THE HARD INTERCHANGE – PORTSMOUTH UK (2014)
1
2
3
4
5
6
7
8
9
10
1 AHR-AR-B01-90-121
69716 47700
5300
5300
5300
5300
5300
5300
5300
5300
5300
AHR-AR-B01-20-300 1
AHR-AR-B01-21-311 1 5540 A
ED.115
2 AHR-AR-B01-27-112 A
A
A
ED.114
A
A
ED.113
A
A
ED.112
A
A
ED.111
A
A
ED.110
A
A
ED.109
A
A
ED.108
A
A
ED.107
A B
B
5000
AHR-AR-BXX-32-623 5575 5575
5575
1 B B01.01 LOBBY
B
B01.03 LOBBY
12 m²
2215
B 5644
ED.102
Incoming Comms Through Old Gulley Location
Electrical Panel
MH
6763
2 m²
RWP
D.109
C
5745
D.104
2 m²
D.120 B01.04
B01.08 TRAVEL SHOP
B01.12 WC
SP
CONCOURSE
2 m²
693 m²
17 m²
7 m²
D.115 D.112
B01.10 CIRCULATION 7 m²
D.113 B01.13 WC 2 m²
B
B01.17 COMMS
D.111 B01.11 WC
MH D.107
D.103
Incoming Water
D.116
B01.15 CLEANER
B
5745 D.117
4 m²
D.114
B SP
B01.14 DIS. WC
To be read in conjunction with the following scoping drawings:
3 m²
B
SP
4174
C1
1020
6 m²
B
D.108
4 m²
D.102 B01.06 KITCHENETTE
D.101
5708
B01.07 WC
9 m²
B
MH
D.110
B B01.05 CONTROL
Zone for outgoing Site Service Ducts
4 m²
ETFE CONTROL ROOM
SP
Proposed Route for Condenser Pipework
B01.16 TICKET MACHINE ROOM
B01.10
B1
1 AHR-AR-B01-21-121
B
B01.19 RETAIL STORE
B01.18
RWP
D.105
B01.09 RETAIL
B
37 m²
D.106
D
B
D.119
35 m²
AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings
SP
2 m²
RETAIL
5745
AHR-AR-B01-23-110 - Scoping Drawing - New Terminal Building Flooring
D.121
AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings
D.118 B
B
Security Screens Rail
B
B
1
3764
12 m²
5644
AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes
3
AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E
AHR-AR-B01-21-312 5745
AHR-AR-B01-21-312
For Planks Setting Out Layout see Drawing: AHR-AR-B01-20-099
B B
7087
D1
B B
B
1 AHR-AR-B01-22-123 E
B
5800
5800 B
ED.104
5825 B
B
3580
1 AHR-AR-B01-22-124
B
B
LOBBY
4 3 2 1 Rev
B
3 AHR-AR-B01-21-122
5866
F
Tender Issue Tender Issue Issued for Consultants Review Issued for Stage E Description
24/11/2014 D.M B.B 21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by
original by
date created
approved by
JE
09/05/14
BB
5875 AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
3 AHR-AR-B01-20-300
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
Floor Ventilation Grilles A Keynote
Count
Type
client name
Portsmouth City Council
A
18
Floor Grilles 1700 X 290 Floor Ventilation Grilles B
Keynote B
Count 30
Type Floor Grilles 1920 X 290
project
The Hard Interchange Portsmouth
drawing
General Arrangement - New Terminal Ground Floor Plan computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
1
Ground Floor Plan 1 : 100
project number
scale
2013.01080.002
1 : 100
drawing number
rev
issue status
4
Tender
AHR-AR-B01-20-100
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
10
9
8
5300
7
5300
6
5300
5
5300
4
5300
5300
20-10-10/110 Plasterboard Ceiling
20-50-30/135 Liquid Applied Inverted Roof Covering System
2 5300
1 5300
Mechanical Extract Ventilation
Stretched fabric Barrisol Ceiling Insulated Pressed Metal Coping
3 5300
20-10-20/130 Fabric Membrane Ceiling System
Suspended real time information Screen
Structure Zone
Latchway
Suspended real time information Screen
Structural Cross Bracing
11380.0 11380.0 Top Col 10300 10597.8 10300.0 9045.0 9045.0 8145.0 8145.0
25-80-15/175 Glazed Curtain Wall 5875.0 5875.0
5540.0 5540.0 Safeguarding Zone for Touch Screen Journey Planner
1
Help Point E2
Stainless Steel Structural Cross Bracing
Building Sections C-C
National Express Ticket Machines
1 : 75
Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
Safeguarding Zone for Touch Screen Journey Planner
Sim 1 AHR-AR-B01-22-402
Suspended real time information Screen
Sim 1 AHR-AR-B01-22-401
Smart card Ticket machine
Mirrored Window to Control Room
Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
To be read in conjunction with the following drawings: ·AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ·AHR-AR-B01-23-110 - Scoping Drawing - New Terminal Building Flooring ·AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof ·AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy ·AHR-AR-B01-35-110 - Scoping Drawing - New Terminal Building Ceilings ·AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes ·AHR-AR-B01-70-110 - Scoping Drawing - New Terminal Building FF&E Insulated Pressed Metal Coping
20-50-30/135 Liquid Applied Inverted Roof Covering System
F
Suspended real time information Screen
E
20-10-20/130 Stretched Fabric Barrisol Ceiling
7087
Structure Zone
Steel Structure ETFE Canopy
1 21-210 D
3580
Mechanical Extract Ventilation
C 4174
B 6763
A 5000
Steel Structure Glass Canopy
Sim 2 AHR-AR-B01-21-122
11380.0 11380.0 Top Col 10597.8
10300 10300.0
25-80-15/175 Glazed Curtain Wall
8945.0 8945.0 4760
8145.0 8145.0
5875.0
3764
2
1 : 75
date created
approved by
DM
09/05/14
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
5364
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
5540.0
D1 Plasterboard Ceiling
03/12/2014 D.M B.B 21/11/2014 D.M B.B 17/10/2014 D.M B.B 16/09/2014 J.E B.B 15/09/2014 J.E B.B Date Dr by App by
original by
5540.0
5708.0
Building Section A-A
Tender Issue Amendments Tender Issue Issued for Consultants Review Updated Issue Issued for Stage E Description
Bus Barrier
WC Level 5708
5875.0
Bus bay real time information Screen mounted to transom
5 4 3 2 1 Rev
1020
C1 Metsec framed pod with roof allowing for some access. Clad with plasterboard internally and vertical timber cladding externally
2215
client name
Portsmouth City Council
B1 Suspended real time information Screen
35-05-35/135 Back to Back Fixed Seating with Tables
project
The Hard Interchange Portsmouth
drawing
General Arrangement - New Terminal Building Building Sections A-A and Section C-C computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
scale
2013.01080.002
1 : 75
drawing number
rev
issue status
5
Tender
AHR-AR-B01-20-200
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Stainless Steel Panels Fascia
10
9
8
5300
7
5300
6
5300
5
5300
4
5300
3
5300
2
5300
5300
1
Steel Structure ETFE Canopy
5300
11380.0 11380.0 Top Col 10300 10597.8 10300.0 9045.0 8945.0 9045.0 8945.0 8145.0 8145.0 25-80-15/175 Glazed Curtain Wall 5875.0 5540.0 5875.0 5540.0
1
Bus Barrier
5745.0 5745.0
Elevation 1 - a 1 : 100 Steel Structure Glass Canopy
Mechanical Extract Ventilation
Steel Structure ETFE Canopy Insulated Pressed Metal Coping
1
2
3
5300
4
5300
5
5300
6
5300
7
5300
8
5300
11380.0 11380.0 Top Col 10300 10597.8 10300.0
9
5300
5300
10 Stainless Steel Panels
5300
9075
9045.0 8945.0 9045.0 8945.0 8145.0 8145.0
Stainless Steel Structural Cross Bracing 25-80-15/175 Glazed Curtain Wall
5540.0 5540.0
3
5745.0 5745.0
5875.0 5875.0
Elevation 1 - a1 1 : 100
20-50-75/110 Steel Structure Glass Canopy
F
E 3580
To be read in conjunction with the following drawings:
Stainless Steel Structural Cross Bracing
Caping
D 7087
Mechanical Extract Ventilation
C
B
4174
6763
Steel Structure ETFE Canopy
Stainless Steel Panels
A
·AHR-AR-B01-21-110 - Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings ·AHR-AR-B01-27-110 - Scoping Drawing - New Terminal Building Roof
5000
·AHR-AR-B01-27-111 - Detailed Drawings - ETFE Canopy ·AHR-AR-B01-40-110 - Scoping Drawing - New Terminal Building Finishes
11380.0 11380.0
Top Col 10597.8
10300 10300.0 8945.0 8945.0 8145.0 8145.0
25-80-15/175 Glazed Curtain Wall Bus Barrier
5875.0
5745.0 5745.0
5540.0 5540.0
6918
D1 Steel Structure ETFE Canopy
Stainless Steel Panels
A
Mechanical Extract Ventilation
B
C
5000
Stainless Steel Structural Cross Bracing
4174
B1 20-50-75/110 Steel Structure Glass Canopy
E 7087
5568
C1
Insulated Pressed Metal Coping
D
6763
3 2 1 Rev
5875.0
4
Tender Issue Issued for Consultants Review Issued for Stage E Description
21/11/2014 D.M B.B 17/10/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by
original by
date created
approved by
JE
09/05/14
BB
Elevation 1 - d1
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
1 : 100
F 3580 T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
11380.0 11380.0 Top Col 10300 10597.8 10300.0
client name
Portsmouth City Council
project
9045.0 9045.0 8145.0 8145.0
8945.0 8945.0
The Hard Interchange Portsmouth
25-80-15/175 Glazed Curtain Wall Bus Barrier 5745.05875.0 5745.05875.0
5540.0 5540.0
drawing
General Arrangement - New Terminal Building Elevations computer file
project number
B1
2
Elevation 1 - d 1 : 100
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
C1
D1
scale
2013.01080.002
1 : 100
drawing number
rev
issue status
3
Tender
AHR-AR-B01-20-300
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
S12
A
A
A
B Alarm Cord
Sanitary
500
F9
1
571
5
EQ 551
EQ 0
1080
0
EQ 473
81
Disabled Toilet Elev 1
550
600
500
352
5
5
400
Access Panel
3
1 : 20
B
A
5
WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap
A
Laminate Panel Cladding 25-05-45/10
B
Laminate Panel IPS System 25-05-45/120
800
800 400
400
1563
5
750
745
Disabled Toilet Elev 3
4
1 : 20
5
745
Disabled Toilet Elev 4 1 : 20
A
A
B
S12
S2a
5708
Disabled Toilet Elev 2
2
1 : 20
S7
S8
S4
600
800
740 0
S9
730
S5
900
2 4 0 0
S7
S11
EQ
Alarm Reset
S6b
S9
S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a
Access Panel
F9
S6a
Dual Flush
2 4 0 0
S5
S5 1750
S4
Access Panel
S8
1000
S3a
550
S1a
100
S2a
S4c
EQ
EQ 873
5
EQ 5
872
Public Toilet Elev 1 1 : 20
550
1066
6
Public Toilet Elev 2
7
1 : 20
5
EQ 640
5
550
Public Toilet Elev 3 1 : 20
70
8
996
835
Public Toilet Elev 4
9
1 : 20
980
5
360
5
980
5
360
5
5
980
Circ Elev 1 1 : 20
2 1 Rev
A
Disabled WC Alarm
A
A
Tender Issue Issued for Consultants Review Description
21/11/2014 D.M B.B 12/11/2014 D.M B.B Date Dr by App by
original by
date created
approved by
DM
09/23/14
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
2 4 0 0
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
project
The Hard Interchange Portsmouth
drawing
100
Detail Drawings - Internal Elevations - Retail Pod Internal Elevations and Sections
5
457
5
980
5 242 5
980
5
332
126 5
1080
5
434
computer file
project number
scale
2013.01080.002
As indicated
drawing number
rev
issue status
2
Tender
AHR-AR-B01-22-403
10
Circ Elev 2 1 : 20
11
Circ Elev 3 1 : 20
12
Circ Elev 4 1 : 20
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Sanitary Disabled WC Alarm
S1a S2a S2b S3a S4c S4 S5 S6a S6b S6c S7 S8 S9 S10 S12 S13a
S12
Wall Tiling 25-85-97/140
Wall Tiling 25-85-97/140
Alarm pull cord with two red bangles Alarm Reset
F9
S6b
900
2400
S7
S7
S4
S5
WC Disabled WC- Doc M Pack Stainless Steel Disabled WC- Doc M Pack Wash Basin Wash Basin Tap Soap Dispenser Hand Dryer Standard Mirror Disabled Mirror Full Height Mirror Grab Rail (set) Toilet Paper Holder Baby Change Bin – Sanitary Waste (by others) Air freshener (by others) Sluice Sink and Tap
S8 1400
S11
1 : 20
440
600
600
2
F1a F1b F1c F2 F3 F3a F3b F3c F3d F4 F5 F6 F7 F8 F9 F10 F11 F12
740 S10
S2a
100
Disabled Toilet Elevation 1
1
Fittings
950
800
900
730
800
600
600
S2a
Disabled Toilet Elevation 2 1 : 20
3
S10
Disabled Toilet Elevation 3 1 : 20
4
Disabled Toilet Elevation 4 1 : 20
Back to Back Fixed Seating Fixed Seating Fixed Seating to Taxi Shelter Litter Bins Kitchenette Kitchenette Base Units Kitchenette Counter Kitchenette Upper Units Kitchenette Sink and Tap Shelving (by others) Office Chair (by others) Built in Work Counter Built in Desk (by others) Built in Retail Display Units (by others) Coat Hook Ashtray Post Cycle Rack Brompton Cycle Dock
600
Filler Panel
Upper Cabinets
F3c
720
F3c
2400
Wall Tiling 25-85-97/140 600
F3b
F3b
F3d
F3a Fridge (By Others)
850
Fridge (By Others)
Filler Panel
F3a E6
E6
Kitchen Elev 1
6
600
1 : 20
Lighting Troffer
600
7
Kitchen Elev 2 1 : 20
8
Kitchen Elev 3 1 : 20
9
Kitchen Elev 4 1 : 20
Single Pane Control Window 2 1 Rev
Tender Issue Issued for Consultants Review Description
21/11/2014 D.M B.B 12/11/2014 D.M B.B Date Dr by App by
original by
date created
approved by
DM
09/23/14
Approver
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
2400
client name
Portsmouth City Council Counter (F6)
project
The Hard Interchange Portsmouth
drawing
720
Support Gables (F6)
Detail Drawings - Internal Elevations - Travel Shop Pod Internal Elevations and Sections computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
5
Control Room 1 : 20
project number
scale
2013.01080.002
As indicated
drawing number
rev
issue status
2
Tender
AHR-AR-B01-22-404
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
252 15 15 Deflection Head
Insulate Roof Void Between Joist Above Rooms: B01.05 - B01.06 - B01.07 - B01.08 - B01.10 Horizontal Flex-ply Fixing Strips
Head Track fixed to underside of Structure
Horizontal Flex-ply Fixing Strips
Horizontal Flexi-ply Battens
70mm Metal Stud
Horizontal Flexi-ply Battens 120mm SHS POD Perimeter Structure 120mm SHS Posts Pod Structure
Acoustic Fleece
Deflection Head
Deflection Head
Fire Rating
Head Track
Head Track
Wall Board
100 SFS Framing
100 SFS Framing
50mm Insulation
Metsec Framing with Plasterboard Lining Partition
Vertical Timber Cladding
Vapour Barrier
120mm SHS POD Perimeter Structure 100
25
100
25
100
25
100
25 Suspended Ceiling
Acoustic Insulation
120mm SHS Posts Pod Structure
Acoustic Fleece
Acoustic Insulation
Metsec Framing with Plasterboard Lining Partition
Vertical Timber Cladding
122
Softwood Batten Vertical Packing
Softwood Batten Vertical Packing Horizontal Flex-ply Fixing Strips
Horizontal Flex-ply Fixing Strips
Horizontal Flexi-ply Battens
Horizontal Flexi-ply Battens
2 Layers 12.5mm Wallboard with Staggered Joints to meet overall Fire Rating of 60 Minutes 70mm Metal Stud
Stailess Steel Skirting / Ply Backing
Stailess Steel Skirting / Ply Backing
100 x 38mm PT Timber sole plate
100 x 38mm PT Timber sole plate
72mm U Channel with Intumescent Mastic
Sealant
Sealant Vinyl Skirting Tiles Floor Finishes
Type P01 + WL01
1
1:5
Metsec Framing with plasterboard lining with acoustical insulation- 25-15-35/145
WL02
Vinyl Skirting Vinyl Skirting
Tiles Floor Finishes
Type P02 + WL01
2
1:5
Metsec Framing with Insulation, vapour barrier and plasterboard lining to achieve 0.35 W/m2.K- 25-15-35/145
WL02
P03
Deflection Head
Deflection Head
Head Track fixed to underside of Structure
Head Track fixed to underside of Structure
P04
Vinyl Floor Finishes
3
Type P03 1:5
To be read in conjunctiion with the following Documents: 1HR Fire Rated partition – metal stud with plasterboard lining- 25-15-25/135
Scoping Drawing - New Terminal Building External Envelope, Walls, Wall Linings
AHR-AR-B01-21-110
Scoping Drawing - New Terminal Building Flooring
AHR-AR-B01-23-110
Scoping Drawing - New Terminal Building Ceilings
AHR-AR-B01-35-110
WL02
Deflection Head
Head Track fixed to underside of Structure 25mm Acoustic Insulation
70mm Metal Stud 70mm Metal Stud 70mm Metal Stud 50mm Insulation
25mm Acoustic Insulation
Fire Rating
Clipclad Rail Horizontal Fixing Channel
Clipclad Rail Horizontal Fixing Channel
Suspended Ceiling
Suspended Ceiling
3 2 1 Rev
Suspended Ceiling
Compact Grade Laminate With Clipclad Inserts Fixed To Clipclad Rails
Tender Issue Amendments Tender Issue Issued for Consultants Review Description
original by
date created
approved by
Author
11/05/14
Approver
Compact Grade Laminate With Clipclad Inserts Fixed To Clipclad Rails 50
122
2 Layers 12.5mm Wallboard With Staggered Joints to Meet Overall Fire Rating Of 60 Minutes
112
Fire Rated Room
Toilet
122
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
50
Moisture Resistant Plasterboard
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com
Moisture Resistant Plasterboard
Services Zone Cubicle
Vinyl Skirting 72 mm Base U Channel
72 mm Base U Channel
70 x 38mm PT Timber sole plate
70 x 38mm PT Timber sole plate
Clipclad Rail Horizontal Fixing Channel
Clipclad Rail Horizontal Fixing Channel
Sealant
Sealant
Tiles Floor Finishes / Skirting
Tiles Floor Finishes / Skirting
03/12/2014 D.M B.B 21/11/2014 D.M B.B 7/11/2014 D.M B.B Date Dr by App by
Cubicle
70mm Metal Stud
Tiles Wall Finish
client name
Portsmouth City Council
project
Stailess Steel Skirting / Ply Backing
The Hard Interchange Portsmouth 72mm U Channel
Vinyl Skirting
Tiles Floor Finishes
drawing
Detailed Drawings - Wall Type Details computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
4
Type P03 + WL02 1:5
Metal stud with moisture resistant plasterboard lining to toilets and acoustical insulation- 25-15-25/135
5
Type P04 + WL02 1:5
6
Type P04 + Tile Finish 1:5
project number
scale
2013.01080.002
As indicated
drawing number
rev
issue status
3
Tender
AHR-AR-B01-22-521
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
20-10-20/130 Fabric Membrane Ceiling System Vinyl Flooring to Top of Roof
Vinyl Flooring to Top of Roof 20-10-20/130 Fabric Membrane Ceiling System Plywood Sheet Roof
Plywood Sheet Roof
LED Lighting Strip
50
100
LED Lighting Strip
75
Staimless Steel Capping
Stiffener 1 0 0
Continuous Curved PPC 150 x 100mm Angle to Follow Profile of Ceiling Setting -out to Fully Support Barrisol Retention Angle
Horizontal Flex-ply Fixing Strips
8945.0 8945.0
Horizontal Flexi-ply Battens
120mm SHS POD Perimeter Structure
150mm Steel Purlins
Barrisol Retention Angle
Stainless Steel Capping 5 0
9045.0 9045.0
Metsec Cleader Angle 100 x 100mm (Follows Barrisol Spring Footprint) Between Roof Purlins
120mm SHS POD Perimeter Structure 8795.0 8795.0
120mm SHS Posts Pod Structure 150mm Steel Purlins
Bracing / Stiffeners as required Vertical Timber Cladding
Metsec Framing with Plasterboard Lining Partition
Horizontal Flex-ply Fixing Strips
3
Vertical Timber Cladding Horizontal Flexi-ply Battens Vertical Softwood Batten Packing
Vertical Softwood Batten Packing
100mm SHS
100mm SHS (Cantilever and Screen Pockets Section of Pod Only)
Barrisol Support Detail 1:5
Internal Pod Partition
Profiled Plate - Support for Screen Track
Profiled Plate - Support for Screen Track RHS - Cladding / Screen Track Support
RHS - Cladding / Screen Track Support (Cantilever and Screen Pockets Section of Pod Only
Galvanised Metal Support Pressing 8145.0 8145.0 5mm Stainlsess Steel Angle Dry Lining Edge Screen Track Screen Track Plasterboard Ceiling 7885 7885.0
1
Cantilever Section Details
Sliding Folding Security Screen (Stored in Pocket)
1:5
4 3 2 1 Rev
Tender Issue Amendments Tender Issue Tender Issue Issued for Consultants Review Description
date created
approved by
Author
11/03/14
Approver
Stailess Steel Skirting
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
Galvanised Metal Support Pressings Sealant Tiles Floor Finishes
WC Level 5708 5708.0
03/12/2014 D.M B.B 26/11/2014 D.M B.B 21/11/2014 D.M B.B 4/11/2014 D.M B.B Date Dr by App by
original by
Va r i es
Sliding Folding Security Screen
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council
SHS Posts Baseplate project
The Hard Interchange Portsmouth
drawing
2
Typical Section Details
Section Details - Pods - Sheet 2
1:5 computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
scale
2013.01080.002
1:5
drawing number
rev
issue status
4
Tender
AHR-AR-B01-22-224
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
6 AHR-AR-B01-70-632
* *
* *
6 AHR-AR-B01-70-632
1147
6 AHR-AR-B01-70-632
* *
SIM
1012
926
623
203
E2
* *
723
1047
ø 495.0
* *
1000
540
* *
700
1100
800 640
5
E12
E9
AHR-AR-B01-70-632
1400
E1
*
696
790
837
*
WC Level 5708 5708.0
Ticket Machine
WC Level 5708 5708.0
2
1 : 10
Help Point
WC Level 5708 5708.0
3
1 : 10
Smart Card Machine
4
1 : 10
Screen Journey Planner 1 : 10 Equipment
TBC by Supplier
*
Ticket Machine
All Dimensions to be Confirmed based on final Product information supplied by Portsmouth City Council and Operators
Timber Frame Metsec Framing with Plasterboard Lining Partition
5
Ticket Machine Plan 1 : 10
Acoustic Fleece
E1 E2 E3a E3b E3c E4 E5 E6 E7 E8 E9 E10 E11 E12 E13
National Express Ticket Machines Help Point Real Time Information Screens (46” screen) Group of 4 Real Time Information Screens (55” screen) Group of 2 Real Time Information Screens (55” screen) Server Cabinet 600W x 1100D x 2300H * Mobile Phone Charging Stand Under Counter Fridge (by others) Microwave (by others) ETFE Air Handling Unit with UPS Smart Card Machine Induction Loop in Bus Bay (final setting out TBC) * Fire Alarm Panel * Safeguarding Zone for Touch Screen Journey Planner Safeguarding Zone for News Screen
* Refer to Elecrical Specification Timber Lining
(RTI screens are free issue by PCC, mounting brackets power and data and installation by main contractor)
SS Framing for Timber Lining mounted FFE
Sim 6 AHR-AR-B01-70-632
Timber Packing
Timber Frame
Metsec Framing + Plasterboard Lining Partition
Acoustic Fleece 1 Rev
Tender Issue
03/12/2014 D.M B.B Date Dr by App by
Description
original by
date created
approved by
Author
10/14/14
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
SS Countersunk Screw
SS Framing for Timber Lining mounted FFE T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
100
6
Typical SS Frame Detail
Portsmouth City Council
1:2 project
100
The Hard Interchange Portsmouth
drawing
Detailed Drawings - FFE - Timber Wall Lining FFE Equipment Interface Details
2 0
1
WC Level 5708 5708.0
25
7
50 Ticket Machine
SS Framing for Timber Lining mounted FFE
100 X 50 X 5mm Stainless Steel Anngle All edges ground flush and smoth
Timber Lining
3D
computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
scale
2013.01080.002
As indicated
drawing number
rev
issue status
1
Tender
AHR-AR-B01-70-632
@A1
This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR.
Dropped Kerb for Cycle Service Vehicle Access
N or th
D CCTV 14
Bollards
1
Overall Site Plan 1 : 250
CCTV 15
CCTV 18
A
NO ENT RY
CCTV Schedule (Exterior)
D
CCTV 20
B
NO ENT RY
D CCTV 21
CCTV 17
CCTV 16
4200.0 4200.0 4002.0 4002.0 4002.0 4189.0 4189.0 4189.0 3842.0 3842.0 3842.0 3500.0 3500.0 3500.0 3850.0
Taxi Rank Public Pick Up Drop Off
Th e rd Ha
A
CCTV 19
Fire Hydrant
B
Taxi Shelter and Toilets See Drawing: AHR-AR-B02-22-405
Bollards
CCTV Mount Height
CCTV Canera Height
White Line Road Markings
Line of ETFE Canopy Above
3700.0 3700.0 3502.0 3502.0 3502.0 3689.0 3689.0 3689.0 3342.0 3342.0 3342.0 2865.0 2865.0 2865.0 3500.0
Mark
Type
CCTV 14 CCTV 15 CCTV 16 CCTV 17 CCTV 18 CCTV 19 CCTV 20 CCTV 21 CCTV 22 CCTV 23 CCTV 24 CCTV 25 CCTV 26 CCTV 27 CCTV 28
Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type D Type E
Taxi Queue
5533
B
Millenium Lighting Columns Reused
B
Double Headed Lighting Columns
White Line Road Markings
C
8m Lighting Columns
D
CCTV Pole
10
A
8
Double Yellow Line Road Markings
9
A
7
5619
6
B
5
Bus Layby
4
B
2
BUSES ONLY
3
The Hard Interchange See Drawing: AHR-AR-B01-20-100
BUSES TAXIS &
5781
A
Trief Kerb Edge Protection
5480
1
CCTV 27
NR Station Structure PCC Structure Boundary
National Express Coach Bay
CCTV 28
D
Air Intake Vents under Banches AHR-AR-B01-90-122
CCTV 25
A
CCTV 23
For Site Finishes Refer To landscaping Drawings: AHR-AR-B01-90-100
Coach Drop Off / Layby
D
5607
Condensor Enclosure AHR-AR-BXX-21-658
UP
C
CCTV 26
Brompton Dock for 40 Bikes
BUSES & TAXIS
Fire Hydrant
CCTV 24
CCTV 22
2 1 Rev
B White Line Road Markings
Tender Issue Issued for Stage E Description
original by
date created
approved by
D.M
09/05/14
BB
AHR London Ltd 5-8 Hardwick Street London EC1R 4RG United Kingdom
C Cycle Parking for 40 Bikes
24/11/2014 D.M B.B 15/09/2014 J.E B.B Date Dr by App by
C
A
Project Scope Boundary Line Exit NR Station Stairs and Ramp Retained
T +44(0)20 78379789 F +44(0)20 78379678 E london@ahr-global.com www.ahr-global.com client name
Portsmouth City Council Bin Store See Drawing: ARH-AR-BXX-90-660
UP
Proposed Future Station Entrance
project
The Hard Interchange Portsmouth
Temporary Hoarding at Edge of New Deck Slab
drawing
General Arrangement - Overall Site Plan Existing Station Entrance
P
or Harb outh ortsm
Stat
ion
computer file
plot date
& ?5HYLW 3URMHFWV? $+5 %/'* ;; 0 $5 FHQWUDOBGDQ PRUHOOL UYW
project number
scale
2013.01080.002
As indicated
drawing number
rev
issue status
2
Tender
AHR-AR-BXX-10-102
@A1