Stone Houses Final Construction Report

Page 1


STONEHOUSES FINALREPORT 2024

INTRODUCTION

After 16 months, and a lot of hard work and attention, the Dix Park Stone Houses and Site are COMPLETE! This double feature report will cover the final quarter of project progress as well as the ribbon-cutting and grand opening of the Stone Houses in May 2024. This report will have lots of photos as there is much to report, and visuals tell the best story.

RECOGNITION&THANKS

Dix Park Conservancy was able to renovate the Stone Houses thanks to a $3MM gift from the State Employees’ Credit Union and a $2MM gift from the State Employees’ Credit Union Foundation. Their contribution both preserves a significant part of the park’s history and creates a welcoming entrance to the park, better accessibility and amenities for visitors, and spaces for community use, park interpretation and education.

The Stone Houses project was a perfect fit for the State Employees’ Credit Union. For over a century, the State of North Carolina employed countless physicians, nurses, therapists, and support staff throughout the Dorothea Dix Hospital campus to serve the mental health needs of its patients. Many hospital staff lived on the campus, including in the Superintendent’s, Physician’s, and Gatekeeper’s Houses. With their generous support, State Employees’ Credit Union honors the former hospital employees and all state employees who have served the people of North Carolina.

SITEWORK

Mostoftheworkinthelastquarteroftheprojectfocusedonthemajorsiteelementsyetto beinstalled.Thisincludedthevastmajorityofhardscape,retainingwalls,stonework,the RestroomAmenityPlaza,theOutdoorClassroom,andtheprimarysitepathwinding throughout.

Sitework:Concretepaths,stairs,footers&foundations,andwallsmakeupthe fullsitepackagebeforelandscaping.

A Stairs leading down into the outdoor classroomarea

B Foundationsbeingpouredfortheseatwall, agreatplacetohearalectureorstartatour

C.Finalgradingaroundthe in-progressseatwall.Youcanget asenseoftheOutdoorClassroom comingintoform.

D.Withtheconcretelaid,thissmallplazawillbeone ofthemostusedspacesinthisareaofthepark.

SITEWORK

Planting:Aftergradingandhardscapes,thesitecomesalivewithplantings.Sarah Reeves,avolunteerandprofessionalhorticulturalistledtheplantingdesignandwas anincredibleresourcetothisproject!

A Thefirstplantsarriveonsite!

B Thefirsttreeisintheground!Oneofmanythat willprovideshadeforyearstocome

SiteEvolution:Thebestwaytoviewthesheerprogressofthesiteisfromabove. Herearethelastfourmonthsofconstruction:noticesmalladditionsovertimethat adduptoaninviting,cohesive,andimmersiveexperience.

A.Februaryaerial
B.Marchaerial
C.Aprilaerial
D.Mayaerial

EXTERIORWORKSUMMARY

SupersDeckandBathroomConstruction:Thefinalbuildingelementwasthe restroomadditiontotheSuperintendentsHouse.ThisisthefirstpublicrestroomatDix Park,integratedelegantlyintothegradeandcreatinganewrestroomamenityplaza betweenthetwoupperhouses.

ThenewlypoureddeckoffthefirstflooroftheSuperintendentsHouse Itistheperfectplacetohostan eventandalsodisplaysoneofthebestviewsofdowntownRaleigh.

EXTERIORWORKSUMMARY

Physician’sBackDeck:Thenewbackporchroofoverthepantry,firstfloorbathroom, andbackdeckatthePhysiciansHouse.

ExteriorDetails& TouchUp:Andfinally, trim,paint,andstone detailworkwasdone.

INTERIORWORKSUMMARY

Detailsthatmaketheinteriorspaces“pop”takeplaceinthefinalmonthsofconstruction.

FinalPaint,FixturesandFinishes:Withanodtoboththeparksettingandtheoriginal historicbuildingperiod,finishselectionsbringlifeandexcitementtotheofficeand sharedspaces.

B Thedetailwe’veheardthe mostabouthasbeenwallpaper! Thisdog-focusedpatterncanbe foundintheGatekeepersVisitor’s Center,butallbathroomsinthe housesreceivedafun, park-focuseddesign.

A.Lightsarehunginthekitchenofthe Superintendent'sHouse.Thisareawillbeusedas bothastaffkitchenandapreparea/backofhouse forrentalsandevents.

PublicRestroomConstruction&Finishes:Durableandsimpledetailingledthe bathroominteriorwork.

Wallsandplumbingareinstalled.

FlooringRestoration:Theoriginalfloorshavebeenpatchedandrefinished, bringingwarmthtoallthreehouses.

PARTII:RIBBONCUTTING

RibbonCuttingOverview:OnMay31,wecelebratedthecompletionoftheStoneHouses withSECU,theSECUFoundation,DixParkConservancyleadersanddonors,andcity leadership.Itwasamissionmomentforallinvolved!WeheardremarksfromSECU FoundationBoardChairChrisAyers,DixParkLegacyCommitteememberYvonne Sanders,andDPCBoardChairBillRoss.

RIBBONCUTTING

RIBBONCUTTING

RIBBONCUTTING

RIBBONCUTTING

RIBBONCUTTING

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Stone Houses Final Construction Report by DixParkConservancy - Issuu