Skip to main content

Portfolio, Daniel Adrián Bejarano

Page 1

Hi !

Jonh Updike once said: “Any activity becomes creative when its maker cares about doing it well or better.” So i send you this:

This is my portfolio, the compilation of academic and professional works throughout 3 countries, Ecuador, Bolivia and Brazil. I hope you like it and that we will contact you very soon


Portfolio Selected Works 2021- 2023

Daniel Adrian Bejarano Palacios


Index

1

About me

2

Gastronomic Cultural Pavilion

3

Chimbacalle Urban Recovery Plan

Page 1

Page 3

Page 9

4

Youth Center for Visual Arts and Digital Media

5

YP House

6

Second Level Hospital of Tupiza

Page 17

Page 41

Page 47


Education Architect Universidad de las Américas, Quito, Ecuador july- 2021

Professional Experience BIM Modelers Leader Hospiplan Consulting Company, Quito Ecuador May 2022- jun 2023 Site Architect Monteiro Inc. Construções November 2022- may 2022 Site Architect Grupo Baluarte Constructors March 2021- august 2021 Urban Designer

About Me

Municipality of Quito November 2020- december 2020

Skills Daniel Adrián Bejarano Architect

Information São Paulo, Brazil +55 (11) 93713 7287 danielpalacios8@gmail.com linkedin.com/in/daniel-bejarano-p/

Languages • • •

1

Spanish: Native English: Upper-Intermediate (B2+) Portuguese: Advanced

• • • • • • • • •

Revit: Advanced Revit MEP: Intermediate Rendering: Advanced Adobe Creative Suite: Advanced Sketchup: Advanced Autocad: Advanced Office: Advanced MS Project: Basic GIS/ QGIS: Intermediate

• • • • • • • • •

Leadership Adaptability Time Management Proactivity Team Management Problem-Solving Effective Communication Decision Making Active Listening

Achievements • • • • •

Gold Medal for Degree Work, August 2021 Honorable Mention of Projects VII, March 2021 Gold Medal Project Workshop V, March 2020 Academic Research Publication Quito Biennial Academic Catalog, Nov 2020 Project publication in m+m Volume 2, April 2021

2


Gastronomic Cultural Pavilion Quito, Ecuador -0.2000, -78.4995

Cultural Equipment

“Public space as urban acupuncture”” acupuncture

Area 17 713 m2 m2

0%

6/10

25 000

Existence of Public Spaces in the area

Uninhabited Lots or Buildings

University or high school students per day

2 existing buildings are recovered and 2 are proposed, all are related by means of circulations that cross the project.

2

Access points are generated from the roads surrounding the project, it is proposed to connect directly through pedestrian access

3

300 m

0

9211 hab

Distance between stops

Leisure or cultural equipment

Lack of vitality due to low attendance

Fixed access points are created on each recovered block

Direct circulation is maintained on the ground floor with a plinth that runs through the public space and connects it

4


ver planta Isometric Section

Facade View

5

Public Space View

6


1

3´

2

3

4´

4

5

6

7

8

E

D

C

B

A

+18.00 +18.00

AMAZONÍA

SIERRA

COSTA

INTERNACIONAL

+14.00 +14.00

+10.00 +10.00

+6.00 +6.00

+2.00 LNT

+2.00

+1.00 +0.00

+0.00

Front facade

Side Facade

E

D

C

B

UNIVERSIDAD DE LAS AMÉRICAS A

FACULTAD DE ARQUITECTURA Y DISEÑO

FACHADAS PABELLÓN CULTURAL GASTRONÓMICO

TALLLER DE INTEGRACIÓN I DANIEL ADRIÁN BEJARANO

10/10

+18.00

+14.00

+10.00

+6.00

+2.00

UNIVERSIDAD DE LAS AMÉRICAS FACULTAD DE ARQUITECTURA Y DISEÑO

FACHADAS PABELLÓN CULTURAL GASTRONÓMICO

TALLLER DE INTEGRACIÓN I DANIEL ADRIÁN BEJARANO

10/10

Isometric view

7

8


At present, Chimbacalle is the result of different layouts and morphological changes initiated since its creation at the beginning of the 20th century.

Chimbacalle Urban Recovery Plan Urban Territorial Recovery Plan

Area 977 679 m2 m2

Estación del Ferrocarril Chimbacalle

Facilidades Transportde Transporte Facilities

Quito, Ecuador 40.157, -70.00

1909

Estación Ecovía Estación Trolebús Tranvía 1914

Parque Pobre Diablo

Liga Barrial Chimbacalle

Estadio Chimbacalle

6

15%

0%

According to the last census (NEC 2010)

Sites of interest without pedestrian connectivity

Public transport coverage

Alternative Transportation Coverage

Pq. Fulton

Pq. Jefferson Pérez

Teatro México

1945

Tejidos Victoria 1914

Áreas de Production Producción Areas

39 820 hab

Parques, Parks, Jardines Gardens y Espacios Públicos and Public spaces

1958

Parque de las Flores

Mercado Chimbacalle La Internacional 1922

Molinos Royal 1911

Fab. Sombreros Yanapi 1978

Pasteurizadora Quito 1960

Plaza Primero de Mayo

1942

Plazas y and Calles Squares Streets

Av. Maldonado 1875

57%

87%

1.72m22 x hab 1.72m

10%

Residential Land Use

Buildings with a height between 1 and 3 floors

Equipment coverage deficit

Percentage of street furniture in good condition

Plazoleta Iglesia Chimbacalle 1915 Av. Alpahuasi

Av. Napo

1909

1930

1944

El Plan Jones Jones Odriozola’s Odriozola plan

1960

1990

La modernización Capitalist capitalista Modernization

1990

actualidad

La thedescentralización decentralization de of Quito

3

ElThe ferrocarril su Railway yand influencia its influence

1942

9

10


Vía principal - Articuladora Estaciones de Transporte 3.Implementar modificaciones formales Nueva distribución que mejoraran y unificaran la imagen visual (Uso de suelo) y estética delÁreas sitio, Verdesy agregaran al entorno construido calidad visual espacial.

Corema Access to Public Transportation

11

Cobertura de paradas

Cobertura de estaciones Conexión de ciclovías Ciclovía existente 863

Implementar

- Implementar formas de ocupación con retiros frontales y posteriores como parte de la nueva normativa Alta permeabilidad en fachada de ocupación del suelo, aportando Media permeabilidad en fachada principal (Av. Napo) conEjeenmayor espacio para el desarroVegetación fachada permeabilidad en Conexiones vías principales llo Alta de sistemas de movilidad del fachada Conexiones vías secundarias peatón y de transportes alternatiMedia en fachada EP y áreas verdespermeabilidad existentes Vegetación en fachada vos; y también EP y áreas verdes propuestos permitiendo la geneConexiones vías principales ración de espacios comunales Variedad de actividades Conexiones vías secundarias EP y áreas verdes existentes privados o públicos en forma de EP y áreasde verdes propuestos centros manzana, que promuede actividades vanVariedad la calidad de vida de los usuarios. Corema connection between public-space Implementar normas para la altura de edificaciones permitiendo regular el perfil urbano, en base a criterios de usos de suelo y jerarquía de los viarios, considerando de igual Eje principal (Av. Napo)

Corema Roads

Ejes principales Ejes viales de mayor importancia Nodo de alto flujo

Intersecciones Altura hasta 5 pisos Altura hasta 4 pisos Altura hasta 3 pisos Altura hasta 2 pisos 8 pisos

CONEXIÓN EQUIPAMIENTOS-ÁREAS VERDES

- Conectar los equipamientos con diferentes puntos del área de estudio mediante una buena distribución que considere sus alcances y conexiones a través de sistemas de transporte alternativo.

CONCLUSIONES

2.Activar las relaciones espaciales interiorexterior que aportan a una adecuada interacción con lo que ocurre en el entorno, mejorando así las experiencias de los Leyenda recorridos de los peatones.

Conectar

Elaborado por: Paola Ango, Santiago Cabrera, Lizbeth Flores

1.Implementar un patrón de múltiples usos de suelo que combina usos de residencia, comercio, oficinas, espacios públicos y verdes para propiciar nuevas dinámicas y actividades que vitalizan el espacio a la vez que aportan al crecimiento económico de una ciudad productiva.

- Activar los espacios públicos y zonas poco recorridas en el área de estudio a través de la creación de pasajes que rompan las manzanas de mayor área, generando mayor comfort en el recorrido del peatón y dinámica entre los diferentes usos y edificaciones. - Activar espacios residuales o poco transitados del área de estudio a través de la redistribución de equipamientos y planteamientos de nuevos usos, de forma que toda el área de estudio se encuentre al alcance de los mismos.

ESPACIO PÚBLICO Y ÁREAS VERDES

Estrategías

Activar

borado por: Emilia Romero, Ariana Urgiles y Alejandro Zapata.

Construir un sitio transformable con espacios atractivos, vivos y dinámicos, que invite a los ciudadanos a ser parte de este, proporcionando accesibilidad, conexiones e interacciones sociales mediante espacios identitarios barriales, patrones de ordenamiento para la calidad visual de la imagen urbana y la distribución del uso y actividades en diferentes horarios para que se conviertan en un espacio integral.

Elaborado por: Andrés Villacis, Michelle Andrade y Gabriela Ayala

SOSTENIBILIDAD URBANA

Objetivo

QUIPAMIENTOS Y USO DE SUELO

Sustainable Development Goals to be applied in the urban plan

Conlusión

Equipamientos existentes Equipamientos nuevos Ciclovía arbolizada Red de conexión Vía peatonal Integración de espacio

Concentración equipamientos Cobertura ÁV Áreas verdes

Corredor verde

Cobertura transporte alternativo

Corema road-pedestrian connections Gráfico:Espacio público y áreas verdes Elaboración propia

12


The objective is to transform Chimbacalle into a sustainable neighborhood, with dynamic and attractive spaces that invite residents or visitors to feel attracted by providing accessibility, connections and social interactions through neighborhood identity spaces.

498000

498400

498800

499200

9974000

9974000

QUITO DM ECUADOR ÁREA DE ESTUDIO

MASTER PLAN 1 : 7 500 0

200

400 M

Leyenda

Adaptation of Public Space

Equipamientos 9973600

9973600

!

Espacio Público Paradas de Bus Uso mixto de (Res, Com, Ofi) Paradas Ciclovía Uso mixto (Res, Com)

Ruta de Ciclovía

Residencia

Equipamientos

!

Áreas verdes

Espacio Público

Áreas verdes internas

Espacios Verdes

Veredas verdes

Uso Mixto (Res, Com, Ofi)

9973200

9973200

Corredores peatonales

Usotranvía Mixto (Res, Com) Ruta Residencia Ruta ciclovía Fachadas verdes 40 % Paradas de tranvía Paradas de Ciclovía

INFORMACIÓN DEL MAPA

9972800

9972800

Señala la propuesta general del taller, mostrando las intervenciones a realizar.

FUENTE DE INFORMACIÓN Información levantada por el taller de integración.

PUBLICACIÓN / DIFUSIÓN Los mapas pueden ser encontrados en la página web del Taller de Integración.

842

9972400

9972400

PRODUCCIÓN DEL MAPA

498000

498400

498800

Elaborado por: Taller de Integración II

499200

Urban proposal made in ArcMap

Use of native vegetation in reused spaces

13

14


1198

PASO ELEVADO WAYNA KUNTUR Connection between equipment

Implementation of new public spaces

1096

Adaptation to topography

15

1199

Urban intervention and equipment

16


Experience of building the void

Youth Center for Visual Arts and Digital Media UIO 40.157, -70.00

Cultural Equipment

The paradigm that “the void obeys the object” is broken, this void configures the form taking itself as a starting point for its configuration through different experiences, to see it, find it, read it and build it, always taking into account the reality of the territory. , solving the problems and potentiating the opportunities of the sector.

Area 3598.40 m2 m2

39 820 hab

40%

4983

4

According to the last census (NEC 2010))) 2010)

Youth and Adolescents

Students in the area

Educational Centers in the Immediate environment

Favorite free time activities

Actividades en la mañana

Acceso a Internet

Acompañamiento en la tarde

29 %

43 % None

Public Centers

58%

29 %

23% sports, 23% recreation, 14% music, 11% education

29% homeworks, 5% cultural, 14% educational, 8% physical

18% ed. institutions, 1% work, 20% home, 2% someone else’s house, 1% other

23% siblings, 20% single, 14% relative, 14% parents

4

Arts

17

Other

Gold medal Best Graduation Project semester 2021-2 Axonometry of the Youth Center

18


Enfoque

How it was made?

Visual Arts

Stimulation of cognitive abilities

Increased perception of environment

Security and autonomy

1

Conexión ofde niveles calzadas Connection thelos levels betweenentre roads through the use of the mediante el basement uso de la plan planta basamental

2

3

La grouping agrupación de los allows módulos permiten las The of modules visual relaciones visuales y de interacción entre los relationships and interaction between users usuarios

4

Se ground liberafloor la isplanta baja, elevando las The released, raising the activities toactividades the upper floors. The public becomes El a los pisosspace superiores. continuous and connects with the area espacio público se vuelve contínuo y se

6

Losmodules módulos generan relacionesbetween entre The generate thelas relationships the thezonas surface areas las ground plantasfloors bajasand y las superiores

Expression of emotions, ideas and feelings

La de actividades permiteto The agrupación grouping of activities makes it possible establecer relaciones visuales y espaciales establish visual and spatial relationships between the container object and the voidy itelforms. entre el objeto contenedor vacío que forma

Digital Media

Trend setting

Working medium

Way to make yourself known

Start a business

5

conecta con la zona

Mediante puentes, los módulos setovan Through bridges, the modules are related each other. The project connects the area, se the relacionando entre si. Elwith proyecto space becomes with exterior. conecta con laone zona, el the espacio se Activities vuelve are the community unointegrated solo con with el exterior. Las actividades se integran con la comunidad

19

20


Accessibility and Flows

Public Space

Entrances through secondary streets

Transition space between the area and the equipment

Homework zone Zona de Tareas

Podcast Trend de setting Creación tendencias Sculpture Esculturas

Paint Zone Pintura Leisure Ocioteca Experimental Theater Teatro Experimental

Baile yand Actuación Dance Acting Vestuario y Maquillaje Wardrobe and Makeup

Mooding and Tunning Modding y Tunning

Desarrollo Web Web Development

Creación Multimedia Media Creation Exposición Exposition

Connectivity

Urban Landscape and Scale

Integration of services and activities to the community with the youth center

Relationship of levels joining the 2 streets of the project, interaction with the user with activities

Clown e Interpret. Clown and Interpr.

Administración Administration

Coffee shop Cafetería Dining room Comedor

Theater Auditorio

Utilería Props Proyección Projection

Zona SnackSnacks Zone

Camerino Dressing room

Parking lots

Estacionamientos

21

Program explained

22


1

2

3

4

5

6

D

C

B

A

+20.40 +19.80

+20.40 +19.80

+15.80

+15.80

+11.80

+11.80

+7.80

+7.80

+3.80

+3.80

-2.00

-2.00

D ADMINISTRACIÓN

4.67

4.09

CONTROL INGRESO

0.10 5.19

3.85

GESTIÓN PERSONAL CONSULTORIO MÉDICO SALA JUNTAS

DIRECCIÓN

1.75

BAÑO DISCAPACITADOS

1.25

INFORMACIÓN

BAÑO COMPARTIDO

VOZ

SANIT.

ELECT.

DATOS

BOMB.

1.67

PRESUR. S

11.62

+0.00

ZONA DE DESCANSO

21

3

20

4

4.95

24 23 22

2

19

5

18

6

17

7

16

8

15

9

14

10

13

11 12

COMEDOR

COCINA

ZONA DE CUBIERTOS

2.64

PREPARACIÓN

30.17

1.30

CUARTO DE DUCTOS

1

5.27

Right Side Facade

SECRETARÍA

1.93 0.20

Front Facade

Unidad Educativa Municipal "José Ricardo Chiriboga"

CONSULTORIO PSICOLÓGICO

B´

C ZONA FRÍA

4.00

CAFETERÍA

ARQUITECTURA

TEMA: CENTRO JUVENIL DE ARTES VISUALES Y MEDIOS DIGITALES

LÁMINA: PLAN C13 1

NOMBRE: DANIEL ADRIÁN BEJARANO PALACIOS

CONTENIDO: FACHADA LATERAL DERECHA PLANIMETRÍAPLANTA SUBSUELO N-8.50

ESCALA: 1:100

A

B

NORTE:

OBSERVACIÓN:

UBICACIÓN:

A

B

C

TEMA: CENTRO JUVENIL DE ARTES VISUALES Y MEDIOS DIGITALES

LÁMINA: PLAN C11 1

CONTENIDO: FACHADA FRONTALESPACIO PÚBLICO PLANIMETRÍAPLANTA SUBSUELO N-8.50

ESCALA: 1:100

5.76

3.91

6.24

CALLE PEDRO CÉSPEDES Y GUAYLLABAMBA A B

C

D ARQUITECTURA

JARANO PALACIOS

3.40

17.66

D´

TRABAJO DE TITULACIÓN

C

TRABAJO DE TITULACIÓN

TEMA: CENTRO JUVENIL DE ARTES VISUALES Y

NOMBRE: DANIEL ADRIÁN BEJARANO PALACIOS

CONTENIDO:

PLANIMETRÍA- PLANTA PLANTA

D NORTE:

OBSERVACIÓN:

UBICACIÓN:

+20.40 +19.80

CALLE PEDRO CÉSPEDES Y GUAYLLABAMBA Escultura

Pintura

+20.40 +19.80 +15.80

Baile y Actuación

Vestuario y Maquillaje

+15.80

+11.80

Creación Multimedia

Desarrollo Web

+7.80

+11.80 Clown e Interpretación

+3.80

+7.80 Cafetería

Comedor

+0.00

+3.80 Auditorio

-4.00

Estacionamientos

+0.00

-8.50

Left Side Facade

Axonometric Section 1

23 ARQUITECTURA

TRABAJO DE TITULACIÓN

TEMA: CENTRO JUVENIL DE ARTES VISUALES Y MEDIOS DIGITALES

PLAN 1 LÁMINA: D16

NOMBRE: DANIEL ADRIÁN BEJARANO PALACIOS

CONTENIDO: CORTE C-C´ PLANIMETRÍAPLANTA SUBSUELO N-8.50

ESCALA: 1:100

OBSERVACIÓN:

24

NORTE:

UBIC

CAL


3.40

5.76

3.91

6.24 17.66

2

1

3

5

4

6

ARQUITECTURA

TEMA: CENTRO JUVENIL DE ARTES VISUALES Y MED

NOMBRE: DANIEL ADRIÁN BEJARANO PALACIOS

CONTENIDO:

+19.80

Pintura Podcasts

+15.80

Teatro Experimental

Vestuario y Maquillaje

+11.80

Creación Audiovisual

+7.80

Exposición

+3.80

Cafetería

Camerino

Auditorio

Zona de Snacks

-2.00

-4.00

-8.50

Section showing modular configuration

25

C

TRABAJO DE TITULACIÓN

+20.40

Creación de Tendencias

B

D´

A

26

PLANIMETRÍA- PLANTA PLANTA BAJA


PREPARACIÓN

ZONA DE CUBIERTOS

2.64 5.27

1.93 0.20

Unidad Educ

COMEDOR

COCINA

C ZONA FRÍA

4.00

CAFETERÍA

3

4

2

3.40

1

B

TRABAJO DE TITULACIÓN

TEMA: CENTRO JUVENIL DE ARTES V

NOMBRE: DANIEL ADRIÁN BEJARANO PALACIOS

CONTENIDO:

+20.40 +19.80

Escultura Zona de Tareas

+15.80

Ocioteca Baile y Actuación

+11.80

Desarrollo Web

+7.80

Clown e Interpretación Exposición de Marcas

+3.80

Área Administrativa

+0.00

Auditorio

-4.00

Estacionamientos

-8.50

Section showing connections between modules

27

6.24

1

ARQUITECTURA

Mooding y Tunning

5.76

3.91

A

D´

5

6

28

PLANIMETRÍA- PLANTA


Day-night transition on equipment

29

30


Public Space + Equipment

31

32


Main entrance

33

34


Circulation tunnels between modules

35

36


Exhibition Hall, collaboration with Daniel Adum Gilbert

37

38


Web Development Room / Digital Art

39

40


Adapt to the environment, take advantage of the visuals and be a comfortable space

YP House BRB- BR -15,86, -47,76

Particular House

Area 450 m2 m2

4 A101

4

3

2

1

8,00 2,57

2,30

1,89

1,24

A

A Lavandería PB01 6 m²

B

B

3,65

2,30 Zona BBQ PB08 22 m²

14

Cocina Abierta PB03 16 m²

Nombre

Alacena PB02 5 m²

13

B

12 11 10 9

S

2,30

8 7

Sala- Comedor PB04 54 m²

6 5

3 4 5

3

6 7

6,95

14,25

2

8

Área Húmeda PB09 79 m²

1

9 10 11

-0,10

12 13 14

3

15

A101

C

C 3,65

Location

2

Activities

Condominio Maxximo Garden, Brasília- Brasil

Height of 2 floors with adaptation to the topography

BBQ area, pool, home theater

1 2

4

Baño Social PB05 5 m²

Cine en Casa PB06 11 m²

Tabla de planificación de

Estudio PB07 10 m²

D

Lavandería Alacena Cocina Abierta Sala- Comedor Baño Social Cine en Casa Estudio Zona BBQ Área Húmeda Habitación Dormitorio 1 Baño Máster Habitación Dormitorio de Servicio Dormitorio Máster Doble Altura

Númer PB01 PB02 PB03 PB04 PB05 PB06 PB07 PB08 PB09 PB10 PB11 PB12 PB13 PB14 PB15 PB16

D

4

3

2

1

Ground Floor, Level 0.00 1

3

1 : 100

4

4

A101

A101

2

1

4

3

2,57

1,24

Views Alacena PB02 5 m²

12 11

B

10 9 8 7

2,30

Sala- Comedor PB04 54 m²

6

Rooms, 1 master and 2 standard

Proximity to educational institutions 4

4 6 7

6,95

14,25

2

8

Área Húmeda PB09 79 m²

9

10 11

-0,10

3

2 3 5

3

12 13 14 15

C

C 3,65

A101

1

Housing taking advantage of visuals

5

1

S

Baño Social PB05 5 m²

Cine en Casa PB06 11 m²

Estudio PB07 10 m²

D

Lavandería Alacena Cocina Abierta Sala- Comedor Baño Social Cine en Casa Estudio Zona BBQ Área Húmeda Habitación Dormitorio 1 Baño Máster Habitación Dormitorio de Servicio Dormitorio Máster Doble Altura

A

Área

PB01 PB02 PB03 PB04 PB05 PB06 PB07 PB08 PB09 PB10 PB11 PB12 PB13 PB14

6 m² 5 m² 16 m² 54 m² 5 m² 11 m² 10 m² 22 m² 79 m² 3 m² 10 m² 7 m² 3 m² 10 m²

PB15 PB16

20 m² 53 m²

Dormitorio de Servicio PB14 10 m²

Habitación PB10 3 m²

Habitación PB13 3 m²

Dormitorio 1 PB11 10 m²

5,15

B

B 4

3

2

1

8,00 2,57

2,30

3,12

Doble Altura PB16 53 m²

5,30

D

Nivel Cubierta

B

3 A101

D

Área Húmeda PB09 79 m²

Sala- Comedor PB04 54 m²

8,15

5,15

Doble Altura PB16 53 m²

C

2,85

Cocina Abierta PB03 16 m²

3,12

Dormitorio Máster PB15 20 m²

Baño Máster PB12 7 m²

C Planta Alta 5,30

2,85

B

Zona BBQ PB08 22 m²

13

Número

3,65

10 min

3,65

3

14

Nombre

2,30

A

Tabla de planificación de habitaciones

6,95

A Lavandería PB01 6 m²

2,30

14,25

1,89

3,65

2,30

A

B

1

8,00

8,00 2,57

2

5,70

4

Planta Baja

D

Planta Baja 2,45

Nivel Pq 0,00

5

4

41

1

Planta Baja 1 : 100

3

2

1

Colaboration with Monteiro Inc. Construcões

3

Corte A-A´

4

3

2

1

4

1 : 100

Upper Floor, Level 2.85 2

Planta Alta 1 : 100

42


1,24

A

B

Zona BBQ PB08 22 m²

14

Cocina Abierta PB03 16 m²

Nombre

Alacena PB02 5 m²

13

Lavandería Alacena Cocina Abierta Sala- Comedor Baño Social Cine en Casa Estudio Zona BBQ Área Húmeda Habitación Dormitorio 1 Baño Máster Habitación Dormitorio de Servicio Dormitorio Máster Doble Altura

B

12 11 10 9

2,30

8 7

S

Sala- Comedor PB04 54 m²

6 5

2 3 4

4

5

3

6 7

6,95

14,25

2

8

Área Húmeda PB09 79 m²

1

9 10 11

-0,10

C

A101

12 13

B

C

3,65

14

A

6,95

15

C

3,65 3,65

D

3

1

14,25

Cine en Casa PB06 11 m²

Baño Social PB05 5 m²

Estudio PB07 10 m²

D

Número

Área

PB01 PB02 PB03 PB04 PB05 PB06 PB07 PB08 PB09 PB10 PB11 PB12 PB13 PB14

6 m² 5 m² 16 m² 54 m² 5 m² 11 m² 10 m² 22 m² 79 m² 3 m² 10 m² 7 m² 3 m² 10 m²

PB15 PB16

20 m² 53 m²

D

3,65

3,65

B

A

Tabla de planificación de habitaciones

Lavandería PB01 6 m²

2,30

2,85

2

PROYECTO Casa YP LAMINA

B

5,15

C

01

5,70

Baño Máster PB12 7 m²

Daniel Adrián Bejarano

1 : 100

0001

Planta Alta N: LAMINA 2

FECHA

3

2

2,85

5,30

Dormitorio Máster PB15 20 m²

D

AUTOR

NUMERO PREDIAL 4

Planta Alta

Planta Baja

1

Planta Baja

1 : 100

1 : 100

2,45

A101

23/4/2023 23:20:13

Nivel Pq 0,00

Corte B-B´

Cross-section

4

1 : 100

Cross-Section

4

3

2

1

D

8,00 2,57

2,30

C 3,65

3,12

B 6,95

A 3,65

14,25

Nivel Cubierta 8,15

2,85

Planta Alta

5,70

5,70

5,30

Planta Alta 5,30

2,85

Sala- Comedor PB04 54 m²

8,15

2,85

Área Húmeda PB09 79 m²

Nivel Cubierta

2,85

Doble Altura PB16 53 m²

Planta Baja 2,45

Planta Baja 2,45

Nivel Pq 0,00

Nivel Pq 0,00

Corte A-A´ 3 Longitudinal Section 1 : 100

4

Corte B-B´ 1 : 100

Open Kitchen

43

Dormitorio 1 PB11 10 m²

Doble Altura PB16 53 m²

3 A101

ESC:

1

Habitación PB13 3 m²

5,15

8,15 3

Habitación PB10 3 m²

B

Nivel Cubierta

4

Dormitorio de Servicio PB14 10 m²

6,95

1,89

14,25

2,30

3,65

2,57

A

44

1


Construction Stage

Double Height + Living / Dining room

Double Height + Living / Dining room

45

46


The implementation of the project has been conceived in such a way that it is consistent with the built typologies of the immediate context

Second Level Hospital of Tupiza PSI- TUP -21.44, -65.72

Health Equipment

Area 8742.16 m2 m2

50 000

88

Brick

Municipality of Tupiza, Potosí Bolivia

Projected users until 2045

Hospitalization and Intensive Treatment Beds

Use of area materiality

Urb. Design

Program

Vegetation

20%

Adaptation of the project with public space

Operating room, Hospitalization, Gynecologyobstetrics

Use of native vegetation adapting to the project

EDGE certified for minimal savings in water, energy and materials

6

Location

47

Location of the Hospital in the Municipality of Tupiza

Colaboration with Hospiplan Consulting Company

Necessary accesses by existing roads and their location

48


MODULATION SPACES ARE CONFIGURED FROM A 30X30 MODULAR MESH

HOSPITAL BASE ROOM SPACE GENERATED WITH REFERENCE TO BASE MODULE

HOSPITALIZATION AREA

Generation of internal patios for the location of native vegetation and use of ventilation and natural lighting

SPACE GENERATED WITH REFERENCE TO BASE MODULE

Modulation of the project based on the 30x30cm module to locate all the services

TUPIZA HOSPITAL ARCHITECTURAL MEDICAL PROGRAM

PERSONAL MANAGEMENT

CLINICAL SUPPORT

DIAGNOSTIC SERVICE

TREATMENT SERVICE

INTERNMENT

PARAMEDICS

PERSONAL MANAGEMENT

INDUSTRIAL SUPPORT

OTHERS

Location of blocks taking the solar incidence by space to reduce artificial lighting

CLINICAL SUPPORT

DIAGNOSTIC SERVICE

TREATMENT SERVICE

INTERNMENT

PARAMEDICS

INDUSTRIAL SUPPORT

OTHERS

Necessary spaces based on the Architectural Medical Project, Medical Analysis and Social Component

49

Use of natural ventilation through internal patios to reduce HVAC systems

50


Zoning by blocks and location of services according to needs

Circulation Flow on the Ground Floor with income and proposed services

Proposed accesses for public, emergency and supply entrances

Circulation flow on the upper floor with access to rooms and different services

51

52


Main entrance of the Tupiza Hospital and the use of local materials

Main Access Hall

Main entrance of the Second Level Hospital of the Municipality of Tupiza

Standard Medical Office

53

54


External Consultation Waiting Room

Observation and Stabilization Room for children and adults

Double room type

Integrated Critical Care Cubicles and Intermediate Care Cubicles

55

56


Sterile area for hand washing inside the Operating Room Unit

Labor and Recovery Unit (UTPR)

Multipurpose Operating Room

Computerized Axial Tomograph

57

58


¡Thanks!


Turn static files into dynamic content formats.

Create a flipbook
Portfolio, Daniel Adrián Bejarano by Daniel Adrián Bejarano - Issuu