Skip to main content

Water Resources

Page 1

Water & Wastewater

Water Resources

HEC-RAS 2D

Moving water efficiently, safely, and sustainably Our water resources team offers integrated services that support sustainable management of water supplies and natural systems. We provide hydrologic and hydraulic analysis, watershed management, and conservation planning to help clients balance growth with resource protection. Our expertise includes flood risk assessment, drought resilience, and the development of strategies for water resource conservation and reuse. We work with municipalities, agencies, and private clients to develop solutions that address regulatory requirements, community needs, and environmental challenges. Through a holistic approach, we help ensure the long-term availability and quality of water resources.

Delft-3D

Services – Hydraulics & Hydrology Modeling – Flood Risk Management – Statistical Analysis – Geomorphology Retention and Detention – Dams, Levees, and Reservoirs – Conveyance – Low Impact Development – Water Quality Modeling – Ecosystem Restoration – Master Planning – Disaster Recovery – Pump Stations – Permitting


Projects RIVER BASIN FLOOD STUDY TEXAS GENERAL LAND OFFICE | TEXAS

DCCM supported 53 Texas counties affected by the 2015 floods, Hurricane Harvey, and other disasters by updating and enhancing existing floodplain maps for rivers emptying into the Gulf of Mexico. The team provided in-depth technical reviews of three HUC-10 watershed models developed by other engineers, including hydrology models built in HEC-HMS linked to HEC-RAS 2D models, with scenarios incorporating rain-on-mesh techniques and Multi-Radar MultiSensor rainfall data. Reviews were delivered at 50%, 75%, and 100% stages following a comprehensive checklist, with team members completing two-day training on HEC-RAS 2D modeling prior to beginning the project.

STORMWATER CONVEYANCE TUNNELS STUDY, PHASE II (SUB TO BLACK & VEATCH) HARRIS COUNTY FLOOD CONTROL DISTRICT | HARRIS COUNTY, TEXAS

DCCM served as a subconsultant for the HCFCD flood bond-funded Phase II Tunnel Study, examining the feasibility of deep tunnel conveyance to reduce flood risks across Harris County’s 23 watersheds. The team performed H&H modeling to develop potential flow diversions, evaluated traditional flood reduction strategies, identified outfall locations along Buffalo Bayou, and ranked tunnel alternatives based on ROW availability, geotechnical conditions, and environmental impacts. The study included recommendations on contract packaging and delivery methods and was completed in 2021.

C-25 CANAL S-461 PUMP STATION CFD MODELING SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD) | FLORIDA

DCCM conducted a numerical computational fluid dynamics (CFD) model analysis of the C-25 canal, proposed S-461 pump station structure, and a section of the proposed C-25 reservoir in St. Lucie County, FL. The C-25 reservoir and stormwater treatment area (STA) project is a major component of the South Florida Water Management District’s Indian River Lagoon-South Program. The project manages water quantity, quality, timing, and distribution targets for the Indian River Lagoon watershed and St. Lucie Estuary, enhancing the aquatic ecosystem. The project supports the District’s inland Flood Risk Management Program by improving water management and reducing flood risk in flood-prone regions.

Innovative strategies to

DESIGN, DEVELOP, AND GROW DCCM.com


Turn static files into dynamic content formats.

Create a flipbook
Water Resources by DCCM - Issuu