DAYANTHA SIRIWARDENE - ARCHITECTURE PORTFOLIO 2022

Page 1

DAYANTHA SIRIWARDENE PORTFOLIO OF SELECTED WORKS


CONTENTS •

SELECTED ARCHITECTURAL & INTERIOR WORKS

RESIDENTIAL - APARTMENT - APARTMENT INTERIORS - HOUSES - PRIVATE WORK COMMERCIAL & OFFICE DEPARTMENT STORE - OFFICE

HOSPITALITY HOTEL - HERITAGE (REFURBISHMENT & RESTORATION) - GUESTROOM - RESTAURANT & BAR EDUCATION UNIVERSITY - SCHOOL

- LABORATORY & LIBRARY SPORTS MULTI-SPORT ARENA

- SWIMMING POOL COMPLEX

INDUSTRIAL WAREHOUSE - PRINTING PRESS HEALTHCARE


SELECTED WORKS 2007- 2022


RESIDENTI AL - APARTM ENTS HIGH-RISE

Left Completed Altair, Colombo Right Steel diagrid construction on sloping tower

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

PRINCIPAL DESIGN CONTRACTOR AREA / COST COMPLETION

: ALTAIR COLOMBO, SRI LANKA (Mixed Development & Residential) : Resident Site Architect (Graduate) : Design Development of Architectural Details, coordination of Super Structure & MEP Services, permit submissions, internal drafting review, Supervision. : Oct 2014 - Aug 2015 : AA One (Design Team 3) (Oct 2014 - Aug 2015) (Local & Design Development Architect) : Safdie Architects (Singapore)(Concept) : Shapoorji Pallonji (India) : 103,893 sqm (70L, 2B) / USD 120 Million : 2021


Left Image of sloping tower apartment diagrid structure at Altair, Colombo Right View of connecting steel outriggers at bridge at level 39 and 41 from eco deck at level 5.

Currently, the tallest residential tower in Sri Lanka, standing 242m in height, the sloping tower and straight tower comprise 404 apartment units. The project took 9 years to complete. The 14 degree sloping tower was constructed using a steel diagrid structure with 2 connection points at level 39 and 41 using steel outriggers. With the vertical tower constructed using r/f concrete, the diagrid was cladded using gfrc panels. Here, the principal Architect was concerned about the weathering of the 2 towers due to the distinct methods of construction. My responsibility as the site Architect was to respond to daily submittal’s, inquiries by contractors and client, quality inspection, participation in meetings etc. In addition, I provided leadership in reviewing the design development drawings and structure, MEP services coordination. Submissions and correspondence with statutory bodies in obtaining planning approval for the drawing revisions made during design development stage was also a key responsibility I undertook.


Right Shop drawing review of podium staircase. Left Section showing refuge floors and calculations for Fire Services department submission


RESIDENTI AL - APARTM ENTS HIGH-RISE

Left Night rendering of view from Indian Ocean of the west side of Achilleion by P&T Group Right Piling & diaphragm wall construction ongoing to the left of the model apartment and sales office building

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

PRINCIPAL DESIGN CONTRACTOR AREA / COST COMPLETION

: ACHILLEION, COLOMBO 04, SRI LANKA (Residential Mixed Development) : Project Coordinator : Peer Review of Architectural design, coordination of Structural, MEP Services, Quantity Surveying & Landscape design. : Sep 2015 - July 2020 : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Local Architect & Consortium Consultant) : P&T Group (Singapore) : CHEC (China) : 99,000 sqm (50L, 2B) / USD 96 Million : On-Hold (Work suspended subsequent to piling & diaphragm wall work)


Above Heli-pad, Sky Restaurant, Eco Deck Infinity pool and Podium Entrance renderings by P&T Group Left Night rendering of view from Indian Ocean of the west side of the twin tower Right Coordination review of Structural framing plans

Designed by Palmer & Turner, Singapore, Achilleion was a luxury 50 level twin tower complex consisting of 2 Basements, 8 podium parking levels, two forty level residential towers housing 584 apartments, with a sky bridge at level twenty eight and a revolving restaurant with a helipad at the top most level. My role as project coordinator for the consortium consultant SWA was to coordinate all the consultants design work as well as ensuring the designs met the Clients brief and programme targets. Reviewing designs for compliance with regulation, providing local regulatory guideline information required to all the foreign design consultants as well as site data as and when required taking responsibility for all project related work. This included the full time supervision of the construction of the show apartment and sales gallery for the project. The particular specifications and bill of quantity descriptions related to the architectural design were documented under my leadership and guidance. Liaising with all relevant statutory bodies to obtain permits and clearances was also carried out by me, with specialist consultants assistance obtained where required (i.e. traffic, solid waste management, environmental impact assessment, helipad design etc). Here, ensuring all requirements, guidelines requested were incorporated in the designs were overlooked and coordinated with the relevant design consultants.


Top Structural drawing review (basement part) Left Structural framing plan review Architectural and MEP Services coordination


RESIDENTI AL - APARTM ENTS Left Render of Dusit Thani

HIGH-RISE

Right Drawing accessing the planning restrictions on the height of the building

: DUSIT THANI, GALLE, SRI LANKA (Residential) POSITION : Architect (Graduate) DUTIES : Concept and Schematic design development, permit submissions. INVOLVEMENT FROM : Oct 2014 - Aug 2015 EMPLOYER : AA One (Design Team 3) (Oct 2014 - Aug 2015) (Design Architect) CONTRACTOR : CSCEC (China) COST : USD 100 Million COMPLETION : 2023 PROJECT

As the development was proposed on sub-urban coastal property without a specific development guidelines, general planning regulations(1986) had to be applied which restricted the height of the proposal. We however, argued a 65.3 degree imaginary line for light and ventilation as well as a 2:1 ratio for height of the building vs the distance to farthest edge of the abutting street would restrict any modern development, which the planners agreed with.


RESIDENTI AL - APARTM ENTS PROJECT POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

D&B CONTRACTOR HEIGHT COMPLETION Left Capitol Elite, Rendering of completed luxury residential apartment complex. Bottom Left Capitol 7, Rendering of residential apartments. Bottom Capitol 7, Typical Floor Plan of Apartment Units

PROJECT POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

D&B CONTRACTOR AREA / COST COMPLETION

: CAPITOL ELITE, COLOMBO 07 : Architect (Graduate) : Concept and Schematic design development, permit submissions. : Oct 2014 - Aug 2015 : AA One (Design Team 3) (Oct 2014 - Aug 2015) (Design & Build Consultant Architect) : Sanken : (6L, 1B) : 2016 : CAPITOL 7, COLOMBO 07, SRI LANKA : Architect (Graduate) : Concept and Schematic design development, permit submissions. : Oct 2014 - Aug 2015 : AA One (Design Team 3) (Oct 2014 - Aug 2015) (Design & Build Consultant Architect) : Sanken : 6,500 sqm (6L, 1B) / USD 4.4 Million : 2016


RESIDENTI AL I NTERI O RS S H O W A PA R T M E N T

Left Completed Achelleion Show Apartment and sales office Right Show Apartment Master Bedroom Interior Design by INDEX DESIGN (Singapore)

: ACHILLEION SHOW APARTMENT, COLOMBO 04, SRI LANKA POSITION : Site Architect / Project Coordinator DUTIES : Site inspection and supervision, review and approval of contractors submittal’s, coordination of site data with design consultants. INVOLVEMENT FROM : Sep 2015 - July 2020 EMPLOYER : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Local Architect) PRINCIPAL DESIGN : P&T Group (Singapore) - Architecture, INDEX DESIGN (Singapore) - Interior. AREA / COST : 160 sqm / USD 1.5 Million COMPLETION : 2016 PROJECT


RESIDENTI AL I NTERI O RS APA RTM E N TS

Left L43 Type D Apartment Interior Design render (Master Suite & Living) by NUSUDIO Top Apartment FFE Plan

: L43 TYPE D APARTMENT INTERIOR LUNA TOWER, SRI LANKA POSITION : Interior Design Architect DUTIES : Design, Specification and preparation of BOQ INVOLVEMENT FROM : Jul 2021 - Jan 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Interior Designer) AREA / COST : 160 sqm / USD 103,000 COMPLETION : 2022 PROJECT


RESIDENTI AL - HO USES LUXURY

Left Rendering of Interior & Exterior views of No 56 Campbell Place by NUSTUDIO Bottom 2rd Floor Layout Plan

: NO 56 CAMPBELL PLACE, COLOMBO 10, SRI LANKA POSITION : Design Architect (Architecture & Interior) DUTIES : Design, Specification, MEP Services coordination, Supervision, Interior Design. INVOLVEMENT FROM : Aug 2020 - Jun 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jan 2022) (Architect & Interior Designer) CONTRACTOR : ROPA AREA / COST : 1,400 sqm / USD 1.25 Million COMPLETION : 2022-23 PROJECT


Left Rendering of triple height interior space No 56 Campbell Place by NUSTUDIO Right Interior rendering of executive dining hall and image of ongoing construction work


RESIDENTI AL - HO USES LUXURY

Top Left Rendering of Exterior views of Residence at No 60 Sirimedura,Badulla Road, Nuwara Eliya by OB Architecture (UK) ` Bottom Left Rendering of Interior Views of Residence at No 60 Sirimedura Badulla Road, Nuwara Eliya by OB Architecture (UK) Right Inputs given for design development drawings

: NO 60 SIRIMEDURA, NUWARA-ELIYA, SRI LANKA POSITION : Design Development Architect DUTIES : Design Development, Specification, Interior Design. INVOLVEMENT FROM : Aug 2020 - Mar 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) PRINCIPAL DESIGN : OB Architecture (UK) CONTRACTOR : To be awarded AREA / COST : 1,200 sqm / USD 1.85 Million COMPLETION : 2023 PROJECT

Situated on a sloping site in Nuwara Eliya, facing the Gregory Lake, we used the conceptual sketch up model by OB Architecture to develop drawings and specifications required for tender. The incorporation of structural elements and provisions for MEP Service pathways were done during the design development stage.


RESIDENTI AL - HO USES P R IVAT E WORK Left View of double height entry porte cochere Bottom Cross section

PROJECT POSITION DUTIES

INVOLVEMENT FROM CONTRACTOR AREA / COST COMPLETION

: WINE HOUSE, ETHUL KOTTE, SRI LANKA : Architect, Interior & Landscape Designer : Architectural, Interior design and drafting, coordination of Structural, MEP Services design, site inspection, obtaining statutory approvals. : Dec 2018 - Dec 2021 : Chinthaka Sudath Wickramasinghe : 230 sqm (2L) / USD 150,000 : Dec 2021

The small 215sqm plot was enclosed on all 4 sides with the exception of a 3.3m entry driveway. Therefore, I felt it was important to create small pocket garden spaces to maximise the natural light and ventilation. These tiny garden spaces allow for through ventilation to keep the internal spaces cool during the hot summer days.


COMMERCI AL

D E PA R T M E N T S T O R E & A PA R T M E N T S

Left top Exterior Rendering of the ODEL Mall, Colombo by Blocher & Blocher Partners (Germany) Right top Mall atrium render by Blocher & Blocher Partners (Germany) Left My notes of a construction coordination meeting of the ground level mall.

: ODEL MALL, COLOMBO 07, SRI LANKA : Asst Project Architect (Local Consultant – Architectural) DUTIES : Design Development of Architectural Details, coordination of Super Structure & MEP Services, Supervision. INVOLVEMENT FROM : Feb 2020- July 2020 EMPLOYER : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Local & Design Development Architect) PRINCIPAL DESIGN : Blocher & Blocher Partners (Germany) (Concept) CONTRACTOR : CSCEC (China) AREA / COST : 60,000 sqm (7L, 4B) / USD 106 Million COMPLETION : 2022 PROJECT POSITION


COMMERCI AL & O FFI CE HIGH-RISE

Left Drone image of completed Access Tower 2 Right Front Elevation drawing

: ACCESS TOWER 2, COLOMBO 02, SRI LANKA POSITION : Project Architect (Graduate) DUTIES : Design Development of Architectural Details, Supervision, respond to contractors submittals. INVOLVEMENT FROM : Oct 2014 - Aug 2015 EMPLOYER : Design Team 3 / A A One (Architect) (Oct 2014 - Aug 2015) CONTRACTOR : Access Engineering AREA / COST : 28,000 sqm (29L) / USD 34 Million COMPLETION : 2017 PROJECT


HOSPITAL I TY - HO TEL HIGH-RISE

: OZO CITY HOTEL, COLOMBO 04, SRI LANKA (158 Key) POSITION : Architect (Graduate) DUTIES : Reviewing construction drawings (Architectural, fire-safety, accessibility, circulation), meeting with specialist sub-contractors and suppliers. Labour, material and machinery outsourcing, site supervision. INVOLVEMENT FROM : Oct 2012 - Jan 2013 EMPLOYER : Sino Lanka Thao Li Construction (Oct 2012 - Jul 2013) (Contractor) CONTRACTOR : Sino Lanka Thao Li Construction AREA / COST : (14L, 1B) / USD 13.7 Million COMPLETION : 2014 PROJECT

Top Front Facade Elevation Top Right Review of changes during construction Left Completed OZO Colombo


: GALLE FACE HOTEL, Classic Wing Refurbishment, Colombo 03, Sri Lanka POSITION : Team Leader Architect (Graduate) DUTIES : Coordination, Preparation of cost estimates and bid documents, providing design consultants with as-built drawings and accurate site information,Supervision. INVOLVEMENT FROM : Oct 2012 - Jul 2013 EMPLOYER : Sino Lanka Thao Li Construction / VMC Asia (Oct 2012 - Jul 2013) (Project Manager) PRINCIPAL DESIGN : Ong & Ong (Singapore)(Concept) CONTRACTOR : Access Projects COST : USD 12.5 Million COMPLETION : 2015 PROJECT


REFURBIS HM ENT - RESTO RATI O N H E R I TA G E H O T E L

Left Refurbished Classic Wing of the Galle Face Hotel, Colombo by Ong & Ong (Sinagapore)

As the Team Leader Architect(Graduate) for the Project Management team, I was responsible for the team documenting the existing condition of the hotel, providing a detailed room book and survey details to the design consultants together with the statutory and antiquities guidelines which would inform the restoration works. Further, specifications required for the refurbishment and restoration work of the existing roof, windows, facade(paint, plaster etc.) as well as demolition work was documented me and reviewed by the Project Directors.

Right I was involved in surveying areas required by the design consultants (i.e. roof, walls, rooms, suspended ceilings, windows and doors etc.)


REFURBIS HM ENT - RESTO RATI O N H E R I TA G E H O T E L

Right Refurbished Facade of the Grand Oriental Hotel Left Public walkway Arcade

: GRAND ORIENTAL HOTEL, Soft Refurbishment, Colombo 01, Sri Lanka POSITION : Lead Design Architect (Architecture & Interior) DUTIES : Design, Specification, MEP Services coordination, Supervision, Interior Design. INVOLVEMENT FROM : Aug 2020 - Jan 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) CONTRACTOR : SEC AREA / COST : 7,500 sqm / USD 1.165 Million COMPLETION : 2021 PROJECT

The soft refurbishment was aimed at improving the image of the hotel which had been neglected for decades. With a budget of 10% the average per square meter allocation for a similar hospitality project, I had to use subtle design and decorative elements to exaggerate and improve the quality space whilst highlighting the colonial heritage of the hotel dating back to 1837. Two ballrooms (Rainbow, Lotus) were also refurbished as part of this project.


Right New reception for the Grand Oriental Hotel Left Refurbished entrance lobby Right Bottom RCP Plan of the ‘Taprobane Lounge’

I designed the bulkhead ceiling to accommodate the AC and MEP services was subtle and was thoughtful in appreciation of the exposed colonial character of the existing soffit.


HO S P I TA L IT Y IN T ER IOR S GU E ST & SU ITE R O O MS

Left Top & Bottom Rendering of Hilton Colombo Suite G by NUSTUDIO Top, Furniture Layout Plan

: HILTON COLOMBO (253 Key Room Refurbishment) POSITION : Architect (Architecture & Interior) DUTIES : Design of Twin Room, G & J Suites, Shop Drawing, Furniture & Interior FFE Review and approval, MEP Services coordination, Supervision. INVOLVEMENT FROM : Aug 2020 - Jul 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) PRINCIPAL ID : FBEYE & NUSTUDIO CONTRACTOR : S&T COST : USD 17.5 Million COMPLETION : 2022 PROJECT


Left Top & Bottom Elevation drawings of Hilton Colombo Suite G Right Suite G Wash-room render

Following strict guidelines provided by Hilton (Operator), I provided leadership for the preparation of the design, specifications and tender documentation for the Suites (Type G & J), Twin Room designs for the refurbishment of the 253 Key Hilton Colombo. Subsequently, reviewing all submittal’s by the Contractor, including material approvals, shop drawings, RFI’s, RFA’s, CVI’s were handled by me in addition to inspection and snagging.


HOSPITAL I TY I NTERI O RS R E STA U R AN T & B A R S

Right Hilton Colombo ’Thorana Lobby & Bar’ Left ‘Graze Kitchen’ all day dining restaurant at Hilton, Colombo

PROJECT

POSITION DUTIES INVOLVEMENT FROM EMPLOYER

PRINCIPAL DESIGN

CONTRACTOR COST COMPLETION

: HILTON COLOMBO, SRI LANKA (Phase 01 Refurbishment) : Asst. Project Coordinator : Architecture & Landscape Design, Review of Interior design specification. : Sep 2015 - July 2020 : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Local Architect & Lead Consultant) : ACID (Singapore) - Interior / SWA - Architecture / MEP : Sanken : USD 20 Million : 2017

As part of the on-site team, my responsibility was to ensure the design and contractors submissions met the Hilton Brand Standard requirements for safety, material quality etc. In addition, reviewing shop drawings, inspection of works were daily activities carried out by me.


HOSPITAL I TY I NTERI O RS R E STA U R AN T & B A RS

Right Taprobane Bar at the Grand Oriental Hotel Left Elevation and equipment plan for bar

: TAPROBANE BAR Lobby Bar At The Grand Oriental Hotel, Fort, Sri Lanka POSITION : Lead Design Architect (Architecture & Interior) DUTIES : Design, Specification, MEP Services coordination, Supervision. INVOLVEMENT FROM : Aug 2020 - Jan 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) CONTRACTOR : SEC COMPLETION : 2021 PROJECT


HOSPITAL I TY I NTERI O RS R E STA U R AN T & B A RS

Right Tap Bar at the Grand Oriental Hotel, Colombo. Left Bar counter and detailed section of counters

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

CONTRACTOR COMPLETION

: TAP BAR Basement pub at The Grand Oriental Hotel, Sri Lanka : Lead Design Architect (Architecture & Interior) : Design, Specification, MEP Services coordination, Supervision. : Aug 2020 - Jan 2022 : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) : SEC : 2021


HOSPITAL I TY I NTERI O RS R E STA U R AN T & B A RS

Top Section drawing of new ceiling proposal for ‘Harbour Room’ Restaurant exposing truss structure Left ‘Harbour Room’ Restaurant

: HARBOUR ROOM RESTAURANT & BAR All day dining restaurant at The Grand Oriental Hotel, Sri Lanka POSITION : Lead Design Architect (Architecture & Interior) DUTIES : Design, Specification, MEP Services coordination, Supervision. INVOLVEMENT FROM : Aug 2020 - Jan 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) CONTRACTOR : SEC COMPLETION : 2021 PROJECT


H O S P I TA L I T Y I N T E R I O R S

CLUB HOUSE

Left Lounge, 80 Club of Colombo Bar Right Verandah dining

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

CONTRACTOR AREA / COST COMPLETION

: 80 CLUB OF COLOMBO, Sri Lanka (Bar & Interior) (Heritage Building - Private Gentlemen’s Club) : Architect ( Interior Design only) : Design, Specification, MEP Services coordination, Supervision. : Aug 2020 - Jan 2022 : NUSTUDIO (Aug 2021 - Jan 2022) (Interior Designer) : Don Carolis, R M Perera, Leema Creations : 600 sqm / USD 2.25 Million : 2021


HOSPITAL I TY I NTERI O RS R E STA U R AN T & B A R S

Left & Right 80 Club of Colombo Bar

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

CONTRACTOR AREA / COST COMPLETION

: 80 CLUB OF COLOMBO, Sri Lanka (Bar & Interior) (Heritage Building - Private Gentlemen’s Club) : Architect ( Interior Design only) : Design, Specification, MEP Services coordination, Supervision. : Aug 2020 - Jan 2022 : NUSTUDIO (Aug 2021 - Jan 2022) (Interior Designer) : Don Carolis, R M Perera, Leema Creations : 600 sqm / USD 2.25 Million : 2021


Left 80 Club of Colombo Bar Equipment Plan & Elevation Right Factory inspection of counter prior to finish

Each furniture piece was inspected at the factory and mock-ups samples were reviewed prior to mass fabrication. The interior of the spaces and furniture was designed as a modern interpretation to the tropical colonial heritage of the building.


HOSPITAL I TY I NTERI O RS C H IN E SE R E STA U RA NT & T E A B A R

Left ‘Emperors Wok’ (Chinese Restaurant) at the Hilton Colombo Right Chinese Restaurant Dining

: CHINESE RESTAURANT (‘EMPERORS WOK’) at the Hilton Colombo POSITION : Architect (Architecture & Interior) DUTIES : Shop Drawing, Furniture & Interior FFE review and approval, MEP Services coordination, Supervision, INVOLVEMENT FROM : Aug 2020 - Jan 2022 EMPLOYER : NUSTUDIO (Aug 2020 - Jul 2022) (Architect & Interior Designer) PRINCIPAL ID : ACID (Singapore) CONTRACTOR : Access Projects (R M Perera) AREA / COST : 600 sqm / USD 1.165 Million COMPLETION : 2021 PROJECT

The project was completed during the COVID 19 pandemic, which restricted nearly all foreign imports. This meant the furniture requirment had to be custom manufacturered locally. As the furniture was of oriental style, the local craftsman had to be guided through a series of mock-up samples to achive the outcome expected. In addition, I coordinated all the equipment within the BOH and Bar counters, enabling the counters to be manufacturerd to fit.


Left Semi PDR ‘Emperors Wok’ (Chinese Restaurant) at the Hilton Colombo Right ‘Tea Bar’ Bottom FFE Layout Plan


E DUCAT I ON A L - U N IVE R S IT Y HIGH-RISE

Top Colombo Innovation Tower (AOD) Left Ground Floor Level Plan

PROJECT

DUTIES

INVOLVEMENT FROM EMPLOYER

CONTRACTOR (D&B) HEIGHT/ COST COMPLETION

: COLOMBO INNOVATION TOWER (AOD), COLOMBO 04, SRI LANKA : Permit drawing review (Planning approval) : Aug 2016- Oct 2016 : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Design & Build Consultant) : Access Projects : 12,000 sqm (20L, 1B) / USD 5.8 Million : 2019

With a fixed budget set by the Client, the Design Build Contractor ensured that SWA was not given a free artistic rein with the design. This is especially noticeable in the limitations of windows and their sizes on the facade. The layout plans too reflect a building solely governed by cost, although the purpose of the development was to house a design academy. I assisted in making the amendment required to meet the statutory requirements request by the fire services department and planning authorities for the revised submission to obtain planning approval.


Rainwater harvesting tanks, tree planters, retaining wall structures, gabion walls,terraced seating, alfresco dining, parking structures, storm-water drainage as well as all soft-scape and hard-scape designs were coordinated with the structural and MEP designs, reviewing of landscape design and providing all site survey information required in the development of the landscape were designed under my supervision and leadership.


E DUCAT I ON A L - U N IVE R S IT Y

Left Rain water harvesting pond and landscaped terrace at Horizon Knowledge Campus Top Coordinated hard-scape section of Alfresco dining terraces and parking

: HORIZON KNOWLEDGE CAMPUS, MALABE, SRI LANKA (PHASE 01) POSITION : Asst’ Project Architect DUTIES : Design Development of Landscape Details & structures, coordination of MEP Services, supervision. INVOLVEMENT FROM : Feb 2020- July 2020 EMPLOYER : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Consortium Consultancy Service) LANDSCAPE DESIGN : Burega Farnell (Singapore) CONTRACTOR : Access Projects AREA / COST : 10,000 sqm (8L, 1B) / USD 5.8 Million COMPLETION : 2021 PROJECT


EDUCATIONAL - AUDITORIUM

Right De Mazenod College, Kandana, Auditorium, Sri Lanka

: AUDITORIUM FOR DE MAZENOD COLLEGE, KANDANA, SRI LANKA POSITION : Architectural Assistant DUTIES : Design & drafting (Conceptual and Schematic stage) INVOLVEMENT FROM : 2008- 2010 EMPLOYER : Dudley Waas Associates (Aug 2007 - Apr 2010) (Consortium Consultant) COMPLETION : 2012 PROJECT


E DUCAT I ON A L - IN T E R IOR L A BOR ATORY & LI B R A RY

: PRIMARY SCIENCE LABORATORY FOR THE OVERSEAS SCHOOL OF COLOMBO, SRI LANKA POSITION : Architectural Assistant DUTIES : Design & drafting, site supervision. INVOLVEMENT FROM : 2008- 2010 EMPLOYER : Dudley Waas Associates (Aug 2007 - Apr 2010) (Consortium Consultant) COST : USD 65,000 COMPLETION : 2008 PROJECT

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

COST COMPLETION Top Left Primary Library, Overseas School of Colombo Left Primary Science Laboratory, Overseas School of Colombo

: PRIMARY LIBRARY FOR THE OVERSEAS SCHOOL OF COLOMBO, SRI LANKA : Architectural Assistant : Design & drafting, site supervision. : 2007- 2009 : Dudley Waas Associates (Aug 2007 - Apr 2010) (Consortium Consultant) : USD 112,000 : 2008


SPORTS ARCHI TECTURE M U LT I - S P O R T A R E N A

Left Entry building and sports arena of The Overseas School of Colombo, Sports Centre Right I assisted the specialist sub-contractors in verifying the anchoring positions for the portable basketball backstops and floor marking

: THE SPORTS CENTRE FOR THE OVERSEAS SCHOOL OF COLOMBO, SRI LANKA POSITION : Architectural Assistant DUTIES : Design & drafting, site supervision INVOLVEMENT FROM : 2007- 2009 EMPLOYER : Dudley Waas Associates (Aug 2007 - Apr 2010) (Consortium Consultant) COST : USD 1 Million COMPLETION : 2009 PROJECT


Left Section & Elevation drawing of the Climbing wall structure. Right Image of climbing wall.

The Overseas School of Colombo, Sports Centre was unique at the time of construction as it was one of the only modern multi sports arenas at the time of construction in Sri Lanka with only the 2nd climbing wall structure. I had the unique opportunity of designing the sports arena layouts which included 8 badminton courts, 2 volleyball courts as well as 3 basketball courts and the climbing wall. As the gymnasium was constructed within an existing skeleton frame the floor had to be levelled using a self levelling screed for the special high performance sports flooring used. A bright palette of colours were used throughout the building to engage with the kids.


SPORTS ARCHI TECTURE SWIMMING POOL COMPLEX

Left & Right St.Benedict’s College Swimming Pool Complex

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

COST COMPLETION

: SWIMMING POOL & PAVILION FOR ST. BENEDICT’S COLLEGE, SRI LANKA : Architectural Assistant : Design & drafting, site supervision : 2008- 2010 : Dudley Waas Associates (Aug 2007 - Apr 2010) (Consortium Consultant) : USD 240,000 : 2010


Left Sectional drawings of St.Benedict’s College Swimming Pool Complex

As the school relied solely on sponsorships and donations to fund the project, the swimming pool complex had to be value engineered on several occasions as the budget provided was not reflective of the design brief.

Top, St.Benedict’s College Swimming Pool Complex

We staggered the pavilion and used subtle variations in colours and materials to create a design interest in the project considering the budget allocation. Retaining the visual connection to the main college building and complementing the colonial architecture of the college whilst developing a modern complex was a few of the challenges we had to meet in the design. Having been given the main criteria, and outline requirements, I prepared and assisted the development of all drawings, particular specification from schematic to construction stage. The in ground, flooded pump rooms, tile specifications and dimensions required for a six(6) lane, 25 meter competitive pool were all designed and drafted following consultation with specialist engineers, vendors and referencing of international standard guideline (i.e. FINA).


INDUSTRIAL - WAREHO USE

Left External Facade, Central Bank Coin Storage Right Interior image prior to storage raking installation at the Central Bank Coin Storage.

PROJECT

POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

CONTRACTOR AREA / COST COMPLETION

: CENTRAL BANK COIN STORAGE, RAJAGIRIYA, SRI LANKA : Architect & Project Coordinator : Design & Coordination, site supervision. : Aug 2018- May 2019 : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Consortium Consultant) : Unique Engineering : 750 sqm / USD 600,000 : 2019


Left External Facade, Central Bank Coin Storage Left Interior image prior to storage raking installation at the Central Bank Coin Storage.

A 750 square meter coin storage space was to be designed and built within a four and a half month period at a cost of USD 600,000 for the Central Bank of Sri Lanka(CBSL). Having designed and coordinated two of the most recent warehouses undertaken by SWA at the time, I was assigned as the Architect and project coordinator. As a purely functional building there was little input that our design team could have on the building envelope or the interior space as it was governed by a strict functional and budgetary restrictions. However, being as creative as possible, our design for the envelope was for it to be suggestive of an protective wrapping its precious stowing. We used two colours in dark bronze and gold to symbolize the old and new coins to be stored. Having one and a half tonne coin palettes raised to heights of up to nine meters required a super flat floor to prevent any of the reach trucks toppling. A FM02 super flat floor was specified in accordance with the TR34 guidelines to accommodate this special storing requirement.


INDUSTRIAL - WAREHO USE M E G A L O G I S T I C S D I S T R I B U T I O N PA R K

Right Completed John Keells Distribution center & Rendered Birds Eye view of Logipark Distribution Warehouse by Sudarshana Senadeera Associates Left Structural & Steel Fabrication Drawing review of LogiPark Distribution Warehouse

PROJECT POSITION DUTIES

INVOLVEMENT FROM EMPLOYER

ARCHITECT CONTRACTOR AREA / COST COMPLETION

: LOGIPARK, KERAWALAPITIYA SRI LANKA : Project Coordinator : Design review and coordination of Design Consultants, monitoring overall progress, site supervision. : Jul 2018- Feb 2020 : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Project Manager) : Sudarshana Senadeera Associates : Nuwani Construction : 25,000 sqm / USD 14 Million : 2022


INDUSTRIAL - PRI NTI NG PRESS

Left, Operational 10 Colour NAPCO Printing Press. Right 10 Colur Heidelberg print machine. Bottom Left Plan & Section of 10 Colour Printing press.

PROJECT POSITION DUTIES INVOLVEMENT FROM EMPLOYER

AREA / COST COMPLETION

: NAPCO, KIRIBATHGODA, SRI LANKA : Architect : Design & Coordination, site supervision. : Nov 2016- May 2017 : Surath Wickramasinghe Associates (Sep 2015 - Jul 2020) (Consortium Consultant) : 600 sqm / USD 516,000 : 2017

The printing press designed to handle two 10 colour printing machines under a temperature between 21-24 degrees and for the floor to be able to absorb all the vibrations of the printers, cutters, feeders and binding machines. Maintaining such a low temperature in a tropical climate as well as constructing a flat (FM3) was a challenge with a very small budget made available by the Client. As the site was located in a low lying site prone to flooding, the warehouse floor was elevated and required a ramp for stacker and fork lift access from the existing factory floor.


HEALTHCARE ARCHI TECTURE ( V O L U N T E E R ) - AY U R V E D I C M E D I C I N E

Right Council Drawing for the State Cottage Ayurvedic Hospital Left State Cottage Ayurvedic Hospital

: STATE COTTAGE AYURVEDIC HOSPITAL, MULATHIYANA, SRI LANKA POSITION : Architectural Assistant DUTIES : Design, drafting and site supervision INVOLVEMENT FROM : 2011- 2014 EMPLOYER : None (Charity Project) ARCHITECT : Errol Siriwardene (Father) AREA / COST : 750 sqm / USD 105,000 COMPLETION : 2014 PROJECT

As the hospital was a donation, I designed the Hospital and the doctor’’s quarters for this rural ayurvedic hospital as a volunteer during my postgraduate studies. The hospital has separate areas to prepare and store the traditional ayurvedic medicine used to treat the village community.