1 minute read

Strategies To Improve Productivity And Innovation

Adoption of VDC infrastructure at site office

Dedicate 2 rooms on site with 3 nos of BIM dedicated hardware each, as well as 1 nos digital smart board to facilitate integrated Concurrent Eng Practice for project collaborations.

Advertisement

Provision of mobile portable VR Machine at Site Office

Provision of portable VR machine to facilitate Virtual Reality Digital mock ups and prototyping. (Sunray has HTC VIVE Pro and Microsoft Holens).

VR simulations allows consultants and clients to experience VIRTUAL ENVIRONMENT and collaborate virtually. To established informed design decisions before physical construction takes place. Reducing Physical Mockups to a minimum.

Adoption of BIM to field devices for site Coordination and collaborations

Provision of 3 nos of BIM Tablets with BIM 360 Field or Novade Systems to facilitate project coordinators to review BIM models and document on site and ensuring field monitoring and control.

This article is from: