Portfolio

Page 1

PORTFOLIO

HISTORY

George Town originated in 1639 with the establishment of a trading outpost by Francis Day. Fort St. George, established by the British the following year, brought in a lot of domestic settlements of locals around the fort under the leadership of Beri Thimappa.After about a century of the British settling here, the French sieged the Fort in1746

This was followed by a period of hectic construction and fortification (a wall built along Wall Tax Road) to strengthen the settlement .The Esplanade was created by the British to provide them a clear field of gun firing in case of future attacks

The fortifications and creation of esplanade brought about a feeling of security in the settlement and encouraged economic activity By this time George Town had become the central business district (CBD) of Madras

Establishment of the Royapuram Railway Terminus on the newly opened Madras-Arcot line in 1856. After the British setup Pax Britannica, a police force, the Esplanade was no longer needed

The High Court was later built on the Esplanade grounds in 1865. The growing trade activities caused a lot of congestion in the Royapuram terminus and as a result, the Central Station was opened in 1873 to decongest the Royapuram Harbour station. The principal roads (North Beach ,Road, Rajaji Salai, NSC Bose Road Broadway Street) leading to and from this region were formally built in 1893

In 1907, Madras Central Station was made the main station of Madras Railway company. 1931 saw the first electrically operated rail service . In 1972, the Madras Transport Corporation was inaugurated and the bus transportation was brought under the government with the establishment of the Broadway Bus terminus in the 1970s. By 1991, George Town as a whole was overflowing with people. Hence plans were made to shift the bus terminus and the Kothwal Chawadi market. In 1995, this plan materialized with the shifting to Koyembedu. In 2002 the Koyembedu CMBT was inaugurated

1814
1856 1929
1909

ESPLANADE ROAD

The common reference to the esplanade is of that open spacethat was created between the Fort and New Black Town after the razing of Old Black Town where the High Court campus stands now. This road was to also act as a clear field vision ground that could be of use as an open firing arena. Till date esplanade road remains the widest open space stretch in george town. On either side of this wide lane, institutional buildings are situated, and the new metro line opens out onto the same

Possibility

EXHIBITION SPACE

Pedestranisation

FOOD STREET

T
to reorganise the major traffic Subway and existing level
High court metro SECTION THROUGH ESPLANADE ROAD

YEAR : 2019-2021

OFFICE : Sanrachana Architectural studio

SCOPE OF WORK : SITE ARCHITECT

Documentation and analysis

Condition mapping

Report making (Monthly & Annual)

GOVERNMENT

MUSEUM, PUDUKKOTTAI.

1.Deterioratedplasterontheparapetswere removedandreplasteredwithroughlimemortar.

2.Copingfortheparapetswerealsodone.

3.Damagesfoundonthecorniceswererepaired andplasteringforthesamehasbeencarried out.

4.Finallayeroffineplasteringisbeingcarried out.

1.Removalofclaytileandcement mortarlayer(lateradditions)and layersoflimemortarandbricktiles wereremoved.

2.Limeconcretingwasdoneusing limeandbrickbatjelly.

3.Compactionoflimeconcretingwas done.

1.Removalofclaytileandcement mortarlayer(lateradditions)and layersoflimemortarandbricktiles wereremoved.

2.Limeconcretingwasdoneusing limeandbrickbatjelly.

3.Compactionoflimeconcretingwas done.

1.Removalofclaytileandcement mortarlayer(lateradditions)and layersoflimemortarandbricktiles wereremoved.

2.Crackswereidentifiedandstitched byredoingthemadrasterrace wherevernecessary.

3.Limeconcretingwasdoneusing limeandbrickbatjelly.

4.Compactionoflimeconcretingwas done.

1.Parapetswithunevenheights ontheschoolsideweremade evenbydismantlingthe brickworktothesamelevelas theotherparapets.

2.Copingwasdoneasper designfollowedthroughout.

1.Deterioratedplasterontheparapets wereremovedandreplasteredwith roughlimemortar.

2.Copingfortheparapetswerealso done.

3.Damagesfoundonthecornices wererepairedandplasteringforthe samehasbeencarriedout.

4.Finallayeroffineplasteringisbeing carriedout.

1.Removalofclaytileandcement mortarlayer(lateradditions)and layersoflimemortarandbricktiles wereremoved.

2.Crackswereidentifiedandstitched byredoingthemadrasterrace wherevernecessary.

3.Limeconcretingwasdoneusing limeandbrickbatjelly.

4.Compactionoflimeconcretingwas done.

1.Removalofclaytileandcement mortarlayer(lateradditions)and layersoflimemortarandbricktiles wereremoved.

2.Limeconcretingwasdoneusing limeandbrickbatjelly.

3.Compactionoflimeconcretingwas done.

PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S SA A
SITECONDITION 2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED 3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
GENERALNOTES: CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: ComprehensiveUpgradationof GovernmentMuseum,Pudukottai 01 R0 TERRACE-DOCUMENTATIONANDSITE WORKUPDATE DEVINTH 1:150 NORTH N
No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020
1.DIMENSIONSTOBECHECKEDASPERTHE
PROJECTTITLE:

Cementmasonry blocksin-between thecolumnshave beendismantled.

Existinglayerofdeteriorated plasterwasremovedandanew layerofroughlimeplasterof1.5 inchthicknesswasappliedand fineplasteringforthesamehas beendone.

Existinglayerofcement plasterwasremoved andnewlayersofrough limeplasterof1.5inch thickand4mmthickfine plasterwereapplied.

Existinglayerofcementplaster aroundthepillarswereremoved. step1:Afterremovalalayerofrough limeplasterwasapplied. step2:coirropesweretiedaround thepillarandalayerofroughlime wasgivenabovetheropes. step3:Moldingsonthecapitalswere restored step4:fineplasteringwasdone.

Termites,damaged doorframesand deterioratedlime plasterhasbeen removed.

Cementmasonry interventionsonthe archedopeningshas beenremovedand newfixeddoorswere givenasperdesign.

Deterioratedlime plasterwasremoved andanewlayerof roughlimeplaster(1.5 inch)thicknesswas applied.

limewashonthe stonepillarswere scrappedand cleanedusing water.

Existinglayerofdeteriorated plasterwasremovedandanew layerofroughlimeplasterof1.5 inchthicknesswasappliedand Fineplasterof4mmthickwas applied

Cementmasonry blocksin-betweenon theopeningshave beendismantled.

Additionof stonelintelson theopenings. Cementmasonry blocksin-betweenon theopeningshave beendismantled.

Openingswereblocked usingirongrillsframed bywoodenmembersin ordertodirectpeople movement.

Removalofplywood aroundthepillars wasdone

Cementmasonry blocksonthe openingshave beendismantled.

Existinglayerofdeteriorated cementplasterwasremoved andanewlayerofrough limeplasterof1.5inch thicknesswasappliedafter theapplicationofpolymers. Fineplasterof4mmthick wasappliedaboveit.

Deterioratedlayeroflimeplaster wasremovedfromthepillars. step1:Afterremovalalayerofrough limeplasterwasapplied. step2:coirropesweretiedaround thepillarandalayerofroughlime wasgiven step3:moldingsonthecapitalswere restored step4:fineplasteringwasdone.

PROJECTTITLE:

Deterioratedlayeroflimeplaster wasremovedfromthepillars. step1:Afterremovalalayerof roughlimeplasterwasapplied. step2:coirropesweretiedaround thepillarandalayerofroughlime wasgiven. step3:layerofclaytilingwaskept aroundthebottomportionsofthe pillarsandthefinalroughlime plasterwasapplied step4:moldingsonthecapitals wererestored step5:fineplasteringwasdone.

Identifiedcrackonthewall hasbeenstitchedusing agranitestone(dimension -3'x6"x5")andgrouting wasdone.Roughlime plasterof1.5inchthick andfineplasterof4mm thickwereapplied.

Paintonthestone pillarswerescrapped andcleanedusing water.

Identifiedcrackonthewall hasbeenstitchedusinga granitestone(dimension -3'x6"x5")andgroutingwas done.Roughlimeplasterof 1.5inchthickandfineplaster of4mmthickwereapplied.

Identifiedcrackonthewall hasbeenstitchedusinga granitestone(dimension3'x6"x4")andgroutingwas done.Roughlimeplasterof 1.5inchthickand4mmfine plasterwereapplied.

Newarchedopening wascreatedtoconnect thecorridorwiththe room.

Additionofstonelintels ontheopenings.

Identifiedcrackonthewallhas beenstitchedusingagranite stone(dimension-3'x6"x4")and groutingwasdone.Roughlime plasterof1.5inchthickandfine plasterof4mmwereapplied.

Existinglayerofdeteriorated plasterwasremovedanda newlayerofroughlimeplaster of1.5inchthicknesswas appliedandFineplasterof 4mmthickisbeingapplied.

Identifiedcrackonthewallhas beenstitchedusingagranite stoneinL-shapeandgrouting wasdone.Roughlimeplaster of1.5inchthickandfineplaster of4mmthickwereapplied.

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

-0.42m -0.175m -0.985m -0.04m lvl -0.06m lvl -0.175m lvl -0.175m -0.42m UP DOWN DOWN DOWN UP OFFICE GALLERY OF WOODEN CARVINGS GEOLOGY ANIMAL SKELETON GALLERY RESERVE ROOM DOWN DOWN DOWN UP
SANRACHANA ARCHITECTURALSTUDIO S SA A 1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION 2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED 3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
PHNO:9884866383
GENERALNOTES: CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: ComprehensiveUpgradationof GovernmentMuseum,Pudukottai 02 R0 GROUNDFLOOR-DOCUMENTATIONAND SITEWORKUPDATE DEVINTH 1:150 NORTH N

Damagedjoistswerereplaced withNewwoodenjoistsafter theapplicationofanti-termite andblackjapanontheupper side

Damagedwoodenjoists werereplacedbyreusing thewoodsalvagedfrom woodenbeamsandrafters

AdditionofSSCapping tojoistsandbeams wherevernecessary.

Damagedwoodenbeams werereplacedbyreusing thewoodsalvagedfrom woodenbeamsandalso newwoodwasused

Damagedwoodenjoists werereplacedbyreusing thewoodsalvagedfrom woodenbeamsandrafters Joistsingoodcondition wereretainedand scrappingofpaintsfor thesamewasdone.

AdditionofSS Cappingtojoists andbeamswherever necessary.

Damagedwoodenbeamswerereplaced withsections(6beams).Ibeamswere coatedwithsteelprotectionpaintandblack japanpaintattheends.Granitebedrock havebeenusedtosupporttheIbeams. Damagedwoodenjoistswere replacedwithnewwooden joistsaftertheapplicationof anti-termiteandblackjapan ontheupperside

CriticallyDamaged woodenbeams werereplacedwith sections.

Deterioratedceiling plasterhasbeen removedandreplastering forthesamewasdone Deterioratedceiling plasterhasbeen removedand replasteringforthe samewasdone

ExistingIbeam

Deteriorated ceilingplasterhas beenremovedand replasteringforthe samewasdone

AdditionofSS Cappingtojoists andbeamswherever necessary.

Polymercoatingisapplied wherevernecessaryand looseplasterontheceiling hasbeenremoved. Anewlayerofroughlime plasterwasappliedanda layeroffineplasteraboveit.

ExistingIbeam

Deterioratedceiling plasterhasbeenremoved andreplasteringforthe samewasdone

PROJECTTITLE:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING

GENERALNOTES: CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383

GALLERY OF PAINTINGS AND PHOTOGRAPHS ANIMAL SKELETON GALLERY STONE SCULPTURE GALLERY IVORY & PAINTINGS RESERVE ROOM
SANRACHANA ARCHITECTURALSTUDIO S
A
SA
THEWORK
SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE:
03 R0 GROUNDFLOOR-DOCUMENTATIONAND SITEWORKUPDATE DEVINTH 1:150 NORTH N
ComprehensiveUpgradationof GovernmentMuseum,Pudukottai

INTERVENTIONPLANWITH DISPLAYLAYOUT

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING

THEWORK

5.READTHEDRAWINGALONGWITH

ARCHITECTURALDRAWING

GENERALNOTES: CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu

DRAWINGTITLE: ComprehensiveUpgradationof GovernmentMuseum,Pudukottai

PROJECTTITLE:

SANRACHANA ARCHITECTURALSTUDIO S SA A

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

OTS PAINTINGS & TEXTILE GALLERY ANTHROPOLOGY GALLERY OF METAL WARES STAIRCASE UP UP Admin accesswill be closed to public PUPPET & DOLLSGALLERY MUSICAL INSTRUMENTS GEOLOGY UP UP UP ENTRY HISTORY OF PUDUKOTTAI UP UP UP BOTANY GALLERY 0.8m 0.8m A A A A A A A A A B1 B1 B1 B1 B1 B1 B1 B1 B1 B1B1 B1 B1 B1 B1 B3 B3 B3 B3 B3 B3 B3 B3 B1 B3B3 B3B3 B3 B3 B3 C C C C C C C C C B3 GALLERY OF WOODEN CARVINGS E1 E1 E1 E1 E1 E1 E1 E1 E1 E1 E1 E2 E2 E2 F F F F G G G G H H J1 J1 K K K K K K K K K K K K K K K K K K K K K M N N A A A A P P S S S S T T T T T T U E1 E2 0.8mE2 0.8mE2 0.8mE2 A A B3 0.8m 0.25 0.97 0.25 1.19 1.94 1.64 0.46 2.68 1.44 0.64 1.17 1.16 1.24 0.39 0.80 0.94 1.28 2.18 2.50 Door to keep the reserves locked 2.66 0.36 0.47 0.38 3.48 1.54 1.26 2.60 2.62 0.31 0.31 2.60 0.96 1.15 1.64 2.35 0.40 2.19 2.24 E2 E1 B3 B1 0.8m B3 T E2 E2 0.8m C C E2 E1 T E1 E1 E1 1.5m E2 0.8m E2 E2 E2 0.8m 0.8m STORE E2 B2 T B2 T B2 B2 B2 B2 +0.05m lvl -0.16m lvl -0.04m lvl +0lvl -0.29m lvl -0.50m lvl -0.42m -0.175m -0.985m -0.04m lvl -0.04m lvl -0.04m lvl -0.04m lvl -0.42m lvl +0lvl -0.04m lvl -0.06m lvl -0.06m lvl -0.06m lvl -0.06m lvl -0.06m lvl -0.175m lvl -0.175m -0.42m -0.04mlvl -0.04mlvl UP UP DOWN DOWN DOWN UP -0.04m lvl DOWN DOWN DOWN UP
A A E E D D C C 01E-A B B 19.PANELDISPLAY 18.DIGITALDISPLAY STANDS 20.OPENDISPLAY Woodencarving 21.OPENDISPLAY Animalheads S T U V 15.TICKETCOUNTER DETAIL 13.PEDESTALFORSTONE SCULPTURES 17.DIORAMA K M P 9.POTDISPLAY 10.STEPPEDDISPLAY 11.WOODENPLATFORM G H J1 5.PHOTODISPLAY 6.TABLEDISPLAY 0.8m 7.TABLEDISPLAY(Size2) 8.FREESTANDING DISPLAYBOX(Puppet) C E1 E2 F 5.1POTRAITS C1 1.LIFTOFFPEDESTAL DISPLAYBOX 2.FREESTANDING DISPLAYBOX 3.FREESTANDING DISPLAYBOX(Size2) 4.FREESTANDING DISPLAYBOX(Size3) DISPLAYBOXTYPES: A B1 B2 B3 FLOORCONDUITS WIRINGALONGJOISTS (WIRINGTOBEHIDDEN UNDERWOODENPELMET) WOODENJUNCTIONBOX ONFLOOR SWITCHBOARD 15AMPSSOCKET LEGENDS WALLLIGHTS CEILINGFIXTURES (pendantlights) SPOTLIGHTS/SPOTLIGHTS WITHUVFILTERS CHANDELIER CCTV SMOKEDETECTOR INTERNALHOOTER FLOORMOUNTEDFANS CEILINGFAN CEILINGLIGHT STRIPLIGHTSFOR POTRAITS
SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT
01 R0
DEVINTH 1:150 NORTH N
PLAN-GROUND FLOORWITHPROPOSEDDISPLAYLAYOUT ANDFLOORCONDUITS

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

3.DRAWINGSTOBEREADANDNOTTOBESCALED

PROJECTTITLE:

ARCHITECTURALSTUDIO S SA A

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

VENTILATORLEVELPLAN REFLECTEDCEILINGPLANAND LIGHTINGDRAWING1 9.54 1.40 0.82 1.20 0.82 1.20 1.22 2.25 2.60 1.22 2.26 0.99 1.10 1.10 1.07 1.10 2.52 1.10 0.57 1.10 0.571.10 1.54 1.100.30 13.42 GALLERY4.34 OF PAINTINGS AND PHOTOGRAPHS IVORY & PAINTINGS 0.53 0.54 3.32 0.54 0.53 5.45 5.45 0.54 3.32 0.540.53 OFFICE
SANRACHANA
2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED
THEWORK
ARCHITECTURALDRAWING
4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING
5.READTHEDRAWINGALONGWITH
CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: ComprehensiveUpgradationof GovernmentMuseum,Pudukottai 02 R0 PLAN-VENTILATORLEVEL DEVINTH 1:150 NORTH N
GENERALNOTES:

REFLECTEDCEILINGPLANAND LIGHTINGDRAWING1

STAIRCASEREFLECTEDCEILING PLAN

PROJECTTITLE: GENERALNOTES:

OFFICE GALLERY OF WOODEN CARVINGS GALLERY OF PAINTINGS AND PHOTOGRAPHS ANTHROPOLOGY GALLERY GALLERY OF METAL WARES GEOLOGY OTS STONE SCULPTURE GALLERY ANIMAL SKELETON GALLERY STONE SCULPTURE GALLERY IVORY & PAINTINGS RESERVE ROOM Wiring to be run along Joist 3 from L to R Wiring to be run along Joist 3 from NORTH to SOUTH Wiring to be run along Joist 3 from NORTH to SOUTH Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to be run along the 2 beam from L to R Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to be run along the 4 beam from L to R Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to be run along Joist 2 from L to R Wiring to be run along the 2 beam from NORTH to SOUTH Wiring to be run along the 2 beam from L to R Wiring to be run along Joist 3 from NORTH to SOUTH Wiring to be run along the 4 beam from L to R Wiring to be run along Joist 3 from NORTH to SOUTH Wiring to be run along Joist 3 from NORTH to SOUTH Wiring to be run along BEAM 1 from NORTH to SOUTH Wiring to be run along Joist 4 from NORTH to SOUTH Wiring to be run along Joist 3 from NORTH to SOUTH Wiring to be run along Joist 7 from NORTH to SOUTH Wiring to be run along BEAM 3 from L to R Wiring to be run along BEAM 4 from L to R Wiring to be run along BEAM 5 from L to R Wiring to be run along Joist 5 from NORTH to SOUTH Wiring to be run along Joist 6 from NORTH to SOUTH Wiring to be run along BEAM 5 from L to R Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to
along Joist 10 from NORTH to SOUTH Wiring to
6
NORTH to SOUTH Wiring to be run along BEAM 1 from L to R Wiring to be run along BEAM 2 from L to R Wiring to be run along BEAM 5 from L to R Wiring to be run along BEAM 6 from L to R Wiring to be run along Joist 4 from NORTH to SOUTH Wiring to be run along Joist 4 from NORTH to SOUTH Wiring to be run along Joist 4 from NORTH to SOUTH Wiring to be run along Joist 3 from L to R Wiring to be run along Joist 12 from L to R Wiring to be run along Joist 21 from L to R Wiring to be run along Joist 30 from L to R Wiring to be run along Joist 3 from L to R Wiring to be run along Joist 7 from NORTH to SOUTH Wiring to be run along Joist 7 from NORTH to SOUTH Wiring to be run along Joist 3 from L to R Wiring to be run along Joist 3 from L to R Wiring to be run along Joist 3 from L to R Wiring to be run along BEAM 1 from L to R Wiring to be run along BEAM 1 from L to R Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to be run along Joist 2 from NORTH to SOUTH Wiring to be run along BEAM 1 from L to R Wiring to be run along Joist 6 from NORTH to SOUTH Wiring to be run along Joist 3 from L to R Wiring to be run along the BEAMS
be run
be run along Joist
from
FLOORCONDUITS WIRINGALONGJOISTS (WIRINGTOBEHIDDEN UNDERWOODENPELMET) WOODENJUNCTIONBOX ONFLOOR SWITCHBOARD 15AMPSSOCKET LEGENDS WALLLIGHTS CEILINGFIXTURES (pendantlights) SPOTLIGHTS/SPOTLIGHTS WITHUVFILTERS CHANDELIER CCTV SMOKEDETECTOR INTERNALHOOTER FLOORMOUNTEDFANS CEILINGFAN CEILINGLIGHT STRIPLIGHTSFOR POTRAITS
PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S
SITECONDITION
UNLESSMENTIONED
NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020
SA A 1.DIMENSIONSTOBECHECKEDASPERTHE
2.ALLDIMENSIONSAREINMETERS
3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE
CLIENT:
SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: ComprehensiveUpgradationof
01 R0 PLAN-RCPANDCEILINGELECTRICAL LAYOUT DEVINTH 1:150 NORTH N
DepartmentofMUSEUMS, GovernmentofTamilnadu
GovernmentMuseum,Pudukottai
5.00 1.93 0.72 4.70 2.66 2.57 2.522.501.93 2.45 3.28 3.423.313.10 1.93 4.885.145.28 2.38 2.09 3.47 3.12 3.88 0.36 3.483.75 3.503.62 2.82 3.19 0.13 2.35 4.904.764.36 3.64 2.82 3.51 1.93 1.99 2.33 2.30 2.02 1.21 1.82 2.643.363.65 2.332.00 0.76 0.21 2.032.64 1.97 ROADLVL EL+0LVL TERRACE EL+3.06MLVL TERRACE EL+4.05MLVL TERRACE EL+5.44MLVL TERRACE EL+2.79MLVL TERRACE EL+3.83MLVL TERRACE EL+4.04LVL TERRACE EL+5.69MLVL TERRACE EL+5.35MLVL +0.18M +0.08M +0.08Mlvl -0.30Mlvl +0.08Mlvl +0.12Mlvl +0.12M +0.10M +0.10M +0.10M +0.10Mlvl -0.26M -0.01Mlvl +0.13M -1.03M
ZOOMINA ZOOMINB 4.904.764.36 4.885.145.28 1.94 1.86 1.90 1.79 1.93 1.98 2.33 +0.12M +0.12M TERRACE3 EL+2.79MLVL SECTIONCC 3.663.36 2.64 1.82 1.41 0.59 1.36 +0.08Mlvl TERRACE2 EL+4.05MLVL LINTEL EL+2.03MLVL SILL EL+0.67MLVL
1.82 No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S
1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION 2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED 3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
GENERALNOTES: CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: ComprehensiveUpgradationof GovernmentMuseum,Pudukottai 04 R0 SECTIONS DEVINTH 1:100 NORTH N ZOOMINA ZOOMINB
SECTIONAA
SECTIONBB
SA A
PROJECTTITLE:

SECTIONDD

SECTIONEE ELEVATION

5.285.144.88 3.10 1.82 0.600.78 0.36 3.413.52 3.45 1.95 3.29 1.50 3.18 2.451.93 0.42 +0.10Mlvl +0.10Mlvl -0.13Mlvl -0.59Mlvl TERRACE10 EL+3.02LVL TERRACE9 EL+6.83MLVL TERRACE7 EL+4.04LVL TERRACE6 EL+5.69MLVL
4.904.76 4.36 2.00 2.91 2.82 3.623.493.19 2.82 3.623.493.19 +0.13Mlvl -0.01Mlvl -0.01Mlvl GROUND EL-1.03MLVL TERRACE7 EL+4.04LVL TERRACE8 EL+5.35MLVL
No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S SA A 1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION 2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED 3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING PROJECTTITLE: GENERALNOTES: CLIENT: DepartmentofMUSEUMS, GovernmentofTamilnadu SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: ComprehensiveUpgradationof GovernmentMuseum,Pudukottai 05 R0 SECTIONSANDELEVATION DEVINTH 1:100 NORTH N

FORT St.GEORGE MUSEUM, CHENNAI

YEAR : 2019

OFFICE : Sanrachana Architectural studio

SCOPE OF WORK : Documentation and analysis

Condition mapping

Structural analysis

Interiors(Museum displays)

Removaloflater addedbrickmasonry.

Restorationoforiginal fenestration.

Removal of later addedbrickmasonry. Restorationoforiginal fenestration.

Removaoaeradded brckmasonyand pywoodResoratono originafenesaton

Removaloflater addedbrickmasonry. Restorationoforiginal fenestration.

Removaloflateradded polishedgranitefloor. Proposedcuddapah /roughgranite/black oxidefloor.

Removaloflateradded brickmasonryand plywood Restoration oforiginalfenestration.

Removalof plywood partitions.

Removaloflateradded polishedgranitefloor

Proposedcuddapah/rough granite/blackoxidefloor.

B

Removaloflateradded brickmasonryand plywoodRestoration oforiginalfenestration.

GROUNDFLOOR

Provisionofdooras pergivendesign andspecification

Removaloflateradded polishedgraniteonthe windowsill.

Removaloflateradded brickmasonry

Removaloflateradded polishedgranitefloor. Proposedcuddapah /roughgranite/black oxidefloor.

Removalofironshutter andprovisionofdooras pergivendesignand specification

Removalof deteriorated plaster,drying outthewetwall areasand Replastering usinglime.

Removalofwall paneling.Limewash hastoberedonein proposedshade.

Thecrackistobeassured andsuitablemeasureslike stitching/groutingaretobe undertaken.

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING

THEWORK

Removalofssrailsand provisionofwoodenrails asperhistoricdesign.

Provisionofdoor aspergivendesign andspecification.

Removaloflater addedpolished graniteonthe windowsill.

A B A

A B UP UP UP

Removalofdeteriorated plaster,dryingoutthewet wallareasandReplastering usinglime.

Removalofdeteriorated plaster,dryingoutthewet wallareasandReplastering usinglime.

Removalofdeteriorated plaster,dryingoutthe wetwallareasand Replasteringusinglime.

B A

GROUNDFLOOR-DAMPNESSMAPPING

Removalofdeteriorated plaster,dryingoutthe wetwallareasand Replasteringusinglime.

GENERALNOTES: CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu DC/1

N

ARCHITECTURALSTUDIO S SA A

SANRACHANA

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

Removaofae addedcemen pasteronhewa UP
5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
PROJECTTITLE: Upgradationof FORTMUSEUM,Chennai.
SCALE: DWGNO: DATE: DRAWNBY: REVNO:
NORTHPOINT 1:200 R0
DRAWINGTITLE: FORTMUSEUM_DOCUMENTATIONAND CONDITIONMAPPING DEVINTHM

Removalof plywoodpanel andRestoration oforiginalwall finishes.

Removaloflateradded plywoodRestorationof originalfenestration.

Removaloflateradded plywood.Restoration oforiginalfenestration.

Dampnessthroughwalland roofjunctionrequireswater proofing.Re-plasteringof deterioratedplaster

Removaloflateradded plywoodRestorationof originalfenestration.

Removaloflateradded brickmasonryand originalfenestrationisto berestored.

Removaloflater addedtileflooring Restorationof originalWooden flooring

Removaloflater addedtileskirting andtheoriginal finishistobe restored.

Dampnessthroughwalland roofjunctionrequireswater proofing.Re-plasteringof deterioratedplaster

FIRSTFLOOR

Dampnessthroughwalland roofjunctionrequireswater proofing.Re-plasteringof deterioratedplaster

Removaloflateradded plywoodRestorationof originalfenestration.

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof FORTMUSEUM,Chennai.

CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu

Dampnessthroughwalland roofjunctionrequireswater proofing.Re-plasteringof deterioratedplaster

A B B A

Removaloflateradded brickmasonryand originalfenestrationisto berestored

Waterproofingofthe terraceistobe undertakenwherever required. Anticorrosivetreatment ofroofmemberswherever necessary.

Thecrackistobe assessedandsuitable measureslike stitching/groutingareto beundertaken.

Removaloflateradded Vinylsheetonwooden flooringRestoration oforiginalflooring.

Thecrackistobe assessedandsuitable measureslike stitching/groutingareto beundertaken.

Removaloflateradded plywood.Restorationof originalfenestration.

Thecrackistobe assessedandsuitable measureslike stitching/groutingareto beundertaken.

Waterproofingofthe terraceistobe undertaken

SECONDFLOOR

Removaloflateradded plywood.Restorationof originalfenestration.

A B B A

SANRACHANA

N

NORTHPOINT DC/2

SCALE: DWGNO:

DRAWINGTITLE: FORTMUSEUM_DOCUMENTATIONAND CONDITIONMAPPING 1:200 R0

DEVINTHM

ARCHITECTURALSTUDIO S SA A

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

42 48 54 57 60 DN UP
33 34 28 40 46 53 UP DN
DATE: DRAWNBY: REVNO:

REFLECTEDCEILINGPLAN-GROUNDFLOOR

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof FORTMUSEUM,Chennai.

Overhaulofelectrical wiringandmuseum lighting..

Thecrackistobe assessedandsuitable measureslike stitching/groutingaretobe undertaken.

Overhaulofelectrical wiringandmuseum lighting..

Overhaulofelectrical wiringandmuseum lighting..

Overhaulofelectrical wiringandmuseum lighting..

REFLECTEDCEILINGPLAN-FIRSTFLOOR

DRAWINGTITLE: FORTMUSEUM_DOCUMENTATIONAND CONDITIONMAPPING N

NORTHPOINT DEVINTHM

SCALE: DC/3

DATE: 1:200 R0

ARCHITECTURALSTUDIO S SA A

SANRACHANA

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383

DWGNO:
DRAWNBY: REVNO:
CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu

Waterproofingofthe terraceistobe undertakenwherever required. Replasteringofdeteriorated limeplaster.

Waterproofingofthe terraceistobe undertakenwherever required. Replasteringofdeteriorated limeplaster. Waterproofingofthe terraceistobe undertakenwherever required.

Replasteringofdeteriorated limeplaster.

Waterproofingofthe terraceistobe undertakenwhereverrequired. Replasteringofdeterioratedlimeplaster.

REFLECTEDCEILINGPLAN-SECONDFLOOR

Thecrackistobe assessedandsuitable measureslike stitching/groutingaretobe undertaken.

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof FORTMUSEUM,Chennai.

GENERALNOTES: CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu

FORTMUSEUM_DOCUMENTATIONAND CONDITIONMAPPING

SANRACHANA ARCHITECTURALSTUDIO S SA
No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383
A
THEWORK
SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT
DRAWINGTITLE:
DC/4 1:100 R0 DEVINTHM N

Thecrackistobe assessedandsuitable measureslike stitching/groutingaretobe undertaken.

Waterproofingofthe terraceistobe undertakenwherever required. Replasteringofdeteriorated limeplaster.

Waterproofingofthe terraceistobe undertakenwherever required. Replasteringofdeteriorated limeplaster.

Removaloflateradded plywood.Restorationof originalfenestration.

Thecrackistobe assessedandsuitable measureslike stitching/groutingaretobe undertaken.

Removaloflateradded plywood.Restorationof originalfenestration.

Removalofdeteriorated plaster,dryingoutthewet wallareasandReplastering usinglime.

Removaloflateraddedtileskirting andtheoriginalfinishistobe restored.

Removalofwallpaneling. Limewashhastoberedone inproposedshade.

Removaloflateraddedtile skirtingandtheoriginal fenestrationistoberestored.

SECTIONAA

PROJECTTITLE:

Removalofdeteriorated plaster,dryingoutthewet wallareasandReplastering usinglime.

Restoration sunshade design

Dampness/spallingofpaint Lateradditions Cementintervention structuralcrack Missing/brokenparts Laterdoneflooring LEGEND
ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S SA A 1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION 2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED 3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
No11/6,9thlane,
Upgradationof FORTMUSEUM,Chennai. GENERALNOTES: CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu SCALE: DWGNO: DATE: DC5 DRAWNBY: 1:100 REVNO: R0 DEVINTHM NORTHPOINT DRAWINGTITLE: DOCUMENTATIONANDCONDITION MAPPING-FORTMUSEUM/SECTION

Waterproofingofthe terraceistobe undertakenwherever required. Replasteringofdeteriorated limeplaster.

Removaloflateradded plywood.Restorationof originalfenestration.

Restorationoforiginal sunshadepatternsasper design

Removaloflateradded plywood.Restorationof originalfenestration.

Removaloflateradded plywood.Restorationof originalfenestration.

Removalofdeteriorated plaster,dryingoutthewet wallareasandReplastering usinglime.

Removaloflateradded curtainrails.

Removaloflateraddedtile skirtingandtheoriginal fenestrationistoberestored.

Removalofdeteriorated plaster,dryingoutthewet wallareasandReplastering usinglime.

SECTIONBB

Dampness/spallingofpaint

Lateradditions

Cementintervention

structuralcrack

Missing/brokenparts

Laterdoneflooring LEGEND
ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S SA A 1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION 2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED 3.DRAWINGSTOBEREADANDNOTTOBESCALED 4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK 5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
No11/6,9thlane,
FORTMUSEUM,Chennai.
CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu SCALE: DWGNO: DATE: DRAWNBY: REVNO: NORTHPOINT DRAWINGTITLE: DOCUMENTATIONANDCONDITION MAPPING-FORTMUSEUM/SECTION DC6 1:100 R0 DEVINTHM
PROJECTTITLE: Upgradationof
GENERALNOTES:

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING

THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof FORTMUSEUM,Chennai.

CLIENT: DepartmentofArchaeology, GovernmentofTamilnadu

DRAWINGTITLE:

FORTMUSEUM_INTERVENTIONDRAWING

NORTHPOINT

ARCHITECTURALSTUDIO S SA A

SANRACHANA

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

A A B B 8.73 6.69 5.47 8.12 8.74 6.72 5.46 8.58 8.14 5.48 8.75 6.10 8.72 8.59 5.15 8.59 5.47 6.87 UP UP UP UP GROUNDFLOOR A A B B 8.50 32.55 7.88 8.49 5.41 8.48 6.66 8.50 UP 1.43 4.20 3.10 5.36 FIRSTFLOOR A A B B 6.90 8.50 8.74 5.63 6.82 8.75 1.51 4.02 3.21 0.88 5.32 PALANQUIN SECONDFLOOR
SCALE: DWGNO:
DATE: DRAWNBY: REVNO:
ID/1 1:250 R0 DEVINTHM N

RECEPTIONTABLE+BAGGAGE

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREMILLIMETER UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

PROJECTTITLE:

Upgradationof FORTMUSEUM

ArchaeologicalSurveyofIndia

DRAWINGTITLE: PROPOSEDDISPLAYDETAILFORTMUSEUM

NORTHPOINT

SANRACHANA

ARCHITECTURALSTUDIO S SA A

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

MANNEQUIN 01 S-1 01 S-1 01 E-A 100 800 100 800 100 18MMTHICKMARINE PLYWOODWITHWHITE MATTFINISHBOXING 38MMX38MM WOODENBLOCK SUPPORT PLAN SECTION01 FFL FFL 200 2000 200 2000 38MMX38MM WOODENBLOCK SUPPORT 18MMTHICKMARINE PLYWOODWITHWHITE MATTFINISHBOXING 8MMCLEARTOUGHENED GLASSWITHANTI-REFLECTIVE COATING. 18MMTHICKMARINE PLYWOODWITHWHITE MATTFINISHBOXING ELEVATIONA 38MMX38MMWOODEN POSTSWHICHFRAMES THEGLASS 38MMX38MMWOODEN POSTSWHICHFRAMES THEGLASS 38MMX38MMWOODEN POSTSWHICHFRAMES THEGLASS 8MMCLEARTOUGHENED GLASSWITHANTI-REFLECTIVE COATING. 8MMCLEARTOUGHENED GLASSWITHANTI-REFLECTIVE COATING. COINDISPLAY 40MMX65MMTHICK MATTFINISHWOOD FRAMINGTHEACYLIC SHEET 15MMTHICKACRYLICSHEET FIXED TOTHEGROOVEOFTHE WOODENFRAME 25MMX25MMTHICK WOODBOXING 38MMX38MMTHICK WOODBOXING 18MMTHICKPLYWOOD TEAKWOODFINISH BOXING 18MMTHICKPLYWOOD TEAKWOODFINISH BOXING 1650 1800 0.35 35015065 1800 400 350 950 40MMX65MMTHICK MATTFINISHWOOD FRAMINGTHEACYLIC SHEET 15MMTHICKACRYLIC SHEETFIXEDTOTHE GROOVEOFTHE WOODENFRAME 18MMTHICKPLYWOOD TEAKWOODFINISH BOXING 25MMX25MMTHICK WOODBOXING 38MMX38MMTHICK WOODBOXING 400 350 950 40MM65MMTHICKMATT FINISHWOODFRAMINGTHE ACYLICSHEET 15MMTHICKACRYLIC SHEETFIXEDTOTHE GROOVEOFTHE WOODENFRAME 18MMTHICKPLYWOOD TEAKWOODFINISH BOXING 1800 FFL FFL 06 06 SECTION01 ELEVATIONA PLAN 735 735 735 735 MEDALDISPLAY 750 250 600 750 250 600 500 500 300 1200 1000 80MMX20MMTHICKMATTFINISH WOODENFRAME 8MMTHICKCLEARTOUGHENEDGLASS ISGROOVEDINTOTHEFRAMES 10MMX30MMWOODENPLANKSARE ATTACHEDTOTHEFRAMESATEQUAL INTERVALS 38MMX38MM WOODENBLOCK SUPPORT 18MMTHICKMARINE PLYWOODWOODENFINISH BOXING 80MMX20MMTHICKMATT FINISHWOODENFRAME 8MMTHICKCLEARTOUGHENED GLASS ISGROOVEDINTOTHEFRAMES 10MMX30MMWOODENPLANKSARE ATTACHEDTOTHEFRAMESAT EQUALINTERVALS 18MMTHICKMARINE PLYWOODWOODENFINISH BOXING S-1 S-1 FFL FFL ELEVATIONA SECTION01 PLAN 80MMX20MMTHICK MATTFINISHWOODEN FRAME ASTRINGISATTACHEDTO THEFRAMEFROMWHICHTHE MEDALSWILLBEHANGED 10MMX30MMWOODEN PLANKSAREATTACHED TOTHEFRAMESATEQUAL INTERVALS 38MMX38MM WOODENBLOCK SUPPORT 38MMX38MM WOODENBLOCK SUPPORT 300 500 TRANSPARENTNYLONTHREAD STRINGISATTACHEDTOTHE FRAMEFROMWHICHTHEMEDALS WILLBEHANGED TRANSPARENTNYLONTHREAD STRINGISATTACHEDTOTHE FRAMEFROMWHICHTHEMEDALS WILLBEHANGED
S-101 S-101 750 20 200 20 2220 200 350 350 200 330 480 480 330 75 75 2260 330 480 480 330 13601320 380 580 554 450 1220 1220 554 480 140 140 140 140 750 20 345 385 200 2235 2195 355 505 505 355 385 345 1360 750 314 314 20 20 580 380 20 ELEVATIONA ELEVATIONB PLAN@60mm PLAN@85mm SECTIONA 75MMX75MMTHICK WOODENLEGSWITH GROOVESFORTHE FIXINGOFPLANKS WOODENPLANKOF THICKNESS20MM 100MMX100MMTHICK WOODENLEGSWITH GROOVESFORTHE FIXINGOFPLANKS 20MMTHICKWOODEN DRAWS 20MMTHICKWOODEN RACKSFORLUGGAGES 20MMTHICKWOODEN DRAWS WOODENPANEL WOODENPANEL STYLE 20MMTHICKWOODEN RACKSFORLUGGAGES 20MMTHICKUPPER WOODENCOUNTER 20MMTHICKLOWER WOODENCOUNTER STYLE WOODENPANEL
SCALE: DWGNO: DATE: PD/01 REVNO: R0 1:50
TYPICALDISPLAYDRAWINGS

GANDHI MEMORIAL MUSEUM, MADHURAI

YEAR : 2019

OFFICE : Sanrachana Architectural studio

SCOPE OF WORK : Documentation and analysis

Condition mapping Interiors(Museum displays )

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING

THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof GANDHIMUSEUM,MADURAI

LIBRARY GALLERY1
GALLERY2 office1 office2 corridor2 corridor1 toilet staircase1 staircase2 ENTRY PORTION PORCHGF 3.07 16.26 6.08 4.66 3.28 2.12 5.56 6.08 3.11 2.18 9.09 12.92 2.14 4.63 2.08 3.38 6.06 10.57 6.19 13.30 2.09 11.51 4.51 4.30 2.09 3.05 8.71 17.84 3.99 8.32 4.42 A A B B
GROUNDFLOOR
SCALE: DWGNO: DATE: DO1 1:200 REVNO: R0 NORTHPOINT DRAWINGTITLE: DOCUMENTATION-PLAN DEPARTMENTOFMUSEUMS, INDIA No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S SA A N

VENTILATORLIBRARY

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING

FIRSTFLOOR

PROJECTTITLE: Upgradationof GANDHIMUSEUM,MADURAI

DRAWINGTITLE: DOCUMENTATION-PLAN

S SA A

SANRACHANA

ARCHITECTURALSTUDIO

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

GALLERY3 GALLERY4 DOWN
GALLERY5 GALLERY 6 GALLERY7 DARKROOM corridor4 corridor3 centralportion frontportion GALLERY8 4.96 2.00 6.19 13.33 2.02 2.19 4.00 4.00 4.64 2.02 2.07 2.03 4.51 13.32 4.53 4.51 4.30 4.89 4.54 4.39 6.21 2.20 4.03 9.21 6.19 5.62 6.19 12.25 3.14 8.33 4.34 5.15 8.32 A A B B
THEWORK
5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING
SCALE: DWGNO: DATE: DO2 1:200 REVNO: R0 NORTHPOINT
DEPARTMENTOFMUSEUMS, INDIA
N

SECONDFLOOR

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING

THEWORK

5.READTHEDRAWINGALONGWITH

ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof GANDHIMUSEUM,MADURAI

DRAWINGTITLE:

GENERALNOTES: SCALE:

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

GALLERY9 GALLERY10 GALLERY11 GALLERY11FRONTSIDE 6.50 6.10 3.74 7.06 6.87 6.39 3.68 5.22 4.26 2.33 3.53 A A B B
DWGNO: DATE: DO3 1:200 REVNO: R0 NORTHPOINT
DEPARTMENTOFMUSEUMS, INDIA
DOCUMENTATION-PLAN
N
PHNO:9884866383 SANRACHANA ARCHITECTURALSTUDIO S SA A

RCPGROUNDFLOOR

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING

THEWORK

5.READTHEDRAWINGALONGWITH

ARCHITECTURALDRAWING

PROJECTTITLE: Upgradationof GANDHIMUSEUM,MADURAI

DRAWINGTITLE: DOCUMENTATION-RCP

NORTHPOINT

STEELBEAMS

CONCRETEBEAMS

SCALE:

DWGNO:

NOT

DATE: DO4

REVNO: R0

WOODENJOISTS

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020 PHNO:9884866383

central portion
VENTILATOR LIBRARY RCPFIRSTFLOOR RCPSECONDFLOOR
DEPARTMENTOFMUSEUMS, INDIA
N
SANRACHANA ARCHITECTURALSTUDIO S SA A

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

SECTIONBB

SECTIONAA

DRAWINGTITLE: DOCUMENTATION-SECTIONS

S SA A

SANRACHANA

ARCHITECTURALSTUDIO

PHNO:9884866383

falseceiling falseceiling 3.24 3.07 6.40 2.07 THIRDFLOOR EL+16.18mLVL 0.64 1.61 0.66 4.24 2.67 2.31 3.87 3.96 4.13 2.40 3.24 1.80 DOME EL+24.44mLVL GROUND EL+0LVL EL+14.32mLVL FFTERRACE EL+0.45mLVL SECONDFLOOR EL+10.76mLVL EL+10.33mLVL
GROUND EL+0LVL CENTRALPORTION EL+5.16mLVL CENTRALPORTION EL+4.83MLVL FIRSTFLOOR EL+4.56mLVL SECONDFLOOR EL+10.76mLVL SECONDFLOORCENTRALPORTION EL+11.66mLVL THIRDFLOOR EL+16.18mLVL SECONDFLOORTERRACE EL+14.32mLVL DOME EL+24.44mLVL FFTERRACE EL+9.38mLVL PLINTH EL+0.45mLVL 3.70 6.40 4.503.54 0.45 3.35 4.02 4.18 1.29 4.65 3.52 2.31 8.26 0.54 SECONDFLOORTERRACE EL+15.66mLVL TERRACE10 EL+10.96mLVL
SCALE: DWGNO: DATE: DO5 1:250 REVNO: R0 NORTHPOINT
PROJECTTITLE: Upgradationof GANDHIMUSEUM,MADURAI DEPARTMENTOFMUSEUMS, INDIA
No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREINMETERS

UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE

5.READTHEDRAWINGALONGWITH

PROJECTTITLE: Upgradationof GANDHIMUSEUM,MADURAI

ELEVATION

DRAWINGTITLE: DOCUMENTATION-ELEVATION

S SA A

SANRACHANA ARCHITECTURALSTUDIO

No11/6,9thlane, ShastriNagar, Adyar, Chennai-600020

PHNO:9884866383

NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK
ARCHITECTURALDRAWING
SCALE: DWGNO: DATE: DO6 1:200 REVNO: R0
NORTHPOINT DEPARTMENTOFMUSEUMS, INDIA

MADRAS HIGH COURT

OFFICE - Abha Narain Lambah Associates POSITION - Intern

WORK - Documentation and Mapping .

GENERALNOTES:

1.DIMENSIONSTOBECHECKEDASPERTHE SITECONDITION

2.ALLDIMENSIONSAREMILLIMETER UNLESSMENTIONED

3.DRAWINGSTOBEREADANDNOTTOBESCALED

4.ANYDISCREPANCYINDRAWINGSHALLBE NOTIFIEDTOTHEARCHITECTBEFORESTARTING THEWORK

5.READTHEDRAWINGALONGWITH ARCHITECTURALDRAWING

Upgradationof MADRASHIGHCOURT HIGHCOURT

CLIENT:

DRAWINGTITLE:

CENTRALSTAIRCASEPLANAND SECTION

PROJECTTITLE: NORTHPOINT

ABHANARAINLAMBAH ASSOCIATES

602,Amrit,AWing,Carter Road,KharWest,Mumbai 400052,INDIA

DN DN DN DN secondfloorlevel +10320 +7600 +7600 +8080 +8080
secondfloorlevel +10320 secondfloorlevel +10320 secondfloorlevel +10320 secondfloorlevel +10320 A A beam SECTION groundfloor +900 level4 +15120 secondfloor +10320 firstfloor +5380 +2660 +3620 +7600 ±0level +8080 +2660 +3620 UP UP +5380 GROUNDFLOORPLAN woodencolumnsupportingthebeam ±0level ±0level +2660 +3620 UP UP +5380 ±0level ±0level +5380 +5380 groundfloorlevel +900 +900 +900 A A beam firstfloorlevel +5380 +7600 +8080 +10320 +10320 FIRSTFLOORPLAN UP UP firstfloorlevel +5380 firstfloorlevel +5380 +7600 +8080 +10320 +10320 UP UP A beam
SECONDFLOORPLAN
SCALE: DWGNO: DATE: DC1 REVNO: R0 1:200
NORTH ELEVATION WEST ELEVATION

INTEGRITY OF THE PAST AND ITS APPRECIATION - Kardyl Building

Heritage (buildings or precincts) are decisive in terms of transferring the integrity, culture, identity for future generations. When heritage buildings or precincts can no longer function with its original use introducing a new function becomes certain to preserve the significance heritage structure or monument. Each generation contributes constantly to the evolving historic environment in its unique way. Architects, designers and developers play an important role in the quality of such change, and have a responsibility to future generations to ensure that their contributions enrich rather than diminish the heritage value. Heritage, it’s a response to their cultural, social, historical, political, economic and physical environments. Adaptation of the structures and significant development of a historic districts bridges the past to the present and to the future.

THESIS -SEM X

STUFF : 1 day -1 month -furniture

SPACE PLAN : 3-30 years -interior layout

SERVICES : 7-15 years -HVAC,plumbing electrical wiring,elevators, and escalators.

SKIN : 20 years-exterior surfaces

STRUCTURE : 30-300 years -foundation and load-bearing elements

SITE : Eternal

STEWART BRAND ,”author of How buildings learn;what happens after they are built” comes up with a layering of buildings and the corresponding lifetime of each layer ,which makes the building future proof . Dividing building’s components by using Brand’s ‘shearing layers of change’ diagram, we can recognize that there are different rates of change of its components.

SITE:

GRADING AND STAGES OF DETORIARATION IN A HERITAGE BUILDING. OBJECTIVE

Heritage Grade I richly deserves careful preservation

SCOPE FOR CHANGES.

No intervention be permitted on exterior and interior of the heritage building or natural feature unless it is necessary in the interest of strenthening and prolonging the life of the building.For this purpose absolute essential and minimal changes would be allowed and they must be in accordance with the original.

SURROUNDING DEVELOPEMENT

All developements in areas of surrounding heritage grade 1 shall be regulated and controlled ensuring it does not mar the grandeur of ,or view from heritage grade 1.

CONCEPTS:

In Bollack’s book, ‘Old buildings new forms; New directions in architectural transformations’, she deals with the forms of transformation.

STAGE 1

Exisiting road traffic and pedestrain activities has been analysed and the space between blocks are used to connect mount road and general paters road.

Vegetation

Cracks on the walls leading to structural problems.

Parasite technique

Walls and roof damages .

Plinth covered by mud due to non maintanence and frequent floods caused by rains

Parasite -stacks

STAGE 2

Central open space has been utilised to mae a vibrant congrigation space and the new block have been added with the same pause again the pedestrian connection has been achieved.

Insertion technique

Parasite-juxtaposition

STAGE 3

Zoning is done , keeping in mind the footfall on both sides of the building. so vehicular movements for the building is directed to paters road and pedestrian movements and entry were restricted through mout road.

Weaving technique

Wrapping technique

PACE LAYERING - How buildings learn
THESIS -SEM X

DEVELOPMENT OF NEW BLOCK ARCHES

By a detailed analysis and study important elements and characters from the existing buildings have been identified and the new intervention is responded to that. .

CORRIDORS

Arches and corridors plays an important role in all colonial buildings across the country and the proportion of those corridors and arches (heights ,widths and materiality have been studied and incorporated in the new intervention which appreciates the od one in a more contemporary way .

VERTICAL ELEMENTS

Another important factor in the site is the art deco features which exists which talks about the linearity and the dominance of vertical elements ( windows and doors ) and use of glass . These characters has also been analysed the new intervention with the combination of both colonial and art deco characters has been designed. .

BASEMENT FLOOR GROUND FLOOR FIRST FLOOR SECTION THROUGH THE BLOCKS
SECTION THROUGH THE LEFT
WING
OUTDOOR READING AREA CAFE AREA VIEW FROM MOUT ROAD LIBRARY READING AREA NEW BLOCK
VIEWS

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.