FORWARD JUSTICE CENTER FOR EQUALITY TRENT BAKER - ARC. 502
PROGRAM PRECEDENT
SURRY HILLS LIBRARY & COMMUNITY CENTER
FJMT - 2009 SYDNEY, AUSTRALIA
PROGRAM PRECEDENT
NEW YORK PUBLIC LIBRARY
TEN ARQUITECTOS - 2013 NEW YORK CITY
PLAN PARTI
(VISUAL CONNECTIONS)
N. CHURCH ST. CITY CENTER (MAIN PLAZA & CENTRAL PARK)
PEDESTRIAN TRAFFIC (LOCAL SHOPS & RESTAURANTS, DPAC, BULLS STADIUM, AMERICAN TOBACCO CAMPUS)
E. MAIN ST. GOVERNMENT AGENCIES (PUBLIC HEALTH, REGISTER OF DEEDS HOUSING AUTHORITY)
SITE PLAN - 1/32" = 1'-0"
OPEN FROM ABV. (TRANSOM WINDOWS)
EXHIBIT STAGING/STORAGE
EDUCATIONAL ACTIVITY
LIBRARY
LOWER LEVEL PLAN - 1/32" = 1'-0"
ELEC.
LOADING
STORAGE
OPEN
INFO/ SECURITY OFFICE
EXHIBIT SPACE
VEST.
MECH. CHASE
CHURCH STREET
RISER
EXHIBIT SPACE
N. MAIN STREET
FIRST FLOOR PLAN - 1/32" = 1'-0"
ELEC.
STORAGE KITCHEN
ORDER
SECOND FLOOR PLAN - 1/32" = 1'-0"
EXTENDED STAY SUITE
BREAKROOM PHONE
JAN.
FORWARD JUSTICE LOBBY
THIRD FLOOR PLAN - 1/32" = 1'-0"
EXTERIOR PLAY AREA NAP ROOM
BREAKOUT
EXTERIOR PLAY AREA
DAYCARE LOBBY
HEAT & SERVE KITCHEN
CHECK-IN READING ROOM
INDOOR PLAY AREA STAFF ROOM
FOURTH FLOOR PLAN - 1/32" = 1'-0"
RTU - 1
RTU - 2
ROOF PLAN - 1/32" = 1'-0"
ROOF 60' - 0"
LEVEL 4 45' - 0"
LEVEL 3 30' - 0"
LEVEL 2 15' - 0"
LEVEL 1 0"
LEVEL 0 -15' - 0"
NORTH ELEVATION - 1/16" = 1'-0"
ROOF 60' - 0"
LEVEL 4 45' - 0"
LEVEL 3 30' - 0"
LEVEL 2 15' - 0"
LEVEL 1 0"
LEVEL 0 -15' - 0"
EAST ELEVATION - 1/16" = 1'-0"
ROOF 60' - 0"
LEVEL 4 45' - 0"
LEVEL 3 30' - 0"
LEVEL 2 15' - 0"
LEVEL 1 0"
LEVEL 0 -15' - 0"
SOUTH ELEVATION - 1/16" = 1'-0"
ROOF 60' - 0"
LEVEL 4 45' - 0"
LEVEL 3 30' - 0"
LEVEL 2 15' - 0"
LEVEL 1 0"
LEVEL 0 -15' - 0"
WEST ELEVATION - 1/16" = 1'-0"
ROOF 60' - 0"
LEVEL 4 45' - 0"
LEVEL 3 30' - 0"
LEVEL 2 15' - 0"
LEVEL 1 0"
N. CHURCH ST.
LEVEL 0 -15' - 0"
BUILDING SECTION - 1/16" = 1'-0"
ROOF 60' - 0"
LEVEL 4 45' - 0"
LEVEL 3 30' - 0"
LEVEL 2 15' - 0"
EAST MAIN ST.
LEVEL 1 0"
LEVEL 0 -15' - 0"
BUILDING SECTION - 1/16" = 1'-0"
DAYCARE
FORWARD JUSTICE
CAFE
ENTRY/EXHIBITION
LIBRARY
ROOFTOP AIR HANDLING UNITS (RTU)
MECHANICAL CHASE
SUPPLY DUCTS
PRIMARY STRUCTURE CONCRETE ON METAL DECKING SUPPORTED BY STEEL BEAMS & COLUMNS
PERFORATED ALUMINUM SCREEN FACADE
CAST-IN-PLACE CONCRETE FOUNDATION WALL
NOTE : ALL ALUMINUM TO BE SAME COLOR
1 A-304
CABLE RAIL W/ STAINLESS STEEL VERTICALS CORED INTO CONC. FLOORING & SET IN EPOXY
CONCRETE PAVER SYSTEM ON ADJUSTABLE PEDESTALS
ROOF 60' - 0"
SLOPED CONCRETE FLOORING TO INTERNAL ROOF LEADER
PERFORATED BENT ALUM. SUNSCREEN (SEE RENDER FOR PERFORATION PATTERN)
CONTINUOUS TPO ROOFING MEMBRANE (FULLY ADHERED) PT 2X BLOCKING BACKUP & 1/2" DENSDECK BOARD TPO MEMBRANE TO WRAP UP & OVER STRUCTURAL GIRT
ALUM. CHANNEL KICKER BOLTED TO VERTICAL CHANNEL W/ SS BOLTS SHOP BENT ALUM. PARAPET EXTENSION
ALUM. PARAPET CAP & EXTENSION PER MFR. STANDARDS
STRUCTURAL ALUM. VERT. CHANNEL @ 5' O.C.
CLOSED CELL SPRAY FOAM INSULATION UNDER PLAZA FLOOR
PARAPET CAP TRIM BY WALL MANUF.
LEVEL 2 15' - 0"
WHITE TPO ROOF MEMBRANE TO WRAP UP AND OVER STRUCTURE
1"
8" MTL GIRT @ 5' O.C.
PROVIDE CLOSED CELL SPRAY FOAM @ EACH WALL PENETRATION
LEVEL 4 45' - 0"
SEE DETAIL @ ROOF PARAPET FOR SUNSCREEN ATTACHMENT & DETAILS
4' - 0"
1/2" DENSDECK BOARD
4' - 0"
CONT. UNEVEN EXTRUDED ALUM. CHANNEL (WELDED TO VERTICAL CHANNEL & BOLTED TO ALUM. SUNSCREEN W/ SS BOLTS) (PROVIDE TWO POINTS OF CONNECTION AT THE TOP)
3" ALUMINUM CLAD INSULATED MTL PANEL ON 8" HSS STRUCTURAL BACKUP
2 1/2" RIGID INSULATION
TAPERED INSULATION TO INTERIOR ROOF LEADER 5/8" TYPE X GWB GALV. MTL DECKING
3 5/8" MTL STUDS @ 24" O.C.
ROOF 60' - 0"
CONT. FLASHING PER MFR. STANDARDS
3" INSULATED ALUM. PANEL
INTEGRAL WINDOW IN METAL PANEL SYSTEM
CHANNEL OUTRIGGER TO SUPPORT VERT. GIRTS (PROVIDE SLOTTED CONNECTION TO ALLOW MOVEMENT)
LEVEL 3 30' - 0"
CONT. SEALANT @ WINDOW HEAD
STRUCTURAL STEEL FRAME
1 A-304
5/8" TYPE X GWB
2
DETAIL @ ROOF PARAPET 3/4" = 1'-0"
A-304
DETAIL @ PLAZA EDGE 3/4" = 1'-0"
2 A-304
LEVEL 2 15' - 0"
ALUM. JAMB EXTENSION
2' - 0"
EXPOSED STEEL COLUMN
ISOLATION JT. (TYP. @ EACH COL.)
2' - 0" TYP.
LEVEL 1 0"
CENTRIA INTEGRAL WINDOW BASE
5/8" GWB.
3" INSULATED ALUM. PANEL
SCHEDULED BASE
12" C.I.P. FOUNDATION WALL
5" S.O.G.
LOOSE FILL GRAVEL AROUND PERFORATED PIPE DRAIN
6" C.A.B.C.
EXPOSED COLUMN
ROUNDED EDGES AT ALUM. SUNSCREEN TYP.
3 5/8" MTL STUDS @ 16" O.C.
10 MIL VAPER BARRIER (VIPER VAPOCHECK OR APPROVED EQ.)
SCHEDULED FLOOR & BASE 5 A-304
ALUM. SILL EXTENSION
FLUID APPLIED WATERPROOFING MEMBRANE
MTL STUDS @ 16" O.C.
PERFORATED PIPE DRAIN
SIDEWALK - SEE CIVIL
CONCRETE FLOOR OVER MTL DECK
LEVEL 0 -15' - 0"
LEVEL 1 0"
6"
5/8" GYP. (PAINTED)
CONT. ALUM. FLASHING SET IN SEALANT
SCHEDULED FLOORING
4"
RETURN GYP @ WINDOW JAMBS, TYP.
12" C.I.P. FOUNDATION WALL
8" HSS GIRT
CONT. FLUID APPLIED WATERPROOFING
STEEL FRAMING
CENTRIA INTEGRAL WINDOW SYSTEM @ PUNCHED OPENINGS (KAWNEER 1600 CURTAINWALL @ LONG SPAN LOCATIONS)
CONT. SPREAD FOOTING 2 1/2" MTL STUDS @ 16" O.C. 5/8" GWB
3" INSULATED ALUMINUM PANEL
LEVEL 0 - 0"
PERFORATED ALUMINUM PANEL SUNSCREEN (SEE ELEV. FOR MORE DETAILS)
4 -15' A-304
A1 A-304
SECTION @ SOUTHEAST CORNER 1/4" = 1'-0"
3 A-304
ENLARGED PLAN VIEW - SE CORNER 3/4" = 1'-0"
CONT. 2 1/2" RIGID INSULATION
4 A-304
FOUNDATION DETAIL @ LOWER LEVEL 3/4" = 1'-0"
5 A-304
DETAIL @ GRADE 3/4" = 1'-0"
SOUTHEAST PERSPECTIVE
SOUTHWEST PERSPECTIVE
ENTRY
ENTRY LEVEL / EXHIBIT
LOWER LEVEL LIBRARY
CAFE LEVEL TWO
CAFE LEVEL TWO
FORWARD JUSTICE LEVEL THREE
DAYCARE LEVEL FOUR
EVENING ENTRY
EVENING SOUTHEAST PERSPECTIVE
EVENING SOUTHWEST PERSPECTIVE