Skip to main content

DeVinci Precast - TCU

Page 1

Design and Manufacturing


Model Assembly Design Working with Structure


Frame Weldment Design Models

Pilaster Cap Frame

Radius Sign Frame Attachment Solution

Precision Design and Interaction of Flex Anchors


Interface of Panel Frame and GFRC

Modeling of Geometric Pattern

4 Add a footer


Precision Machining of Geometry for Mold Construction


Molding and Casting of Fluted Panel Machined Painted Fluted Pallet Being Prepared for Spray Up

Spray Up of GFRC Laminate

Stripping of Finished Fluted Panel


Machining and Assembly of Player Relief Pattern


Application of Rubber on Pattern for Mold


Application of GFRC on Pattern to Create Mold Backup Structure and Mold Frame Installation


Set up and Assembly of Mold on Rubber Pallet


Spray up of Finished Piece and Frame Installation


Final Preparation of Finished Relief Panel

Stripping of Finished Piece

Burn / Wash of Panel

Shipping


Install Moments

Preparation for Sign

Bowl Parapet Return

Right Player


Install Process

East Fluted Panel

East Entry Balcony

South Bookend


Completed Project TCU Amon G. Carter Stadium - 2020

North Bookend

East Entry

East Elevation


Turn static files into dynamic content formats.

Create a flipbook
DeVinci Precast - TCU by DeVinci - Issuu