Design and Manufacturing
Model Assembly Design Working with Structure
Frame Weldment Design Models
Pilaster Cap Frame
Radius Sign Frame Attachment Solution
Precision Design and Interaction of Flex Anchors
Interface of Panel Frame and GFRC
Modeling of Geometric Pattern
4 Add a footer
Precision Machining of Geometry for Mold Construction
Molding and Casting of Fluted Panel Machined Painted Fluted Pallet Being Prepared for Spray Up
Spray Up of GFRC Laminate
Stripping of Finished Fluted Panel
Machining and Assembly of Player Relief Pattern
Application of Rubber on Pattern for Mold
Application of GFRC on Pattern to Create Mold Backup Structure and Mold Frame Installation
Set up and Assembly of Mold on Rubber Pallet
Spray up of Finished Piece and Frame Installation
Final Preparation of Finished Relief Panel
Stripping of Finished Piece
Burn / Wash of Panel
Shipping
Install Moments
Preparation for Sign
Bowl Parapet Return
Right Player
Install Process
East Fluted Panel
East Entry Balcony
South Bookend
Completed Project TCU Amon G. Carter Stadium - 2020
North Bookend
East Entry
East Elevation