Chief Executive’s Management Report
November 2025 Council Meeting

![]()
November 2025 Council Meeting

The Organisational Structure Review, initiated in January 2025 has now been completed and the outcome was formally communicated to all Staff, Elected Members & Trade Unions on 7th November 2025. The revised structure, designed to enhance operational efficiency and strategic alignment will begin implementation on 1st January 2026, with full transition targeted for completion by May 2026. This marks a significant step in positioning the organisation to meet future challenges and deliver improved services.
Donegal County Council have been awarded funding of €500,000 for the Carrigart Downings Walkway Project under Measure 3 of the 2025 Outdoor Recreation Infrastructure Scheme. This project proposal is phase 2 of a programme of work to complete the walkway between Carrigart and Downings connecting two rural coastal settlements. The Council have engaged a contractor who is currently at an advanced stage in relation to phase 1 with works due to be complete before year end.

Works are also at an advanced stage on the Millside Walk in Fintown where a 2km recreational walking path and associated amenities for public use looping through Coillte forestry on the banks of the River Finn is being developed. It is expected that works will also be complete before year end with funding being provided through an allocation of €200,000 under the 2023 Outdoor Recreation Infrastructure Scheme.

IPB Pride of Place in association with Co-operation Ireland is an all-island competition that acknowledges the work that communities are doing all over the island of Ireland. The competition focus is about people coming together to shape, change and improve daily lives in their communities. Since the competition commenced in 2003, it has impacted on hundreds of thousands of people, all of whom are proud of their place. The competition is based on communities demonstrating directly to the judges their pride in their place by oral presentations where they highlight community activities, culture and many other aspects that contribute to their pride of place. It is also important that the community demonstrates a real partnership with their local authority and shows that all sectors of the community are included.
Donegal County Council were represented at the Pride of Place Awards on Friday November 7th by the Barrack Hill Town Park Steering Committee and the Deele Anglers. Congratulations to the Barack Hill Town Park Steering Committee who received a runner up award under the Community Wellbeing category in recognition of their ongoing proactive engagement within Barrack Hill Park.

The development of the local Age Friendly Programme to support older people in the community is part of the multi stakeholder response to populations ageing. The Programme works closely with the Older Persons Council and their Executive ensuring active participation in local projects and collaborating on delivery. Older People’s Councils are recognised structure for communication and representation of older people across our county.
The well attended Older Persons Council Annual General Meeting took place at the Clanree Hotel on 15th October, 2025. Attendees were greeted by Caroline McDaid Chairperson on the OPC who urged new members to register and join the executive committee There were talks given on the many successful initiatives delivered by the Age Friendly Programme in Donegal. Aengus Kennedy, Lead
Nature Guide and Field Ecology Specialist, captivated the room with a presentation on bird migration. He detailed Donegal's vital role in these global journeys and advised how communities can help protect the natural habitats that birds depend on. The healthcare focus continued with Dr. Áine Keating, Consultant in Emergency Medicine at Letterkenny University Hospital. Dr. Keating provided an update on the new surgical hub and outlined key initiatives within the Emergency Department designed to improve the experience for older patients.
There was much interest in new members joining after the success of the AGM, effectively representing the voice of older people in the community

The Major Projects Division has been established to manage the delivery of major projects funded from various sources, including URDF, RRDF, BEDF, Failte Ireland, Shared Island and Peace Programme Funding. It also includes the Building Control and Taking in Charge functions. The range of projects currently being managed are as follows:
In partnership with Fáilte Ireland, this project proposes to transform the Fort Dunree visitor experience, providing new public spaces, refurbishing existing infrastructure and provision of a new glass walkway. Unfortunately, An Coimisiún Pleanála have refused our planning application for the development and we are currently considering the next steps with the Design Team and Project Board.
This Shared Island, Enterprise Ireland and Donegal County Council co-funded project proposes the development of 7,717m2 Enterprise Space, Alpha Building, Beta Building linking with the Letterkenny 2040 public realm. Following an unsuccessful tender process in 2024 the Donegal 2040 DAC is currently considering options to progress the project.
This project proposes the development of a multi-use park infrastructure, football facilities and servicing of lands. Construction has commenced on this project and remains on programme for completion in the coming months (Q4, 2025).
This project proposes a cross-border community park (Lifford and Strabane) over thirty acres to include a pavilion, events space, play areas, bridge, and walkways. A funding application under the PEACE PLUS programme has been approved to the value of €16.7M. A design team has been appointed to complete detailed design and prepare construction procurement documents and manage the construction phase. The project will be officially launched in January 2026.
The Burtonport Harbour to Island Regeneration (Phase 2) project proposes a ferry terminal building and enterprise space in the new harbour environment in Burtonport. Work commenced on site in August 2024 and is scheduled for completion in Q1 2026.
Killybegs
– Town Centre Regeneration:
This project proposes the provision of a Public Realm outdoor space, strategic land acquisitions and the modification and extension of Island House to provide a Tourism Information Centre, Office space and public amenities. The official opening of the Public Realm took place in June and the handover of Island House from the Assigned Certifier complete as of November 15th.
Carndonagh Tús Nua Regeneration:
In partnership with Spraoi agus Spórt, this project will see the delivery of a Coworking Hub, Fablab, Creative Hub and public realm infrastructure. Following approval of the Compulsory Purchase Order in October 2024 land acquisition is now underway. Site investigation works were completed in Feb 2025 and detailed design/tender documentation is now complete. Decision Gate 2 – Pre-Tender Approval was received from the DRCD on the 17th of September. Advertisements seeking tenders for construction works have issued and tenders are due back at the end of November.
Ballybofey & Stranorlar ‘SEED’ Project:
This project proposes a public realm outdoor space, car parking and Enterprise Development in Ballybofey town center. The land acquisition process is continuing. An Oral Hearing for the CPO took place on 14th October and the decision is awaited from An Coimisiún Pleanála. Decision Gate 2 – Pre-Tender Approval was received from the DRCD on the 12th of September for the “Ritz” element of the works only, and advertisements seeking tenders for these construction works are due to issue in mid-November.
Letterkenny 2040 – Reimagined Market Square:
This project consists of the demolition and removal of the existing public realm and construction of a new public realm environment. The submitted Tenders have been assessed, and pre-appointment meetings, with the potentially successful tenderer, are ongoing. It is anticipated that works will commence in Q1 of 2026.
This project consists of the construction of a new community hub building, a multi-purpose community field and a community garden and landscaped public realm. A design consultant was appointed in March 2025 and they are now progressing with the detailed design process with Tender invites to issue in Q1, 2026.
This project consists of the regeneration of public areas throughout the town centre including provision of civic meeting places, green spaces, surface renewal and pedestrian priority improvements. The tender process for the construction contractor is complete and works are due to commence on Phase 1 in midNovember.
The overall objective of the project is to regenerate and reconnect the costal edge and historic town centre. The project consists of six key interventions:
1. A new iconic pedestrian bridge over the Mill River
2. The creation of a high performance promenade and Shore Front Green
3. Enhanced connection between the new Shore Front Green environment and the Main Street
4. Enhanced Shore Front walkway and promenade along the Fishing Green
5. Connection of the promenade to Swan Park, Buncrana Castle and Cockhill Road
6. The repurposing and extension of the old garda barracks building to create bespoke office accommodation.
An integrated design team was appointed in Nov 2024 to undertake the design of the project and design work is ongoing. A decision on the Part 8 planning application for the repurposing and extension of the old garda barracks is expected from the November Council meeting in anticipation of a future Category One funding application.
The development proposes the adaptive reuse and extension of the vacant Letterkenny Courthouse to deliver a flexible, multi-use civic, tourism, and cultural facility. Part 8 Planning for the project has been obtained and the project handed over to the CPDU team in late August with THRIVE Strand 2 funding (ref. Table 2 in Section 3.2 above) announced on 17th of September. The tender process for the appointment of an integrated design team will be advertised by the middle of November 2025, with detailed design works commencing in Q1 2026.
The Council continues to progress the taking-in-charge of residential estates and to the end of October 2025, a further 13 estates have been taken in charge this year including Ballymacool and Meadow Hill in Letterkenny and The Beeches in Ballybofey, the three largest estates in the County, containing approximately 725 houses.
Proactive engagements continue with Uisce Éireann in respect of approximately 140 estates, seeking their agreement to proceed to Taking in Charge, and this work continues in relation to all the legacy estates for which applications have been received. Agreement has been reached with Uisce Éireann in relation to several estates with problematic sewage pumping stations, and works have been completed under this arrangement at Ash Meadows in Stranorlar, and Lennon Grove & Meadowvale in Ramelton in 2025. Uisce Éireann have funded the element of the works associated with remediation of the water and wastewater services, and the Council are responsible for funding all other elements of the works, including roads, footpaths, and street lighting.
Significant progress has been made in respect of the estates which have been awarded funding under the Multi-annual Developer Provided Water Services Infrastructure (DPI) Resolution Programme with St. Jude’s/Hazelwood in Lifford, Dromore Park, Killygordon, Doonan Court in Donegal and Ras na Mhuilleann & Flaxmill Court in Carrigans now complete while works at Woodlands, Ballyshannon is expected complete in Q1 2026.
The valid Commencement Notice submission trend for the period 2015-2025 (to end of Oct) is set out in the chart below. The 733 Notices submitted so far in 2025 relate to 1,029 building projects (of which 844 are new builds) compared with 1,332 building projects for the same period in 2024 (of which 1,131 were new builds.)
During 2024, the Development Charges waivers led to a significant increase in the number of Commencement Notices submitted. However, it would appear that there continues to be an increase in the level of construction starts so far in 2026.

Similarly, the Building Control department has received 91 Disability Access Certificate (DAC) applications up to the end of October. The DAC application submission trend for the period 2015-2025 (YTD) is set out in the chart below:
Donegal County Council continues to provide support to refugees through the Offer a Home Programme and the Local Authority Integration Team (LAIT).
The total number of refugees in Donegal is 8962. There are 2137 people registered in the County as requiring International Protection as of 28th October 2025 including 932 children living in 29 centres. There are a total of 6,825 new arrivals from Ukraine currently living in Donegal, according to the latest set of data from the Central Statistics Office (28th October 2025).
The LAIT support team continue to provide one-to-one support to International Protection applicants, BOTPS, (Ukrainian), those with Refugee, Subsidiary Protection, or Permission to Remain Status and Programme Refugees.
Supports include access to services, including healthcare, welfare entitlements, language development, cultural orientation, entering employment, education, and training, to enable them to live independently and fully integrate into the community.
Since 2024, Donegal’s Local Authority Integration Team has been a friendly first port of call for people arriving in the county, meeting them where they are (in centres, libraries, clinics), answering questions, and connecting them to the services that make daily life work. The team do not replace or duplicate mainstream services; they make them understandable and accessible.
Collaboration: Working hand-in-hand with multiple statutory stakeholders, including HSE, ATU, ETB (incl. REALT), Tusla, Intreo, Garda Síochána, the County Childcare Committee, and other DCC teams (Housing, Libraries, Arts & Culture, Social Inclusion)—plus the community and voluntary sector with, among others, Community Centres, Family Resource Centres, Donegal Intercultural Platform, Donegal Volunteer Centre, Donegal Youth Service and Foróige.
Joined-up problem-solving: A multi-agency LAIT Working Group tackles front-line issues quickly; the CIF strategic group, chaired by the Council Chief Executive, keeps everyone pulling in the same direction.
Visible in the Community: Supporting ‘Wainfest’ with DCC Library Services; IFest; Africa Day events with The Exchange and DYS; and a Camogie Ireland Programme introducing camogie to migrant women.
Listening, then designing: One-to-one clinics and surveys identify real needs; orientation clinics bring stakeholders into IPAS centres, so people get answers early and clearly.
Skills for independence: With ETB, ‘Manage My Home’ builds digital and financial confidence for households moving into their first Irish homes.
Health and wellbeing: Upcoming Sláintecare-funded Community Health Programme for women, shaped with local partners and communities.
Feet on the ground: County-wide Social Inclusion Week walks and supporting “friends of the centre” events reduce isolation and spark new
connections.
Sharing what works: A county Centre Manager Network established to share information and learning and support good practice across IPAS centres.
Opening doors to education: Teaming with ATU on routes to third-level education and recognition of prior learning.
Clear map, common purpose: Contributing to the Donegal BME Inclusion Strategy and building a county-wide service map so no one is left guessing.
Nothing about us without us: A Refugee Response Advisory Panel— made up of LAIT cohort members—shapes improvements across council and partner services.
A festival of us: ‘IFest’ at Oakfield Park—a joyful, well-attended celebration of culture, talent, and the shared life of Donegal.
Donegal County Council Refugee Response team has secured funding from the Department of Foreign Affairs & Trade to host a conference in November that seeks to explore what inward migration has contributed to Ireland.
This conference in Letterkenny, Co Donegal, on November 14th, examined the impacts of recent and anticipated future migration into the region. The project is consistent with the theme of this year's funding "The EU as a catalyst for change", in that it examined the factors that have reversed Ireland’s role in producing migrants for other countries to being a country that is attractive for migrants to come to.
Membership of the EU has brought migration and increased diversity to Ireland, making Ireland open to freedom of movement, with the accession of the Eastern European countries in 2005 and onwards. Many of those who came here from Syria, Poland, Lithuania, Ukraine, etc, have integrated well and are part of the fabric of our communities here. This shows how successful migration and integration can be for people.
As well as this, the accession of further countries and the EU funding that went into Ireland have contributed to transforming Ireland from a place that people emigrate from to one that people immigrate to, but that is something which the Irish psyche hasn’t fully come to grips with. A conference with expert speakers contributes to developing that understanding, exploring what inward migration has contributed to Ireland and how we can learn the lessons from that.
As a country in Europe that has not experienced significant inward migration until recently, Ireland can learn from its EU partners and seek to develop its own integration policies and strategies based on the expertise and experience of others. The EU exists as a space for shared learning, with space to adapt EU policies to be relevant at the local level. By taking on board the experiences of other countries in terms of experiences of migration, Ireland can emerge as a leader within Europe in how to transition from a country of emigration to one of immigration, with integration principles based on EU values including equality, democracy and the rule of law, which will be of benefit for other countries, particularly those who joined the EU in the past two decades and for whom this transition is also now beginning with the influx of migrants on Eastern borders
It was the ambition of the event planning team to host a balanced and informative conference that examined the benefits of immigration to this region in terms of the introduction and influence of new skills and cultures, while also giving space to the concerns of host communities. The conference also examined the transformation that has occurred from when Ireland was a place that people emigrated from to one that people now immigrate to. Speakers explored what inward migration has contributed to Ireland and how Local Authorities can be drivers of Civic Engagement for all refugees and migrants.
The Conference has been supported by funding from the Communicating Europe Initiative 2025 in the Department of Foreign Affairs and Trade. This grant funding was awarded to the Local Authority Integration Team, Donegal County Council.

The planning authority has finalised work on the Drafting of ‘Proposed Variation No. 1’ to the County Development Plan 2024-2030, which provides for the following –
New Area Plans for An Clochán Liath, Ballyshannon, Bridgend, Carndonagh, Donegal Town, and Killybegs and amendments to Chapter 17 - Area Plan General Introduction.
Amendment of Buncrana Area Plan by Rezoning lands at Cockhill, Buncrana from Residential Phase 2 to Residential Phase 1.
Amendment of Letterkenny Plan on foot of RZLT-related rezonings and rezoning of pNHA lands to Local Environment.
Amendment of Ballybofey/Stranorlar Area Plan on foot of RZLT rezonings and rezoning of lands at Mullindrait, Stranorlar to Residential Phase 1.
Consultation with Members has taken place through the Municipal Districts and at a plenary level and a general consensus was reached that the Draft Variation should be put out for public consultation, with opportunities for changes to the Draft Variation during later stages of the process, should the need arise.
Publication of the Draft Variation is targeted for early January 2026 and a series of public ‘drop-in’ events will be held in each of the towns subject of a new Area Plan. Adoption of Proposed Variation No. 1 is likely to occur in mid-2026 following public consultation and other requirements.
At the September plenary meeting, the Members agreed to publish the Draft Development Contribution Scheme 2025-2030 for a period of public consultation. The public notices have been prepared and are to be published in local newspapers in the week beginning 17th November. Publication of the draft scheme will also be advertised on the Council’s website and social media channels. The period of public consultation will run from 21st November 2025 to 12th January 2026.
The most recent information in relation to enforcement case activity is set out below. Significant numbers of complaints in relation to new cases continue to be received and in addition, the level of historic cases remains high. Within this overall caseload, the focus remains on addressing current complaints that are not ‘statute-barred’ due to the passage of time, and to seek to resolve contemporary unauthorised development complaints in a timely fashion.
Information relating to the significant levels of activity is set out below. The level of services relating to other case types (Pre-planning enquiries; general queries; licensing) continues to form a significant part of the service to the community and amounts to approximately 5,000 customer calls received per year across the service.
Based on the application numbers received in 2025 to the end of October, it is projected that approx. 2450 applications will be received in 2025.
Regeneration and Development
Funding is provided from the Department of Rural and Community Development and calls for application to the Fund are sought under two categories. Category 1 relates to projects with all necessary planning and other consents in place and which are ready to proceed, i.e. shovel ready. Category 2 projects are those which require further development to become ready for Category 1 status.
Table 1 below provides a summary update on the status and delivery of projects under the RRDF.
Table 1: Rural Regeneration and Development Fund Projects
Project Type Value (includes DCC cofunding)
RRDF Funding Call 4 – Category 2 –
Project Development Measure
Back to Ballyshannon
Category 2
Category 2 (2020)
Current Status/Delivery
Funding application for projects identified in both Rathmullan and Dungloe submitted by the closing date of the 14th March 2025.
Application was not successful, and feedback from the Department is currently being reviewed.
€247,500 Further screening to be arranged.
Scope of the site has been extended to include properties on College Street, Ballyshannon.
To be targeted for future Category 1 Funding.
Work progressing to prepare project for planning consent.
Ramelton Reimagined/Historic Town Centre
Burtonport Phase II
Repowering Buncrana
Category 2
Category 1 (2022)
Category 1
Category 2 (3rd Call)
€249,159
€7,949,868
Project with CPDU for delivery.
Property with CPDU for delivery.
Team supporting delivery through participation on Project Steering Group.
Property with CPDU for delivery.
Part 8 approved February 2023.
Team supporting delivery through participation on Project Steering Group. Rathmullan (in partnership with The Way Forward Rathmullan CLG).
Milford Town Centre First Plan
Unsuccessful for funding under Call 5 in May 2024.
Project submitted for RRDF Category 2 Funding Call that closed on the 14 March 2025.
Application was not successful, and feedback from the Department is currently being reviewed.
€100,000 Town Centre First Plan launched November 2023
GM Design Associates preparing a statutory planning scheme for the lands at Lower
Glenties Town Centre First Plan
Creeslough Village Plan and Community Regeneration Project (in association with the Creeslough Working Group, Creeslough Community Association and Arup).
Moville Regeneration Strategy and Action Plan.
Dungloe
Ardara
Mount Marian.
Part 8 published with closing date for submission the 31st October 2025.
Application made in April 2025 under Town and Village Renewal for funding to acquire former Milford Hotel which was unsuccessful.
€30,000
Creeslough Minor Tourism Works
GM Design Associates appointed to assist with preparation of the Plan.
Engagement with the Glenties Town Team ongoing.
Walkability Audit undertaken in December 2024.
Workshop with Members of the Glenties MD held on the 13 May 2025.
Public consultation event held on the 22 May 2025.
Draft Plan to be presented for public consultation from the 12 September 2025.
Plan currently being finalised.
Village Plan launched 21 March 2024.
Part 8 for Community Regeneration Project approved in September 2023.
Project successfully awarded funding of €12.1m under Call 5 in May 2024 (total project value is €13.5m).
GM Designs appointed in March 2025 to prepare detailed designs.
Project with CPDU for delivery.
Team supporting delivery through participation on Project Steering Group.
€24,500
GM Design Associates appointed to assist to prepare Plan.
Further public consultation event held on the 20 March 2025 to present the draft Plan.
Workshop held with the Members of the Inishowen MD on the 26 June 2025 to agree the final Plan.
Launch of the Plan took place on the 18th September 2025.
€50,000
Funding allocation under Town and Village Renewal to advance design and planning consent for public realm works at Main Stret, Dungloe.
Tender issued to procure external design team.
Tender appointment made and works commenced to prepare the project for planning consent.
€50,000
Funding allocation under Town and Village Renewal to advance design and planning consent for buildings in Ardara.
Tender package being prepared to procure external design team.
€50,000
Council to facilitate drawdown of funding for works now to be arranged through the
Bundoran Regeneration Plan
Buncrana Regeneration Plan
Lifford Regeneration Plan
Raphoe Heritage Led Plan
Downings Action Plan/Project Plan
Glenties Town Team
Creeslough Town Team
Buncrana Town Team
BallybofeyStranorlar Town Team
€15,000
€40,000
€40,000
€60,000
External support services appointed and initial inception meeting with Elected Members to be arranged.
External support services appointed and initial inception meeting with Elected Members to be arranged.
External support services appointed and initial inception meeting with Elected Members to be arranged.
Funding secured from the Build Heritage Investment Fund in March 2025.
Paul Doherty Architects appointed to undertake the plan following a tender process.
Inhouse
Work progressing to prepare draft plan.
Community consultation event held on the 10 July 2025.
Workshop to be arranged with the Members of the LMMD shortly on next steps.
€10,000
Town team established in August 2024 to represent the community in the preparation and delivery of the Glenties Town Centre First Plan.
Creeslough Town Team established and first meeting held on the 25 October 2024.
Funding of €10,000 allocated from the DRCD to support town team capacity building.
External consultancy services procured to deliver team capacity building training to the Town Team, which is now completed.
Team meeting monthly to deliver on the actions identified in the Creeslough Village Plan.
€10,000
Allocation of €10,000 from the DRCD to support the establishment of a Buncrana Town Team.
Town Team established in September 2024.
External consultancy services procured to deliver team capacity building training to the Town Team, which is now completed.
Team meeting monthly to identify and deliver on the priority projects for the town.
Town Team Plan prepared and due to be launched in November 2025.
€10,000
Town Team established to deliver the Ballybofey and Stranorlar Regeneration Strategy with support from the Regeneration Team.
Funding of €10,000 allocated from the DRCD to support projects identified by the Town Team.
Team meeting monthly to deliver on the actions identified in the Regeneration
Moville Town Team
Milford Town Team
Fál Carrach Town Team.
Strategy.
Inaugural Town Team meeting planned for November 2025.
Work to commence to establish a Town Team to deliver the Milford Town Centre First Plan with support from Donegal County Council.
A number of public consultation event held in April, May and June to gauge interest in establishing a Town Team.
First meeting of the Fál Carrach Town Team held on the 10 July 2025.
Town Team working to prepare a Town Team Plan through public consultation and engagement.
Funding is provided from the Department of Housing, Local Government and Heritage for towns with a population more than 10,000 which includes Letterkenny in this County, with calls for application to the Fund sought under two categories. Category 1 relates to projects with all necessary planning and other consents in place and which are ready to proceed, i.e. shovel ready. Category 2 projects are those which require further development to become ready for Category 1 status.
Summary update of Projects
Table 2 below provides a summary update on the current status and delivery of projects under the URDF.
Table 2: Urban Regeneration and Development Fund Projects Call Value of Project (includes DCC cofunding).
Call 1 (approved September 2019)
3 Sub-Projects
Call 2 (May 2020 and approved March 2021)
6 Sub Projects
€3m 1 Prepare Letterkenny 2040 Regeneration Strategy
Completed 2022. 2 Letterkenny Urban Regeneration site.
DCC took possession of the former ESB site and adjacent lands through a CPO in 2023.
Site to be developed for the Alpha/Beta Office accommodation, public realm and Housing. Completed 2025.
3 Public Realm/Linear Park Phase 1 Opened June 2023.
€19.3m (€4.8m DCC co-funding)
1. Reimagine public space at Market Square.
Project with CPDU for delivery.
2. Cathedral Quarter Park and Church Lane Shared Surface Scheme Acquisition of strategic site fronting Church Lane
completed and now in possession of Donegal County Council.
Avison Young appointed to take forward all previous engagement and act on Council’s behalf as regards further offers/acquisitions/CPO.
Council to consider further offers and advance any acquisitions/CPOs.
Hall Black Douglas appointed as architect-led design team in January 2025.
AAB Group Accountants appointed to prepare a Scoping/Feasibility Study and Business Plan in respect of the Creative Enterprise Hub element of the project and these services commenced in January 2025.
Current design stage: data/information gather via tender for survey (topo, Ground penetration survey, elevational survey, ground investigations) completed.
Design team working on overall designs.
Public consultation events, including workshop with the Members, held on the 16th October 2025.
Valuations obtained and land acquisition offers made.
Avison Young appointed to take forward all previous engagement and act on Council’s behalf as regards further offers/acquisitions/CPO.
Council to consider further offers and advance any acquisitions/CPOs.
Re-engagement with Donegal Youth Services carried out December 2024 and capacity testing exercise at Devlin Hall and adjoining lands commenced January 2025 using in-house architectural resource but this work has now paused due to other priority work.
Council to explore other options to re-commence this work.
EPIC Heritage Consulting Ltd appointed to prepare a Visitor Experience Plan/ Product Identification Plan and Business Plan for the development of a major visitor attraction at the Courthouse.
Interpretation and Business Plan presented to Members of the LMMD in February 2025.
Community consultation event held on the 18th February 2025.
Funding of €10,000 secured in March 2024 from the Built Heritage Investment Scheme for minor repair works and, with co-funding from Donegal
County Council, these works have been completed.
Funding of €199,969 allocated under THRIVE Strand 1 from the Northern and Western Regional Assembly for the purpose of engaging architect-led team to bring the project to Part 8 stage.
Robin Lee, Architects, appointed as architectled design team in January 2025.
Workshop with Members of the LMMD held in February 2025.
Apex Surveys appointed to undertake topographical and building surveys.
Greentrack consultants appointed to undertake AA and EIA Screening.
Public drop in event held on the 10th April 2025.
Workshop held with the Members of the LMMD on the 13th May 2025.
Part 8 published and approved at the May 2025 Plenary meeting.
THRIVE Strand 2 funding application submitted by the closing date of the 30th May 2025 including:
- Energy Audit complete
- Do No Significant Harm Assessment and Report complete
- Climate Proofing Assessment and report complete
- Business Plan completing out at present
- Bat Roosting and Activity Survey.
Funding of €7m allocated under THRIVE 2 in September 2025.
Project being handed over to CPDU for delivery.
Avison Young appointed to take forward all previous engagement and act on Councils behalf as regards further offers/ acquisitions/ CPO.
Consultation with Local Link ongoing in relation to private bus operators and short term solution.
Land acquisition offers made in December 2024 leading to collaborative approach with key landowner. Agreement to undertake masterplan for the lands to determine potential for public/private collaboration. Tender being drafted at present.
Options for temporary bus hub being advanced in-house.
Call 3 (March 2023 and approved July 2023).
“The Eat Out’ Outdoor Dining Infrastructure Project
Letterkenny Cultural Corridor
€4m
Youth/Community focused project at Lower Main Street
Part 8 in relation to the Cultural Corridor element of the project approved by Donegal County Council at the November 2023 Plenary meeting.
In-house team has commenced steps to develop a Part 8 for Phase 2 (from constructed Phase 1 to Pearse Road).
Valuation services of Avison Young being engaged in relation to phase 2 (from constructed Phase 1 to Pearse Road) and lands required for the Cultural Corridor element of the Scheme.
All landowners engaged.
Engagement ongoing with relevant stakeholders.
Topographical survey completed.
External structural/civil engineering consultative services procured for site investigation services access sought to 3rd party lands.
Revolving fund for acquisition costs of long-term vacant property or sites
46 properties on the programme and all owners have been engaged with.
Several properties already activated or being activated through the Croi Conaithe grant scheme and other schemes.
Several properties currently for sale and these are being monitored.
Valuation Services engaged in relation to property valuations.
Legal Services engaged in relation to property acquisitions.
Council to advance 10 properties for acquisition/CPO.
4 properties added to the Derelict Sites Register.
Construction completed.
Part 8 approved November 2023.
Valuation services of Avison Young being engaged in relation to lands required for the delivery of the Scheme.
Services of Quantity Surveyor engaged to provide cost estimates for the scheme and work completed.
To be targeted for future URDF funding call.
Early engagements with Letterkenny Youth Club and Donegal Youth Services have commenced.
Avison Young appointed in Q4 2023 to take forward all previous engagement and act on Council’s behalf as regards further offers/acquisitions/CPO.
Capacity testing of potential lands available commenced in January 2025 with engagement with relevant stakeholders. Exercise paused due to resource requirements across RRDF programme.
The Croi Conaithe Vacant Property Refurbishment Grant Scheme opened for
applications in July 2022 and Table 3 below provides further details of the applications received to-date.
This initiative was launched in April 2023 with targets set for Local Authorities to bring properties back into use. Surveys commenced to identify and verify occupancy status of properties appearing vacant and contact made with some owners. This work will re-commence once staffing resources permit and options will be explored to establish funding source to acquire identified properties. The acquired properties may subsequently be used for social housing, made available for sale on the open market or used for other purposes e.g. community use.
2023 Target:
To activate 350 properties and commence CPO in 6 cases. This has been achieved.
2024 Target:
To activate 300 properties and commence CPO in 6 cases. This has been achieved.
2025 Target:
To activate 300 properties and commence CPO in 6 cases.
The update and upkeep of the Derelict Sites Register falls within the remit of the Regeneration and Development Team since last year. There have been 4 new additions to the Register this year so far. A review of the 18 properties that were on the Register for a number of years is completing and as a result, to date 6 properties have been removed from the Register as they do not meet the criteria for inclusion on the Registrar.
In addition, a Derelict Sites Policy and Procedures has been developed which sets out the obligations and legislative procedures to be followed in respect of derelict sites and compulsory acquisitions and sets out the Council’s priority programme for making additions to the Derelict Sites Register. The Derelict Sites Policy and Procedures document was approved this year by the Elected Members at each MD level and by the Planning SPC.
The Council’s Septic Tank Inspectors have completed 87 out of 127 inspections to date, with a 23% pass rate observed.
For the remainder of this year, priority will be given to carrying out inspections in Zone 1.
Key findings in recent inspections include:
Electrical faults with secondary treatment units
Failure to keep power switched on to these units
Failure to adequately maintain & service the system
The Council will also be following up on remedial works on wastewater treatment systems/septic tanks which have failed an inspection where the deadline for completing the works has elapsed. Homeowners are advised that this is an offence, and prosecutions may be taken by the Council.
Environment staff have been/will be in attendance at the following meetings to provide information on how grant funding may be accessed in conjunction with the above. The schedule is as follows:
04.11.2025 - Carndonagh PSC 3-6pm
20.11.2025 – Letterkenny PSC 4-7pm
24.11.2025 - Donegal Town PSC 4-7pm
27.11.2025 - Dungloe PSC 4-7pm
01.12.2025 – The Base, Stranorlar 4-7pm
Air quality monitoring at the EPA’s Letterkenny Monitoring Station has indicated reasonably good air quality for most of the month of October. This is reflective of mild and occasionally stormy conditions which has aided the dispersion of particulate matter and other by-products of solid fuel burning.
As the weather generally turns colder in November, Donegal County Council’s Environment team will be enforcing compliance with the Solid Fuel Regulations and reminding all homeowners using solid fuel as their main source of heating to fully comply with the regulations by burning approved solid fuels. Packaging on Coal, coal-based products, and wood must be labelled “Contents comply with the Air Pollution Act Regulations” and show a registration number issued to the fuel producer.
Donegal County Council would like to remind farmers in the county of the following key messages as autumn and winter approaches.
Plan to complete the land spreading of slurry by the 1st October
farmyard manure cannot be applied to land after the 1st November,
check & repair gutters and downpipes to minimize soiled water in yards
ensure that any effluent or soiled water generated is directed to appropriate storage tanks.
There should be no direct runoff of soiled water from farm roadways to waters.
The 2025 Bathing Season concluded officially on the 15th September with the Council’s Central Lab completing monitoring at all designated bathing waters.
Average rainfall for August is approximately 100mm of rain, 2025 there was approximately 65mm of rainfall, due to the good weather there were fewer prior warning raised for the bathing waters than previous few years.
We found cattle access to streams running onto Blue Flag (BF) beaches does have an impact on bathing water quality. As a result, NAIP inspections may be performed near BF beaches in early 2026.
As the 2025 home heating season commences, Donegal County Council’s Environment team will be enforcing compliance with the Solid Fuel Regulations through:
Targeted routine inspections –retailers & manufacturers
Non-routine inspections –weekends & night-time, focus on mobile operators” bell men”, complaints about private houses
Sampling & testing of coal products
All homeowners using solid fuel as their main source of heating are asked to fully comply with the regulations by burning approved solid fuels, including coal, coalbased products, wood & turf, whose packaging is labelled “Contents comply with the Air Pollution Act Regulations” and showing a registration number issued to the fuel producer.
National Agricultural Inspection Programme (NAIP)



Main Issues Found during Inspections
X3 Bales high without control of Effluent Cattle Access to Stream/River
The second phase of the Community Climate Action Fund opened on 28th October 2025 until 22nd December 2025.
The Community Climate Action Programme (CCAP) is a new programme to support small and large, rural and urban communities to take climate action at a local level. Donegal County Council in association with the Department of Climate, Energy and Environment (DCEE), will provide funding to local communities for projects that promote community climate action.
The objective of the CCAP is to build low carbon, sustainable communities, which will, in turn contribute to the national climate and energy targets.
This funding is part of the Community Climate Action Programme, which supports projects and initiatives that facilitate climate action within local communities. The fund is open to not-for-profit community groups and clubs.
The CCAP can fund 100% of all eligible costs for the project and there are three project sizes eligible:
Small scale projects < €20,000
Medium scale projects €20,000 to €50,000
Large scale projects €50,000 to €100,000
Projects must deliver a direct positive impact on climate change by reducing greenhouse gas emissions and/or helping communities adapt to the consequences of climate change.
The 5 themes of the programme are as follows with some examples of projects that may be applied for:
Theme 1: Community & Energy
LED community lighting, small renewable energy projects (solar / hydro / wind), rainwater harvesting, retrofitting community buildings (windows & doors, insulation, LED lighting, heat pumps)
Theme 2: Sustainable Travel
Cycle parking / racks, improving cycle way access, safe and active routes to schools, eCargo bikes, bike repair hubs
Theme 3: Food and waste
Community gardens / allotments, community fridges, polytunnel, raised beds
Theme 4: Shopping and recycling
Swap shops, water filling stations, single use plastics elimination, musical instrument reuse, paint recycling, toy library
Theme 5: Local climate and environmental action
Mini forests, dispersed orchards (fruit trees), community gardens, roof gardens, pollinator projects
Further Information on the fund will be available on the Donegal County Council website once dates are confirmed and the fund is open for applications.
Climate Action Week
Donegal County Council’s Climate Action Unit was proud to support An Taisce's National Climate Action Week, which took place from 13th to 19th October 2025. Local community and voluntary groups across County Donegal organised a wide variety of events to raise awareness and inspire action on climate issues under the following themes:
Biodiversity
Grow Your Own
Energy
Sustainable Travel
Circular Economy e.g. Repair & Reuse
A number of events were also organised for DCC staff which included lunchtime talks by the North West Energy Agency (NWEA) on the supports they have available for home energy upgrades, webinars on Grow Your Own- Cook Your Own Food, a Swift Conservation Webinar by BirdWatch Ireland and a Sustainable Fashion Event.
A Community Climate Action Fund – Showcase Event was held during Climate Action Week, to celebrate the work of community groups across Donegal, and with their Northern Ireland partners, in delivering climate action projects for the benefit of their communities.
Community groups from across Donegal, and with our Northern Ireland partners, have been supported under Phase 1 of the Community Climate Action Fund.,
To date:
20 projects were supported under Strand 1 of the fund across County Donegal, and
5 Projects were supported under Strand 1a, with partner organisations in Northern Ireland
This amounted to a total investment of €1.1 million for climate action and biodiversity on the ground, within our communities.
These projects contribute to our overall national climate ambition of moving towards a carbon neutral society, they also highlight the many benefits that such positive actions can bring.
Donegal County Council signs up to Reduce Your Use Energy Campaign for 2025/2026 Winter Season
Donegal County Council is taking part in the Government’s Reduce Your Use energy efficiency campaign throughout the organisation.
The Public Sector has been challenged to take a leading role in reducing our nation’s energy demand, and it is expected that this campaign can deliver 5-10% energy savings overall across the sector, and up to 15% in buildings.
The Reduce Your Use energy efficiency campaign is an effective way to assist with increasing our energy security, lowering energy bills and meeting our targets
Our Energy Team and Climate Action Unit is taking the lead in this campaign and will be promoting a regular energy saving action for colleagues to take at work. Information will also be signposted on energy saving ideas for you to try at home.
DCC colleagues are encouraged you to take part in the energy saving actions and any planned activities over the winter months ahead. The campaign will cover a number of key themes; Theme 1 Heating & Hot Water, Theme 2 Office Equipment, Theme 3 Transport.
Now, more than ever, we need to be mindful of how we use energy in our daily lives - from the moment we wake up to the moment we switch off the lights at night. Together, we can make a difference by taking these small but effective energy saving actions.
The National Tidy Towns competition for 2025 showcased outstanding community spirit and dedication across County Donegal. Towns and villages across all Municipal Districts (MDs) demonstrated strong environmental and civic engagement, with several areas receiving national recognition.
Donegal achieved five Gold Medals, two Silver Medals, one Bronze Medal, and a special Endeavour Award in 2025.
Letterkenny–Milford Municipal District
Town / Village Points 2025 Awards / Notes Letterkenny
Airt
County Second, Gold Medal
County Third, Gold Medal Gradam Na Gaeltachta Buaiteoir Náisinta
Letterkenny continued its strong performance, finishing just one point behind Buncrana. Carraig Airt achieved County Third and secured a Gold Medal for its consistent improvement. Award Gradam Na Gaeltachta Buaiteoir Náisinta.
Glenties Municipal District
Town / Village
/ Notes
Dunfanaghy
Inishowen Municipal District
Town / Village
First Award, Gold
Buncrana retained its position as the top-performing town in Donegal, earning County First and a Gold Medal. Moville and Malin also maintained high national standings with over 385 points each.
Lifford–Stranorlar Municipal District Town
Raphoe earned a Gold Medal, marking one of the towns best results to date.
Donegal Municipal District Town
Donegal Town achieved a Bronze Medal, continuing to perform strongly in the national competition.
Glenties Municipal District
Dunfanaghy
County Summary
Category
2025 Results
County First Buncrana (398 pts, Gold Medal)
County Second Letterkenny (397 pts, Gold Medal)
County Third Carraig Airt (392 pts, Gold Medal)
Gold Medals 5 (Buncrana, Moville, Letterkenny, Carraig Airt, Raphoe)
Silver Medals 2 (Malin, Glenties)
Bronze Medals 1 (Donegal Town)
Endeavour Award An Falcarragh
Donegal’s communities continue to excel in the National Tidy Towns initiative, demonstrating exceptional civic pride. The Council extends congratulations to all participants for their commitment and community spirit.
Background
Donegal County Council, as a Designated Local Authority, are tasked with the Administration of the Enhanced Defective Concrete Blocks Grant Scheme on behalf of the Department of Housing, Local Government & Heritage.
The Enhanced Defective Concrete Block Grant Scheme offers financial assistance to support affected homeowners in designated local authority areas to remediate their dwelling, where their dwelling had been damaged by the use of defective concrete blocks in its construction.
The Enhanced Scheme has been in operation since 3rd July 2023.
The primary legislation which underpins the Enhanced Scheme is the Remediation of Dwellings Damaged by the Use of Defective Concrete Blocks Act 2022.
This report provides an update on the implementation of the Enhanced Defective Concrete Block Grant Scheme and covers the period up to and including 31st October 2025.
At the commencement date, Donegal County Council had 1,296 applications received under the Previous Scheme which required transitioning to the Enhanced Scheme. These applications are referred to as “Transitional Applications”. Donegal County Council had issued approval to 849 applications prior to the commencement of the Enhanced Scheme.
Key Points:
Of the 849 Transitional Applications which received Confirmation of Eligibility and Remediation Option by Donegal County Council under the provisions of the Previous Scheme, 527 applicants were approved for Option 1 and the remaining 322 applicants were approved for Option 2 – 5 and Blended Options.
78% of all approved applicants have now submitted the required information (Declaration of Floor Area - DOFA, dimensioned drawings) to enable Grant Calculation by Donegal County Council.
To date 98% of all submitted Declarations have been processed or returned to the applicant for follow up.
Under the provisions of the Enhanced Scheme, the technical assessment of validated applications is the remit of the Housing Agency. The initial step for an application, following validation and referral to the Housing Agency, is the Housing Agency’s Determination of Damage Threshold of the relevant dwelling.
The average timescale for Determination of Damage Threshold by the Housing Agency is 60 days.
For applications that meet the Damage Threshold, the Housing Agency provides an indicative timeline for determination of the Remediation Option & Grant Amount. The Determination of Damage Threshold and the Remediation Option Grant as decided by the Housing Agency is communicated to the applicant by the Council’s DCB Grant Office.
Where it is deemed by the Housing Agency that an application has not met the Damage Threshold or where an applicant is not satisfied with the Approved Remediation Option, the applicant may submit an Appeal to the Independent Appeals Panel.
Overview of Referral of Applications to the Housing Agency
To date, 98% of applications assessed by the Housing Agency have been
To date, the Housing Agency has decided the Remedial Option Grant on 56% of the applications which have been determined to have met the Damage Threshold under the provisions of the Enhanced Scheme. These Options are summarised below:
Donegal County Council fully recognises the importance of timely processing of valid Payment Claims under the Defective Concrete Blocks Enhanced Scheme, to ensure cash flow for all parties involved.
To date, Donegal County Council has processed valid Payment Claims and issued payments to applicant homeowners to a value of over €158m (€158,042,370).
The Council is committed to issuing reimbursements, under the Enhanced Scheme, to applicant homeowners as soon as practical.
The continued support of Elected Members and Oireachtas Members is fully acknowledged.
Section 3.1 provides an overview of Payments issued to applicants across both the Previous Scheme and the Enhanced Scheme by period.
€6,163,234
Remediation Works
Ancillary Grant
Competent Building Professional / Engineer Report Fees
Professional Fees (Remedial Works Plan, Health & Safety)
€141,050,395
€4,653,781
€7,473,939
€4,864,255
Total Value of Grants Paid to Date (Previous Scheme and Enhanced Scheme) €158,042,370
€16,000,000
€14,000,000
€12,000,000
€10,000,000
€8,000,000
€6,000,000
€4,000,000
€2,000,000
€0
Value of DCB Grants Paid per month Jul-23Aug23Sep23Oct-23Nov-23Dec-23
No. of Applicants receiving Payment
3.3: Payment Claims Submitted – 4 Week Rolling Period
Average No. of days from Claim Submitted to Claim Paid (this includes time for submission of Further Information where the initial Payment Claim submitted was incomplete)
Average No. of Days from a Valid Claim Approved to Claim Paid
4.1 : Overview of Applications received under the Enhanced DCB Scheme
Applications Received under the Enhanced DCB Scheme
4.2: Active DCB Applications by Municipal District

4.3 Remediation Option & Grant Amount as at 31st October 2025
This table outlines the decided Remediation Option Grants which have been notified to approved applicants by the DCB Grant Office.
Total No. of Grant Amounts decided to date (Previous Scheme & Enhanced Scheme) 1328
Total Value of Grant Amounts decided to date (Previous Scheme & Enhanced Scheme) €457,428,565
No. of Confirmation of Grant Amounts from the Previous Scheme as calculated / recalculated under the Enhanced Scheme by Donegal County Council (Transitional Applications) 656
Value of Grant Amounts from the Previous Scheme as calculated / recalculated under the Enhanced Scheme by Donegal County Council €221,954,923
Number of Confirmation of Grant Amounts received from the Housing Agency under the terms of the Enhanced Scheme 672
Value of Grant Amounts decided by the Housing Agency €235,473,642
4.4 Commencements & Completions
No. of Commencements notified by Applicants to the DCB Grant Office 784 No. of Dwellings currently undertaking Remediation Works 579
No. of Dwellings Fully Remediated 205
The DCB Grant Office continues to actively engage with applicants across the full scope of the Scheme. This includes Validation of Enhanced Scheme Applications, Ancillary Grant Applications, Notification of Decisions, Validation of Payment Claims, Processing Payments, Change of Competent Building Professional and all other general queries.
The DCB Section of Donegal County Council’s Website is updated regularly and contains all the information and links that an applicant may require at various stages of the application process.
The telephone clinics are available every Tuesday and Thursday (9am – 12.30pm) to assist applicant with any queries. The DCB Grant Office Team follow up on applicants’ queries outside of the specific telephone clinics.
Applicants can also submit queries via email to dcb@donegalcoco.ie and a member of the team will be in contact with the applicant.
The Community Facilitators play a vital role in supporting and guiding homeowners and families who are most vulnerable and / or applicants who may not have the necessary facilities to submit an online application. There are currently four Community Facilitators available to assist applicants throughout the county.
Donegal County Council’s overall social housing delivery pipeline is summarised below. These figures reflect the Council’s pipeline from 2022-2030 and includes inhouse projects, turnkey developments, Part V’s and AHB developments.
Project Status
Tendered Projects / Pre-Contract Stage
at Advanced Design Stage (Planning Approved)
* Projects at design and planning stages can only progress with Uisce Eireann Connection Agreements and Departmental approval.
** Projects at Planning Stage can only progress with Planning Approval and Uisce Eireann Connection Agreement for Water and Wastewater, and Departmental approval.
Photos below outline progress on site on social housing projects across the county.






Housing grants are available in the form of the Housing Adaptation Grant for Disabled People, Mobility Aids Grant and the Housing Aid for Older People Grant. These grants improve homes and allow households to stay living within their homes for as long as possible.
In late 2024, the Department announced increased funding in housing grants for older people and those with a disability. The revised Housing Adaptation Grants for Older People and Disabled People commenced on the 01 December 2024 and provide for an increase in the grant limits of over 30% and an increase of 25% in the income thresholds for eligibility. Key changes in the Regulations include:
an increase in the maximum level of Housing Adaptation Grant for Disabled People to €40,000 (an increase of €10,000); and
an increase in the maximum level of the Mobility Aid Grant to €8,000 (an increase of €2,000); and
an increase in the maximum level of the Housing Aid for Older People Grant to €10,700 (an increase of €2,700).
In previous years, the Council obtained increases in our allocation late in the year, following a redistribution by the Department of funding from local authorities who did not fully expend their allocation.
The Council recently submitted a request for additional allocation to the Department following a communication from the Department requesting local authorities to submit requests for additional allocation for consideration. The Department has now responded to confirm an additional allocation of €1,500,000.00 to the Council increasing the Councils overall allocation for 2025 to €5,270,067.00.
The table below confirms the Council’s allocation this year and in recent years and the re-distribution of funds from other Local Authority areas:
Housing Grants – Examples of Internal & External Works


The Energy Efficiency Retrofitting Programme remains a key area of our work programme and is essential to households at risk of fuel poverty to reduce energy costs and improve living conditions for our tenants. The Council intends to continue to exceed targets in this area and we are currently in discussions with the Department seeking additional allocation of units and funding going forward.
Donegal County Council received a 2025 allocation of 166 units (average spend of €34,000 per unit totaling €5,644,000) from the Department of Housing, Local Government and Heritage. By the end of 2025, Donegal County Council will have retrofitted 825 social housing units through this Programme since 2021, with the retrofit of an additional 25 social housing units due for completion in early 2026.
The Department has confirmed that the EERP Programme with continue into 2026 when additional social housing stock will be retrofitted under the Programme.
As per the recently published “2024 Local Government Climate Action Key Performance Indicators Full Report”, Donegal County Council placed 2nd on the National table for the number of social houses retrofitted by each Local Authority from 2022 – 2024.



Creative Ireland, HSE’s Health Promotion and Improvement, Integrated Healthcare Area Donegal and Developing Healthy Communities, Northern Ireland recently designed and delivered a Shared Island initiative called Take 5. It took place over five weeks in seven locations across Derry and Donegal and culminated in a shared event at the Regional Cultural Centre on October 15th .

A new library initiative called Skills for Life will be coming on stream at local libraries in the coming months. It aims to tackle areas such as Basic Digital Skills, Financial Literacy, Media Literacy, Business and Employment Skills, Health Awareness and Sustainable Lifestyles and Environmental Awareness through events, learning tools and initiatives.

As part of the implementation of the County Donegal Heritage Plan, the Culture Division of Donegal County Council in partnership with the Mellon Centre for Migration Studies launched a travelling version of the ‘Working Over By: Donegal Emigrant Working Lives in Scotland 1940-1990’ exhibition in the Glasgow City Archives, The Mitchell Library, Glasgow on September 23rd 2025. Donegal Diaspora Ambassador Packie Bonner launched the exhibition as part of a civic reception
hosted by the Lord Provost Jacqueline McLaren. The travelling exhibition has proved very popular and will run in the Glasgow City Archives until January 2026.

Pictured with Packie Bonner at the launch of the ‘Working Over By’ exhibition in the Glasgow City Archives September 23rd are representatives from Donegal County Council, Glasgow City Council and the Irish Consulate.
A free 40-page booklet entitled ‘Glasgow Corporation Transport & The Donegal Connection’ by historian, journalist and author Hugh Dougherty was launched in the Donegal County Museum, Letterkenny on October 1st 2025. The booklet tells the story of Donegal men and women who worked on Glasgow Corporation Transport buses, trams, trolleybuses and subway. The booklet is the sixth publication in the Donegal Heritage Series published by the County Donegal Heritage Office with funding from The Heritage Council and Donegal County Council.

Pictured at the launch of the ‘Glasgow Corporation Transport & The Donegal Connection’ booklet in the County Museum, Letterkenny are Cllr. Donal Coyle (Chairperson, County Donegal Heritage Forum) and Hugh Dougherty (author).
Archaeologist Paula Harvey from Ardara won the National Heritage Hero Award at the National Heritage Week Awards in the Royal Hospital, Kilmainham, Dublin on October 17th 2025 hosted by The Heritage Council. The National Heritage Hero Award honours an individual or organisation that has made an outstanding, longterm contribution to the protection and promotion of Ireland’s heritage. The County Heritage Award for Donegal was won by the Fahan Community Development Partnership and the Lamberton family for their event and presentation on engineer and antiquarian William J. Doherty from Fahan.

The Laurels, Glenties Historic Towns Initiative
In partnership with the Brian Friel Trust, work is continuing on the conservation and restoration of the interior of The Laurels (playwright Brian Friel’s mother’s home in Glenties), service provision at the site and the implementation of the landscape management plan. The Laurels is a Protected Structure of national significance. The Laurels - Glenties Historic Towns Initiative 2025 is part-funded by The Heritage Council, Donegal County Council and the Brian Friel Trust. The Brian Friel Trust organised a weekend of events in early October for his tenth anniversary to commemorate his life and work, at which the garden at The Laurels (designed by Diarmuid Gavin) was opened. Conservation works to the house will continue into the spring of 2026.

Ballyshannon Historic Towns Atlas
The Royal Irish Academy in partnership with the Culture Division of Donegal County Council launched the Irish Historic Towns Atlas for Ballyshannon in the Abbey Arts Centre on October 9th and in the Royal Irish Academy, Dublin on October 30th. The launches included presentations by Dr. Angela Byrne, author of the atlas. The Irish Historic Towns Atlas is part of a European project on historic towns that facilitates comparative urban studies. Ballyshannon is the only town in County Donegal that meets the pre-requisite criteria. Thirty-two towns in Ireland have been published so far and each atlas comprises a variety of maps, an essay explaining the historical
development of the town, and a body of classified topographical information covering the urban area as a whole and its component parts.

Heritage professionals in Donegal County Council were featured in a speciallycommissioned film for the Local Authority Heritage Practice Seminar in the National Gallery, Dublin on October 15th 2025. The short film highlighted the collaborative work of the Heritage Officer, Biodiversity Officer, County Archivist, Museum Curator and Architectural Conservation Officer in Donegal County Council as a national exemplar. The seminar was organised by The Heritage Council and explored the establishment of heritage teams in local authorities and was attended by Local Authority Chief Executives, Directors of Service, local authority heritage professionals, the Department of Housing, Local Government & Heritage and the County & City Management Association.
Northern Periphery Arc (NPA) European Project: INNOCAP Climate-related IoT Sensors Pilot Implementation
Through collaboration between Information Systems and the Water & Environment Directorate, as a partner in the INNOCAP project, Donegal County Council is implementing a pilot using sensors to monitor water levels in the river catchment flowing into Glenties town. These sensors will provide real-time data on water levels, helping understand how the river reacts to weather events. This information is going to be used to test nature-based solutions and assess if they improve the river’s response. The final project meeting for INNOCAP was hosted by Donegal County Council on 4th November and included a site visit to where the sensors are located.


INNOCAP Final Conference: “Building Capacity in Disruptive Technology in the Public Sector.”
The final conference was held on 5th November and brought together speakers and delegates from INNOCAP partners, Donegal County Council, ERNACT, University of Galway (Ireland), University of Helsinki –Ruralia Institute (Finland), SASS (Iceland), and Örnsköldsvik Municipality (Sweden) as well as Offaly, Laois Westmeath, Longford and Meath County Councils and the Atlantic Technological University (ATU). The focus was on showcasing the project outcomes and how AI, data analytics, IoT and GIS technologies are transforming local government operations in the partner regions. Presentations explored a wide range of innovative initiatives, including AIsupported innovation platforms, data-driven waste management, digital tools for planning and water management, and STEM education for future innovators.
Donegal Tech Advocates Event


End of Summer Social Evening Invitation with Guest Speaker Andreea Wade at the Kinnegar Brewery Letterkenny on 25th September 2025.
Donegal County Council, in partnership with regional stakeholders, is actively promoting and supporting the growth of the innovative tech sector in Donegal. On September 25th, 2025, the Donegal Tech Advocates hosted an event ‘Tech in leadership, the age of AI’at Kinnegar Brewery in Letterkenny, featuring keynote
speaker Andreea Wade, with fifty-two attendees participating.
It gave attendees the opportunity to:
Connect with Donegal’s innovative tech community
Gain insights from industry experts
Celebrate Donegal’s thriving tech sector in a friendly, relaxed setting

“Powering Progress & Opportunities in Offshore Renewables”
Over 45 participants attended an event on the 24th of September in Letterkenny: "Powering Progress & Opportunities in Offshore Renewables".
The event focused on engineering, marine energy, environmental services, and supply chain development within the offshore renewables sector. It aimed to provide insights into emerging opportunities across Irish, UK, and mainland European markets, as well as networking opportunities for potential partnerships.
Keynote Speakers and Sector Leaders:
-Liam Curran from Enterprise Ireland, supporting Irish SMEs in offshore wind and marine sectors
-Martin McGuinness of MMG Ocean, a marine engineering firm based in Killybegs
-Charlotte O’Kelly, an expert in marine project management
-Shane Heverin, a seasoned Master Mariner with extensive offshore energy experience
-Derek Robertson of Subsea Micropiles, specializing in offshore foundation solutions
-Karol Harkin, a renewable energy innovator from Donegal

BIM, in collaboration with Donegal County Council, hosted a conference in Killybegs on 20 October to explore future opportunities for the seafood sector in the blue bioeconomy. Sea the future: Blue Bioeconomy for growth proved to be a thought-provoking event for the 120 delegates in attendance. The aim was to offer a balance of cutting-edge research and commercial insights on the blue bioeconomy. In focus was the potential to transform available underutilised marine resources into higher value ingredients for the emerging biostimulant, petfood and human consumption markets. The day’s presentations included a spotlight on commercial success stories, as well as featuring current research in the area, and accessible pre-commercial scale up facilities available to the sector through Teagasc’s Aimbio-funded facility. The suite of associated aligned soft supports also available to seafood companies from various state agencies was also highlighted. These will be further enhanced in future plans to ensure opportunities are further de-risked and scaled appropriately prior to investment.
A vital component of the event was the interactive session at the end of the presentations, designed to capture the perspectives of seafood producers and processors. This dialogue focused on future opportunities and the type of aligned state supports needed to advance the sector. Feedback from this session—and the wider event—will guide Donegal Blue Economy Group, comprising Donegal County Council, BIM, LEOs, Marine Institute, ATU, and Killybegs Cluster to evolve enhanced aligned supports, with the potential to progress a pre-commercial facility to enable strategic growth of the blue bio economy.

Disrupt by the Sea 2025 - Showcasing Donegal’s Global Innovation Reach
Disrupt by the Sea 2025, held on 16 October at The Blue Goat in Ramelton, showcased Donegal’s growing global innovation network and investor reach. ALPHA Innovations Annual Flagship event secured $100,000 in live investment from returning US Sharks John Fries and Mark Baiada, with two new Sharks joining the panel: John Cummins, an Irish born Life Sciences entrepreneur who scaled and exited in the United States, and Dr Joan O’Shea, a leading Neurosurgeon and founder of The Spine Institute, New Jersey. Four promising scale up companies pitched from a long list of more than 140 companies, with Kowroo named overall and audience choice winner. Fifty per cent of the pitching companies were female led, and one side investment remains under negotiation. The event attracted more than 80 attendees, featured a showcase of local artisan producers, and included a panel discussion with returning winners and regional finalists from the National AI Challenge, further reinforcing Donegal’s reputation as a region capable of competing on a world stage.




ALPHA Innovation played a leading role in the National AI Challenge Sept 2025, a nationwide hackathon supported by Google Cloud, OpenAI, and government departments. Now in its second year, the Challenge expanded rapidly, with participation more than doubling from 237 in 2024 to 540 in 2025. The initiative aims to accelerate AI adoption and education across Ireland, engaging over 27 mentors from industry, venture capital, accelerators, and academia, supported by 12 regional innovation hubs. Donegal’s performance stood out nationally: ALPHA co-built four AI powered teams with 50 per cent female founders and attracted participants from across Ireland, including Dublin, Kildare, Galway, and Sligo. Of the 15 teams selected for the national finals, 3 originated from the Donegal hub, representing 20 per cent of all finalists, while a team including an ALPHA programme alumnus was also successful at Enterprise Ireland HQ. Teams including Cassan Earth, Canavan Atlantic, Project Aura and AOIFE built advanced AI solutions and working prototypes within three weeks, demonstrating Donegal’s ability to compete and lead on a national stage. On a per-capita basis, Donegal outperformed larger regions, underscoring ALPHA Innovation’s growing role as a key driver of Ireland’s national AI ecosystem. Head of ALPHA Innovation, Kevin Sexton, serves on the National Steering Group for the Challenge, positioning Donegal to influence AI innovation policy and practice at a national level.



The 2025 Tip O’Neill Irish Diaspora Awards were held at the Inishowen Gateway Hotel in Buncrana, celebrating four outstanding members of the global Irish
community for their contributions to music, civic leadership, and cultural philanthropy. The event featured a panel hosted by Ulster University, formal addresses from government and local leaders, and concluded with a special performance by Three Dog Night. Honourees included musician Danny Hutton, Lord Mayor Vincent Keaveny, and Sydney-based community leaders Eileen and Seán Donaghey. The awards continue to honour the legacy of Tip O’Neill and strengthen ties between Donegal and the Irish diaspora worldwide.


Donegal County Council together with Fáilte Ireland and the LEO hosted a series of business clinics across the county over four days in November, one clinic per MD. The aim of the business clinics was to signpost operators with an idea for a tourism business or those who wished to branch out their current business to include a tourism offering, to the information they would need to assist them with their project. Clinics were widely advertised in local press and across Donegal County Council and Fáilte Ireland social media channels through October. Those expressing an interest were then asked to fill out a short survey so that specific information could be prepared for the meetings. 13 meetings were held with operators who will potentially develop a new tourism offering over the coming years in the county. Each meeting was followed up with an action plan for the operator to action and it is intended to monitor progress with each one to bring them through from ideation to reality.

Waterworld Bundoran is proud to announce that it has been awarded the Gold Standard Award, the highest possible achievement in the National Quality Standards Awards (NQSA) through Ireland Active. This distinction places Waterworld in the ‘Outstanding’ category, meaning the facility has exceeded the rigorous standards set by Ireland Active and the wider leisure industry. The comprehensive audit process assessed every aspect of the operation, including Human Resources, Health and Safety procedures and practices, Customer Focus, Hygiene, and overall operational standards. The Gold Award represents exceptional performance across all areas, and it is believed that Waterworld Bundoran is the only facility of its kind in Donegal to achieve this level of recognition in 2025.
This accomplishment is a reflection of the dedication of the board, management, and staff, as well as the continued support of Donegal County Council. It also highlights the success of the significant investments made in 2025, with the building owner, Donegal County Council, investing more than €2 million in building enhancements, which included upgrades to the changing rooms, reception area, and air control plant throughout. Waterworld Bundoran remains committed to exceeding industry standards and delivering an outstanding
experience for all visitors. Participation in the Ireland Active audit process demonstrates the team’s ongoing focus on quality, safety, and continuous improvement, ensuring that Waterworld continues to be one of the North West of Irelands leading family attractions.
Bundoran Waterworld is recognized by businesses in the region as a critical piece of infrastructure supporting the wider accommodation, hospitality and visitor experience in Bundoran and south Donegal.
The Local Enterprise Office of Donegal County Council continues to be a key driver of local economic development, supporting small and micro enterprises across the county. Throughout the last two months, Local Enterprise Office Donegal has remained focused on fostering innovation, sustainability, and export growth, while delivering targeted supports that contribute to business resilience and job creation throughout the region.
The following table illustrates LEO Donegal’s progress against targets as of the end of Q3 2025.
This year, Local Enterprise Office Donegal celebrated National Women’s Enterprise Day (NWED) with an evening event in the Mount Errigal Hotel, Letterkenny on Thursday, 16th October. The evening brought together women in business from across the county for an inspirational programme of talks, networking, and shared learning. With a focus on insight, growth, and visibility, the event highlighted the innovation and resilience of women leading businesses in Donegal and beyond. Hosted by transformational coach Orla Hasson, the event featured an impressive line-up of speakers, including keynote speaker, Tessa Breslin, motivational speaker, Sally Murphy, NWED Ambassador, Olivia Finney, and Caroline
McLoughlin, Executive Director at Morgan Stanley. Jacqueline Toner of Healing Flow Wellness led a breathwork session, while Mirenda Rosenberg facilitated a guided networking session.

Pictured: Head of Enterprise Brenda Hegarty, Asst Head of Enterprise, Grace Korbel, Sectoral Executive, Sinead Milligan with Orla Hasson, Tessa Breslin, motivational speaker, Sally Murphy, Olivia Finney, Caroline McLoughlin and Jacqueline Toner at the National Women’s Enterprise Day event in the Mount Errigal Hotel.
Donegal producers delivered an outstanding performance at this year’s Blas na hÉireann – The Irish Food Awards, held recently in Dingle, showcasing the strength and quality of the county’s vibrant food community. Fourteen local producers were shortlisted across a wide range of categories, with eight proudly taking home gold, silver, and bronze medals. The Donegal winners included Donegal Rapeseed Oil, Donegal Sea Salt Ltd., Filligans Handmade Preserves, Green Pastures Donegal, Kinnegar Brewing, Kombucha Na Dálaigh, Little Mammas Gelato, and Natural Dairies. Little Mammas Gelato from Donegal Town was awarded Best in County, sponsored by the Local Enterprise Office Donegal. This success marks a fantastic achievement for the local food sector, celebrating the innovation, passion, and craftsmanship of Donegal’s producers, all of whom are great ambassadors for Food Coast Donegal.


Lead2Grow is a pilot programme designed to help businesses in the North West with the skills, insights, and strategies to scale their businesses. Delivered in partnership with IESE Business School, New York, one of the world’s top-ranked institutions, the programme brings together 14 businesses from Donegal and Derry & Strabane to learn from world-class academics and industry experts. Lead2Grow coincides with Golden Bridges 2025 in Boston, reflecting a strong collaboration between Donegal County Council and Derry City & Strabane District Council.
The 8 businesses travelling from Donegal are Niche Specialist Staffing Partners Ltd., Silver Strand Rope Works Ltd, Seabound Engineering Ltd, Welditz Engineering Ltd., KSK Rathmor Engineering & Recruitment Ltd., O’Reilly Sports Ltd, Cruckglass Ltd (Living Green) and GILLCON GROUP Ltd. 6 of the businesses participating are clients of the LEO, 1 is an Enterprise Ireland client (Welditz Ltd) and 1 Udaras client (GILLCON Ltd).
Business Support Clinics continue to take place across Donegal, offering valuable opportunities for local entrepreneurs to connect with the Local Enterprise Office team and explore the supports available to help their businesses thrive. The recent in-person clinic in Carndonagh, held on Friday, 24th October, was very well attended, with participants gaining practical advice on everything from training and mentoring to financial supports and application processes. Looking ahead, the next FREE virtual Business Supports Clinic will take place on Friday, 14th November at 10am.
At the ten-week point of the Ambition Programme, the cohort continues to push themselves and build impressive momentum, demonstrating real commitment to their growth and goals. The energy and collaboration among the 17 participants remain strong, with each founder actively applying the insights and strategies gained so far. The programme is progressing exceptionally well, with participants showing clear progress in refining their business models, expanding networks, and developing the confidence needed to scale successfully. This continued drive highlights the power of the Ambition Programme in fostering female entrepreneurship and supporting women to reach their full potential as business leaders.

The Local Enterprise Office Donegal is acting as a project partner in the GIFT project, an Interreg NPA project funded by the EU. The GIFT project promotes the use of EU Geographical Indications (GIs) for food, non-food and tourism sectors in Northern areas. Other partners in the project are University of Helsinki Ruralia Institute, Icelandic Lamb and the Ministry of Agriculture, Self-Sufficiency, Energy and Environment Greenland. An opening seminar for the project is due to take place in Kuopio, Finland on November 11th 2025. The Donegal Tweed Association is due to pilot the project to gain Protected Geographical Indication (PGI) status for Donegal tweed.



project trip to Finland. The project team visited a holiday resort where they host workshops on the craft of making Bilberry Pie (Mustikkakukko). Savolainen mustikkakukko has earned Protected Geographical Indication (PGI) status, which is a form of special EU recognition and protection for traditional foods that are geographically distinctive. This status was granted to the specific Finnish ryecrust bilberry pie, ensuring its unique qualities and origin are preserved.
Donegal County Council is currently the lead Council on the A5/N2 Cross Border Committee with Cllr. Paul Canning acting as Chair. Representatives from the A5 N2 Cross-Border Committee and the A5 Enough is Enough Committee met on Monday 10th November in Lifford to discuss their shared support for the A5 Western Transport Corridor project and their desire that the upcoming appeal of the High Court decision to stall the project will see that judgement reversed.
The appeal against the recent court judgement is listed to take place between the 9th and 11th December 2025 with a judgment expected in the first half of 2026.
The meeting brought together elected representatives from Donegal County Council, Monaghan County Council, Derry City and Strabane District Council, Fermanagh and Omagh District Council and Mid-Ulster District Council and campaign advocates, reflecting a united commitment to improving road safety, economic connectivity, and regional development along this vital route linking the North West and the rest of the island.
The A5/N2 Cross Border Committee is made up of Councillors from the five Councils along the transport corridor (Mid Ulster District Council, Fermanagh and Omagh District Council, Monaghan County Council, Donegal County Council and Derry City & Strabane District Council). Its purpose is to demonstrate and lobby for progress on the various projects along N2, A5 and Donegal TEN-T.

The Special Plenary Meeting held on the 31st October received a detailed update on
the background to the project,
the details of the three sections included in the project,
an outline on the scale of the land and property proposed to be acquired as part of the CPO,
details of the Land Liaison Team currently in place, and,
the next steps on the project.
It is proposed to submit the EIAR and CPO to An Coimisiún Pleanála in January 2026.

Restoration Improvement and Restoration Maintenance
Restoration Improvement and Restoration Maintenance programmes representing the core work programmes of the Roads Areas are now in the wrap up stage for 2025. Final claims for recoupment of costs has to be submitted to the DOT by end of November. In 2025 the Council improved and resurfaced 252 individual roads under the Restoration Improvement programme, and a further 213 roads across the County were sealed under the Restoration Maintenance or Surface Dressing programme. These include the additional RI allocation announced late in the year, enabling over 20 additional schemes.
Under the Community Involvement Scheme Programme, in conjunction with local community groups, DCC delivered 23 separate projects across the county to the
value of just under €1,089,000 in 2025. These projects are of importance to the local communities, and would otherwise go unfunded.
Since the previous report, Roads Areas dealt with the latest named storm ‘Amy’ , which resulted in a Red warning in early October, with crews called out at relatively short notice on a Friday evening, across the County to remove trees and other detritus on the road network. Further cleanups carried into the weekend. Estimated cleanup costs have been forwarded to central Government requesting reimbursement.

Under this programme heading as funded by the DRCD&G the Council delivered 79 schemes under the initial allocation of €1,023,479 and a further tranche 2 allocation of €1,050,000 later in the year. Donegal County Council received the highest allocation for LISs in the country in 2025.
The invasive species control programme targeted for October each year has been successfully completed, with all known sites along the public road network being monitored and further sites being added to the programme as they are identified.

The Winter Maintenance programme commenced on the 13th October 2025. The first call-out of the season was on Sunday evening 16th November. We have adequate supplies of salt available to use.

The Winter Maintenance Programme was discussed at the recent meeting of the Roads and Transportation SPC. The Terms of Reference for a review of the programme is to be agreed at the next meeting of the SPC in February 2026 with the review completed in advance of the winter maintenance season in Q3 2026.
The Department of Transport has advised that it is changing the name and the criteria for its previous programme for former national roads to sections of regional roads which meet the following minimum criteria
A regional road with PSCI less than 6;
A road with measured traffic volumes greater than 5,000 AADT;
A road with wide cross sections greater than 7m;
Appreciable length of road to be rehabilitated, minimum 500m length;
Rural roads with speed limit 60km/hr or higher
Where the proposed scheme is a Former National Road then the road must have been reclassified prior to 2016.
Our initial assessment is that only sections of the following regional roads that may be eligible for this programme.
R238 from Muff to Quigleys Point
R245 from Letterkenny to Milford
R267 from Donegal Town to Tullyearl Roundabout
R267 from Bundoran to Ballyshannon
R263 from Killybegs to Five Points
R238 from Buncrana to Burnfoot
Letterkenny is critical to the growth and development of Donegal. Letterkenny as a regional centre of importance is highlighted within the National Planning Framework Project Ireland 2040 as well as in the NWRA Regional Social and Economic Strategy.
The NTA approved €4.5M for Active Travel in Donegal in 2025. Letterkenny is the focus for most of the larger scale projects with construction of the Active Travel Project on the Kilmacrennan Road between the Hospital and Knocknamona Roundabouts commenced in September 2025. Works are expected to complete by end of 2026.
Part 8 planning was approved for two further Active Travel Projects on Circular Road and the Ballyraine Road. Part 8 planning for similar Active Travel schemes at High Road and Ballymacool will be submitted for Plenary approval in 2026. Preliminary Design has now commenced on Old Farm Road and Gortlee.
Construction of a large 5km Active Travel Project commenced on the Finner Road between Bundoran and Ballyshannon in September 2025 and is progressing very well.
The Lifford Active Travel scheme is being delivered by direct labour and is also progressing well providing the final link of the NWGN Castlefinn to Lifford
Greenway to the N14 / N15 junction. Same will be completed in 2026.
The quay wall reconstruction project at Ailt an Chorráin was completed in July 2025 for the final construction sum of €1,963,514.45 of which the Council contributed €776,514.45 while the DAFM through both BALAMI and Harbour Infrastructure Funding contributed €1,187,000.
Works have also been completed to repair and upgrade the Ferry Slipway at Ailt an Chorráin in 2025.
With the BALAMI funding programme now completed funding opportunities for significant Piers and Harbours infrastructure works are very limited. Efforts are ongoing with DRCD with respect to funding to engage a dedicated Executive Engineer to progress pier infrastructure projects in support of our Island communities. To date, no funding has been secured.
The council is also progressing its applications for Foreshore Leases and material disposal approvals for dredging operations at Greencastle Harbour, Buncrana and Malin – a specialist consultant has been appointed and detailed environmental surveys and testing has been completed. The application process is well under way.
Donegal County Council completed a non-statutory public consultation on proposals for implementing new speed limits within urban areas including a proposed 30km/h speed limit within the urban core of some of our towns and villages in the county in May 2025. The Council received a DOT circular for direction on next steps. The statutory public consultation process will commence in 2026.
In total 103 settlements that currently have an urban speed limit of 50km/h or 60km/h with 58 of these locations seeing some change to their speed limits, and of these there are proposals for 43 new 30kph Urban Cores. 45 locations have no proposed speed limit changes.
Studies have shown that lower urban vehicle speeds considerably reduce the collision fatality risk for pedestrians or cyclists.
The strategic road grant approved by DOT for 2025 has enabled the Council to proceed to contract award for €12M road realignment and new bridge construction project at Fintra. BAM is the appointed contractor while ARUP is the appointed consultant providing site supervision and Employers Representative roles. Land purchase, under the CPO process, is progressing well and the contractor has advised that the project should be completed by end of 2026.
Patrick J Tobin & Co Ltd T/A Tobin Consulting Engineers has been appointed as the consultant for Phase 2 to 7 of the TII Project Management Guidelines for the development and delivery of a suitable solution at Droichead an Churraoin on the
Baile na Finne-Glenties road. Route options are currently being investigated with ground investigation and topographical surveys to be undertaken as part of the process. Updates will be provided to the GMD as the project develops.
Bridge assessment for load capacity, condition surveys and remedial works requirements have been undertaken during 2025 with respect to:
Logues Bridge
Mulroy Bay Harry Blaney Bridge
Dromore Footbridge
Greencastle Footbridge
Bundoran Footbridge
Letterkenny Old Town Footbridge
Glenmore Bridge
Land acquisition is ongoing at Glenmore Bridge (Donegal MD) and tender documents have been prepared for final review and issue to the DOT for approval before year end to facilitate commencement of the construction tender process in 2026. Subject to DOT allocation it is anticipated that works could commence on site in May / June 2026.
Letterkenny Northern Network Project
Work ongoing with the development and extension of the Letterkenny Northern Network Project to incorporate additional planning developments, enhanced junction provision and linkages with Part 8 planning to commence in November 2025 to facilitate close out of detailed design and construction as funds become available in 2026/2027.
Letterkenny Southern Network Project
Phase 2 is now closing out with a peer review, presentation to LMMD and DOT approval anticipated in the coming weeks. A public information event announcing the Phase 2 Preferred Corridor was held in the Letterkenny Radison Hotel on 19th November 2025 (from 3pm to 7pm).
This coincided with the annual Letterkenny Transportation Event which has been expanded in 2025 to include a multi-agency update to the public on Letterkenny based infrastructural developments planned for and in progress:
Donegal County Council (Road Networks / Active Travel / TEN-T)
ATU Donegal
HSE
The Road Safety Team co-ordinated and delivered its annual Road Safety Road Show in the Aura Leisure Centre in October 2025 in collaboration with AXA Insurance. There has been extremely positive feedback from the schools in attendance.
The Council has also progressed delivery of 2 new Vehicle Restraint Systems (Crash Barriers) in Inishowen and Stranorlar MDs as funded by DOT Low-Cost Accident funding.
The recent announcement regarding the Light Duty Vehicle (LDV) Phase 3 scheme in Donegal confirmed the rollout of seven new high-powered electric vehicle (EV) recharging hubs in the county.
This investment is part of a nationwide, €9.9 million grant initiative, funded through Zero Emission Vehicles Ireland (ZEVI) and delivered by Transport Infrastructure Ireland (TII). The LDV scheme aims to significantly boost the national EV charging network, particularly along Motorways and National Road primary and secondary roads, with a goal of having charging points at maximum intervals.
The seven successful locations in Donegal are:
Daly's Service Station, Lifford (on the N15)
Glenties Services (on the N56)
McClafferty's Eurospar & Circle K (on the N56)
McIntyre's Service Station (on the N56)
Moore's Service Station (on the N56)
Supervalu Killybegs (on the N56)
Wild Atlantic Camp (on the N56)
These hubs will provide fast and ultra-fast charging points (typically 250kW average capacity) and are expected to be available for public use in 2026.


John G. McLaughlin Chief Executive
The Ireland North West (Ireland NW) Trade and Investment Mission to the United States successfully took place over five days, engaging with key stakeholders across Philadelphia, Boston, and surrounding regions. The mission aimed to strengthen transatlantic relations, promote Ireland NorthWest unique investment opportunities, and foster collaborations in education, life sciences, and business development. Among those attended was the Mayor of Derry City and Strabane District Council, Councillor Ruairí McHugh, and Leas Cathaoirleach of Donegal County Council, Cllr Donal 'Mandy' Kelly, as well as Council officials, senior representatives from Ulster University and Atlantic Technological University, Londonderry Chamber of Commerce; Letterkenny Chamber of Commerce; and key industry leaders and representatives from the Local Enterprise Office Donegal, Alpha Innovation and Údarás na Gaeltachta.
A key part of the mission is the new "Lead2Grow" programme, which has been designed to empower CEOs with the skills, insights and strategies to scale their businesses. The NW companies learned from leading academics and industry experts at the IESE Business School's campus and from each other. The mission is designed to build on the success of previous visits, which have supported over 50 North West firms in testing the US market and developing business opportunities. Businesses that participated are: (5 from Donegal)
-O’Reilly Sports (Donegal)
-SeaBound Engieering Ltd (Donegal)
-Living Green (Donegal)
-Silver Strand Rope Works Ltd (Donegal)
-Welditz (Donegal)
-Udaras na Gaeltachta (Donegal)
-Fast
-FNW Group
-Gilcon Group Ltd
-Glenermott Enterprises Ltd
-KSK Rathmor Engineering and Recruitment
-McColgan’s
-Niche
-Vox Talk AI
Monday 10th
November Cllr Donal Mandy Kelly, jointly leading the delegation alongside Mayor of Derry and Strabane Council Cllr Ruari McHugh, participated in their first official engagement at the Irish Diaspora Centre in Havertown, Philadelphia. The meeting with members of the Donegal Association of Philadelphia underscored the deep-rooted diaspora connections that serve as a foundation for future collaborations.


Tuesday 11th November The delegation highlighted the strong US-Ireland transatlantic bond, particularly in education and business sectors.
Key activities included:
Visiting Neumann University, where discussions with Provost Dr. Eric Wellington, President Dr. Chris Domes, and others emphasized the importance of academic partnerships.
Attending the Rocco and Mary Abessinio Speaker Series featuring Ward Fitzgerald, CEO of ExCorde Capital. His inspiring success story and philanthropic commitment exemplify the potential for impactful US-Ireland business links.
Participating in the IABCN’s annual John Brennan Life Sciences Summit, with insights from Dr. Colleen Tewksbury of the University of Pennsylvania. Philadelphia’s reputation as a hub for innovative life sciences companies was reaffirmed.



Wednesday 12th November
The delegation continued to Boston, beginning with a highlevel meeting at the British Embassy in Cambridge, hosted by Britain’s Consul General to New England, David Clay. The session highlighted Ireland NW’s strategic advantages, including its cross-border location, talented workforce, and research ecosystem.
•The delegation met with Massachusetts state officials, including Senator Nick Collins and local City Councillors, strengthening historic and diaspora ties.
•A visit to Harvard University facilitated discussions on AI, research, and innovation, led by Faculty Lead Dr. Logan McCarty. The visit to Harvard’s SEC and Innovation i-lab showcased opportunities for collaboration in science and technology sectors.




Thursday 13th November Thursday was designated as Goldenbridges Day for the Ireland NW delegation. The day was marked by participation in the 17th Annual Goldenbridges Conference held at Babson College. The delegation was honoured to be joined by Minister for State Charlie McConalogue and Minister Caoimhe Archibald, underscoring the significance of this event in fostering transatlantic connections.
The Goldenbridges Conference continues to serve as a vital platform for bringing together influential supporters of Ireland’s North West, with the primary aim of building solid and mutually beneficial transatlantic relationships. The success of this event is largely attributed to the dedicated efforts of Aisling Events, with special acknowledgment to the team, Mairtin O'Muilleoir, Connla McCann, and Amy Dickenson for their excellent organization and execution.
The conference featured inspirational panels of speakers, including businesses from the North West that participated earlier in the week. These businesses engaged in a transformational leadership programme designed to support scaling operations into the US market, further reinforcing the region’s growth potential.
-Minister McConalogue emphasized the importance of culture in maintaining strong diaspora connections.
-Minister Archibald highlighted the significant investments into Derry and the North West region, noting how these investments are delivering tangible benefits to local communities.
A notable highlight of the conference was the recognition of Mayor Ray and Kathy Flynn for their outstanding contributions to the Irish community in Boston and globally, acknowledging their leadership and dedication.
Sighle Fitzgerald, Ireland’s Consul General to New England, hosted a special evening reception for the visiting delegation. During this event, four individuals were honoured for their exceptional contributions to supporting transatlantic relations:
Cllr Elizabeth Breadon
State Representative Jim Arciero
Sean P. Morgan
Dr. Peter Aquino



Friday 14th November
The visit concluded with a special business breakfast hosted by Andrea Haughian and her team at Invest NI. This event provided an excellent opportunity for the Ireland NW delegation to engage with US-based businesses that are either currently connecting with or interested in establishing connections with companies in Ireland NW.
The discussion focused on sharing insights into the significant potential for US companies to expand their European and UK operations from the regions of Donegal, Derry, and Strabane.
Cllr Donal Mandy Kelly wrapped up the week’s proceedings with a heartfelt expression of gratitude. He extended an open invitation to all US friends and partners to visit Donegal, Derry, and Strabane, promising a warm and welcoming “Céad Míle Fáilte”