Divy Jajodia | Undergraduate Architecture Portfolio | Nirma University

Page 1

PORTFOLIO

Divy Jajodia

Selected works (2021-2024)

Nirma university

DIVY JAJODIA

DOB 15/04/2003

Address D-34 HIG colony behind shopping complex, AB road, Indore, Madhya Pradesh

Phone no. +919893481111

Email 21bar008@nirmauni.ac.in jajodiadivy1@gmail.com

EDUCATION

2021 - present Nirma university

Bachelor in Architecture

Sem 6 (ongoing)

Working drawing

2018 - 2021

Sri Sathya Sai Vidhya Vihar, Indore, M.P

2018 Indus World School, Indore, M.P

LANGUAGES KNOWN

English Hindi

INTERESTS

Sketching

Painting Cricket

Travel

DIGITAL & MANUAL SKILLS

2D Drafting

BIM

3D Modelling

Post Production

Realistic Rendering

GIS Mapping

Manual Skills

Autodesk Autocad 2D

Autodesk Revit

Sketchup

Rhinoceros

Grasshopper

Adobe Photoshop

Adobe Illustrator

Adobe Indesign

Lumion

Twinmotion

Enscape

Vray

Arch Map

Model making

Wood cutting

Claywork

Hand drafting

COMPETITIONS & ACHIEVEMENTS

June 2022

May 2023 - July 2023

Sept 2023

Feb 2024

Best studio performance 1st year

Two months internship in Indore at - Avnish Singh Design Studio

Tarang (competition) ANDC I NASA India

Shajar-E-Sukoon HUDCO I NASA India

RELATED STUDY PROGRAM

July 2022

Jan 2023

Jan 2024

Key monastry, Kaza , Himachal Pradesh

Jethbhai ni pol, Ahmedabad

Nuwara Eliya , Sri Lanka

Shortlisted Top 5o

Ongoing

Measure Drawing

Measure Drawing Field studio urban development

01.

02.

03.

4
MACHAAN Sem II Sem IV
CONJOINMENT
6 - 9 10 - 15 16 - 23
Sem V Sem VI (ongoing) SARVATRAKALA THE
CONTENTS

04.

05.

06.

ANDC Trophy (competition)

HUDCO Trophy (competition)

Summer internship

Related Study Program Sketches and Models

5
24 - 27 28 - 33 34 - 49
TARANG SHAJAR-E-SUKOON MISCELLANEOUS

Sem : II

Area : 130 sq m

Year : 2022

Type: Contextual studio 01

MACHAAN A PHOTOGRAPHERS DEN

Site : Polo Forest, Ahmedabad

The studio focuses on the contextual response of the site in which I was supposed to design in a forest. The brief was such that we have to design a deck and a resting space for the viewers. Exposed concrete was used as the material to give a raw finish which also blends with the context.

The studio focuses on the contextual response of the site in which I was supposed to design in forest. The brief was such that we have to design a deck and a resting space for the viewers. Exposed concrete was used as the material to give a raw finish which also blends with the context.

6
7
8 Entry level plan First floor plan 1 0 2 5 M A’ A’ A A
9 Section AA’ 0 1 2 5 M

02

Sem : IV

THE CONJOINMENT

Area : 156000 sq m

Year : 2023

Site : Mauritius

Type: Housing studio

Crafted for community connectivity and well-being, Mauritius’s housing project merges modern living with heritage and nature. Featuring a central green park and a serene lake, it encourages relaxation and social bonds. A lively commercial hub and restaurant support local commerce and gatherings. Preserved historic sites enrich cultural heritage. With green spaces and pathways, residents enjoy nature and connectivity. This architectural venture aims for inclusive harmony amidst Mauritius’s history and beauty.

10
WHICH BINDS EVERYTHING
A PLACE
11
12
Legend 1. Commenrcial space 2. Cafe’s 3. Temple 4. Lake 5. Central heritage park 6. School 7. Green belt
4 5 7 8 9 9 9
8. Community housing 9. Common parking

The design ensures that similar types of plots have common spaces, creating a harmonious arrangement.

Linking the housing plots together helps neighbors interact more, making people feel closer and building stronger friendships in the community.

Green spaces follow a hierarchy, from small community areas between homes to larger spaces at nodes for activities and gatherings, ending at the central core. Site plan

13
1
3
6
2
14

The cluster housing design fosters community interaction through 14 units of 200sqm each. A hierarchy of open spaces begins with smaller courtyards inside, expanding to larger areas towards the cluster’s edge. The first floor features an open terrace with potential for future expansion. Linear building layout enables cross ventilation, aided by courtyards as buffer spaces.

15

03

SARVATRAKALA AN ART EXHIBITION CENTER

Sem : V and VI

Area : 23000 sq m

Year : 2023

Site : Thaltej, Ahmedabad

Type: Institutional studio working drawing (ongoing)

Sarvatrakala, a ferrocement shell structure which is built around the existing trees on the site and as the name suggetsts the structure itself is an art. The structure is divided into public, semi public and private zones with a central gathering space which brings the structure together.

16
17

Initial sketches

18

Process and Form Development

START

1. Lacks difference between public and private space

2. Too bulky mass

3. Cannot enjoy the site or form around.

MIDWAY

1. Created a community zone in between but it lacks connection with general public.

2. Activity space is getting disturbed.

FINAL

1. Several spaces for different purposes are formed.

2. cretes connection with general public.

19
1. Identified the spaces where there were less trees. 3. Public and private spaces are separated 4. Final form is formed by further breaking the mass. 2. A bulky mass is formed.
20 1 2 3 4 6
8 10
7

Legend

1. Entrance to the site

2. Art Hart

3. Admin Block

4. Temporary Exhibition

5. Activity Area

6. Auction Space

7. Artist’s Achievement

8. Permanent Exhibtion

9. Restoration Zone

10. Outdoor Cafe

21
5 9 10 0 10 20 50 M

Center line plan Section

22 B C E F G H I J K D A 3000 3000 2870 24650 B C E F G H I J K D A 9920 4480 5440 2500 2000 2430 3500 L L M M N N O O P P Q Q R R S S T T U U 2420 2000 1600 820 650 1420 850 650 3670 7670 3500 2430 2270 LVL +4480 LVL +5440 SARVATRA KALA ART EXHIBITION DIVY JAJODIA 21BAR008 ADMIN BLOCK SECTION C SCHEDULE: FINISHES HATCH BRICK RCC PCC FINISHED LEVEL UNFINISHED LEVEL ALL THE DIMENSIONS SHALL ALL THE DIMENSION ARE IN MM. DIMENSIONS IN DRAWINGS TO PRECEDENCE OVER THOSE TO ALL THE DIMENSIONS ARE UNFINISHED OTHERWISE MENTIONED. ALL AMBIGUITY SHALL BE BROUGHT ARCHITECT IMMEDIATELY. B A203 A301 W.SD A204 NOTE : RING BEAM - 150 X 300 RIDGES - 450 X 230 TIE BEAM - 300 X 300 FOUNDATION RING BEAM - 300 X 600 SECTION C A103 12410 12390 7340 7340 9760 9760 R S T A B C D E F G H I J K L M N O P Q 24820 2430 2650 2430 2650 U V W X Y 5490 3700 1190 3370 5560 2780 2780 2500 2 1 1920 3880 4330 3640 3840 930 6920 7180 6840 4310 5000 9440 16° 18° 20° +0390 +0330 PANTRY 6080 11460 3160 2500 2270 19790 4350 2710 +0390 +0330 WAITING AREA +0390 +0330 RECEPTION AREA +0380 +0330 TOILET +0380 +0330 TOILET +0390 +0330 OFFICE +0390 +0330 OFFICE +0390 +0330 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2000 3520 8950 3780 1600 2620 6200 3210 3770 3440 3410 +0390 +0330 FOYER 12830 4750 4680 4130 2680 5280 690 450 380 310 3490 850 1500 6010 SARVATRA KALA ART EXHIBITION DIVY JAJODIA 21BAR008 ADMIN BLOCK CENTER LINE PLAN SCHEDULE: FINISHES HATCH BRICK RCC PCC FINISHED LEVEL UNFINISHED LEVEL ALL THE DIMENSIONS SHALL BE DIMENSIONS IN DRAWINGS TO PRECEDENCE OVER THOSE TO A ALL THE DIMENSIONS ARE UNFINISHED OTHERWISE MENTIONED. ALL AMBIGUITY SHALL BE BROUGHT ARCHITECT IMMEDIATELY. B A203 ELE3 W.SD A106 C A106 C A108 D A108 D A110 E A110 E ELE1 A111 ELE1 A111 ELE2 A112 ELE2 A112 NOTE : RING BEAM - 150 X 300 RIDGES - 450 X 230 TIE BEAM - 300 X 300 FOUNDATION RING BEAM - 300 X 600 +300 +00
23 24450 11960 4120 4120 6100 A C B D E F G H I J K L 3840 7340 9760 12370 30° 2610 2420 3500 6400 6700 SARVATRA KALA ART EXHIBITION DIVY JAJODIA 21BAR008 ADMIN BLOCK TIE BEAM AND RING BEAM PLAN SCHEDULE: FINISHES HATCH BRICK RCC PCC FINISHED LEVEL UNFINISHED LEVEL ALL THE DIMENSIONS SHALL BE DIMENSIONS IN DRAWINGS TO PRECEDENCE OVER THOSE TO A ALL THE DIMENSIONS ARE UNFINISHED OTHERWISE MENTIONED. ALL AMBIGUITY SHALL BE BROUGHT ARCHITECT IMMEDIATELY. B A203 ELE3 W.SD NOTE : RING BEAM - 150 X 300 RIDGES - 450 X 230 TIE BEAM - 300 X 300 FOUNDATION RING BEAM - 300 X 600 12040 11690 11240 10670 9980 9130 8060 6680 4770 1000 1000 1000 1000 1000 1000 1000 1000 1000 920 9920 LVL +4480 LVL +5440 SARVATRA KALA ART EXHIBITION DIVY JAJODIA 21BAR008 ADMIN BLOCK SECTION C SCHEDULE: FINISHES HATCH BRICK RCC PCC FINISHED LEVEL UNFINISHED LEVEL ALL THE DIMENSIONS SHALL BE ALL THE DIMENSION ARE IN MM. DIMENSIONS IN DRAWINGS TO PRECEDENCE OVER THOSE TO ALL THE DIMENSIONS ARE UNFINISHED OTHERWISE MENTIONED. ALL AMBIGUITY SHALL BE BROUGHT ARCHITECT IMMEDIATELY. B A203 A301 W.SD A204 NOTE : RING BEAM - 150 X 300 RIDGES - 450 X 230 TIE BEAM - 300 X 300 FOUNDATION RING BEAM - 300 X 600
A103
SECTION C
Section depicting curve dimentions Tie beam layout plan

04

Sem : V

ANDC TROPHY

BEST OUT OF WASTE COMPETITION

Area : 27 sqm

Year : 2023

Site : Chharodi Lake, Ahmedabad

The pavilion Tarang, is an architectural project built at the edge of the Chharodi Lake, Ahmedabad, Gujarat, Tarang is to identify wastes largely generated in our day to day lives and transform them into an intriguing form borrowed from the site. It intends to generate consciousness amongst public for irresponsible waste disposal and a new perception towards its usage especially in architecture and construction.

24
25
26
Form Development Details
Section
Exploded Axonometric
27
The pavilion is strategically placed at the site such that its visual and physical interaction is with a large number and diversity of public throughout the day.

HUDCO TROPHY STAFF HOUSING PROJECT 05

Sem : VI

Area : 8600 sq m

Year : 2024

Site : Ghaziabad , Uttar Pradesh

Shajar-e-sukoon, translates to ‘Tree of Tranquillity. It is a staff housing designed with a stepped form generating terraces and breakout spaces on multiple levels with plantations and urban farming, with the intention to provide a sustainable, adequate and affordable living. The greens on vertical levels add a fourth dimension to the housing, enhancing the quality of life by bringing its residents closer to the nature, even while being high up in the sky.

28
29

Form development

30
Perspective section
31
32
Exploded isometric showing the stacking of units
33
Isometric diagram
Co working space with terrace farming Common terrace plantation
Rainwater harvesting system Waste water management system

06

SUMMER INTERNSHIP

AT AVNISH SINGH DESIGN STUDIO, INDORE

Sem: After sem IV

Sem: After IV sem

Year: May - July 2023

Year: May - July 2023

Duration: Two months

Duration: Two months

During summer internship in Indore I got to learn many things such as working drawings, electrical layout, site management, 3d modelling and rendering etc.

34
35
36 BEAM (PB3) AS PER DETAIL BEAM (PB5) AS PER DETAIL BEAM (GRB3) AS PER DETAIL BEAM (GRB5) AS PER DETAIL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 BEAM (FRB3) AS PER DETAIL BEAM (FRB5) AS PER DETAIL BEAM (PB1) AS PER DETAIL LANDING BEAM AS PER DETAIL PLINTH LEVEL (+ 0.60M) FIRST FLOOR LEVEL (+ 4.10M) SECOND FLOOR LEVEL (+ 7.60M) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Riser = Equally Divided By 23 Steps Tread = 300MM Riser = Equally Divided By 23 Steps Tread = 300MM 3500 3500 3500 MUMTY FLOOR LEVEL (+ 17.00M) 1650 1ST LANDING 2ND LANDING GROUND FLOOR FIRST FLOOR SECOND FLOOR LANDING BEAM AS PER DETAIL BEAM AS PER DETAIL BEAM AS PER DETAIL BEAM (TRB3) AS PER DETAIL BEAM (TRB5) AS PER DETAIL LANDING BEAM AS PER DETAIL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 3RD LANDING BEAM (TB3) AS PER DETAIL BEAM (TB5) AS PER DETAIL LANDING BEAM AS PER DETAIL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 4TH LANDING TERRACE FLOOR THIRD FLOOR LEVEL (+ 11.10M) TERRACE FLOOR LEVEL (+ 14.60M) 3500 3000 Riser = Equally Divided By 23 Steps Tread = 300MM Riser = Equally Divided By 23 Steps Tread = 300MM THIRD FLOOR SLAB PROJECTION AS PER DETAIL SLAB PROJECTION AS PER DETAIL SLAB PROJECTION AS PER DETAIL SLAB PROJECTION AS PER DETAIL 1825 3500 3500 3500 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 A A ROAD LEVEL (+ 0.00M) 500 500 500 500 600 600 600 600 600 1825 1825 1825 1825 1800 1800 SHOULD NOT BE LESS THEN 20 N/SQMM IN 28 DAYS AS PER IS 456-2000, A. SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS. 11. SEE THE ARCHITECTURAL DRAWINGS FOR FOLLOWING : B. SIZE AND LOCATION OF ALL INTERIOR AND EXTERIOR NONBEARING C. SIZE AND LOCATION OF FLOOR DRAINS, SLOPES, DEPRESSED D. SIZE AND LOCATION OF ALL FLOOR AND ROOF CURBS. E. FLOOR AND ROOF FINISHES. 12. IF ANY DESCREPANCY FOUND IN THE DRAWING SHALL BE BROUGHT TO THE NOTICE OF CONSULTANTS/ENGINEERS BEFORE EXECUTION OF IF NOT SPECIFIED. PARTITIONS. AREAS ETC. WORK. 3. GENERAL NOTES GIVEN UNDER THIS HEADING SHALL BE UNIFORMLY STRUCTURAL DRAWINGS SHALL BE REFERRED ALONG WITH ARCHIAPPLICABLE FOR R.C.C. WORK AND STRUCTURAL DRAWINGS, ALL 10. CONC. SHALL BE M:20 NOMINAL MIX BY WEIGHT FOR ALL R.C.C MEMBERS, AVERAGE COMPRESSIVE STRENGTH OF CONCRETE 8. REDUCTION IN COLUMN SIZE SHALL BE MADE FROM BOTH FACE 7. ANY MINOR OR MAJOR CHANGES ARE NOT ALLOWED WITHOUT WRITTEN 6. POURING OF CONC. SHALL BE AFTER CHECKING & SATISFACTION OF 9. NOTES WHICH IS GIVEN IN PREVIOUS DRG. IS ALSO APPLICABLE FOR (WIDTH WISE ), IF NOT SPECIFIED. 4. ALL DIMENSIONS ARE IN MM. UNLESS NOTED OTHERWISE. DO NOT GENERAL NOTES: TECTURAL DRAWINGS. SITE-ENGINEER. THIS DRG. SCALE THE DRAWING. EXCAVATED LEVEL IS 140 KN/Sqm THE SAFE BEARING CAPACITY OF SOIL AT 0.9 M DEPTH FROM NATURAL 14. FOUNDATION DESIGN IS BASED ON ON LETTER NO. ALL FOOTING SHALL BE RESTED ON SOIL HAVING SAFE BEARING CAPICITY SOIL NOT LESS THAN 140 KN/Sqm ACCORDING TO THE REPORT 13. LAP LENGTH FOR REINFORCEMENT SHALL BE 50 TIMES DIA OF BAR IF NOT SPECIFIED. 5. REINFORCEMENT STEEL SHALL BE THERM MECHANICALLY TREATED (TMT) BAR HAVING MINIMUM YIELD STRESS AS 500 N/SQMM AND CONFORMING TO IS :1786 SHALL BE USED. 1. THIS STRUCTURE DESIGN FOR G+2 FLOOR ONLY 2. S.B.C. OF SOIL SHOUID BE CONSIDERED 15T/M AT 3M DEPTH 1. ALL DIMENSIONS ARE IN MT. 2. DRAWING NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS TO BE FOLLOWED. 3. ANY AMBIGUITIES OR DISCREPANCIES IN THE DRAWING SHOULD BE REPORTED TO THE ARCHITECT IN ADVANCE. 4. ARCHITECT SHALL NOT BE RESPONSIBLE FOR CONSTANT SUPERVISION ON THE WORK. 5. AMENDMENTS TO BE MADE, IF ANY, IN THE WORK TO BE CARRIED OUT AT SITE DURING CONSTRUCTION SHALL BE INFORMED TO THE ARCHITECT IN ADVANCE. 6. ARCHITECT SHALL NOT BE RESPONSIBLE FOR USE OF MATERIALS (TYPE & GRADE) & THE WORKS. 7. THE CLIENT, HIS REPRESENTATIVES, CONTRACTORS SHALL OBTAIN NECESSARY PERMISSION SUCH AS N.A. PERMISSION, PERMISSION TO EXCAVATE, PERMISSION TO DISPOSE OFF THE EXAVATED MATERIAL, ETC. FROM APPROPRIATE AUTHORITIES BEFORE STARTING THE WORK. 8. THE DRAWING ARE PREPARED ON THE BASIS OF DOCUMENNTS & INFORMATION PRODUCED/SUBMITTED & GIVEN BY THE CLIENT/OWNER/P.A.H. THE PROCUREMENT & GENUINITY OF DOCUMENTS PRODUCED IS SOLE RESPONSIBILITY OF CLIENT/OWER/P.H.A. THE LIABILITY OF ARCHITECT IS LIMITED TO PURELY ARCHITECTURAL ASSIGNMENT ONLY. R1 01 This drawing is the property and copyright if Ar.Avnish Singh. It shall not be copied or reproduced in any manner whatsover and shall be used only for the job for which it is issued. NOTE:SUBJECT TO APPROVAL FROM CONCERNED GOVERNMENT BODY. SCALE :- N.T.S. DRAWING STATUS :CONCEPTUAL FOR APPROVAL NOT FOR CONSTRUCTION GOOD FOR CONSTRUCTION AS BUILT OTHER PROJECT:CLIENT:ARCHITECT:Ar. AVNISH SINGH DRAWING TITLE:SHEET NO. :NORTH :SCALE DATE DEALT SCALE N.T.S. AS Ph. no. +91731-4248037 email: studio@arasds.com web:www.arasds.com 202, swadesh bhawan press complex indore DESIGN STUDIO GENERAL NOTES :PIPLIYAHNA SCHOOL IMC INDORE NN 18-01-23 P I P L I Y A H A N A S C H O O L N STAIRCASE DETAIL A-4128-A-600-01 PLAN SECTION A-A
37 SB18 H - 22" SB23 H - 54" SB21 H - 18" SS20 H - 36" SB22 H - 08" SB19 H - 22" SB24 H - 43" SB16 H - 54" SS17 H - 12" SB25 H - 22" SB33 H - 54" SS34 H - 12" SB30 H - 8" SB31 H - 18" SS32 H - 36" SB29 H - 36" SB28 H - 22" SB26 H - 54" SB27 H - 45" SB3 H - 22" SS7 H - 36" SB5 H - 8" SB1 H - 54" SS1 H - 12" SB2 H - 18" SB13 H - 54" SB9 H - 54" SB8 H - 36" SB10 H - 40" SB11 H - 22" SB14 H - 54" SB12 H - 44" G G exhaust AS PER NICHE WP23 H - 96" EQ EQ 1'-3" 1'-3" G SB15 H - 54" WP2 SB4 H - 22" WP1 WP7 WP4 WP4 WP3,4 WP2 SB6 H - 18" DB LOCATION CP1,3 CP4,1 CP4,1 CP1,3 WP8 WP9 WP10 WP12 WP11 WP12 WP9 CP9 CP11 CP12 WP14 WP14 WP13 CP15 CP15 WP (CONNECTED FROM BELOW) WP15 WP16 CP16,19 CP16,18 CP16,19 CP16,18 WP18,19 WP19 WP21 WP19 WP16 WP23 CP23 WP16 CP26 WP25 WP26 WP27 CP26 WP26 WP26 WP28 WP29 CP28,33 CP28,33 CP28,33 CP28,33 WP32 WP33 1'-9" 1'-4" EQ EQ 4'-1" 1'-4" 8" 1'-9" 1'-7" 1'-0" EQ EQ 2'-7" 5'-5" 2'-7" 1'-4" EQ EQ EQ EQ WP20 1'-5" 4'-8" EQ EQ EQ 5'-5" 1'-4" 1'-10" 1'-6" 10" 8" 1'-10" 1'-8" WP8 1'-6" 6'-8" 4'-0" EQ EQ 6'-4" 2'-0" EQ EQ 2'-2" EQ EQ 2'-11" 2'-2" EQ 7'-3" EQ 1'-9" 1'-9" EQ EQ EQ 3'-0" 1'-9" EQ EQ 2'-4" EQ EQ EQ EQ EQ FOR NICHE FOR NICHE 3'-6" EQ 4'-1" 1'-6" EQ EQ EQ EQ EQ 1'-4" 1'-6" EQ main door lock screen location WP9 SILL 6' LINTEL 8' FOR NICHE 5'-2" 4'-4" WIFI POINT EQ EQ EQ 1'-4" CONCEALED AC MECHANICAL VENTIALTION 3'-3" EQ CP15,13 CP15,13 FP15 FP16,19 FP1,4 FP28,33 WP14 CP13 CP8 CP8 EQ EQ 9" EQ EQ 6" 7" exhaust G S.NO. SYMBOL TAG DESCRIPTION 01. TELEPHONE POINT 02. TV POINT 03. WIFI POINT 04. CP CEILING/SLAB POINT 05. WP WALL POINT 06. AC POINT 07. EXHAUST POINT 08. GEYSER POINT 09. FP FAN POINT 10. 11. SB SS--SWITCH BOARD SWITCH SOCKET KS SECOND FLOOR- ELECTRICAL R1 01 This drawing is the property and copyright if Ar.Avnish Singh. It shall not be copied or reproduced in any manner whatsover and shall be used only for the job for which it is issued. NOTE:KEY PLAN:- SCALE :- N.T.S. LEGENDS :SCHEDULE :REVISION DATE OF ISSUE REMARK R0 R1 R2 R3 R4 DRAWING STATUS :CONCEPTUAL FOR APPROVAL NOT FOR CONSTRUCTION GOOD FOR CONSTRUCTION AS BUILT OTHER PROJECT:CLIENT:ARCHITECT:Ar. AVNISH SINGH DRAWING TITLE:SHEET NO. :NORTH :- SCALE DATE DEALT CHECK N.T.S. AS Ph. no. +91731-4248037 email: studio@arasds.com web:www.arasds.com 202, swadesh bhawan press complex indore DESIGN STUDIO 1. ALL DIMENSIONS ARE IN FEET. 2. DRAWING NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS TO BE FOLLOWED. 3. ANY AMBIGUITIES OR DISCREPANCIES IN THE DRAWING SHOULD BE REPORTED TO THE ARCHITECT IN ADVANCE. 4. ARCHITECT SHALL NOT BE RESPONSIBLE FOR CONSTANT SUPERVISION ON THE WORK. 5. AMENDMENTS TO BE MADE, IF ANY, IN THE WORK TO BE CARRIED OUT AT SITE DURING CONSTRUCTION SHALL BE INFORMED TO THE ARCHITECT IN 6. ARCHITECT SHALL NOT BE RESPONSIBLE FOR USE OF MATERIALS (TYPE & GRADE) & THE WORKS. 7. THE CLIENT, HIS REPRESENTATIVES, CONTRACTORS SHALL OBTAIN NECESSARY PERMISSION SUCH AS N.A. PERMISSION, PERMISSION TO EXCAVATE, PERMISSION TO DISPOSE OFF THE EXCAVATED MATERIAL, ETC. FROM APPROPRIATE AUTHORITIES BEFORE STARTING THE WORK. 8. THE DRAWING ARE PREPARED ON THE BASIS OF DOCUMENNTS & INFORMATION PRODUCED/SUBMITTED & GIVEN BY THE CLIENT/OWNER/P.A.H. THE PROCUREMENT & GENUINITY OF DOCUMENTS PRODUCED IS SOLE RESPONSIBILITY OF CLIENT/OWER/P.H.A. THE LIABILITY OF ARCHITECT IS LIMITED GENERAL NOTES :DR. MAHENDRA CHAURASIA RESIDENCE INDORE ADVANCED. TO PURELY ARCHITECTURAL ASSIGNMENT ONLY. R5 DR. MAHENDRA CHAURASIA RESIDENCE ( INDORE) DR. MAHENDRA CHAURASIA 14-07-21 SECOND FLOOR- ELECTRICAL
38

SUBJECT TO APPROVAL FROM CONCERNED GOVERNMENT BODY.

KEY PLAN

SCHEDULE :-

DATE OF ISSUE REMARK

DRAWING STATUS :-

CONCEPTUAL

FOR APPROVAL

NOT FOR CONSTRUCTION

GOOD FOR CONSTRUCTION AS BUILT

OTHER

PROJECT:-

CLIENT:-

ARCHITECT:Ar. AVNISH SINGH

DESIGN STUDIO RESIDENCE

202, swadesh bhawan

press complex indore

Ph. no. +91731-4248037 email: studio@arasds.com web:www.arasds.com

DRAWING TITLE:-

PARKING WAITING AREA FABRICATION

SHEET NO. :-

A-7013-S-800-01

NORTH :- SCALE DATE DEALT CHECK N.T.S. AS

RM 17-04-2023

39 This drawing is the property and copyright if Ar.Avnish Singh. It shall not be copied or reproduced in any manner whatsover and shall be used only for the job for which it is issued.

06

RELATED STUDY PROGRAM

Sri Lanka RSP

Year- Jan 2024

Type- Field studio (urban development)

Kaza RSP

Year- June 2022

Type- Measure drawing

Ahmedabad RSP

Year- Jan 2023

Type- Measure drawing

The RSP focuses on redevelopment of the city Nuwara Eliya which is a hill station and was a british colonization earlier. The city expects more than 10,000 tourists every year which results in the requirement of building an identity of the city.

Located in Himachal Pradesh near Spiti Valley. We were supposed to document Key monastery which included the residence on monks and the temple.The RSP’s focus was to learn about vernacular materials, construction techniques and the way of living.

The RSP focuses on understanding the minimum use of spaces according to anthropometry, use of materials like wood and stone in construction and measure draw one of the house in Ahmedabad old city which is 100 years old.

40
41
NUWARA ELIYA , SRI LANKA
AHMEDABAD POL
KAZA , HIMACHAL PRADESH

Sri Lanka RSP

Unavailabilty

Unavailability

Polluted

Polluted stream flowing next to a

street edge devoid of adequate space for

SCALE AND PROPORTION NUWARA ELIYA FIELD STUDIO 2024 GROUP 5 Map showing zones explored to understand scale and proportion of different type of built areas Key plan showing the area being focused in the town 9 4 2 1 3 5 10 8 7 6 01. Post Office 09. Play School 10. Technical College LEGEND on comparison. Municipal Corporation Municipal Corporation Secterariat Building Technical college Primary School Court Complex In the of colonial scale These a around Varied according Banks structures increase building. Also the and systematic 6.00 M 4.00 M 6.00 M 24.00 M 7.00 M 4.00 M 3.50 M 12.00 M 13.50 M PANOROMIC VIEWS OF INSTITUTIONAL BUILDINGS IN AND AROUND THE OLD CITY IDEALY SCALE AND PROPORTION Primary Roads Secondary Roads Residential Institutional Commercial and mixed use town 01. Post Office 02. Municipal Corporation 03. Court Complex 04. Secretariat Building 05. Police station 06. Commerical Bank 07. Windsor Hotel 08. Primary School 09. Play School 10. Technical College LEGEND space in relation to human It’s the perceived size based relationship between different open spaces and infrastructure enviornment in urban area inter-related, play an important role the built and unbuilt spaces. EXISTING CONDITION
of dedicated paking lots elsewhere leads to traffic congestion on streets, especially during peak season.
move-
IDENTIFIED PROBLEMS
stream flowing next to a congested street edge devoid of adequate space for pedestrian
ment and activities.
Insufficient spaces for pedestrian movement
Non functional voids
Lack of visual and physical connection between streets of different terrain levels
Inadequate public interaction spaces
Lack of porosity Identified Problems 07 PROBLEMS IDENTIFIED MAPPING OF OLD CITY
of dedicated parking lots elsewhere leads to traffic congestion on streets, especially during peak season.
pe-
congested
destrian movementand activities.

BUILDINGS

PROPOSED MASTER PLAN

43 PROPOSED MASTER PLAN Proposed Master Plan 10 PART PLAN A PART PLAN B INSTITUTIONAL BUILDINGS PROPOSED PLAZA PROPOSED COMMERCIAL COMPLEX PEDESTRIAN PATHS LANDSCAPE VEHICULAR ROADS PROPOSED PARKING
COMPLEX PROTOTYPE PATHWAYS Wide footpaths Public plaza Commercial complex Parking 2 m 5 m 2 m 5 m 2 m 2 m 7 m m
COMMERCIAL
COMMERCIAL COMPLEX PARKING
AXONOMETRIC DIAGRAM SHOWING DEVELOPMENT NEAR PART A
44
Section BB’ Terrace plan
Kaza RSP
45
Front elevation Entry level plan
46 NOT ACCESSIBLE STAFF ROOM 4331 X 5303 MANAGERS ROOM 3000 X 3060 STAFF ROOM 4331 X 5303 COMMON AREA 7625 X 10610 COURTYARD ENTRANCE ROOM 3520 X 2950 TOILET TOILET ADJACENT STRUCTURE UP A' A C' C B' B W01 W02 W03 W04 W05 W06 W07 D01 D02 D03 D04 D05 1425 1710 1233 1214 1765 1686 1600 777 795 815 855 329 1855 330 860 3571 1855 1425 878 878 770 415 1447 1065 2927 1901 1017 3455 746 852 1848 1310 560 2867 975 7560 1838 506 448 510 1078 825 2970 512 1350 815 440 875 1271 870 1636 2683 2788 1635 9075 10532 1018 776 165 1397 2839 1423 7692 995 710 1298 2800 1589 3036 3015 3079 3094 1968 2800 3228 1891 2294 1755 1607 1604 1729 2192 996 4015 1760 2816 1902 2725 1531 1738 3932 19BAR009 LEGEND CLIENT: PROJECT: UNIVERSITY: KEY PLAN SCALE DRAWING NAME: DRAWN BY: dimensions are in INSTITUTE OF KRUTIK Ahmedabad RSP Ground floor plan
47
SECTION CC' Section CC’

Sketches

48

Models and Installations

49
Divy Jajodia +919893481111 jajodiadivy1@gmail.com 21bar008@nirmauni.ac.in

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.