FORWARD JUSTICE
CENTER FOR EQUALITY ARC 502 Studio - Caitie Eicher
SITE CONTEXT + HISTORY
SITE PLAN - 1/32” = 1’
FLOOR 01 - 1/16” = 1’
FLOOR 02 - 1/16” = 1’
FLOOR 03 - 1/16” = 1’
ROOF 44’ - 0”
LEVEL 03 30’ - 0”
LEVEL 02 16’ - 0”
SECTION A - 1/16” = 1’
ROOF 44’ - 0”
LEVEL 03 30’ - 0”
LEVEL 02 16’ - 0”
SECTION B - 1/16” = 1’
SECTION PERSPECTIVE
ELEVATION A - 1/16” = 1’
ELEVATION B - 1/16” = 1’
WATERPROOF ROOFING MEMBRANE 3/4" SHEATHING
SCHEDULED VERTICAL LOUVER LOUVER ATTATCHMENT PLATE SPACING SUPPORT ROD SYSTEM TOP LOUVER TRACK GUTTER WOOD PANELING DROP CEILING 1" INSULATED GLAZING (TEMPERED)
PARTIAL 3D MODEL + DETAIL
SECTION PERSPECTIVE
FLOOR 01 - 1/16” = 1’