Skip to main content

East Lancaster Northern Access

Page 1

G 11.93 BT BT

Start of second Northbound lane for Mannin Way junction

N

ST

KEY

ST ST

FH

Footway / Splitter Island

G 11.93

59 3. LP

Carriageway

Re-located bus stop

Verge

ON LS NE

Overrun Area

AY W

Approximate extent of adopted highway

Proposed Guard Rail

7. 3

5.1

4

Proposed TS01 ADS Signage located approximately 90m away from the new junction in line with TSM Chapter 7 Appendix E requirements.

6.7 Dropped kerb for access to shared foot/cycleway

11.05

3 .0 11 10 .54

11.1

9

10.5

0

11.6

8

5.

8

10.73

10.74

10.6

3

11.8

5

10.95

11.68

10.83 10.75

11.03

8

10.88

10.99 11.03

11.57

11.84

11.38

10.96

9

11.42

11.51

10.94

11.76 11.55

10.89

11.90 11.66

11.42 11.62

Guard rail to be provided at pedestrian crossing location. Alternatively guard rail to be provided within the splitter island only- details to be agreed at detailed design stage.

Scheme Ref. Lozenge Roundabout, Caton Road 11.73 11.64 Sign Ref. 11.39 TS01 (OP2) x-height 75.0 2 11.0 Letter colour BLACK SIGN FACE 11.3 Background WHITE Width 2490 mm 6 10.96 11.34 11.53 11.02 11.21 10.97 Border BLACK Height 1340 11.56 11.42 mm Material Class RA2 (12899-1:2007) Area 3.34 m² 11.5

6.2

4.

5

11.47

11.51

11.3 11.16

10.91 10.93

11.54

11.01 11.44

11.05

11.37

7

6. 7

7 Potential locations for sculpture/statue/landmark or landcaping scheme in the centre of the island to provide a gateway feature and restrict visibility through the island. Details to be developed by landscape archtect to the approval of Lancashire County Council.

13.73

14.72

Scheme Ref. Lozenge Roundabout, Caton Road Sign Ref. TS02 (OP2) x-height 75.0 Letter colour BLACK SIGN FACE Background WHITE Width 2585 mm Border BLACK Height 1990 mm Material Class RA2 (12899-1:2007) Area 5.14 m²

Dropped kerbs for cyclists to rejoin carriageway

3. 5

Proposed TS02 ADS Signage located approximately 90m away from the new junction in line with TSM Chapter 7 Appendix E requirements.

NOTES - GENERAL 1.

All dimensions in metres unless stated otherwise.

2.

The information shown on this drawing is intended to provide a general outline of the highway Improvement works.

3.

Land take based on 0.6m wide retaining wall constructed of concrete clad with stone. Other forms of construction such as gabion baskets may require more land.

4.

Temporary land requirement not shown.

2

PS

PS

FFL: 16.97

RS

Access to be maintained, footway to tie in to existing levels.

PRELIMINARY ISSUE

1.75m minimum footway width for 2m

CA

TO

N

RO

AD

FFL: 16.62

13/08/2024 08/07/2024

LJB LJB

LB LB

24/06/2024

OS

MB GW

P01

MINOR AMENDMENTS MINOR AMENDMENTS DRAWING UPDATED FOLLOWING STAGE 1 RSA COMMENTS DRAFT ISSUE

07/05/2024

MB

LB

Rev

Description

Date

P04 P03 P02

GW GW

GW

Drn / Chk / App

Document Control

PS

Issuing Office PS

LP

Tetra Tech Manchester

LP

Quay West at Media City UK, Trafford Wharf Road, Trafford Park, Manchester, M17 1HH Te +44 (0)161 872 3223

BOL

www.tetratecheurope.com Client

RS

PERSIMMON HOMES LANCASHIRE RS

RS MH CL12.27 m G 12.41

BT

Project Name

RIDGE FARM, LANCASTER

MH CL12.37 m

BT LP

BT ST EL EL

PS

Sheet Title

PS

ROUNDABOUT ARRANGEMENT SCHEME LOZANGE GENERAL ARRANGEMENT SINGLE LANE NORTHBOUND OPTION

G 12.45 12.43 G

TTE Project Number

Drawn By

784-B031114

MB

Client Project Number

Originator

Date Checked By

Date Approved By

Scale @ A1

Suitability

MAR '23

Date

1:500

S3

Role

Number

Revision

ZZ - SK - H - 0018

P04

BT

LP

BT

0

5

10

15

20

25 m

MAR '23

LB

MAR '23

LB

Volume/System Level/Location Type/Code

B031114 - TTE - 00

-

SCALE 1:500 © Copyright Tetra Tech

TTE_MT_v1


Turn static files into dynamic content formats.

Create a flipbook
East Lancaster Northern Access by DevComms - Issuu