COMPANY PROFILE 2017
COMPANY PROFILE
Organization type
HEADQUARTERS
Limited Liability Company
RO / Cluj-Napoca Calea Dorobantilor 98-100 Olimpia Business Center ,2nd Floor
FOUNDING YEAR
WEB
www.dicositiganas.ro
office@dicositiganas.ro
FIELD OF ACTIVITY
REGISTRY OF COMMERCE
FISCAL NUMBER
Architectural, Structural and MEP Design, Urban Planning and other associated technical services, from the concept phase, throughout the execution and after.
J12/462/1997
RO 9256461
1997
2
TELEPHONE +4 0264 442 054 +4 0264 442 065
OUR PHILOSOPHY
1. We design. We discover solutions to suit our client aims. We work with our clients to develop projects. The journey towards a new construction is often difficult, but we travel with our clients from the first to the last day.
2. We integrate. Planning, architecture, engineering and facility management are melting together in every project. To obtain quality each has to bring contributions in a balanced holistic approach. 3. We master computers. Computers are our precise tools. Tolerances and errors belong to the real world and we reduce them by not allowing them into the virtual project. The virtual is the future real in permanent discussion with what it has to become. BIM is the way we develop our projects.
4. We conceive for the place. Particular condi-
6. We adapt. Permanent evaluation of the project development means to adapt to what becomes priority. This also means to stay open and to never consider a project frozen, solved. We adapt as a way of development towards reality and quality. 7. We revise. To design means to manage the changes and to permanently revise models, drawings, schedules. Revision doesn’t mean correction, it means evolution.
8. We communicate. Continuous communication with clients, authorities, contractors and suppliers is fundamental. Lack of communication in construction costs lots of money in the end.
9. We innovate. There is no progress without innovation. Creation and innovation are the means for design. The last project has to be better than the previous one.
tions at every project site are important and lead to specific solutions. A complete site analysis is determinant for both project concept and solution.
10. We deliver. To design means to deliver what is
5. We understand architecture. Architecture
expected at the right time. A project is a series of deliveries.
is the result of wishing, thinking and building. It consists of both immaterial and material characteristics, such as value, efficiency, satisfaction and cost, profit, performance. Our clients need good architecture.
3
SOFT WARE
4
• Autodesk Building Design Suite Ultimate 2017 Revit / Navisworks Manage / AutoCAD Architecture, Structural Detailing, MEP, Raster Design /Showcase / 3dsmax • Autodesk Building Design Suite Premium 2017 • Autodesk Structural Fabrication Suite 2017 Autodesk Steel / Revit / Navisworks Manage / AutoCAD • Axis 13 • Mathcad • Graitec Advance Steel 2013 • Vray 3.4 • BAExpress • Microsoft Project • Construct manager (Windoc Deviz) • Microsoft Office • Corel X6 • Adobe Photoshop Premium Suite CS5 . • Swish Max 6 • Eset Nod32 • Eset Nod32 File Server • ASIS (accounting) • Microsoft Windows Server 2012 R2 • Microsoft Windows 10 • Linux • Total commander
HARD WARE
5
CERTIFICATES
• Certificate - National Center for Fire Security and Civil Protection nr.1761 of 01.02.12: design and installation of signaling systems, alarm and alert in case of fire • Certificate - National Center for Fire Security and Civil Protection nr.1763 of 01.02.12: design of systems and facilities to limit and extinguish fires • Certificate - ANRE nr. 9046 validity : 10.06.2013-20.06.2018, the design of interior electrical installation for civil construction, industrial, aerial and underground connections at a nominal voltage of 0.4 kV • Licensed plumbers to work on water and sanitation facilities • Electricians authorized to work in low voltage electrical installations • Authorized installers for gas installation work • Romania Green Building Council: SC Dico si Tiganas SRL is one of the charter members since September 2010
QUALITY:
Integrated Management System Certified by SRAC (Romanian Society for Quality Assurance) and IQNET (International Certification Network) in accordance with the: ISO 9001:2008 Quality Management Systems ISO 14001: 2004 Environmental Management System OHSAS 18001:2007 Occupational Health and Safety Management System
6
ag e
m an ag er s ar str ch uc ite tu ct ra s le ng ine M er EP s en gin ee ad rs m ini str at ion
23/53
av er ag e
WHO WE ARE
8
22
34 20 12 7 6
30/53
60
7
TURN OVER 2006 901.362€ 30 employees
8
2007
1.999.051€ 48 employees
2008
2.094.483€ 60 employees
2009
1.856.483€ 60 employees
2010
1.856.483€ 56 employees
20
1.237 50 empl
011 7.280€
loyees
NUMBER OF EMPLOYEES 2012
1.157.323€ 50 employees
2013 796.503€
2014 562.533€
50 employees
41 employees
2015
1.963.180€ 48 employees
2016
1.910.119€ 52 employees
9
RESIDENTIAL
10
2003
• Residential Houses Cluj-Napoca
• Residential Park in Arad Arad
2004 2006 2007 2008 2009 2010
• Social DwellingS 180.000sqm/ 26 cities in Romania • A HOUSE 380sqm / Cluj-Napoca • Liviu Rebreanu apartments Cluj-Napoca • Nasaud apartments 16.527 sqm / Cluj-Napoca • M House Cluj-Napoca • Central Park Residence 36.600 sqm / Cluj-Napoca • NewTown Residence 114.500sqm / Bucharest • “CARTIERUL TINERETULUI Cluj-Napoca • METEOR HOUSING 1232.4 sqm / Cluj- Napoca
CLUJ”
• TRANSILVANIA 15.500 sqm / Cluj-Napoca • GIMAROM 11.000sqm / Cluj-Napoca
2012 2015 2016
• Biasini residence 4.100sqmn / Cluj-Napoca • Plai Apartments 5.500sqm / Cluj-Napoca • Gheorgheni apartments 1.495sqm / Cluj -Napoca • CITADELA RESIDENCE 29.560sqm / Cluj-Napoca • C House Cluj-Napoca • AVIRA RESIDENCE 4.226sqm / Cluj-Napoca • GlORIS RESIDENCE 5.866sqm / Cluj-Napoca
11
SPORT& LEISURE
12
2002 2007
• Outdoor Cluj-Napoca
swimming pools
• Wellness SPA Cluj-Napoca • Night-flood installation Cluj-Napoca
on football stadium
2008
• CFR Stadium Cluj-Napoca
2009
• Municipal Cluj-Napoca
2011
• Cluj ARENA STADIUM 30.000 seats / Cluj-Napoca
2014
• Multifunctional Sports-Hall 7.350 seats / 38.500 sqm / Cluj-Napoca
2016 2017
Stadium
• ION OBLEMENCO STADIUM 31.000 seats / 56.900 sqm / Craiova • TARGU-JiU STADIUM - HOTEL 12.500 seats / 37.500 sqm / Targu- Jiu
& OFFICES
• Multifunctional Sports-Hall 9.400 seats / 38.500 sqm / Cluj-Napoca
- EXTENTION 13
RETAIL
14
2007 2008 2009 2013 2014
• Shopping Center “TIAGO 50.000 sqm / Tirgu-Mures
MALL”,
• Shopping Center “LIBERTY 70.000 sqm / Bucharest • Light Cinema Liberty Bucharest • Light Cinema Oradea Oradea • Shopping Center “TIAGO 47.453 sqm / Oradea • “Cora constanta Cora SRL / Constanta
CENTER”,
MALL”,
(canopy cover)”
• “Korona Shopping and 145.000 sqm / Brasov
Entertainment Center”, 15
OFFICE
16
1999 2001 2004 2007 2008 2010 2011 2012
• BERGENBIER Office 1.005 sqm / Blaj • ELECTRICA Turda
building
Office building
• Olimpia Business 6.810 sqm / Cluj-Napoca
Center
• ELM Office building 2.638 sqm / Cluj-Napoca • VITRINA Office Building 2.812 sqm / Cluj-Napoca • MULTIFUNCTIONAL 30.171 mp / Cluj-Napoca
BUILDING
• SENTOSA OFFICES 1.520 sqm / Cluj-Napoca • ALBINI OFFICES 400 sqm / Cluj-Napoca • Dental Laboratory and 1.070 sqm / Cluj-Napoca • DGFP OFFICE
2 aparments
4.600 sqm / Cluj-Napoca
2017
• IQUEST OFFICES 23.300 sqm / Cluj-Napoca
17
INDUSTRIAL
18
1999 2003 2004 2005 2006 2007 2008
• FUNDY SWEETS Cluj-Napoca
Production Building
• Jidvei Wine Reservoirs Building Jidvei • INTERBREW Reservoirs for brewery Blaj • INTERBREW Production building 4.300 sqm / Blaj
• INTERBREW Deposits Blaj • ECKERLE Production 3.500 sqm / Cluj-Napoca
Building
• Savadisla Camp 20.000 sqm • SWISSPOR Production 7.680 sqm / Turda
Building
• BOSCH REXROTH Production Building, Phase 36.600 sqm / Blaj • TRELLEBORG Production Building 7.200 sqm / Dej
• „Schneider” production 2.000 sqm / Lipova
factory
• BOSCH REXROTH Production 19.400 sqm / Blaj • Production Building 3.500 sqm / Apahida
2010
• LA LORRAINE Bakery 6.300 sqm / Campia Turzii
2012
• BOSCH PRoduction 19.200 sqm / Blaj
I
Building, Phase II
Factory
Building, Phase III
19
2013 2014 2017
20
• BOSCH Production 39.700 sqm / Cluj
Building
• DE’LONGHI Production Building TETAROM III Jucu 26.850 sqm / Cluj • EMERSON Production and offices Buildings EUROBUSINESS 101.020 sqm / Oradea • EMERSON Production and offices Buildings 12.000 sqm / Cluj
• BOSCH Multifunctional Building 4.600 sqm / Cluj • BOSCH Production Building 39.510 sqm / Cluj
21
OTHER
22
2006 2009
• “HAPPY KIDS” International 1.800 sqm / Cluj-Napoca • Rehabilitation, renovation Cluj-Napoca • Partial Restoration Cluj-Napoca • Administrative pavilion in
“Romulus Vuia”
school
National Ethnographic Park
4.680 sqm / Cluj-Napoca • Headquarters Court Beclean 3.000 sqm / Beclean • Headquarters Court Targu Neamt 4.680 sqm / Targu Neamt
2016
• School P+2E 4.456 sqm / Floresti
23
DATA CENTER
24
2014 2015 2016
• SCALABLE DATA CENTER 12.500 sqm / Northern Europe
• SCALABLE DATA CENTER 12.500 sqm / Northern Europe • CABLE LANDING STATION 2.000 sqm / South America
• DATA CENTER INTERIOR 1.500 sqm / North America
RETROFIT 25
CLIENTS
26
• • • • • • • • • • • • • • • • • • • • • • • • • • • • •
AG CONSULTING S.R.L. AMBULATORIU CLINIC INTEGRAT, CLUJ-NAPOCA ANGLO-ROMANIAN DEVELOPMENT LTD BECHTEL INTERNATIONAL INC. BOG’ART Bucuresti BOSCH REXROTH SRL BRD GROUPE SOCIETE GENERALE “CARTIERUL TINERETULUI CLUJ” SRL CASAROM, Luxemburg CONCEFA SA, Sibiu CONSILIUL JUDETEAN CLUJ DELONGHI ROMANIA DIRECTIA PENTRU SPORT A JUDETULUI CLUJ ECHO INVESTEMENT S.A. EMERSON SRL (Romania) ENERGOBIT SRL ENKA A.S. Enol GRUP INVEST ERRIGAL TRIUMF INVESTITII EUROSTRUCTURES INTERNATIONAL Ltd. FOTBAL CLUB CFR 1907 CLUJ S.A. FUNDATIA COPII FERICITI, CLUJ-NAPOCA GIMAROM IMOBILE S.A. IMO INVEST S.A. IMMO-MANAGEMENT ROMANIA S.R.L. INBEV BLAJ INTERBREW ROMANIA S.A. LA LORRAINE BAKERY GROUP. LIBERTY CENTER S.R.L., BUCURESTI
• • • • • • • • • • • • • • • • • • • •
MIVAN-KIER JOINT VENTURE MLS PROJECT ORADEA S.R.L. MUZEUL ETNOGRAFIC AL TRANSILVANIEI REAL CONSTRUCT GRUP SRL, SIBIU REIF GMBH & CO. KG, GERMANIA ROBERT BOSCH SRL PROFESIONAL INVEST SRL, CLUJ-NAPOCA PRIMARIA CLUJ-NAPOCA SPITALUL CLINIC DE BOLI INFECTIOASE, CLUJNAPOCA SPITALUL CLINIC DE RECUPERARE , CLUJNAPOCA SPORT COMPLEX TRANSILVAN, CLUJ-NAPOCA SWISSPOR S.A. TRANSILVANIA CONSTRUCTII S.A. TRELLEBORG AUTOMOTIVE TRIBUNALUL BISTRITA-NASAUD TRIBUNALUL NEAMT UNIVERSITATEA TEHNICA DIN CLUJ-NAPOCA CORA ROMANIA Lidl ROMANIA TACO DEVELOPMENTS
27
MAGAZINES
28
OTHER MAGAZINES: • 2012 aug - House Trends magazine no. 45 (Portugal) • 2012 jun - TSPORT no. 285 - Lo stadio (quasi) transparente (Italy) • 2012 apr - Architecture and Culture - A&C Building, Seoul, Korea • 2011 nov - Igloo habitat & architecture , no. 119, Romania • 2014 “Exploring Identity - The Nomand Archive”, at the 14 Venice Bienale of Architecture
29
AWARDS
2008-Aquapanel Challenge Prize by Knauf for the ELM OFFICE BUILDING 2009-OAR Transylvania - Awards for the Office Building of the Transylvanian
Museum of Ethnography 2009 - OAR Transylvania - Awards for the Municipal Stadium Cluj-Napoca 2010-Award for Rehabilitation and Modernization of the Câmpina Downtown Area 2011-OAR Transylvania - Award for Constructions over 1000 sqm for Cluj ARENA 2012-UAR President’s Award at the National Architecture Biennale, 10th anniversary edition, Bucharest 2012-HunterDouglas - Project of the Year (Europe/Africa/Middle Est) for the Cluj ARENA – Conference Hall 2013- Architizer A+ Awards for the Institutional Winners-Sports – Stadium Cluj-Arena 2013-Nomination for European Union Award Mies van der Rohe for Contemporary Architecture, Barcelona 2013-ArchDaily Building of the Year Awards 2015-Architizer A+ Awards for the Institutional Winners-Sports Multifunctional Sports Hall Cluj-N.