20 Suffolk Road, Harrow, HA2 7QQ Stage 6- Building Regulations
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Title Sheet - 20 Suffolk
Road Stage 6- Buliding Regulations
Scale :
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
New Wall Demolition Plan
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Title Sheet - New Wall
Demolition Plan
Scale :
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6A
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Living
Porch
Demolished Chimney
Kitchen
Hallway
Garage
DEMOLITION SYMBOL LEGEND Wall Types Tag- See drawing for Wall Types
Dashed line indicates Walls and Windows to be demolished
2
Ground Floor New Wall and Demolition Plan 1 : 25
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Ground Floor New Wall &
Demolition Plan
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6A-01-6102
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Bedroom 2 Bedroom 3
1
LPW-6C-01-6146
Hallway
Bedroom 1
Bathroom
1
LPW-6C-01-6145
DEMOLITION SYMBOL LEGEND Wall Types Tag- See drawing for Wall Types
Dashed line indicates Walls and Windows to be demolished
1
First Floor New Wall and Demolition Plan 1 : 25
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : First Floor New Wall &
Demolition Plan
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6A-01-6103
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
LPW-6C-01-6147
1
LPW-6C-01-6146
No Brickwork Should be Visible on other Partition Wall Please make Insulated Wall
ETS.II-061
INW-14
INW-14 INW-14
IW-12
Demolish Existing Wall & Chimney Wall 2
LPW-6A-01-6104
1
ST-DR-P2-XX-412
Bedroom INW-11
1
LPW-6C-01-6144
Demolish Existing Roof & Gutter and replace with new Roof & Gutter
ETS.II-065
Bathroom
INW-11
INW-11 INW-11
INW-11
INW-11
Storage
ETS.II-065
1
ST-DR-P2-XX-411
ETS.II-065
1
Demolish Existing Roof & Gutter and replace with new roof
1
Loft Floor New walls and Demolition plan 1 : 25
Dashed line indicates Walls and Windows to be demolished 2
Retain Chimney Wall
Wall Types Tag- See drawing for Wall Types
ST-DR-P2-XX-410
2157
DEMOLITION SYMBOL LEGEND
Roof
Demolish Chimney Wall
7350
1753
LPW-6C-01-6145
IW-12
Demolition Plan
5440
2
1 : 25
HA2 7QQ
Drawing : Loft Floor New Wall &
Loft
Chimney Retention Section
Project : 20 Suffolk Road, Harrow,
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6A-01-6104
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
LPW-6C-01-6147
1
LPW-6C-01-6146
1
LPW-6C-01-6144
1
2
1
LPW-6C-01-6145
LPW-6A-01-6104
ST-DR-P2-XX-412
1
ST-DR-P2-XX-411
DEMOLITION SYMBOL LEGEND Wall Types Tag- See drawing for Wall Types
Dashed line indicates Walls and Windows to be demolished
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
1
Roof Floor New walls and Demolition plan
Drawing : Roof Floor New walls and
1 : 25
Demolition plan
2
ST-DR-P2-XX-410
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6A-01-6105
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Setting-Out Sheets- Plan, Sections & Elevations
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Title Sheet- Setting-Out
Sheets- Plan, Sections & Elevations
Scale :
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Living Kitchen
LEGEND
Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings Double/Triple Trimmers As shown in the Drawings
Hallway Porch
Roof Slope Direction in Decimal Degree
Hallway
Direction of Beam & Block Floor
VFS(Vertical Fire Stop) UP
Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
Garage
SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details
No Change to Plan
Window Type & Number- See Window Schedule for futher details Roof Tag
1t
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Setting-Out Plans- Proposed
Ground Floor Plan
Note: Front and back watering taps to be agreed by contractor with client. Contractor to agree suitable spot for car charging point in the fornt with client
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6122
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Bedroom 2 Bedroom 3
LEGEND
Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings Double/Triple Trimmers As shown in the Drawings
Hallway
Roof Slope Direction in Decimal Degree 13
UP
Direction of Beam & Block Floor DN
1
12
Bedroom 1
11
2
Bathroom
9 8
7
6
3 4
10
VFS(Vertical Fire Stop)
5
Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details Roof Tag
1t
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Setting-Out Plans- Proposed
First Floor Plan
Note: Front and back watering taps to be agreed by contractor with client. Contractor to agree suitable spot for car charging point in the fornt with client
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6123
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
0x
80
x8
0x
80
Neighbours Dormer
x8
8086 INW-14
113
1291
73
1500 653
1645
A
1291
5943 3003
INW-14
LEGEND
Existing Lintel/Beam Retain
IW-12
113
1351
700
76 24
808
100
2885
B
EDL.03 Type EDC
ETS.II-065
1
271
830
3900
830
850
36°
3066
W2.21 Stair Void Type WE
4
271
ETS.II-065
183
271
2018
100 mmø SWP
ST-DR-P2-XX-411
275
590
2880
1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
1639
2885
100
Notes:
1525
2705
100
1460
808 2018
5923
VFS(Vertical Fire Stop)
Stair Void
2185
1210 IW-12
800
1460
113
Direction of Beam & Block Floor
790
790
Stair Void
790
1425
1
NC-6C-YY-6161
113
113
100
710
Storage
963
Stair Void
Roof Slope Direction in Decimal Degree
INW-11
670
388
Stair Void
100
INW-11
1403 2501
1219
ETS.II-065
INW-11
Stair Void
INW-11
ID2.23 Type IDE
100 503
100 mmø SWP
1918
Bathroom
1918
40 mmø SWP
Double/Triple Trimmers As shown in the Drawings
1018
520
975
2834
ID2.21 Type IDB
Rafter Direction & Size As shown in the Drawings
271 5449
100 INW-11
INW-11
Joist Direction & Size As shown in the Drawings
2
3704
ID2.24 Type IDC
NC-6C-YY-6160
1525
EDL.04 Type EDC
Bedroom
Existing Joist Direction & Size Retain
2
2235
ID2.25 Type IDD
2848
1000
1
ST-DR-P2-XX-412
5939
NC-6A-01-6103
5440
FL-TM-02A
792
73
830
1673
3003
433
767
266
113
73
ETS.II-061
204
73
0 1560
ETS.II-061
300
1560
Lead finish to return Dormer cheek next to boundary
4 8 C HS S
3 8 C HS S
No Brickwork Should be Visible on other Partition Wall Please make Insulated Wall
1
NC-6C-YY-6163
1
NC-6C-YY-6162
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
8086
SYMBOL LEGEND
x8 80 0x 1 8 C HS S
1216
2827
964
Denotes Span of block on beam floor at ground floor level.
RF 05
3139
Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details
1
NC-6I-YY-6315
Roof Tag
1t
Project : 20 Suffolk Road, Harrow,
2
ST-DR-P2-XX-410
3
1 : 25
2
1
1
Loft floor Setting out plan
HA2 7QQ
Drawing : Setting-Out Plans- Proposed
Loft Floor Plan
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6124
Rev :
1
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
NC-6C-YY-6163
1
NC-6C-YY-6162
0
2x Trimmers
1
NC-6C-YY-6160
A
1006 2
NC-6A-01-6103
1:0
1
1140
ST-DR-P2-XX-412
Existing Joist Direction & Size Retain Existing Lintel/Beam Retain
2
3704
1:40
NC-6C-YY-6160
SW.09 Type SWA
LEGEND
Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings
907
1:0 1:0
5958
Double/Triple Trimmers As shown in the Drawings
RF 05
RF01
Roof Slope Direction in Decimal Degree
780
SW.10 Type SWC
Direction of Beam & Block Floor
27
VFS(Vertical Fire Stop)
B
780
SW.08 Type SWC
4018
Notes:
1639
1318 1
4
ST-DR-P2-XX-411
1
NC-6C-YY-6161
1:0
RF 05
1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details
1
NC-6I-YY-6315
Window Type & Number- See Window Schedule for futher details Roof Tag
1t
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
3
Roof Plan
2
ST-DR-P2-XX-410
1 : 25
2
1
1
Proposed Roof Plan
Drawing : Setting-Out Plans- Proposed
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6125
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
A
B
4
2 LPW-6A-01-6104
3704
1639 RF 05
SW.09 Type SWA
Top of Roof= 8515
SW.10 Type SWC
SW.08 Type SWC Roof 7350 36.1°
0
Top of Roof= 6401
°
36
36 °
Top of Roof= 5643 Top of Roof Edge= 5428
RF 05 36 Top of Roof Edge= 5040 °
Loft 5440 First Floor Ceiling 5160
First Floor 2785 Ground Floor Ceiling 2540
Ground Floor 0
Garden LVL -600
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Setting-Out Elevations-
Proposed Front Elevations
Scale : 1 : 25
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6140
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
4
B
A
0
2 LPW-6A-01-6104
1639
3704
398
RF01
Top of Roof= 8493
528
528
Glass Juliet Balcony
Roof
EDL.03 Type EDC
7350
EDL.04 Type EDC
ETS.II-065
1000
1000
1913
1913
Air Admittance Valve 100 mmø VP
300
238
Top of Roof Edge= 5040 ° 36
213 392
233
240
RF 05
240
Top of Roof= 5643
Loft 5440 First Floor Ceiling 5160
First Floor 2785 Ground Floor Ceiling 2540
Ground Floor 0
Garden LVL
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
-600
Drawing : Setting-Out Elevations-
Proposed Rear Elevations
Scale : 1 : 25
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6141
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
3
3079
Top of Roof Edge= 8593
1.4°
2
964
1
2827
1966
RF01
ETS.II-061
Roof 7350
36
Lead finish to return Dormer cheek next to boundary
.1°
100 mmø VP
RF 05
36
Top of Roof= 6401
Loft
233
Top of Roof Edge= 5428
36°
987
.1°
5440
First Floor Ceiling 5160
First Floor 2785 Ground Floor Ceiling 2540
Ground Floor 0
Garden LVL -600
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Drawing : Setting-Out Elevations-
Proposed LHS Elevations
Scale : 1 : 25
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6142
Rev :
1
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
2
1966
2827
3
964
3079
Top of Roof= 8493
Roof
C SH 1 S8
0x
80
RF 05
SW.10 Type SWC
Top of Roof Edge= 8493
x8
1.4°
RF01
SW.08 Type SWC
ETS.II-065
850 3153
7350
RF 05
.1° 36
Top of Roof Edge= 5428
W2.21 Type WE
Top of Roof= 5643
36 36°
Loft 5440
RF 05
36°
1200
Top of Roof= 6401
° Top of Roof Edge= 5040
First Floor Ceiling 5160
17°
First Floor 2785 Ground Floor Ceiling 2540
Ground Floor 0
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
Garden LVL -600
Drawing : Setting-Out Elevations-
Proposed RHS Elevations
Scale : 1 : 25
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6143
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
1
2
3 1
2
NC-6C-YY-6163
ST-DR-P2-XX-410
Membrane Legend
C SH 2 S8
0x
80
x8
NC-6C-YY-6162
Breather Membrane ( Ext wall, Sloping Roof)
RF01 Top of Roof Edge= 8593
988
15 13
178
409
1165
.1°
36
ETS.II-065
B2.23 / UB203x133x30
Top of Beam= 7176
1100
/ Structural Framing 1
Cavity Membrane ( Lintel)
ETS.II-065
Top of Roof Eaves= 5416 Top of Roof Edge= 5432
5440 First Floor Ceiling
225
25
Waterproof Membrane(Roof, Floor)
Loft
5160
13
285
22
Top of Beam= 5400
285
1925
2666
x8
2666
EDL.04 Type EDC
FL-TM-02A
600 285
80 Bedroom
Vapour Barrier - 1200 Guage( Roof, Walls) Vapour Barrier - 2000 Guage ( Roof, Walls)
240
Top of Roof Edge= 6098
Top of Beam= 5400
0x C SH 4 S8
INW-14
2666
8 0x x8 C SH 3 S8 0
°
.1 36
ID2.25 Type IDD
7350
LPW-6A-01-6104 NC-6A-01-6103
IW-12
Damp Proof Course(Wall)
Roof
2
/ Structural Framing 1
RF 05
Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)
1.4°
Top of Beam= 8295
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
SW.09 Type SWA
BR.30 / UC152x152x30
150 310
Top of Roof= 8515
RF 05 B2.20 / UKC152x152x44
B2.21 / UKC152x152x44
LEGEND
Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings
Red Line indicates Chimney Zone
Rafter Direction & Size As shown in the Drawings
1
Proposed Sections BB
Double/Triple Trimmers As shown in the Drawings
1 : 25
Roof Slope Direction in Decimal Degree Direction of Beam & Block Floor
VFS(Vertical Fire Stop)
Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details
1t
Roof Tag
Drawing : Setting-Out Sections-
Proposed Sections
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6144
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
2
3
Membrane Legend 1 NC-6C-YY-6162
BR.30 / UC152x152x30
1
2
NC-6C-YY-6163
ST-DR-P2-XX-410
Breather Membrane ( Ext wall, Sloping Roof)
RF01
Top of Roof= 8515
13
531
SW.08 Type SWC
Hot Water Tank
988
360 15
Top of Beam= 8295
Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)
Top of Roof Edge= 8493
1.4°
ETS.II-065
Roof
INW-11
1645
IW-12
Bedroom
11
Headroom
2000
B2.20 / UKC152x152x44
6 5 4 3
9 8 7
240
285
19819819819819819819819819819880
12 / 900x100x40 Steel Plate B2.21 / UKC152x152x44
Waterproof Membrane(Roof, Floor)
Top of Roof Edge= 5428
233
22
13
10
Bedroom 1
RF 05 FL-TM-02A
25
13 200
25
Top of Beam= 5400
Cavity Membrane ( Lintel)
Top of Beam= 5400
Storage
Vapour Barrier - 2000 Guage ( Roof, Walls)
1000
1166
36° Top of Roof Edge= 5428
ID2.21 Type IDB
LPW-6F-6230
1925
ID2.23 Type IDE
2135
.1°
3
2666
Boiler 36
Vapour Barrier - 1200 Guage( Roof, Walls)
7350
RF 05
Top of Roof= 6401
Damp Proof Course(Wall)
36
Loft
°
5440 First Floor Ceiling 5160
200 / 300x100x15 Steel Plate
LEGEND
Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings
Hallway
Rafter Direction & Size As shown in the Drawings
594
2 1
Existing Joist Direction & Size Retain
Double/Triple Trimmers As shown in the Drawings
First Floor
Top of Roof Edge= 2555
2785 Ground Floor Ceiling
Roof Slope Direction in Decimal Degree
2540
Direction of Beam & Block Floor
VFS(Vertical Fire Stop)
Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
Ground Floor 0 Top of Foundation= -600
Garden LVL -600
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
SYMBOL LEGEND
1
Denotes Span of block on beam floor at ground floor level.
Proposed Section BB
Wall Types Tag- See drawing for Wall Types
1 : 25
Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details
1t
Roof Tag
Drawing : Setting-Out Sections-
Proposed Sections
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6145
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1 ST-DR-P2-XX-411
1 1
ST-DR-P2-XX-412
NC-6C-YY-6160
0
NC-6C-YY-6160
A
Membrane Legend
2
B
4
2
1
NC-6A-01-6103
NC-6C-YY-6161
RF01
RF 05
Breather Membrane ( Ext wall, Sloping Roof) Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)
Top of Roof= 8593
x8
B2.23 / UB203x133x30
C SH 2 S8
380
0x
80
Damp Proof Course(Wall)
248
Party Wall Top of Beam= 7193
ID2.24 Type IDC
2100
Cavity Membrane ( Lintel)
INW-11
FL-TM-02A
Headroom
240
22
INW-11
2000
240 25
Top of Beam= 5400
ETS.II-065
36
Top of Roof Edge= 5040
486
LEGEND
5160
198198198198198
11
10
B2.22 / UC152x152x30
5440 First Floor Ceiling
1467
13 25
200
B2.26 / UC152x152x30
Loft
°
13
12
Waterproof Membrane(Roof, Floor)
1200
W2.21 Type WE
x8 0x C SH 4 S8 0
Top of Beam= 5400
Vapour Barrier - 2000 Guage ( Roof, Walls)
7350
Bathroom
8
1925
Bedroom
1913
EDL.04 Type EDC
Roof
1201
/ 100x150mm Conc. Padstone INW-14
Vapour Barrier - 1200 Guage( Roof, Walls)
INW-11
9
Existing Joist Direction & Size Retain Existing Lintel/Beam Retain
8
7
Joist Direction & Size As shown in the Drawings
6
Rafter Direction & Size As shown in the Drawings
5
4
2
1
Double/Triple Trimmers As shown in the Drawings
1188
3
Hallway
Roof Slope Direction in Decimal Degree
First Floor
Direction of Beam & Block Floor
2785
VFS(Vertical Fire Stop)
1
Section CC
Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
1 : 25
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Concrete encased around Ground Bearing Steel
Window Type & Number- See Window Schedule for futher details
1t
Roof Tag
Drawing : Setting-Out Sections-
Proposed Sections
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6146
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Membrane Legend 1
1
NC-6I-YY-6315
ST-DR-P2-XX-412
4
B
A
1
2
2
1
NC-6C-YY-6161
NC-6C-YY-6160
NC-6A-01-6103
NC-6C-YY-6160
Breather Membrane ( Ext wall, Sloping Roof)
0
Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)
1 ST-DR-P2-XX-411
RF01
Damp Proof Course(Wall) Vapour Barrier - 1200 Guage( Roof, Walls)
459
Top of Roof Edge= 8564
Vapour Barrier - 2000 Guage ( Roof, Walls)
ETS.II-061 INW-11
ETS.II-065
B2.23 / UB203x133x30
Top of Beam= 7193
Roof
Cavity Membrane ( Lintel)
7350
Waterproof Membrane(Roof, Floor)
C SH 4 S8 0x 8
INW-11
119
INW-11
2666
0x 8
SW.09 Type SWA
25
ID2.25 Type IDD
1 LPW-6F-6232
FL-TM-02A
22
LEGEND
Existing Joist Direction & Size Retain
Loft
285 13
200 25
Bedroom
285
B2.27 / UB203x133x30
1116
1100
Top of Beam= 5400
5440 First Floor Ceiling
Existing Lintel/Beam Retain
5160
Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings Double/Triple Trimmers As shown in the Drawings Roof Slope Direction in Decimal Degree
1
Direction of Beam & Block Floor
Section DD 1 : 25
VFS(Vertical Fire Stop)
Notes: 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
Project : 20 Suffolk Road, Harrow,
HA2 7QQ
SYMBOL LEGEND Denotes Span of block on beam floor at ground floor level. Wall Types Tag- See drawing for Wall Types Door Type & Number- See Door Schedule for futher details Window Type & Number- See Window Schedule for futher details
1t
Roof Tag
Drawing : Setting-Out Sections-
Proposed Sections
Scale : As indicated
Status : Construction
Date : 09/10/2026
Dwg No : LPW-6C-01-6147
Rev :
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Construction Details
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Title Sheet - Construction
Details
Scale : Date : 09/10/2026
Status : Construction
Rev :
Dwg No : LPW-6F
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
NEIGHBOURING PROPERTY
high performance PIR insulation board fitted between rafters to maintain a 50mm min. air gap over insulation for ventilation purposes & underdrawn with a thicker amount of the same board with taped joints to provide a vapour control layer & air leakage barrier. 25 x 47mm fixing batten between plasterboard & under rafter insulation, lined internally with 12.5mm thick plasterboard & 3mm thick skim coat finish typical thickness between rafters is 25-50mm & underdrawn with 75-90mm - U-value not to exceed 0.18W/m²K
10mm min. air space between back of new internal lining & existing party wall existing roof tiling, battens & roofing felt left in-situ
vertical height of stud wall typically 900-1200mm above finished floor level space behind used for storage accessed via hinged or sliding doors. note:- the stud wall is non-loadbearing unless designed otherwise by a structural engineer
50mm min. clear airgap over rafter insulation ensure top of cavity is fire stopped with a noncombustible board & maintain a continuity of insulation to prevent cold bridging 25mm continuous ventilation provided at eaves level by proprietory soffit or over gutter fascia vent
LOFT CONVERSION 50mm thick glass mineral wool or rock mineral wool slab insulation fitted between 50 x 75mm timber stud partition lining or 50mm metal "I" studs at 600mm max. c/c's for fire & sound purposes - this system will vary dependant on insulation manufacturer chosen studs finished internally with 2 layers of 12.5mm thick plasterboard with joints staggered between layers & all gaps sealed with acoustic sealant, finished internally with 3mm skim coat all to comply with Part E of the current Building Regulations. U-value not to exceed 0.30W /m²K
existing party wall construction - typically 215mm solid brickwork found on older properties with a traditional rafter & purlin roof. Newer properties have cavity party walls but are usually unsuitable for a loft conversion due to having a trussed rafter roof construction.
provide strutting by herringbone, solid or pre-galvanised mild steel as previously detailed
existing first floor ceiling / new second floor construction with stud wall as Details 2 & 3
5mm thick acoustic isolation strip screwed or glued at base of plasterboard for sound deadening purposes
existing first floor ceiling / new second floor construction as previously detailed seal gap between sloping ceiling & floor insulation to roof storage area as a continuation of rafter insulation or in floor space - agree this with your Local Authority Building Control Officer
LC-04
provide strutting by herringbone, solid or pre-galvanised mild steel - 1 row at midspan of floor span between 2.5-4.5m, with 2 rows equally spaced above a 4.5m span
LC-09
Party wall upgrade detail
Drawing note: this is a typical existing party wall upgrade detail showing an insulated wall to meet fire & sound purposes; the detail will vary depending on the construction of the party wall which are typically 215mm solid brickwork in older properties or cavity construction in newer houses. it is essential to make good the mortar pointing on the wall & fit a fire stop barrier at the existing wall / roof junction before fitting the new insulation & plasterboard.
Front Eaves detail - cold roof
Drawing note: this is a "cold" roof situation that is typically used in a loft conversion when the roof tiles are being left insitu. See Detail LC5 for "warm" roof detail that can be used when the roof tiles & roofing felt are being replaced ensure 50mm continuous ventilation is provided at ridge / high level by proprietory ridge vent or tile vents - this maintains cross ventilation throughout the roofspace
A
0 RF01
2x50mm mineral wool insulation
96
150 21
Code 4 Lead Flashing Dress over party wall upstand
13 150
442
12
Waterproofing Membrane
13
10025
25
Plain Tile to match Roof ETS.II-061
7350
Breather membrane Kingspan K116 100mmInsulation between 140mm s/w timber framework
1
Flashing Detail 1 : 10
Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)
ETS.II-065 Tile Faced Timber Wall(U-Value 0.14 W/m2k) External to Internal Finish: - 44 mm Matching Tile - 25X38mm Horizontal Timber Battens over, - 25X38mm Vertical Timber Battens over, - Tyvek Breathable Moisture Barrier Membrane with minimum 300mm overlapping between joints, over, - 15mm External Grade Plywood over Or use 12mm Promat Supalux Non-combustible/Fire-Rate Board where walls are within 1 meter of the boundry wall. over - 50x140mm C16 Tanalized Timber structure filled with 120mm Kigspan K112 insulation between studs over, - Vapour barrier membrane over, - 37.5 mm Kingspan K118 insulated plasterboard skimmed finished. MR Plasterboard in Wet Zone
Vapour Barrier - 1200 Guage( Roof, Walls) Vapour Barrier - 2000 Guage ( Roof, Walls) Cavity Membrane ( Lintel) Waterproof Membrane(Roof, Floor)
Project : 20 Suffolk Road, Harrow, HA2
7QQ
20mm Kingspan K112 Insulated Plaster board
Code 4 Lead Flashing Dress over party wall upstand
Breather Membrane ( Ext wall, Sloping Roof)
Damp Proof Course(Wall)
14 32 183
Vapor Barrier membrane
Membrane Legend
Boundary Line
20
25x38mm vertical Timber batten @ 400mm Centres
RF01- Extension Flat Warm Deck Roof Construction with GRP Waterproofing & 50x150mm Joists (U-Value 0.14 W/m2k) - 5mm Fire Rated Kemrol Water Proofing or White-Knight® Cold Applied Liquid Flat Roofing (Reaction to fire BRoofT4) - over 18mm OSB T&G Board with staggered joints. - over 150mm Celotex XR4000 Thermal Insulation mechanically fixed. Insulation laid 90 degrees to OSB Board Joints below, - over Vappour Barrier (Minimum 1200 Gauge Polythebe) stand over Plywood - over 12mm OSB Board with staggered joints. - over (25mm) reducting height firrings dropping in desired direction - over 50x150mm Tanalised Timber Joist @400 centers filled with 100mm of mineral wool insulation in joists gaps at roof & external wall junction. - over 12.5mm Plasterboard.
Drawing : Loft & Stair Details Metal Soakers
Scale : As indicated Date : 09/10/2026
Status : Construction
Rev :
Dwg No : LPW-6F-6232
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
18-25mm thick external grade timber fascia / upvc fascia fixed to battens screwed to wall and roof silcone mastic seal to window / head plate caulking / mastic seal to ceiling & wall plasterboard junction
LC-17
10 0
typical "warm" pitched roof as show on drawing number LC05
50
50
fascia edging / roofing edge finished with pre-formed galvanised mild steel roofing trim as detailed in your chosen flat roofing membrane / felt manufacturers guidance notes - this will vary slightly between different manufacturers VCL sealed at edge with jointing tape or welt as chosen manufacturers details
0 10
high performance single ply roofing membrane / finish shown fully adhered to top of insulation with hot air welds - this can also be mechanically fixed & the detail will vary between manufacturers, typically with 100-150mm laps
high performance PIR insulation board fitted over the VCL - use a tapered board or construct flat roof with firrings to achieve a 1:80 min. fall to BS 6229: 2018 for single ply membranes or BS 8217: 2005 for bitumen / built-up felt roofing. typical overall thickness is 150mm dependent on the thermal resistance value of the insulation used. U-value not to exceed 0.14W /m²K for new build construction
150 mm
900
single ply roofing membrane to be extended and secured under timber fillet. abutment membrane to extend over timber fillet and secured under lead flashing or suitable non-toxic alternative min. requirement of 150mm above the finished roof level and detail varies depending on manufacturers requirements
18-25mm thick external grade ply decking 500 gauge min. vapour control layer & air leakage barrier nailed or stapled to decking with 100mm min. laps flat roof joists at 400mm max. c/c's - sizing taken from span charts / BS 5268-2: 2002 or calculated by structural engineer if overspanned
typical "warm" flat roof as drawing number LC17 with high performance single ply roofing membrane
12.5mm thick plasterboard internal lining with 3mm thick skim coat finish
Flat roof eaves detail - warm roof
Drawing note: this is a "warm" roof situation which is becoming the most common finish for flat roof extensions, a warm roof has less chance of thermal movement, condensation & cold bridging. please note most flat roofs must be laid to a fall to avoid water pooling, check manufacturers and installers recommendations. the window head is shown with the ceiling running through at the same level - it is also common to have a section of wall above the head to the ceiling level depending on what is the required height, minimum recomended FFL to ceiling height should be 2.3m
LC-18
new flat roof / ceiling joists supported off galvanised mild steel joist hangers or into the web of the steel beam - detail to be designed and agreed by the structural engineer & will vary from project to project
new steel beam built in, blocked-out with timber noggins & bolted thru typically with M10 or M12 diameter bolts at 500mm max. c/c's - dependant on the ceiling level required & the height of the existing ridge, additional timber beams may be required to support the underside of the existing ridge - the beam size & detail must be calculated & designed by structural engineer & will vary from project to project
Dormer - flat roof / ridge abutment Drawing note: this is a single ply roofing membrane flat roof / ridge junction detail that is typical on many domestic loft conversions - there are many variants on this theme & they will vary depending on the height of the existing ridge & the ceiling height required for the project; sometimes the flat roof will come directly off the ridge & may require removal of the ridge board with a new ridge beam, or the new beam will be positioned directly under the existing ridge board each project will be individually designed & calculated by a structural engineer. ensure flashing between the new flat roof & the existing sloping roof has adequate laps to ensure it is watertight & prevents any driving rain from getting into the structure.
Membrane Legend Breather Membrane ( Ext wall, Sloping Roof) Damp Proof Membrane- 1200 Guage( Floor) Damp Proof Membrane- 2000 Guage ( Floor)
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Damp Proof Course(Wall) Vapour Barrier - 1200 Guage( Roof, Walls) Vapour Barrier - 2000 Guage ( Roof, Walls) Cavity Membrane ( Lintel) Waterproof Membrane(Roof, Floor)
Drawing : Loft & Stair Details
Scale : As indicated Date : 09/10/2026
Status : Construction
Rev :
Dwg No : LPW-6F-6233
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
Proposed Structural Drawings & Calcs Set
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Proposed Structural
Drawings & Calcs Title
Scale : Date : 12/06/2026
Status : Construction
Rev :
Dwg No : ST-DR-
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
4 8 C HS S
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
Masonary Wall
0x 80
3 8 C HS S
x8
External Timber Wall
0x
/ 700x100x30 Steel Plate 2
NC-6C-YY-6163
1
NC-6C-YY-6162
Internal Timber Stud Wall
80 x8
B2.22 / UC152x152x30
/ 900x100x40 Steel Plate
0 433 1
NC-6C-YY-6160
2
2
NC-6A-01-6103
B2.20 / UKC152x152x44
1
ST-DR-P2-XX-412
50x200,C24 @ 400 c/c
NC-6C-YY-6160
A
298
653
B2.21 / UKC152x152x44
767
50x200,C24 @ 400 c/c
3704
Existing lintel or beam to be retain 100x100 Stair Newel post as per Stair case designer's requirements.
B2.26 / UC152x152x30
Existing ceiling joists to be retain
LEGEND
Existing Joist Direction & Size Retain
B
Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings
B2.27 / UB203x133x30
1822
1639
1639
Stair Void
1
ST-DR-P2-XX-411
4
183
140
Direction of Beam & Block Floor
VFS(Vertical Fire Stop)
x8 80 0x 1 8 C HS S
Steel Base Plate
2827
/ 400x225x20 Steel Plate
Notes:
964
3079
Loft floor Strcuctural Showing Below 1 : 25
1
NC-6I-YY-6315
1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
Base Level
Base Offset Top Level
Top Offset
1753 -40 -40 0
787 -364 -364 787
Roof Roof Roof Roof
Mark C2 C4 C3 C1
Type
Column Location Mark
SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8
A-2 A-3(-312) A-2(-767) 2-4
Reference Level
Length 944 1586 1586 2697
Type Comments
Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³
Comments
Roof Roof Loft Loft Loft Loft Loft
Mark
Type
BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30
Cut Length 5423 1500 5808 5693 3534 3534 3098
Volume 0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³
2
ST-DR-P2-XX-410
3
2
1 Proposed Steel Column Schedule
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Proposed Loft Plan Structure
Proposed Steel Beam Schedule
Loft Loft Loft Loft
Roof Slope Direction in Decimal Degree
2x Trimmers
1216
1
Double/Triple Trimmers As shown in the Drawings
/ 300x100x15 Steel Plate
1
NC-6C-YY-6161
/ 550x100x25 Steel Plate
Rafter Direction & Size As shown in the Drawings
Start Level Offset 945 -157 0 0 0 0 0
End Level Offset 945 -157 0 0 0 0 0
Comments
Scale : 1 : 25 Date : 12/06/2026
Status : Construction
Rev :
Dwg No : ST-DR-P2-02-402
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
/ 100x150mm Conc. Padstone
B2.23 / UB203x133x30
1
NC-6C-YY-6163
1
NC-6C-YY-6162
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
TB-01 (Slopping rafters): 2/50x225, C24 bolted together
/ 100x150mm Conc. Padstone
0
2x Trimmers
NC-6C-YY-6160
1
NC-6C-YY-6160
2
A
2
NC-6A-01-6103
BR.30 / UC152x152x30
1
ST-DR-P2-XX-412
50x175,C24 @ 400 c/c
50x150,C24 @ 400 c/c
LEGEND DN
B
Existing Joist Direction & Size Retain Existing Lintel/Beam Retain Joist Direction & Size As shown in the Drawings Rafter Direction & Size As shown in the Drawings
4
1
ST-DR-P2-XX-411
1
NC-6C-YY-6161
Double/Triple Trimmers As shown in the Drawings Roof Slope Direction in Decimal Degree Direction of Beam & Block Floor
VFS(Vertical Fire Stop)
Notes:
2
ST-DR-P2-XX-410
Proposed Steel Beam Schedule 1
NC-6I-YY-6315
1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. THE CONTRACTOR TO CHECK ALL DIMENSIONS, ANGLES, DRAIN RUNS AND CONDITIONS ON SITE BEFORE WORKS COMMENCEMENT. ANY DISCREPANCIES REPORT IMMEDIATELY TO THE ENGINEER. 3. CONDITION OF ALL EXISTING STRUCTURAL ELEMENTS, WITH PARTICULAR ATTENTION TO EXISTING BEARING WALLS TO BE USED FOR THE PROPOSED DEVELOPMENT, TO BE CHECKED BY THE CONTRACTOR BEFORE WORKS COMMENCEMENT. 4. DRAWINGS TO BE READ IN CONJUNCTION WITH RELATIVE STRUCTURAL CALCULATIONS, DETAILS AND SPECIFICATION. 5. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE INDICATIVE ONLY. 6. CONTRACTOR AND CLIENT TO BE AWARE OF CONSTRUCTION & DESIGN MANAGEMENT (CDM) DUTIES. 7. FOR PROPOSED STRUCTRAL BEAM AND COLUMN SCHEDULE REFER SHEET NO. ST-DR-P2-00-10
Reference Level
3
2
1
Roof Roof Loft Loft Loft Loft Loft
Mark
Type
BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30
Cut Length 5423 1500 5808 5693 3534 3534 3098
Volume
Start Level Offset
End Level Offset
0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³
945 -157 0 0 0 0 0
945 -157 0 0 0 0 0
Comments
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Proposed Roof Plan
Structure
Proposed Steel Column Schedule
1
Roof Plan Showing Structures Below 1 : 25
Base Level Loft Loft Loft Loft
Base Offset Top Level
Top Offset
1753 -40 -40 0
787 -364 -364 787
Roof Roof Roof Roof
Mark C2 C4 C3 C1
Type
Column Location Mark
SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8
A-2 A-3(-312) A-2(-767) 2-4
Length 944 1586 1586 2697
Type Comments
Scale : 1 : 25 Date : 12/06/2026 Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³
Comments
Status : Construction
Rev :
Dwg No : ST-DR-P2-RL-403
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1 1 ST-DR-P2-XX-411 NC-6C-YY-6161
1 NC-6I-YY-6315
1
2 NC-6C-YY-6160
ST-DR-P2-XX-412
1 NC-6C-YY-6160
2 NC-6A-01-6103
BR.30 / UC152x152x30
x8
x8 80 0x 2 8 C HS S
1607
Top of Beam= 8295
Roof
B2.23 / UB203x133x30
7350
/ Structural Framing 1
600
60
x8 80 0x 4 8 C HS S
0x
80
Top of Beam= 6997
C SH 1 S8
/ 100x150mm Conc. Padstone
60
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
600
/ 300x100x15 Steel Plate
Loft 5440 First Floor Ceiling 5160 B2.27 / UB203x133x30
/ 900x100x40 Steel Plate B2.20 / UKC152x152x44
Proposed Steel Beam Schedule
Reference Level Roof Roof Loft Loft Loft Loft Loft
Mark
Type
BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30
Cut Length
Volume
Start Level Offset
5423 1500 5808 5693 3534 3534 3098
0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³
945 -157 0 0 0 0 0
End Level Offset 945 -157 0 0 0 0 0
Comments
Proposed Steel Column Schedule
Base Level Loft Loft Loft Loft
Base Offset Top Level
Top Offset
1753 -40 -40 0
787 -364 -364 787
Roof Roof Roof Roof
Mark C2 C4 C3 C1
Type
Column Location Mark
SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8
A-2 A-3(-312) A-2(-767) 2-4
Length
Type Comments
944 1586 1586 2697
Volume
Comments
0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Proposed Structural Sections
Scale : 1 : 25 Date : 12/06/2026
Status : Construction
Rev :
Dwg No : ST-DR-P2-XX-410
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
1
2
NC-6C-YY-6162
NC-6C-YY-6163
ST-DR-P2-XX-410
8295 mm Top of Beam BR.30 / UC152x152x30
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
7350 mm Top of Beam
B2.23 / UB203x133x30
7350
4 8 C HS S x8
80
0x
x8
x8
80
80
0x
0x
3 8 C HS S
1 8 C HS S
Roof
5400 mm Top of Beam
5400 mm Top of Beam
Top of Base Plate= 5440
B2.26 / UC152x152x30
Top of Steel Plate= 5194
Top of Steel Plate= 5242
Top of Steel Plate= 5193
Loft 5440 First Floor Ceiling
B2.20 / UKC152x152x44
5160 Steel Base Plate
/ 550x100x25 Steel Plate
/ 900x100x40 Steel Plate
/ 400x225x20 Steel Plate
B2.27 / UB203x133x30
/ 300x100x15 Steel Plate
Existing Foundation
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Proposed Structural Sections Proposed Steel Beam Schedule
Proposed Steel Column Schedule
Base Level Loft Loft Loft Loft
Base Offset Top Level 1753 -40 -40 0
Roof Roof Roof Roof
Top Offset 787 -364 -364 787
Mark C2 C4 C3 C1
Type SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8
Column Location Mark A-2 A-3(-312) A-2(-767) 2-4
Length 944 1586 1586 2697
Type Comments
Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³
Comments
Reference Level Roof Roof Loft Loft Loft Loft Loft
Mark
Type
BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30
Cut Length
Volume
Start Level Offset
5423 1500 5808 5693 3534 3534 3098
0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³
945 -157 0 0 0 0 0
End Level Offset 945 -157 0 0 0 0 0
Comments
Scale : 1 : 25 Date : 12/06/2026
Status : Construction
Rev :
Dwg No : ST-DR-P2-XX-411
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
1
1
2
NC-6C-YY-6162
NC-6C-YY-6163
ST-DR-P2-XX-410
Chimney To be Retained 8295 mm Top of Beam
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
0x
80
x8
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
1322
C SH 2 S8
BR.30 / UC152x152x30
7350 mm Top of Beam
Roof 7350
0x x8 C SH 4 S8 0
2038
C SH 3 S8
0x
8
80
x8
B2.23 / UB203x133x30
5400 mm Top of Beam 5400 mm Top of Beam Top of Base Plate= 5234
Top of Steel Plate= 5233
Loft 5440 First Floor Ceiling
/ 700x100x30 Steel Plate 2
B2.22 / UC152x152x30
B2.20 / UKC152x152x44
B2.21 / UKC152x152x44
5160
/ 900x100x40 Steel Plate
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Proposed Steel Beam Schedule
Reference Level
Proposed Steel Column Schedule
Base Level Loft Loft Loft Loft
Base Offset Top Level
Top Offset
1753 -40 -40 0
787 -364 -364 787
Roof Roof Roof Roof
Mark C2 C4 C3 C1
Type
Column Location Mark
SHS80x80x8 SHS80x80x8 SHS80x80x8 SHS80x80x8
A-2 A-3(-312) A-2(-767) 2-4
Length 944 1586 1586 2697
Type Comments
Volume 0.00 m³ 0.00 m³ 0.00 m³ 0.01 m³
Comments
Roof Roof Loft Loft Loft Loft Loft
Mark
Type
BR.30 UC152x152x30 B2.23 UB203x133x30 B2.20 UKC152x152x44 B2.21 UKC152x152x44 B2.22 UC152x152x30 B2.26 UC152x152x30 B2.27 UB203x133x30
Cut Length 5423 1500 5808 5693 3534 3534 3098
Volume
Start Level Offset
End Level Offset
0.02 m³ 0.01 m³ 0.03 m³ 0.03 m³ 0.01 m³ 0.01 m³ 0.01 m³
945 -157 0 0 0 0 0
945 -157 0 0 0 0 0
Drawing : Proposed Structural Sections Comments
Scale : 1 : 25 Date : 12/06/2026
Status : Construction
Rev :
Dwg No : ST-DR-P2-XX-412
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
25 0x 10 late x 50 P / 5 teel S
0x 1 8 C HS S x8 80
UC BR 15 .30 2x 15 / 2x 3
0
U
U
x8 80
/ 0 .26 2x3 B2 x15 2 15 UC
/ Co 100x nc 15 . P 0m ad m sto ne
0x 2 8 C HS S
/ 0 .27 x3 B2 x133 03 B2
/9 0 Ste 0x10 el 0x4 Pla 0 te
/ 0 .23 x3 B2 x133 03 B2
UK
x 80 0x 3 8 C HS S
4
8
x 80 0x 4 8 C HS S
20 5x 22 late x 00 P / 4 teel S
B C1 2.20 52 x1 / 52 x4
8
/3 0 Ste 0x10 el 0x1 Pla 5 te
/ 0 .22 2x3 B2 x15 2 15 UC
30 0x 10 te 2 x la 00 / 7 eel P St
/ Co 100x nc 15 . P 0m ad m sto ne
UK B2 C1 .21 52 x1 / 52 x
44 0 x4 00 te 1 x 00 Pla / 9 teel S
L-Shaped Steel Straps @ 600mm centres to hold steel columns in place
Project : 20 Suffolk Road, Harrow, HA2
7QQ
Drawing : Loft Floor 3Ds
Scale : Date : 12/06/2026
Status : Construction
Rev :
Dwg No : ST-DR-P2-XX-423
DESIGNLABS LONDON
ARCHITECTURE / INTERIOR / MANAGEMENT / PLANNING T: 07870661614 / 07888831314 E: info@designlabslondon.com W: www.designlabslondon.com © THIS DRAWING IS THE COPYRIGHT OF DESIGNLABS LONDON LTD (DLL). It shall not be in any way used or reproduced or construct without their prior written consent. All dimensions are to be checked on site by client or contractor prior to commencing any work. Work only to figured dimensions. Any discrepancies are to be reported to the DLL in writing and DLL shall not take responsiblity for site failing to inform discrepancies.
17/06/2026
STRUCTURAL CALCUALTION FOR 20 Suffolk Road, Harrow, HA2 7QQ
KUNTAL PATEL SAI STRUCTURES LIMITED STRUCTURE ENGINEER, PLANNER & CONTRACTOR Mobile: (+44) 794 772 3532, Email: info@saistructures.co.uk Website: https://saistructures.co.uk & https://saidevelopers.co.uk
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
1 Date
App'd
Date
17/06/2026
INTRODUCTION: The following document is associated with the construction work to take place at the above mentioned address and contains design calculations for structural elements, as well as approximate schematic arrangements of those elements. IMPORTANT GUIDANCE ON THE USE OF THIS DOCUMENT (TO BE READ BY ALL PARTIES): This document is intended to be accompanied by all relevant architect’s and engineer's drawings, and all relevant documentation should be considered prior to commencement of the work. Engineer's drawings relating to this document will be explicitly outlined herein. This document should be reviewed in its entirety (along with any other relevant documentation) by the builder, architect (if applicable) and client, prior to commencement of the work. Any layouts, instructions or recommendations should be considered. Any deviations from the proposals outlined herein are to be approved by the engineer prior to the work being undertaken. Any deviations from the proposals made without the engineer's consent are beyond the scope of this document and the engineer cannot be held liable for any adverse consequences of such deviations. The calculations within this document have been carried out in good faith based on the data provided by the client and/or builder/architect. Extracts of the information provided will be included within this document for reference where appropriate. It is the responsibility of the architect (where applicable) or client to notify the engineer when changes are made to the information. This will enable the design to be reviewed and, where necessary, changes made. Approval of these calculations and drawings by the Local Authority Building Control should be obtained prior to any ordering of material or fabrication. No liability is accepted for any changes that may be required as a result of work having commenced prior to such an approval having been obtained. Where information about the existing arrangements of buildings is not available (e.g. floor / roof span orientations or load-bearing wall arrangements) the engineer will use their judgement to make assumptions. These (generally conservative) assumptions will be clearly outlined within the document, and should be confirmed by a suitably qualified individual on site. The engineer is then to be notified of any discrepancies prior to commencement of the work as design changes may be necessary. Where drawings, construction specifications, method statements or additional design calculations are omitted and are not referenced it is because these have not been requested by the client. These can be made available by the engineer at the client's request. IF IN DOUBT: ASK!! It should be noted that until the existing structure has been exposed it is not always possible to foresee what the existing structural arrangement will be. This may include floor and roof span directions, construction materials and existing beam locations among other aspects. It is therefore advised to remove finishes from areas being modified as early as possible to avoid any delays on site that the untimely discovery of such information can lead to. In addition, it is advised to carry out some form of ground investigation as early as possible to avoid any unexpected construction requirements which may cause delays on site e.g. piled foundations. Wherever there is any uncertainty we will make every effort to highlight where this lies, however suitable project planning / management by the contractor/client are essential to the smooth execution of any construction project.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
2 Date
App'd
Date
17/06/2026
HEALTH & SAFETY It should be noted that structural work, particularly where this involves the transit and installation of large, heavy structural elements, has the potential to be hazardous. Where possible any specific risks are identified either within these calculations or drawings related to this document. An overview of the health and safety risks which may result from the undertaking of instructions noted in this document (and related documents), and possible means of mitigating these risks are noted in the table below. If you would like any guidance on the table below please ask the engineer. Description of Risk
Risk of Occurance
Possible Consequence(s)
1
Crushing due to falling structural elements
High
Death Serious Injury Damage to Property
a) Reduce weight of elements. b) Find alternative method of construction. c) Splicing of large / heavy structural elements to reduce handling weights. d) Produce method statement for installation. e) Use of suitable lifting equipment. f) Ensure suitable temporary works in place
2
Collapsing trenches / banks or retained earth
High
Death Serious Injury
a) Stabilise earth using box shutters / raking shores / sheet piles or other during construction. b) Restricting persons from working in deep trenches or adjacent to steep banks of un-retained earth
3
Rupture of Concrete Shuttering
Medium
Serious Injury Damage to Property
a) Ensure concrete pour heights of not more than 0.75m b) Ensure suitable shuttering in place
4
Fire from Site Welding
High
Death Serious Injury Damage to Property
a) Check for combustible materials in vicinity. Implement suitable precautionary measures. e.g. removal or shielding of combustible materials b) Avoid shot firing except where absolutely necessary
5
Fire from Shot-Firing
Medium
Death Serious Injury Damage to Property
a) Check for combustible materials in vicinity. Implement suitable precautionary measures. e.g. removal or shielding of combustible materials b) Avoid shot firing except where absolutely necessary
6
General Site Risk i.e. Falls from height, falling objects, hazardous/heavy machinery etc
High
Death Serious Injury Damage to Property
a) Use PPE (i.e. hard hat, gloves, goggles, hi-viz clothing, earplugs, site boots et al) b) Implement general precautionary measures (i.e. installation of necessary barriers, signage, alarms) c) Conduct site-specific H&S assessments d) Produce Method Statements
Possible Mitigation Measures
PARTY WALL AGREEMENTS If the building work involves: ➢ ➢ ➢
work on an existing wall which is shared with another property, or building on the boundary with a neighbouring property, or excavating near a neighbouring building,
then the client must find out whether the work falls under the Party Wall Act. If it does, the Act requires the client to notify all affected neighbours of proposed works. Refer to your architect for guidance, or see this website for guidance:https://www.gov.uk/guidance/party- wall-etc-act-1996-guidance.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
3 Date
App'd
Date
17/06/2026
CONSTRUCTION NOTES GENERAL NOTES 1.
Any SPAN / HEIGHT DIMENSIONS shown in this document are for CALCULATION PURPOSES ONLY and are not to be used as a final dimension for the fabrication / machining of structural elements.
2.
All dimensions are to be checked on site by the builder / contractor / fabricator prior to commencement of fabrication / machining / construction. Any discrepancies between the information outlined herein and the dimensions on site are to be reported to the engineer.
3.
Temporary works are the sole responsibility of the builder / contractor. Temporary works method statements are to be provided to the engineer by the builder / contractor prior to commencement of the work.
4.
All parties are assumed to be aware of their responsibilities under the Construction Design and Management (CDM) Regulations 2015. If you are unsure ofthis please contact the engineer.
5.
SAI Structures Limited take no responsibility for any elements outside of the scope of these calculations. For structural elements not covered by this document it is assumed that a design is being prepared / provided by others, if additional calculations / drawings / specifications are required then please contact SAI Structures Limited and we can provide a fee for their design.
6.
All structural work has to be carried out by a competent builder in accordance with the requirements of The Building Regulations Part A and the recommendations set out in BS8103 Parts 1-3.
7.
This document is to be read in conjunction with the architectural drawings / details, and any discrepancies reported to the engineer immediately. Final steel levels and dimensions are to be confirmed by the architectural consultant.
8.
SAI Structures Limited have not visited site and therefore take no responsibility for the quality of construction nor its compliance with this document. It is the contractor's responsibility to ensure that all works comply with the drawings, notes and assumptions made within these calculations.
9.
The client / contractor should be aware of beam, frame and column deflections and their impact on existing or adjacent elements, for example beam deflection on bi-fold doors. Typical beam deflections will be span/200 total (Dead+Live) for beams and height/300 (Wind) for columns. The following calculations provide anticipated deflections within the relevant sections.
10. The client should be aware that where beams are installed within existing masonry structures it is likely that minor cracking will occur within the masonry above due to the load redistribution. It is recommended that the contractor allows to make suitable repairs within their contract. 11. All proprietary (i.e. off-the-shelf) items specified within this document are to be installed in strict accordance with the manufacturer's recommendations. This includes, but is not limited to restraint straps, lintels, chemical / resin anchors and fixing brackets. 12. For structural elements not considered within the scope of this document it is assumed that a suitable specification is to be made by others. If additional calculations, specifications or drawings are required then please contact SAI Structures Limited and we can provide a fee for their design. 13. At locations where beam bearing information is provided on the layout this will be in a position where load-bearing masonry (with foundations / support) has been assumed. It should be confirmed by a suitably qualified individual that these walls are load-bearing, and the masonry is to be inspected for suitability prior to commencement of the work.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
4 Date
App'd
Date
17/06/2026
FOUNDATION / CONCRETE / DRAINAGE NOTES: 1. 2.
Unless noted otherwise: All concrete is to be Grade C28/35 to BS8500-1. All reinforcement for concrete is to be high yield (fy = 500 N/mm2) to BS4449:2005. 3. All strip / pad foundations are to be reinforced concrete construction with minimum 2 layers A393 mesh (1 top, 1 bottom) ▪ Minimum cover to reinforcement is to be:- 25mm in slabs (top) ▪ 50mm in pad foundations / footings / ground beams / rafts / basement slabs (bottom) ▪ 40mm in retaining walls, slabs (bottom) 4. Where existing loadbearing walls have been assumed in this calculation document, the foundation supporting the wall should be exposed and checked/approved by the Building Inspector prior to commencement of works. This includes areas where openings are to be created which may reduce the effective area of the foundations, or where the load is to be focused on a particular area of existing foundations e.g. where there is a column or pier. 5. Any foundation design calculations will, unless noted otherwise, be based on an assumed bearing capacity of 100kN/m2. For the design to be valid it should be ensured that the formation level bearing stratum is inspected for suitability on site by an approved Building Control Officer (BCO) or other suitably qualified individual prior to commencement of the work. 6. Where the thickness of concrete specified in spread foundations is not sufficient to reach a suitable bearing stratum the excavation can be filled using either well compacted crushed hardcore or lean-mix concrete up to foundation formation level. If the formation level stratum is deemed not to be suitable by the BCO for any reason then the engineer is to be notified immediately as a design review will be required. 7. Columns / posts / piers / walls / must be placed CENTRALLY on any new foundation (including padstones) unless specifically noted otherwise. Padstones should be placed immediately below the lower point at which it is indicated that the column terminates on the layout. The under-build to existing masonry walls may need to be extended, or the cavity fillled with concrete (where applicable) to provide a suitable seating for the padstone. 8. Where extra load or an additional storey is to be added onto an existing wall / foundation, the existing foundation is to be exposed and inspected by the BCO to check it is adequate to support the new loads. Contact the engineer if further guidance is needed, or if the BCO requests calculations to be provided. 9. Unless detailed site investigation permits, final foundation depths will not be specified within this document. This is because itbis not possible without such information to know what the ground conditions will be at a particular location. 10. Specified minimum footing depths are generally to be taken from ground floor level. Where the limiting criteria noted in the calculations may relate to existing foundations the foundations are to be inspected prior to commencement of the work to ensure that the limiting geometry can be achieved. 11. If new pad foundations are required adjacent to existing strip footing or brick spread foundations then the new pad should extend to at least as deep as the existing adjacent footing. If the existing adjacent footing is shallower than the proposed pad formationlevel then local underpinning may be required to prevent undermining. 12. General minimum depths for strip footings / spread foundations are not less than 450mm for bearing strata other than clay, and not less than 900mm for footings in shrinkable clay with no nearby vegetation. For foundations in shrinkable clays the proximity of nearby vegetation should be carefully considered and the guidance of the engineer and/or BCO should be sought as spread foundations may not be suitable or the footing depth may need to be calculated. 13. Unless specified within the document the width of new strip footing foundations are to be sized / installed as per the requirements set out in the Building Regulations Part A Document. The width of footing is to be agreed on-site with the BCO prior to pouring concrete. 14. For foundations in chemically aggressive soil conditions the guidance in BS8500-1 and BRE Special Digest 1 should be followed, if in doubt chemical testing should be undertaken by a suitably qualified geotechnical engineer and provided to the LABC officer for further consideration. 15. It is to be ensured that ground bearing foundations do not surcharge drains or manholes. This is usually acheived by ensuring that the formation level is not above the invert level of adjacent drains. An appropriate lintelling detail should be adopted when bridging over drains. In the Greater London Area, if an existing drain passes through your proposed development, it is advised you consult with your Architect to see whether a Thames Water Build-Over Agreement is required.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
5 Date
App'd
Date
17/06/2026
DESIGN PHILOSOPHY: All structural members are designed to be capable of withstanding applied loads during construction, operation and maintenance of the building without any distress, failure, loss of function, damage or durability problems. They are to support the most onerous combinations of dead, imposed and (where applicable) wind loads tending to produce either maximum ultimate stresses or deflection. For this project the stability is to be provided by the following structural systems or a combination thereof: Global Lateral Stability: masonry piers or shear walls with dead load restoring moment / floors or ceilings to provide diaphragm (boarded & strapped where critical) Wall Panel Local Lateral Stabilty: masonry piers or walls/floors, ceilings or rafters (boarded & strapped where critical)/timber stud walls Vertical Loads: masonry walls, piers or columns with padstones for concentrated loads where necessary/strip footings/timber stud walls/steel beams/timber beams
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
6 Date
App'd
Date
17/06/2026
GENRAL SPECIFICATIONS:
Structural Steelwork: 1. 2.
All Materials and workmanship to be in accordance with BS5950 Structural Steelwork sections to be Grade S275JR for internal steel and S275J2 for external steel in accordance with EN10025:Part 2:2004 3. Bolts to be Grade 8.8 unless noted otherwise 4. Welds to be 6mm continuous fillet, unless noted otherwise 5. Contractor to varify all dimensions on site before commencing any work or making fabrication drawings which are to be issued to the engineer for approval. No dimensions are to be taken from drawings. Discrepencies are to be reported to teh engineer prior to proceeding. The engineer requires 7 working days to check and make comments on any fabrication drawings. 6. Steel fabricator to design all connetions for maximum moments and reactions indicated on drawings or within the calculation document issued to the contractor unless part of the engineers design brief. 7. Steelwork which is not required to be galvanised or encased in concrete to be blast cleaned/wire brushed free from mill scale, rust and other contaminants and painted with two coats of approved primer as soon as possible but no longer than 4 hours after cleaning. 8. Uncased columns and beams loacated within an external wall to have a minimum gap of 40mm from face of external or alternately 25mm minimum impermeable insulation from the face of the steel the the rxternal wall, unless galvalised. 9. All steel encased in concrete to be unpainted. 10. All pockets formed in brickwork or blockwork for steel beams to be made good in C35 Concrete. 11. Bolted connections to have a minimum of 4 M16 Bolts per member, unless noted otherwise 12. Steels to have a minimum bearing of 100mm 13. External Steelwork and where otherwise noted to be galvanised to a minimum of 140 microns thickness unless noted otherwise and in accordance with BS728. 14. HSFG bolt connections are to be metal to metal and painted on site after the connection has been completed and load indicating washers are in their final position 15. Where cranked elements are specified these should be full-strength butt-welded at the cranked joint by a suitably qualified steel fabricator. Joints should be tested in accordance with the relevant British or European standards. 16. Where columns / posts are situated adjacent to a wall (as shown on the indicative layouts) they are to be fixed back to the wall. This can be achieved by either welding / shot-firing frame cramps to the web / flange @ 450mm vertical centres and coursing into the masonry bed joints. Alternatively bolt to the face of the wall by welding mild steel brackets to the flanges of the column @ 450mm vertical centres and bolting through using chemically bonded M12 anchors. 17. Beams and posts are to be seated centrally on padstones and posts unless noted otherwise. Generally, the beam location relative to the supported wall will be dictated by the padstone or post location as indicated on the element layouts. If there is any doubt about the location of the padstone or post contact the engineer immediately. Final locations are to be confirmed in conjunction with the architectural consultant and contractor. In most instances the beam will be central to the wall, or cavity wall, above except in some cases where acting as a lintel in an external facing cavity wall. 18. If a column is indicated as going from "ground floor level" this may also indicate that the column needs to extend further below ground floor level to the top surface of a pad foundation. This depends on the appropriate foundation type. 19. Unless noted otherwise in the design or layout information beams are to bear over the full width of any spreader or post. This does not apply when a supporting padstone runs in line with the beam - in which case see shim detail in padstone notes. 20. Ensure clearance is provided to under-side of steelwork at interesecting wall locations where no bearing information is shown so as to prevent unintended load transfer to non load-bearing walls. 21. Steelwork finish / paint systems shall be in accordance with the recommendations of the Corus / Tata guide; "The Prevention of Corrosion on Structural Steelwork". For typical situations we recommend the following; Internal Steelwork in a heated building with clean atmosphere - typically primer only. For steelwork in environments which may be subject to moisture variations (e.g. within a cavity, with outer leaf shelf plates, or external steelwork) consideration should be given to the use of galvanizing to the relevant European Standards (typically 85m galvanised or paint applied system to the approval of Building Control). 22. Fire protection of steelwork is to be specified by the architect, if intumescent painting is required (e.g.; columns) then the
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
7 Date
App'd
Date
17/06/2026
paint system should be compatible with the primer / underlying corrosion protection system. 23. Where possible beams installed in PAIRS should be bolted together through the centre of the webs using M12 bolts @ 500mm centres with spacer tubes in between. 24. Where possible beams are to be bolted to the centreline of the supporting masonry wall / column / padstone using 2 No. M12 chemically bonded anchors, and the padstone strapped down to the adjacent masonry using 2 No. mild steel restraint straps. DO NOT BOLT AWAY FROM THE CENTRE LINE OF THE MASONRY / PADSTONE. Where the centre line of the masonry / padstone is not accessible the beam itself is to be strapped. 25. Shelf plates will be required in certain instances to be agreed with the architectural consultant and contractor. Shelf plates should extend for the full beam length (including bearings) and be grouted into the masonry bed joints at the bearings. The following are typical shelf plate arrangements: a) Single Beams supporting cavity Walls
b) Beams acting as lintels in external walls
Concrete: 1. 2.
All Materials and workmanship to be in accordance with BS8110 parts 1 & 2 – The structural use of concrete Concrete quality to be 35N/mm2 at 28 Days unless noted otherwise, Max aggrigate to be 20mm, Min Cement content 330kg/m3, max water to cement ratio 0.6 3. Reinforcement to be placed in accordance with BS8110 4. Concrete cubes to be taken at 7 & 28 Days to obtain required crushing strengths 5. Concrete quality for mass concrete foundations in non aggressive soils to be 25N/mm2 6. No reinforcement to be cut displaced or omitted without prior written agreement of the engineer. 7. Cover to reinforcement to be in accordance with BS8110 Part 1 tables 3.3 & 3.4 8. Ground Slab to be blinded into 50mm of lean mix prior to reinforcement being placed in position, blinding concrete mix to be 1/10 to all reinforcement bases except for water resisting structures. 9. If no soil investigation and been carried out then sulphate – resisting cement should be used within the ground. 10. For below ground structures provide waterproof concrete installed and detailed to specialist specifications.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
8 Date
App'd
Date
17/06/2026
Timber: 1. 2.
All Materials and workmanship to be in accordance with BS5268: Part 2 - Structural Use of Timber Roof Trusses and bracing to be designed and detailed by specialist subcontractor. Trusses to be designed and fabricated in accordance with BS5268: Parts 2 & 3 3. All timbers to have a minimum grade of C16 (unless noted otherwise) and to have maximum moisture content of 18% 4. Joists to have a minimum end bearing of 50mm 5. Ends of joists built into cavity walls should not project into the cavity, and should be painted with two coats of bituminous primer 6. Multiple timber members to be bolted together at 600c.c. with M12 Bolts and 50x50x3mm washers unless noted otherwise. 7. No notches, holes or rebates etc. to be cut in any member without the written consent of the engineer 8. All structural timber to be adequately protected against adverse weather conditions during stacking and after erection 9. All structural timber to be treated by vacuum pressure impregnation of organic or waterborne preservative, to a dry salt retention in accordance with the manufacturer’s recommendations. Type of treatment may be: - ‘Tanalith’, ‘Celcure’, ‘Promtim’, or other only with the prior approval of the Architect. 10. All fixings in the roof space are to be galvanised unless noted otherwise 11. Strutting Requirement <2.5m non required 2.5m – 4.5m at mid-span >4.5m at 1/3 span points 12. Where strutting is required provide solid strutting with a minimum thickness of 38mm and a depth no less than ¾ of the joist depth and strutting should be blocked solidly to perimeter walls. 13. Strutting or blocking should not block the ventilation space in cold deck flat roofs 14. Restraint strapping - 100mm x 50mm wall plate strapped down to walls. Ceiling joists and rafters to be strapped to walls and gable walls, straps built into cavity, across at least 3 timbers with noggins. All straps to be 1000 x 30 x 5mm galvanized straps or other approved to BSEN 845-1 at 2m centres, in accordance with CP111 Part 2. 15. Where purlins are designed to support the rafters, rafters are to be birdsmouthed to the purlin. 16. Where supported by timber posts, the bearing should be the full width of any such supporting post. Where beams are to be seated on posts they are to be positioned centrally on the posts unless noted otherwise. 17. Where members are notched at the supports to a depth greater than 1/3 depth of the member the engineer is to be notified. 18. At the top and bottom of timber column / post positions a minimum of 2No horizontal restraint straps and noggins should be provided running orthogonally to the joist / rafter to provide restraint. These straps should be a minimum of 1200mm long x 30mm wide by 5mm thick in galvanised mild steel (or similar proprietary product). Straps will be suitably fixed to both the column and noggin. 19. For columns / posts directly adjacent to existing masonry, these should be resin anchored into the masonry using M12 HiltiHY70 anchors (or similar) @ 450mm vertical centres. Angle brackets may be used if preferred to direct fixing. 20. Where steelwork is to be installed in loft conversions ensure there is a 25mm gap between the top of the existing ceiling joist and the underside of the steel beam to avoid unintended load transfer. 21. Joints between members are to be created using either traditional joinery techniques or proprietary fixings. Where input is required contact the engineer.
22. Insulation and Ventilation requirements will not have been considered within this document when specifying joists/rafter sizes. The joist/rafter sizes mentioned might need to be increased in depth to allow for the relevant insulation/ventilation to be provided. Refer to architects details for minimum joist/rafter depth requirements for insulation/ventilation purposes.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
9 Date
App'd
Date
17/06/2026
Masonry: 23. All Materials and workmanship to be in accordance with BS5628 Code of Practice for the Structural Use of Brickwork 24. Brickwork to have average crushing strength of 20.5N/mm2 unless noted otherwise 25. Blockwork belowground to be high density concrete blocks with a minimum compressive strength of 10N/mm2, above ground provide aerated lightweight blocks with a minimum compressive strength of 7.3N/mm2 unless nother otherwise 26. Mortar to be Class ii below ground and Class iii above ground unless noted otherwise. 27. ‘Hyload’ DPC or similar approved to all walls. 28. Wall ties to be stainless steel vertical twist type ties to comply with BS1243 at a maximum spacing of 900mm horzonatally and 450mm vertically with a minimum embedment of 50mm in the mortar joint unless noted otherwise. Where cavity width is >90mm ties to be placed 450mm vertically and horizontally. Additional ties to be provided at the sides of all openings so that there is at least one tie at 300mm c/c maximum 29. Wall ties shall not slop inwards 30. Brickwork restraints to be in accordance with BS5628 PT 1 at 1200mm c/c restraints to brickwork and 1200mm c/c for vertical straps. 31. Joints to masonry to be a minimum of 6m centres for blockwork and with a minimum distance of 3m from the end of any wall in accordance with BS5628 and a maximum of 12m centres for brickwork. 32. At brick/block junctions, brickwork is to be block bonded into blockwork unless noted otherwise. 33. Where blocks are laid flat they are to be solid concrete blocks. 34. Lintel Bearings to be in accordance with manufacturers recommendations. 35. Where existing masonry is deemed to be of poor quality, or where the mortar has degraded significantly, the brickwork should be either re- pointed or replaced in its entirety as appropriate prior to loading. 36. Unless noted otherwise all concrete blocks are to be bedded on narrow edge i.e. NOT laid flat. 37. Horizontal / Vertical restraint strapping to floors and roofs as indicated in the Building Regulations Part A "Lateral support by roofs and floors" [Diagrams 15 and 16] must be provided. 38. Ties movement joints should be provided at the following maximum centres; 6m centres in blockwork, 12m centres in brickwork. Joint locations should be as per the architects recommendations but our recommendation is that they are positioned adjacent to wind-posts, columns or buttressing walls, joint spacing should be reduced at positions of restraint i.e. cranks & corners. If joint centres cannot be achieved then we recommend that bed joint reinforcement is used at 450mm vertical centres.
Project:
Job Ref.
20 Suffolk Road, Harrow, HA2 7QQ Section:
Sheet no./Rev.
Loft conversion Email: info@saistructures.co.uk Website: https://siastructures.co.uk
Calc. by
KP
Date
Chk'd By
10 Date
App'd
Date
17/06/2026
PADSTONE NOTES 1. 2.
3.
Where steel beams bear directly onto masonry (i.e. no padstones) they are to be bedded onto a dry / level mortar bed. Unless noted otherwise all concrete blocks are to be bedded on narrow edge i.e. NOT laid flat. In many instances historic buildings, particularly in the south east, will have poor quality masonry and degrading mortar capable of sustaining only a limited amount of compressive force. In such cases the engineer should be notified as the padstone sizes specified may need to be increased in size. All padstones specified are to be C35 concrete. Where it is not possible to find "off the shelf" padstone sizes it may be necessary to cast in- situ padstones, or to cut/stack lintels to give the correct padstone dimension requirements. Lintels can be stacked as shown below, if a padstone with significant depth is required (example below shows two 800mm long 140x100 pre-cast concrete lintels stacked on top of eachother to create an 800x100x300 padstone). Lintels can be stacked to achieve the required depth, but must not be positioned side-by-side in any circumstances.
4.
Mild steel spreader plates may be used as an alternative to padstones providing the following detail, with stiffeners to prevent the bearing plates from bending, is applied:
5.
Where beams are oriented in the same direction of the padstone (i.e. parrallel), then mild steel shims must be used, as per the detail below, to ensure even pressure distribution on the padstone.
Padstone specifications are called-up thus:
6. 7. 8.
440 x 100 x 215 (LENGTH) (WIDTH) (HEIGHT) If the padstone width is referred to as "(wall width)" this means that the padstone width is to be equal to the full supporting wall width, including the cavity where appropriate. In no case should the padstone width be less than 200mm. Padstones should in no case be wider than the wall (or single leaf of a cavity wall) upon which they are supported. If the supporting wall width is found to be less than the width of the specified padstone the engineer should be notified immediately. Where two beams share the same padstone they are to be arranged symmetrically on the padstone, so that (unless noted otherwise) neither padstone is offset from the centre of the padstone more or less than the other.
Project:
No.
20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build
Section
Location
BASIC LOADS Prep by
Email:
KP
Date
June ' 26
BASIC LOADS
Check by
Sheet No.
1 Date
Project:
No.
20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build
Section
Location
Sheet No.
BASIC LOADS Prep by
Date
KP
Email:
Check by
1 Date
June ' 26
A ROOF AND CEILING LOADS Pitch 45 ° Tile type : Concrete Tiles (assumed) 1.22
0.86 (a) ROOF DEAD LOAD
Clay Tiles (Plain - Machine Made 101.6 mm gauge) Clay Tiles (Single Lap Interlocking) Concrete Tiles (Plain - Stone Aggregate 101.6 mm gauge) Concrete Tiles (Single Lap Interlocking) Slates (Including 76.2 mm Lap + Nails) DPM Membrane + Insulation Boarding (Battenboard, blockboard, laminboard) Battens + Felt Timber Rafters + Insulation
(b) FLAT ROOF DEAD LOAD
Roof Finish (2 Layers, 19.1mm) Insulation Ply deck Bitumen Felt (3 Layer) Boarding (Battenboard, blockboard, laminboard) Plasterboard + Skim (12.7mm) Timber Joists + Insulation
Sloping kN/m² 0.640 0.440 0.740 0.560 0.340 0.080 0.090 0.070 0.200
Applicabel kN/m²
0.440
0.080 0.100 0.070 0.200 0.890
In Plan kN/m² 0.00 0.62 0.00 0.00 0.00 0.11 0.14 0.10 0.28 1.26
1.30
kN/m²
0.20 0.03 0.10 0.09 0.20 0.15 0.20 0.97
1.00
kN/m²
kN/m² 0.05 0.15 0.15 0.35
0.35
kN/m²
kN/m² 0.60 0.75
0.60 0.75
kN/m² kN/m²
In Plan kN/m²
(c) CEILING DEAD LOAD Insulation Joists Plasterboard + Skim
(e) ROOF AND CEILING IMPOSED LOADS Pitch Roof Flat roof
Project:
No.
20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build
Section
Location
BASIC LOADS Prep by
Email: B
Sheet No.
Date
Check by
KP
June ' 26
kN/m² 100mm 1.00 1.60 2.00
140mm 1.40 2.24 2.80
215mm 2.15 3.44 4.30
102.5mm 2.46 2.26 1.85 1.95 2.15
225.00 5.54 5.09 4.16 4.39 4.84
300mm 7.38 6.78 5.55 5.85 6.45
1 Date
WALL LOADS
(a) WALLS LOADINGS
(100mm Inner Leaf)
Blockwork Blockwork (Light ~ 100 mm thick) Blockwork (Medium ~ 100 mm thick) Blockwork (Dense ~ 100 mm thick) Brickwork Brickwork (Blue ~ 102.5 mm thick) Brickwork (Engineering ~ 102.5 mm thick) Brickwork (Fletton ~ 102.5 mm thick) Brickwork (London Stock ~ 102.5 mm thick) Brickwork (Sand Lime ~ 102.5 mm thick) Finishes + Mortar Mortar (10mm thick) Render (12.7mm thick) Plaster Coat (13mm thick) Cavity Insulation (100mm thick)
(b) EXTERNAL CAVITY WALLS
0.18 0.29 0.15 0.02
kN/m²
(100mm Inner Leaf)
1.95 1.00 0.35 3.30
102.5mm Brickwork Blockwork (medium density-1800 kg /m3) Cavity Insulation & 12.5mm Plasterboard on dabs
(c) PARTY WALLS (per leaf) 100mm Blockwork (medium density-1800 kg /m3) Cavity Insulation & 12.5mm Plasterboard on dabs
(100mm cavity)
3.30
kN/m²
2.35
2.35
kN/m²
1.60 0.50 2.10
2.10
kN/m²
2.24 0.50 2.74
2.75
kN/m²
4.16 4.16
4.20
kN/m²
0.40 0.08 0.15 0.50 0.16 1.29
1.30
kN/m²
0.08 0.15 0.50 0.16 0.89
0.90
kN/m²
kN/m² 2.00 0.35
(d) INTERNAL LOADBEARING MASONRY WALLS 100mm Blockwork (medium density-1800 kg /m3) 2 No.12.5mm Plasterboard on dabs
140mm Blockwork (medium density-1800 kg /m3) 2 No.12.5mm Plasterboard on dabs
(d) INTERNAL LOADBEARING MASONRY WALLS 225mm thick solid existing brickwork
(e) TIMBER WALLS kN/m² e.1
e.2
Timber stud - Dormer Cheek - (1.0 Hr Fire Resistance) Wood /tile cladding Insualtion 100x50 Timber stud 2 No.12.5mm Plasterboard on dabs Multi plaster finish
Internal timber stud partition- (1.0 Hr Fire Resistance) Insualtion 100x50 Timber stud 2 No.12.5mm Plasterboard on dabs Multi plaster finish
Project:
No.
20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build
Section
Location
BASIC LOADS Prep by
KP
Email: (f) SUB-STRUCTURE WALLS
Date
Check by
1 Date
June ' 26
(600mm high) kN/m 1.42
External
C
Sheet No.
1.45
kN/m²
0.75
kN/m²
1.75
kN/m²
FLOOR LOADS kN/m²
(b) UPPER FLOORS : DEAD LOADS (HOUSES)
0.15 0.13 0.12 0.15 0.15 0.70
Boarding (boards/plywood ~ 22mm thick) SoundBloc Plasterboard (15mm thick) FireBloc Plasterboard (12mm thick) Timber Joists + Insulation Ceiling & Services
kN/m² Partitions (Timber)
1.00 1.70 kN/m²
(c) UPPER FLOORS : IMPOSED LOADS General - Houses & Flats - Load bearing partitions
1.50
1.50
kN/m²
Corridors/Lobbies/Communal Areas
3.00
3.00
kN/m²
Garages & Cycle store Bin soters
2.50 3.00
2.50 3.00
kN/m² kN/m²
4.85
kN/m²
(d) GROUND FLOOR : DEAD LOADS 150dp B & B floor 75mm Screed (22kN/m³) 75/100mm Insulation Partitions
(d) GROUND FLOOR : DEAD LOADS 200mm RC Insitu Slab 75mm Screed (20kN/m³) 75/100mm Insulation Partitions
Flats kN/m² 2.18 1.65 0.02 1.00
Houses kN/m² 2.18 1.65 0.02 1.00
4.85
4.85 kN/m² 4.80 1.50 0.02 0.50 6.82
Project:
No.
20 Suffolk Road, Harrow, HA2 7QQ Houses Traditional Build
Section
Location
Sheet No.
BASIC LOADS Prep by
KP
Email:
Date
Check by
1 Date
June ' 26
D STAIR LOADS FOR HOUSES DEAD LOAD (a) FLIGHTS (Timber) Flights with Risers and 12.5mm plasterboard Screen/Balustrade
kN/m² kN/m² 0.50 0.00 0.50
(b) IMPOSED LOADS (Hosues)
kN/m²
Timber Flights
1.50
(c) FLIGHTS (Precast Concrete)
kN/m²
P.C. Units Finishes
(d) LANDINGS/LOBBY AREAS (Precast Concrete) 200mm P.C. Units 50mm Screed (22 kN/m³) Finishes
(e) IMPOSED LOADS (Apartments) P.C. Flights and Landings (For less than 3.0 storey) (for more than 3 story) E
6.72 0.30 7.02
4.80 1.10 0.30 6.20
1.50
kN/m²
7.05
kN/m²
6.20
kN/m²
1.50 3.00
kN/m² kN/m²
kN/m² 1.50 3.00
(a) UPPER FLOORS : DEAD LOADS (PC PLANKS)
200mm Hollowcore Slab 75mm Screed (20kN/m³) Deck (18mm chipboard , battens at 400c/c) Partitions Ceiling (12.5 Plasterboard + metal)
kN/m²
kN/m²
CONCRETE FLOOR LOADS
150mm Hollowcore Slab 75mm Screed (20kN/m³) Deck (18mm chipboard , battens at 400c/c) Partitions Ceiling (12.5 Plasterboard + metal)
0.50
kN/m² 3.19 1.50 0.15 0.50 0.18 5.52 3.42 1.50 0.15 0.50 0.18 5.75
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
EuroBeam Project Summary Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: Job number: ITEMS: 1: Beam: Flat roof joists Span: 3.9 m. Reactions (unfactored/factored): R1: 1.25/1.76 kN; R2: 1.25/1.76 kN Use 50 x 175 C24 2: Beam: Rafters Span: 2.3 m. Reactions (unfactored/factored): R1: 0.87/1.22 kN; R2: 0.87/1.22 kN Use 50 x 150 C24 3: Beam: TB-01(Slopping rafter) Span: 3.9 m. Reactions (unfactored/factored): R1: 2.86/3.90 kN; R2: 5.10/6.92 kN Use 2no 50 x 225 C24 4: Beam: BR.30 Span: 5.3 m. Reactions (unfactored/factored): R1: 15.84/22.18 kN; R2: 17.05/23.87 kN Use 152 x 152 x 30 UKC S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 5: Column: C1 Section: 80 x 80 x 8.0 SHS Grade S355 Sum of stress ratios = 0.049 OK 6: Column: C2 Section: 80 x 80 x 8.0 SHS Grade S355 Sum of stress ratios = 0.035 OK 7: Beam: BR.23 Span: 1.7 m. Reactions (unfactored/factored): R1: 14.09/19.45 kN; R2: 14.09/19.45 kN Use 203 x 133 x 25 UKB S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 8: Column: C3 & C4 Section: 80 x 80 x 8.0 SHS Grade S355 Sum of stress ratios = 0.028 OK 9: Beam: Loft floor joists Span: 3.0 m. Reactions (unfactored/factored): R1: 1.35/1.96 kN; R2: 1.35/1.96 kN Use 50 x 200 C24 10: Beam: Loft floor joists Span: 3.6 m. Reactions (unfactored/factored): R1: 2.50/3.55 kN; R2: 1.88/2.66 kN Use 50 x 200 C24 11: Beam: Loft floor joists Span: 1.5 m. Reactions (unfactored/factored): R1: 1.34/1.89 kN; R2: 1.06/1.50 kN
Job number: Made by: KP Page: 1 Printed 17 Jun 2026 15:09
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
12: Beam: Typical Double-up Trimmer to support partition` Span: 1.6 m. Reactions (unfactored/factored): R1: 4.73/6.59 kN; R2: 4.73/6.59 kN Use 2no 50 x 200 C24 13: Beam: TB-02 Span: 1.6 m. Reactions (unfactored/factored): R1: 4.61/6.42 kN; R2: 4.53/6.36 kN Use 2no 50 x 200 C24 14: Beam: B2.26 Span: 3.6 m. Reactions (unfactored/factored): R1: 6.44/9.03 kN; R2: 5.44/7.70 kN Use 152 x 152 x 30 UKC S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 15: Beam: BR.22 Span: 3.6 m. Reactions (unfactored/factored): R1: 7.39/10.19 kN; R2: 21.89/30.20 kN Use 152 x 152 x 30 UKC S275 Bearing R1: BOLTED CONNECTION TO BEAM/COLUMN Bearing R2: BOLTED CONNECTION TO BEAM/COLUMN 16: Beam: B2.21 Span: 5.65 m. Reactions (unfactored/factored): R1: 24.60/34.66 kN; R2: 45.22/63.37 kN Use 152 x 152 x 44 UKC S275 Bearing R1: 25 mm S275 bearing plate, size 500 x 100 mm Bearing R2: 40 mm S275 bearing plate, size 900 x 100 mm 17: Beam: BR.27 Span: 3.4 m. Reactions (unfactored/factored): R1: 28.32/39.53 kN; R2: 8.78/12.00 kN Use 203 x 133 x 30 UKB S275 Bearing R1: 10 mm S275 bearing plate, size 250 x 225 mm Bearing R2: 6 mm S275 bearing plate, size 175 x 100 mm 18: Beam: B2.22 Span: 5.65 m. Reactions (unfactored/factored): R1: 26.10/36.76 kN; R2: 33.68/47.33 kN Use 152 x 152 x 44 UKC S275 Bearing R1: 25 mm S275 bearing plate, size 550 x 100 mm Bearing R2: 30 mm S275 bearing plate, size 700 x 100 mm 19: Web cleat connection Beam [Item 14]: 152x152x30 UC connects to web of beam [Item 16]: 152x152x44 UC Factored load carried by connection = 9.026 kN Use 100mm long S275 angle cleats with 2 rows of M16 bolts at 50 c/s Connection resistance: 49.9kN OK 20: Web cleat connection Beam [Item 16]: 152x152x44 UC connects to web of beam [Item 17]: 203x133x30 UB Factored load carried by connection = 34.66 kN Use 100mm long S275 angle cleats with 2 rows of M16 bolts at 50 c/s Connection resistance: 71.4kN OK
Job number: Made by: KP Page: 2 Printed 17 Jun 2026 15:09
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 3
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: Flat roof joists Load name U G roof U QA roof
Printed 17 Jun 2026 15:09
Loading w1 1.00*0.40 0.60*0.40
Start x1 Loading w2 End x2 0 L 0 L Total load (unfactored): 2.50 kN Dead/Permanent (unfactored): 1.56 kN Live/Variable (unfactored): 0.94 kN Factored (6.10): 3.51 kN
R1comp 0.78 0.47 1.25 0.78 0.47 1.76
Span: 3.9 m. R2comp Defl. 0.78 1.20 0.47 0.72 1.25 1.93 0.78 1.20 0.47 0.72 1.76
Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 1.71 kNm (6.10) at 1.95 m. from R1 Maximum S.F. = 1.76 kN (6.10) at R1 Mid-span deflections: Dead: 1.20 x 108/EI (E in N/mm2, I in cm4) Live: 0.72 x 108/EI Total: 1.93 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 50 x 175 C24 3.7 kg/m approx W el,y = 255.2 cm3 Iy = 2,233 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 1.71 x 1000/255 = 6.70 N/mm2 OK Bending resistance = 12.18 x 255/1000 = 3.11 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 1.76 x 1000 x (3/2)/(33.5 x 175) = 0.45 N/mm2 OK Shear resistance = 2.03 x 33.5 x 175 x (2/3)/1000 = 7.94 kN
Deflection Final deflection limit = 0.003L = 11.70 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.22 x 106/((11,000/16) x 50 x 175) = 0.24 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 1.20 0.72
Inst. mm 4.91 2.94 0.24 8.09
kdef 0.60 0.60
y2 1.00 0.30
Final mm 7.85 3.47 0.35 11.67
OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 4
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: Rafters Load name U G roof U QA roof
Printed 17 Jun 2026 15:09
Loading w1 1.30*0.40 0.60*0.40
Start x1 Loading w2 End x2 0 L 0 L Total load (unfactored): 1.75 kN Dead/Permanent (unfactored): 1.20 kN Live/Variable (unfactored): 0.55 kN Factored (6.10): 2.44 kN
R1comp 0.60 0.28 0.87 0.60 0.28 1.22
Span: 2.3 m. R2comp Defl. 0.60 0.19 0.28 0.09 0.87 0.28 0.60 0.19 0.28 0.09 1.22
Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 0.702 kNm (6.10) at 1.15 m. from R1 Maximum S.F. = 1.22 kN (6.10) at R1 Mid-span deflections: Dead: 0.19 x 108/EI (E in N/mm2, I in cm4) Live: 0.09 x 108/EI Total: 0.28 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 50 x 150 C24 3.2 kg/m approx W el,y = 187.5 cm3 Iy = 1,406 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 0.70 x 1000/188 = 3.75 N/mm2 OK Bending resistance = 12.18 x 188/1000 = 2.28 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 1.22 x 1000 x (3/2)/(33.5 x 150) = 0.36 N/mm2 OK Shear resistance = 2.03 x 33.5 x 150 x (2/3)/1000 = 6.80 kN
Deflection Final deflection limit = 0.003L = 6.90 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 0.50 x 106/((11,000/16) x 50 x 150) = 0.12 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 0.19 0.09
Inst. mm 1.22 0.57 0.12 1.91
kdef 0.60 0.60
y2 1.00 0.30
Final mm 1.96 0.67 0.17 2.80
OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 5
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: TB-01(Slopping rafter) Load name Loading w1 U G roof 1.00*0.20 U QA roof 0.60*0.20 V G stud partition 0
Start x1 Loading w2 End x2 0 L 0 L 0 1.35*2.55 L Total load (unfactored): 7.96 kN Dead/Permanent (unfactored): 7.49 kN Live/Variable (unfactored): 0.47 kN Factored (6.10): 10.82 kN
R1comp 0.39 0.23 2.24 2.86 2.63 0.23 3.90
Span: 3.9 m. R2comp Defl. 0.39 0.60 0.23 0.36 4.48 5.18 5.10 6.15 4.87 5.79 0.23 0.36 6.92
Load types: U:UDL; V:Variable load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 5.37 kNm (6.10) at 2.21 m. from R1 Maximum S.F. = -6.92 kN (6.10) at R2 Mid-span deflections: Dead: 5.79 x 108/EI (E in N/mm2, I in cm4) Live: 0.36 x 108/EI Total: 6.15 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 2no 50 x 225 C24 9.4 kg/m approx W el,y = 843.8 cm3 Iy = 9,492 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.0 Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.0/1.30 = 11.08 N/mm2 Design bending stress, sm,y,d = 5.37 x 1000/844 = 6.37 N/mm2 OK Bending resistance = 11.08 x 844/1000 = 9.35 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 100 = 67 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.0/1.30 = 1.85 N/mm2 Design shear stress, sv,y,d = 6.92 x 1000 x (3/2)/(67.0 x 225) = 0.69 N/mm2 OK Shear resistance = 1.85 x 67 x 225 x (2/3)/1000 = 18.55 kN
Deflection Final deflection limit = 0.003L = 11.70 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 3.88 x 106/((11,000/16) x 100 x 225) = 0.30 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 5.79 0.36
Inst. mm 5.54 0.35 0.30 6.19
kdef 0.60 0.60
y2 1.00 0.30
Final mm 8.87 0.41 0.47 9.75
OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 6
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: BR.30 Load name O G o.w. U G Roof U QA Roof U G Roof U QA Roof P G Bm: Flat roof joists: R1 P QA Bm: Flat roof joists: R1
Loading w1 0.3 1.30*1.30 0.60*1.30 1.00*2.00 0.60*2.00 0.78 0.47
Start x1 Loading w2 End x2 0 L 0 L 0 L 0 L 0 L 5.20 5.20 Total load (unfactored): 32.89 kN Dead/Permanent (unfactored): 21.93 kN Live/Variable (unfactored): 10.96 kN Factored (6.10): 46.05 kN
R1comp 0.80 4.48 2.07 5.30 3.18 0.01 0.01 15.84 10.59 5.26 22.18
Span: 5.3 m. R2comp Defl. 0.80 3.1 4.48 17.4 2.07 8.0 5.30 20.5 3.18 12.3 0.77 0.1 0.46 0.1 17.05 61.6 11.34 41.1 5.71 20.4 23.87
Load types: O:Beam o.w.; U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 29.43 kNm (6.10) at 2.65 m. from R1 Maximum S.F. = -23.9 kN (6.10) at R2 Mid-span deflections: Dead: 41.1 x 108/EI (E in N/mm2, I in cm4) Live: 20.4 x 108/EI Total: 61.6 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 30 UKC S275 D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y=222 cm3 Classification: Flange: c/t = 65.6/9.4 = 6.98 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/6.5 = 19.0 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 23.87 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.3x100 - 2x153x9.40 + (6.50+2x7.60) x9.40 = 1,159 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,159 x (275/ 3)/(1.0 x 1000) = 184 kN (>=23.87) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/6.5 = 21.35 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 29.4 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 248/1000 = 68.2 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 248.0 cm3 Iw = 0.031 dm6 IT = 10.5 cm4 Iz = 560 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr 0.00-5.30 6.68 29.4 1.00d 1.00 50.8 C1 derivation: d: taken as 1.0 (conservative)
lz 2.008
l LT 1.158
f LT 1.132
c LT c LT, mod 0.604 0.604
M c,Rd 68.2
M b,Rd 41.2 OK
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
Deflection LL deflection = 20.4 x 1e8/(210,000 x 1,750) = 5.6 mm (L/953) OK TL deflection = 61.6 x 1e8/(210,000 x 1,750) = 16.8 mm (L/316)
Bearings R1 (22.18 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
R2 (23.87 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
Job number: Made by: KP Page: 7 Printed 17 Jun 2026 15:09
SAI Structrues Limited
KP
Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Job number: Made by: KP Page: 8 Printed 17 Jun 2026 15:09
Column calculation to EN1993-1-1 using S355 steel Location: C1 Length: 2.55 m. Pos Dur
Load
kN
A G B/F Bm: BR.30 [5.3 m.] : R1 A QA B/F Bm: BR.30 [5.3 m.] : R1 Total load kN
10.59 5.26 15.85
Fact 6.10 14.30 7.89 22.19
Load durations: G: Dead; Qx: Imposed; QA: Residential
SECTION SIZE : 80 x 80 x 8.0 HF SHS S355 (17.6 kg/m) Section properties: Ag = 22.4cm2 iz = 2.91 cm Design strength, fy = 355 N/mm2 e = 0.814 Classification: Flange: c/t = 56.0/8.0 = 7.00 <= 33e (26.8): Class 1, plastic [Table 5.2] Web: c/t = 56.0/8.0 = NAN <= 33e (26.8): Class 1, plastic Major axis: LEy = 1.0L = 2.55 m. Slenderness, ly = 2.55 x 100/2.91 = 87.6 Minor axis: LEz = 1.0L = 2.55 m. Slenderness, lz = 2.55 x 100/2.91 = 87.6 Compression Design axial load, NEd = 22.19 kN Design compression resistance, Nc,Rd = A.fy/gM0 = 22.40 x 100 x 355/(1.0 x 1000) = 795 kN OK Calculate flexural buckling resistances, Nb,Rd l1 = 93.9e = 93.9 x 0.814 = 76.4 Buckling about y-y (major) axis ly = ly/l1 = 87.6/76.4 = 1.15 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(ly - 0.2) + ly2) = 1.26 [EC3 (6.49)] Flexural buckling reduction factor, cy = 1/(f + (f2 -ly2)) = 0.56 [EC3 (6.49)] Design buckling resistance, Nb,y,Rd = cyA.fy/gM1 = 0.56 x 22.40 x 100 x 355/(1.0 x 1000) = 449 kN OK [EC3 (6.47)] Buckling about z-z (minor) axis lz = lz/l1 = 87.6/76.4 = 1.15 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(lz - 0.2) + lz2) = 1.26 [EC3 Table 6.2] Flexural buckling reduction factor, cz = 1/(f + (f2 - lz2)) = 0.56 [EC3 (6.49)] Design buckling resistance, Nb,z,Rd = czA.fy/gM1 = 0.56 x 22.40 x 100 x 355/(1.0 x 1000) = 449 kN OK [EC3 (6.47)] Bending about y-y (major) axis: N/A Bending about z-z (minor) axis: N/A
SAI Structrues Limited
KP
Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Job number: Made by: KP Page: 9 Printed 17 Jun 2026 15:09
Column calculation to EN1993-1-1 using S355 steel Location: C2 Length: 1.5 m. Pos Dur
Load
kN
A G B/F Bm: BR.30 [5.3 m.] : R2 A QA B/F Bm: BR.30 [5.3 m.] : R2 Total load kN
11.34 5.71 17.05
Fact 6.10 15.31 8.57 23.87
Load durations: G: Dead; Qx: Imposed; QA: Residential
SECTION SIZE : 80 x 80 x 8.0 HF SHS S355 (17.6 kg/m) Section properties: Ag = 22.4cm2 iz = 2.91 cm Design strength, fy = 355 N/mm2 e = 0.814 Classification: Flange: c/t = 56.0/8.0 = 7.00 <= 33e (26.8): Class 1, plastic [Table 5.2] Web: c/t = 56.0/8.0 = NAN <= 33e (26.8): Class 1, plastic Major axis: LEy = 1.0L = 1.50 m. Slenderness, ly = 1.50 x 100/2.91 = 51.5 Minor axis: LEz = 1.0L = 1.50 m. Slenderness, lz = 1.50 x 100/2.91 = 51.5 Compression Design axial load, NEd = 23.87 kN Design compression resistance, Nc,Rd = A.fy/gM0 = 22.40 x 100 x 355/(1.0 x 1000) = 795 kN OK Calculate flexural buckling resistances, Nb,Rd l1 = 93.9e = 93.9 x 0.814 = 76.4 Buckling about y-y (major) axis ly = ly/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(ly - 0.2) + ly2) = 0.78 [EC3 (6.49)] Flexural buckling reduction factor, cy = 1/(f + (f2 -ly2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,y,Rd = cyA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Buckling about z-z (minor) axis lz = lz/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(lz - 0.2) + lz2) = 0.78 [EC3 Table 6.2] Flexural buckling reduction factor, cz = 1/(f + (f2 - lz2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,z,Rd = czA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Bending about y-y (major) axis: N/A Bending about z-z (minor) axis: N/A
KP
SAI Structrues Limited Structural Engineer & Planner
Job number: Made by: KP Page: 10
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: BR.23 Load name O G o.w. U G Chimney wall P G Column: C2 P QA Column: C2
Printed 17 Jun 2026 15:09
Loading w1 0.3 2.50*2.50 11.34 5.71
Start x1 Loading w2 End x2 0 L 0 L 0.85 0.85 Total load (unfactored): 28.18 kN Dead/Permanent (unfactored): 22.48 kN Live/Variable (unfactored): 5.71 kN Factored (6.10): 38.91 kN
R1comp 0.26 5.31 5.67 2.86 14.09 11.24 2.86 19.45
Span: 1.7 m. R2comp Defl. 0.26 0.03 5.31 0.68 5.67 1.16 2.86 0.58 14.09 2.46 11.24 1.87 2.86 0.58 19.45
Load types: O:Beam o.w.; U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed:
Maximum B.M. = 13.34 kNm (6.10) at 0.85 m. from R1 Maximum S.F. = 19.45 kN (6.10) at R1 Mid-span deflections: Dead: 1.87 x 108/EI (E in N/mm2, I in cm4) Live: 0.58 x 108/EI Total: 2.46 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 203 x 133 x 25 UKB S275 D=203.2 mm B=133.2 mm t=5.7 mm T=7.8 mm Iy=2,340 cm4 iz=3.10 cm W pl,y=258 cm3 W el,y=230 cm3 Classification: Flange: c/t = 56.1/7.8 = 7.20 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 172.4/5.7 = 30.2 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 19.45 kN Shear area, Av = A - 2btf + (tw+2r)tf = 32.0x100 - 2x133x7.80 + (5.70+2x7.60) x7.80 = 1,285 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,285 x (275/ 3)/(1.0 x 1000) = 204 kN (>=19.45) OK [EC3 6.2.6] Shear buckling: hw/tw = 187.6/5.7 = 32.91 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 13.34 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 258/1000 = 70.9 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 258.0 cm3 Iw = 0.029 dm6 IT = 5.96 cm4 Iz = 308 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-1.70 2.45 13.3 1.00d 1.00 126.5 0.909 0.749 0.770 0.845 0.845 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
M c,Rd 70.9
M b,Rd 59.9 OK
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Deflection LL deflection = 0.58 x 1e8/(210,000 x 2,340) = 0.1 mm OK TL deflection = 2.46 x 1e8/(210,000 x 2,340) = 0.5 mm (L/3399)
Bearings R1 (19.45 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
R2 (19.45 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
Job number: Made by: KP Page: 11 Printed 17 Jun 2026 15:09
SAI Structrues Limited
KP
Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Job number: Made by: KP Page: 12 Printed 17 Jun 2026 15:09
Column calculation to EN1993-1-1 using S355 steel Location: C3 & C4 Length: 1.5 m. Pos Dur
Load
kN
A G B/F Bm: BR.23 [1.7 m.] : R1 A QA B/F Bm: BR.23 [1.7 m.] : R1 Total load kN
11.24 2.86 14.10
Fact 6.10 15.17 4.29 19.46
Load durations: G: Dead; Qx: Imposed; QA: Residential
SECTION SIZE : 80 x 80 x 8.0 HF SHS S355 (17.6 kg/m) Section properties: Ag = 22.4cm2 iz = 2.91 cm Design strength, fy = 355 N/mm2 e = 0.814 Classification: Flange: c/t = 56.0/8.0 = 7.00 <= 33e (26.8): Class 1, plastic [Table 5.2] Web: c/t = 56.0/8.0 = NAN <= 33e (26.8): Class 1, plastic Major axis: LEy = 1.0L = 1.50 m. Slenderness, ly = 1.50 x 100/2.91 = 51.5 Minor axis: LEz = 1.0L = 1.50 m. Slenderness, lz = 1.50 x 100/2.91 = 51.5 Compression Design axial load, NEd = 19.46 kN Design compression resistance, Nc,Rd = A.fy/gM0 = 22.40 x 100 x 355/(1.0 x 1000) = 795 kN OK Calculate flexural buckling resistances, Nb,Rd l1 = 93.9e = 93.9 x 0.814 = 76.4 Buckling about y-y (major) axis ly = ly/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(ly - 0.2) + ly2) = 0.78 [EC3 (6.49)] Flexural buckling reduction factor, cy = 1/(f + (f2 -ly2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,y,Rd = cyA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Buckling about z-z (minor) axis lz = lz/l1 = 51.5/76.4 = 0.675 [EC3 6.3.1.3] Use curve a: a = 0.210 f = 0.5(1 + a(lz - 0.2) + lz2) = 0.78 [EC3 Table 6.2] Flexural buckling reduction factor, cz = 1/(f + (f2 - lz2)) = 0.86 [EC3 (6.49)] Design buckling resistance, Nb,z,Rd = czA.fy/gM1 = 0.86 x 22.40 x 100 x 355/(1.0 x 1000) = 683 kN OK [EC3 (6.47)] Bending about y-y (major) axis: N/A Bending about z-z (minor) axis: N/A
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 13
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: Loft floor joists Load name U G floor dead U QA Floor live
Printed 17 Jun 2026 15:09
Loading w1 0.75*0.80/2 1.5*0.80/2
Start x1 Loading w2 End x2 0 L 0 L Total load (unfactored): 2.70 kN Dead/Permanent (unfactored): 0.90 kN Live/Variable (unfactored): 1.80 kN Factored (6.10): 3.91 kN
R1comp 0.45 0.90 1.35 0.45 0.90 1.96
Span: 3.0 m. R2comp Defl. 0.45 0.32 0.90 0.63 1.35 0.95 0.45 0.32 0.90 0.63 1.96
Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 1.47 kNm (6.10) at 1.50 m. from R1 Maximum S.F. = 1.96 kN (6.10) at R1 Mid-span deflections: Dead: 0.32 x 108/EI (E in N/mm2, I in cm4) Live: 0.63 x 108/EI Total: 0.95 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 50 x 200 C24 4.2 kg/m approx W el,y = 333.3 cm3 Iy = 3,333 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 1.47 x 1000/333 = 4.40 N/mm2 OK Bending resistance = 12.18 x 333/1000 = 4.06 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 1.96 x 1000 x (3/2)/(33.5 x 200) = 0.44 N/mm2 OK Shear resistance = 2.03 x 33.5 x 200 x (2/3)/1000 = 9.07 kN
Deflection Final deflection limit = 0.003L = 9.00 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.01 x 106/((11,000/16) x 50 x 200) = 0.18 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 0.32 0.63
Inst. mm 0.86 1.73 0.18 2.77
kdef 0.60 0.60
y2 1.00 0.30
Final mm 1.38 2.04 0.23 3.65
OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 14
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: Loft floor joists Load name U G floor dead U QA Floor live P G stud partition P G Roof P QA Roof P G stud partition
Printed 17 Jun 2026 15:09
Loading w1 0.75*0.60/2 1.50*0.60/2 0.75*1.10*0.60/2 1.3*2.00*0.60/2 0.6*2.00*0.60/2 0.75*2.50*0.60/2
Start x1 Loading w2 End x2 0 L 0 L 0.60 0.60 0.60 2.75 Total load (unfactored): 4.38 kN Dead/Permanent (unfactored): 2.40 kN Live/Variable (unfactored): 1.98 kN Factored (6.10): 6.21 kN
R1comp 0.40 0.81 0.21 0.65 0.30 0.13 2.50 1.39 1.11 3.55
Span: 3.6 m. R2comp Defl. 0.40 0.49 0.81 0.98 0.04 0.12 0.13 0.37 0.06 0.17 0.43 0.36 1.88 2.48 1.01 1.33 0.87 1.15 2.66
Load types: U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 2.50 kNm (6.10) at 1.66 m. from R1 Maximum S.F. = 3.55 kN (6.10) at R1 Mid-span deflections: Dead: 1.33 x 108/EI (E in N/mm2, I in cm4) Live: 1.15 x 108/EI Total: 2.48 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 50 x 200 C24 4.2 kg/m approx W el,y = 333.3 cm3 Iy = 3,333 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.1 [EC5 6.6(2)] Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.1/1.30 = 12.18 N/mm2 Design bending stress, sm,y,d = 2.50 x 1000/333 = 7.49 N/mm2 OK Bending resistance = 12.18 x 333/1000 = 4.06 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 50 = 33.5 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.1/1.30 = 2.03 N/mm2 Design shear stress, sv,y,d = 3.55 x 1000 x (3/2)/(33.5 x 200) = 0.79 N/mm2 OK Shear resistance = 2.03 x 33.5 x 200 x (2/3)/1000 = 9.07 kN
Deflection Final deflection limit = 0.003L = 10.80 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.75 x 106/((11,000/16) x 50 x 200) = 0.31 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 1.33 1.15
Inst. mm 3.63 3.14 0.31 7.08
kdef 0.60 0.60
y2 1.00 0.30
Final mm 5.81 3.71 0.43 9.95
OK
KP
SAI Structrues Limited Structural Engineer & Planner
Job number: Made by: KP Page: 15
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: Loft floor joists Load name U G floor dead U QA Floor live P G stud partition P G Roof P QA Roof
Printed 17 Jun 2026 15:09
Loading w1 0.75*0.60/2 1.50*0.60/2 0.75*1.10*0.60/2 1.3*2.00*0.60/2 0.6*2.00*0.60/2
Start x1 Loading w2 End x2 0 L 0 L 0.60 0.60 0.60 Total load (unfactored): 2.40 kN Dead/Permanent (unfactored): 1.36 kN Live/Variable (unfactored): 1.03 kN Factored (6.10): 3.40 kN
Load types: U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 0.958 kNm (6.10) at 0.60 m. from R1 Maximum S.F. = 1.89 kN (6.10) at R1 Mid-span deflections: Dead: 0.08 x 108/EI (E in N/mm2, I in cm4) Live: 0.05 x 108/EI Total: 0.14 x 108/EI
R1comp 0.17 0.34 0.15 0.47 0.22 1.34 0.79 0.55 1.89
Span: 1.5 m. R2comp Defl. 0.17 0.01 0.34 0.03 0.10 0.02 0.31 0.05 0.14 0.02 1.06 0.14 0.58 0.08 0.48 0.05 1.50
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 16
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: Typical Double-up Trimmer to support partition` Load name Loading w1 Start x1 Loading w2 End x2 U G Floor dead 0.58/0.25 0 L U QA Floor live 0.42/0.25 0 L U G stud partition 0.75*2.55 0 L Total load (unfactored): 9.46 kN Dead/Permanent (unfactored): 6.77 kN Live/Variable (unfactored): 2.69 kN Factored (6.10): 13.17 kN
R1comp 1.86 1.34 1.53 4.73 3.39 1.34 6.59
Span: 1.6 m. R2comp Defl. 1.86 0.20 1.34 0.14 1.53 0.16 4.73 0.50 3.39 0.36 1.34 0.14 6.59
Load types: U:UDL; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 2.63 kNm (6.10) at 0.80 m. from R1 Maximum S.F. = 6.59 kN (6.10) at R1 Mid-span deflections: Dead: 0.36 x 108/EI (E in N/mm2, I in cm4) Live: 0.14 x 108/EI Total: 0.50 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 2no 50 x 200 C24 8.4 kg/m approx W el,y = 666.7 cm3 Iy = 6,667 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.0 Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.0/1.30 = 11.08 N/mm2 Design bending stress, sm,y,d = 2.63 x 1000/667 = 3.95 N/mm2 OK Bending resistance = 11.08 x 667/1000 = 7.38 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 100 = 67 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.0/1.30 = 1.85 N/mm2 Design shear stress, sv,y,d = 6.59 x 1000 x (3/2)/(67.0 x 200) = 0.74 N/mm2 OK Shear resistance = 1.85 x 67 x 200 x (2/3)/1000 = 16.49 kN
Deflection Final deflection limit = 0.003L = 4.80 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 1.89 x 106/((11,000/16) x 100 x 200) = 0.17 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 0.36 0.14
Inst. mm 0.49 0.20 0.17 0.85
kdef 0.60 0.60
y2 1.00 0.30
Final mm 0.79 0.23 0.24 1.26
OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 17
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: TB-02 Load name U G Floor dead U QA Floor live R G Floor dead R QA Floor live R G stud partition P G stud partition
Printed 17 Jun 2026 15:09
Loading w1 0.58/0.30 0.42/0.30 0.75*1.20/2 1.5*1.20/2 0.75*2.55 0.75*2.55*1.20/2
Start x1 Loading w2 End x2 0 L 0 L 0.90 L 0.90 L 0 0.90 0.90 Total load (unfactored): 9.15 kN Dead/Permanent (unfactored): 6.28 kN Live/Variable (unfactored): 2.87 kN Factored (6.10): 12.78 kN
R1comp 1.55 1.12 0.07 0.14 1.24 0.50 4.61 3.35 1.26 6.42
Span: 1.6 m. R2comp Defl. 1.55 0.16 1.12 0.12 0.25 0.02 0.49 0.03 0.48 0.10 0.65 0.10 4.53 0.52 2.92 0.37 1.61 0.15 6.36
Load types: U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 2.82 kNm (6.10) at 0.88 m. from R1 Maximum S.F. = 6.42 kN (6.10) at R1 Mid-span deflections: Dead: 0.37 x 108/EI (E in N/mm2, I in cm4) Live: 0.15 x 108/EI Total: 0.52 x 108/EI Timber beam calculation to BS EN1995-1-1 using C24 timber
Use 2no 50 x 200 C24 8.4 kg/m approx W el,y = 666.7 cm3 Iy = 6,667 cm4 Timber grade: C24 Grade bending strength, fm,k = 24.0 N/mm2 [BS EN 338: 2009 Table 1] Grade shear strength, fv,k = 4.0 N/mm2 [BS EN 338: 2009 Table 1] E0.05 = 7,400 N/mm2; E0,mean = 11,000 N/mm2 [BS EN 338: 2009 Table 1] Material partial factor, gM = 1.3 [EC5 UK Table NA.3] Loading modification factor, kmod = 0.6 (Service class 1; Live load duration: Permanent) [EC5 Tables 2.2/3.1] Load sharing factor, ksys = 1.0 Deflection modification factor, kdef = 0.60 (Service class 1, solid timber/glulam/LVL) [EC5 Table 3.2]
Bending Height factor, kh = 1.0 [EC5 3.2(3)] Design bending strength, fm,y,d = fm,k.kmod.kh.ksys/gm = 24.0 x 0.60 x 1.00 x 1.0/1.30 = 11.08 N/mm2 Design bending stress, sm,y,d = 2.82 x 1000/667 = 4.23 N/mm2 OK Bending resistance = 11.08 x 667/1000 = 7.38 kNm
Shear Effective width for shear, bef = kcr.b = 0.67 x 100 = 67 mm. [A1:2008 (6.13a)] Design shear strength, fv,d = fv,k.kmod.ksys/gm = 4.00 x 0.60 x 1.0/1.30 = 1.85 N/mm2 Design shear stress, sv,y,d = 6.42 x 1000 x (3/2)/(67.0 x 200) = 0.72 N/mm2 OK Shear resistance = 1.85 x 67 x 200 x (2/3)/1000 = 16.49 kN
Deflection Final deflection limit = 0.003L = 4.80 mm Final deflection, ufin = Suinst(1 + y2.kdef) [EC2 Eq.2.29/2.30] Instantaneous mid-span shear deflection, uinst,v = 1.2Munf/(GmeanA) where (G = E/16) uinst,v = 1.2 x 2.01 x 106/((11,000/16) x 100 x 200) = 0.18 mm Final shear deflection is assumed to increase in proportion to total bending deflection
Mid-span deflections: G: QA: Shear deflection: Total mm.
x 1e8/EI 0.37 0.15
Inst. mm 0.51 0.20 0.18 0.89
kdef 0.60 0.60
y2 1.00 0.30
Final mm 0.82 0.24 0.26 1.32
OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 18
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: B2.26 Load name OG o.w. U G floor dead U QA Floor live R G Stair R QA Stair P G stud partition P G Roof P QA Roof P G stud partition P G Beam: TB-02 : R2 P QA Beam: TB-02 : R2
Loading w1 0.3 0.75*0.60/2 1.50*0.60/2 1.00*1.60/2 1.50*1.60/2 0.75*1.10*0.60/2 1.3*2.00*0.60/2 0.6*2.00*0.60/2 0.75*2.50*0.80/2 2.92 1.61
Start x1 Loading w2 End x2 0 L 0 L 0 L 2.75 L 2.75 L 0.60 0.60 0.60 0.60 1.45 1.45 Total load (unfactored): 11.88 kN Dead/Permanent (unfactored): 7.27 kN Live/Variable (unfactored): 4.61 kN Factored (6.10): 16.73 kN
R1comp 0.54 0.40 0.81 0.08 0.12 0.21 0.65 0.30 0.63 1.74 0.96 6.44 4.25 2.19 9.03
Span: 3.6 m. R2comp Defl. 0.54 0.66 0.40 0.49 0.81 0.98 0.60 0.23 0.90 0.34 0.04 0.12 0.13 0.37 0.06 0.17 0.13 0.35 1.18 2.69 0.65 1.48 5.44 7.87 3.02 4.90 2.42 2.97 7.70
Load types: O:Beam o.w.; U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 9.13 kNm (6.10) at 1.45 m. from R1 Maximum S.F. = 9.03 kN (6.10) at R1 Mid-span deflections: Dead: 4.90 x 108/EI (E in N/mm2, I in cm4) Live: 2.97 x 108/EI Total: 7.87 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 30 UKC S275 D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y=222 cm3 Classification: Flange: c/t = 65.6/9.4 = 6.98 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/6.5 = 19.0 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 9.03 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.3x100 - 2x153x9.40 + (6.50+2x7.60) x9.40 = 1,159 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,159 x (275/ 3)/(1.0 x 1000) = 184 kN (>=9.03) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/6.5 = 21.35 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 9.13 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 248/1000 = 68.2 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 248.0 cm3 Iw = 0.031 dm6 IT = 10.5 cm4 Iz = 560 cm4 G = 81,000N/mm2
KP
SAI Structrues Limited Structural Engineer & Planner
Job number: Made by: KP Page: 19
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-3.60 4.64 9.1 1.00d 1.00 78.7 1.394 0.931 0.915 0.742 0.742 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
Deflection LL deflection = 2.97 x 1e8/(210,000 x 1,750) = 0.8 mm (L/4455) OK TL deflection = 7.87 x 1e8/(210,000 x 1,750) = 2.1 mm (L/1681)
Bearings R1 (9.03 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
R2 (7.70 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
Printed 17 Jun 2026 15:09
M c,Rd 68.2
M b,Rd 50.6 OK
KP
SAI Structrues Limited Structural Engineer & Planner
Job number: Made by: KP Page: 20
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Beam: BR.22 Load name O G o.w. P G Column: C3 & C4 P QA Column: C3 & C4 P G Column: C3 & C4 P QA Column: C3 & C4
Printed 17 Jun 2026 15:09
Loading w1 0.3 11.24 2.86 11.24 2.86
Start x1 Loading w2 End x2 0 L 2.00 2.00 3.45 3.45 Total load (unfactored): 29.3 kN Dead/Permanent (unfactored): 23.6 kN Live/Variable (unfactored): 5.7 kN Factored (6.10): 40.4 kN
R1comp 0.54 5.00 1.27 0.47 0.12 7.39 6.00 1.39 10.19
Span: 3.6 m. R2comp Defl. 0.54 0.66 6.24 10.73 1.59 2.73 10.77 1.36 2.74 0.35 21.89 15.83 17.56 12.75 4.33 3.08 30.20
Load types: O:Beam o.w.; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed:
Maximum B.M. = 19.57 kNm (6.10) at 2.00 m. from R1 Maximum S.F. = -30.20 kN (6.10) at R2 Mid-span deflections: Dead: 12.75 x 108/EI (E in N/mm2, I in cm4) Live: 3.08 x 108/EI Total: 15.83 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 30 UKC S275 D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y=222 cm3 Classification: Flange: c/t = 65.6/9.4 = 6.98 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/6.5 = 19.0 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 30.2 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.3x100 - 2x153x9.40 + (6.50+2x7.60) x9.40 = 1,159 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,159 x (275/ 3)/(1.0 x 1000) = 184 kN (>=30.2) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/6.5 = 21.35 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 19.57 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 248/1000 = 68.2 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 248.0 cm3 Iw = 0.031 dm6 IT = 10.5 cm4 Iz = 560 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-3.60 4.64 19.4 1.00d 1.00 78.7 1.394 0.931 0.915 0.742 0.742 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
M c,Rd 68.2
M b,Rd 50.6 OK
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Deflection LL deflection = 3.08 x 1e8/(210,000 x 1,750) = 0.8 mm (L/4295) OK TL deflection = 15.83 x 1e8/(210,000 x 1,750) = 4.3 mm (L/836)
Bearings R1 (10.19 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
R2 (30.20 kN) : User-entered BOLTED CONNECTION TO BEAM/COLUMN
Job number: Made by: KP Page: 21 Printed 17 Jun 2026 15:09
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 22
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: B2.21 Load name O G o.w. U G Floor dead U QA Floor live R G Stud partition R G Floor dead R QA Floor live P G Bm: B2.26 [3.85 m.] : R2 P QA Bm: B2.26 [3.85 m.] : R2 P G Bm: BR.22 [3.6 m.] : R2 P QA Bm: BR.22 [3.6 m.] : R2
Loading w1 0.5 0.75*1.50/2 1.50*1.500/2 0.75*2.50 1.01/0.30 0.87/0.30 3.02 2.42 17.56 4.33
Start x1 Loading w2 End x2 0 L 0 L 0 L 0 2.20 1.50 L 1.50 L 1.50 1.50 5.25 5.25 Total load (unfactored): 69.8 kN Dead/Permanent (unfactored): 44.7 kN Live/Variable (unfactored): 25.1 kN Factored (6.10): 98.0 kN
R1comp 1.41 1.59 3.18 3.32 5.13 4.42 2.22 1.78 1.24 0.31 24.60 14.92 9.68 34.66
Span: 5.65 m. R2comp Defl. 1.41 7 1.59 7 3.18 15 0.80 8 8.84 37 7.62 32 0.80 8 0.64 7 16.32 14 4.02 3 45.22 139 29.76 82 15.46 57 63.37
Load types: O:Beam o.w.; U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 57.9 kNm (6.10) at 2.87 m. from R1 Maximum S.F. = -63.4 kN (6.10) at R2 Mid-span deflections: Dead: 82 x 108/EI (E in N/mm2, I in cm4) Live: 57 x 108/EI Total: 139 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 44 UKC S275 D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W el,y=326 cm3 Classification: Flange: c/t = 65.6/13.6 = 4.82 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/9.5 = 13.0 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 63.4 kN Shear area, Av = A - 2btf + (tw+2r)tf = 56.1x100 - 2x156x13.6 + (9.50+2x7.60) x13.6 = 1,705 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,705 x (275/ 3)/(1.0 x 1000) = 271 kN (>=63.4) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/9.5 = 14.61 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 57.9 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 372/1000 = 102 kNm OK Beam has full lateral restraint: check for lateral-torsional buckling not required Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
Deflection LL deflection = 57 x 1e8/(210,000 x 2,700) = 10.1 mm (L/560) OK TL deflection = 139 x 1e8/(210,000 x 2,700) = 24.5 mm (L/230)
Bearings Bearing plate sizing is to EC3 152 x 152 x 44 UC stiff bearing length, b1 = t + 1.6r + 2T = 48.9 mm Masonry: 7N/mm2 brick, shape factor, d = 0.850 [Table A1 BS EN 772-1] Normalised compressive strength, fb = 7.00 x 0.850 = 5.95 N/mm2 Mortar: M2: fm = 2.0 N/mm2 K = 0.5, a = 0.7, B = 0.3 [EC6-1-1 UK NA 2012 Table NA.4] a B 0.7 0.3 Characteristic compressive strength, fk = K.fb .fm = 0.50 x 5.95 x 2.00 = 2.15 N/mm2 [EC6-1 Eq(3.1)] Category II mfr, class 2 execution: gm = 3.0 [EC6-3 UK NA Table NA.1] Design compressive strength, fd = fk/gm = 2.15/3.0 = 0.715 N/mm2
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
R1 (34.7 kN) : 500 x 100 x 25 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (500-48.9)/2 = 226mm Factored stress under plate = 34.7 x 1000/500 x 100 = 0.69 N/mm2 Required plate thickness = (3 x 0.69 x 226 x 226/265) = 20.0 mm: use 25mm Factored bending stress in plate = 0.69 x 226 x (226/2)/(25 x 25/6) = 169 N/mm2 (fy=265 N/mm2) BOLTED CONNECTION TO BEAM/COLUMN
R2 (63.4 kN) : 900 x 100 x 40 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (900-48.9)/2 = 426mm Factored stress under plate = 63.4 x 1000/900 x 100 = 0.70 N/mm2 Required plate thickness = (3 x 0.70 x 426 x 426/265) = 38.0 mm: use 40mm Factored bending stress in plate = 0.70 x 426 x (426/2)/(40 x 40/6) = 239 N/mm2 (fy=265 N/mm2)
Job number: Made by: KP Page: 23 Printed 17 Jun 2026 15:09
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 24
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: BR.27 Load name O G o.w. U G Stud partition P G Bm: B2.21 [5.65 m.] : R1 P QA Bm: B2.21 [5.65 m.] : R1
Loading w1 0.3 1.35*2.50 14.92 9.68
Start x1 Loading w2 End x2 0 L 0 L 0.35 0.35 Total load (unfactored): 37.1 kN Dead/Permanent (unfactored): 27.4 kN Live/Variable (unfactored): 9.7 kN Factored (6.10): 51.5 kN
R1comp 0.51 5.74 13.38 8.68 28.32 19.63 8.68 39.53
Span: 3.4 m. R2comp Defl. 0.51 0.52 5.74 5.87 1.54 3.72 1.00 2.41 8.78 12.52 7.78 10.11 1.00 2.41 12.00
Load types: O:Beam o.w.; U:UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed:
Maximum B.M. = 14.52 kNm (6.10) at 0.98 m. from R1 Maximum S.F. = 39.5 kN (6.10) at R1 Mid-span deflections: Dead: 10.11 x 108/EI (E in N/mm2, I in cm4) Live: 2.41 x 108/EI Total: 12.52 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 203 x 133 x 30 UKB S275 D=206.8 mm B=133.9 mm t=6.4 mm T=9.6 mm Iy=2,900 cm4 iz=3.17 cm W pl,y=314 cm3 W el,y=280 cm3 Classification: Flange: c/t = 56.1/9.6 = 5.85 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 172.4/6.4 = 26.9 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 39.5 kN Shear area, Av = A - 2btf + (tw+2r)tf = 38.2x100 - 2x134x9.60 + (6.40+2x7.60) x9.60 = 1,456 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,456 x (275/ 3)/(1.0 x 1000) = 231 kN (>=39.5) OK [EC3 6.2.6] Shear buckling: hw/tw = 187.6/6.4 = 29.31 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 14.52 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 314/1000 = 86.3 kNm OK Lateral-torsional buckling check Beam is laterally restrained at supports only Support conditions R1/R2: Compression flange laterally unrestrained; both flanges free to rotate on plan. Partial torsional restraint by dead bearing of bottom flange to support (1.2L+2D) Design buckling resistance moment, Mb,Rd = cLT,mod.Mc,Rd cLT,mod = cLT/f (but <=1/lLT 2 and <=1.0) [Eq.6.58] f = 1 - 0.5(1-kc)[1 - 2(lLT - 0.8)2] 6.3.2.3(2) kc = 1/ C1 [NA2.18] Use buckling curve b: a = 0.340 [EC3 Tables 6.3/6.4 NA 2.17] cLT = 1/[fLT + (FLT 2-blLT 2)] [EC3 (6.57)] FLT = 0.5[1 + aLT(lLT - lLT,0) + blLT 2] lLT,0 = 0.4 b = 0.75 [EC3 UK NA 2.17] lLT = (fy.W pl,y/Mcr) Mcr = C1(p2EIz/Le2) (Iw/Iz + Le2GIT/p2EIz) [SN003: k and kw taken as 1.0, conservative] W y = 314.0 cm3 Iw = 0.037 dm6 IT = 10.3 cm4 Iz = 385 cm4 G = 81,000N/mm2 Segment Le MMax C1 kc M cr lz l LT f LT c LT c LT, mod 0.00-3.40 4.49 14.5 1.00d 1.00 69.3 1.633 1.116 1.089 0.629 0.629 C1 derivation: d: taken as 1.0 (conservative) Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
M c,Rd 86.3
M b,Rd 54.3 OK
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Job number: Made by: KP Page: 25 Printed 17 Jun 2026 15:09
Deflection LL deflection = 2.41 x 1e8/(210,000 x 2,900) = 0.4 mm (L/8592) OK TL deflection = 12.52 x 1e8/(210,000 x 2,900) = 2.1 mm (L/1654)
Bearings Bearing plate sizing is to EC3 203 x 133 x 30 UB stiff bearing length, b1 = t + 1.6r + 2T = 37.8 mm Masonry: 7N/mm2 brick, shape factor, d = 0.850 [Table A1 BS EN 772-1] Normalised compressive strength, fb = 7.00 x 0.850 = 5.95 N/mm2 Mortar: M2: fm = 2.0 N/mm2 K = 0.5, a = 0.7, B = 0.3 [EC6-1-1 UK NA 2012 Table NA.4] a B 0.7 0.3 Characteristic compressive strength, fk = K.fb .fm = 0.50 x 5.95 x 2.00 = 2.15 N/mm2 [EC6-1 Eq(3.1)] Category II mfr, class 2 execution: gm = 3.0 [EC6-3 UK NA Table NA.1] Design compressive strength, fd = fk/gm = 2.15/3.0 = 0.715 N/mm2 R1 (39.5 kN) : 250 x 225 x 10 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (250-37.8)/2 = 106mm Factored stress under plate = 39.5 x 1000/250 x 225 = 0.70 N/mm2 Required plate thickness = (3 x 0.70 x 106 x 106/275) = 9.29 mm: use 10mm Factored bending stress in plate = 0.70 x 106 x (106/2)/(10 x 10/6) = 237 N/mm2 (fy=275 N/mm2) R2 (12.0 kN) : 175 x 100 x 6 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (175-37.8)/2 = 68.6mm Factored stress under plate = 12.0 x 1000/175 x 100 = 0.69 N/mm2 Required plate thickness = (3 x 0.69 x 68.6 x 68.6/275) = 5.94 mm: use 6mm Factored bending stress in plate = 0.69 x 68.6 x (68.6/2)/(6 x 6/6) = 269 N/mm2 (fy=275 N/mm2)
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 26
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Beam: B2.22 Load name O G o.w. U G Ceiling U QA Ceiling R G Floor dead R QA Floor live R G Floor dead R QA Floor live P G Bm: BR.22 [3.6 m.] : R1 P QA Bm: BR.22 [3.6 m.] : R1 P G Bm: B2.26 [3.6 m.] : R1 P QA Bm: B2.26 [3.6 m.] : R1
Loading w1 0.5 0.25*1.30/2 0.25*1.30/2 1.39/0.30 1.11/0.30 0.79/0.30 0.55/0.30 6.00 1.39 4.25 2.19
Start x1 Loading w2 End x2 0 L 0 L 0 L 1.50 L 1.50 L 0 1.50 0 1.50 5.25 5.25 1.50 1.50 Total load (unfactored): 59.8 kN Dead/Permanent (unfactored): 37.2 kN Live/Variable (unfactored): 22.6 kN Factored (6.10): 84.1 kN
R1comp 1.41 0.46 0.46 7.06 5.64 3.43 2.38 0.42 0.10 3.12 1.61 26.10 15.91 10.19 36.76
Span: 5.65 m. R2comp Defl. 1.41 7 0.46 2 0.46 2 12.17 52 9.72 41 0.52 6 0.37 4 5.58 5 1.29 1 1.13 12 0.58 6 33.68 137 21.27 82 12.41 54 47.33
Load types: O:Beam o.w.; U:UDL; R:Part UDL; P:Point load; Load positions: m. from R1 Load durations: G: Dead; Qx: Imposed: QA: Residential
Maximum B.M. = 57.4 kNm (6.10) at 2.78 m. from R1 Maximum S.F. = -47.3 kN (6.10) at R2 Mid-span deflections: Dead: 82 x 108/EI (E in N/mm2, I in cm4) Live: 54 x 108/EI Total: 137 x 108/EI Beam calculation to BS EN1993.1.1 using S275 steel SECTION SIZE : 152 x 152 x 44 UKC S275 D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W el,y=326 cm3 Classification: Flange: c/t = 65.6/13.6 = 4.82 <= 9e (8.32): Class 1, plastic EC3 Table 5.2 Web: c/t = 123.6/9.5 = 13.0 <= 72e (66.6): Class 1, plastic
Shear Design shear force, VEd = 47.3 kN Shear area, Av = A - 2btf + (tw+2r)tf = 56.1x100 - 2x156x13.6 + (9.50+2x7.60) x13.6 = 1,705 mm2 [EC3 6.2.6 (3)] Shear resistance, Vpl,Rd = Av .(fy/ 3)/gM0 = 1,705 x (275/ 3)/(1.0 x 1000) = 271 kN (>=47.3) OK [EC3 6.2.6] Shear buckling: hw/tw = 138.8/9.5 = 14.61 <= 72e (66.56): check not required [EC3 6.2.6(6)]
Bending Moment resistance Design moment, MEd = 57.4 kNm Moment resistance, Mc,y,Rd = fy.W pl,y = 275 x 372/1000 = 102 kNm OK Beam has full lateral restraint: check for lateral-torsional buckling not required Combined bending and shear VEd <= 0.5 Vc,Rd : Check for bending/shear interaction not required [EC3 6.2.8(2)] Web buckling and crushing have not been checked
Deflection LL deflection = 54 x 1e8/(210,000 x 2,700) = 9.6 mm (L/590) OK TL deflection = 137 x 1e8/(210,000 x 2,700) = 24.1 mm (L/235)
Bearings Bearing plate sizing is to EC3 152 x 152 x 44 UC stiff bearing length, b1 = t + 1.6r + 2T = 48.9 mm Masonry: 7N/mm2 brick, shape factor, d = 0.850 [Table A1 BS EN 772-1] Normalised compressive strength, fb = 7.00 x 0.850 = 5.95 N/mm2 Mortar: M2: fm = 2.0 N/mm2 K = 0.5, a = 0.7, B = 0.3 [EC6-1-1 UK NA 2012 Table NA.4] a B 0.7 0.3 Characteristic compressive strength, fk = K.fb .fm = 0.50 x 5.95 x 2.00 = 2.15 N/mm2 [EC6-1 Eq(3.1)] Category II mfr, class 2 execution: gm = 3.0 [EC6-3 UK NA Table NA.1]
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Design compressive strength, fd = fk/gm = 2.15/3.0 = 0.715 N/mm2 R1 (36.8 kN) : 550 x 100 x 25 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (550-48.9)/2 = 251mm Factored stress under plate = 36.8 x 1000/550 x 100 = 0.67 N/mm2 Required plate thickness = (3 x 0.67 x 251 x 251/265) = 21.8 mm: use 25mm Factored bending stress in plate = 0.67 x 251 x (251/2)/(25 x 25/6) = 201 N/mm2 (fy=265 N/mm2) BOLTED CONNECTION TO BEAM/COLUMN
R2 (47.3 kN) : 700 x 100 x 30 mm S275 bearing plate Bearing plate projection beyond stiff bearing length = (700-48.9)/2 = 326mm Factored stress under plate = 47.3 x 1000/700 x 100 = 0.68 N/mm2 Required plate thickness = (3 x 0.68 x 326 x 326/265) = 28.5 mm: use 30mm Factored bending stress in plate = 0.68 x 326 x (326/2)/(30 x 30/6) = 239 N/mm2 (fy=265 N/mm2) BOLTED CONNECTION TO BEAM/COLUMN
Job number: Made by: KP Page: 27 Printed 17 Jun 2026 15:09
SAI Structrues Limited
KP
Structural Engineer & Planner
Job number: Made by: KP Page: 28
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
Notched beam angle cleat connection check (EC3 + UK NA) Beam side calcs based on NCCI SN017a (fin plates), support side on SN014a (end plates)
Location: Typiccal Steel to steel Connection (152 UC) Factored load at support = 9.03 kN Beam: S275 152 x 152 x 30 UC connection to web of S275 152 x 152 x 44 UC Section dims: 152 x 152 x 30 UC: D=157.6 mm B=152.9 mm t=6.5 mm T=9.4 mm Iy=1,750 cm4 iz=3.83 cm W pl,y=248 cm3 W el,y 152 x 152 x 44 UC: D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W e Notch dimensions: Top: 70 x 18mm Bottom: 70 x 14mm Use 2no 100mm long 90 x 90 x 10 angle cleats 2no sets of M16 8.8 bolts at 50 mm centres
ANGLE CLEAT CONNECTION 100mm long 90 x 90 x 10mm angle cleats 152 x 152 x 44 UC 70
18
30
50
106.5
50
10
2 No sets M16 8.8 bolts
100
152 x 152 x 30 UC 14
Check detailing Check plate/cleat length (100mm) >= 0.6 x beam depth (94.6mm) OK Check bolt pitch (50mm) >= 2.2d0 (39.6mm) OK Check bolt end clearance (25mm) >= 1.2d0 (21.6mm) OK [EC3-1-8 Table 3.3] Check bolt edge clearance (40mm) >= 1.2d0 (21.6mm) OK [do.] Bolt resistance (M16 8.8 bolts) Shear resistance per bolt = Fv ,Rd = av .fub.As/gM2 = 0.6 x 800 x 157/(1.25 x 1000) = 60.3 kN [EC3-1-8 Table 3.4] Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 [EC3-1-8 Table 3.4] where av = 0.6; fub = 800 N/mm2; As = 157.0 mm2; gM2 = 1.25 ab is the smallest of ad, fub/fu or 1.0 ad = e1/3d0 for end bolts, (p1/3d0) - 0.25 for inner bolts (bolts in direction of load transfer) k1 = 2.8e2/d0 - 1.7 but <= 2.5 for inner bolts (bolts perpendicular to load transfer) and 1.4p2/d0 - 1.7 but <= 2.5 for inner bolts (do.) d0: bolt hole diameter (18 mm); e1: end distance; e2: edge distance; p1: pitch fu for t = 3-100mm: S275: 410N/mm2; S355: 470N/mm2 [EC3-1-1 UK NA 2.4: use product values not those in EC3] VRd,1, Beam web bolts in shear VRd,1 = n.Fv,Rd/ ((1 + an)2 + (Bn)2) [NCCI SN017a 3] Fv,rd = 2 x 60.3 = 121 kN (bolts are in double shear) For a single line of bolts a = 0; B = 6z/(n(n+1)p1) = 6 x 50/(2 x (2 + 1) x 50) = 1.000 VRd,1 = n.Fv,rd/ (1 + (Bn)2) = 2 x 121/ (1 + (1.000 x 2)2) = 108 kN OK VRd,2, Cleat in bearing (beam web bolts) VRd,2 = n/ (((1 + an)/Fb,Rd,ver)2 + (Bn/Fb,Rd,hor)2) a and B as above [NCCI SN017a 4] Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 10/(1.25 x 1000) = 85.09 kN VRd,2 = 2 x 2/ ((1/60.74)2 + (1.00 x 2/85.09)2) = 139 kN OK
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Printed 17 Jun 2026 15:09
VRd,3, Cleats in shear (gross section) VRd,3 = Av .fy,p/( 3gM0) [NCCI SN017a 5] Av = tp.hp/1.27 = 100 x 10/1.27 = 787 mm2 VRd,3 = 2 x 787 x 275/( 3 x 1.0 x 1000) = 250 kN OK VRd,4, Cleats in shear (net section) VRd,4 = Av,net.fu,p/( 3gM2) [NCCI SN017a 6] Av,net = (100 - 2 x 18) x 10 = 640 mm2 VRd,4 = 2 x 640 x 410/( 3 x 1.10 x 1000) = 275 kN OK VRd,5, Cleats in shear (block shear) VRd,5 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] gM2, partial factor for the resistance of net sections = 1.1 [EC3 UK NA 2.15] Ant = net area in tension = 31 x 10 = 310mm2; Anv = net area in shear = 48 x 10 = 480mm2 VRd,5 = 2 x (0.5 x 410 x 310/1.10 + (1/ 3) x 275 x 480/1.0)/1000 = 268 kN OK VRd,6, Support-side bolts in shear Fv,Rd,red = 0.8 Fv,Rd = 0.8 x 60.3 = 48.2 kN (0.8 reduction factor allows for tension in bolt) [SN014a 3] VRd,6 = n.Fv,rd,red = 2 x 2 x 48.2 = 193 kN OK [NCCI SN014a 3] VRd,7, Cleat in bearing (support-side bolts) Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,top = 2.50 x 0.463 x 410 x 16 x 10/(1.25 x 1000) = 60.7 kN Fb,Rd,oth = 2.50 x 0.676 x 410 x 16 x 10/(1.25 x 1000) = 88.7 kN As Fv,Rd,red (48.2 kN) < Fb,Rd,max (88.7 kN),VRd,7 = n.Fb,rd,min VRd,7 = 2 x 2 x 60.7 = 243 kN OK [NCCI SN014a 4] VRd,8, Beam web in bearing (beam web bolts) Fb,Rd = k1.ab.fu.d.tp/gM2 Fb,Rd,ver = 2.50 x 0.676 x 410 x 16 x 6.5/(1.25 x 1000) = 57.6 kN Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 6.5/(1.25 x 1000) = 55.3 kN VRd,8 = 2/ ((1/57.6)2 + (1.00 x 2/55.3)2) = 49.9 kN OK VRd,9, Beam web in shear (gross section) VRd,9 = Av,b.fy,b1/( 3gM0) [NCCI SN017a 11] Av,b = (157.6 - (18 + 14)) x 6.5 = 816 mm2 (Remaining web area only) VRd,9 = 816 x 275/( 3 x 1.0 x 1000) = 130 kN OK [NCCI SN017a 11] VRd,10, Beam web in shear (net section) VRd,10 = Av,b,net.fu,b1/( 3gM2) [NCCI SN017a 12] Av,b,net = 816 [Av,b] - (2 x 18 x 6.5) = 582 mm2 VRd,10 = 582 x 410/( 3 x 1.10 x 1000) = 125 kN OK VRd,11, Beam web in shear (block shear) VRd,11 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] Ant = net area in tension = 31 x 6.5 = 202mm2 Anv = net area in shear = 60.0 x 6.5 = 390mm2 VRd,11 = (0.5 x 410 x 202/1.10 + (1/ 3) x 275 x 390/1.0)/1000 = 99.5 kN OK VRd,12, Supporting beam web in bearing VRd,12 = nFb,Rd Fb,Rd = k1.ab.fu.d.t/gM2 k1 = 2.5; a = 50/(3 x 18) - 0.25 = 0.676 Fb,Rd = 2.50 x 0.676 x 410 x 16 x 9.5/(1.25 x 1000) = 84.2 kN VRd,12 = 2 x 2 x 84.2 = 337 kN OK Ductility check Check VRd (49.9 kN) < VRd,1 (107.8 kN) OK [SN017a 16] Rotational capacity has not been checked
Summary: VRd,1
Job number: Made by: KP Page: 29
Beam web bolts in shear
107.8 kN
KP
SAI Structrues Limited Structural Engineer & Planner
Job number: Made by: KP Page: 30
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
VRd,2 VRd,3 VRd,4 VRd,5 VRd,6 VRd,7 VRd,8 VRd,9 VRd,10 VRd,11 VRd,12
Printed 17 Jun 2026 15:09
Cleat in bearing (beam web bolts) Cleats in shear (gross section) Cleats in shear (net section) Cleats in shear (block shear) Support-side bolts in shear Cleat in bearing (support-side bolts) Beam web in bearing (beam web bolts) Beam web in shear (gross section) Beam web in shear (net section) Beam web in shear (block shear) Supporting beam web in bearing
139.4 kN 250.0 kN 275.4 kN 268.0 kN 192.9 kN 243.0 kN 49.9 kN ¬ 129.6 kN 125.3 kN 99.5 kN 337.0 kN
Critical design check: 8 - Beam web in bearing (beam web bolts): Connection resistance = 49.9kN OK
SAI Structrues Limited
KP
Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
Job number: Made by: KP Page: 31 Printed 17 Jun 2026 15:09
Notched beam angle cleat connection check (EC3 + UK NA) Beam side calcs based on NCCI SN017a (fin plates), support side on SN014a (end plates)
Location: Typiccal Steel to steel Connection (152 UC & 203 UB) Factored load at support = 34.7 kN Beam: S275 152 x 152 x 44 UC connection to web of S275 203 x 133 x 30 UB Section dims: 152 x 152 x 44 UC: D=166.0 mm B=155.9 mm t=9.5 mm T=13.6 mm Iy=2,700 cm4 iz=3.92 cm W pl,y=372 cm3 W e 203 x 133 x 30 UB: D=206.8 mm B=133.9 mm t=6.4 mm T=9.6 mm Iy=2,900 cm4 iz=3.17 cm W pl,y=314 cm3 W el,y Notch dimensions: Top: 70 x 22mm Use 2no 100mm long 90 x 90 x 10 angle cleats 2no sets of M16 8.8 bolts at 50 mm centres
ANGLE CLEAT CONNECTION 100mm long 90 x 90 x 10mm angle cleats 22
70
30
50
109.5
50
2 No sets M16 8.8 bolts
100
10 152 x 152 x 44 UC
203 x 133 x 30 UB
Check detailing Check plate/cleat length (100mm) >= 0.6 x beam depth (99.6mm) OK Check bolt pitch (50mm) >= 2.2d0 (39.6mm) OK Check bolt end clearance (25mm) >= 1.2d0 (21.6mm) OK [EC3-1-8 Table 3.3] Check bolt edge clearance (40mm) >= 1.2d0 (21.6mm) OK [do.] Bolt resistance (M16 8.8 bolts) Shear resistance per bolt = Fv ,Rd = av .fub.As/gM2 = 0.6 x 800 x 157/(1.25 x 1000) = 60.3 kN [EC3-1-8 Table 3.4] Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 [EC3-1-8 Table 3.4] where av = 0.6; fub = 800 N/mm2; As = 157.0 mm2; gM2 = 1.25 ab is the smallest of ad, fub/fu or 1.0 ad = e1/3d0 for end bolts, (p1/3d0) - 0.25 for inner bolts (bolts in direction of load transfer) k1 = 2.8e2/d0 - 1.7 but <= 2.5 for inner bolts (bolts perpendicular to load transfer) and 1.4p2/d0 - 1.7 but <= 2.5 for inner bolts (do.) d0: bolt hole diameter (18 mm); e1: end distance; e2: edge distance; p1: pitch fu for t = 3-100mm: S275: 410N/mm2; S355: 470N/mm2 [EC3-1-1 UK NA 2.4: use product values not those in EC3] VRd,1, Beam web bolts in shear VRd,1 = n.Fv,Rd/ ((1 + an)2 + (Bn)2) [NCCI SN017a 3] Fv,rd = 2 x 60.3 = 121 kN (bolts are in double shear) For a single line of bolts a = 0; B = 6z/(n(n+1)p1) = 6 x 50/(2 x (2 + 1) x 50) = 1.000 VRd,1 = n.Fv,rd/ (1 + (Bn)2) = 2 x 121/ (1 + (1.000 x 2)2) = 108 kN OK VRd,2, Cleat in bearing (beam web bolts) VRd,2 = n/ (((1 + an)/Fb,Rd,ver)2 + (Bn/Fb,Rd,hor)2) a and B as above [NCCI SN017a 4] Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 10/(1.25 x 1000) = 85.09 kN VRd,2 = 2 x 2/ ((1/60.74)2 + (1.00 x 2/85.09)2) = 139 kN OK
KP
SAI Structrues Limited Structural Engineer & Planner
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
VRd,3, Cleats in shear (gross section) VRd,3 = Av .fy,p/( 3gM0) [NCCI SN017a 5] Av = tp.hp/1.27 = 100 x 10/1.27 = 787 mm2 VRd,3 = 2 x 787 x 275/( 3 x 1.0 x 1000) = 250 kN OK VRd,4, Cleats in shear (net section) VRd,4 = Av,net.fu,p/( 3gM2) [NCCI SN017a 6] Av,net = (100 - 2 x 18) x 10 = 640 mm2 VRd,4 = 2 x 640 x 410/( 3 x 1.10 x 1000) = 275 kN OK VRd,5, Cleats in shear (block shear) VRd,5 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] gM2, partial factor for the resistance of net sections = 1.1 [EC3 UK NA 2.15] Ant = net area in tension = 31 x 10 = 310mm2; Anv = net area in shear = 48 x 10 = 480mm2 VRd,5 = 2 x (0.5 x 410 x 310/1.10 + (1/ 3) x 275 x 480/1.0)/1000 = 268 kN OK VRd,6, Support-side bolts in shear Fv,Rd,red = 0.8 Fv,Rd = 0.8 x 60.3 = 48.2 kN (0.8 reduction factor allows for tension in bolt) [SN014a 3] VRd,6 = n.Fv,rd,red = 2 x 2 x 48.2 = 193 kN OK [NCCI SN014a 3] VRd,7, Cleat in bearing (support-side bolts) Bolt bearing resistance, Fb,Rd = k1.ab.fu.d.tp/gM2 e1 = 25 mm; e2 = 40 mm; k1 = 2.50; ab = 0.463 Fb,Rd,top = 2.50 x 0.463 x 410 x 16 x 10/(1.25 x 1000) = 60.7 kN Fb,Rd,oth = 2.50 x 0.676 x 410 x 16 x 10/(1.25 x 1000) = 88.7 kN As Fv,Rd,red (48.2 kN) < Fb,Rd,max (88.7 kN),VRd,7 = n.Fb,rd,min VRd,7 = 2 x 2 x 60.7 = 243 kN OK [NCCI SN014a 4] VRd,8, Beam web in bearing (beam web bolts) Fb,Rd = k1.ab.fu.d.tp/gM2 Fb,Rd,ver = 2.50 x 0.611 x 410 x 16 x 9.5/(1.25 x 1000) = 76.2 kN Fb,Rd,hor = 2.19 x 0.741 x 410 x 16 x 9.5/(1.25 x 1000) = 80.8 kN VRd,8 = 2/ ((1/76.2)2 + (1.00 x 2/80.8)2) = 71.4 kN OK VRd,9, Beam web in shear (gross section) VRd,9 = Av,b.fy,b1/( 3gM0) [NCCI SN017a 11] Av,b = Av /2 + (D/2 - NDT)t = 1,705/2 - (166.0/2 - 22) x 9.5 = 1,432 mm2 Avb = half gross shear area + remaining web above mid-height
VRd,9 = 1,432 x 275/( 3 x 1.0 x 1000) = 227 kN OK [NCCI SN017a 11] VRd,10, Beam web in shear (net section) VRd,10 = Av,b,net.fu,b1/( 3gM2) [NCCI SN017a 12] Av,b,net = 1,432 [Av,b] - (2 x 18 x 9.5) = 1,090 mm2 VRd,10 = 1,090 x 410/( 3 x 1.10 x 1000) = 235 kN OK VRd,11, Beam web in shear (block shear) VRd,11 = 0.5.fu,p.Ant/gM2 + (1/ 3).fy,p.Anv /gM0 [EC3-1-8 3.10.2(3)] Ant = net area in tension = 31 x 9.5 = 295mm2 Anv = net area in shear = 56.0 x 9.5 = 532mm2 VRd,11 = (0.5 x 410 x 295/1.10 + (1/ 3) x 275 x 532/1.0)/1000 = 139 kN OK VRd,12, Supporting beam web in bearing VRd,12 = nFb,Rd Fb,Rd = k1.ab.fu.d.t/gM2 k1 = 2.5; a = 50/(3 x 18) - 0.25 = 0.676 Fb,Rd = 2.50 x 0.676 x 410 x 16 x 6.4/(1.25 x 1000) = 56.8 kN VRd,12 = 2 x 2 x 56.8 = 227 kN OK Ductility check Check VRd (71.4 kN) < VRd,1 (107.8 kN) OK [SN017a 16] Rotational capacity has not been checked
Summary:
Job number: Made by: KP Page: 32 Printed 17 Jun 2026 15:09
KP
SAI Structrues Limited Structural Engineer & Planner
Job number: Made by: KP Page: 33
Site address: 20 Suffolk Road, Harrow, HA2 7QQ Job: Client: STEEL.eub
VRd,1 VRd,2 VRd,3 VRd,4 VRd,5 VRd,6 VRd,7 VRd,8 VRd,9 VRd,10 VRd,11 VRd,12
Printed 17 Jun 2026 15:09
Beam web bolts in shear Cleat in bearing (beam web bolts) Cleats in shear (gross section) Cleats in shear (net section) Cleats in shear (block shear) Support-side bolts in shear Cleat in bearing (support-side bolts) Beam web in bearing (beam web bolts) Beam web in shear (gross section) Beam web in shear (net section) Beam web in shear (block shear) Supporting beam web in bearing
107.8 kN 139.4 kN 250.0 kN 275.4 kN 268.0 kN 192.9 kN 243.0 kN 71.4 kN ¬ 227.4 kN 234.6 kN 139.4 kN 227.0 kN
Critical design check: 8 - Beam web in bearing (beam web bolts): Connection resistance = 71.4kN OK