Skip to main content

Data Center First Brochure

Page 1

Welcome to Data Center First

Private and Confidential


Company Overview

3


About Data Center First Data Center First Pte Ltd, founded in 2021 and headquartered in Singapore, is a data centre development and operations company. Data Center First is backed by Gaw Capital Partners and owned by a blend of industry veterans and new-comers. We Design, Build, Deploy and Market data centre campuses to enable our customers globally to meet the demand of the digital economy.

By connecting our DC campuses with multiple independent fiber systems, we create a platform to enable Digital Asia.

Private and Confidential

4


Our Vision Grow the business through the acquisition of Customer Communities, Data Centre Assets and Intellectual Properties

Our Mission To build a connected infrastructure that supports a networked and digitised Asia

Our Values Cultivate and invest in human capital with a focus on a constantly changing dynamic business environment

Private and Confidential

5


DCF Media Release

Gaw Forms Partnership with Data Center First Gaw Capital Press Release, July 22, 2021

Singapore-Based Operator to Launch Maiden DC in Batam The Straits Times, October 18, 2021

Data Center First to build 30MW Campus in Nongsa PR Newswire Japan, October 18, 2021

Private and Confidential

6


The Data Center Landscape

10


Global Opportunities

Sensors (IoT), Machine Learning, AI

Social, Big Data, Mobility

LANs, File Server, Internet

Mainframes, Mini Computer, Early PCs

Private and Confidential

12


Cloud and Cloudbased applications continue to grow within Enterprises

Regional hubs are collapsing and giving way to Interconnected Mega-City Hubs

New sub-sea cables will emerge to cater to growing global connectivity needs

Global Opportunities: New Business Drivers

Smart Cities and Digital Economy transformation agendas are merging, driven by massive Cloud & IOT applications deployment – Arrival of the 4th Platform

Businesses and consumers are driven toward a common apex at the network Edge

Private and Confidential

Digital Economy Data Architecture is shifting from seeking Fault Tolerance to Resilience

13


Connecting ASEAN with the world Connecting ASEAN together digitally and to the Rest of the World - Data Center First NexGen Digital Infrastructure

Private and Confidential

14


Our Growth Strategy

3 2 1 Expand to small and strategic ASEAN cities with an Asset-light Data Center Deployment model that gets us to the market and to profitability faster

Design, Develop, Construct, Sell and Operate consistent DC services

Follow the 3-step approach going into new markets: a. Locate a strategic local-partner with selective regional partners for the design, construction and operation, sales and marketing of data centers b. Establish sales pipeline and cross-sell across existing customer communities c. Build up In-Country core leadership team & operations team

Private and Confidential

15


Our Growth Strategy

5 4

Enabling smart connected solutions

Where market permits, expand into 2nd DC every 24 months at each city site

Private and Confidential

16


Our DNA Colocation Focused Carrier Neutrality Cloud Ready Follow the Fiber Campus Deployment

17


DCF Maiden Project: Dakota

18


Overview of Project Dakota DC Campus

Site and Buildings • • • • • • • • •

2.5 hectare Land Size Two (2) DC Buildings to be built on demand One (1) General Administration and Power House Building Protected Fencing for Entire Site and Facility Main Entrance and Reception Area which is separated from DC Building Two (2) Incoming Utility Supplies at the Power House and providing Redundant High Voltage Supplies to each DC Building 24 x 7 Site Command Center 24 x 7 Security Control Center 24 x 7 Site Support and Maintenance Staff

Standards • • •

DC facility will be constructed in accordance to Uptime’s Tier lll Reliability Standards Threat, Vulnerability and Risk Assessment based on Monetary Authority of Singapore recommendation for financial and banking clients Telecom and Network Cabling will be designed in accordance to TIA-942 requirement

Private and Confidential

19


Details of Project Dakota DC Campus

Aerial View of Data Centre Site @ Nongsa

Floor Topology • • • • • •

Total Building GFA = 6,084.60 m2 DC Halls = Total of 4 x DC Halls Racks per DC Hall = 230 racks Total Racks = 920 Rack Power Density = 4.5kW Raised Floor Loading = 15kN/sqm

• • • • •

Raised Floor Height = 1 Meter Slab to Slab Height = 6 Meters Power/Cooling = 1.35MW Covered Loading Bay Rampless from Loading Bay to Halls

Support for Critical Services • • • •

Two Diverse Telecom Cross Connect Rooms Two Diverse PLN HT Incomers (Rooms) Two Diverse HT/LV and UPS Power Supplies (Rooms) Rings and Diverse Chilled Water Supplies and Piping Design

Private and Confidential

20


Thank you for taking the time! We look forward to hearing from you

Private and Confidential

21


Turn static files into dynamic content formats.

Create a flipbook
Data Center First Brochure by datacenterfirst - Issuu