Architecture Portfolio DANIEL SAMANIEGO DIAZ
2015 - 2020
TU DELFT
The Netherlands M.Sc. Arch. 2018-2020
UIUC
United States of America B.S. Arch. 2014-2018
ORIGIN
Guayaquil, Ecuador
ETSAV
Spain Exchange 2017-2018
Contents i. Technische Universiteit Delft (TU Delft) Mad Heights MSc 3 - MSc 4: Complex Projects - Midtown Manhattan | 2019-2020
ii. Escola Tècnica Superior d’Arquitectura del Vallès (ETSAV) Biblioteca del Nord (Public Library) ARCH 475: Architectural Design and Development | Spring 2018
Giardino del Popolo (Public Garden) MSc 2: Architecture Beyond Oil | Spring 2019
Els Patis (The Patios) ARCH 476: Architectural Design and Exploration | Fall 2017
Hyperloop Station MSc 1: EXTREME - Architectural Engineering | Fall 2018
Biophilic Healing MSc 1: Delft Seminars on Building Technology | Fall 2018
iii. University of Illinois at UrbanaChampaign (UIUC) The Village Green Apartments + Lofts ARCH 374: Design and the City | Spring 2017
A Taste of Nature ARCH 373: Design and the Landscape | Fall 2016
The Valve(s) ARCH 272: Strategies of Architectural Design | Spring 2016
iv. Personal Work Hand Drawings Overseas Architectural Studies
Photography Trave Documentation
Graphic Design Cono Sur Mathematical Olympiad | August 2017
Computer Drawings Miscellaneous Assignments | 2016-2019
Mad Heights
TU Delft Graduation Studio 2019-2020 | Complex Projects - Midtown Manhattan
LOCATION
New York City, USA
TYPE
Social Housing
DESCRIPTION
The housing affordability crisis is a real pressing issue not only in New York City but in many other highly developed cities from big economies worldwide. This crisis can also lead to further social and economic problems if any actions are not taken to counter it. The Complex Projects graduation studio studied the economic and political forces that shift the dwelling patterns for the residents of Midtown Manhattan. My graduation topic takes a critical look at the existing housing situation in this city and strives to develop a future group vision for Manhattan. In this manner, this thesis will focus on: how to effectively work with affordable housing in Midtown Manhattan within the current model of the New York housing market? And what design guidelines, urban considerations and regulations could facilitate the provision of affordable housing? In this way, the project consists of an elevated hybrid complex that combines commercial, residential, and recreational programs. As such, the project takes its title from its location on Madison Avenue and its heightened nature. The design concept originates from utilizing the block’s unused air rights (undeveloped space above each plot/building with potential for profit), which is essential for an affordable housing project’s financial feasibility for developing the maximum space possible. Left: Mad Heights from street level - the ‘anti-block‘
EMPIRE VILLAGE
SOUTHEASTERN PORTION OF MIDTOWN | 1:1000 MODEL
‘EMPIRE VILLAGE’ The studio divided Midtown Manhattan into four roughly equal-size areas to be assigned to four different groups of students. Our group was assigned the Southeastern portion - bounded by 42nd St, 6th Ave, 23rd St, and the East River. This area includes landmarks such as the Empire State Building and is characterized by a special urban-suburban character, hence receiving the name of Empire Village for the juxtaposition of the metropolitan and village-like urban areas. Our group’s research and resulting projects had to be located within this precinct.
Site + Urban Analysis The research focused on exploring current and past patterns of dwelling and housing typologies in order to predict and reconsider the future patterns of living and housing that may lead to better functioning societies. In this manner, this thesis will explore how to effectively work with affordable housing in Midtown Manhattan within the current model of the New York financial housing market, going through the exploration of design guidelines, urban considerations and regulations that could facilitate the provision of affordable housing. These considerations include increasing population density, making use of New York’s policies and tax incentives for affordable housing development on certain zones, selecting a site with the lowest real-estate value, making use of the highest amount possible of underused space, adding multifunctional spaces, and minimizing construction and maintenance costs. All these are taken into consideration for the project’s financial feasibility – very important for developers in order to choose to work with affordable housing. Ultimately, fostering community engagement within and with its context becomes integral to effectively run an affordable housing complex in the long-term. The following maps show the superimposition of the urban considerations that determine the most suitable site for an affordable housing complex in the Empire Village.
1.61 thousand
COMMUTING WORKERS
WEEKDAYS
565
thousand COMMUTING WORKERS
WEEKENDS
ACTUAL INHABITANTS OF MANHATTAN: COMMUTERS
INCLUSIONARY HOUSING AREAS
AIR RIGHTS
COMMERCIAL ACTIVITY
TRANSPORTATION
RESIDENTIAL DENSITY
COMMUTER DENSITY
LOWER REAL ESTATE
SELECTED SITE
Concept Development + Design AVAILABLE AIR RIGHTS
1. AIR SPACE MASSING
2. OPEN UP
3. REDISTRIBUTE
4. ELEVATE
5. RECESS
6. RESULT: 70,000 m2
2. SLIPFORMING CORES
3. OUTRIGGER SYSTEM
4. PREFAB MODULES
5. RIGID FRAME
6. OVERALL STRUCTURE
STRUCTURAL ASSEMBLY
1. PERFORATION
PUBLIC/COMMERCIAL DECK AT LEVEL 15
INTERIOR COURTYARD
PUBLIC TERRACE AT LEVEL 23
4. 5. 1.
6.
2.
3.
Market-rate housing
1. Solar PV Panels 2. Controller 3. Electricity Storage
7.
Affordable housing Accessible units
4. Boiler 5. Chilled Water Plant 6. Fan Room 7. VAV Terminals
Hostel Apart-Hotel Offices
4. 5. 1.
6.
Retail
2.
3.
Ammenities
7.
Services
PROGRAM + CIRCULATION
MECHANICAL SYSTEM: VARIABLE AIR VOLUME SUMMER SUN
Wall register Roller for sun shading
Wall return grille
Sliding door
WINTER SUN Wall register
Wall return grille
Heating screed
CLIMATE CONTROL PER UNIT
GROUND FLOOR PLAN
0m
10m
20m
40m
LEVEL 10
LEVEL 21
LEVEL 15
LEVEL 23
LEVEL 17
LEVEL 30
A
A SOUTH ELEVATION
SECTION AA
0m
10m
20m
40m
1.
1.
2.
3.
4.
5.
10.
6. 8.
7. 9.
A. LIVING UNITS - TWO CONSTRUCTION SYSTEMS
SECTION 1:50 1. Floor slab: Flooring parquet, 15 mm Heating screed, 40 mm Impact sound insulation, 30 mm Cross-laminated timber panel, 140 mm Air layer, 30 mm Impact sound insulation, 50 mm Cross-laminated timber panel, 70 mm 2. Exterior Wall Spruce, painted larch, 25 mm Wooden substructure 20 mm Wooden studs/thermal insulation, 150 mm Cross-laminated timber panel, 120 mm 3. Panel Joining with fish plate, three- layer panel with four rows of screws 27/160 mm 4. Interior Wall Cross-laminated timber panel, 120 mm Plasterboard, 12 mm Thermal insulation, 50 mm Air layer, 15 mm Cross-laminated timber panel, 120 mm 5. Floor slab: Flooring parquet, 15 mm Heating screed, 40 mm Impact sound insulation, 30 mm Cross-laminated timber panel, 140 mm Air layer, 30 mm Impact sound insulation, 50 mm Concrete topping, reinforced 200 mm Cross-laminated timber, 140 mm 6. Exterior glazing Masonry cladding (existing), 150 mm Steel studs substructure (existing), 100 mm Thermal Insulation 150 mm Gypsum board, 10 mm 7. Floor slab: Flooring parquet, 15 mm Heating screed, 40 mm Impact sound insulation, 30 mm Concrete topping, reinforced 200 mm Dowel-laminated timber, 140 mm Thermal insulation, 150 mm 8. Exterior wall Spruce, painted larch, 25 mm Wooden substructure 20 mm Thermal insulation, 100 mm 9. Steel beam, HEB 550 Plasterboard, (fire prevention) 2 mm 10. Interior Wall: Plasterboard 15 mm Thermal insulation, 50 mm Reinforced concrete, 800 mm
2.
1. Foyer + Service Core 2. Kitchen + Bathroom 3. Living Room + Bedroom
3.
C
A
LONGITUDINAL SECTION
SECTION B 1. Wall: Spruce, painted larch, 25 mm Wooden substructure 20 mm Wind paper Wooden studs/thermal insulation, 150 mm Vapour barrier Cross-laminated timber panel, 120 mm 2. Floor slab Flooring parquet, 15 mm Heating screed, 40 mm Impact sound insulation, 30 mm Cross-laminated timber panel, 140 mm Air layer, 30 mm Impact sound insulation, 50 mm Cross-laminated timber panel, 70 mm
2.
1.
B
B. TIMBER MODULES FACADE SECTION C 1. Floor slab: Flooring, 15 mm Heating screed, 40 mm Impact sound insulation, 30 mm Cross-laminated timber panel, 140 mm Air layer, 30 mm Impact sound insulation, 50 mm Cross-laminated timber panel, 70 mm 2. Wall Cross-laminated timber panel, 120 mm Plasterboard, 12 mm Thermal insulation, 50 mm Air layer, 15 mm Cross-laminated timber panel, 120 mm
1.
D
2.
C. TIMBER RIGID FRAME FACADE 3. 1.
5.
4.
6.
2. 7.
0m
10m
20m
40m
D. PREFAB TIMBER MODULES CONNECTION
SECTION D 1. Floor slab: Flooring carpet, 9 mm Impact sound insulation, 10 mm Cross-laminated timber panel (3-layers), 99 mm Cross-laminated timber panel (5-layers), 169 mm 2. Beams, glued laminated timber, 220/500 mm 3. Column, glued laminated timber, 320/320 mm 4. Heating and utilities conduit 5. Wall Timber boarding, cedar, heat-treated, 30 mm Substructure, plywood strip, weatherproof 13 mm Wood fibreboard, 13 mm Thermal insulation, 200 mm Timber strip (vapour barrier), 10 mm Wood fibreboard, 13 mm 6. Glazing Wood and aluminum with triple glazing 7. Glare protection: timber slats (horizontal)
HOUSING UNIT BEDROOM
HOSTEL ROOM - 16 BEDS
FAMILY UNIT
HOUSING UNIT LIVING ROOM (ACCESSIBLE DESIGN)
CO-WORKING AREAS
OFFICE SPACE
Giardino del Popolo TU Delft Spring 2018 | Architecture Beyond Oil
LOCATION
Naples, ITALY
TYPE
Waterfront/Industrial Park
DESCRIPTION
Its name, the “People’s Garden,” while paying homage to the name of the dock it is located, refers to the project’s vision of providing a natural place by the sea for the citizens of Napoli and visitors alike. Its location becomes strategic as it is located in between the tourist port and shipbuilding sector, right next to the Historical Center. Though this area of the port includes important functions, such as the headquarters of the Port Authority, the site and its surroundings have long been kept in run-down conditions and the current infrastructure blocks the waterfront, giving an uninviting presence for the public. This proposal aims to recover the lost link between the city and the sea while creating a natural mini-ecosystem that the public, local flora, and fauna will benefit from. In addition, the project will seek to produce biofuel as an alternative to fossil fuels that will likely come to past in the following decades. The biofuel would be a product from biomass generated by the marine remediation process. In this way, Giardino del Popolo aims to create a self-sustaining economy that can also benefit the port of Naples economically.
Left: Collage of vision - bring the waterfront back to the city.
Research + Group Work Upon our site visit to Naples, our research group focused on what makes the city an ever-dynamic place where businesses, residents and visitors thrive, despite the economical and social challenges that Naples and Campania regios are facing. The unplanned and sometimes improvisational nature of the city quarters with its public spaces made us regard Napoli as a true reflection of its history and its inhabitants, with a strong own identity. As such, Naples has developed from the port, so the relationship between the sea and the city has been very close. The harbor developed from the west to the east. The port expands as the functions and needs become bigger, including oil storage and refineries. Today, the city aims to move towards a post-oil environment and economy.
Group Vision However, the main challenges we found the city is confronting are the loss of waterfront, rising pollution levels, aging infrastructure, and economic stagnation. Our group vision will aim to tackle these problems on a city- and regional- scale through each student’s personal focus and design intervention: 1. Samaniego, D., 2. Peng, B., 3. Jiang, M., 4. Hwing, H.
OIL DOCK SHIPBUILDING CONTAINER TERMINAL FUTURE CONTAINER TERMINAL
PASSENGER SECTOR
Personal Intervention
CALATA VILLA DEL POPOLO
Following the group vision, I decided to intervene on the port in the Villa del Popolo pier. Close to the historical center, this pier is located in between the tourist passenger port and the commercial port. Therefore, its location comes as the intersection of the strategies that will drive Naples’ future development: city-waterfront connection, bio-remediation, and clean post-oil industries.
1.
1. 2.
2.
12.
4.
4.
3.
3. 5. 5.
6.
6.
7.
7. 5 10 25
20
15
8.
8.
9. 9.
10.
11.
10.
11.
Buildings to be demolished 0m
50m
100m
2020 -2030
200m
2030 -2040
2040 -2050
LEGEND Sites of interest: 1. Piazza Mercato 2. Piazza del Carmine 3. Port Authority headquarters
1.
1.
2.
2.
13.
12.
Project facilties: 4. Geothermal separator & condenser 5. Food hall 6. Lagoon 7. Turbine & generator 8. HTL plant 9. Bioremediation laboratories 10. Water treatment pond 11. Algae reservoir 12. Water pump 13. Tram station
4.
4. 3.
3. 5.
5.
6.
6.
7.
7.
5 5 10
10
25
9.
20
15
25
20
15
8.
8.
9.
10.
11.
12.
2050 -BEYOND
10.
11.
RECONNECTING THE CITY WITH THE SEA Construction of the esplanade starts along Via Nuova Marina (transferred underground) and arches are carved out, thus relinking the Mercato district with the waterfront. Demolition starts taking place. Buildings of industrial heritage and the pier are restored. Abandoned ro-ro ships are cleaned. Terraforming starts to be made with sediment from dredging process undertaken by the port authority. BIOREMEDIATION Once terraforming is complete, the construction of the geothermal system and the hydrothermal liquefaction (HTL) plant will begin. The functions from the demolished buildings are transferred to the new eastern commercial/ passenger zone of the port (former container terminal). Construction of the esplanade and terraformed land is finished. Heavy metal-contaminated soil starts to undergo bioremediation with hyperaccumulators willows, bentgrass, and mustard.
1. 3. 2.
4.
8. 6. 0m
50m
100m
9.
7.
200m
2.
In 2030, the geothermal system & generator for the HTL plant are ready for operation. HTL facilities are ready for use. Start of marine bioremediation start of biomass production - start of biofuel production. Geothermal system for north pool begins construction.
5. 9. 8.
6.
Castel Sant Elmo and the current passenger port as seen from the top of Giardino del Popolo’s tallest hill.
5. 6.
1. Piazza Mercato 2. Via Nuova Marina 3. Geothermal separator & condenser 4. Geothermal system tubes 5. Injection wells
6. Algae reservoir 7. Water treatment pond 8. Bioremediation laboratories 9. HTL plant: offices, biofuel storage, & biomass-biofuel converter
1.
In 2040, the north pound is cleaned and ready for human use. It becomes separated from the water treatment system. Heat is provided by the geothermal energy system. Hyperaccumulators continue to grow and soil becomes apt for new species as the site starts to create an ecosystem of its own. As oil becomes more scarce and expensive, biofuel generates more significant revenue. Investements increase and creates job opportunities in further research. Pollution levels of the water in the port decrease. From 2050 onwards, the ecosystem keeps growing and becomes more resilient. Site attracts more visitors. As hydrocarbons decrease in cleaner water, biomass production from such decreases, leading to generate biomass from another source (algae). Algae pond is constructed. The Port of Napoli goes beyond the International Maritime Organization’s 2018 regulation - to cut off 50% of greenhouse gases emission by 2050 - by attempting to make ship traffic to its port carbon neutral. DNV GL, leading maritime services company, predicts carbon-neutral fuels to surprass oil for shipping by 2050. 39% of the global shipping energy mix will consist of carbon-neutral fuels - ammonia, hydrogen, biofuel. These fuels will have greater market share than oil, liquefied natural gas, and battery-electric.
3.
2.
HYPERACCUMULATORS Plants that extract metals from the soils of contaminated sites to return the ecosystem to a less toxic state. Agrostis (bentgrass): Al, As, Mn, Pb, Zn
Brassicaceae (mustard): Ag, Cr, Cu, Mn, Pb, Se, Zn
Salix (willows): Cr, Hg, Se, hydrocarbures, Cd, Pb, U, Zn
WATERFRONT CONNECTION Once blocked by the highway and outdated port infrastructure, the city can now retrieve the lost link with the sea. Piazza Mercato and the waterfront can be linked by opening the residential complex in the form of an arc while paying homage to traditional Italian architecture. The highway will thus be underground while the esplanade is on top for pedestrian use.
IN-OUT CIRCULATION
‘Arc of Ottieri’ at Palazzo Ottieri opening to Piazza Mercato and the church of the Holy Cross and Purgatory.
Car traffic Pedestrian flow
GEOTHERMAL ENERGY NETWORK The facilities and lagoon of Giardino del Popolo receive their energy from the geothermal energy generators at Low-Line and Park Industry. The whole system is interconnected with underground pipes, reutilized from the old oil pipes. 1. Incoming geothermal energy 2. Separator 3. Condenser 4. High-temperature water 5. High-temperature steam 6. Medium-temperature water 7. Turbine & generator 8. Reservoir 9. Injection wells 10. Hydrothermal liquefaction plant 11. Water pump
1.
3. 2.
5.
4.
9.
6.
8. 7. 10.
11.
Hot baths at lagoon next to pier.
FROM BIOREMEDIATION TO A SELFSUSTAINING ECONOMY BIOREMEDIATION 1. Hydrocarbon-polluted water from the dock is pumped throughout the bay and the enclosed reservoirs. 2. Biosurfactants begin biodegradation process of such hydrocarbons. 3. Bioedegradation releases water and CO2 (as that of plants), and produces wet biomass, to be initially stored and treated at the laboratories. 5. 5.
BIOFUEL YIELD 4. Hydrothermal liquefaction (HTL): biomass is converted into biofuel in the underground HTL plant. The process operates at 250-550 Celsius degrees with a pressure of 5-25 Mpa. Catalysts for this process are water and transition metals (Ni, Pd, Pt, Al) - recycled from old port facilties. ECONOMY 5. Refined biofuel is either stored or sold for use at the local passenger and container terminals for ships. Selling biofuel generates revenue thus creating a self-sustained economy for the plant and a strong incentive for companies to invest, as part of the ZES (Special Economic Zone), for developing the next stages of the project.
2.
4.
3.
2.
5.
Commercial: Ro-ro traffic
1. Passengers: Cruises & ferries
Passengers: Cruises & ferries Commercial: Container ships
Hyperloop Station
TU Delft Fall 2018 | EXTREME (Architectural Engineering)
LOCATION
Amsterdam, THE NETHERLANDS
TYPE
Transport hub
DESCRIPTION
The EXTREME architecture studio explores the close connection between architecture and technology in an extreme geographical context. This year’s studio dealt with the design of an underground Hyperloop station under the Amsterdam Bijlmer Arena train station as part of a theoretical trans-European Hyperloop network. This proposal for a Hyperloop station in Bijlmer Centrum, whose design was inspired by the technological feat of the Hyperloop system, strives to give a new face to the heart of Biljmermeer. Its design makes it a capacious, easy-to-read infrstructure which is located strategically at a point where all public transport systems converge, becoming a convenient link between these. The entrances and its walkable grass roof aim to strenghthen physical ties between the station with the surrounding residential and commercial areas - a place for residents, workers, and commuters alike. Once inside, apart from the Hyperlooop itself, retail, food, and services can be taken in at a glance. The design provides a natural and straightforward (linear) organization of traffic flows and services.
Left: Departure concourse.
Research The resulting project stems from the research on user-friendly underground spaces and on the theory behind the Hyperloop system. These research conclusions would lead to integral design considerations with focus on technical solutions regarding the overall design configuration, function, materialization, climate, daylight, and infrastructural assembly. In addition, important attention was given to the site, Bijlmermeer, in order to revitalize this declining area of Amsterdam through our design interventions.
CAPACITY: 6 passengers NUMBER OF DOORS: 2 TYPE: two-directional pod TOP SPEED: 1200 km/h FREQUENCY: 1 every 30 seconds HYPERLOOP POD
BUT WHY HYPERLOOP FASTER THAN A PLANE: Air and rolling resistances are taken out of consideration, facilitating speeds over 1000 km/h (620 mph). AMSTERDAM
HIGH SAFETY STANDARDS: due to tis possible setbacks, the safety and trustworthyness of the Hyperloop system has received top priority.
PARIS
HIGH COMFORT: Similar to trains, there is no need to wait in line for hours, every minute a Hyperloop Pod can depart to each destination. SUSTAINABILITY: Pods can travel very efficiently and gain their power from renewable energy sources, such as geothermal or the sun. EUROPEAN HYPERLOOP NETWORK (HARDT HYPERLOOP)
FRANKFURT
TU DELFT’S HYPERLOOP TEAM PROTOTYPE (2018)
PROPOSED UNDERGROUND PATH: PARIS-FRANKFURT VIA AMSTERDAM
Amsterdam ArenA Amsterdamse Poort Shopping Centre Ziggo Dome Concert Hall
Future Entertainment Centre
Railway
Bike parking
Streets
Taxi
Pedestrian paths
Car parking
Bus lane
Railway statio
Points of interest
Bus station
BIJLMER CENTRUM AT AMSTERDAM ZUIDOOST
AFAS LIVE/Pathe Bijlmer Arena Station
Concept Development
Current flows of people.
ENTRANCE
+
= Entrance from all directions.
The position of the entrance pavilion does not interrput the existing circulatory flows.
PROGRAM LAYOUT
+
=
Concourse is located at the intersection of the hyperloop path
The scheme reflects the juxtaposition of the axis of the boulevard
Administrative, commercial and service functions are organized
and the rails.
and the grid of Bijlmer.
undeground around the formed scheme.
WALKABLE ROOF Apart from serving as the entrance of the tranport station, the pavilion also provides an insulated walkable glass roof. A vast lawn slides from both ends of the pavilion to the top of the shell.
1. EXCAVATION
2. SHELL
3. BRIDGE
4. RESULT: WALKABLE ROOF
Design AMSTERDAMSE POORT SHOPPING CENTRE
ARENA BOULEVARD TO ZIGGO DOME & AMSTERDAM ARENA
AMSTERDAM BIJLMER ARENA
AFAS LIVE/PATHE CINEMA
SITE PLAN
Composing an integral design in this proposal - landscape, station, the shopping area, and the plaza form a new unity providing a new place of gathering and leisure for workers, commuters, shoppers, and passerbys.
RETAIL GROCERY STORE
a’ RETAIL
c RETAIL
TOURIST INFORMATION
RETAIL
RETAIL
Emergency exit
Emergency exit
ATRIUM/EXHIBITION SPACE
b TICKET SALE
RETAIL
RETAIL
STORE
TENANCY
RETAIL STORE
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
STORE
AL
OM RO
NIC HA EC
TENANCY
M
c’ a TENANCY
FOOD COURT
TENANCY
RETAIL TENANCY
TENANCY
STORES TENANCY
TORE
RETAIL
LEVEL -1 PLAN (TICKETING + SHOPPING)
STORES RETAIL
TORE RETAIL
RETAIL
STORE RETAIL
b’
DEPARTURES
TO PARIS
ARRIVALS
DEPARTURES
LEVEL -2 PLAN (HYPERLOOP CONCOURSE)
LONGITUDINAL SECTION
TO FRANKFURT
ENTRANCE PAVILION FACADE
HYPERLOOP AT SECOND SUBLEVEL: Bright and reflective materials help to provide a more pleasant user-friendly experience for underground spaces.
This
scheme
provides
a
more
straightforward and efficient way of separating zones for the direction of the passenger flow, facilitating the execution of the desired frequency.
TERMINAL SECTION
ENTRANCE PAVILION SECTION
EMBARK-DISEMBARK
The linear organization helps the commuters to get a simpler and more straightforward sense of orientation, which is crucial not only for the transport efficiency but also for diminishing negative preconcpetions of underground spaces. DAYLIGHT + NATURAL VENTILATION
TICKET CONTROL
STRUCTURAL PLAN
ENTRANCE PAVILION AT BIJLMERMEER
PEDESTRIAN CIRCULATION
PHYSICAL MODEL WITH SURROUNDINGS
1.
3.
3.
1. Roof construction Planted layer and 150 mm substrate layer filter mat 40 mm layer of gravel on 6 mm foot-resistant 1.2 mm EPDM waterproof membrane 90 mm foamed-glass thermal insulation 0.2 mm polythene vapour barrier 2. 60 mm concrete topping 3. 90/180/20 mm pre-oxydized (Corten) steel angle 4. Double-curved double glazing: 2x 6mm laminated safety glass + 15 mm cavity + 2x 6mm laminated safety glass 5. 50/7 mm steel CHS 6. Flourescent tube 7. Soffit system: perforated sheet metal panels 8. W 450x300 I-beam
1.
4.
5.
2.
7. 6.
PAVILION ROOF CONNECTION | 1:5
2.
2.
4.
5. 6.
3.
7. 1. 8.
4.
PAVILION GROUND CONNECTION | 1:5
1. Roof construction 50 mm seamless external surfacing: granolithic concrete 2 mm PVC membrane 75 mm polyuterane insulation with fleece backing bonded to bitumen vapour barrier 300 mm floor slab 2. Double-curved double glazing: 2x 6mm laminated safety glass + 15 mm cavity + 2x 6mm laminated safety glass 3. 50/7 mm steel CHS 4. Soffit system: perforated sheet metal panels
1. Roof construction 50 mm seamless external surfacing: granolithic concrete 2 mm PVC membrane 75 mm polyuterane insulation with fleece backing bonded to bitumen vapour barrier 300 mm floor slab 2. 700 mm plinth element (precast concrete) 3. 15 mm plaster 4. 10 mm floor covering: magnesite 5. 1000 mm floor slab 6. 100 mm lean concrete 7. 1300 mm floor slab 8. 200 mm lean concrete
UNDERGROUND FOUNDATION WALLS | 1:20
Derma-Healing
TU Delft Fall 2018 | Delft Seminars on Building Technology
CENTRUM WEST
OOST
LOCATION
ZUID
Amsterdam, THE NETHERLANDS ZUIDOOST
TYPE
Medical Facility
AMC LOCATION: AMSTERDAM ZUIDOOST (SOUTHEAST)
DESCRIPTION
Part of an intensive building technology seminar during the first quarter of the Master of Architecture track at TU Delft. This course asked the students to make a new design or renovate a self-selected fragment of the Amsterdam Medical Center (AMC) - a large building complex with serious problems in climate control and in being user-friendly. The resulting design aims to provide innovative design solutions with regard to the use of energy and patients’ comfort. My proposal deals with the transformation of the building envelope at a tower facade that faces the south side, as it has an enormous potential for sustainable design strategies due to the sunlight it receives. The concept consists of a biological skin, serving as both a protective layer and a selective filter of elements that are needed for homeosthasis and thermoregulation. These principles are used as a basis for the approach of the AMC’s external renovation, whose main goals are reducing energy consumption, producing its own energy, and reusing materials.
G
AMC COMPLEX
BED TOWER SECTION ‘G’
Thus, the new facade would help to minimise the energy consumption for cooling and lighting and harvest energy for the adjacent room’s energy demands, with descentralised air handling units and lighting system.
CLIENT AND BUILDING OWNER
BUILDING FRAGMENT FROM AMSTERDAM MEDICAL CENTER
ENERGY PERFORMANCE
FULL FACADE ELEVATION
STRUCTURAL SYSTEM CROSS-SECTION
STRUCTURAL SYSTEM ELEVATION
6. 10.
2.
9.
4.
1.
DETAIL A | 1:2 2.
DETAIL B | 1:5 3. 5.
7.
10.
4. 8.
1.
6. 11.
SUMMER
WINTER
DETAIL C | 1:5
DETAIL D | 1:5
CLIMATE CONTROL This double-skin facade system manages to conserve and reduce the energy needed for heating in winter, cooling in summer, and overall lighting. The assembly consists of the existing facade of the bedtower, an ir space for natural ventilation or harvesting heat and an exterior layer of laminated double-glazing with operable panels and electricity-generating pv panels. Apart from offering major thermal resistance due to its climatic buffer zone, the new facade combines active solar energy collection and shading. The installation of operable air vents that can be opened or closed controls the climate inside and the acoustics.
1. Stainless steel screws into the slab and column 2. Double glazing in aluminium framing: 4mm toughened glass + 10mm cavity + 7mm laminated safety glass 3. W 100 x 100 x 19.3 steel column 4. Ferns 5. Aluminum wire mesh, welded 6. Second-generation thin-film solar cells made of amorphous silicon, transluscent 7. 60/60/5mm I-profile aluminium beam 8. Air vent: mineral wool sheated in 2x2mm aluminium sheet, anodised 9. 320mm precast reinforced concrete slab 10. Air diffuser 11. W 130 x 130 x23.8 steel column, inclined and connected to bed-tower structural system
MODULAR FRAGMENT
B
D
A
C
CROSS SECTION DETAIL
SOUTH ELEVATION DETAIL
LONGITUDINAL SECTION DETAIL
HYDROPONIC WALL Cross-linked polyethylene, 2cm Reinforced felt fabric Metal staple Water and air circulation PLAN VIEW DETAIL The structural assembly of the facade also leaves space between the veritcal supports that can be used as “green towers,“ as part of biophilic design. Ferns are planted outdoors for ornamentations and clean air filters. Inside, legumes are grown by a hydroponical system, using rainwater without soil, which can be harvested for local consumption. During winter, this buffer zone can be kept as a greenhouse, allowing the crops to grow all year long. INSIDE DOUBLE-SKIN FACADE: BALCONY AND CROPS
Biblioteca del Nord
UIUC-ETSAV Spring 2018 | Architectural Design and Development
LOCATION
Barcelona, SPAIN
TYPE
Public Library
DESCRIPTION
As part of the ‘cap-stone’ studio, the graduation project from UIUC consists in the schematic design and development of a small-scale public library emphasizing the integration of a building’s components: materials, details, structure, program, life safety, technology, and universal design. Biblioteca del Nord aims to provide a translucent library and cultural media center to allow complete visibility and engagement with the surrounding community at the Eixample. The most striking visual qualities of this project are its structural facade and the interplay of voids on each different level of the building, that together compose the most identifiable architectural language. As such, the library serves as a chill-out space for casual reading, studying, exhibitions, or simply relaxing, bringing together students, residents, and visitors alike. Along these lines, the project complies with building code regulations on four fundamental aspects: - Building safety: two fire stairs as means of egress in case of fire or other hazardous situations. - Accessibility/universal design. - Sustainability: local regulations to comply with sustainable building standards. - Site occupation and building height limits. Left: Main stacks along the top level steps.
Site + Program The site comprises 360 square meters and is located at a corner in Barcelona’s Eixample district, at the intersection of Carrer Roger de Flor and Carrer de Ribes. The corner site is currently occupied by a gas station, which would be replaced by the new public library building. The building program follows a usual scheme and configuration following research on public and educational libraries in Spain and the rest of the World, adapted for tis size and context.
PROGRAM
SITE PLAN
Design The library’s scheme comes from the intersection of two radial configurations, with the main stairs and elevator forming the cores of the building and establishing the spaces where the different functions would take place. In this manner, the stairs, elevator, and bathrooms form a longitudinal axis and divide the building into two main separate spaces. This scheme gives liberty to the generation of voids connecting different levels, hence giving this building its main spatial quality. STRUCTURAL SYSTEM
NORTHEAST ELEVATION
WEST ELEVATION
TRANSVERSAL SECTION
SECOND FLOOR
GROUND FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
THIRD FLOOR
BASEMENT FLOOR
LONGITUDINAL SECTION
DETAILS FACADE
MAIN STACKS OVERLOOKING BARCELONA NORD
Els Patis
UIUC-ETSAV Fall 2017 | Architectural Design and Exploration
LOCATION
Barcelona, SPAIN
TYPE
Restaurant
TEAM PROJECT
Cristian Badescu | Hyojin Kim | Daniel Samaniego Personal responsibilities: Concept Development, Planning, Structural & Mechanical Systems Design, Area Tabulation.
DESCRIPTION
The project development is part of a collaborative joint studio with the ETSAV’s Taller 7A (a 4th/5th year design course of the host institution) and Erasmus students. Located next to the Library of Pompeu Fabra University, the proposal could be understood as strictly a university restaurant. However, we proposed to overcome this restrictive aspect and instead opening the restaurant to the public. The site is a plot attached to the old Water Reservoir of La Ciutadella park that was built for the Universal Exposition of 1888. The building lost its original use soon after, finally becoming a university library in 1999. There were also several auxiliary buildings that were eleminated, leaving only the brick chimney as a symbolic element that must be respected.
Left: Main fool hall and balcony, second level.
SITE LOCATION: BARCELONA POBLENOU
GROUND LEVEL PLAN
Ca a ny de ar
eS
rd
rre
GROUND LEVEL
r Ca
r re
de
lul
L
n
gto
in ell eW
rd
rre
Ca
SITE PLAN
Pompeu Fabra University Library
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.
Main Dining Hall Vestibule Cooking Area Cold Kitchen Food Preparation Bar Staff Restrooms Staff Locker Rooms Courtyard Patio Freezing Room Office Garbage Disposal Loading Zone
BASEMENT LEVEL 1. Secondary Dining Hall 2. Restrooms 3. Patio 4. Ware-Washing 5. Mechanical Room 6. Summer Kitchen
BASEMENT LEVEL PLAN
Steel Rooftop
SOUTHWEST ELEVATION Load-bearing Brick Walls + Columns
Concrete Basement Foundations
Concrete Foundations SECTION LOOKING SOUTHEAST
STRUCTURAL SYSTEM
MATERIALS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. DETAIL SECTION LOOKING SOUTHEAST
Spanish Brick Glass Wood Panket Concrete Zinc Roof Metal Girder Metal Beam Suspended Wood Ceiling Thermal Insulation Metal Handrail Ceramic Tiles Wood Steps
FACADE DETAILING
DAYLIGHT
RESTAURANT IN CONTEXT
HVAC SYSTEM PLAN
LIGHTING SYSTEM PLAN
Beyond its aesthetic value as a vital element in Mediterranean architecture, the central courtyard acts as an organizational element of the building’s layout, with all the functions distributed around it.
The dining hall is divided into two levels, with the lower one connected to a lowered patio that allows more ventilation and natural light while strengthening privacy and acoustical qualities, separated from the street noise.
The Village Green Apartments + Lofts UIUC Spring 2017 | Design and the City
LOCATION
Champaign, IL
TYPE
Residential/commercial
DESCRIPTION
Every year young professionals want to live in vibrant urban communities with access to work, restaurants, entertaiment, and other cultural ammenities. This proposal of live/work housing features urban lofts with open floor plans and flexible living spaces. Lofts blend working and entertainment together matching the lifestyles of urban dwellers. Given the lack of natural light that the site would receive as it’s located between two adjacent structures, the building as a whole maximizes the use of natural light and ventilation by the employment of floor-to-ceiling openings, with the use of shading devices for the facades facing the Sun.
Left: Main entrance seen from Walnut St. and Main St. corner.
1927
1957
1987
Site + Urban Analysis This exercise consists in the research, documentation, and critical analysis of Champaign’s downtown through different periods of time, with the technique of figure ground maps. They show the change in density in different regions of the downtown. The earliest map shows full and compact blocks, a very dense urban approach that started to decline through the time of the second map and reached its lowest peak in 1987, with more demand for parking lots, making the whole area less pedestrianfriendly and car-based. However, the current map shows a growing interest in denser construction and more pedestrian-friendly spaces, coinciding with the revival of the area, with the advent of small businesses such as restaurants and bars that are currently in demand from both students and residents. Hence, the dwelling takes advantage of the site to contribute with this thriving urban environment for young professionals. BUILDING TYPE Residential Office/Service
Commercial Public
2017
TRANSPORTATION Bike Route Bus Route
Train Rack Bus Stop
Design
1. BASE PRISM
NORTH ELEVATION
2. GROUP
3. SEPARATE
4. DISPLACE
EAST ELEVATION
5. LOOK
SECTION LOOKING SOUTH
UNIT A
UNIT C’
The first floor contains two retail/office tenants, both connected to separated mezzanine levels, serving as small apartments that are inhabited by the supervisors of the workplaces. The access to the upper apartments is located at the alley. The third and fourth floor each contain three lofts, with one bedroom, kitchen, and bathroom. The penthouse level serves as a common area for the residents and includes a gym, a pool table, seating areas, and sunbathing beds.
UNIT C
The overall interior design features a minimalistic approach with cleanlines and open-concept layouts that allow residents to arrange the space to their needs.
FLOOR 1
FLOOR 3.5-5.5
FLOOR 3-5
FLOOR 6
PROPORTION
UNIT C
STRUCTURE: STEEL FRAME UNIT A
UNIT B
CIRCULATION
A Taste of Nature UIUC Fall 2016 | Design and the Landscape
LOCATION
Kickapoo State Recreation Area, IL
TYPE
Campground
DESCRIPTION
To heighten sensory experience, this proposal brings visitors into a more intimate contact with the surrounding landscape. Kickapoo State Recreation Area, located in central Illinois and close to the border with Indiana, receives thousands of visitors to take advantage of the scenery, hiking paths, bike tracks, camping, kayaking, and canoeing. It was once surfacemined for coal. The spoil piles and mine pits left behind after nearly a century of mining were part of the legacy from which nature reclaimed the land to transform Kickapoo State Recreation Area into the outdoor playground it is today. The project consists in the overall site plan of the campground and the design of the different outdoor and indoor structures. It comprises 6 sleeping structures, a meeting house with a bathroom facility, a dock with common space, and a communal space for cooking/gathering. All paths and facilities comply to ADA standards.
Left: View towards the pond from the communal house.
PROGRAM 1. Six sleeping structures to house two to four people per structure. 2. One ADA accessible meeting house with communal dining/living room. 3. One ADA accessible outdoor space for 24 visitors with space for cooking/ gathering. 4. One ADA accessible dock with communal space and space to store kayaks. 5. One ADA accessible bird blind.
KICKAPOO STATE PARK, ILLINOIS, USA
SITE PLAN
The position of the campground facilities seeks to provide the best scenic views, while minimizing human impact, creating a more visceral experience with the natural environment. It allows convenient accesibility between the facilities and adjacent spaces, balancing spatial integration and privacy.
TOPOGRAPHY
SUN PATH
CIRCULATION
COMMON HOUSE FLOOR PLAN
COMMON HOUSE SECTION LOOKING NORTHWEST
SLEEPING CABIN ELEVATION
SLEEPING CABIN PLAN
Sensory insults, such as noise or unpleasant views, are avoided to stimulate sensory experiences in both the journey and transition through the approach from the hiking paths to the rest of the camp. Thus, all the campground facilities are located at the south side of the pond, taking advantage of the view to the north side (see above), which provides a better natural landscape as it has remained more intact from the past mining activity. Both the common house and cabins feature large openings facing the northwest that frame the view and don’t allow direct sunlight to enter at peak hours.
SLEEPING CABINS
BIRD’S EYE VIEW OF WHOLE CAMPING SITE
SLEEPING CABIN
COMMON HOUSE BACK TERRACE
SLEEPING CABIN SECTION
The Valve(s)
UIUC Spring 2016 | Strategies of Architectural Design
LOCATION Downtown Champaign, IL
TYPE Food Market + Food Science Labs
DESCRIPTION
This proposal consists of the exploration of a public and commercial space, intended for the exchange of permanent and temporary goods/services. The space for the market not only allows a connection between the producer and the consumer but also provide a permanent space for the use of the community. The design expands from the traditional notion of a ‘farmer’s market’. It activates the space with flexibility to provide a year round programing, such as art displays, community venues, crafts - activities that bring people from the community together and foster interactions. The forms that make up the design concept originates from ‘valves,’ which are both instruments for food science as well as parts of our human digestive systems. Hence, multiple intersecting valves add to the architectural expression of the market’s functions.
Left: Main entrance - Neil St. and W Hill St. intersection.
SITE PLAN
PLANNING AND CONSIDERATIONS The concept follows the juxtaposition of valves. These forms allow for open communal spaces. Each floor comprises three intersecting valves, with each upper floor featuring a different rotation of the formed volume, all connected to the central tower, which, in addition of an atrium, provides structural stability for the cantilevered valves. Vast open spaces allow fluid circulation. The glasspaneled ends allow natural light to enter, while offering views of the city.
SECTION LOOKING WEST
SOUTH ELEVATION
FOOD SCIENCE LAB
GROUND FLOOR PLAN
THIRD FLOOR
FOOD MARKET
Hand Drawings
CAIXA FORUM, BARCELONA, SPAIN (2017)
BASILIQUE DE SAINT-NAZARE, CARCASONNE, FRANCE (2017)
PLAÇA REAL, BARCELONA, SPAIN (2017)
CATHÉDRALE NOTRE-DAME-IMMACULÉE, MONACO (2017)
ERECTHEION, ATHENS, GREECE (2017)
METEORA, GREECE (2017)
PARIS TRAVELLING WORKSHOP Jan. 7 - 12, 2018
Overseas Architectural Studies as part of ETSAV Exchange Program.
MUSÉE DU LOUVRE
SAINTE-CHAPELLE
PLACE DES VOSGES
FOUNDATION LOUIS VUITTON
PANTHÉON
VILLA LA ROCHE
Photography
SALSES-LE-CHATEAU, SALSES, FRANCE (2017)
STAVROS NIARCHOS FOUNDATION, ATHENS, GREECE (2017)
BORGO MARINARI, NAPLES, ITALY (2019)
RED STAR LINE MUSEUM, ANTWERP, BELGIUM (2019)
WALDEN 7, BARCELONA, SPAIN (2018)
PALACIO KURSAAL, DONOSTIA, SPAIN (2018)
GUGGENHEIM MUSEUM, NYC, USA (2019)
WTC PATH STATION, NYC, USA (2018)
HUDSON YARDS, NYC, USA (2019)
KOLUMBA MUSEUM, COLOGNE, GERMANY (2020)
Graphic Design
XXVIII CONO SUR MATHEMATICAL OLYMPIAD Logo and poster design for mathematical competition Guayaquil, Ecuador | August 2017 200 x 100 cm
Uruguayan team arriving at Guayaquil’s International Airport
Computer Drawings GRACIA
EIXAMPLE
EL GOTIC
BARCELONETA
CROSS SECTIONS OVER BARCELONA DISTRICTS (2017)
OLD vs NEW ST. PETER’S BASILICA, ROME (2015)
CARNEGIE HALL TOWER, NEW YORK CITY (2019)
Thank You