: LEy = 1.0L = 1.50 m. Slenderness, ly = 1.50 x 100/2.91 = 51.5 Minor axis: LEz = 1.0L = 1.50 m. Slenderness, lz = 1.50 x 100/2.91 = 51.5 Compression Design axial load, NEd = 19.46 kN Design compression resistance, Nc,Rd = A.fy/gM0 = 22.40 x 100 x 355/(1.0 x 1000) = 795 kN OK Calculate flexural buckling resistances, Nb,Rd l1 = 93.9e = 93.9 x 0.814 = 76.4 Buckling about y-y (major) axis ly = ly/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(ly - 0.2) + ly2) = 0.78 [EC3 (6.49)] Flexural buckling reduction factor, cy = 1/(f + (f2 -ly2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,y,Rd = cyA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Buckling about z-z (minor) axis lz = lz/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(lz - 0.2) + lz2) = 0.78 [EC3 Table 6.2] Flexural buckling reduction factor, cz = 1/(f + (f2 - lz2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,z,Rd = czA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Bending about y-y (major) axis: N/A Bending about z-z (minor) axis: N/A


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 13

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: Loft floor joists Load name U G floor dead U QA Floor live

Printed 17 Jun 2026 15:09

Loading w1 0.75*0.80/2 1.5*0.80/2

Start x1 Loading w2 End x2 0 L 0 L Total load (unfactored): 2.70 kN Dead/Permanent (unfactored): 0.90 kN Live/Variable (unfactored): 1.80 kN Factored (6.10): 3.91 kN

R1comp 0.45 0.90 1.35 0.45 0.90 1.96

Span: 3.0 m. R2comp Defl. 0.45 0.32 0.90 0.63 1.35 0.95 0.45 0.32 0.90 0.63 1.96

Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 1.47 kNm (6.10) at 1.50 m. from R1 Maximum S.F. = 1.96 kN (6.10) at R1 Mid-span deflections: Dead: 0.32 x 108/EI (E in N/mm2, I in cm4) Live: 0.63 x 108/EI Total: 0.95 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 50 x 200 C24 4.2 kg/m approx W el,y = 333.3 cm3 Iy = 3,333 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 1.47 x 1000/333 = 4.40 N/mm2 OK Bending resistance = 12.18 x 333/1000 = 4.06 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 1.96 x 1000 x (3/2)/(33.5 x 200) = 0.44 N/mm2 OK Shear resistance = 2.03 x 33.5 x 200 x (2/3)/1000 = 9.07 kN

Deflection Final deflection limit = 0.003L = 9.00 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.01 x 106/((11,000/16) x 50 x 200) = 0.18 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 0.32 0.63

Inst. mm 0.86 1.73 0.18 2.77

kdef 0.60 0.60

y2 1.00 0.30

Final mm 1.38 2.04 0.23 3.65

OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 14

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: Loft floor joists Load name U G floor dead U QA Floor live P G stud partition P G Roof P QA Roof P G stud partition

Printed 17 Jun 2026 15:09

Loading w1 0.75*0.60/2 1.50*0.60/2 0.75*1.10*0.60/2 1.3*2.00*0.60/2 0.6*2.00*0.60/2 0.75*2.50*0.60/2

Start x1 Loading w2 End x2 0 L 0 L 0.60 0.60 0.60 2.75 Total load (unfactored): 4.38 kN Dead/Permanent (unfactored): 2.40 kN Live/Variable (unfactored): 1.98 kN Factored (6.10): 6.21 kN

R1comp 0.40 0.81 0.21 0.65 0.30 0.13 2.50 1.39 1.11 3.55

Span: 3.6 m. R2comp Defl. 0.40 0.49 0.81 0.98 0.04 0.12 0.13 0.37 0.06 0.17 0.43 0.36 1.88 2.48 1.01 1.33 0.87 1.15 2.66

Load types: U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 2.50 kNm (6.10) at 1.66 m. from R1 Maximum S.F. = 3.55 kN (6.10) at R1 Mid-span deflections: Dead: 1.33 x 108/EI (E in N/mm2, I in cm4) Live: 1.15 x 108/EI Total: 2.48 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 50 x 200 C24 4.2 kg/m approx W el,y = 333.3 cm3 Iy = 3,333 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 2.50 x 1000/333 = 7.49 N/mm2 OK Bending resistance = 12.18 x 333/1000 = 4.06 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 3.55 x 1000 x (3/2)/(33.5 x 200) = 0.79 N/mm2 OK Shear resistance = 2.03 x 33.5 x 200 x (2/3)/1000 = 9.07 kN

Deflection Final deflection limit = 0.003L = 10.80 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.75 x 106/((11,000/16) x 50 x 200) = 0.31 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 1.33 1.15

Inst. mm 3.63 3.14 0.31 7.08

kdef 0.60 0.60

y2 1.00 0.30

Final mm 5.81 3.71 0.43 9.95

OK


KP

SAI Structrues Limited Structural Engineer & Planner

Job number: Made by: KP Page: 15

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: Loft floor joists Load name U G floor dead U QA Floor live P G stud partition P G Roof P QA Roof

Printed 17 Jun 2026 15:09

Loading w1 0.75*0.60/2 1.50*0.60/2 0.75*1.10*0.60/2 1.3*2.00*0.60/2 0.6*2.00*0.60/2

Start x1 Loading w2 End x2 0 L 0 L 0.60 0.60 0.60 Total load (unfactored): 2.40 kN Dead/Permanent (unfactored): 1.36 kN Live/Variable (unfactored): 1.03 kN Factored (6.10): 3.40 kN

Load types: U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 0.958 kNm (6.10) at 0.60 m. from R1 Maximum S.F. = 1.89 kN (6.10) at R1 Mid-span deflections: Dead: 0.08 x 108/EI (E in N/mm2, I in cm4) Live: 0.05 x 108/EI Total: 0.14 x 108/EI

R1comp 0.17 0.34 0.15 0.47 0.22 1.34 0.79 0.55 1.89

Span: 1.5 m. R2comp Defl. 0.17 0.01 0.34 0.03 0.10 0.02 0.31 0.05 0.14 0.02 1.06 0.14 0.58 0.08 0.48 0.05 1.50


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 16

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: Typical Double-up Trimmer to support partition` Load name Loading w1 Start x1 Loading w2 End x2 U G Floor dead 0.58/0.25 0 L U QA Floor live 0.42/0.25 0 L U G stud partition 0.75*2.55 0 L Total load (unfactored): 9.46 kN Dead/Permanent (unfactored): 6.77 kN Live/Variable (unfactored): 2.69 kN Factored (6.10): 13.17 kN

R1comp 1.86 1.34 1.53 4.73 3.39 1.34 6.59

Span: 1.6 m. R2comp Defl. 1.86 0.20 1.34 0.14 1.53 0.16 4.73 0.50 3.39 0.36 1.34 0.14 6.59

Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 2.63 kNm (6.10) at 0.80 m. from R1 Maximum S.F. = 6.59 kN (6.10) at R1 Mid-span deflections: Dead: 0.36 x 108/EI (E in N/mm2, I in cm4) Live: 0.14 x 108/EI Total: 0.50 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 2no 50 x 200 C24 8.4 kg/m approx W el,y = 666.7 cm3 Iy = 6,667 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.0 Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.0/1.30 = 11.08 N/mm2 Design bending stress, sm,y,d = 2.63 x 1000/667 = 3.95 N/mm2 OK Bending resistance = 11.08 x 667/1000 = 7.38 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 100 = 67 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.0/1.30 = 1.85 N/mm2 Design shear stress, sv,y,d = 6.59 x 1000 x (3/2)/(67.0 x 200) = 0.74 N/mm2 OK Shear resistance = 1.85 x 67 x 200 x (2/3)/1000 = 16.49 kN

Deflection Final deflection limit = 0.003L = 4.80 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.89 x 106/((11,000/16) x 100 x 200) = 0.17 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 0.36 0.14

Inst. mm 0.49 0.20 0.17 0.85

kdef 0.60 0.60

y2 1.00 0.30

Final mm 0.79 0.23 0.24 1.26

OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 17

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: TB-02 Load name U G Floor dead U QA Floor live R G Floor dead R QA Floor live R G stud partition P G stud partition

Printed 17 Jun 2026 15:09

Loading w1 0.58/0.30 0.42/0.30 0.75*1.20/2 1.5*1.20/2 0.75*2.55 0.75*2.55*1.20/2

Start x1 Loading w2 End x2 0 L 0 L 0.90 L 0.90 L 0 0.90 0.90 Total load (unfactored): 9.15 kN Dead/Permanent (unfactored): 6.28 kN Live/Variable (unfactored): 2.87 kN Factored (6.10): 12.78 kN

R1comp 1.55 1.12 0.07 0.14 1.24 0.50 4.61 3.35 1.26 6.42

Span: 1.6 m. R2comp Defl. 1.55 0.16 1.12 0.12 0.25 0.02 0.49 0.03 0.48 0.10 0.65 0.10 4.53 0.52 2.92 0.37 1.61 0.15 6.36

Load types: U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 2.82 kNm (6.10) at 0.88 m. from R1 Maximum S.F. = 6.42 kN (6.10) at R1 Mid-span deflections: Dead: 0.37 x 108/EI (E in N/mm2, I in cm4) Live: 0.15 x 108/EI Total: 0.52 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber

Use 2no 50 x 200 C24 8.4 kg/m approx W el,y = 666.7 cm3 Iy = 6,667 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.0 Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]

Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.0/1.30 = 11.08 N/mm2 Design bending stress, sm,y,d = 2.82 x 1000/667 = 4.23 N/mm2 OK Bending resistance = 11.08 x 667/1000 = 7.38 kNm

Shear Effective width for shear, bef = kcr.b = 0.67 x 100 = 67 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.0/1.30 = 1.85 N/mm2 Design shear stress, sv,y,d = 6.42 x 1000 x (3/2)/(67.0 x 200) = 0.72 N/mm2 OK Shear resistance = 1.85 x 67 x 200 x (2/3)/1000 = 16.49 kN

Deflection Final deflection limit = 0.003L = 4.80 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 2.01 x 106/((11,000/16) x 100 x 200) = 0.18 mm Final shear deflection is assumed to increase in proportion to total bending deflection

Mid-span deflections: G: QA: Shear deflection: Total mm.

x 1e8/EI 0.37 0.15

Inst. mm 0.51 0.20 0.18 0.89

kdef 0.60 0.60

y2 1.00 0.30

Final mm 0.82 0.24 0.26 1.32

OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 18

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: B2.26 Load name OG o.w. U G floor dead U QA Floor live R G Stair R QA Stair P G stud partition P G Roof P QA Roof P G stud partition P G Beam: TB-02 : R2 P QA Beam: TB-02 : R2

Loading w1 0.3 0.75*0.60/2 1.50*0.60/2 1.00*1.60/2 1.50*1.60/2 0.75*1.10*0.60/2 1.3*2.00*0.60/2 0.6*2.00*0.60/2 0.75*2.50*0.80/2 2.92 1.61

Start x1 Loading w2 End x2 0 L 0 L 0 L 2.75 L 2.75 L 0.60 0.60 0.60 0.60 1.45 1.45 Total load (unfactored): 11.88 kN Dead/Permanent (unfactored): 7.27 kN Live/Variable (unfactored): 4.61 kN Factored (6.10): 16.73 kN

R1comp 0.54 0.40 0.81 0.08 0.12 0.21 0.65 0.30 0.63 1.74 0.96 6.44 4.25 2.19 9.03

Span: 3.6 m. R2comp Defl. 0.54 0.66 0.40 0.49 0.81 0.98 0.60 0.23 0.90 0.34 0.04 0.12 0.13 0.37 0.06 0.17 0.13 0.35 1.18 2.69 0.65 1.48 5.44 7.87 3.02 4.90 2.42 2.97 7.70

Load types: O:Beam o.w.; U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 9.13 kNm (6.10) at 1.45 m. from R1 Maximum S.F. = 9.03 kN (6.10) at R1 Mid-span deflections: Dead: 4.90 x 108/EI (E in N/mm2, I in cm4) Live: 2.97 x 108/EI Total: 7.87 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 30 UKC S275 D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y=222 cm3 Classification: Flange: c/t = 65.6/9.4 = 6.98 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/6.5 = 19.0 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 9.03 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.3x100 - 2x153x9.40 + (6.50+2x7.60) x9.40 = 1,159 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,159 x (275/ 3)/(1.0 x 1000) = 184 kN (>=9.03) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/6.5 = 21.35 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 9.13 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 248/1000 = 68.2 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 248.0 cm3 Iw = 0.031 dm6 IT = 10.5 cm4 Iz = 560 cm4 G = 81,000N/mm2


KP

SAI Structrues Limited Structural Engineer & Planner

Job number: Made by: KP Page: 19

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-3.60 4.64 9.1 1.00d 1.00 78.7 1.394 0.931 0.915 0.742 0.742 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

Deflection LL deflection = 2.97 x 1e8/(210,000 x 1,750) = 0.8 mm (L/4455) OK TL deflection = 7.87 x 1e8/(210,000 x 1,750) = 2.1 mm (L/1681)

Bearings R1 (9.03 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

R2 (7.70 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

Printed 17 Jun 2026 15:09

M c,Rd 68.2

M b,Rd 50.6 OK


KP

SAI Structrues Limited Structural Engineer & Planner

Job number: Made by: KP Page: 20

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Beam: BR.22 Load name O G o.w. P G Column: C3 & C4 P QA Column: C3 & C4 P G Column: C3 & C4 P QA Column: C3 & C4

Printed 17 Jun 2026 15:09

Loading w1 0.3 11.24 2.86 11.24 2.86

Start x1 Loading w2 End x2 0 L 2.00 2.00 3.45 3.45 Total load (unfactored): 29.3 kN Dead/Permanent (unfactored): 23.6 kN Live/Variable (unfactored): 5.7 kN Factored (6.10): 40.4 kN

R1comp 0.54 5.00 1.27 0.47 0.12 7.39 6.00 1.39 10.19

Span: 3.6 m. R2comp Defl. 0.54 0.66 6.24 10.73 1.59 2.73 10.77 1.36 2.74 0.35 21.89 15.83 17.56 12.75 4.33 3.08 30.20

Load types: O:Beam o.w.; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed:

Maximum B.M. = 19.57 kNm (6.10) at 2.00 m. from R1 Maximum S.F. = -30.20 kN (6.10) at R2 Mid-span deflections: Dead: 12.75 x 108/EI (E in N/mm2, I in cm4) Live: 3.08 x 108/EI Total: 15.83 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 30 UKC S275 D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y=222 cm3 Classification: Flange: c/t = 65.6/9.4 = 6.98 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/6.5 = 19.0 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 30.2 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.3x100 - 2x153x9.40 + (6.50+2x7.60) x9.40 = 1,159 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,159 x (275/ 3)/(1.0 x 1000) = 184 kN (>=30.2) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/6.5 = 21.35 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 19.57 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 248/1000 = 68.2 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 248.0 cm3 Iw = 0.031 dm6 IT = 10.5 cm4 Iz = 560 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-3.60 4.64 19.4 1.00d 1.00 78.7 1.394 0.931 0.915 0.742 0.742 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

M c,Rd 68.2

M b,Rd 50.6 OK


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Deflection LL deflection = 3.08 x 1e8/(210,000 x 1,750) = 0.8 mm (L/4295) OK TL deflection = 15.83 x 1e8/(210,000 x 1,750) = 4.3 mm (L/836)

Bearings R1 (10.19 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

R2 (30.20 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN

Job number: Made by: KP Page: 21 Printed 17 Jun 2026 15:09


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 22

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: B2.21 Load name O G o.w. U G Floor dead U QA Floor live R G Stud partition R G Floor dead R QA Floor live P G Bm: B2.26 [3.85 m.] : R2 P QA Bm: B2.26 [3.85 m.] : R2 P G Bm: BR.22 [3.6 m.] : R2 P QA Bm: BR.22 [3.6 m.] : R2

Loading w1 0.5 0.75*1.50/2 1.50*1.500/2 0.75*2.50 1.01/0.30 0.87/0.30 3.02 2.42 17.56 4.33

Start x1 Loading w2 End x2 0 L 0 L 0 L 0 2.20 1.50 L 1.50 L 1.50 1.50 5.25 5.25 Total load (unfactored): 69.8 kN Dead/Permanent (unfactored): 44.7 kN Live/Variable (unfactored): 25.1 kN Factored (6.10): 98.0 kN

R1comp 1.41 1.59 3.18 3.32 5.13 4.42 2.22 1.78 1.24 0.31 24.60 14.92 9.68 34.66

Span: 5.65 m. R2comp Defl. 1.41 7 1.59 7 3.18 15 0.80 8 8.84 37 7.62 32 0.80 8 0.64 7 16.32 14 4.02 3 45.22 139 29.76 82 15.46 57 63.37

Load types: O:Beam o.w.; U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 57.9 kNm (6.10) at 2.87 m. from R1 Maximum S.F. = -63.4 kN (6.10) at R2 Mid-span deflections: Dead: 82 x 108/EI (E in N/mm2, I in cm4) Live: 57 x 108/EI Total: 139 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 44 UKC S275 D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W el,y=326 cm3 Classification: Flange: c/t = 65.6/13.6 = 4.82 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/9.5 = 13.0 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 63.4 kN Shear area, Av = A - 2btf + (tw+2r)tf = 56.1x100 - 2x156x13.6 + (9.50+2x7.60) x13.6 = 1,705 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,705 x (275/ 3)/(1.0 x 1000) = 271 kN (>=63.4) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/9.5 = 14.61 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 57.9 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 372/1000 = 102 kNm OK Beam has full lateral restraint: check for lateral-torsional buckling not required Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

Deflection LL deflection = 57 x 1e8/(210,000 x 2,700) = 10.1 mm (L/560) OK TL deflection = 139 x 1e8/(210,000 x 2,700) = 24.5 mm (L/230)

Bearings Bearing plate sizing is to EC3 152 x 152 x 44 UC stiff bearing length, b1 = t + 1.6r + 2T = 48.9 mm Masonry: 7N/mm2 brick, shape factor, d = 0.850 [Table A1 BS EN 772-1] Normalised compressive strength, fb = 7.00 x 0.850 = 5.95 N/mm2 Mortar: M2: fm = 2.0 N/mm2 K = 0.5, a = 0.7, B = 0.3 [EC6-1-1 UK NA 2012 Table NA.4] a B 0.7 0.3 Characteristic compressive strength, fk = K.fb .fm = 0.50 x 5.95 x 2.00 = 2.15 N/mm2 [EC6-1 Eq(3.1)] Category II mfr, class 2 execution: gm = 3.0 [EC6-3 UK NA Table NA.1] Design compressive strength, fd = fk/gm = 2.15/3.0 = 0.715 N/mm2


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

R1 (34.7 kN) : 500 x 100 x 25 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (500-48.9)/2 = 226mm Factored stress under plate = 34.7 x 1000/500 x 100 = 0.69 N/mm2 Required plate thickness = (3 x 0.69 x 226 x 226/265) = 20.0 mm: use 25mm Factored bending stress in plate = 0.69 x 226 x (226/2)/(25 x 25/6) = 169 N/mm2 (fy=265 N/mm2) BOLTED CONNECTION TO BEAM/COLUMN

R2 (63.4 kN) : 900 x 100 x 40 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (900-48.9)/2 = 426mm Factored stress under plate = 63.4 x 1000/900 x 100 = 0.70 N/mm2 Required plate thickness = (3 x 0.70 x 426 x 426/265) = 38.0 mm: use 40mm Factored bending stress in plate = 0.70 x 426 x (426/2)/(40 x 40/6) = 239 N/mm2 (fy=265 N/mm2)

Job number: Made by: KP Page: 23 Printed 17 Jun 2026 15:09


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 24

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: BR.27 Load name O G o.w. U G Stud partition P G Bm: B2.21 [5.65 m.] : R1 P QA Bm: B2.21 [5.65 m.] : R1

Loading w1 0.3 1.35*2.50 14.92 9.68

Start x1 Loading w2 End x2 0 L 0 L 0.35 0.35 Total load (unfactored): 37.1 kN Dead/Permanent (unfactored): 27.4 kN Live/Variable (unfactored): 9.7 kN Factored (6.10): 51.5 kN

R1comp 0.51 5.74 13.38 8.68 28.32 19.63 8.68 39.53

Span: 3.4 m. R2comp Defl. 0.51 0.52 5.74 5.87 1.54 3.72 1.00 2.41 8.78 12.52 7.78 10.11 1.00 2.41 12.00

Load types: O:Beam o.w.; U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed:

Maximum B.M. = 14.52 kNm (6.10) at 0.98 m. from R1 Maximum S.F. = 39.5 kN (6.10) at R1 Mid-span deflections: Dead: 10.11 x 108/EI (E in N/mm2, I in cm4) Live: 2.41 x 108/EI Total: 12.52 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 203 x 133 x 30 UKB S275 D=206.8 mm B=133.9 mm t=6.4 mm T=9.6 mm Iy=2,900 cm4 iz=3.17 cm W pl,y=314 cm3 W el,y=280 cm3 Classification: Flange: c/t = 56.1/9.6 = 5.85 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 172.4/6.4 = 26.9 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 39.5 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.2x100 - 2x134x9.60 + (6.40+2x7.60) x9.60 = 1,456 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,456 x (275/ 3)/(1.0 x 1000) = 231 kN (>=39.5) OK [EC3 6.2.6] Shear buckling: hw/tw = 187.6/6.4 = 29.31 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 14.52 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 314/1000 = 86.3 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 314.0 cm3 Iw = 0.037 dm6 IT = 10.3 cm4 Iz = 385 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-3.40 4.49 14.5 1.00d 1.00 69.3 1.633 1.116 1.089 0.629 0.629 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

M c,Rd 86.3

M b,Rd 54.3 OK


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Job number: Made by: KP Page: 25 Printed 17 Jun 2026 15:09

Deflection LL deflection = 2.41 x 1e8/(210,000 x 2,900) = 0.4 mm (L/8592) OK TL deflection = 12.52 x 1e8/(210,000 x 2,900) = 2.1 mm (L/1654)

Bearings Bearing plate sizing is to EC3 203 x 133 x 30 UB stiff bearing length, b1 = t + 1.6r + 2T = 37.8 mm Masonry: 7N/mm2 brick, shape factor, d = 0.850 [Table A1 BS EN 772-1] Normalised compressive strength, fb = 7.00 x 0.850 = 5.95 N/mm2 Mortar: M2: fm = 2.0 N/mm2 K = 0.5, a = 0.7, B = 0.3 [EC6-1-1 UK NA 2012 Table NA.4] a B 0.7 0.3 Characteristic compressive strength, fk = K.fb .fm = 0.50 x 5.95 x 2.00 = 2.15 N/mm2 [EC6-1 Eq(3.1)] Category II mfr, class 2 execution: gm = 3.0 [EC6-3 UK NA Table NA.1] Design compressive strength, fd = fk/gm = 2.15/3.0 = 0.715 N/mm2 R1 (39.5 kN) : 250 x 225 x 10 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (250-37.8)/2 = 106mm Factored stress under plate = 39.5 x 1000/250 x 225 = 0.70 N/mm2 Required plate thickness = (3 x 0.70 x 106 x 106/275) = 9.29 mm: use 10mm Factored bending stress in plate = 0.70 x 106 x (106/2)/(10 x 10/6) = 237 N/mm2 (fy=275 N/mm2) R2 (12.0 kN) : 175 x 100 x 6 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (175-37.8)/2 = 68.6mm Factored stress under plate = 12.0 x 1000/175 x 100 = 0.69 N/mm2 Required plate thickness = (3 x 0.69 x 68.6 x 68.6/275) = 5.94 mm: use 6mm Factored bending stress in plate = 0.69 x 68.6 x (68.6/2)/(6 x 6/6) = 269 N/mm2 (fy=275 N/mm2)


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 26

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Beam: B2.22 Load name O G o.w. U G Ceiling U QA Ceiling R G Floor dead R QA Floor live R G Floor dead R QA Floor live P G Bm: BR.22 [3.6 m.] : R1 P QA Bm: BR.22 [3.6 m.] : R1 P G Bm: B2.26 [3.6 m.] : R1 P QA Bm: B2.26 [3.6 m.] : R1

Loading w1 0.5 0.25*1.30/2 0.25*1.30/2 1.39/0.30 1.11/0.30 0.79/0.30 0.55/0.30 6.00 1.39 4.25 2.19

Start x1 Loading w2 End x2 0 L 0 L 0 L 1.50 L 1.50 L 0 1.50 0 1.50 5.25 5.25 1.50 1.50 Total load (unfactored): 59.8 kN Dead/Permanent (unfactored): 37.2 kN Live/Variable (unfactored): 22.6 kN Factored (6.10): 84.1 kN

R1comp 1.41 0.46 0.46 7.06 5.64 3.43 2.38 0.42 0.10 3.12 1.61 26.10 15.91 10.19 36.76

Span: 5.65 m. R2comp Defl. 1.41 7 0.46 2 0.46 2 12.17 52 9.72 41 0.52 6 0.37 4 5.58 5 1.29 1 1.13 12 0.58 6 33.68 137 21.27 82 12.41 54 47.33

Load types: O:Beam o.w.; U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential

Maximum B.M. = 57.4 kNm (6.10) at 2.78 m. from R1 Maximum S.F. = -47.3 kN (6.10) at R2 Mid-span deflections: Dead: 82 x 108/EI (E in N/mm2, I in cm4) Live: 54 x 108/EI Total: 137 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 44 UKC S275 D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W el,y=326 cm3 Classification: Flange: c/t = 65.6/13.6 = 4.82 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/9.5 = 13.0 <= 72e (66.6): Class 1, plastic

Shear Design shear force, VEd = 47.3 kN Shear area, Av = A - 2btf + (tw+2r)tf = 56.1x100 - 2x156x13.6 + (9.50+2x7.60) x13.6 = 1,705 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,705 x (275/ 3)/(1.0 x 1000) = 271 kN (>=47.3) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/9.5 = 14.61 <= 72e (66.56): check not required [EC3 6.2.6(6)]

Bending Moment resistance Design moment, MEd = 57.4 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 372/1000 = 102 kNm OK Beam has full lateral restraint: check for lateral-torsional buckling not required Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked

Deflection LL deflection = 54 x 1e8/(210,000 x 2,700) = 9.6 mm (L/590) OK TL deflection = 137 x 1e8/(210,000 x 2,700) = 24.1 mm (L/235)

Bearings Bearing plate sizing is to EC3 152 x 152 x 44 UC stiff bearing length, b1 = t + 1.6r + 2T = 48.9 mm Masonry: 7N/mm2 brick, shape factor, d = 0.850 [Table A1 BS EN 772-1] Normalised compressive strength, fb = 7.00 x 0.850 = 5.95 N/mm2 Mortar: M2: fm = 2.0 N/mm2 K = 0.5, a = 0.7, B = 0.3 [EC6-1-1 UK NA 2012 Table NA.4] a B 0.7 0.3 Characteristic compressive strength, fk = K.fb .fm = 0.50 x 5.95 x 2.00 = 2.15 N/mm2 [EC6-1 Eq(3.1)] Category II mfr, class 2 execution: gm = 3.0 [EC6-3 UK NA Table NA.1]


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Design compressive strength, fd = fk/gm = 2.15/3.0 = 0.715 N/mm2 R1 (36.8 kN) : 550 x 100 x 25 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (550-48.9)/2 = 251mm Factored stress under plate = 36.8 x 1000/550 x 100 = 0.67 N/mm2 Required plate thickness = (3 x 0.67 x 251 x 251/265) = 21.8 mm: use 25mm Factored bending stress in plate = 0.67 x 251 x (251/2)/(25 x 25/6) = 201 N/mm2 (fy=265 N/mm2) BOLTED CONNECTION TO BEAM/COLUMN

R2 (47.3 kN) : 700 x 100 x 30 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (700-48.9)/2 = 326mm Factored stress under plate = 47.3 x 1000/700 x 100 = 0.68 N/mm2 Required plate thickness = (3 x 0.68 x 326 x 326/265) = 28.5 mm: use 30mm Factored bending stress in plate = 0.68 x 326 x (326/2)/(30 x 30/6) = 239 N/mm2 (fy=265 N/mm2) BOLTED CONNECTION TO BEAM/COLUMN

Job number: Made by: KP Page: 27 Printed 17 Jun 2026 15:09


SAI Structrues Limited

KP

Structural Engineer & Planner

Job number: Made by: KP Page: 28

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

Notched beam angle cleat connection check (EC3 + UK NA) Beam side calcs based on NCCI SN017a (fin plates), support side on SN014a (end plates)

Location: Typiccal Steel to steel Connection (152 UC) Factored load at support = 9.03 kN Beam: S275 152 x 152 x 30 UC connection to web of S275 152 x 152 x 44 UC Section dims: 152 x 152 x 30 UC: D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y 152 x 152 x 44 UC: D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W e Notch dimensions: Top: 70 x 18mm Bottom: 70 x 14mm Use 2no 100mm long 90 x 90 x 10 angle cleats 2no sets of M16 8.8 bolts at 50 mm centres

ANGLE CLEAT CONNECTION 100mm long 90 x 90 x 10mm angle cleats 152 x 152 x 44 UC 70

18

30

50

106.5

50

10

2 No sets M16 8.8 bolts

100

152 x 152 x 30 UC 14

Check detailing Check plate/cleat length (100mm) >= 0.6 x beam depth (94.6mm) OK Check bolt pitch (50mm) >= 2.2d0 (39.6mm) OK Check bolt end clearance (25mm) >= 1.2d0 (21.6mm) OK [EC3-1-8 Table 3.3] Check bolt edge clearance (40mm) >= 1.2d0 (21.6mm) OK [do.] Bolt resistance (M16 8.8 bolts) Shear resistance per bolt = Fv ,Rd = av .fub.As/gM2 = 0.6 x 800 x 157/(1.25 x 1000) = 60.3 kN [EC3-1-8 Table 3.4] Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 [EC3-1-8 Table 3.4] where av = 0.6; fub = 800 N/mm2; As = 157.0 mm2; gM2 = 1.25 ab is the smallest of ad, fub/fu or 1.0 ad = e1/3d0 for end bolts, (p1/3d0) - 0.25 for inner bolts (bolts in direction of load transfer) k1 = 2.8e2/d0 - 1.7 but <= 2.5 for inner bolts (bolts perpendicular to load transfer) and 1.4p2/d0 - 1.7 but <= 2.5 for inner bolts (do.) d0: bolt hole diameter (18 mm); e1: end distance; e2: edge distance; p1: pitch fu for t = 3-100mm: S275: 410N/mm2; S355: 470N/mm2 [EC3-1-1 UK NA 2.4: use product values not those in EC3] VRd,1, Beam web bolts in shear VRd,1 = n.Fv,Rd/ ((1 + an)2 + (Bn)2) [NCCI SN017a 3] Fv,rd = 2 x 60.3 = 121 kN (bolts are in double shear) For a single line of bolts a = 0; B = 6z/(n(n+1)p1) = 6 x 50/(2 x (2 + 1) x 50) = 1.000 VRd,1 = n.Fv,rd/ (1 + (Bn)2) = 2 x 121/ (1 + (1.000 x 2)2) = 108 kN OK VRd,2, Cleat in bearing (beam web bolts) VRd,2 = n/ (((1 + an)/Fb,Rd,ver)2 + (Bn/Fb,Rd,hor)2) a and B as above [NCCI SN017a 4] Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 10/(1.25 x 1000) = 85.09 kN VRd,2 = 2 x 2/ ((1/60.74)2 + (1.00 x 2/85.09)2) = 139 kN OK


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Printed 17 Jun 2026 15:09

VRd,3, Cleats in shear (gross section) VRd,3 = Av .fy,p/( 3gM0) [NCCI SN017a 5] Av = tp.hp/1.27 = 100 x 10/1.27 = 787 mm2 VRd,3 = 2 x 787 x 275/( 3 x 1.0 x 1000) = 250 kN OK VRd,4, Cleats in shear (net section) VRd,4 = Av,net.fu,p/( 3gM2) [NCCI SN017a 6] Av,net = (100 - 2 x 18) x 10 = 640 mm2 VRd,4 = 2 x 640 x 410/( 3 x 1.10 x 1000) = 275 kN OK VRd,5, Cleats in shear (block shear) VRd,5 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] gM2, partial factor for the resistance of net sections = 1.1 [EC3 UK NA 2.15] Ant = net area in tension = 31 x 10 = 310mm2; Anv = net area in shear = 48 x 10 = 480mm2 VRd,5 = 2 x (0.5 x 410 x 310/1.10 + (1/ 3) x 275 x 480/1.0)/1000 = 268 kN OK VRd,6, Support-side bolts in shear Fv,Rd,red = 0.8 Fv,Rd = 0.8 x 60.3 = 48.2 kN (0.8 reduction factor allows for tension in bolt) [SN014a 3] VRd,6 = n.Fv,rd,red = 2 x 2 x 48.2 = 193 kN OK [NCCI SN014a 3] VRd,7, Cleat in bearing (support-side bolts) Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,top = 2.50 x 0.463 x 410 x 16 x 10/(1.25 x 1000) = 60.7 kN Fb,Rd,oth = 2.50 x 0.676 x 410 x 16 x 10/(1.25 x 1000) = 88.7 kN As Fv,Rd,red (48.2 kN) < Fb,Rd,max (88.7 kN),VRd,7 = n.Fb,rd,min VRd,7 = 2 x 2 x 60.7 = 243 kN OK [NCCI SN014a 4] VRd,8, Beam web in bearing (beam web bolts) Fb,Rd = k1.ab.fu.d.tp/gM2 Fb,Rd,ver = 2.50 x 0.676 x 410 x 16 x 6.5/(1.25 x 1000) = 57.6 kN Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 6.5/(1.25 x 1000) = 55.3 kN VRd,8 = 2/ ((1/57.6)2 + (1.00 x 2/55.3)2) = 49.9 kN OK VRd,9, Beam web in shear (gross section) VRd,9 = Av,b.fy,b1/( 3gM0) [NCCI SN017a 11] Av,b = (157.6 - (18 + 14)) x 6.5 = 816 mm2 (Remaining web area only) VRd,9 = 816 x 275/( 3 x 1.0 x 1000) = 130 kN OK [NCCI SN017a 11] VRd,10, Beam web in shear (net section) VRd,10 = Av,b,net.fu,b1/( 3gM2) [NCCI SN017a 12] Av,b,net = 816 [Av,b] - (2 x 18 x 6.5) = 582 mm2 VRd,10 = 582 x 410/( 3 x 1.10 x 1000) = 125 kN OK VRd,11, Beam web in shear (block shear) VRd,11 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] Ant = net area in tension = 31 x 6.5 = 202mm2 Anv = net area in shear = 60.0 x 6.5 = 390mm2 VRd,11 = (0.5 x 410 x 202/1.10 + (1/ 3) x 275 x 390/1.0)/1000 = 99.5 kN OK VRd,12, Supporting beam web in bearing VRd,12 = nFb,Rd Fb,Rd = k1.ab.fu.d.t/gM2 k1 = 2.5; a = 50/(3 x 18) - 0.25 = 0.676 Fb,Rd = 2.50 x 0.676 x 410 x 16 x 9.5/(1.25 x 1000) = 84.2 kN VRd,12 = 2 x 2 x 84.2 = 337 kN OK Ductility check Check VRd (49.9 kN) < VRd,1 (107.8 kN) OK [SN017a 16] Rotational capacity has not been checked

Summary: VRd,1

Job number: Made by: KP Page: 29

Beam web bolts in shear

107.8 kN


KP

SAI Structrues Limited Structural Engineer & Planner

Job number: Made by: KP Page: 30

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

VRd,2 VRd,3 VRd,4 VRd,5 VRd,6 VRd,7 VRd,8 VRd,9 VRd,10 VRd,11 VRd,12

Printed 17 Jun 2026 15:09

Cleat in bearing (beam web bolts) Cleats in shear (gross section) Cleats in shear (net section) Cleats in shear (block shear) Support-side bolts in shear Cleat in bearing (support-side bolts) Beam web in bearing (beam web bolts) Beam web in shear (gross section) Beam web in shear (net section) Beam web in shear (block shear) Supporting beam web in bearing

139.4 kN 250.0 kN 275.4 kN 268.0 kN 192.9 kN 243.0 kN 49.9 kN ¬ 129.6 kN 125.3 kN 99.5 kN 337.0 kN

Critical design check: 8 - Beam web in bearing (beam web bolts): Connection resistance = 49.9kN OK


SAI Structrues Limited

KP

Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

Job number: Made by: KP Page: 31 Printed 17 Jun 2026 15:09

Notched beam angle cleat connection check (EC3 + UK NA) Beam side calcs based on NCCI SN017a (fin plates), support side on SN014a (end plates)

Location: Typiccal Steel to steel Connection (152 UC & 203 UB) Factored load at support = 34.7 kN Beam: S275 152 x 152 x 44 UC connection to web of S275 203 x 133 x 30 UB Section dims: 152 x 152 x 44 UC: D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W e 203 x 133 x 30 UB: D=206.8 mm B=133.9 mm t=6.4 mm T=9.6 mm Iy=2,900 cm4 iz=3.17 cm W pl,y=314 cm3 W el,y Notch dimensions: Top: 70 x 22mm Use 2no 100mm long 90 x 90 x 10 angle cleats 2no sets of M16 8.8 bolts at 50 mm centres

ANGLE CLEAT CONNECTION 100mm long 90 x 90 x 10mm angle cleats 22

70

30

50

109.5

50

2 No sets M16 8.8 bolts

100

10 152 x 152 x 44 UC

203 x 133 x 30 UB

Check detailing Check plate/cleat length (100mm) >= 0.6 x beam depth (99.6mm) OK Check bolt pitch (50mm) >= 2.2d0 (39.6mm) OK Check bolt end clearance (25mm) >= 1.2d0 (21.6mm) OK [EC3-1-8 Table 3.3] Check bolt edge clearance (40mm) >= 1.2d0 (21.6mm) OK [do.] Bolt resistance (M16 8.8 bolts) Shear resistance per bolt = Fv ,Rd = av .fub.As/gM2 = 0.6 x 800 x 157/(1.25 x 1000) = 60.3 kN [EC3-1-8 Table 3.4] Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 [EC3-1-8 Table 3.4] where av = 0.6; fub = 800 N/mm2; As = 157.0 mm2; gM2 = 1.25 ab is the smallest of ad, fub/fu or 1.0 ad = e1/3d0 for end bolts, (p1/3d0) - 0.25 for inner bolts (bolts in direction of load transfer) k1 = 2.8e2/d0 - 1.7 but <= 2.5 for inner bolts (bolts perpendicular to load transfer) and 1.4p2/d0 - 1.7 but <= 2.5 for inner bolts (do.) d0: bolt hole diameter (18 mm); e1: end distance; e2: edge distance; p1: pitch fu for t = 3-100mm: S275: 410N/mm2; S355: 470N/mm2 [EC3-1-1 UK NA 2.4: use product values not those in EC3] VRd,1, Beam web bolts in shear VRd,1 = n.Fv,Rd/ ((1 + an)2 + (Bn)2) [NCCI SN017a 3] Fv,rd = 2 x 60.3 = 121 kN (bolts are in double shear) For a single line of bolts a = 0; B = 6z/(n(n+1)p1) = 6 x 50/(2 x (2 + 1) x 50) = 1.000 VRd,1 = n.Fv,rd/ (1 + (Bn)2) = 2 x 121/ (1 + (1.000 x 2)2) = 108 kN OK VRd,2, Cleat in bearing (beam web bolts) VRd,2 = n/ (((1 + an)/Fb,Rd,ver)2 + (Bn/Fb,Rd,hor)2) a and B as above [NCCI SN017a 4] Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 10/(1.25 x 1000) = 85.09 kN VRd,2 = 2 x 2/ ((1/60.74)2 + (1.00 x 2/85.09)2) = 139 kN OK


KP

SAI Structrues Limited Structural Engineer & Planner

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

VRd,3, Cleats in shear (gross section) VRd,3 = Av .fy,p/( 3gM0) [NCCI SN017a 5] Av = tp.hp/1.27 = 100 x 10/1.27 = 787 mm2 VRd,3 = 2 x 787 x 275/( 3 x 1.0 x 1000) = 250 kN OK VRd,4, Cleats in shear (net section) VRd,4 = Av,net.fu,p/( 3gM2) [NCCI SN017a 6] Av,net = (100 - 2 x 18) x 10 = 640 mm2 VRd,4 = 2 x 640 x 410/( 3 x 1.10 x 1000) = 275 kN OK VRd,5, Cleats in shear (block shear) VRd,5 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] gM2, partial factor for the resistance of net sections = 1.1 [EC3 UK NA 2.15] Ant = net area in tension = 31 x 10 = 310mm2; Anv = net area in shear = 48 x 10 = 480mm2 VRd,5 = 2 x (0.5 x 410 x 310/1.10 + (1/ 3) x 275 x 480/1.0)/1000 = 268 kN OK VRd,6, Support-side bolts in shear Fv,Rd,red = 0.8 Fv,Rd = 0.8 x 60.3 = 48.2 kN (0.8 reduction factor allows for tension in bolt) [SN014a 3] VRd,6 = n.Fv,rd,red = 2 x 2 x 48.2 = 193 kN OK [NCCI SN014a 3] VRd,7, Cleat in bearing (support-side bolts) Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,top = 2.50 x 0.463 x 410 x 16 x 10/(1.25 x 1000) = 60.7 kN Fb,Rd,oth = 2.50 x 0.676 x 410 x 16 x 10/(1.25 x 1000) = 88.7 kN As Fv,Rd,red (48.2 kN) < Fb,Rd,max (88.7 kN),VRd,7 = n.Fb,rd,min VRd,7 = 2 x 2 x 60.7 = 243 kN OK [NCCI SN014a 4] VRd,8, Beam web in bearing (beam web bolts) Fb,Rd = k1.ab.fu.d.tp/gM2 Fb,Rd,ver = 2.50 x 0.611 x 410 x 16 x 9.5/(1.25 x 1000) = 76.2 kN Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 9.5/(1.25 x 1000) = 80.8 kN VRd,8 = 2/ ((1/76.2)2 + (1.00 x 2/80.8)2) = 71.4 kN OK VRd,9, Beam web in shear (gross section) VRd,9 = Av,b.fy,b1/( 3gM0) [NCCI SN017a 11] Av,b = Av /2 + (D/2 - NDT)t = 1,705/2 - (166.0/2 - 22) x 9.5 = 1,432 mm2 Avb = half gross shear area + remaining web above mid-height

VRd,9 = 1,432 x 275/( 3 x 1.0 x 1000) = 227 kN OK [NCCI SN017a 11] VRd,10, Beam web in shear (net section) VRd,10 = Av,b,net.fu,b1/( 3gM2) [NCCI SN017a 12] Av,b,net = 1,432 [Av,b] - (2 x 18 x 9.5) = 1,090 mm2 VRd,10 = 1,090 x 410/( 3 x 1.10 x 1000) = 235 kN OK VRd,11, Beam web in shear (block shear) VRd,11 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] Ant = net area in tension = 31 x 9.5 = 295mm2 Anv = net area in shear = 56.0 x 9.5 = 532mm2 VRd,11 = (0.5 x 410 x 295/1.10 + (1/ 3) x 275 x 532/1.0)/1000 = 139 kN OK VRd,12, Supporting beam web in bearing VRd,12 = nFb,Rd Fb,Rd = k1.ab.fu.d.t/gM2 k1 = 2.5; a = 50/(3 x 18) - 0.25 = 0.676 Fb,Rd = 2.50 x 0.676 x 410 x 16 x 6.4/(1.25 x 1000) = 56.8 kN VRd,12 = 2 x 2 x 56.8 = 227 kN OK Ductility check Check VRd (71.4 kN) < VRd,1 (107.8 kN) OK [SN017a 16] Rotational capacity has not been checked

Summary:

Job number: Made by: KP Page: 32 Printed 17 Jun 2026 15:09


KP

SAI Structrues Limited Structural Engineer & Planner

Job number: Made by: KP Page: 33

Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub

VRd,1 VRd,2 VRd,3 VRd,4 VRd,5 VRd,6 VRd,7 VRd,8 VRd,9 VRd,10 VRd,11 VRd,12

Printed 17 Jun 2026 15:09

Beam web bolts in shear Cleat in bearing (beam web bolts) Cleats in shear (gross section) Cleats in shear (net section) Cleats in shear (block shear) Support-side bolts in shear Cleat in bearing (support-side bolts) Beam web in bearing (beam web bolts) Beam web in shear (gross section) Beam web in shear (net section) Beam web in shear (block shear) Supporting beam web in bearing

107.8 kN 139.4 kN 250.0 kN 275.4 kN 268.0 kN 192.9 kN 243.0 kN 71.4 kN ¬ 227.4 kN 234.6 kN 139.4 kN 227.0 kN

Critical design check: 8 - Beam web in bearing (beam web bolts): Connection resistance = 71.4kN OK