ACKNOWLEDGEMENTS
ROYAL COLLEGE OF ART ADS5
CONTENTS 1.0 INTRODUCTION Purpose of research
8
Thornbury Green Site location Site images Masterplan Typologies Focus typologies
10 12 14 16 18 20
HOUSES
2.0 EXISTING CONDITION Existing condition summary Menu of components Structural solution Construction methedology Internal fit-out Drawings Plans Section/Elevation
34 36
Detail Drawings Foundation External wall Eave Internal structural wall Internal partition wall
38 40 42 44 46
Images Taylor Wimpey images
48
Embodied carbon calculation Cost analysis
50 51
Existing condition findings
54
3.0 CARBON COPY Alternative proposals summary Menu of components
58 60
Structural solutions Foundations Insulation types Stone rainscreen Timber windows Stone roof tiles Internal partitions Internal floor finishes
4
24 26 28 30 32
62 84 86 92 106 108 110 112
114 116
Detail Drawings Foundation External wall Eave Internal structural wall Internal partition wall
118 120 122 124 126
Images Carbon copy image comparisons
128
Embodied carbon calculation Cost analysis
134 133
Carbon copy comparitive findings
136
140
Internal stone External stone Timber piles
142 146 150
5.0 FINDINGS Final comparitive findings
6.0 CATALOGUE OF MATERIAL COMPONENTS Component Catalogue
HOUSES
4.0 WHAT IF? What if? summary
ROYAL COLLEGE OF ART ADS5
Drawings Plans Section/Elevation
156
158
5
6 HOUSES
1.0 INTRODUCTION
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
7
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
HOUSES
PURPOSE OF RESEARCH
8
Figure 1.1 Typical suburban house construction
We are in a climate emergency. The construction industry contributes an estimated 40% of total carbon emissions in the UK annually. The UK also has targets to build 300,000 new homes per year by 2025. With these two facts in mind, this research investigates the methods and envirionmental impact of the most commonly built housing typology in the UK: the suburban house. Through a detailed analysis of the existing condition, we propose alternative solutions that are both econimcally viable and radically better for the environment.
ROYAL COLLEGE OF ART ADS5
SUBURBAN HOUSE TYPOLOGY
Taylor Wimpey is the UK’s largest house building company, expecting to complete 14,000 homes by the end of 2021. This project uses a typical Taylor Wimpey housing development in the village of Eynsham, Oxfordshire as a research site. Through this research, we have concluded that by changing materials and construction methedology it is possible to build a carbon copy development of that proposed by Taylor Wimpey that is faster. cheaper. greener. HOUSES
COST COMPARISON
150000 100000 50000 0
0
Existing Condition
Stone + Timber Frame
-50000
Stone + CLT
Existing Condition
Stone + CLT
Stone + Timber Frame
-100000
-20000
Large stone
-40000
kgCO2e/m3
20000
40000
Cost per house/£
200000
EMBODIED CARBON COMPARISON
9
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
THORNBURY GREEN
TAYLOR WIMPEY Taylor Wimpey are the largest house builder in the UK, expecting to complete 14,000 homes in 2021. It is therefore pertinent to investigate how they are building these homes, how carbon intensive they are, how comfortable they are and if they can be built better. WHY THORNBURY GREEN
HOUSES
Thornbury Green is a typical Taylor Wimpey estate, in truth we could have picked any site anywhere in the country as the exact same houses are built from Penzance to Newcastle.
LOCATION Thornbury Green is located on a greenfield site in the village of Eynsham, five miles north west of Oxford. Eynsham is a commuter village for Oxford.
DATE OF CONSTRUCTION Thornbury Green is due for completion in 2021 with half of the homes already built.
CONSTRUCTION MATERIAL/METHODOLOGY
10
The houses all share a common logic no matter the typology. Perimeter concrete blockwork supports softwood timber joists and rafters that span between to make the floors and roof.
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 1.2 Thornbury Green housing development
11
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
SITE LOCATION
EYNSHAM
HOUSES
The site is a greenfield site on the western edge of the village of Eynsham in Oxfordshire, five miles north west of Oxford. The village has a population of 4648.
Figure 1.3 Satellite image of Eynsham clearly marking the Thornbury Green on the western edge
12
Figure 1.4 OS Map
ROYAL COLLEGE OF ART ADS5
Eynsham
HOUSES
Oxford
13
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
SITE IMAGES
THORNBURY GREEN
14
HOUSES
The site is a greenfield site on the western edge of the village of Eynsham in Oxfordshire, five miles north west of Oxford. The village has a population of 4648.
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 1.5 Thornbury Green housing development
15
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
MASTERPLAN
SITE INFORMATION Developer Taylor Wimpey Total Homes 160 80 (Phase 1)
HOUSES
Site Area 0.074km2
MASTERPLAN KEY 2 Bedroom: 10
3 Bedroom: 44
4 Bedroom: 86
16
5 Bedroom: 20
Total GIA 20 662.30m2 10 331.15m2 (Phase 1) Total NIA 16 872.94m2 8 436.47m2 (Phase 1)
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 1.6 Thornbury Green masterplan
17
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
TYPOLOGIES 2 BED
Name: The Canford Total Units: 5 GIA: 64.01m2/Unit NIA: 48.26m2/Unit
320.05m2/Total 241.30m2/Total
HOUSES
3 BED
Name: The Gosford Total Units: 4 GIA: 80.45m2/Unit NIA: 61.77m2/Unit
321.80m2/Total 247.08m2/Total
Name: The Alton G Total Units: 10 GIA: 100.80m2/Unit NIA: 79.96m2/Unit
1008.00m2 799.60m2/T
869.60m2/Totall 634.00m2/Total
Name: The Marford Total Units: 28 GIA: 145.30m2/Unit NIA: 119.15m2/Unit
4068.40m2 3336.20m2
1206.31m2/Total 965.09m2/Total
Name: The Templeton Total Units: 3 GIA: 223.62m2/Unit 670.86m2/T 2 NIA: 172.32m /Unit 516.96m2/T
4 BED
Name: The Midford Total Units: 8 GIA: 108.70m2/Unit NIA: 79.25m2/Unit 5 BED
18
Name: The Wayford Total Units: 7 GIA: 172.33m2/Unit NIA: 137.87m2/Unit
ROYAL COLLEGE OF ART ADS5
/Total /Total
2
2
Name: The Manford Total Units: 7 GIA: 128.67m2/Unit NIA: 104.40m2/Unit
HOUSES
/Total Total
2
Name: The Charlbury Total Units: 8 GIA: 120.68m2/Unit 965.44m2/Total NIA: 90.47m2/Unit 723.26m2/Total
900.69m2/Total 730.80m2/Total
Total Total
19
ROYAL COLLEGE OF ART ADS5
1.0 INTRODUCTION
FOCUS TYPOLOGIES
HOUSES
In order to focus the study, we have selected the two most frequent typologies in the development to analyse in further depth. These include a three bedroom semi-detached house and a four bedroom detached house.
Figure 1.7 The Alton G
3 BED: THE ALTON G
Total units 10
Bedrooms 3
GIA 100.80m2/Unit
Envelope Single skin brick/ Recon stone lintels/ Triple glazing
20
NIA 79.96m2/Unit
Glazed area 7.80m2/Unit
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 1.8 The Marford
4 BED: THE MARFORD
Total units 28
Bedrooms 4
GIA 128.67m2/Unit
Envelope Stone veneer / Recon stone lintels/ Triple glazing
NIA 104.40m2/Unit
Glazed area 7.80m2/Unit 21
22 HOUSES
2.0 EXISTING CONDITION
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
23
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
SUMMARY
SIMPLE BUILDINGS WITH STANDARD DETAILS Taylor Wimpey’s business model means they buy designs of houses much like you would buy a car or a jumper, they buy the rights and then they can build them wherever they like. What this means in practice is they have a set of standard details which are used all over the country that do not respond to local conditions and are completely devoid of any true character or ambition.
We have analysed the standard details to see what we can learn from how Taylow Wimpey build, where the most embodied carbon is and how we can do it better.
COST/HOUSE
Cost per house/£
0
20000 0
kgCO2e/m3
40000
100000
EMBODIED CARBON/HOUSE
Existing Condition
24
50000
HOUSES
Thornbury Green is a new build development on green build site that is a net carbon emitter so not only is the creation of these homes adding carbon to our atmosphere, they are reducing biodiversity. Secondly they are poorly insulated meaning that they are expensive to run and cost further carbon byway of heating and cooling them.
Existing Condition
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 2.1 Thornbury Green housing development
25
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
MENU OF COMPONENTS
FOCUS ON WALL TYPE We have focussed our analysis primarily on wall type because in such simple buildings as these, this is where carbon can be reduced most effectively.
HOUSES
C
B
A
D
Figure 2.2 3 Bedroom semi-detached house
A
D
Foundation
Internal partition wall
B
E
Wall-floor connection
Internal structural wall
C
26
Eave/Dormer
ROYAL COLLEGE OF ART ADS5 HOUSES
C
B
A
E
Figure 2.3 4 Bedroom detatched house
27
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
STRUCTURAL SOLUTION
SAME STRATEGY NO MATTER THE TYPOLOGY
HOUSES
All houses share a common structural strategy no matter the typology, this includes: poured reinforced concrete foundations, perimeter aircrete blockwork, concrete beam and block slab and internal softwood timber joists and rafters. The timber joists span perpendicular to the front elevation in the 3 bed house and parallel to it in the 4 bed house with an additional internal structural wall.
28
Figure 1.1 Thornbury Green housing development
ROYAL COLLEGE OF ART ADS5
3 BED
HOUSES
4 BED
29
Softwood timber Concrete block/Reinforced concrete
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
CONSTRUCTION METHODOLOGY
ON SITE LABOUR INTENSIVE None of the elements used are prefabricated off site. Footings, foundations, blockwork, the timber joists and roofing slates are all constructed on site by hand; this means that the time spent on site is long and busy. An average Taylor Wimpey site, such as Thornbury Green, has one hundred people working on it at a time.
FOOTINGS
HOUSES
Footings are 150mm reinforced concrete poured in situ.
FOUNDATIONS Foundations are constructed as a twin layer of aircrete blockwork with 100mm insulation in between.
SLAB
30
The slab is quickly constructed as a concrete beam and block floor. This sits on the foundation at 150mm above the ground with a void in between.
Structural walls are made with external aircrete blockwork.
ROYAL COLLEGE OF ART ADS5
STRUCTURAL WALLS
RAINSCREEN
HOUSES
The rainscreens are either a single skin of self supporting brick or stone slates which are glued to a second layer of aircrete blockwork. The choice of rainscreen is typology dependant.
TIMBER JOISTS Softwood timber joists are cut and secured together with nail plates on site.
INSULATION Glass mineral wool is sprayed into the cavity after the walls are built. This method is quick but can result in an uneven result.
31
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
INTERNAL FIT-OUT
FINISH HEAVY
32
HOUSES
The basic construction components mean that many layers of finish are required in order to make the homes comfortably habitable. This includes the use of plasterboard and paint, wallpaper or tiles on walls, plasterboard and paint on soffits and carpet or porcelain tiles on floors. All of these finishes are areas to target to reduce the overall embodied carbon of each house.
Ceramic tiling Carpet Paint Wallpaper Softwood radiator cover Softwood skirting
KITCHENS
ROYAL COLLEGE OF ART ADS5
HALLWAYS
Ceramic tiling Paint Chipboard/melamine surfaces Softwood skirtings Curtains
LIVING SPACES HOUSES
Carpet Paint Wallpaper Softwood skirting
BEDROOMS Carpet Paint Wallpaper Softwood skirting Curtains
BATHROOM Ceramic tiling Paint Plastic bathrub Porcelain loo and sink
33
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
PLAN
HOUSES
3 BED
4 BED
34
0m
1
2
ROYAL COLLEGE OF ART ADS5
HOUSES
35
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
SECTION/ELEVATION
HOUSES
3 BED
36
0m
1
2
ROYAL COLLEGE OF ART ADS5
HOUSES
37
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
FOUNDATION DETAIL 3 BED
2
1
HOUSES
3
5 4
VOID
6
1
38
2
Wall Brick 100mm glass mineral wool insulation Wall cavity tie Concrete blockwork DPM Wall finish 12mm plasterboard
3
Paint 12x100mm softwood skirting
4
Slab Concrete beam and block floor system
Floor finish Carpet Underlay 75mm concrete screed 75mm rigid insulation DPM
5
Foundation wall Concrete block 100mm EPS insulation
6
Footing 150mm reinforced concrete
ROYAL COLLEGE OF ART ADS5
4 BED
2
1
3
HOUSES
5 4
VOID
6
1
2
Wall Limestone veneer Concrete blockwork 100mm glass mineral wool insulation Wall cavity tie DPM Wall finish 12mm plasterboard
3
Paint 12x100mm softwood skirting
4
Slab Concrete beam and block floor system
Floor finish Carpet Underlay 75mm concrete screed 75mm rigid insulation DPM
5
Foundation wall Concrete block 100mm EPS insulation
6
Footing 150mm reinforced concrete
39
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
EXTERNAL WALL DETAIL 3 BED
HOUSES
1
2
3
4
1
40
2
Wall finish 12mm plasterboard Paint 12x100mm softwood skirting Floor finish Carpet Underlay 75mm concrete screed
75mm rigid insulation DPM 3
Slab Concrete beam and block floor system
4
Wall 100mm concrete block 100mm glass mineral
wool insulation Wall cavity ties 5
Footing 150mm reinforced concrete
ROYAL COLLEGE OF ART ADS5
4 BED
1
HOUSES
2
3
4
1
2
Wall finish 12mm plasterboard Paint 12x100mm softwood skirting Floor finish Carpet Underlay 75mm concrete screed
75mm rigid insulation DPM 3
Slab Concrete beam and block floor system
4
Wall 100mm concrete block 100mm glass mineral
wool insulation Wall cavity ties 5
Footing 150mm reinforced concrete
41
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
EAVE DETAIL 3 BED AND 4 BED
HOUSES
1
2 4
3
5
1
42
2
Roof build-up Cement fibre tiles Softwood timber batten Waterproof membrane Softwood timber rafters Mineral wool insulation Gutter Plastic gutter Underlay
3
Fascia Plastic fascia board Softwood timber batten
4
Wall 100mm concrete block 12mm plasterboard Paint
5
Soffit 100mm glass mineral wool insulation 12mm plasterboard Paint
6
Window uPVC triple glazed window Steel lintel angle
ROYAL COLLEGE OF ART ADS5
HOUSES
43
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
INTERNAL STRUCTURAL WALL DETAIL 3 BED (PARTY WALL)
1
HOUSES
2
VOID
VOID
3 4
5
1
44
2
Wall finish 12mm plasterboard Paint 12x100mm softwood skirting Floor finish Carpet Underlay 75mm concrete screed
75mm rigid insulation DPM 3
Slab Concrete beam and block floor system
4
Wall 100mm concrete block 100mm glass mineral
wool insulation Wall cavity ties 5
Footing 150mm reinforced concrete
ROYAL COLLEGE OF ART ADS5
4 BED
1
2
HOUSES
VOID
VOID
3 4
5
1
2
Wall finish 12mm plasterboard Paint 12x100mm softwood skirting Floor finish Carpet Underlay 75mm concrete screed
75mm rigid insulation DPM 3
Slab Concrete beam and block floor system
4
Wall 100mm concrete block 100mm glass mineral
wool insulation Wall cavity ties 5
Footing 150mm reinforced concrete
45
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
INTERNAL PARTITION WALL DETAIL 3 BED AND 4 BED
1
HOUSES
2
VOID
3
1
46
2
Wall 90mm metsec frame 12mm plasterboard Paint 12x100mm softwood skirting Floor finish Carpet Underlay
75mm rigid insulation DPM 3
Slab Concrete beam and block floor system
ROYAL COLLEGE OF ART ADS5
HOUSES
47
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
IMAGES
48
HOUSES
3 BED
ROYAL COLLEGE OF ART ADS5
4 BED
HOUSES
49
HOUSES
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
EMBODIED CARBON
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
Concrete
Strip foundation
3
1597
Blockwork
Walls
45
12,799
Limestone
Veneer
7
1298
Softwood
Stud partitions
2
-1,139
Softwood
Floor joists
n/a
-351
Concrete
Beam and block floor
11
3119
Concrete
Screed
2
1832
Plywood
Floor
2
-622
Plasterboard
Internal lining
6
1567
Fibre cement
Roof tiles
3
949
Softwood
Roof trusses
4
-2291
Mineral wool
Insulation
47
698
Glass
Windows
<1
380
Limestone
Sills and lintels
<1
74
50
TOTAL/HOUSE
19,737
ROYAL COLLEGE OF ART ADS5
COST ANALYSIS
ELEMENT
QUANTITY M2
COST £
Concrete
Strip foundation
3
239
Blockwork
Walls
45
24,352
Limestone
Veneer
7
2061
Softwood
Stud partitions
2
2840
Softwood
Floor joists
176
1753
Concrete
Beam and block floor
11
8765
Concrete
Screed
2
509
Plywood
Floor
2
1525
Plasterboard
Internal lining
6
9194
Fibre cement
Roof tiles
3
216
Softwood
Roof trusses
4
1028
Mineral wool
Insulation
47
17,317
Glass
Windows
<1
6750
Limestone
Sills and lintels
<1
117
TOTAL/HOUSE
HOUSES
MATERIAL
76,665
51
ROYAL COLLEGE OF ART ADS5
2.0 EXISTING CONDITION
FINDINGS
CARBON INTENSIVE SIMPLE BUILDINGS The analysis of the existing condition has showed us that while these are incredibly simple buildings they are very carbon intensive. The homes are cheap to build but expensive to run because their insulation is so poor. Finally they are not site specific and therefore do not take into account local geology meaning that the standard Taylor Wimpey details may not be sufficient - again putting the onus on repair and maitenance by the home owner over due dilligance and quality from the start.
COST/HOUSE
Cost per house/£
0
20000 0
kgCO2e/m3
Existing Condition
52
50000
100000
EMBODIED CARBON/HOUSE 40000
HOUSES
The foundations, structure and many layers of finish are the three principal components we must focus on to propose a carbon negative carbon copy.
Existing Condition
ROYAL COLLEGE OF ART ADS5
HOUSES
53
54 HOUSES
3.0 CARBON COPY
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
55
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
SUMMARY
GREENER, CHEAPER, FASTER In order to reduce the overall emboided carbon, we bagan by changing the most carbon intensive elements of the existing structural solution - the reinforced concrete and concrete blocks. Why use concrete when you can use the inherient strength of stone in a carbon negative and more efficient process?
HOUSES
Above the foundations, we have investigated two all timber options, one timber frame and one CLT to assess which method is the greenest, fastest and cheapest. Timber has been selected as the structural solution due to the truly renewable quality of trees. Within our assessment we have looked equally at material sourcing, processing, transportation, construction, cost and resultant occupant comfort for both options in order to come to a valid conclusion of which method is best: stone with a timber frame. Our investigations show that with extended thinking about material qualities, construction methods and flow chains that it is possible to build carbon copies of the Taylor Wimpey design that are both economically viable and provably better for the environment. COST COMPARISON
150000 -50000
Existing Condition
Stone + CLT
Stone + Timber Frame
-100000
-40000
56
100000 50000 0
0
Existing Condition
Large stone
-20000
kgCO2e/m3
20000
40000
Cost per house/£
200000
EMBODIED CARBON COMPARISON
Stone + CLT
Stone + Timber Frame
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 3.1 4 Bedroom carbon copy
168%
24%
EMBODIED CARBON
PROJECT COST
57
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
MENU OF COMPONENTS
CARBON COPY COMPONENTS All the components analysed in the existing condition have been redrawn according to our research to show how our carbon copy how that is cheaper, greener and faster can be built.
HOUSES
C
B
A
D
Figure 3.2 3 Bedroom carbon copy
A
D
Foundation
Internal partition wall
B
E
Wall-floor connection
Internal structural wall
C
58
Eave/Dormer
ROYAL COLLEGE OF ART ADS5 HOUSES
C
B
A
E Figure 3.3 4 Bedroom carbon copy
59
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STRUCTURAL SOLUTION A - TIMBER FRAME
TIMBER I-JOISTS External timber I-joist frame. The internal plan is kept structurally free to allow for future flexibility. This method can be built by hand using similar construction methods as Taylor Wimpey’s current model. Time on site is longer than CLT but overall material quantity is far less. EMBODIED CARBON
HOUSES
-703kgCO2e/m3
60
Figure 3.4 Timber I-joist structural iso
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 3.5 Timber I-joist construction
61
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FABRICATION A - TIMBER FRAME
TIMBER I-JOISTS
HOUSES
Traditional timber framing uses simple softwood studs to form the structural frame. We are using the timber frame system used in passivhaus buildings where timber I-joists comprised of two small softwood timber sections connected and stiffened by a 12mm OSB sheet. This allows us to create a deep insulation cavity and achieve a low u-value with the most minimal amount of material possible. OSB must undergo a secondary process which of course increases its carbon footprint but it is still predominately carbon sequestering timber and makes use of waste material so is inherintly sustainable. The largest manufacturer of timber I-joists in Europe is located in Scotland. Joists are manufactured and cut to length in the factory therefore reducing waste and time spent on site.
62
Figure 3.6 Timber I-joist fabrication at James Jones in Scotland
ROYAL COLLEGE OF ART ADS5
FABRICATION PROCESS
HOUSES
COMPONENTS Softwood timber - 100% OSB - softwood timber strands 95% - resin and wax 5%
Figure 3.7 Timber I-joist
63
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
TRANSPORTATION A - TIMBER FRAME
EFFICIENT STACKING Transporting timber I beams is incredibly efficient; in each lorry, enough timber for three houses can fit in. This efficiency coupled with the short transport distance from Scotland means the embodied carbon on bringing it to site is very low - nearly seven times as less than CLT.
HOUSES
n.b. Embodied carbon has been calculated assuming lorries are fully loaded on delivery to site and empty upon return.
64
Figure 3.8 Timber I-joist transportation
ROYAL COLLEGE OF ART ADS5
600 KM
HOUSES
Figure 3,9 Option A transport route
3 BUILDINGS/LORRY
48 JOURNEYS 59.6 TONNES CO2E Figure 3.10 Option A transport analysis
65
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
CONSTRUCTION A - TIMBER FRAME
RELATIVELY LONG ON SITE COMPARED TO CLT Constructing a timber frame house is not dificult nor is it long in comparison to the masonry walls of the existing condition. Members come precut from the factory so there is no on site cutting required. Pieces are nail gunned together before being panelled and filled with insulation.
HOUSES
In comparison to CLT, this is a labour intensive and time consuming method.
66
Figure 3.11 Timber I-joist construction
ROYAL COLLEGE OF ART ADS5
HOUSES
67
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FINISH A - TIMBER FRAME
TIMBER PANELLING REQUIRED
HOUSES
Timber panels must be fixed to the inside of the insulated timber frame to make the walls of the homes, this of course is an extra source of material and cost associated with this method. Instead of using the current system of plasterboard and paint or wallpaper however, veneered plywood panelling can be used with the higher cost compared to plasterboard offset by the lack of final finishes. Time on site and labour costs are reduced by not requiring extra decoration.
68
Figure 3.13 Veneered plywood wall panelling
ROYAL COLLEGE OF ART ADS5
1
2
HOUSES
Figure 3.14 Timber I-joist component iso
1
Limestone wall 75mm limestone Waterproof membrane 15mm Plywood 300mm insulation
2
Timber frame 300mm Timber I-joist 12mm veneered plywood panelling
69
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STRUCTURAL SOLUTION B - CLT
PREFABRICATION External CLT frame. The internal plan is kept structurally free to allow for future flexibility. This method is prefabricated off-site and brought to site flat pack therefore minimising on-site time and transportation emissions. This is quick and simple to construct but overall the material quanitity is higher than a timber frame as is the required timber quality.
EMBODIED CARBON
HOUSES
-841kgCO2e/m3
70
Figure 3.15 CLT structural iso
ROYAL COLLEGE OF ART ADS5
HOUSES
Figure 3.16 CLT construction
71
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FABRICATION B - CLT
FINISH READY IN THE FACTORY
HOUSES
CLT is comprised of timber lengths being glued together into panels. This process increases the strength of the timber and means that wall panels can be made to the exact dimensions required with all openings precut in the factory. Machine precision means that time reduces waste and time on site. The massive nature of CLT panels means that technically a lot of carbon is sequestered per house houwever the amount of material used is far greater than in timber frame. From an environmental and cost perspective therefore, CLT is less appropriate for this typology.
72
Figure 3.17 CLT fabrication in the factory
ROYAL COLLEGE OF ART ADS5
FABRICATION PROCESS
HOUSES
COMPONENTS CLT - Softwood timber >99% - Adhesive <1%
Figure 3.18 CLT
73
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
TRANSPORTATION B - CLT
FLAT PACK CLT panels are transported as individual flat pack panels to site for assembly. Transporting panels over completed homes saves carbon because the amount of wasted space on each truck is reduced dramatically so less lorry loads are required. Even so, each building (single detached house or two semi-detached houses) will require its own lorry to transport. Currently there are no CLT manufactures in the UK so all panels will have to come from Austria meaning transporting CLT uses nearly seven times as much carbon compared to timber frame.
HOUSES
n.b. Embodied carbon has been calculated assuming lorries are fully loaded on delivery to site and empty upon return.
74
Figure 3.19 CLT transportation
ROYAL COLLEGE OF ART ADS5
1520 KM
HOUSES
Figure 3.20 Option B transport route
1 BUILDING/LORRY
142 JOURNEYS 404.7 TONNES CO2E Figure 3.21 Option B transport analysis
75
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
CONSTRUCTION B - CLT
QUICK CONSTRUCTION
HOUSES
There are 42 pieces per house, all of which come precut and drilled so simply need to be craned into postion when they arrive on site. A house can be erected in more or less a day.
76
Figure 3.22 CLT construction
ROYAL COLLEGE OF ART ADS5
HOUSES
77
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FINISH B - CLT
NO EXTRA FINISHES
HOUSES
CLT panels require not supplementary finishes such as paint or wallpaper because of the natural beauty of the timber. Not only is this better for the environment and cost but it is also better for occupant health with scientific studies proving the wellbeing benefits of living in timber homes.
78
Figure 3.24 Barrett’s Grove, Groupwork
ROYAL COLLEGE OF ART ADS5
1
2
HOUSES
Figure 3.25 CLT component iso
1
Limestone wall 75mm limestone Waterproof membrane 15mm Plywood 300mm insulation
2
CLT 100mm CLT fire coated panel
79
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STRUCTURAL FINDINGS
OPTION A - TIMBER FRAME Timber frame is the best option for these houses. Technically they do not have such a high negative embodied carbon as CLT but this is because the material needed is so much less. The most sustainable thing is to leaves trees in the ground so following embodied carbon figures alone is misguided - timber frame is still negative. Secondly the cost of timber frame is dramatically cheaper as is the embodied carbon of transporting it to site. Time on site may be slightly longer than CLT but any costs associated with this are fully offset by the material price.
150000
Timber Frame
80
100000 75000 25000 0
Cost per house/£
-20000 -50000 -60000
-40000
-30000
kgCO2e/m3
-10000
125000
0
CLT
COST COMPARISON
50000
HOUSES
EMBODIED CARBON COMPARISON
CLT
Timber Frame
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 3.26 Timber I-joist construction iso
81
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FOUNDATIONS
CLAY SOIL The site sits on clay soil. Clay is succeptible to heaving and settling, this is where the ground water content chanegs and the earth can increase by 150mm (heave) or decrease by 150mm (settle), both are detrimental to the structure of a building. In order to limit it’s effects, deep pads are more appropriate than the existing condition of shallow strip foundation. The void between the earth and the underside of the floor must also increase to 300mm to withstand the potential +/-150mm differential.
HOUSES
2m deep limestone pad foundation limit the potential damage from the soil and also drastically reduce embodied carbon. The large cost increase could be thought to be offset over the lifespan of each building as it is less likely to require maintenence.
EYNSHAM
Figure 3.27 Geology map showing the clay soils of the Cotswolds
Clay soil
COST COMPARISON
1200 400 0
Concrete strip
82
800
Cost per house/£
800 0
400
kgCO2e/m3
1200
1600
1600
EMBODIED CARBON COMPARISON
Limestone pads
Concrete strip
Limestone pads
150 750
312x35000x150mm reinforced concrete
ROYAL COLLEGE OF ART ADS5
EXISTING CONCRETE STRIP
PROPOSED STONE PADS HOUSES
2000
300
600x600x300mm limestone
2700
2700
2700
HEAVING
SETTLING
Increase in soil water level +150mm
Decrease in soil water level -150mm
83
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
INSULATION TYPES
SAME STRATEGY NO MATTER THE TYPOLOGY
HOUSES
The current Taylor Wimpey standard wall build-up achieves a u-value of 0.25W/m2K, using 100mm of blown glass mineral wool insulation. Not only does this mean the houses are not sufficiently warm on their own and therefore rely on expensive, usually carbon intensive heating but the embodied carbon on the material itself is incredibly high at +1.86kgCO2e/ kg. We have investigated several alternative insulation materials, assessing their thermal conductivity, embodied carbon and u-value achievement at different thicknesses using different wall build-ups. We are aiming to improve the u-value of these homes to passivhaus standard 0.15W/m2K while simulataneously reducing the environmental impact of constructing with our chosen insulation. Passivhaus standard has been chosen as a target because its performance can be quantifiably proved excellent and will not result in excessively thick walls. Hemp Batts provide a good thermal conductivity and are carbon negative. EXISTING
U-VALUE 0.25W/m2K
PROPOSED
84
TARGET U-VALUE 0.15W/m2K
Mineral
Image: Knauf Insulation
0.034 W/mK Embodied Carbon: Embodied Carbon: +1.12 kgCO2e/kg +0.63 kgCO2e/kg Embodied Carbon: Image: Rockwool Thermal Conductivity: GLASS MINERAL WOOL kgCO2e/kg Embodied carbon +1.86 Thermal Conductivity: +1.86kgCO e/kg Image: Knauf Insulation 0.035-0.038 W/mK Embodied Carbon: 0.038 W/mK Thermal conductivity Thermal Conductivity: +0.98 kgCO2e/kg 0.034W/m k Embodied Carbon: Carbon: 0.034 W/mK +0.63 kgCO2e/kg kgCO2e/kg +1.12 MINERAL WOOL Embodied carbon Thermal Conductivity: +1.12kgCO e/kg Thermal conductivity Image: Rockwool 0.037 W/mK Image: Architects Journal Conductivity: Thermal Conductivity:
al edWool Mineral paper
Wood al Wool led paper
2
2
2
0.035W/m2k
0.038 W/mK W/mK 0.035-0.038 Embodied Carbon: Image: Knauf Insulation Embodied Carbon: RIGID WOOD FIBRE Embodied carbon +0.98 kgCO2e/kg +0.98kgCO e/kg +0.01 kgCO2e/kg Embodied Carbon: Carbon: Thermal conductivity Image: STEICO Protect Dry Embodied 0.037W/m k +0.63 kgCO2e/kg kgCO2e/kg Thermal Conductivity: +1.12 Thermal Conductivity: Image: Image:Architects RockwoolJournal 0.037 W/mK Embodied 0.048 W/mKCarbon: INSULATED LIME PLASTER Conductivity: Embodied carbon Thermal Thermal Conductivity: +0.78 kgCO2e/kg +0.78kgCO e/kg Embodied Carbon: Embodied Carbon: 0.038 W/mK Thermal conductivity 0.035-0.038 W/mK +0.01 kgCO2e/kg kgCO2e/kg 0.018W/m k +0.98 Embodied Carbon: Thermal Conductivity: Image: STEICO Protect Dry +0.63 kgCO2e/kg 0.18 W/mK Thermal Conductivity: Image: Wynnes Thermal Conductivity: RECYCLED NEWSPAPER 0.048 W/mK W/mK Embodied carbon 0.037 Image: Architects Journal +0.63kgCO e/kg Embodied Carbon: Thermal Conductivity: Image: Rockwool Embodied Carbon: Thermal conductivity +0.78W/mK kgCO2e/kg 0.038W/m k 0.038 -1.28 kgCO2e/kg Embodied Carbon: Carbon: Embodied Image: Celtic Sustainables STRAW BALES Embodied carbon +0.01 kgCO2e/kg Thermal Conductivity: +0.98 kgCO2e/kg +0.01kgCO e/kg Image: Wynnes Thermal Conductivity: Image: STEICO Protect Dry Thermal conductivity 0.18 W/mK 0.048W/m k 0.039 W/mK Thermal Conductivity: Thermal Conductivity: Image: Architects Journal Embodied Carbon: Embodied Carbon: 0.048 W/mK 0.037 W/mK -1.28 kgCO2e/kg SHEEP’S WOOL+0.78 kgCO2e/kg Embodied carbon +0.07kgCO e/kg Embodied Carbon: Thermal conductivity Image: Celtic Sustainables Thermal Conductivity: +0.01 kgCO2e/kg 0.039W/m k Image: Black Mountain Thermal Conductivity: 0.039 W/mK 0.18 W/mK Image: Wynnes Thermal Conductivity: Image: STEICO Protect Dry HEMP BATTS Embodied Carbon: Embodied carbon -0.63kgCO e/kg 0.048 W/mK Unknown Thermal conductivity Embodied Carbon: Carbon: Embodied 0.039W/m k -1.28 kgCO2e/kg Image: Black Mountain +0.78 kgCO2e/kg Thermal Conductivity:
ps tedWool Lime Bales r
2
2
2
2
2
2
2
2
2
2
2
0.039 W/mK Thermal Conductivity: Conductivity: Embodied Carbon: Thermal 0.039W/mK W/mK Unknown 0.18
Image: Celtic Sustainables
Image: Wynnes
85
Batts ps tedWool Lime r Batts
2
HOUSES
Wood Bales led al Wool paper ted Lime Wood rBales ed paper ted Lime s Wool rBales Wood
ROYAL COLLEGE OF ART ADS5
n Types
+1.12 kgCO2e/kg Embodied Carbon: +1.86 kgCO2e/kg Thermal Conductivity: 0.035-0.038 W/mK Thermal Conductivity:
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
WALL THICKNESS STUDIES TARGET: 0.15W/M2K (PASSIVHAUS) Investigating how thick wall build-ups will be with specific insulation thicknesses and the u-values that can be achieved. Numbers in red are equal to or less than the required 0.15W/M2K Passivhaus standard. 312
312
MATERIAL
HOUSES
TW STANDARD
312
312
312
387
387
387
175MM 387
387
231
306
306
231
231
306
306
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp231 Straw bale
0.25 0.27 0.27 0.26 0.27 0.27 0.31
Glass mineral wool 0.16 Recycled newspaper 0.17 Mineral wool 0.16 Wood fibre 0.16 Sheep’s wool 0.17 306 Hemp 306 0.18 Straw bale 0.21
350
350
425
425
350
350
425
425
302
350
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp 302 Straw bale
0.29 0.32 0.32 0.31 0.32 0.32 0.38
425
425
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp 377 Straw bale
0.18 0.18 0.18 0.19 0.20 377 0.20 0.24
302
302
377
377
302
302
377
377
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp Straw bale
0.20 0.22 0.20 0.21 0.22 0.22 0.26
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp Straw bale
86
387
231
350
STONE + TIMBER FRAME
INSULATION THICKNESS 100MM (TW STANDARD)
231
STONE + CLT
312
0.31 0.34 0.34 0.34 0.35 0.35 0.41
462
462
537
537
537
612
612
612
462
462
462
537
537
537
612
612
612
250MM 387
387
325MM
462
462
400MM
462
537
537
537
612
381
381
381
457
457
457
531
531
531
381
381
381
457
457
457
531
531
531
0.12 0.13 0.12 0.12 0.13 0.13 0.16
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool 381 381 Hemp Straw bale
0.09 0.10 0.10 0.10 0.09 457 0.09 0.13
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool457 Hemp Straw bale
0.08 0.09 0.08 0.08 0.09 457 0.09 0.11
531
500
500
500
575
575
575
650
650
650
500
500
500
575
575
575
650
650
650
425
452
452
425
452
377
500
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool 452 452 Hemp Straw bale
377
0.13 0.14 0.13 0.14 0.14 0.14 0.17
452
527
452
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp Straw bale
500
452
0.17 0.14 0.16 0.15 0.16 0.14 0.20
500
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool 527Hemp 527 Straw bale
527
452
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp Straw bale
575
575
0.10 0.11 0.10 0.11 0.11 527 0.11 0.14
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool 602 Hemp Straw bale
527
602
527
0.14 0.11 0.13 0.12 0.12 0.13 0.16
527
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool Hemp Straw bale
0.08 0.09 0.08 0.09 0.09 0.09 0.11
575
527
612
HOUSES
306
Glass mineral wool Recycled newspaper Mineral wool Wood fibre Sheep’s wool 306 381 Hemp Straw bale
ROYAL COLLEGE OF ART ADS5
462
650
602
602
602
602
531
650
602
602
0.11 0.09 0.10 0.10 0.10 0.11 0.13
87
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
WALL THICKNESS NEIGHBOURHOOD STUDY
EXTEND BACKWARDS, NOT SIDEWAYS Our insulation studies have shown that we must increase the overall wall build-up to a minimum of 452mm. Using a timber frame reduces the overall build-up by 48mm compared to CLT for equivalent u-values.
HOUSES
Increasing wall build-up will of course impinge on NIA, therefore we have studied whether it is possible to expand out in all directions or if we must keep the same external width as is currently planned and increase the depth of the buildings. It has been concluded that house width cannot be increased with the existing masterplan (which we are keeping the same) but there is space to extend back into the large private garden of each house. Therefore we are elongating the plan of each house in order to accomdate the increase in wall build-up without reducing NIA.
88
Figure 3.28 Each house has a large private garden that can be utilised slightly to accept the improved thicker wallls
9450
ROYAL COLLEGE OF ART ADS5
EXISTING CONDITION
NIA 3B: 79.96m2 NIA 4B: 119.15m2
OFFSETTING EQUALLY OUT - TOO TIGHT FOR DRIVEWAYS
HOUSES
9750
NIA 3B: 79.96m2 NIA 4B: 119.15m2
EXTENDING BACK
100050
NIA 3B: 79.96m2 NIA 4B: 119.15m2
89
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STONE RAINSCREEN
WHY STONE?
HOUSES
Oolitic limestone is vernacular to the Cotswolds region, it has been quarried and built with for centuries. Not only is limestone a contextual choice but also a clear environmental choice as stone has 35% of the carbon emissions of brick. Stone is quarried, minimally processed and brought to site. Concrete blocks or bricks must be quarried, crushed, mixed, fired and then only after all that brought to site. The following investigation outlines how we detail the stone and what effects this has on appearance and construction metheodology as well as carbon emissions.
90
Figure 3.29 Tyoical Cotswolds cottage
ROYAL COLLEGE OF ART ADS5
800
STONE QUARRYING
400 200
CONCRETE BLOCK MAKING
Stone
Brick
Concrete block
Figure 3.30 Comparitive embodied carbon of different rainscreen materials
HOUSES
0
kgCO2e/m3
600
BRICK FIRING
Figure 3.31 Geology map showing the band of oolitic limestone that runs through the Cotswolds
91
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
HAND LIFTABLE STONES
SAME CONSTRUCTION METHEDOLOGY AS EXISTING Currently Taylor Wimpey use bricks or stone slips constructed by hand to form their rainscreen facades in front of the structural concrete block walls which are also built by bricklayers. This test explores keeping the same construction methedology but replacing brick/concrete blocks with self supporting limetstone blocks. Limestone has a density of 2400kg/m3. We have used this to get the dimensions of a limestone block that weighs no more than 19kg and is 125mm deep.
HOUSES
EXISTING CONDITION
BRICK
CONCRETE BLOCK
112.5x215x65mm 2.75kg
440x215x100mm 19kg
LIMESTONE
LIMESTONE BLOCK
92
400x200x125mm 19.2kg
ROYAL COLLEGE OF ART ADS5
EMBODIED CARBON/HOUSE Stone thickness: 125mm Stone volume: 25.6m3 Carbon: 4663kg
HOUSES
Figure 3.32 Liftable stone facade
93
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
SAFE STONE BANDING
EXPRESSION WITHIN THE FACADE The Health and Safety England guidance on safe lifiting limits in the workplace shows the amount of weight a person can lift by hand at which height they can lift it. Using this, we can size stones accordingly in bands and express the mode of construction through the facade so the simple stone wall starts to tell a tale.
410
HOUSES
410 410
94
410
19.2kg
9.6kg
200x200x125mm
400x200x125mm
500x200x125mm
2090
410
9.6kg
ROYAL COLLEGE OF ART ADS5
EMBODIED CARBON/HOUSE Stone thickness: 125mm Stone volume: 25.6m3 Carbon: 4663kg
HOUSES
Figure 3.33 Liftable stone banding facade
95
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
LARGE STONES
40% LESS STONE REQUIRED If a crane is used, the stone facade be made of large sections that act as rainscreen and lintel all in one. Large stones retain the innate structural stability of the stone therefore the thickness of stones slim from 125mm to just 75mm, reducing the material quantity and cost by 40%. The speed of construction compared to a hand built facade will reduce time on site further reducing costs.
HOUSES
Large stones are sized at a maximum of 1000x2000mm so they are not too brittle in transit. This means that they can still be used efficiently to create window openings so extra lintels are not required - further reducing material, cost and carbon.
96
Figure 3.34 Lyon Housing, Gilles Perraudin
ROYAL COLLEGE OF ART ADS5
EMBODIED CARBON/HOUSE Stone thickness: 75mm Stone volume: 16m3 Carbon: 2914kg
HOUSES
Figure 3.34 Large stone facade
97
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
LARGE STONES INTEGRATED LINTELS + PORCH FASTER, GREENER The existing condition homes currently have small porch canopies built from painted timber, composite concrete roof tiles and lead. Additionally, reconstituted stone lintels sit above each window.
HOUSES
Using large stones enables us to integrate lintels and a porch canopy into the facade, minimising time on site, reducing material and reducing carbon.
98
Figure 1.1 Thornbury Green housing development
ROYAL COLLEGE OF ART ADS5
Figure 1.1 Thornbury Green housing development
HOUSES
Figure 3.35 Integrated lintels and porch stone
99
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STONE SLIPS
MUCH MORE CARBON INTENSIVE
HOUSES
The exisitng methedology for Taylor Wimpey stone rainscreens is to use stone slips. Taylor Wimpey glue their slips to a layer of concrete blockwork behind but as we have estabalished that a timber frame building is far less carbon intensive, we must use a secondary structure of galvanised steel for slips to hang from. Such a system has nealy 4 times the embodied carbon as liftable self supporting stone and 6.5 times the embodied carbon of large self supporting stone.
100
Figure 1.1 Thornbury Green housing development
ROYAL COLLEGE OF ART ADS5
EMBODIED CARBON/HOUSE Stone slip volume: 10mm Stone slip volume: 6.5m3 Stone slip carbon: 1298kg Galvanised steel secondary structure volume: 1m3 Galvanised steel secondary structure carbon: 16882kg Total carbon: 18,180kg
HOUSES
Figure 3.36 Stone slip facade
101
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STONE RAINSCREEN FINDINGS
LARGE STONES
Figure 3,37 Comparitive rainscreen embodied carbon per house
12,000 0
4000
8000
kgCO2e/m3
16,000
HOUSES
20,000
Our studies have shown that using large stones has nearly half the embodied carbon of liftable stones and nearly six times less than stone slips with a secondary steel structure. Additionally, this methedology removes the need for lintels and porches so will further save on embodied carbon. Finally the small number of pieces per house means that construction time will be quick so labour cost can be saved.
102
Liftable stone
Large stone
Stone slips + steel structure
ROYAL COLLEGE OF ART ADS5
HOUSES
Figure 3.38 4 bedroom carbon copy
103
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
STONE ROOF TILES
LIMESTONE OR SLATE? Taylor Wimpey use cement fibre tiles which only have a lifespan of 30 years. To make a cement fibre tile, stone must be quarried, crushed, fired, mixed and set. In contrast stone can be used for roofing which has a lifespan of 80100 years and the only processing required is quarrying and cutting to size. Immediately the environmental and carbon benefits of stone are clear.
HOUSES
Vernacular roofing in the Cotswolds typically uses ‘stone slates’, these are the local limestone handcut into tiles. They are naturally rough and thick therefore require a pitch of 50-55o to allow for adequate run-off. Welsh slate is another typical roofing material in the UK. Welsh slate is naturally very smooth and can be cut thinly so the pitch and overall material quantity can be much less than Cotswolds stone slates. We are proposing to use Welsh slate to minimise material, wasted loft space and maximise long lasting environmental benefits.
0.6 0
0.4
kgCO2e/m3
0.8
1
EMBODIED CARBON COMPARISON
104
Cement tiles
Stone slates
Welsh slate
ROYAL COLLEGE OF ART ADS5
COTSWOLDS STONE SLATES
Figure 3.39 Cotswold stone slate requires a roof pitch of 50o
HOUSES
WELSH SLATE
Figure 3.40 Welsh slate can use the same pitch as the existing condition
105
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
TIMBER WINDOWS
VELFAC WINDOWS Plastic is one of the chief material issues plaguing our planet today. Windows can be made of recylced uPVC however, the process of dissasembling, melting and moulding them into new windows is extremely fuel intensive so far from ideal. Secondly, using plastic windows on houses designed to be environmentally friendly is antithetical to that ethos.
As a component, these windows are more expensive than the existing condition but they can be afforded through savings elsewhere. Velfac over uPVC windows also have a visual benefit that cannot be ignored.
COST COMPARISON
Cost per house/£
0
1 0
kgCO2e/kg
2
200
3
300
4
400
EMBODIED CARBON COMPARISON
100
HOUSES
Timber windows undergo far fewer processes in becoming a window but must be externally treated (with oil, wax, paint or similar) to prevent decay. Velfac windows are a composite of external aluminium and internal timber which means that they do not require much maintenance and still sequester carbon.
2
-200
1
-100
uPVC
106
uPVC
Velfac
Velfac
ROYAL COLLEGE OF ART ADS5
UPVC
Figure 3.41 uPVC windows
HOUSES
VELFAC
Figure 3.42 Timber velfac windows
107
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
TIMBER INTERNAL PARTITIONS
GREENER, CHEAPER
20000
EMBODIED CARBON COMPARISON
10000 5000 -5000
0
kgCO2e/m3
15000
HOUSES
The existing methedology for internal partition walls is a metsec frame with plasterboard finished with either paint or wallpaper. Metsec frames are quick to construct because they come pre-cut and drilled however a simple stud wall of softwood timber is equally easy to build, greener and cheaper. 15mm pine veneered plywood lines the partitions instead of plasterboard and an ancillary finish; this is more expensive but offset by the cheaper studwork and lack of need for extra layers of finish which not only reduce material costs but labour costs as well.
108
Metsec
Softwood Timber
ROYAL COLLEGE OF ART ADS5
METSEC
HOUSES
Figure 3.43 Existing condition metsec partitions and internal fit out
SOFTWOOD TIMBER
Figure 3.44 Proposed softwood timber partitions and veneered ply lining
109
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
TIMBER AND STONE FLOOR FINISHES
CARBON SEQUESTERING FLOORS Currently Taylor Wimpey use carpet or porcelain tiles throughout their houses. Carpet cannot be easily recycled and is often the first thing new owners will look to change; it also requires underlay which is equally difficult to recycle fully. Porcelain tiles require quarrying clay, firing, glazing and firing again so while cheap are very carbon intensive to fabricate.
HOUSES
Hardwood timber floors are not often replaced by new owners so not only do they sequester carbon, they reduce material wastage over the lifespan of the building. Limestone simply requires quarrying and cutting before it can be laid. Limestone should be finished with a biodegradable wax layer to protect it from stains. We are proposing to use hardwood timber floors throughout with the exception of bathrooms where limestone will be laid.
1 2
1
0
kgCO2e/kg
2
3
4
EMBODIED CARBON COMPARISON
110
Carpet
Porcelain Tile
Hardwood Timber
Limestone
ROYAL COLLEGE OF ART ADS5
CARPET AND TILE
HOUSES
Figure 3.45 Existing condition is mostly carpet and large areas of tile
TIMBER AND STONE
Figure 3.46 Proposed timber floors thorugh except for bathrooms where limestone is used
111
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
PLAN
HOUSES
3 BED
00
01
4 BED
112
0m
1
2
00
01
ROYAL COLLEGE OF ART ADS5
HOUSES
02
113
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
SECTION/ELEVATION
HOUSES
3 BED
4 BED
114
0m
1
2
ROYAL COLLEGE OF ART ADS5
HOUSES
115
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FOUNDATION DETAIL 3 BED AND 4 BED
1
HOUSES
2
VOID
116
1
ROYAL COLLEGE OF ART ADS5 HOUSES
1
Wall 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood 12x100mm softwood skirting
2
Floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist Hemp batt insulation DPM
3
Foundation 2x75mm limestone block 150mm EPS insulation Vented opening 400x400x600 limestone plinth 600x600x300 limestone footing Reinforced concrete
117
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
EXTERNAL WALL DETAIL 3 BED AND 4 BED
3
HOUSES
1
2
118
1
118
Wall 75mm limestone 50mm air gap Waterproof membrane 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood
12x100mm softwood skirting 2
Window Triple glazed velfac timber window Limestone sill Hardwood timber sill
3
Intermediate floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist 12mm veneered plywood
ROYAL COLLEGE OF ART ADS5
HOUSES
119
119
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
EAVE DETAIL 3 BED 2
HOUSES
1
120
3
ROYAL COLLEGE OF ART ADS5
4 BED
3
1
HOUSES
1
Wall 75mm limestone 50mm air gap Waterproof membrane 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood
12x100mm softwood skirting
2
Flat roof Sedum planting 200mm soil 100mm drainage board DPM 300mm timber I-joist Hemp batt insulation 12mm veneered plywood
3
Pitched roof Welsh slate tiles Softwood timber battens DPM 300mm timber I-joist Hemp batt insulation 12mm standard ply
121
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
INTERNAL STRUCTURAL WALL DETAIL 3 BED (PARTY WALL) AND 4 BED
1
122
HOUSES
2
VOID
VOID
ROYAL COLLEGE OF ART ADS5 HOUSES
1
Wall 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood 12x100mm softwood skirting
2
Floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist Hemp batt insulation DPM
123
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
INTERNAL PARTITION WALL DETAIL 3 BED AND 4 BED
1
HOUSES
2
VOID
124
1
Wall 90mm softwood timber frame 90mm hemp batt insulation 12mm veneered plywood 12x100mm softwood skirting
2
Floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist Hemp batt insulation DPM
ROYAL COLLEGE OF ART ADS5
HOUSES
125
126 HOUSES
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
COMPARATIVE IMAGES
ROYAL COLLEGE OF ART ADS5
HOUSES
127
128 HOUSES
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
129
130 HOUSES
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
131
HOUSES
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
EMBODIED CARBON
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
Limestone
Pad foundation
4
756
Limestone
Wall
16
2914
Softwood I-beam
Wall and floor
<1
-2030
Softwood
Wall and floor
6
-3888
Softwood
Stud partitions
2
-1139
Plywood
Linings/floors
16
-8079
Welsh slate
Roof tiles
2
408
Softwood
Roof trusses
n/a
-473
Hemp batt
Insulation
109
-2389
Glass
Windows
<1
380
Limestone
Sills and lintels
<1
49
132
TOTAL/HOUSE
-13489
ROYAL COLLEGE OF ART ADS5
COST ANALYSIS
ELEMENT
QUANTITY M2
COST £
Limestone
Pad foundation
4m3
1200
Limestone
Wall
16m3
4626
Softwood I-beam
Wall and floor
<1
Unknown
Softwood
Wall and floor
507
5065
Softwood
Stud partitions
284
2840
Plywood
Linings/floors
1322
19,830
Welsh slate
Roof tiles
2m3
648
Softwood
Roof trusses
103
1028
Hemp batt
Insulation
109m3
15,025
Glass
Windows
14
6750
Limestone
Sills and lintels
<1m3
78
TOTAL/HOUSE
HOUSES
MATERIAL
57,270
133
ROYAL COLLEGE OF ART ADS5
3.0 CARBON COPY
FINDINGS
GREENER, CHEAPER, FASTER Our analysis has proved that it is possible to build a carbon copy scheme of that built by Taylor Wimpey that is carbon negative. Not only this, our scheme is comparatively cheaper to build per house due to the change and reduction of materials, desiging out supplementary finishes and faster construction techniques.
HOUSES
Our carbon copy scheme is more at home in the Cotswolds than that proposed by Taylor Wimpey and will be more comfortable for residents to live in. This analysis has been concluded in a vaccum however, and it would therefore be interesting to see how our design could be rolled out to other Taylor Wimpey sites and investigate how this may have positive effects. A second additional study that would be good to do is looking into how these homes are serviced - could a district ground source heat pump be viable for the whole development to share? Will this cheapen users’ bills and increase their fuel security?
COST COMPARISON
150000 -50000
Existing Condition
Stone + CLT
Stone + Timber Frame
-100000
-40000
134
100000 50000 0
0
Existing Condition
Large stone
-20000
kgCO2e/m3
20000
40000
Cost per house/£
200000
EMBODIED CARBON COMPARISON
Stone + CLT
Stone + Timber Frame
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 3.48 3 bedroom carbon copy
168%
24%
EMBODIED CARBON
PROJECT COST
135
136 HOUSES
4.0 WHAT IF?
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
137
ROYAL COLLEGE OF ART ADS5
4.0 WHAT IF?
SUMMARY
LOADBEARING STONE Traditionally the stone of vernacular houses in the Cotswolds is not just a rainscreen but also structure. If we were to go beyond the carbon copy and design further, this would be our principle approach. The following two options briefly explore how it can be articulated either as external stone or as internal stone.
138
HOUSES
Additionally we have explored the use of timber piles in lieu of limestone for foundations. This would mean that our foundations, which have one of the highest individual component embodided carbon figures, will be carbon negative for each house. The following have all been designed as ideas, ‘what if?’ scenarios and therefore require further investigation, especially into accurate cost and carbon calculations
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 4.1 Typical Cotswolds cottage
139
ROYAL COLLEGE OF ART ADS5
4.0 WHAT IF?
INTERNAL STONE
INSULATED RENDER HIDING COSY VERNACULAR STONE INTERIOR Internal structural stone offers fantastic environmental and visual possibilities. Firstly, by making the stone loadbearing, we will eliminate the need for a timber frame and reduce wall build-up so reduce material quantites and cost. Secondly it frees the external elevations to, in essence, become anything it wants. One route we have explored is to use insulated render so each house becomes a black (or coloured) box where no lintels or roof tiles are required as it is all wrapped in a homogenous envelope.
HOUSES
Reducing the wall build-up, material quantites and improving the u-value can only be a good thing. These houses will externally appear out of place but in actual fact can be argued to be more ‘vernacular’ than our proposed carbon copy because their stone is loadbearing. The internal palette of exposed stone and timber panelled partitions will create a cosy, cottage atmosphere. The simple and cheap facade can mean more money is put into planting, which will create a richer environment for people to enjoy and biodiversity to thrive.
Figure 4.2 Ada Street, Groupwork
140
Figure 4.3 Didden Village, MVRDV
ROYAL COLLEGE OF ART ADS5 HOUSES
1
Figure 4.4 Internal stone walls
1
Limestone wall Dryvit insulated render system 300mm rigid wood fibre insulation Waterproof membrane 125mm limestone
141
142 HOUSES
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 4.5 Prospect Cottage, Derek Jarmin
Figure 4.6 Serpentine Pavillion, Peter Zumthor
143
ROYAL COLLEGE OF ART ADS5
4.0 WHAT IF?
EXTERNAL STONE
CUTE DORMERS External stone means the houses will contextually appear at home which is of course something to be prized - the typical Cotswold cottage is cute and sought after for a reason. Wall build-up and material quantities will again be reduced by making the stone loadbearing. However to avoid thermal bridges and areas for condensation to creep into the building, a complex insulated hanging detail is required for the floor joists which could increase costs.
HOUSES
To mitigate any potential cost increases, we have explored dropping the ceiling on the 4 bedroom house and added cute little dormers typical of the area. This, coupled with the elimination of a timber frame, will reduce material quanitities and indeed cost.
144
Figure 4.8 Cute little dormers set into a Cotswolds cottage
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 4.9 4 bedroom with low roof and dormers
145
ROYAL COLLEGE OF ART ADS5
NO NIA LOSS
1200
HOUSES
The roof pitch starts 1200mm above FFL and therefore there is no loss of NIA/net sellable area.
146
0m
1
2
Floor joists can hang directly off the external loadbearing stone work with a nylon insulation strip to avoid cold bridges. As the wall panels only need to hold themselves up now, the timber frame can be removed so much less material is used and less work required per house. The stone must increase to a thickness of 125mm but there is no impct on overall build-up.
ROYAL COLLEGE OF ART ADS5
INSULATED FLOOR JOIST HANGER
1
HOUSES
2
1
Limestone wall 125mm limestone 50 air gap Waterproof membrane Cavity ties 15mm plywood 300mm insulation 12mm veneered plywood 12mm timber skirting
2
Intermediate floor Nylon insulation strip Steel hanger 300mm timber I-joist Acoustic insulation Softood timber battens 22mm plywood 12mm hardwood floor
147
ROYAL COLLEGE OF ART ADS5
4.0 WHAT IF?
TIMBER PILE FOUNDATIONS
CARBON NEGATIVE FOUNDATIONS The foundations in our carbon copy are still very carbon intensive at +756kgCO2e/m3 and dramatically more expensive than the existing methedology of concrete block. We have therefore looked to use timber piles made of oak or coppice chestnut which would make our foundations carbon negative and increase the construction speed. Timber pile foundations will most likely be greener, cheaper and faster. Timber piles are used reguarly for fencing that lasts 60+ years in the post and rail fencing of southern England. Setting the pile 3m deep will mean they can withstand any heaving or settling forces. A galvanised steel flange must be inserted into the top of each pile to retain the strength in case the timber starts to rot at the top of ground level. HOUSES
The main design feature that this method would bring about is the need to leave 300mm of the timber above ground level to ensure the underside of the house can be adequately ventilated to avoid rot. We can take advantage of this however and introduce a ramp over linked swales on the front and back of each house. This will ensure equal access, increase biodiversity, help reduce flood risk and increase the beauty of the masterplan.
148
Figure 4.10 Chestnut post and rail fencing can last outdoors for 60 years
ROYAL COLLEGE OF ART ADS5
PROPOSED STONE PADS
2000
300
600x600x300mm limestone
2700
HOUSES
2700
2700
300
PROPOSED TIMBER PILES
2700
2700 3000
2700
300x3000mm timber 600x220x10mm steel flange
149
ROYAL COLLEGE OF ART ADS5
VOID
HOUSES
2
150
1
1
Foundation 3000x300mmdia. chestnut or oak pile 800x220x10mm galvanised steel flange
2
Swale Water loving planting
ROYAL COLLEGE OF ART ADS5 HOUSES
Figure 4.11 Ramp over swale entrance
Figure 4.12 Tasinge Plads, Copenhagen Planted swales with walkways over the top
151
152 HOUSES
5.0 FINDINGS
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
153
ROYAL COLLEGE OF ART ADS5
5.0 FINDINGS
FINAL COMPARITIVE FINDINGS
GREENER, CHEAPER, FASTER This analysis has explored if it is possible to recreate a Taylor Wimpey housing development that is greener, cheaper and faster than the existing condition. Through our research we have concluded that it is indeed possible. Thoughtful questioning of, and, understanding material along with construction methods means that these houses can be built using a timber frame and large self supporting Cotswolds limestone facade.
154
HOUSES
This research is in essence only a beginning, it is a provocation of what is possible when we think and deeply analyse design decisions. Changing a material based on cost or colour alone does not look at the whole picture and doing so does an injustice to the future residents of these homes and our shared planet. This analysis has been done in the isolation of two typologies on a single site. The next steps to develop this research further would be to present it to Taylor Wimpey and work together to understand how this could work at an economy of scale. Secondly, this research has been more site specific than a Taylor Wimpey development in which the same house can be built in Southampton or Sunderland so developing a map of Britain and housing typologies accordingly that are all greener, cheaper and faster would be an incredibly interesting and pertinent exercise.
168%
24%
EMBODIED CARBON
PROJECT COST
ROYAL COLLEGE OF ART ADS5
COST COMPARISON
100000 0
50000
40000 20000 0
Existing Condition
Stone + CLT
Stone + Timber Frame
Existing Condition
Stone + CLT
Stone + Timber Frame
-100000
-50000
-20000
Large stone
-40000
kgCO2e/m3
HOUSES
Cost per house/£
150000
200000
EMBODIED CARBON COMPARISON
155
156 HOUSES
ROYAL COLLEGE OF ART ADS5
ROYAL COLLEGE OF ART ADS5
HOUSES
157
ROYAL COLLEGE OF ART ADS5 HOUSES 158
6.0
CATALOGUE OF MATERIAL COMPONENTS
ROYAL COLLEGE OF ART ADS5
HOUSES
159
ROYAL COLLEGE OF ART ADS5
6.0 CATALOGUE OF MATERIAL COMPONENTS
FOUNDATION DETAIL 3 BED AND 4 BED
1
HOUSES
2
VOID
160
1
ROYAL COLLEGE OF ART ADS5 HOUSES
1
Wall 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood 12x100mm softwood skirting
2
Floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist Hemp batt insulation DPM
3
Foundation 2x75mm limestone block 150mm EPS insulation Vented opening 400x400x600 limestone plinth 600x600x300 limestone footing Reinforced concrete
161
ROYAL COLLEGE OF ART ADS5
6.0 CATALOGUE OF MATERIAL COMPONENTS
EXTERNAL WALL DETAIL 3 BED AND 4 BED
3
HOUSES
1
2
162
1
Wall 75mm limestone 50mm air gap Waterproof membrane 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood
12x100mm softwood skirting 2
Window Triple glazed velfac timber window Limestone sill Hardwood timber sill
3
Intermediate floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist 12mm veneered plywood
ROYAL COLLEGE OF ART ADS5
HOUSES
163
ROYAL COLLEGE OF ART ADS5
6.0 CATALOGUE OF MATERIAL COMPONENTS
EAVE DETAIL 3 BED 2
HOUSES
1
164
3
ROYAL COLLEGE OF ART ADS5
4 BED
3
1
HOUSES
1
Wall 75mm limestone 50mm air gap Waterproof membrane 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood
12x100mm softwood skirting
2
Flat roof Sedum planting 200mm soil 100mm drainage board DPM 300mm timber I-joist Hemp batt insulation 12mm veneered plywood
3
Pitched roof Welsh slate tiles Softwood timber battens DPM 300mm timber I-joist Hemp batt insulation 12mm standard ply
165
ROYAL COLLEGE OF ART ADS5
6.0 CATALOGUE OF MATERIAL COMPONENTS
INTERNAL STRUCTURAL WALL DETAIL 3 BED (PARTY WALL) AND 4 BED
1
166
HOUSES
2
VOID
VOID
ROYAL COLLEGE OF ART ADS5 HOUSES
1
Wall 300mm timber I-joist frame 300mm hemp batt insulation 12mm veneered plywood 12x100mm softwood skirting
2
Floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist Hemp batt insulation DPM
167
ROYAL COLLEGE OF ART ADS5
6.0 CATALOGUE OF MATERIAL COMPONENTS
INTERNAL PARTITION WALL DETAIL 3 BED AND 4 BED
1
HOUSES
2
VOID
168
1
Wall 90mm softwood timber frame 90mm hemp batt insulation 12mm veneered plywood 12x100mm softwood skirting
2
Floor 12mm Hardwood timber floor 22mm plywood 50x25mm Softwood timber battens Acoustic insulation Timber I-Joist Hemp batt insulation DPM
ROYAL COLLEGE OF ART ADS5
HOUSES
169
ROYAL COLLEGE OF ART ADS5
EXTERNAL CONTRIBUTORS
WEBB YATES ENGINEERS 48-50 Scrutton Street London EC2A 4HH london@webbyates.com
EIGHT ASSSOCIATES
HOUSES
46 Loman Street London SE1 0EH info@eightassociates.co.uk
OLP COST CONSULTANTS Office 7 35-37 Ludgate Hill London EC4M 7JN info@olpcostconsultants.co.uk
IVO DESIGN +44 (0) 7954 09 81 31 +34 623 104 054 ivo@ivodisseny.com
NORTON ROSE FULBRIGHT 3 More London Riverside London SE1 2AQ
170
+44 20 7283 6000
ROYAL COLLEGE OF ART ADS5
HOUSES
171
ACKNOWLEDGEMENTS
ADS 5 ROYAL COLLEGE OF ART
CONTENTS 1.0 INTRODUCTION Purpose of research Construction methodology Reference: stone tower research project Case studies 2.1 EXISTING CONDITION A (OFFICE) Site and location Key information Tower overview Construction methodology Existing structural plans Existing elevations and sections Existing close up section Existing exploded axonometric Existing detail drawings Embodied carbon calculation Cost analysis
TOWER
8 10 12 14
18 19 20 22 24 26 28 29 30 32 33
2.2 CARBON COPY A (OFFICE) Stone exoskeleton + Timber in-between + Stone core Construction methodolgy Stone frame options Beam variations Structural plans Elevation and Section Close up section Exploded axonometric Detail drawings External view comparison Embodied carbon calculation Cost analysis
36 28 40 42 44 46 48 49 50 52 54 55
2.3 WHAT IF? Office additional internal columns Embodied carbon calculation Cost analysis
58 60 61
3.1 EXISTING CONDITION B (RESIDENTIAL)
4
Site and location Key information Tower overview Construction methodology Existing structural plans Existing elevations and sections Existing close up section Existing exploded axonometric
64 65 66 68 70 72 74 75
76 78 79
ROYAL COLLEGE OF ART
Existing detail drawings Embodied carbon calculation Cost analysis 3.2 CARBON COPY B (RESIDENTIAL)
82 84 86 88 90 92 94 96 98 100
ADS 5
Variation 1 & 2 Construction methodolgy Structural plans Close up sections Exploded axonometric Detail drawings Piles foundation comparison Internal finishes comparison Embodied carbon calculation Cost analysis 4.0 DATA COMPARISONS
104 108
5.0 FINDINGS Overall savings Conslusion to the tower typology
114 120
6.0 MENU OF COMPONENTS
122
TOWER
Office tower 22 Bishopsgate Residential tower One Park Drive
5
6 TOWER
1 INTRODUCTION
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
7
ADS 5 ROYAL COLLEGE OF ART TOWER
1.0 INTRODUCTION
PURPOSE OF RESEARCH
As the product of new technologies and response to spatial limitations, growing populations, zoning regulations, and business requirements, are towers logical extrusion of land values or irrational, anti-urban monster? In a world responding to the climate crisis, towering skyscrapers that use massive amounts of energy and materials to construct and operate may look increasingly out of place. This paper examines the current state of two tower types: office tower and residential tower. Focusing on the case studies of 22 Bishopsgate and One Park Drive, we selected these typical buildings in London that demonstrate the most up-to-date construction practices.
8
In light of the current climate context, the report will focus on how timber and stone could be used in the tower typology. By replacing building materials and reconstructing details, we intend to provide a new strategy for the tower’s sustainable innovation while conserving the structure’s original features to the maximum extent.
ROYAL COLLEGE OF ART ADS 5 TOWER
22 Bishopsgate, City of London, PLP Architecture. Image CC credit: Matt Brown – flickr
One Park Drive, Canary Wharf, Herzog de Meuron. Photographed by Lee Mawdsley
9
TOWER
ROYAL COLLEGE OF ART
ADS 5
1.0 INTRODUCTION
10
Towers under construction, concrete / steel structures. Photographed by Lee Mawdsley
ROYAL COLLEGE OF ART ADS 5 TOWER
22 Bishopsgate and One Park Drive, under construction, Two typical tower structures.
CONSTRUCTION METHODOLOGY Both belonging to the tower typology, 22 Bishopsgate and One Park Drive are stacked and combined by the same basic elements: core frame, slab, and facade. Both rely heavily on reinforced concrete; the office tower’s fundamental structure is made up of a huge number of steel columns and beams, while the residential tower’s construction logic is flat slabs supported by reinforced concrete blade walls and columns. Wind lateral force is dealt with differently in the two buildings: 22 Bishopsgate employs a specific steel outrigger system in the middle of the building levels, whilst One Park Drive uses a lot of concrete shear walls to keep the structure stable.
11
TOWER
ROYAL COLLEGE OF ART
ADS 5
1.0 INTRODUCTION
Stone Tower Research Project. Groupwork, in collaboration with Jackson Coles, Eight Associates and Webb Yates
REFERENCE: STONE TOWER RESEARCH PROJECT Researching how far one can go using stone, Groupwork has imagined a 30-story basalt structure with a total Gross Internal Floor Area of 37,800 m² / 406,875 ft², part of the Stone Tower Research project.
12
The comparative study considering many structural solutions aims to “investigate whether large scale commercial buildings can be built with stone superstructures, stone and or timber floor plates to meet the same criteria of optimum office space and building height as steel and concrete structures and be the same or lower in construction cost and carbon footprint”.
ROYAL COLLEGE OF ART ADS 5
Stone Tower – Typical Plan (stone flooring cassettes shown)
TOWER
One Par Drive, Canary Wharf, Herzog de Meuron. Photographed by Lee Mawdsley
Stone Tower – Front Elevation
Stone Tower – Side Elevation
13
ROYAL COLLEGE OF ART
ADS 5
1.0 INTRODUCTION
TOWER
Case study: 30 Finsbury Square, London, Eric Parry Architects , 2002. Source: https://www. ericparryarchitects.co.uk/ projects/30-finsbury-square/
14
Case study: Sara Cultural Centre, Skellefteå, White Arkitekter, 2021. Source: https:// whitearkitekter.com/project/ sara-cultural-centre/
ROYAL COLLEGE OF ART ADS 5
CASE STUDIES
30 Finsbury Square, London, Eric Parry Architects , 2002
Sara Cultural Centre, Skellefteå, White Arkitekter, 2021
The project comprised a large office development of approximately 16,660 square meters of office floor space arranged over 7 stories.
The centre’s timber structure references the city’s historic wooden buildings, and is sheathed in a double layer of glass that reveals the crosslaminated and glue-laminated timber panels that form the spaces within.
This elevational study is nevertheless based upon the engineered distribution of weight bearing down through the piers. Parry had hoped to integrate an additional break in the tension of the visual grid by wrapping a small section of the stone frame composition in the sculpture of stainless steel balls by Richard Deacon RA, like an interweaving necklace.
The building, which makes use of locally and sustainably sourced and processed timber, has an aim to be carbon negative within 50 years.
TOWER
The use of stone under varying pressures, as if it were post-and-beam construction from the days of ancient Greece, working just like in a ‘hightech stone age’.
Structural engineers Florian Kosche developed two construction systems for the building that eliminate the use of concrete within the load-bearing structure. Prefabricated modules made from Cross Laminated Timber (CLT) were used to construct the high-rise hotel, while a combination of glue laminated timber with cores and walls in CLT was deployed for the cultural centre. In hand, an energy system created by Skellefteå Kraft and ABB was developed to reduce the building’s power consumption and includes roofmounted solar panels that produce renewable energy.
15
16 TOWER
2.1 EXISTING CONDITION A: OFFICE
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
17
ADS 5
2.1 EXISTING CONDITION A
ROYAL COLLEGE OF ART
22 BISHOPSGATE
22 Bishopsgate, also known as Twentytwo, is a commercial skyscraper in the City of London financial district.The project replaces an earlier plan a tower named The Pinnacle, on which construction was started in 2008 but suspended in 2012 following the Great Recession, with only the concrete core of the first seven storeys. The structure was later subjected to a re-design, out of which it became known by its postal address, 22 Bishopsgate.
OFFICE TOWER
The Pinnacle is the second-tallest building in both the United Kingdom and the European Union after The Shard. Shaped to respect townscape views, its twentythree-sided, faceted glass form makes a strong and serene backdrop to the surrounding articulated towers and to the historic fabric of the Bank of England Conservation Area.
18
22 Bishopsgate under construction, City of London, PLP Architecture. Image CC credit: It’s No Game – flickr.
ROYAL COLLEGE OF ART
SITE AND LOCATION ADS 5 OFFICE TOWER
Existing site plan. Planning Application Documents.
KEY INFORMATION Completion: 2020 Height: 272.32m (AOD) Storeys: 62 Gross Internal Area (GIA): 196,982 m2 Net Internal Area (NIA): ~108,340 m2
19
ROYAL COLLEGE OF ART
ADS 5
2.1 EXISTING CONDITION A
TOWER OVERVIEW Extensive amenity spaces form a “vertical village” in 22 Bishopsgate, these spaces encourage social interaction, collaboration, inclusion, shared experiences, services and events. At its base, pedestrian access is unlocked through the cluster in the heart of the City, converting it into landscaped public open space. Four main entrances access the Lobby, with an evolving programme of curated art and sculpture displays.
OFFICE TOWER
The office building offers 1.275 million sq ft of high specification office space, arranged across four office zones. An innovative evacuation method is created by using passenger lifts rather than typical fire evacuation lifts. The four zones are separated by two-hour fire rating slabs, each has its own dedicated bank of lifts. The double-decker lifts, which run at a pace of 6-8 metres per second, provide a safe and quick escape route for the building’s occupants.
20
The vertical village: varied amenity spaces where people and ideas thrive. 22 Bishopsgate Brochure
ROYAL COLLEGE OF ART ADS 5 OFFICE TOWER
Four office entrance and four banks of lifts, for swift and direct journeys to the destination floor – with no stops.
Four office zones. Not to scale, for identification purposes only.
21
ROYAL COLLEGE OF ART
ADS 5
2.1 EXISTING CONDITION A
OFFICE TOWER
Outrigger system. Located at levels 25 and 41.
Transfer structure. Linking the new structures into the existing foundation.
CONSTRUCTION METHODOLOGY OUTRIGGER SYSTEM Responding to the pushing forces of the strong winds affecting the higher levels, the engineers designed a series of trusses that play the role of outriggers located at levels 25 and 41. These steel structures span from floor to ceiling and tie back to the concrete core. Restrain the building and help it to stand still when the wind tries to bend it down. The structure also compresses and shrinks due to the effect of the increased weight.
22
TRANSFER STRUCTURE One of the biggest transfer structure in the design of 22 Bishopsgate, nicknamed by the design team as the “Rhino truss” for its geometry. It was required in order to transfer the loads from the south east corner columns of the building to the foundations that needed to be utilised from the old Pinnacle design.
ROYAL COLLEGE OF ART ADS 5
Top down construction. Temporary structural elements are built to support the core.
OFFICE TOWER
Double skin system. Facade under construction.
TOP DOWN CONSTRUCTION It consists in starting to build the core from an elevated level, in this case from the ground floor. This way, construction can progress simultaneously above and below ground. Temporary structural elements are built to support the core. These usually occupy less space than the final configuration of the core walls would thus freeing space underneath and facilitating the execution of the works required below ground. DOUBLE SKIN SYSTEM Along the west side, the huge loads from the peripheral columns had to be brought into the piles located much nearer to the central core. Engineers do this by sloping the columns inwards from level six to level three, returning to vertical for the entrance lobby down to ground level, and then sloping again from ground to basement. To resist the horizontal forces, the truss at the top helps take the tension and another at the bottom to resist compression.
23
24 OFFICE TOWER
ROYAL COLLEGE OF ART
ADS 5
2.1 EXISTING CONDITION A
ROYAL COLLEGE OF ART ADS 5 OFFICE TOWER
Existing structural plan of typical floors
EXISTING STRUCTURAL PLANS The three main parts of the building: core, slabs and facade progress in a stepped sequence over time. The floor slabs are composite with cellular steel beams, providing a diaphragmaction restraint to the perimeter columns. The concrete core’s footprint at the ground floor is roughly 60 x 15 meters - is formed by walls that reduce their thickness as they rise to the top floors, accommodating the reduced structural demands of the upper levels in comparison to those of the lower ones, also reduces as a result of the lesser number of lifts and services that reach the top floors.
25
ADS 5
2.1 EXISTING CONDITION A
RESIDENTIAL TOWER
ROYAL COLLEGE OF ART
EXISTING SECTIONS AND ELEVATIONS
26
Existing Section.
ROYAL COLLEGE OF ART
ADS 5 RESIDENTIAL TOWER
Existing Elevation.
27
ROYAL COLLEGE OF ART
ADS 5
2.1 EXISTING CONDITION A
OFFICE TOWER
CLOSE UP SECTION
Existing Close-up Section. Floor composition: 50mm Finish 150mm Concrete slab 130mm Metal deck 762mm Cellular beam Ceiling
28
Wall composition: 25mm Outer glazing panel 125mm Air cavity 165mm Inner facade, with 100mm insulation and double glazing
ROYAL COLLEGE OF ART
EXISTING EXPLODED AXONOMETRIC
ADS 5
Steel Beam (b) Hot Rolled Structural Steel
Glass + Metal Outer Skin Aluminium (bar and rod) Flat Glass
Concrete Slab (b) Concrete 40 MPa
Galvanised Structural Steel
Glass + Metal Inner Skin Aluminium (bar and rod) Flat Glass
OFFICE TOWER
Metal Deck (b)
Steel Column Hot Rolled Structural Steel
Steel Beam (a) Hot Rolled Structural Steel
Concrete Core Reinforced Concrete
Concrete Slab (a) Concrete 40 MPa
Metal Deck (a) Galvanised Structural Steel
Exploded axonometric, Level 8-25, Column 800x700 / UB 762x267x197
29
ROYAL COLLEGE OF ART
ADS 5
2.1 EXISTING CONDITION A
OFFICE TOWER
EXISTING FACADE DETAIL
Existing facade detail. From planning application document.
30
A triple glazing system, 25mm Outer glazing panels 125mm Air cavity 100mm Inner facade
ROYAL COLLEGE OF ART ADS 5 OFFICE TOWER
Existing Facade detail, with louver inside. From planning application document. The louver units will be installed on the East Facade, in order to minimise their visual impact from the more distant views, replacing the already installed glazed facade panels.
31
ADS 5 ROYAL COLLEGE OF ART
2.1 EXISTING CONDITION A
OFFICE TOWER
EMBODIED CARBON CALCULATIONS
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
Reinforced Concrete
Core
37,604
25,119,672
Light Concrete
Floor Slab
22,535
6,492,291
Zinc Coated Steel Sheet
Metal Deck
19,530
451,886,235
Beams and Hot Rolled Structural Steel Columns
14,447
155,765,857
Flat Glass
Glazing
29,658
70,445,455
Aluminium
Metal Frame
1,471
25,263,477
32
TOTAL
734,972,987
ROYAL COLLEGE OF ART ADS 5
COST ANALYSIS
Total building area: 196,982 m2 Total building cost: £590,946,000 (£3,000/m2)
SUPERSTRUCTURE
OFFICE TOWER
CONCRETE + STEEL SUPERSTRUCTURE (EXISTING): ENVELOPE
£590,946,000 / 3 = £196,982,000 (concrete = £1,000/m2) (steel = £2,500/t) FIT-OUT
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 (data online) 2. Superstructure, envelope and fit out are each a third of the total cost
33
34 TOWER
2.2 CARBON COPY A: OFFICE
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
35
ADS 5
2.2 CARBON COPY A
OFFICE TOWER
ROYAL COLLEGE OF ART
22 BISHOPSGATE
Precedent: 15 Clerkenwell Close, London, GROUPWORK + Amin Taha Architects Stone - Timber - Stone structure Source: https://www.archdaily. com/891018/15-clerkenwellclose-groupwork-plus-amintaha-architects
CONSTRUCTION METHODOLOGY
36
Taking 15 Clerkenwell Close as a reference, the alternative proposal will build a stone exoskeleton for 22 Bishopsgate. Simultaneously, the project will replace the original concrete core with stacked stone (using granite, basalt or marble). Timber structures such as CLT slabs and glulam beams will be placed in-between, connecting the stone elements and forming together a sustainable construction.
600,000,000 £
400,000,000 0
200,000,000
COST COMPARISON
750,000,000 500,000,000 250,000,000 0
kgCO2e
EMBODIED CARBON COMPARISON
ROYAL COLLEGE OF ART
Alternative
Existing
Alternative
-95.8%
-18.8%
IN EMBODIED CARBON
IN PROJECT COST
CORE
OFFICE TOWER
STONE EXOSKELETON + TIMBER IN-BETWEEN + STONE CORE
ADS 5
Existing
Stacked stone; Pre-tensioned limestone.
COLUMNS
Pre-tensioned limestone, cross-sectional area decreases from bottom to top,
LINTELS
Pre-tensioned stone, 600mm thickness all the time Limestone
BEAMS
Glulam beams + Partial cellular beams Softwood glulam + Hot rolled structural steel
FLOOR SLAB
CLT floor slabs Sustainably sourced CLT
INNER FACADE
Refer to the louver strategy, doubling the thermal layer Aluminium (bar abd rod) + Flat glass
OUTRIGGER
Use bracing on the exoskeleton instead Limestone
37
38
OFFICE TOWER
ROYAL COLLEGE OF ART
ADS 5
2.2 CARBON COPY A
Left: Limestones in the quarry. Right: A typical cast-in connection used for concrete. Image source: The design of cast-in plates report, ©J.R.Henderson, published in Berkshire, 2017
Stone Exoskeleton
Stone - Timber Connection
A stone exoskeleton is used for quicker erection on site and allowing a curtain wall to sit 150mm from it so that both weathering and thermal performance remains high without the need for window interfaces and thermal bridging points. In turn leaving the envelope as high performance and lower in cost.
There are two main connections between stone and wood involved in the alternative project: the glulam beams and the core, and its connection with the exoskeleton. Therefore, internal steel plates can be used as the mediator for load transmission. By pre-designing the connection nodes, the metal pieces are firmly embedded in the stone with the help of mortar, the glulam beam is stabilized by metal anchors which tie it back to the stone structure.
ROYAL COLLEGE OF ART ADS 5
Right: Exposed timber structures in the 53-m-high (18-storey) Brock Commons Tallwood House.
Large Span Glulam Beam
CLT Slabs
Glulam members are built with individual laminations of structural timber and give an effective material usage.
CLT is a highly engineered wood product that is excellent for all sorts of different structures. CLT’s composition and method of manufacture offer huge opportunities, since the panel can be glued and worked into almost any shape and size.
The laminations are finger jointed to produce great lengths and are industrially bonded with adhesive so as to create the required size. Thanks to the lay-up of glulam, very large structural elements can be produced out of timber from smaller trees.
OFFICE TOWER
Left: Long-span glued laminated timber beams, image source: https://www. structuremag.org/?p=16406
CLT has excellent strength and stiffness properties, which mean that CLT panels can compete with other more traditional structural materials in high-rise buildings.
39
ADS 5 ROYAL COLLEGE OF ART
2.2 CARBON COPY A
STONE FRAME OPTIONS The size of the stone skeleton is closely related to the amount of material, which affects the final calculation of embodied carbon. Taking the maximum span of the CLT floor (6m) as a reference, three options were discussed at the beginning of the project: 3m column spacing + single-layer frame, 3m column spacing without lintel, and 6m column spacing + double-layer frame. When comparing the calculation results for the typical floor, the 6m + doublelayer frame option offers the highest performance in terms of sustainability.
3M SPACING COLUMNS WIT
OFFICE TOWER
3M SPACING COLUMNS + SINGLE-STORY FRAME
Volume m3
Embodied Carbon kgCO2e
LINTEL
158.4
188,592
COLUMN
COLUMN
368
438,140
TOTAL
40
TOTAL
626,732
Volume m3
408.6
ROYAL COLLEGE OF ART
Frame diagrams in elevation
ADS 5
TH NO LINTEL
6M SPACING COLUMNS + DOUBLE-STORY FRAME
OFFICE TOWER
Exploded axonometric, Typical floor of level 8 - 25. Not to scale, for identification purposes only. Structural and sustainability comparison.
Embodied Carbon kgCO2e
Volume m3
Embodied Carbon kgCO2e
486,479
LINTEL
79.1
94,176
486,479
COLUMN
181.8
216,452
TOTAL
310,628
41
ROYAL COLLEGE OF ART
ADS 5
2.2 CARBON COPY A
BEAM VARIATIONS
OFFICE TOWER
VARIATION 1:STEEL CELLULAR BEAMS
Exploded axonometric, Typical fllor of Level 8 - 25. Not to scale, for identification purposes only. 200mm CLT slabs 762x267x197mm Universal beam
Volume m3
Embodied Carbon kgCO2e
CELLULAR BEAM
0.11
1,186
CLT SLABS
5.15
- 4,333
42
TOTAL
- 3,147
ROYAL COLLEGE OF ART
VARIATION 2:GLULAM BEAMS WITH SERVICE AREA
ADS 5 OFFICE TOWER
Beam to core diagram, Typical floor of Level 8 - 25. Not to scale, for identification purposes only. 200mm CLT slabs embedded in the beam; 300x800mm Glulam beam; 533x165x66mm Universal beam.
Volume m3
Embodied Carbon kgCO2e
GLULAM BEAM
0.96
- 982
CLT SLABS
5.08
- 4,274
CELLULAR BEAM
0.02
216
TOTAL
- 5,040
43
44 OFFICE TOWER
ROYAL COLLEGE OF ART
ADS 5
2.2 CARBON COPY A
ROYAL COLLEGE OF ART ADS 5 OFFICE TOWER
Existing structural plan of typical floors
STRUCTURAL PLANS The three main parts of the building: core, slabs and facade progress in a stepped sequence over time. The floor slabs are composite with cellular steel beams, providing a diaphragmaction restraint to the perimeter columns. The concrete core’s footprint at the ground floor is roughly 60 x 15 meters - is formed by walls that reduce their thickness as they rise to the top floors, accommodating the reduced structural demands of the upper levels in comparison to those of the lower ones, also reduces as a result of the lesser number of lifts and services that reach the top floors.
45
ADS 5
2.2 CARBON COPY A
OFFICE TOWER
ROYAL COLLEGE OF ART
SECTIONS AND ELEVATIONS
46
Alternative Section.
ROYAL COLLEGE OF ART
ADS 5 OFFICE TOWER
Alternative Elevation.
47
ROYAL COLLEGE OF ART
ADS 5
2.2 CARBON COPY A
OFFICE TOWER
CLOSE UP SECTION
Alternative Close-up Section. Floor composition: 200mm Raised floor 200mm CLT slab, embedded on the glulam beam 800mm Glulam beam Ceiling
48
Wall composition: 500mm Stone exoskeleton 150mm Air cavity 410mm Inner facade, with 210mm insulation and double glazing
ROYAL COLLEGE OF ART
EXPLODED AXONOMETRIC
ADS 5
Glulam Beam (b) Softwood Glulam
Cellular Beam in Service Area (b) Hot Rolled Structural Steel
Pretensioned Stone Lintel Limestone
Stone Column (b) Limestone
Sustainably Sourced CLT
Glass + Metal Inner Skin Aluminium (bar and rod) Flat Glass
OFFICE TOWER
CLT Slab (b)
Glulam Beam (a) Softwood Glulam
Cellular Beam in Service Area (a) Hot Rolled Structural Steel
Stone Bracing Limestone
Stone Core (a) Limestone
Stone Column (a) Limestone
CLT Slab (a) Sustainably Sourced CLT
Alternative axonometric, Level 8-25, Column 800x500 / Glulam beam 800x300 / UB 533x165x66 mm
49
FACADE DETAIL
ADS 5 OFFICE TOWER
ROYAL COLLEGE OF ART
2.2 CARBON COPY A
50
Alternative facade detail.
ROYAL COLLEGE OF ART ADS 5 OFFICE TOWER
3D diagram of the facade detail. Knife plate connector helps to link the stone frame and glulam beam.
51
ROYAL COLLEGE OF ART
ADS 5
2.2 CARBON COPY A
OFFICE TOWER
EXTERNAL VIEW COMPARISON
Existing architectural appearance.
52
source: https://www. buildington.co.uk/londonec2/22-24-bishopsgate/22bishopsgate/id/2171.
ROYAL COLLEGE OF ART ADS 5 OFFICE TOWER
Alternative architectural appearance. Conceptual Collage.
53
ADS 5 ROYAL COLLEGE OF ART
2.2 CARBON COPY A
EMBODIED CARBON CALCULATIONS
VOLUME M3
EMBODIED CARBON KGCO2E
44,605
8,430,307
Cross Laminated Floor Slab Timber
30,046
- 25,278,392
Glulam
Beams
9,478
- 9,698,284
Flat Glass
Glazing
14,382
34,160,266
Aluminium
Metal Frame
1,141
19,601,477
308
3,322,930
MATERIAL
ELEMENT Core
Limestone
External Column
OFFICE TOWER
Stone Lintel
Hot Rolled Service Beams Structural Steel
TOTAL
30,538,305
54
95.8% SAVING
Total building area: 196,982 m2 Total building cost: £590,946,000 (£3,000/m2) SUPERSTRUCTURE
ENVELOPE
COST
108,793
32,637,900
Cross Laminated Floor Slab Timber
150,230
37,557,500
Glulam
31,593
7,898,250
2,461(t)
6,152,500
ELEMENT Core
Limestone
External Column Stone Lintel
Beams
Hot Rolled Service Beams Structural Steel
TOTAL
OFFICE TOWER
VOLUME M2/T
MATERIAL
ADS 5
FIT-OUT
CONCRETE + STEEL SUPERSTRUCTURE (EXISTING): £590,946,000 / 3 = £196,982,000 (concrete = £1,000/m2) (steel = £2,500/t)
ROYAL COLLEGE OF ART
COST ANALYSIS
84,246,150 + 196,982,000x2 = 478,210,150 18.8% SAVING
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 2. Superstructure, envelope and fit out are each a third of the total cost 3. Building envelope and internal fit out stays the same 4. Stone = £300/m2, CLT = £250/m2, Glulam = £250/m2, Steel = £2,500/t
55
56 TOWER
2.3 WHAT IF?
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
57
ADS 5
2.3 WHAT IF?
ROYAL COLLEGE OF ART
22 BISHOPSGATE
OFFICE TOWER
ADDTIONAL INTERNAL COLUMNS
Additional columns diagram.
58
The What If section provides another possibility for the office tower. If the client does not mind breaking the concept of no column working space and chooses to have additional internal glulam columns, the use of additional columns can help reduce the thickness of glulam beams, and there is no need to attach cellular beams to the side of the core to place the service area on the ceiling. The tower thus will have better sustainability performance.
200,000,000
£
400,000,000
600,000,000 Alternative
0
COST COMPARISON
750,000,000 500,000,000 0
250,000,000
kgCO2e
EMBODIED CARBON COMPARISON
ROYAL COLLEGE OF ART
Existing
Existing
Alternative
-20.3%
IN EMBODIED CARBON
IN PROJECT COST
ADS 5
-95.7%
OFFICE TOWER
Glulam column - CLT slab connection By using an additional flat connection between the column and slabs, the strategy can lead to better fire performance, and can also reduce the length of the span required by CLT slabs, therefore reducing costs and embodied carbon.
59
ADS 5 ROYAL COLLEGE OF ART
2.3 WHAT IF?
EMBODIED CARBON CALCULATIONS
VOLUME M3
EMBODIED CARBON KGCO2E
44,605
8,430,307
Cross Laminated Floor Slab Timber
30,046
- 25,278,392
Glulam
Beams and Columns
5,436
- 5,562,635
Flat Glass
Glazing
14,382
34,160,266
Aluminium
Metal Frame
1,141
19,601,477
MATERIAL
ELEMENT Core
OFFICE TOWER
Limestone
External Column Stone Lintel
TOTAL
31,351,023
60
95.7% SAVING
ROYAL COLLEGE OF ART
COST ANALYSIS
SUPERSTRUCTURE
ENVELOPE
FIT-OUT
CONCRETE + STEEL SUPERSTRUCTURE (EXISTING): £590,946,000 / 3 = £196,982,000 (concrete = £1,000/m2) (steel = £2,500/t)
COST
108,793
32,637,900
Cross Laminated Floor Slab Timber
150,230
37,557,500
Beams and columns
27,180
6,795,000
ELEMENT Core
Limestone
External Column
OFFICE TOWER
VOLUME M2
MATERIAL
ADS 5
Total building area: 196,982 m2 Total building cost: £590,946,000 (£3,000/m2)
Stone Lintel
Glulam
TOTAL
76,990,400 + 196,982,000x2 = 470,954,400 20.3% SAVING
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 2. Superstructure, envelope and fit out are each a third of the total cost 3. Building envelope and internal fit out stays the same 4. Stone = £300/m2, CLT = £250/m2, Glulam = £250/m2, Steel = £2,500/t
61
ADS 5 ROYAL COLLEGE OF ART TOWER 62
3.1
EXISTING CONDITION B: RESIDENTIAL
ROYAL COLLEGE OF ART
ADS 5 TOWER
63
ADS 5
3.1 EXISTING CONDITION B
ROYAL COLLEGE OF ART
ONE PARK DRIVE
One Park Drive is a residential skyscraper situated in the south west corner of Wood Wharf, within the Canary Wharf development on the Isle of Dogs, London. The building was designed by Herzog & de Meuron, is cylindrical in shape, and with 58-storeys comprising 468 private residential apartments.
RESIDENTIAL TOWER
The skyscraper was designed to have the appearance of a cylindrical tower, but the majority of the apartments have regular straight edges. This creates an aesthetic appearance that differentiates the building from the oblong-shaped office towers, but does not impact the quality of the apartments.
64
Canary Wharf, London Herzog de Meuron Photo from CBRE Residential
ROYAL COLLEGE OF ART
SITE AND LOCATION ADS 5 RESIDENTIAL TOWER
Wood Wharf Masterplan Scheme Development Plot A1
KEY INFORMATION Completion: Q1 2021 Height: 204.93m Storeys: 58 Residential Units: 468 Gross Internal Area (GIA): 54,656m2 Net Internal Area (NIA): 40,992m2 (75% of GIA)
65
ROYAL COLLEGE OF ART
ADS 5
3.1 EXISTING CONDITION B
TOWER OVERVIEW One Park Drive is a single building made up of three distinct typologies. Each typology evolved from a re-examination of city living, has its own distinct characteristics while also working together as a harmonious whole.
RESIDENTIAL TOWER
One Park Drive celebrates its communal spaces, with the residents’ amenities being on the first two floors, where they are fully integrated into the life of the building. The library and residents’ lounge are on the ground floor level, with the pool and gym on the first floor above. These interior spaces, radiating out from the central core of the building, are enhanced by their seamless interaction with the surrounding gardens and water.
66
Three apartment typologies
ROYAL COLLEGE OF ART RESIDENTIAL TOWER
The Cluster apartments form the heart of the building. Here the floorplates are mirrored and rotated to create a rhythmic visual complexity, while still maintaining the clarity of the internal spaces. The lower levels are connected with the parks and the water; the higher floors are connected with the sky.
ADS 5
The spiralling top of the building contains the Bay apartments. The orthogonal geometry of the apartments intersects the implicit curve of the building, creating the opportunity for double-height terraces which are recessed into the building. The design of the Bay apartments is focused on maximising light and the views across London.
The lower floors feature the Loft apartments – some of the largest apartments with high ceilings and wrap-around terraces. This location exploits their immediate connection to the surrounding green spaces and the waterfront.
Tower Overview
67
ROYAL COLLEGE OF ART
ADS 5
3.1 EXISTING CONDITION B
CONSTRUCTION METHODOLOGY The structural concept adopted for the tower superstructure typically consists of reinforced concrete flat slabs supported by reinforced concrete blade walls and columns. The core of the tower is located centrally within the internal layout and is partially enhanced by frame action of the surrounding tower.
RESIDENTIAL TOWER
Levels 10 through to 32 uses post-tension slabs. Praeter and AKT II developed the design and the use of post-tensioning to limit the deflections in the cantilevered areas due to the span of the cantilevered areas making it impossible to design as traditional RC without increasing slab depths or adding downstand beams.
68
Tower under construction Photo from Praeter Engineering Ltd
ROYAL COLLEGE OF ART ADS 5 RESIDENTIAL TOWER
Tower under construction Photo from Praeter Engineering Ltd
69
ROYAL COLLEGE OF ART
ADS 5
3.1 EXISTING CONDITION B
EXISTING STRUCTURAL PLANS
RESIDENTIAL TOWER
Bay
Cluster
Loft
70
0
5
10
20m
ROYAL COLLEGE OF ART ADS 5
0
5
10
20m Key plan showing how 1/4 of each floorplate is repeated to form one floor
RESIDENTIAL TOWER
The geometry of One Park Drive is expressed in the profile of the external facade for each typology Additional complexity is created by the stacking, rotation and mirroring of individual floor plates. This gives varying aspects to each apartment type establishing individuality within a unified whole. The terraces are naturally formed between the apartments’ enclosing walls and the outer edges of each floor plate, making them an intrinsic element of the apartment planning.
0
5
10
20m
71
ROYAL COLLEGE OF ART
ADS 5
3.1 EXISTING CONDITION B
EXISTING ELEVATIONS AND SECTIONS AOD 211.43
Level 56 Level 55
RESIDENTIAL TOWER
Level 54
Level 32 Level 31
Level 10
Level 02 Level 01 Ground Level 6.50
North Elevation 1:1000 1 North Elevation
72
1 : 500
ROYAL COLLEGE OF ART
AOD 211.43
Level 56 Level 55
AOD 211.43
Level 56 Level 55 Level 54
Level 54
ADS 5 RESIDENTIAL TOWER
Level 32 Level 31
Level 32 Level 31
Level 10
Level 10
Level 09
Level 09
Level 02
Level 02
Level 01
Level 01
Ground Level 6.50
Ground L 6.50
Section NE-SW 1:1000 1 Section AA'
2 Section BB'
1 : 500
1 : 500
73
ROYAL COLLEGE OF ART
ADS 5
3.1 EXISTING CONDITION B
CLOSE UP SECTION
EXTERIOR
INTERIOR
INTERIOR
INTERIOR
EXTERIOR
INTERIOR
RESIDENTIAL TOWER
Separating Wall composition: 25mm Finish 75mm Insulation 300mm Reinforced Concrete 75mm Insulation 25mm Finish
External Wall composition: 100mm Reconstituted Stone Cladding 200~500mm Reinforced Concrete 50mm Air Cavity 100mm Rigid Insulation 150mm Insulation 25mm Finish
Floor composition: 25mm Finish 150mm Insulation 230mm Reinforced Concrete 100 Shallow Decking 12.5mm Proprietary Metal Frame 12.5 mm Ceiling
0
74
Existing Close-up Section
1
2
4m
ROYAL COLLEGE OF ART
EXISTING EXPLODED AXONOMETRIC Glazing +Frame Aluminium (bar and rod) Flat Glass
Cladding Reconstituted Stone (Light Concrete)
Separating Wall Plasterboard
ADS 5
Bay
Concrete Shear Wall Reinforced Concrete
Concrete Core Reinforced Concrete
Concrete Slab 250mm Reinforced Concrete
Aluminium (bar and rod) Flat Glass
Cladding Reconstituted Stone (Light Concrete)
Separating Wall Plasterboard
Cluster
Concrete Shear Wall Reinforced Concrete
RESIDENTIAL TOWER
Glazing +Frame
Concrete Core Reinforced Concrete
Concrete Slab 250mm Reinforced Concrete
Glazing +Frame Aluminium (bar and rod) Flat Glass
Cladding Reconstituted Stone (Light Concrete)
Separating Wall Plasterboard
Loft
Concrete Shear Wall Reinforced Concrete
Concrete Core Reinforced Concrete
Concrete Slab 250mm Reinforced Concrete
Exploded axonometric: Loft, Cluster, Bay
75
ROYAL COLLEGE OF ART
ADS 5
3.1 EXISTING CONDITION B
RESIDENTIAL TOWER
EXISTING BALCONY DETAIL
76
Close-up detail of existing balcony
ROYAL COLLEGE OF ART ADS 5
EXTERIOR
INTERIOR
RESIDENTIAL TOWER
Close-up detail of existing balcony
Schock thermal breaks are used in the existing balcony system in order for the reinforced concrete floor slab to be continue onto the terraces.
4m
Structural thermal breaks for concrete balcony construction contain components that are cast into the concrete floor slab on the interior side, and into the concrete balcony on the exterior side. The assembly is engineered to carry the same design load as a conventional reinforced concrete balcony.
77
ADS 5 ROYAL COLLEGE OF ART
3.1 EXISTING CONDITION B
EMBODIED CARBON CALCULATIONS
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
22,131.3
14,783,708
Core Reinforced Concrete
Structural Wall
RESIDENTIAL TOWER
Floor Slab Light Concrete
Cladding
3284.1
945,821
Flat Glass
Glazing
677.8
1,609,775
Aluminium
Metal Frame
299.4
5,141,596
Plasterboard
Separating Wall
3349.8
877,648
78
TOTAL
23,358,548
ROYAL COLLEGE OF ART
COST ANALYSIS
Total building area: 54,656m2
SUPERSTRUCTURE
ENVELOPE
£163,968,000 / 3 = £54,656,000 (concrete = £1,000/m2)
FIT-OUT
RESIDENTIAL TOWER
CONCRETE SUPERSTRUCTURE (EXISTING):
ADS 5
Total building cost: £163,968,000 (£3,000/m2)
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 2. Superstructure, envelope and fit out are each a third of the total cost
79
80 TOWER
3.2 CARBON COPY B: RESIDENTIAL
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
81
82
-20,000,000
Existing
Stone
Stone + Timber
0
0
10,000,000
50,000,000
20,000,000
100,000,000 150,000,000 200,000,000
£
COST COMPARISON
-10,000,000
kgCO2e
EMBODIED CARBON COMPARISON
RESIDENTIAL TOWER
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
ONE PARK DRIVE
VARIATION 1: STONE
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
Existing
Stone
Stone + Timber
Two carbon copies have been proposed in order to test the best alternative for the tower in terms of embodied carbon, costs and aesthetics.
ROYAL COLLEGE OF ART
CONSTRUCTION METHODOLOGY
The first variation is to replace all reinforced concrete with post-tensioned stone. Stone is stronger than concrete, hence less amount of it is needed for the same structure.
VARIATION 1: STONE
ADS 5
The second variation also uses post-tensioned stone for the core and structural walls but floor slabs and separating walls are CLT, which lowers the overall weight, embodied carbon and costs of the tower.
VARIATION 2: TIMBER + STONE
-111%
IN EMBODIED CARBON
IN EMBODIED CARBON
-23.3%
-24.5%
IN PROJECT COST
IN PROJECT COST
CORE
Post-tensioned stone
Post-tensioned stone
STRUCTURAL WALLS
Post-tensioned stone
Post-tensioned stone
SEPARATING WALLS
Plasterboard
CLT
FLOOR SLAB
Post-tensioned stone
CLT
BEAMS AND COLUMNS
-
Glulam
RESIDENTIAL TOWER
-50%
83
RESIDENTIAL TOWER
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
Post-tensioned stone Photo from R. Pedreschi
Post-tensioned Stone In contemporary applications stone is attached to buildings in a variety of ways, connecting to the supporting structure using steel angles and brackets or by incorporating the stone in a pre-cast concrete panel. By post-tensioning the stone, prefabricated panels can be made which eliminate either the secondary steelwork and subsequent site operations or avoid the need for pre-cast concrete panels.
84
Replacing reinforced concrete with stone also means that less amount of the material is needed for the same weight and building structure. This further reduces emobided carbon and costs of construction.
ROYAL COLLEGE OF ART ADS 5 RESIDENTIAL TOWER
CLT residential interior Photo from PATH Architecture
Timber interior + exposed beams and columns Mass timber such as CLT and Glulam is only used in the internal walls, floor slabs, beams and columns of the proposed carbon copies. This is due to the UK policy which prohibits the use of timber materials in the external walls of buildings over 18m tall. No extra wall or floor finishes are necessary as the timber can be left exposed for aesthetic pruposes. Using timber for the internal components has the benefit of reducing the overall weight of the building, hence less foundation piles are needed.
85
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
STRUCTURAL PLANS
Bay
RESIDENTIAL TOWER
0
5
10
20m
5
10 10
20m 20m
Cluster
Loft
VARIATION 1:
86
STONE
0
0
5
ROYAL COLLEGE OF ART ADS 5
0
5
10
20m
RESIDENTIAL TOWER
VARIATION 2:
00
55
10 10
20m 20m
TIMBER + STONE STRUCTURAL WALLS AND CORE
87
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
CLOSE UP SECTIONS
EXTERIOR
INTERIOR
INTERIOR
INTERIOR
EXTERIOR
INTERIOR
Balcony composition: 200mm Post-tensioned Stone Thermal break
RESIDENTIAL TOWER
Separating Wall composition: 25mm Finish 75mm Insulation 250mm Post-tensioned Stone 75mm Insulation 25mm Finish
External Wall composition: 250mm Post-tensioned Stone 50mm Air Cavity 150mm Insulation 25mm Finish
Floor composition: 25mm Finish 150mm Insulation 200mm Post-tensioned Stone 12.5 mm Ceiling
VARIATION 1:
88
STONE
0
1
2
4m
140x225mm Glulam Beams 100mm CLT wall
EXTERIOR
ROYAL COLLEGE OF ART
Internal wall composition:
INTERIOR
200mm Post-tensioned Stone Thermal break
ADS 5
Balcony composition:
Separating Wall composition: INTERIOR
25mm Finish 75mm Insulation 250mm Post-tensioned Stone 75mm Insulation 25mm Finish
RESIDENTIAL TOWER
INTERIOR
External Wall composition: 250mm Post-tensioned Stone 50mm Air Cavity 150mm Insulation 25mm Finish
EXTERIOR
INTERIOR
Floor composition: 25mm Finish 150mm Insulation 250mm CLT Floor Slab
VARIATION 2:
0
1
2
4m
TIMBER + STONE STRUCTURAL WALLS AND CORE
89
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
EXPLODED AXONOMETRIC
Glazing +Frame Aluminium (bar and rod) Flat Glass
Separating Wall Plasterboard
Stone Structural Wall Post-tensioned stone
Bay
Stone Core Post-tensioned stone
Stone Slab
RESIDENTIAL TOWER
200mm Post-tensioned stone slab
Glazing +Frame Aluminium (bar and rod) Flat Glass
Separating Wall Plasterboard
Stone Structural Wall Post-tensioned stone
Cluster
Stone Core Post-tensioned stone
Stone Slab 200mm Post-tensioned stone slab
Glazing +Frame Aluminium (bar and rod) Flat Glass
Separating Wall Plasterboard
Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Slab 200mm Post-tensioned stone slab
VARIATION 1:
90
STONE
Loft
ROYAL COLLEGE OF ART
Glazing +Frame Aluminium (bar and rod) Flat Glass
Beams and Columns Glulam
Separating Wall CLT
ADS 5
Bay
Timber Floor Slab CLT
Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Balcony Slab 200mm Post-tensioned stone slab
RESIDENTIAL TOWER
Glazing +Frame Aluminium (bar and rod) Flat Glass
Beams and Columns Glulam
Separating Wall CLT
Timber Floor Slab
Cluster
CLT
Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Balcony Slab 200mm Post-tensioned stone slab
Glazing +Frame Aluminium (bar and rod) Flat Glass
Beams and Columns Glulam
Separating Wall CLT
Timber Floor Slab CLT
Loft Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Balcony Slab 200mm Post-tensioned stone slab
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
91
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
RESIDENTIAL TOWER
BALCONY DETAIL
92
Close-up detail of proposed balcony
ROYAL COLLEGE OF ART ADS 5
EXTERIOR
INTERIOR
RESIDENTIAL TOWER
Close-up detail of proposed balcony
1m x 1m post-tensioned stone slabs are used for the proposed balcony system. They are connected to the stone structural walls with a 50mm gap for thermal insulation. This system can be used for both the stone and stone + timber carbon copies.
4m
93
ROYAL COLLEGE OF ART
ADS 5
3.2_CARBON COPY BB 3.2 CARBON COPY
FOUNDATION PILES COMPARISON
EXISTING
ST
RESIDENTIAL TOWER
635,385 KN
X127
Royal College of Art
24 m
1.8 m
* 5000 kN / pile assumption 94
94
CFA PILES
ADS 5 COLLEGE OF ART ROYAL
TONE
STONE + TIMBER
ADS 5
417,186 KN
X108
X83
CFA PILES
CFA PILES
15% Emodied Carbon Savings
35% Emodied Carbon Savings
RESIDENTIALTOWER TOWER RESIDENTIAL
539,740 KN
Royal College of Art
95 95
ROYAL COLLEGE OF ART
ADS 5
3.2 CARBON COPY B
RESIDENTIAL TOWER
INTERNAL FINISHES COMPARISON
96
Existing bedroom interior
ROYAL COLLEGE OF ART ADS 5 RESIDENTIAL TOWER
Stone finishes bedroom interior
Timber finishes bedroom interior
97
ADS 5 ROYAL COLLEGE OF ART
3.2 CARBON COPY B
EMBODIED CARBON CALCULATIONS
VARIATION 1: STONE
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
21,589.6
3,756,590
Core Sandstone
Structural Wall
RESIDENTIAL TOWER
Floor Slab
Flat Glass
Glazing
677.8
1,609,775
Aluminium
Metal Frame
299.4
5,141,596
Plasterboard
Separating Wall
4080
1,068,960
TOTAL
11,576,922
98
50% SAVING
ROYAL COLLEGE OF ART
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
13,925.7
2,423,072
13,808.6
-11,613,033
ADS 5
MATERIAL
Core Sandstone
Structural Wall Balcony Slab
Separating Wall Hardwood
Beams and Columns 144.4
-147,721
Flat Glass
Glazing
677.8
1,609,775
Aluminium
Metal Frame
299.4
5,141,596
TOTAL
RESIDENTIAL TOWER
Floor Slab Cross Laminated Timber
-2,586,311 111% SAVING
99
ADS 5 ROYAL COLLEGE OF ART
3.2 CARBON COPY B
COST ANALYSIS
Total building area: 54,656m2 Total building cost: £163,968,000 (£3,000/m2)
CONCRETE SUPERSTRUCTURE (EXISTING):
RESIDENTIAL TOWER
SUPERSTRUCTURE
FIT-OUT
ENVELOPE
£163,968,000 / 3 = £54,656,000 (concrete = £1,000/m2)
STONE SUPERSTRUCTURE (VARIATION 1): £300/m2 x 54,656m2 = £16,396,800 (stone = £300/m2)
STONE + TIMBER SUPERSTRUCTURE (VARIATION 2): (£300/m2 x 16,396.8m2) + (£250/m2 x 38,259.2m2)= £14,483,840 (stone = £300/m2) (CLT = £250/m2)
100
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 2. Superstructure, envelope and fit out are each a third of the total cost 3. Building envelope and internal fit out stays the same 4. Stone = £300/m2, CLT = £250/m2 5. Variation 2 uses 70% CLT and 30% stone
ROYAL COLLEGE OF ART
VARIATION 1: STONE
MATERIAL
ELEMENT
COST
54,656
£16,396,800
Core Sandstone
Structural Wall
ADS 5
VOLUME M2
Balcony Slab £125,708,800 + 54,656,000x2 = £125,708,800
TOTAL
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
MATERIAL
ELEMENT
VOLUME M2
COST
16,397
£4,919,040
38,259
£9,564,800
RESIDENTIAL TOWER
23.3% SAVING
Core Sandstone
Structural Wall Balcony Slab
Cross Laminated Timber
TOTAL
Floor Slab Separating Wall £14,483,840 + 54,656,000x2 = £123,795,840 24.5% SAVING
101
102 TOWER
4 DATA COMPARISONS
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
103
ADS 5 ROYAL COLLEGE OF ART
4.0 DATA COMPARISONS
22 BISHOPSGATE EMBODIED CARBON COMPARISON
VARIATI STONE
EXISTING
VOLUME M3
EMBODIED CARBON KGCO2E
VOLUM M3
0
0
44,605
Cross Laminated Floor Slab Timber
0
0
30,046
Glulam
Beams and Columns
0
0
9,478
Flat Glass
Glazing
29,658
70,445,455
14,382
Aluminium
Metal Frame
1,471
25,263,477
1,141
Hot Rolled Structural Steel
Beams and Columns
14,447
155,765,857
308
Zinc Coated Steel Sheet
Metal Deck
19,530
451,886,235
0
Reinforced Concrete
Core
37,604
25,119,672
0
Light Concrete
Floor Slab
22,535
6,492,291
0
MATERIAL
ELEMENT Core
Limestone
External Column
OFFICE TOWER
Stone Lintel
104
TOTAL
734,972,987
EMBODIED CARBON KGCO2E
VOLUME M3
EMBODIED CARBON KGCO2E
8,430,307
44,605
8,430,307
- 25,278,392
30,046
- 25,278,392
- 9,698,284
5,436
- 5,562,635
34,160,266
14,382
34,160,266
19,601,477
1,141
19,601,477
3,322,930
0
0
0
0
0
0
0
0
0
0
0
30,538,305
31,351,023
95.8% SAVING
95.7% SAVING
OFFICE TOWER
ME
ADS 5
VARIATION 2: STONE - TIMBER - STONE WITH ADDITIONAL COLUMNS
ROYAL COLLEGE OF ART
ION 1: - TIMBER - STONE
105
ADS 5 ROYAL COLLEGE OF ART
4.0 DATA COMPARISONS
22 BISHOPSGATE COST COMPARISON
EXISTING
COST £
MATERIAL
ELEMENT Core
Limestone
External Column
OFFICE TOWER
Stone Lintel
Superstructure
196,982,000
Cross Laminated Timber
Floor Slab
Glulam
Beams and Columns
Hot Rolled Structural Steel
Beams and Columns
Envelope
196,982,000
-
Fitout
196,982,000
-
TOTAL
590,946,000
106
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 2. Superstructure, envelope and fit out are each a third of the total cost 3. Building envelope and internal fit out stays the same 4. Stone = £300/m2, CLT = £250/m2, Glulam = £250/m2, Steel = £2,500/t
ROYAL COLLEGE OF ART
QUANTITY M2/T
COST £
QUANTITY M2/T
COST £
108,793
32,637,900
108,793
32,637,900
150,230
37,557,500
150,230
37,557,500
31,593
7,898,250
27,876
6,795,000
2,461(t)
6,152,500
0
0
196,982,000
196,982,000
196,982,000
196,982,000
478,210,150
470,954,400
18.8% SAVING
20.3% SAVING
OFFICE TOWER
VARIATION 2: STONE - TIMBER - STONE WITH ADDITIONAL COLUMNS ADS 5
VARIATION 1: STONE - TIMBER - STONE
107
ADS 5 ROYAL COLLEGE OF ART
4.0 DATA COMPARISONS
ONE PARK DRIVE EMBODIED CARBON COMPARISON EXISTING
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
VOLUM M3
22,131.3
14,783,708
0
3284.1
945,821
0
0
0
21,589.6
0
0
0
Core Reinforced Concrete
Structural Wall
RESIDENTIAL TOWER
Floor Slab Light Concrete
Cladding Core Structural Wall
Sandstone Floor Slab Balcony Slab Floor Slab Cross Laminated Timber Separating Wall Hardwood
Beams and Columns
0
0
0
Flat Glass
Glazing
677.8
1,609,775
677.8
Aluminium
Metal Frame
299.4
5,141,596
299.4
Plasterboard
Separating Wall
3349.8
877,648
4080
108
TOTAL
23,358,548
VOLUME M3
EMBODIED CARBON KGCO2E
0
0
0
0
0
0
3,756,590
13,925.7
2,423,072
0
13,808.6
-11,613,033
0
144.4
-147,721
1,609,775
677.8
1,609,775
5,141,596
299.4
5,141,596
1,068,960
0
0
11,576,922
-2,586,311
-50% SAVING
-111% SAVING
RESIDENTIAL TOWER
EMBODIED CARBON KGCO2E
ADS 5
6
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
ROYAL COLLEGE OF ART
ME
VARIATION 1: STONE
109
ADS 5 ROYAL COLLEGE OF ART
4.0 DATA COMPARISONS
ONE PARK DRIVE COST COMPARISON
EXISTING
COST £
MATERIAL
ELEMENT Core
Sandstone
RESIDENTIAL TOWER
Superstructure
Structural Wall
54,656,000
Balcony Slab Floor Slab
Cross Laminated Timber
Separating Wall
Envelope
54,656,000
-
Fitout
54,656,000
-
TOTAL
590,946,000
110
* Assumptions: 1. Total building cost is calculated with the assumption of £3,000/m2 2. Superstructure, envelope and fit out are each a third of the total cost 3. Building envelope and internal fit out stays the same 4. Stone = £300/m2, CLT = £250/m2 5. Variation 2 uses 70% CLT and 30% stone
ROYAL COLLEGE OF ART
VARIATION 1: STONE
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
QUANTITY M2/T
COST £
54,656
£16,396,800
16,397
£4,919,040
38,259
£9,564,800
-
54,656,000
54,656,000
54,656,000
54,656,000
£125,708,800
£123,795,840
23.3% SAVING
24.5% SAVING
RESIDENTIAL TOWER
COST £
ADS 5
QUANTITY M2/T
111
112 TOWER
5 FINDINGS
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
113
114
0
200,000,000
400,000,000
£
COST COMPARISON
600,000,000
0
ROYAL COLLEGE OF ART
250,000,000
500,000,000
kgCO2e 750,000,000
EMBODIED CARBON COMPARISON
TOWER
ADS 5
5.0 FINDINGS
OVERALL SAVINGS
22 BISHOPSGATE (OFFICE TOWER)
Existing Alternative What If
Existing
Alternative
What If
0
50,000,000
100,000,000 150,000,000 200,000,000
£ -20,000,000
-10,000,000
0
kgCO2e 10,000,000
EMBODIED CARBON COMPARISON
ADS 5
COST COMPARISON
20,000,000
ROYAL COLLEGE OF ART
ONE PARK DRIVE (RESIDENTIAL TOWER)
Stone Stone + Timber
Existing
Stone
Stone + Timber TOWER
Existing
115
ADS 5 ROYAL COLLEGE OF ART
5.0 FINDINGS
22 BISHOPSGATE
-96%
-18.8%
IN EMBODIED CARBON
IN PROJECT COST
PROS
TOWER
Less amount of stone is needed for the same structural properties (around half the dimensions of concrete walls); CLT / glulam are carbon sequestering materials; Overall lighter weight of building so less foundation piles needed; Timber can be left exposed without extra finishes for aesthetic purposes.
CONS Requires more mature, clear, industrialized construction processes; Requires more skilled labour; Construction time may be longer; As an alternative to the original double skin system, the performance of the new stone-thermal envelope should be studied in more detail;
116
Requires stronger response to lateral force.
ONE PARK DRIVE
ROYAL COLLEGE OF ART
5.0 FINDINGS
STONE
IN EMBODIED CARBON
-23.3% IN PROJECT COST
Less amount of stone is needed for the same structural properties (around half the dimensions of concrete walls); Thickness of stone floor slabs can also be less than concrete slabs; Overall reduction in embodied carbon and costs.
ADS 5
-50%
PROS
CONS Requires more skilled labour; Construction time may be longer.
TOWER
TIMBER + STRUCTURAL WALLS AND CORE
PROS
-111% IN EMBODIED CARBON
-24.5% IN PROJECT COST
Less amount of stone is needed for the same structural properties (around half the dimensions of concrete walls); Timber is a carbon sequestering material; Overall lighter weight of building so less foundation piles needed; Timber can be left exposed without extra finishes for aesthetic purposes; Carbon negative.
CONS Requires more skilled labour; Construction time may be longer; Slight increase in cost.
117
TOWER
ROYAL COLLEGE OF ART
ADS 5
5.0 FINDINGS
22 Bishopsgate, City of London, PLP Architecture. Image CC credit: Matt Brown – flickr
118
One Par Drive, Canary Wharf, Herzog de Meuron. Photographed by Lee Mawdsley
ROYAL COLLEGE OF ART ADS 5
CONCLUSION TO THE TOWER TYPOLOGY
TOWER
Following the Stone Tower Research Project where Groupwork and other consultants have proposed a notional 30-storey commercial office tower in central London, we have taken their optimal scenario (stone exoskeleton + CLT floors) and tested it on the latest and second tallest office tower in the City of London 22 Bishopsgate. The combination of replacing traditional concrete and steel frame with stone exoskeleton and timber slabs and beams lead to an overall reduction in embodied carbon and cost, without comprising on office internal space or appearance. The facade of the tower differs slightly from the original as a result of the stone exoskeleton and bracing system, but overall shape and layout of building are kept the same. We also chose to look at One Park Drive in order to see if there are any limitations to our carbon copy proposals for a residential tower. Both the stone and stone + timber proposals led to a reduction in embodied carbon and cost, while keeping the dinstinctive circular shape of the floorplates and internal unit sizes.
119
120 TOWER
6 MENU OF COMPONENTS
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 TOWER
121
ADS 5
22 BISHOPSGATE
TOWER
ROYAL COLLEGE OF ART
6.0 MENU OF COMPONENTS
Exploded axonometric, Typical fllor of Level 8 - 25. Not to scale, for identification purposes only.
122
200mm CLT slabs 762x267x197mm Universal beam
ROYAL COLLEGE OF ART ADS 5 TOWER
Beam to core diagram, Typical floor of Level 8 - 25. Not to scale, for identification purposes only. 200mm CLT slabs embedded in the beam; 300x800mm Glulam beam; 533x165x66mm Universal beam.
123
TOWER
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
Alternative Close-up Section. Floor composition: 200mm Raised floor 200mm CLT slab, embedded on the glulam beam 800mm Glulam beam Ceiling
124
Wall composition: 500mm Stone exoskeleton 150mm Air cavity 410mm Inner facade, with 210mm insulation and double glazing
ROYAL COLLEGE OF ART ADS 5
Glulam Beam (b) Softwood Glulam
Cellular Beam in Service Area (b) Hot Rolled Structural Steel
Pretensioned Stone Lintel Limestone
Stone Column (b) Limestone
CLT Slab (b) Sustainably Sourced CLT
Aluminium (bar and rod) Flat Glass
TOWER
Glass + Metal Inner Skin
Glulam Beam (a) Softwood Glulam
Cellular Beam in Service Area (a) Hot Rolled Structural Steel
Stone Bracing Limestone
Stone Core (a) Limestone
Stone Column (a) Limestone
CLT Slab (a) Sustainably Sourced CLT
Alternative axonometric, Level 8-25, Column 800x500 / Glulam beam 800x300 / UB 533x165x66 mm
125
ADS 5 TOWER
ROYAL COLLEGE OF ART
6.0 MENU OF COMPONENTS
126
Alternative facade detail.
ROYAL COLLEGE OF ART ADS 5 TOWER
3D diagram of the facade detail. Knife plate connector helps to link the stone frame and glulam beam.
127
ADS 5
6.0 MENU OF COMPONENTS
TOWER
ROYAL COLLEGE OF ART
ONE PARK DRIVE
128
Close-up detail of proposed balcony
ROYAL COLLEGE OF ART ADS 5
EXTERIOR
INTERIOR
TOWER
Close-up detail of proposed balcony
4m
129
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
EXTERIOR
INTERIOR
INTERIOR
INTERIOR
EXTERIOR
INTERIOR
Balcony composition: 200mm Post-tensioned Stone Thermal break
TOWER
Separating Wall composition: 25mm Finish 75mm Insulation 250mm Post-tensioned Stone 75mm Insulation 25mm Finish
External Wall composition: 250mm Post-tensioned Stone 50mm Air Cavity 150mm Insulation 25mm Finish
Floor composition: 25mm Finish 150mm Insulation 200mm Post-tensioned Stone 12.5 mm Ceiling
VARIATION 1:
130
STONE
0
1
2
4m
140x225mm Glulam Beams 100mm CLT wall
EXTERIOR
ROYAL COLLEGE OF ART
Internal wall composition:
INTERIOR
200mm Post-tensioned Stone Thermal break
ADS 5
Balcony composition:
Separating Wall composition: INTERIOR
INTERIOR
TOWER
25mm Finish 75mm Insulation 250mm Post-tensioned Stone 75mm Insulation 25mm Finish
External Wall composition: 250mm Post-tensioned Stone 50mm Air Cavity 150mm Insulation 25mm Finish
EXTERIOR
INTERIOR
Floor composition: 25mm Finish 150mm Insulation 250mm CLT Floor Slab
VARIATION 2:
0
1
2
4m
TIMBER + STONE STRUCTURAL WALLS AND CORE
131
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
Glazing +Frame Aluminium (bar and rod) Flat Glass
Separating Wall Plasterboard
Stone Structural Wall Post-tensioned stone
Bay
Stone Core Post-tensioned stone
Stone Slab 200mm Post-tensioned stone slab
Glazing +Frame
TOWER
Aluminium (bar and rod) Flat Glass
Separating Wall Plasterboard
Stone Structural Wall Post-tensioned stone
Cluster
Stone Core Post-tensioned stone
Stone Slab 200mm Post-tensioned stone slab
Glazing +Frame Aluminium (bar and rod) Flat Glass
Separating Wall Plasterboard
Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Slab 200mm Post-tensioned stone slab
VARIATION 1:
132
STONE
Loft
ROYAL COLLEGE OF ART
Glazing +Frame Aluminium (bar and rod) Flat Glass
Beams and Columns Glulam
Separating Wall CLT
ADS 5
Bay
Timber Floor Slab CLT
Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Balcony Slab 200mm Post-tensioned stone slab
Glazing +Frame Aluminium (bar and rod) Flat Glass
Beams and Columns
TOWER
Glulam
Separating Wall CLT
Timber Floor Slab
Cluster
CLT
Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Balcony Slab 200mm Post-tensioned stone slab
Glazing +Frame Aluminium (bar and rod) Flat Glass
Beams and Columns Glulam
Separating Wall CLT
Timber Floor Slab CLT
Loft Stone Structural Wall Post-tensioned stone
Stone Core Post-tensioned stone
Stone Balcony Slab 200mm Post-tensioned stone slab
VARIATION 2: TIMBER + STONE STRUCTURAL WALLS AND CORE
133
2
COMPLEX SHAPE CULTURAL BUILDING
CONTENTS Pg. n. 6 8 10
2. EXISTING CONDITION 2.1 Site and location 2.2 Design concept 2.3 Areas and volumes 2.4 Photographic survey 2.5 Graphic documentation 2.6 Structure 2.7 Construction methods 2.8 General scheme 2.9 Key detail 2.10 Materials origins 2.12 Transport requirements
14 16 18 20 30 50 52 62 64 66 68
3. CARBON COPY 3.1 Timber space frame 3.2 General scheme 3.3 Proposed detail 3.4 Performance result
74 76 78 80
4. WHAT IF 4.1 Form finding 4.2 Catenary arches 4.3 General scheme 4.4 Proposed detail
84 86 88 90
5. DIRECT DATA COMPARISON 5.1 Carbon copy 5.2 What if
96 102
6. Findings 6.1 Performance result
110
7. APPENDIX 7.1 Timber space frame 7.2 Sequential roof
114 116
COMPLEX SHAPE CULTURAL BUILDING
1. INTRODUCTION 1.1 Purpose of research 1.2 Introduction to case study 1.3 Programme
3
COMPLEX SHAPE CULTURAL BUILDING
1
4
INTRODUCTION
COMPLEX SHAPE CULTURAL BUILDING
5
INTRODUCTION
PURPOSE OF RESEARCH
COMPLEX SHAPE CULTURAL BUILDING
During Term 1 of 2021/22, the Royal College of Art’s Architectural Design Studio 5 (ADS5) concentrated on building elements, their origins, carbon sequestering materials, and how they can be joined, bound, and brought to completion. ADS5 investigated seven building typologies: - Houses - Bridges - Complex Shaped Cultural Buildings - Towers - Mid-rise Buildings - Airports - Hopsitals and Laboratories Alternative materials and construction methods were researched and evaluated in an attempt propose a greener, faster and cheaper design alternative for a chosen building within each building typology. The scope of the analysis prescribed that the doppelganger design retained the original programme and form.
Tihs report is for Complex Shaped Cultural Buildings. It takes the design of the Heydar Aliyev Centre as a case study to understand if complex geometry could be realized using alternative materials and construction methods.
6
COMPLEX SHAPE CULTURAL BUILDING
7
INTRODUCTION
CASE STUDY
Title: Heidar Alyev Centre Typology: Cultural centre Location: Baku, Azerbaijan Client: The Republic of Azerbaijan COMPLEX SHAPE CULTURAL BUILDING
Architects: Zaha Hadid Architects Area: 101801 m2 Year: 2012 Main contractor: DIA Holding Consultants: Tuncel Engineering, AKT, GMD Project, HB Engineering, Werner Sobek Engineering & Design, Etik Fire Consultancy, Mezzo Studio, ENAR Consultants, Sigal, MBLD, Subcontractors and manufacturers MERO, Bilim Makina, Arabian Profile, Lindner AG, Sanset İkoor, Quinette, Baswa, Astas, Kone Elevators, Ikmam, MM Mühendisler Mermer, HRN Dizayn, x, Remak Makina, Tema, MIM Mühendislik, Elekon Enerji Sistemleri, NIS Epoksi Kaplama Sistemleri, Light Projects, Limit Insaat, Doka, Zumtobel, Solarlux, Bolidt Project team: Zaha Hadid, Patrik Schumacher, Saffet Kaya Bekiroglu, Sara Sheikh Akbari, Shiqi Li, Phil Soo Kim, Marc Boles, Yelda Gin, Liat Muller, Deniz Manisali, Lillie Liu, Jose Lemos, Simone Fuchs, Jose Ramon Tramoyeres, Yu Du, Tahmina Parvin, Erhan Patat, Fadi Mansour, Jaime Bartolome, Josef Glas, Michael Grau, Deepti Zachariah, Ceyhun Baskin, Daniel Widrig, Murat Mutlu, Charles Walker
8
INTRODUCTION
HEYDAR ALIYEV CENTRE
COMPLEX SHAPE CULTURAL BUILDING
Figure. 1 Aerial view of the site Source: Google images
9
INTRODUCTION
PROGRAMME
COMPLEX SHAPE CULTURAL BUILDING
As part of the former Soviet Union, the urbanism and architecture of Baku, the capital of Azerbaijan, was heavily influenced by the planning of that era. Since its independence in 1991, Azerbaijan has invested heavily in modernising and developing Baku’s infrastructure and architecture, departing from its legacy of normative Soviet Modernism. Zaha Hadid Architects was appointed to design the Centre following a competition in 2007. Built on the site of a Soviet munitions factory, the Centre is the primary building for the nation’s cultural programs. It is named after Heydar Aliyev, the first secretary of Soviet Azerbaijan from 1969 to 1982, and president of the Azerbaijan Republic from 1993 to 2003. It aspires to express the sensibilities of Azeri culture and the optimism of a nation that looks to the future. The Heydar Aliyev Centre is a 57,500 m² (619,000 sq ft) building complex. Not a single straight line was used in the design. All of its functions, together with entrances, are represented by folds in a single continuous surface. This fluid form creates an opportunity to connect the various cultural spaces, while at the same time, providing each element of the Centre with its own identity and privacy.
10
First floor:
Second floor
Third floor:
Fourth floor:
Fifth floor:
Sixth floor:
Seventh floor:
Eighth floor:
Library
Exhibition space
Auditorium
Multipurpose
Restaurant/Bar
Commercial
COMPLEX SHAPE CULTURAL BUILDING
Groundfloor:
11
COMPLEX SHAPE CULTURAL BUILDING
2 EXISTING CONDITION
COMPLEX SHAPE CULTURAL BUILDING
13
EXISTING CONDITION
COMPLEX SHAPE CULTURAL BUILDING
SITE AND LOCATION
14
LOCATION
1 Heydar Aliyev Ave, Baku 1033, Azerbaijan
GEOGRAPHICAL AREA
Western coast of the Caspian Sea
CO-ORDINATES
40.3959° N, 49.8678° E
POPULATION
2181800 (2014)
AREA
2140 km2
HEIGHT
28m below sea level
CLIMATE
Temperate and semi-arid climate
TEMPERATURE RANGE
4 to 26.4 °°C
AVARAGE TEMPERATURE
14.6 °°C
PRECIPITATION
around 210 mm/yr
WINDS
Strong winds all year
SNOW
Occasional winter snow storms up to 144 km/hr
EARTHQUAKE RISK
Moderate
GEOGRAPHICAL FEATURES
In the vicinity of volcanoes and salt lakes
COMPLEX SHAPE CULTURAL BUILDING
Figure. 2 Aerial view of the location Source: Google maps
Figure. 3 Aerial view of the site Source: Google maps
15
EXISTING CONDITION
DESIGN CONCEPT
CONTINUOUS FLUID SURFACE:
COMPLEX SHAPE CULTURAL BUILDING
The design of the Heydar Aliyev Centre establishes a continuous, fluid relationship between its surrounding plaza and the building’s interior. The plaza, as the ground surface; accessible to all as part of Baku’s urban fabric, rises to envelop an equally public interior space and define a sequence of event spaces dedicated to the collective celebration of contemporary and traditional Azeri culture. Elaborate formations such as undulations, bifurcations, folds, and inflections modify this plaza surface into an architectural landscape that performs a multitude of functions: welcoming, embracing, and directing visitors through different levels of the interior. One of the critical, yet challenging, elements of the project was the architectural development of the building’s skin. To achieve a continuous surface that appears homogenous, meant a broad range of different functions, construction logics and technical systems were brought together and integrated into the building’s envelope. Advanced computing allowed for the continuous control and communication of these complexities among the numerous project participants. The Heydar Aliyev Centre principally consists of two collaborating systems: a concrete structure combined with a space frame system. To attain large-scale column-free spaces which enables the visitor to experience the fluidity of the interior, vertical structural elements were absorbed by the envelope and curtain wall system.
16
48100 sqm of continuous fluid surface
COMPLEX SHAPE CULTURAL BUILDING
Vertical supporting structure
Axonometric views
17
EXISTING CONDITION
COMPLEX SHAPE CULTURAL BUILDING
AREAS AND VOLUMES
GROSS INTERNAL AREA (G.I.A):
57000 m2
NETT INTERNAL AREA (N.I.A):
10670 m2 - 18.7%
TOTAL SITE AREA:
111300 m2
ESITIMATED VOLUME:
285000 m3
LEVEL
18
G.I.A.
N.I.A.
RATIO
Groundfloor plan
15800 m2
2750 m2
17.4%
First floot plan
1000 m2
1950 m2
17.7%
Second floor plan
10000 m2
1950 m2
19.5%
Third floor plan
9000 m2
1950 m2
21.6%
Fourth floor plan
5200 m2
1200 m2
23.0%
Fifth floor plan
2500 m2
450 m2
18.0%
Sixth floor plan
1700 m2
200 m2
11.8%
Seventh floor plan
950 m2
200 m2
21.0%
Eighth floor plan
850 m2
200 m2
23.0%
Canopy
39100 m2
--
--
First floor: 11000 m2 1950 m2 - 17.7%
Second floor 10000 m2 1950 m2 - 19.5%
Third floor: 9000 m2 1950 m2 - 21,6%
Fourth floor: 5200 m2 1200 m2 - 23%
Fifth floor: 2500 m2 450 m2 - 18%
Sixth floor: 1700 m2 200 m2 - 11,8%
Seventh floor: 950 m2 200 m2 - 21%
Eighth floor: 850 m2 200 m2 - 23%
COMPLEX SHAPE CULTURAL BUILDING
Groundfloor: 15800 m2 2750 m2 - 17.4%
19
EXISTING CONDITION
COMPLEX SHAPE CULTURAL BUILDING
PHOTOGRAPHIC SURVEY
20
NUMBER
SUBJECT
LOCATION
PHASE
1
Site aerial picture
outside
completed
2
S-W facade
outside
completed
3
S-E facade
outside
completed
4
S-E facade detail
outside
completed
5
N-W facade detail
outside
completed
6
South-East facade
outside
completed
7
Main hall groundfloor
inside
completed
8
Main hall first floor
inside
completed
9
Tower corridor
inside
completed
10
Auditorium
inside
completed
11
Auditorium
inside
completed
12
Auditorium
inside
construction
13
Canopy space frame
outside
construction
14
Space frame
outside
construction
15
Concrete core
inside
construction
16
Steel structure
outside
construction
17
Outher skin detail
outside
construction
18
Outher skin detail
outside
construction
19
Outher skin detail
outside
construction
20
Canopy detail
outside
construction
21
Canopy detail
outside
construction
22
Canopy detail
outside
construction
COMPLEX SHAPE CULTURAL BUILDING
1
21
COMPLEX SHAPE CULTURAL BUILDING
2
3
22
6
5
23
COMPLEX SHAPE CULTURAL BUILDING
4
COMPLEX SHAPE CULTURAL BUILDING
7
8
24
9
12
11
25
COMPLEX SHAPE CULTURAL BUILDING
10
COMPLEX SHAPE CULTURAL BUILDING
13
14
26
COMPLEX SHAPE CULTURAL BUILDING
16
15
27
COMPLEX SHAPE CULTURAL BUILDING
17
28 18
19
22
21
29
COMPLEX SHAPE CULTURAL BUILDING
20
EXISTING CONDITION
COMPLEX SHAPE CULTURAL BUILDING
DRAWINGS
30
TITLE
SCALE
CUT HEIGHT
Site plan
1:3000
--
Ground floor plan
1:1000
+ 0.00 m
First floot plan
1:1000
+ 7.00 m
Second floor plan
1:1000
+ 12.00 m
Third floor plan
1:1000
+ 17.00 m
Fourth floor plan
1:1000
+ 22.00 m
Fifth floor plan
1:1000
+ 27.00 m
Seventh floor plan
1:1000
+ 32.00 m
Eighth floor plan
1:1000
+ 37.00 m
Ninth floor plan
1:1000
+ 41.50 m
Canopy plan
1:1000
+ 47.00 m
South-West elevation
1:1000
--
South-East elevation
1:1000
--
North-West elevation
1:1000
--
North-East elevation
1:1000
--
Longitudinal section A-A
1:1000
--
Trasversal section B-B
1:1000
--
Longitudinal section C-C
1:1000
--
Trasversal section D-D
1:1000
--
COMPLEX SHAPE CULTURAL BUILDING
0
30
60
90
120
150
300
Site plan
31 GSPublisherVersion 0.2.100.100
B
C
D
B
C
COMPLEX SHAPE CULTURAL BUILDING
A
A
D
0
Ground floor plan +0.00 m
32
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
B
C
D
B
C
A
A
D
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
First floor plan +7.00 m
GSPublisherVersion 0.2.100.100
33
B
C
D
B
C
COMPLEX SHAPE CULTURAL BUILDING
A
A
D
0
Second floor plan +12.00 m
34
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
B
C
D
B
C
A
A
D
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
Third floor plan +7.00 m
GSPublisherVersion 0.2.100.100
35
B
C
D
B
C
COMPLEX SHAPE CULTURAL BUILDING
A
A
D
0
Fourth floor plan +22.00 m
36
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
B
C
D
B
C
A
A
D
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
Fifth floor plan +27.00 m
GSPublisherVersion 0.2.100.100
37
B
C
D
B
C
COMPLEX SHAPE CULTURAL BUILDING
A
A
D
0
Sixth floor plan +32.00 m
38
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
B
C
D
B
C
A
A
D
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
Seventh floor plan +37.00 m
GSPublisherVersion 0.2.100.100
39
B
C
D
B
C
COMPLEX SHAPE CULTURAL BUILDING
A
A
D
0
Eight floor plan +41.50 m
40
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
B
C
D
B
C
A
A
D
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
Canopy plan +47 m
GSPublisherVersion 0.2.100.100
41
COMPLEX SHAPE CULTURAL BUILDING
0
South-West elevation
42
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
South-East elevation
GSPublisherVersion 0.2.100.100
43
COMPLEX SHAPE CULTURAL BUILDING
0
Norht-West elevation
44
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
North-East elevation
GSPublisherVersion 0.2.100.100
45
COMPLEX SHAPE CULTURAL BUILDING
0
Section A-A
46
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
Section B-B
GSPublisherVersion 0.2.100.100
47
COMPLEX SHAPE CULTURAL BUILDING
0
Section C-C
48
GSPublisherVersion 0.2.100.100
10
20
30
40
50
100
COMPLEX SHAPE CULTURAL BUILDING
0
10
20
30
40
50
100
Section D-D
GSPublisherVersion 0.2.100.100
49
EXISTING CONDITION
STRUCTURE
The building composes three different structural systems, each realised with different materials and techniques. CONCRETE CORES:
COMPLEX SHAPE CULTURAL BUILDING
The concrete cores were constructed first and is the vertical supporting structure. Mainly made from a series of casted on site reinforced concrete, the system provides three main areas responsible for resisting most of the vertical and horizontal loads of the building. COMPOSITE SLABS: Second are horizontal slab floors consisting of longspan steel beams with reinforced concrete slabs casted on top of a metal deck. The floors are mainly supported by the concrete cores, spanning the gaps that divide them. In some areas they are also partially supported by the steel frame of the canopy (see below). STEEL SPACE FRAME: The canopy has a double-curved free-form geometry and is built up in several layers with different functions. Its main supporting structure composes a MERO double-curved space frame made of solid steel ball nodes and CHS members. It spans between the three concrete cores but also directly connects to the ground. The space frame’s ability to transmit loads to the ground from and to different directions allowed the free-form design of the Centre.
50
Concrete cores
COMPLEX SHAPE CULTURAL BUILDING
Composite slabs
Steel space frame
Systems combined
51
EXISTING CONDITION
CONSTRUCTION METHODS
EXTERNAL SKIN:
COMPLEX SHAPE CULTURAL BUILDING
The exterior skin comprises an openjoint rain-screen system (cladding the building’s roof and exterior walls and extending into some of the interior ceiling as well), and the plaza, with a steady and invisible transition between the two. The latter, the plaza, is made from glass fiber reinforced concrete (GFRC) panels, whereas the rain-screen cladding is made from glass fiber reinforced polyester (GFRP) panels with a gelcoat layer to colour match the ground condition of the GFRC panels. Each GFRP panel has a 120mm perpendicular return on all edges (to give the illusion of solid stone) with 50 mm wide primary joints between panels, allowing access to fixings, and 15 mm wide transverse joints. All panels are uniquely shaped and sized. The precise design required considerable specialist engineering and 3D modelling. The total surface area is about 39100 m2 for the cladding and another 9000 m2 for the plaza. Both cladding and plaza panels are defined by architectural joint lines, which depend on the limits imposed by their production and transportation. The joint lines create a unique and free-flowing pattern, enveloping the entire building and the plaza.
52
COMPLEX SHAPE CULTURAL BUILDING
Figure. 6 Solid skin panels Source: Google images
53
EXISTING CONDITION
CONSTRUCTION METHODS
SUBSTRATE TO THE SOLID SKIN:
COMPLEX SHAPE CULTURAL BUILDING
The external surface - an open-joint rain-screen cladding system (see below) - required a secondary steel substructure to fix it to the space frame. The secondary steel structure is attached to the nodes of the space frame by means of rods. The secondary steel layer interfaces the space frame chord nodes’ geometry and that of the double-curved cladding system. The cladding system is connected to the secondary steel layer with metal fixings. The substructure covers about 39 000 m2 of roof area and consists of more than 12 500 elements, all of which are individual.
54
COMPLEX SHAPE CULTURAL BUILDING
Figure. 5 Substrate to solid skin Source: Google images
55
EXISTING CONDITION
CONSTRUCTION METHODS
COMPOSITE INSULATION PANELS
COMPLEX SHAPE CULTURAL BUILDING
The first layer is a prefabricated weatherproofing tray system which rests on the top chord nodes of the primary roof structure space frame. The trays consist of two U-section purlins, a trapezoidal metal deck in between, a self-adhesive vapour barrier, two layers of rigid, non-flammable rockwool insulation and a weatherproofing membrane on top. The trays are connected via overlapping metal flaps covering the gaps between adjacent trays. Due to the free-form shape of the space frame, all four corner bays covered by any given tray are not in one common plane, but twisted. Therefore, maximum acceptable warping criteria for the cold-bending of the four corner trays during installation were defined. Trays exceeding these criteria were produced with a triangular form, with two triangles and an additional U-section purlin in the middle. The support on the space frame stools and the fixing of the trays were achieved with spherical washers in order to accommodate the varying support angles. All weatherproofing trays were preassembled off-site, according to their actual dimensions, and lifted up to the roof as complete units. This allowed most of the work to be done before facing the very windy working conditions several metres above ground.
56
COMPLEX SHAPE CULTURAL BUILDING
Figure. 4 Substrate to outher skin Source: Google images
57
EXISTING CONDITION
CONSTRUCTION METHODS
SPACE FRAME
COMPLEX SHAPE CULTURAL BUILDING
The canopy has a double-curved freeform geometry and is built up in several layers with different functions. Its main supporting structure composes a MERO double-curved space frame made of solid steel ball nodes and CHS members. This structural system makes no differentiations and does not introduce variations for the supporting structure in any part of the building. This, no matter what the geometry of the canopy is or the predominant forces acting in particular locations. Such a system needs to rely on the stiffness and redundancy of the structural elements in order to distribute and resist different loads. This approach resulted in the use of large amounts of materials, in an effort to both support a nonspecific structure and resolve geometry weakness. The design and geometry of the building was not pragmatic and ignored environmental and sustainable solutions.
58
COMPLEX SHAPE CULTURAL BUILDING
Figure. 8 Space frame Source: Google images
59
EXISTING CONDITION
CONSTRUCTION METHODS
INTERNAL SKIN
COMPLEX SHAPE CULTURAL BUILDING
The internal skin of the building has the same geometrical complexity as the exterior skin. In addition, the architectural intention was also to divide the interior skin visually into “bands” in the crossbuilding direction, again emphasizing the theme of the plaza wrapping around the building. The system consists of a layer of purlins holding curved substructure tubes at a 50 cm spacing. The tubes have thin steel plate fixings attached to them on a 50 × 50 cm grid. The tubes and their fixings were designed to match the 3D curvature of the interior skin. The interior cladding, consisting of fibrereinforced flexible boards, was attached to the fixings by site-drilled screws. After installing a larger area of boards, the architectural joints and the curved slots for lighting, spotlights, loudspeakers, and other mechanical and electrical systems were cut out on site and filled with seam profiles. Skimming and painting provided the final touches.
60
COMPLEX SHAPE CULTURAL BUILDING
Figure. 7 Inner skin Source: Google images
61
EXISTING CONDITION
GENERAL SCHEME STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
COMPLEX SHAPE CULTURAL BUILDING
4m 4m
LAYER
MATERIAL
M3
KgC02e
COST £
External skin
GFR polyester
0.608
8539
3200
Substrate str.
Steel profiles
0.057
615
1118
Composite panels
Whaterproofing
0.048
14
320
Rigid insulation
1.920
88
800
Vapour barrier
0.016
0.02
80
Steel decking
0.093
1003
1280
Steel purlins
0.031
334
607
Space frame
Steel profiles
0.165
1780
3238
Substrate str.
Steel profiles
0.053
571
1040
Internal skin
GFR gypsum boards
0.48
125
1600
18779
13283
45,891,181
32,460,331
TOTAL TOTAL FOR THE BUILDING
62
Solid skin Substrate to the solid skin Composite panels
Space frame
Substrate to the internal skin
Plan view of a typical portion of the space frame
4x4 meters portion used as a mean of comparison between the different options
0
40
80
120
160
200
400
General scheme
GSPublisherVersion 0.2.100.100
63
COMPLEX SHAPE CULTURAL BUILDING
Internal skin
EXISTING CONDITION
KEY DETAIL
Fibrorinforced plastic panels
COMPLEX SHAPE CULTURAL BUILDING
Substrate to the solid skin
Composite panel
Corrugated steel decking
MIRO Spacea frame
Substrate to the internal skin
Internal skin
64
2 cm
Fibroreinforced plastic panels
Ø 12 cm
Tubular steel profiles
0.2 cm 12 cm 0.2 cm 0.4 cm 0.6 cm
Whaterproofing Rigid insulation Vapour barrier Steel decking Steel profiles
Ø 15 cm
Tubular steel profiles
Ø 15 cm
Tubular steel profiles
Ø 12 cm
Tubular steel profiles
3 cm
Fibroreinforced gypsum boards
Ø 15 cm
Ø 6.5 cm
Ø 10 cm
Ø 6.5 cm
COMPLEX SHAPE CULTURAL BUILDING
Ø 10 cm
Ø 15 cm
0
10
20
30
40
50
100
Detail
GSPublisherVersion 0.2.100.100
65
EXISTING CONDITION
MATERIALS ORIGIN MANIFACTURER
Mero-TSK Prichsenstadtd GmbH & CO.KG Blim Makina Mero-TSK International GmbH & CO.KG Mimi Engineering Construction Steel End Norm Cement Norm MMC Arabain Profile Lindner Grouo
COMPLEX SHAPE CULTURAL BUILDING
Lindner GFT GmbH HUECK HUECK Estrusion GMBH & CO. KG Safi YApi SIstemleri Hueck Doka Kalip-Iskele Sanayi ve Ticaret A.S. Ikoor HQ Ikoor Manufacturing BASWA acoustic AG Astas Gayrimenkul Bolidt Synthetic Products B.V.
PORTS
Trieste Port, Italy Venice Port, Italy Izmir Port, Turkey Haydarpasa Port, Turkey Samsun Port, Turkey Porti Port, Georgia Jabel Ali Port, UAE Busher Port, Iran Anzali Port, Iran Baku Port, Azerbaijan Norfolk Port, USA Bibraltar Port, Botswana
66
COMPLEX SHAPE CULTURAL BUILDING
67
EXISTING CONDITION
SUPPLIER MATERIAL
SUPPLIER
LOCATION
Steel Space Frame
Mero-TSK
Germany
Bilim Makina
Turkey
COMPLEX SHAPE CULTURAL BUILDING
(received for installation)
Structural Steel
Cement
(assumed supplier as largest producer in region and second closet factory to site)
GRFC, GFRP External
MIM Mühendislik
Turkey
Norm Cement
Azerbaijan
Arabian Profile
Cladding, Plaza
Internal Skin Cladding
68
United
Arab
Emirates
Lindner
Germany
EXISTING CONDITION
TRANSPORT REQUIREMENTS ROUTE AND MEANS OF TRANSPORTATION
DISTANCE/KM
Prichsenstadt, Germany to Trieste Port, Italy
Truck
732
Trieste Port, Italy to Izmir Port, Turkey
Ship
2000
Izmir Port, Turkey to Bursa, Turkey
Ship
331
Bursa, Turkey to Haydarpaşa Port, Turkey
Ship
147
Haydarpaşa Port, Turkey to Poti Port, Georgia
Ship
1100
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
1816 Truck
454
Samsun Port Turkey to Poti Port, Georgia
Ship
460
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902 1816
TOTAL DISTANCE Baku, Azerbaijan to Baku, Azerbaijan (site)
Truck
TOTAL DISTANCE
54 54
Sharjah, UAE to Jebel Ali Port. UAE
Truck
58
Jebel Ali Port, UAE to Bushehr Port, Iran
Ship
650
Bushehr Port, Iran to Anzali Port, Iran
Ship
1280
Anzali Port, Iran to Baku Port, Azerbaijan
Ship
280
Baku Port, Azerbaijan to Baku Azerbaijan (site)
Truck
74
TOTAL DISTANCE
2342
Dettelbach, Germany to Trieste Port, Italy
Truck
759
Trieste Port, Italy to Izmir Port, Turkey
Ship
2000
Izmir Port, Turkey to Haydarpaşa Port, Turkey
Ship
470
Haydarpaşa Port, Turkey to Poti Port, Georgia
Ship
1100
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
COMPLEX SHAPE CULTURAL BUILDING
Ankara, Turkey to Samsun Port, Turkey
5231
69
EXISTING CONDITION
SUPPLIER MATERIAL
Glass Curtain Façade
SUPPLIER
LOCATION
Hueck
Germany
Safi Yapı Sistemleri
COMPLEX SHAPE CULTURAL BUILDING
(glass manufacturer)
Formwork
Doka
Turkey
A. Wooden Cladding
Ikoor
Virginia
(American White Oak)
(received for fabbrication)
U.S.A
(assumed American White Oak sourced from Virginia, one of the two American States which produce the largest amount of the tree)
70
Turkey
Acoustic Ceilings
BASWA
Switzerland
Polyurethane Floors
Bolidt
Netherlands
EXISTING CONDITION
TRANSPORT REQUIREMENTS ROUTE AND MEANS OF TRANSPORTATION
DISTANCE/KM
Lüdenscheid, Germany to Trieste Port, Italy
Truck
1064
Trieste Port, Italy to Izmir Port, Turkey
Ship
2000
Izmir Port, Turkey to Istanbul, Turkey
Ship
459
Istanbul, Turkey to Haydarpaşa Port, Turkey
Ship
22
Haydarpaşa Port, Turkey to Poti Port, Georgia
Ship
1100
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
5547 Truck
47
Haydarpaşa Port, Turkey to Poti Port, Georgia
Ship
1100
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
2049
Norfolk Port, USA to Gilbraltar Port, BoT
Truck
6460
Gilbraltar Port, BoT to Izmir Port, Turkey
Ship
3200
Izmir Port, Turkey to Ankara, Turkey
Truck
618
Ankara, Turkey to Samsun Port, Turkey
Truck
454
Samsun Port Turkey to Poti Port, Georgia
Ship
460
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
12094
Baldegg, Switzerland to Venice Port, Italy
Truck
519
Venice Port, Italy to Izmir Port, Turkey
Ship
2060
Izmir Port, Turkey to Haydarpaşa Port, Turkey
Ship
470
Haydarpaşa Port, Turkey to Poti Port, Georgia
Ship
1100
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
5051
Hendrik-Ido-Ambacht, Netherlands to Trieste Port, Italy
Truck
1311
Trieste Port, Italy to Izmir Port, Turkey
Ship
2000
Izmir Port, Turkey to Haydarpaşa Port, Turkey
Ship
470
Haydarpaşa Port, Turkey to Poti Port, Georgia
Ship
1100
Poti Port, Georgia to Baku, Azerbaijan (site)
Truck
902
TOTAL DISTANCE
COMPLEX SHAPE CULTURAL BUILDING
Gebze, Turkey to Haydarpaşa Port, Turkey
5783 71
COMPLEX SHAPE CULTURAL BUILDING
2
72
CARBON COPY
COMPLEX SHAPE CULTURAL BUILDING
73
CARBON COPY
TIMBER SPACE FRAME
HYBRID TIMBER-STEEL SPACE FRAME WITH RECONSTITUTED STONE SANDWICH PANELS
In an attempt to replicate the form of the design, this appoach retains the use of the original structural model but with more sustainable materials.
COMPLEX SHAPE CULTURAL BUILDING
Sustainably sourced hardwood is one of the leading carbon sequestering materials used in the construction industry. The proposal replaces the CHS members of the Mero space frame with timber elements, while still keeping the bespoke steel nodes for structural stability. Structural steel has very high embodied carbon and reducing its use should drastically reduce the overall carbon footprint of the Centre. Although Azerbaijan has issues with deforestation and imports more timber than they produce, this material is easily, and cheaply, available from neighbouring Turkey and other countries in the Caucasus and Central Asia, compared to importing the steel CHS members for the space frame from Germany. In addition, the GFRP (another material with very high embodied carbon) will be replaced with resconstituted stone panels sandwiching carbon sequestering thermacork insulation. This will also negate the need for superfluous secondary steel structures. The stone-cork panels will be flat and tringulated to reduce energy use during production and enable ease of installation.
74
COMPLEX SHAPE CULTURAL BUILDING
Figure. 8 Ateliers Romeo structural sandwich panels consiting waste marble bonded over closed cell insulation with basalt cement in preparation for exhibition at the 2021 Seoul Biennale of Architecture and Urbanism. Source: Groupwork, @ Groupwork_arch. (23 August 2021). <https://twitter.com/Groupwork_arch/ status/1429845673650884611> [accessed 4 December 2021]
Figure. 9 Test for a multi-bolt cast iron connecting forks for glulam birch members for a space frame. Source: M. Dickson and D. Parker, Sustainable Timber Design (Oxon: Routledge, 2015), p. 195.
75
CARBON COPY
GENERAL SCHEME STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
COMPLEX SHAPE CULTURAL BUILDING
4m 4m
LAYER
Composite panels
Space frame
MATERIAL
M3
KgC02e
COST £
Reconstituted stone
0.365
302
3200
Whaterproofing
0.080
23
1120
Thermacork
2.240
-192
520
Hardwood members
8.832
-9038
4500
Steel connection
0.145
1563
2850
Plywood
0.080
-41
10
-7383
12,200
-18,042,206
29,813,750
Internal skin TOTAL TOTAL FOR THE BUILDING
76
Stone-Thermacork panels
Timber-Steel space frame
Flexible plywood
4x4 meters portion used as a mean of comparison between the different options
0
40
80
120
160
200
400
General scheme
GSPublisherVersion 0.2.100.100
77
COMPLEX SHAPE CULTURAL BUILDING
Plan view of a typical portion of the space frame
CARBON COPY N.1
PROPOSED DETAIL
Reconstituted stone
COMPLEX SHAPE CULTURAL BUILDING
Thermacork insulation
Reconstituted stone
Weatherproofing
Steel node, cone, sleeve, shear plane, connetion
Timber member
Flexible plywood
78
DIRECT COMPARISON
PROPOSED KEY DETAIL
COMPLEX SHAPE CULTURAL BUILDING
Stone-Insulation Panel 01. reconstituted stone 02. thermacork insulation 03. weathering membrane Steel-Timber space-frame 04. steel node 05. steel sleeve 06. steel cone 07. steel shear plane 08. steel bolt connector 09. hardwood member
10. connection rod 11. connection steel plate 12. flexible plywood 13. silicone sealant 14. metal connection plate Tensioned Stone 15. sandstone block 16. steel anchorage 17. anchor head 18. steel tendon
79
CARBON COPY
PERFORMANCE RESULT
The cost of the canopy proposal is slightly less than the original design with a cost cut by about 8 percent. This is mainly due to the volume of hardwood needed.
COMPLEX SHAPE CULTURAL BUILDING
However, the environmental impact wil be extremely high with a reduction in embodied carbon by about 140% due to the high sequestering ability of the timber. Stone is another great carbon sequestering material used in the construction industry. Stone, including sandstone, is readily available in Azerbaijan and Icherisheher (the Old City of Baku) is both abundant with and resplendent in the material. There are several stone quarries locally. The proposal also replaces the concrete cores and concrete slab floors with tensioned stone cores and CLT floors respectively. Some structural steel will still be used but this will be drastically reduced. Both stone cores and CLT floors have the advantage of being prefabricated which will reduce construction time on site. Although the timber members for the hybrid space frame will also be prefabricated, it will require machinery for installation but the energy used is anticipated to be less overall as three layers requiring such machinery will be reduced to two.
80
COMPLEX SHAPE CULTURAL BUILDING
140% IN EMBODIED CARBON
from 45,891,181 kg to 18,042,206 kg
GSPublisherVersion 0.16.100.100
8%
IN PROJECT COST from 32,460,331 £ to 29,813,750 £
GSPublisherVersion 0.16.100.100
81
COMPLEX SHAPE CULTURAL BUILDING
3
82
WHAT IF?
COMPLEX SHAPE CULTURAL BUILDING
83
WHAT IF?
FORM FINDING
PROPOSED APPROACH:
COMPLEX SHAPE CULTURAL BUILDING
In its current particular conformation, the structural space frame requires the use of a massive amounth of material to be able to stand the heavy loads and the large span that the project involves. What if we modify the conformation of the envelope in shapes better suitable for distributing the loads they are subjected to? The proposed approach aims to achieve cheaper, more sustainable, and more lightweight structures through the adaptation of the shape of the outer envelope to the forces it has to sustain. The main cretaria of such operation is the individuation of specific areas within the supporting structure of the building that are mainly subjected to compression, tension or mixed forces. The geometry of the envelope and the disposition of the vertical structure helped us defining how the canopy could be divided into different areas, each of which might be suitable to be substituted with a different structural system.
84
COMPRESSION ONLY STR: Compression-only structures take the familiar form of walls, arches, shells and grid shells. Unlike tension-only structures that deflect to balance the loads, compression-only structures do not have this luxury, as any movement increases the risk of buckling. This is a major risk for masonry structures, as they have little or no bending capacity other than that provided by the compression thrust. Masonry can behave differently from other engineering materials, such as steel and concrete. It is both orthotropic and nonlinear with little tensile capacity, and therefore it must be employed with care.
COMPLEX SHAPE CULTURAL BUILDING
Figure. 9 EXAMPLE OF COMPRESSION ONLY STRUCTURE Armadillo vault - ETH Zurich Block Research Group
TENSION ONLY STRUCTURES: Evolutionary structural optimization method is a simple but effective means for form finding for complex structures. It has been extended to structural topological optimization with different design interest, such as tension-only or compressiononly structures. When a tensile structure is to be designed, the compression-dominant elements are improper for the design condition, and therefore are first removed. The elements under tension but at low stress levels are considered as inefficient, and should be gradually deleted as well.
Figure. 9 EXAMPLE OF TENSION ONLY STRUCTURE EXPO ‘98 Portuguese National Pavillionm - Alvaro Siza
85
WHAT IF?
COMPLEX SHAPE CULTURAL BUILDING
CATENARY ARCHES
1
4
2
5
3
6 Catenary arches obtained through the use of GeoGebra - https://www.geogebra.org/m/SPA65Fqk
A catenary arch is a type of architectural arch that follows an inverted catenary curve. Catenary arches are strong because they redirect the vertical force of gravity into compression forces pressing along the arch’s curve. In a uniformly loaded catenary arch, the line of thrust runs through its center. Through the use of GeoGebra the shapes featured in the existing building have been approximated into catenary arches. Such a slight change in the geometry guarantees shapes able to better distribute the loads, significantly reducing the amounth of material required for construction.
86
2 5
Section A-A
1
1
10
20
3
30
40
4 50
6
100
1:1000
COMPLEX SHAPE CULTURAL BUILDING
Proposed possible scheme of the structure Composite cross-laminated stone canopy and CLT cores Section A-A 1
10
20
30
40
50
100
1:1000
100
0.100
Comparative section
0
10
20
30
40
50
100
Comparative sections
GSPublisherVersion 0.2.100.100
87
WHAT IF?
GENERAL SCHEME STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
4m
COMPLEX SHAPE CULTURAL BUILDING
4m
LAYER
MATERIAL
M3
KgC02e
COST £
Outher skin
Stone panel
0.40
680
200
Composite stone layer
0.20
500
300
Stone panel
0.40
680
200
Whaterproofing
0.048
14
800
Rigid insulation
10.00
5000
1280
Vapour barier
0.016
0.02
80
Stone panel
0.80
1360
450
Composite stone layer
0.40
1000
500
Stone panel
0.80
1360
450
Steel cables and plates
0.4
431
1000
11025
5260
20,671,875
9,862,600
Composite panel
Inner skin
TOTAL TOTAL FOR THE BUILDING
88
GSPublisherVersion 0.14
GSPublisherVersion 0.14
4.100.100
Lower part of one of the vaults resting on top of a stone arch
COMPLEX SHAPE CULTURAL BUILDING
4.100.100
Upper part of one of the vaults with the section of the panels progressively reducing
Cross-lamianted stone panels kept together by means of post-tensioned cables. 80X80 cm avarage size
4x4 meters portion used as a mean of comparison between the different options
0
40
80
120
160
200
400
General scheme
GSPublisherVersion 0.2.100.100
89
WHAT IF?
PROPOSED DETAIL
Silicon sealing
Stone panel Composite stone layer
COMPLEX SHAPE CULTURAL BUILDING
Stone panel
Whaterproofing membrane
Rigid insulation
Vapour barrier
Stone panel Composite stone layer Stone panel
External skin
90
16 cm
0.2 cm 12/16 cm 0.2 cm 6 cm
Cross-laminated stone panel Whaterproofing Rigid insulation Vapour barrier Cross-laminated stone panel
Ø 2 cm
Post-tension steel cable
4 cm
Cross-laminated stone panel Whaterproofing Rigid insulation Vapour barrier Cross-laminated stone panel
52 cm
0.2 cm 60/52 cm 0.2 cm 16 cm Ø 2 cm
COMPLEX SHAPE CULTURAL BUILDING
100
4 cm 12 cm
Post-tension steel cable
60 cm
0
10
20
30
40
50
100
Detail
GSPublisherVersion 0.2.100.100
91
WHAT IF?
PERFORMANCE RESULT
COMPLEX SHAPE CULTURAL BUILDING
While the existing structures employ a large amount of material to resist the loads it is subjected to, a load-based approach could allow the non-linear and long-spanning structures featured in the project to be realized using less materials and in a more efficient way. Difficulties related to the particularity of the shapes involved would still require a high degree of precision and custom fabrication for the project, certainly going to affect the final costs and construction times. The possibility of making such shapes with this type of material, although plausible in small dimensions and scales, remains however to be demonstrated in projects of such large dimensions and complexity. Lastly, the system, although it would seem to help cut costs and emissions, proves not very functional for the integration of all the other systems that a building needs in order to properly function.
92
COMPLEX SHAPE CULTURAL BUILDING
54%
IN EMBODIED CARBON from 45,891,181 kg to 20,671,875 kg
GSPublisherVersion 0.16.100.100
69%
IN PROJECT COST from 32,460,331 £ to 9,862,600 £
GSPublisherVersion 0.16.100.100
93
COMPLEX SHAPE CULTURAL BUILDING
4
94
DIRECT COMPARISON
COMPLEX SHAPE CULTURAL BUILDING
95
DIRECT DATA COMPARISON
EXISTING KEY DETAIL 01
12 02
03
07
04
06
08
09
10
05
11
COMPLEX SHAPE CULTURAL BUILDING
01. GFRP with gelcoat layer - 50mm primary joints - 15mm transverse joints - 120mm edge returns 02. CHS
4.535m
Insulation panel 03. weathering membrane 04. rigid rockwool 05. self-adhesive vapour barrier 06. trapezoidal metal deck 07. u-section purlin
12
MERO KK space-frame primary structure 08. steel node - Ø 110-350mm 09. steel sleeve 10. steel cone 11. CHS member - Ø 60.3-273mm - length up to 4.5m - galvanised - coated ISO 12944
13
13
17
02
18 14
20
16 19
96
12. connection rods 13. metal connection joints 14. calendared tubular steel 15. connection steel plates 16. flexboard 17. silicone sealant 18. metal connection plate 19. in-situ concrete 20. rebar reinforcement
15 16
ADS 5
DIRECT COMPARISON
PROPOSED KEY DETAIL
COMPLEX SHAPE CULTURAL BUILDING
Stone-Insulation Panel 01. reconstituted stone 02. thermacork insulation 03. weathering membrane Steel-Timber space-frame 04. steel node 05. steel sleeve 06. steel cone 07. steel shear plane 08. steel bolt connector 09. hardwood member
Royal College of Art
10. connection rod 11. connection steel plate 12. flexible plywood 13. silicone sealant 14. metal connection plate Tensioned Stone 15. sandstone block 16. steel anchorage 17. anchor head 18. steel tendon
97
DIRECT DATA COMPARISON
EXISTING MODULE
Fibrorinforced plastic panels
COMPLEX SHAPE CULTURAL BUILDING
Substrate to the solid skin
Composite panel
Corrugated steel decking
MIRO Spacea frame
Substrate to the internal skin
Internal skin
98
DIRECT COMPARISON
PROPOSED MODULE
Reconstituted stone
Thermacork insulation
COMPLEX SHAPE CULTURAL BUILDING
Reconstituted stone
Weatherproofing
Steel node, cone, sleeve, shear plane, connetion
Timber member
Flexible plywood
99
DIRECT DATA COMPARISON
EXISTING CONDITION STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
COMPLEX SHAPE CULTURAL BUILDING
4m 4m
LAYER
MATERIAL
M3
KgC02e
COST £
External skin
GFR polyester
0.608
8539
3200
Substrate str.
Steel profiles
0.057
615
1118
Composite panels
Whaterproofing
0.048
14
320
Rigid insulation
1.920
88
800
Vapour barrier
0.016
0.02
80
Steel decking
0.093
1003
1280
Steel purlins
0.031
334
607
Space frame
Steel profiles
0.165
1780
3238
Substrate str.
Steel profiles
0.053
571
1040
Internal skin
GFR gypsum boards
0.48
125
1600
18779
13283
45,891,181
32,460,331
TOTAL TOTAL FOR THE BUILDING
100
DIRECT COMPARISON
PROPOSED CONDITION STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
COMPLEX SHAPE CULTURAL BUILDING
4m 4m
LAYER
Composite panels
Space frame
MATERIAL
M3
KgC02e
COST £
Reconstituted stone
0.365
302
3200
Whaterproofing
0.080
23
1120
Thermacork
2.240
-192
520
Hardwood members
8.832
-9038
4500
Steel connection
0.145
1563
2850
Plywood
0.080
-41
10
-7383
12,200
-18,042,206
29,813,750
Internal skin TOTAL TOTAL FOR THE BUILDING
140%
8%
IN EMBODIED CARBON
IN PROJECT COST
from 45,891,181 kg to 18,042,206 kg
from 32,460,331 £ to 29,813,750 £
GSPublisherVersion 0.16.100.100 GSPublisherVersion 0.16.100.100
101
ion 0.1.100.100
DIRECT DATA COMPARISON
EXISTING KEY DETAIL 2 cm
Fibroreinforced plastic panels
Ø 12 cm
Tubular steel profiles
COMPLEX SHAPE CULTURAL BUILDING
0.2 cm 12 cm 0.2 cm 0.4 cm 0.6 cm
Whaterproofing Rigid insulation Vapour barrier Steel decking Steel profiles
Ø 15 cm
Tubular steel profiles
Ø 15 cm
Tubular steel profiles
Ø 12 cm
Tubular steel profiles
3 cm
Fibroreinforced gypsum boards
Ø 15 cm
Ø 10 cm
Ø 6.5 cm
Ø 10 cm
Ø 6.5 cm
Ø 15 cm
0
Detail
GSPublisherVersion 0.2.100.100
102
10
20
30
40
50
100
PROPOSED KEY DETAIL 4 cm 12 cm
16 cm
0.2 cm 12/16 cm 0.2 cm 6 cm
Cross-laminated stone panel Whaterproofing Rigid insulation Vapour barrier Cross-laminated stone panel
Ø 2 cm
Post-tension steel cable
4 cm
Cross-laminated stone panel Whaterproofing Rigid insulation Vapour barrier Cross-laminated stone panel
52 cm
0.2 cm 60/52 cm 0.2 cm 16 cm Ø 2 cm
COMPLEX SHAPE CULTURAL BUILDING
100
DIRECT COMPARISON
Post-tension steel cable
60 cm
0
10
20
30
40
50
100
Detail
GSPublisherVersion 0.2.100.100
103
DIRECT DATA COMPARISON
EXISTING MODULE
Fibrorinforced plastic panels
COMPLEX SHAPE CULTURAL BUILDING
Substrate to the solid skin
Composite panel
Corrugated steel decking
MIRO Spacea frame
Substrate to the internal skin
Internal skin
104
DIRECT COMPARISON
PROPOSED MODULE
Silicon sealing
Stone panel Composite stone layer Stone panel
COMPLEX SHAPE CULTURAL BUILDING
Whaterproofing membrane
Rigid insulation
Vapour barrier
Stone panel Composite stone layer Stone panel
External skin
105
DIRECT DATA COMPARISON
EXISTING CONDITION STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
COMPLEX SHAPE CULTURAL BUILDING
4m 4m
LAYER
MATERIAL
M3
KgC02e
COST £
External skin
GFR polyester
0.608
8539
3200
Substrate str.
Steel profiles
0.057
615
1118
Composite panels
Whaterproofing
0.048
14
320
Rigid insulation
1.920
88
800
Vapour barrier
0.016
0.02
80
Steel decking
0.093
1003
1280
Steel purlins
0.031
334
607
Space frame
Steel profiles
0.165
1780
3238
Substrate str.
Steel profiles
0.053
571
1040
Internal skin
GFR gypsum boards
0.48
125
1600
18779
13283
45,891,181
32,460,331
TOTAL TOTAL FOR THE BUILDING
106
DIRECT COMPARISON
PROPOSED CONDITION STRUCTURE MODULE A portion of 4x4 meters has been taken as example for the calculations and the comparison among the existing and the proposals. To find the values referring to all the 30000 m2 of the canopy, the results must be multiplied 1875 times.
COMPLEX SHAPE CULTURAL BUILDING
4m 4m
LAYER
MATERIAL
M3
KgC02e
COST £
Outher skin
Stone panel
0.40
680
200
Composite stone layer
0.20
500
300
Stone panel
0.40
680
200
Whaterproofing
0.048
14
800
Rigid insulation
10.00
5000
1280
Vapour barier
0.016
0.02
80
Stone panel
0.80
1360
450
Composite stone layer
0.40
1000
500
Stone panel
0.80
1360
450
Steel cables and plates
0.4
431
1000
11025
5260
20,671,875
9,862,600
Composite panel
Inner skin
TOTAL TOTAL FOR THE BUILDING
54%
69%
IN EMBODIED CARBON
IN PROJECT COST
from 45,891,181 kg to 20,671,875 kg
from 32,460,331 £ to 9,862,600 £
107
GSPublisherVersion 0.16.100.100 GSPublisherVersion 0.16.100.100
COMPLEX SHAPE CULTURAL BUILDING
5
108
FINDINGS
COMPLEX SHAPE CULTURAL BUILDING
109
CONCLUSION
FINDINGS
COMPLEX SHAPE CULTURAL BUILDING
It conclusion, it is possible to redesign the canopy of the Heyday Aliyev Centre to build it cheaper and greener. Both proposals, one for replacing an all steel space frame with a hypbrid timber-steel space frame, and the other of using catenary arches, suggest favourable results. The former is far more sustainable with a reduction by 140% in embodied carbon while the latter could be far cheaper with a reduction by about 69% in cost. It is also suggested that the time for construction will be reduced since more materials (like the stone and timber) could be sourced locally or from closer countries.
110
.16.100.100
WHAT IF
140%
54%
IN EMBODIED CARBON
IN EMBODIED CARBON
from 45,891,181 kg to 18,042,206 kg
from 45,891,181 kg to 20,671,875 kg
8%
GSPublisherVersion 0.16.100.100
COMPLEX SHAPE CULTURAL BUILDING
.16.100.100
CARBON COPY
69%
IN PROJECT COST
IN PROJECT COST
from 32,460,331 £ to 29,813,750 £
from 32,460,331 £ to 9,862,600 £
GSPublisherVersion 0.16.100.100
111
COMPLEX SHAPE CULTURAL BUILDING
4 5
112
APPENDIX
COMPLEX SHAPE CULTURAL BUILDING
113
APPENDIX
2 m avarage
COMPLEX SHAPE CULTURAL BUILDING
TIMBER SPACE FRAME
2 m avarage
0
Outher skin composition
GSPublisherVersion 0.2.100.100
114
40
80
120
160
200
400
Crosslaminated stone panels Whaterproofing Rigid insulation Timber truss
COMPLEX SHAPE CULTURAL BUILDING
Timber truss
0 GSPublisherVersion 0.1.100.100
10
20
30
40
50
100
Outher skin composition
GSPublisherVersion 0.2.100.100
115
APPENDIX
COMPLEX SHAPE CULTURAL BUILDING
SEQUENTIAL ROOF
0
Outher skin composition
GSPublisherVersion 0.2.100.100
116
40
80
120
160
200
400
Crosslaminated stone panels
15 15
Whaterproofing Rigid insulation Timber truss
44
COMPLEX SHAPE CULTURAL BUILDING
15
15 15
44
15
0
10
20
30
40
50
Timber truss
100
Outher skin composition GSPublisherVersion GSPublisherVersion 0.1.100.100 0.1.100.100
GSPublisherVersion 0.2.100.100
117
ACKNOWLEDGEMENTS
4 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
CONTENTS
Purpose of Research Kings Cross R5 Development
8 10
ROYAL COLLEGE OF ART
1. INTRODUCTION
2. EXISTING CONDITIONS 14 15 20 30 42 56
3. CARBON COPY PROPOSALS Introduction Material Studies: Timber and Stone Carbon Copies: Structure, Embodied Carbon, and Cost Carbon Copy 1: Self Standing Stone and CLT Carbon Copy 2: Stone Veneer and CLT Carbon Copy 3: Structural Stone Operational Carbon
64 66 84 84 102 120 140
MID-RISE URBAN BLOCKS
Background Design Summary Drawings Material Studies: Brick and Concrete Analysis: Structure, Embodied Carbon, and Cost Operational Carbon
4. FINDINGS Comparisons Overall Savings Embodied Carbon Analysis Cost Analysis Carbon Copy 1 Carbon Copy 2 Carbon Copy 3 Conclusions
150 152 154 155 156 158 160 162
5. FURTHER APPLICATIONS FOR TYPOLOGIES
164
6. CATALOGUE OF MATERIAL COMPONENTS
172
5
6 MID-RISE URBAN BLOCKS
1 INTRODUCTION
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
7
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
1.0 INTRODUCTION
PURPOSE OF RESEARCH
MID-RISE TYPOLOGY This paper looks at alternative materials and methods of construction that can aid in decreasing the embodied carbon in the construction industry. It particularly looks at the Mid-Rise Urban Block typology The case study chosen is the Kings Cross R5 Urban Block Development by Maccreanor Lavington Architects and Porphyrios Architects. It is a mid-rise commercial and residential development. It is 15 storeys high, with a total GIA of 13,750 m2, across the three blocks of the development. To study the significance of urban housing blocks and predominant ways of building in concrete while also examining possibilities in a mass revolution that in conglomeration will hugely reduce the number of carbon at a city scale. This is done by exploring alternative construction materials and design techniques at the chosen typology. The structural and environmental capacity of timber, stone and brick superstuctures will be examined against cost analysis. Many communities and policymakers in cities around the world do not like the growing number of residential towers, but they also realise that houses are not a sustainable urban solution. Between these two extremes, there is a missing middle of mid-rise buildings that relate to the street and are within the height of trees.
8
A mid-rise building is a structure that has between five and 10 storeys and is equipped with a lift. More specifically, the National Fire Chiefs Council classifies medium-rise buildings as ‘structures whose uppermost habitable floor is less than 30m and greater than 18m above ground level measured from the lowest side of the building’. This definition is based on the knowledge that standard firefighting turntables have not historically been able to access buildings that are more than 18m high. Mid-use buildings often offer a mix of residential uses as well as commercial ones. They have various economic, environmental and social benefits, such as building as a scale which supports vibrant and walkable urban realms, hugher property values and more tax revenues.
ADS 5 ROYAL COLLEGE OF ART
8000000 7000000
EMBODIED CARBON / KGCO2E
6000000 5000000 4000000 3000000 2000000 1000000 0 -1000000 -2000000 CARBON COPY 1
CARBON COPY 2
CARBON COPY 3
EXISTING
CARBON COPY 1
CARBON COPY 2
CARBON COPY 3
MID-RISE URBAN BLOCKS
EXISTING
4000000 40000000 3500000 35000000
COST / GBP
3000000 30000000 2500000 25000000 2000000 20000000 1500000 15000000 1000000 10000000 500000 5000000 00
REGULATIONS FOR MID-RISE BUILDINGS As mid-rise buildings tend to rise higher than 18 metres, Building Regulations have set additional requirements for the materials and façades used for this typology to guarantee fire safety. 1. Applications for tall or large buildings should include an urban design analysis. 2. Applications for tall buildings should generally be limited to sites in central zones 3. Relate well to the form, proportion, composition, scale and character of surrounding. 4. Only be considered in areas whose character would not be affected adversely by the scale 5. Incorporate sustainable design and construction practices 6. Have ground floor activities that provide a positive relationship to the surroundings 7. Incorporate publicly accessible areas on the upper floors, where appropriate 9
ADS 5 ROYAL COLLEGE OF ART
1.0 INTRODUCTION
EXISTING CONDITION
MID-RISE URBAN BLOCKS
KINGS CROSS R5 DEVELOPMENT When the building was designed in 2008, it was done so in the contect of an empty site location ready for development. Prior to its development, urban aspirations of the site had been developed by The Camden City Council, Argent Consultants and Allies and Morrison. Thus, when developing this site, the architects seeked inspiration from buildings which could have been on the site and those that will be added following the completion of the masterplans developed. The London Development Plan aims to ensure development proposals achieve the highest possible intensity of use compatible with local context, good design principles and with public transport capacity. King’s Cross is identified as part of the Central Activities Zone where developments are expected to maximise plot ratios. The Plan sets minimum targets for growth and states that these should be, where possible, exceeded. The councils main objective will be to create firm links between the development and the local area so that it is a relevant and positive addition to, and well integrated with, this part of London. This integration includes: Physical connections – The opportunities for better east-west and north-south movement across the site Economic connections – New jobs should be widely available, offering more opportunities for those who find it difficult to work for many reasons Social links – The Councils are keen to see and create a balanced and successful development that recognises cultural diversity Completing the picture – A large development like King’s Cross Central will take place in stages. Each major phase of the comprehensive development should contain an appropriate mix of different uses, including housing Working with the community – In King’s Cross, the focus is on community involvement, better access to jobs and training, improving local people’s qualifications through education, safer streets and an attractive environment; and
10
Achieving sustainable development.
1.1.11. Looking to the future, there are a number of projects at different stages, that have major implications for King's Cross: 1.1.11. Looking to the future, there are a number of projects at different stages, > major Theimplications St Pancras that have forInternational King's Cross: and Domestic Station, CTRL
infrastructure, site restoration and landscaping will be completed
>
>
1
12
Junction Copenhagen
Copenhagen 7
106
7
104
112
102
104
112
uct Viad
uct
38 to 51
38 to 51
Conveyor
Conveyor
38 to 5
38 to
52 71
5 52 71
Conveyor
Conveyor
61 63
57 59
115 to 138
13 15
11 9
7 5 3 1
14
2 to 58
16e 15e 16a 15a
14
12 13 10
1 to 25
87
83 81
3
YORK WAY
73
65
91
81
83
87
55 51
47
RO AD
73
43
N DO NIA
65
17a 19
51
35 17
43
33
LE CA
N 41
DO NIA
to
13
35
1 3
33
CA LE
5
18
TCBs
BM 17.16m
5
19 13
374
372
311
5
1 3 5
374
372
309 307
305
297
54
115 to 81
295
287
311
307
305
58a
58
54
297
295
59
41
36
46
10
14
20
11 to
10
12
16 18
12
150
39
to
to
116
20
19 1 to
287
1
8 24
36
80 to 71
to 60 59 to 40 6
1 to
ET
201
PH
FOR SEA
118
47
20
11 to
12
79
1 to
to 132 106
105
RO AD
to 35
37
41
18
18.3m
19
13 5
59
58a 58
36 38
47
10
14
12
16
12
18
1 to
103
EET
N STR ISO HARR
am
E
95
67
47
41 46
10
to 67
80 to
79
71
to 60
115 to 81
59 to 40
150
39
to
to
116
20
19 1 to
6
1 to
123
121
119
117
109
181
107
to 160
159 to 136
38 to
31 3 to
8 36
106 85
1 to
1 12
24
47 to 132
118
D
St Pete
1
Gly
se
135
112
to
A TH
111
52
13
se
Hou
22.4m
85
107 105
103
95
to
12 13 10
1 to 25
20.1m
91
55 47 37
35
5 TCBs
BM 17.16m
gs ldin
ge
Bui y
sa
nle
Pas
RT
Cla
CO
re
U
nce
31 3 to
123
121
119
117
109 159 to 136
135
209 to 240
1
7 8
9
200
202
204
206
208
210
212
15a
3
Tanks
13
ge sa 11
to
20
Pas
y
nle
10 1
to
Sta
Sta
ER S ELL
W
W
(a)
SOMERS TOWN
83 to 114
24 12
20 8
53 55 49 51
33 35
29 31
2 3 4
5 6
25 27
29 37 45
45 47
14 2
38 46
32 40 48
30
36 44
41 43
28
26 34 42
37 39
7 15 23
7
2 to 58
16e 15e 16a
Tunnel
20.1m
Tanks
YORK WAY 18.3m
17a 19
BM
RS EL LE
17
e18.73m
ag
RT 1
U CO
Cla
to
e nc
112
1
43
309
BM 24.87m
Tanks
Tanks
ss Pa
11
ey
gs 1
to
Bui
10
ldin
Sta nl
nley Sta
Pa
(a)
117 to
45
35 to 33
553
17 19
83 to 114
31 39 47
25 33 41
27 35 43
20 12
5 13 21
115 to 138
1 9 17
3 11 19
17 9 13 5
11 9 5
7
Tunnel
200
202
204
206
208
210
3
212
Tunnel
DW
1
ag
119
113
36 1 to 55
53
51
49
47
43
41
39
35
29
71 6
25
1 to
21 23
57 59
209 to 240
1 9
BM 24.87m DW
1
1 to 4
117
to
113
43 37
re
111
55
4
149 to 119
41 39
SOMERS TOWN
41 39
35 to 33
40 41 42
83
to 55
9
181
12
1 to
101 45 43 37
17 1 to
19
7 40 41 42
121
113 109 111 107 105 101 103
109 111
56
56
61 63
24 12
20 8
53 55 49 51
45 47
14 2
38 46
32 40 48
30
41 43
36 44
26 34 42
28
17
33 35 29 31
2 3
4
5
25 27
21 23
6
7 8
17 19
13 15
19
19
311
17 9
37 39
31 39 47
29 37 45 27 35 43
25 33 41
7 15 23
5 13 21
20 12
13 5
1
103 101
72 to 37
26 17 1 to
31
36
19
39
5
1
1
1
1
9
7
37 38
36 37 38
39
5
119
149
to 13
12
7
103
36
11
4 to
121
102
12
Viad
30
28
30
27
OSE CL
RS PE
RE A
13
9
31
11
4 to
1 to
11
1
127
125
123
Tunnel
OSE CL
RS PE
75
CAMDEN TOWN
27
2
12
28 27
16
24
26
10
18 15
38
18
CAMDEN TOWN
1 to
24 to 13
5 24
72
97
85c
75
65
27
WAY
24
2 12
16
1
3
WAY
ROSSENDALE
ROSSENDALE
10
11
14
11
14
26
109 85b 85
85b
9
40
40
1 to
36
1
37
143
135
123
106
1
3
13
14
31 to 1t
39 to 54 7 to 18
27 28
Junction
244 204 to 104 to 170
19
55 to 70 19 to 30
3
244 204 to 104 to 170
39 40
19
102
11
31 to 1t
70 a
4
14
12
13
6
102
110 a
102 a
56 to 154
94 a
11
78 a
7
4
13
70 a
11 11 12
18
DW
7
6
78 a 11
11
94 a
12
20
102 a
56 to 154
DW
1
ja Poo 1
Co Poo ja
5a
15
38
12 1 to
9
to
19 to 63
1
23
119
79
3
1917
to
1
1 to
34
to
15
to
4 1 to 14 9 to
21
32
20
28
4 1 to 14 9 to
21
32
79
109
REA
99 15
87
15
117
1 to
1917
23
34
85c
to
46
42
68
97
26
135 141
74
75
15
50
75
13
5
52
72
7
117
54
65
26
6
87
11
11
141
127
20
27
20 21
113 109 125 111 107
to
to
1
3
137 139
137 139
1
56
42
5
1 to
123 105
BM
93
135
30 31
101
ss
81
50
68
146
103
to
27
35
to
to
91
74
148
99
18.73m
83
RACE
1
160
81
12
79
62
3
148
146
11
30 31
15
39
to
39
52 6
85
9
62
72
29
73
28
181
8 to
9
76
19 to 63
28
36
75
18
75
18
1 to
36
1 to36
1
to
1 to
36
1 to36
1
to
2
76 48
e
17
17
1
to
to
1 to
9
69
1 to
12
12
TERR ACE
24
24
16
1 to
well
1 to
Northi
90
AC
m
RE ST
92
22.62
PL
28
24
1 to
161
94
BM
Chads
Croft
DY
14
(Univ
30
3
1 to
30
Policy EN55, Appendix EN3
The references above are for guidance and are not intended to be an exhaustive list of all policies relevant to a particular location. The majority of policies in the UDP apply throughout the whole of the Borough.
LCSP, Exel and their development partner Argent St George will be developing the major part of the railway lands remaining after the CTRL works have been completed, including the Triangle. currently to as ‘King's Cross Central’ >The development LCSP, Exelisand their referred development partner Argent St George will and it isbelikely to take place over the period 2007-2018. Initial remaining after developing the major part of the railway lands applications are expected in early 2004; the CTRL works have been completed, including the Triangle. h Hou dwic 75 San to
D
y Hall Parr Lond hes y of Hug ersit
net Tha
51
42
Court
sfield
Great
eld
Hollisfi
ST.
EET
Mullet
21.55m
ST
BM
EE
80
17
to
19 to
RE
UA
FLA XM AN
1
48
160
7
56
to
81
93
5
66
133
91
3
35
24
to
83
TER
1 to
181
81
25
62
Pep
AM
TON
74
Surgery House
21.2m 1 to
1 to
10
s
to
Bond
18
24
69
79 16
1 to
to
15
18
3
48
161
1
31
32
56
1
73
160
Court
26 26
1 to
66
to
1 to 58
46
FLA XM AN
The references above are for guidance and are not intended to be an of Speciallocation. The majority exhaustive list of all policies relevant Site to a particular of policies in the UDP apply throughout the whole of the Borough. Scientific Interest
eld
1 to
Loxham House
rton s Tanke House 20
LOXH
House
23.04m
ings
REET
BM
Edward
1 to
32
35
to
54 41
18
28
31 26
31
31 133
47
1 to
58
56
29
39
1 to
29
27
531
1 to
27
47
69
Rail Safeguarding Chapter 17
Metropolitan Open Land Policy EN46, Appendix EN3
eld
Kellet
10
70
Build
1 to
SP
DD JU
EET NE STR
1 to
House
1 80
Posts
18
25
37
30 to 38 to
67
Scientific Interest Policy EN55, Appendix EN3
20.7m
28
23
26
25
37
75 48 to61
75
65
Transport Proposal Site Chapter 17
en
Sandfi
Bedefi
Club
ER TANK
s
34
borne
1 to
House
18
1 to
21
23
30 to
to
109 111
T14
Gatesd
D
26
1 to
Whid
pe House
ST HOPE
IDBOR
Midho
ood Charlw
WH
MID
11 to
5
se
Heather
1 to
19
21
29
15 38 to
51
1 to
1
St Pete
Hou
88
White
ER STR
22.1m
House
Po
1 to
17
15
19
62
49
18
13
17
15
8 to 1 to 39
48 to61 47
1 to
FOR
ET
9
Fleetfield
18
11
13
to
15
1
11
62
144
29
20 21
16
1 to 39 9
345
337
9
12
9
2
15
7
11
7
1 5 57
339
335
333
321
ET
31
13
RE
25
1 to
11
19
15
26
15
34
16
71
321
19
6
13
12
29
1 to
319
14
Manston
26
1
to
69
291
345
337
21
67
297
285
339
335
333
331
15
65
291
8
19
17 13
12
11
1
12
34
57
297
285
to
to
to
31
283
11 2
22
19
17 13
to
26
29
83
281
2
2
25
to
277
7
319 14
ot
Dep
RE
ens
SEA
RE
el
90
ds House
24
49
1 to
41
8
20
16
1
20
1 to
283
331
AD
e
2
10
277
281
Hous
19
und
UA
Gard
Playgro
are
ST
SQ
D
Squ
ST
Jess
to
CROM
Moatlan
98
Fleetway
24
1 to
RE UA
37
E
YL
Croft
ET STRE
18 1
96
18
to
1
Open Space and Conservation Site of Nature Special 10
ARGYLE SQUARE
Argyle Walk
68
Cross Holy Church
352
E YL
HEA
le
SQ
Great
E
ld
ARG
GE
Gly
Bdy Ward CR
100
eer Pion
13
1 to
PH
47
Metropolitan Open Land Policy EN46, Appendix EN3
EN
Argy
27
YL
RID
108
18
Cromer
Riverfleet
24
62
Land Use Proposal Site Chapter 17
RK
Pep
field
ARG
Hollisfie
7
Mullets
ST
ool Sch
m
yle
ary
24
Arg
TONB
1 to
Northia
ell
Prim
112
102
108
RO INN
Riverside
BI
ARG
Posts
Cross age Holy Vicar
Chadsw
114
106
350
ET 24
7
en
19
HAM
10
EET
116
28
81
348
RE
Gatesd
1 to
20.7m
EET
STR
HAR
37
364
ST
1 to
ET
LOX
ST.
52
35
’S AY GR
D
TCB
358
7
HEA
RE
ET
RISON 45
362
5
EN
ld
ld Sandfie
21.55m
1 to
PH
Ferris House
CH
356
4
RK
1a
3
BI
ST
Bedefie
Club
VE
RE
6
Lucas House
’S AD
5
Posts
RE
1 to
ST
LB
TCBs
UA E SQ
10
Willin
360
2
RO
10
34
BM
1 to
1 to
e House
Houses
STR HOPE
TON KER
Houses
1 to
26
Loxham House
Kellet
11 to
ton Tanker s House 20
ood Charlw
MID
13
TAN
’S
AD
366
1
1
LG
7
se Hou
CH
Playground
6
ridge Tonb es Hous
YL ARG
ST
8
Po
ET RE
BE
ARGYLE SQUARE
ST
k Ban
74
ST
21.2m
ss Cro sion ’s Mis King ist
Met
5
k
hire
Der
Surgery House
Bond
A CH ST g House
TCBs
16.2m
ET
RE ST
5
Rail Safeguarding Chapter 17
King’s Cross Thameslink Station
370
1
Fleetfield hod
24
use Ho
Ban
25
E
49
IELD
ve gro Bel
UAR
118
A TH
120
13
10
59 58
59
58
10
1a
1a
1
35
29
34
30
27
1
42
295
343
E
SQ
TF ET ES RE CR
19
ST
PO
Transport Proposal Site Strategic View - Background T14 Chapter 17 Consultation Area Policies EN43, 45
275
38
38
6
289
287
e
AD
1
8
10 8
Hous
RO
5
275
1
2
10
E ROAD
er
AD
10
2a
26
26a
352
Pione
and
HE
E
und
ens
1
28
3
8
10
30
350
INN
ay
berl thum el Hot
EN
Gard
UAR
Playgro
GYL
re Squa
SQ
le
5
1
2
38
2
376
GP
15.4m
13
Nor
Subw
RK
AR
E
Argy
1
2a
5
1 to 32
3
3
41
25 22
to
1
144
7
41 to
67
20 21
5
RE
67
3
48
65
57 to 63
1
41 to
65
57 to 63
53
16
5 to
1
1
UA
47 to 51
36
25 to
6
6
SQ
45
36
25 to
4
5 to
120
110
EY
39 to 43
120
74 to 68 to 83 77
53
22 16
49 to 55
47 to 51
24
1 to
4
124
49
KL
37
1 to
124
49
110
19
OA
35
40
348
BI
GYL
Crossge Holy Vicara
E
14
18
ST PANCRAS
1 to
SQ
16
42
364
378
380
264
266 to 270
ot
Dep
13
AR
AD S RO
90
17
AC
m
TCBs
114
116
Bank 272 to 276
PENTONVILL
16.2m
368
Fleetway
24
2
PH
44
358
King’s Cross
7
RA
1 to
18 bys
8
120
46
362
ay Subw
92
22.62
PL
rough e BidboHous
n
69
N STO
EU
70
Club
356
ET
EET
94
e
erso And rett ital Gar Hosp
71
Tonbridge
22.1m
Riverfleet
1 to
to
1
Edward
Tonbridge Houses
100
10
360
1
NC PA
RE
ST
23.04m
BM
DY
75
Hous
ses
Open Space and Nature Conservation
PH
278
280
284 282
288 286
292 290
294 to 300
304 302
16.2m
Riverside
TCBs
80
ting
FB
TCBs
ET
BM
E STR
ET se RE n Hou ST Norther DD Great JU
EE
80
to
beth
rge
(PH) 14
8 to
Geo
Eliza
al
s Hou
Willin
16.1m
BM 16.59m
Police Office
1
15.9m
201
Has
24.5m
12
5
RE
IELD
Midhop
ngs
1 to
SP
52
se
wich
Hou
(Univ
Sand
y Hall Parr Lond hes of Hug ersity
40
105
A CH
Primary Retail Frontage Policy SH7
Proposals
Policies EN43, 45
OMEGA PLACE
18
ST
TF
5 70
Buildi
1 to
orne Whidb
Bdy Ward CR
House
48
22 20
ES
AD
ET
IDBORN
se
et Than
51
42
38
19 to
16
45
23
49 to 55
39 to 43
24
27 37
47
53
65
84 to 87
21
11
13 67
30
37
1
22
19
21
5
27 19
37 29
47
53 65
27 to
35
2 to 8
203
21
10
to
(odd)
(odd) 101 to 105
101 to 105
20
BALFE STREET
24
7
CR
HE
RE
WH
Hou
Heather
9m
24
16.5m
’S AY
5
EN
ay 37
ool Sch
yle
ary
Arg
Prim
ST
el
88
White
Works
GR
4
and
RK
1a
3
BI
Subw
E GYL
Jess
108
to
16
Roy
TCB
366
2
berl hum l Hote
AR
112
28
18
18
ST PANCRAS
1 to
to
106
27
26
289
287
1
Nort
ET
27
114
20
74
73
PH
ET
Hou
18
to
1
ST PANCRAS EET STR
22.1m
Qu
se
lair
Sinc
343
RE
19
EET
116
90
MER CRO
ds House Moatlan
5
17.8
30
42
295
ST
13
STR
18 to
1
96
PH
Cross Holy dra Church
RE
24
Argyle Walk
ge
ST
7
Rai
PH
El Sub Sta
y
und
AD
68
98
TCB
E
lwa
9m
gro
xan Ale ons nsi een Ma
to
17.4
Un
CALEDONIA STREET
PH
ST g House
TCBs
CH
ST
1 to
Neighbourhood Shopping and Service Centre Policies SH3, SH9
Primary Retail Frontage Policy SH7
Strategic View - Background Strategic View - Wider Land Use Proposal Site Consultation Area Chapter 17 Setting Consultation Area Policies EN43, 45
17.2m
6
2
VE
7
BM
47
han
GS IN
PH
GP
16.2m
ET
RE
ST
’S
AD
5
KING’S CROSS
24 to 1 16.7m
RO
35
81
UAR SQ
LE
17.2m
der
House
Exc
eph
Tel
264
15.4m
King’s Cross Thameslink Station
(Terminus)
GY
way Sub Vent
Ancient Monument Appendix EN2
Proposals
BM
32 FB
8
10
Bank
King’s Cross Station Posts
AR
Pipe
45
ON
37
Cromer
53
ST HA
(a)
D Fn
District Shopping and Service Centre Policies SH3, SH6, SH8
Policies SH3, SH9
Strategic View - Wider Strategic View Setting Consultation Area Viewing Corridor Policies EN43, 45 Policies EN43, 44
32
2 FB
GP
8
Archaeological PriorityNeighbourhood Area Shopping Policy EN41 and Service Centre
44
34
10
12
163
2
222 to 249 57 to 81
54
34b
26
26a
18
RO
52
18
22
22
35 29
34 30
27
60
4
22
22 16
21
11 13
19
67
129 to 135 137 to 151
23
44
to
60
to
29
6
5
1
1
ns
7 8
1
RE
57 to 81
1
11 13 15
47 49 51
53 55 57
8
29
50
50 129 to 135 137 to 151
29 45
11 13 15
47 49 51
53 55 57
107 109 111
50
5
8
1
1
107 109 111
132 to 137
139 to 153
29
132 to 137
139 to 153
UA
3
12 10
44
to
SQ
4
1 to 55 (odd)
1 to 55 (odd)
1
1 to 10
29 60
to
45
KL EY
3
249 to 261
222 to 249
2a
6
1 to 10
OA
249 to 261
2 to 6a
E
211 to 247
8
ns
2
1
1 to 4
e Garde
1 14
12
y Squar
08
1 to 4
110 a
156
2b
5a
13
186 188
Broadstone
18
200 202
1 to 32
CAMLEY STREET
20
158 160
172 174
Manston
CAMLEY STREET
19
156
6 14 22
6
121
12 5 13 21
5
39 to 54 7 to 18
4 12 20
1
19 3 11 19
20
2a
2 to 6a
121
27 28
18 10 2
22
2b
8
1 to 4 1 to 4
39 40
24
DW
17 9 1
15
28
9
12
109
55 to 70 19 to 30
8
186 188
DW
7
16
7
158 160
Broadstone
200 202
109
172 174
6 14 22
1
5 13 21
143
4 12 20
135
3 11 19
20
123
18 10 2
22
85
17 9 1
24
85
7 15
28
50
8
E
22
8
AR
to
16
7
Oakle
2
4
74 to 68 to 83 77
43
211 to 247
6
5
4
8
26
6
8
CRINAN STREET
to
12 10
Battlebridge Basin
e Garde
28
14
3
22
08
Bollards
40
36 to 40
42
28
22 20
1
266 to 270
Major Shopping and Service Centre Policies SH3, SH4, SH5, SH8
MID-RISE URBAN BLOCKS
2
57
7
Community Centre
1
44
30
1 El Sub Sta
ALBION YARD
13
ST
PH
100
102
108
LB
Posts
Gardens
46
38
24
Bank
ST
EU
l
106
TCB
M
370
ST PANCRAS
TCBs
Ferris House
ET
ST
Tiber Gardens
Tiber
60 to 108
54 to
14
57 59
21
27.2m
53 55
6 to
5
51
53
49
27 to
45 47
9
67
3
8
Brydon Walk
48
9m
D1
PH
1
Met
GP
RE
’S
Lucas House
RE
20.0m
Strategic View Viewing Corridor Policies EN43, 44
36 to 26
42 to 50
2 to 8
64 to
1
7
41 43
52
10
28
6
60
20
23 to
Walk
BALFE STREET
1 2227 to 5 to to 26 30
170
4 5
37 39
64
32
57
3
4
Campbell
44
54 to
170
2
3
33 35
68
S Gantry
21
1
2
54
S Gantry
26
LG
1 to
GE
24
114
H UG
ton mil Ha House
s Cros ion ’s Miss King ist hod
ET
se Hou
CH
n Hal Tow
TCBs
116
22.4m
PH
>
RAILWAY STREET
17.8
30
203
28.5m
1
29 31
Station
32
to
8 16 24
(disused)
Road
34
163
13 to 24
43 6 14 22
70 to 78
York
34b
28
2
2
4 12 20
2
80
4
36 to 40
16.3m
se Hou
BE
ers
RID
Chamb
26
to
4
6
8
idge s Tonbr House
PH
120
one
T2
Hot
Great Northern Hotel
LB
DBO
Mabledon Court
rn
el
ve gro Bel
Bank
TONB
ROAD
28
16
R
E RE
ST
ST
Figure 1.1 Extract from Camden Adopted UDP Proposals Map
Flaxman House
10 18
6
42 to 50
ay
St Pancras
30
Club
se
22.2m
se
n Hou
erto Som
82 to 96
8
52
Subw
MIDLAND
118
ET
32
Tonbridge
22.1m
21.4m
ergr Und
25 27
Battlebridge Basin
60
2b
ay
Subw
120
se
ses
PH
h Hou
RO
Nor
the
18.2m
BI Clifton House
124
22.4m
re
ST
RO
bor
AD
ON ST EU
at
PO
6
Tonbridge Houses
100
Clif
TCBs
376
m
AD S RO
n Hou
ther
rough BidboHouse
34
ET
36
RE
1 to 30
32
se Hou
378
380
16.85
RA
t Nor Grea
RE
ST
106
19.5m
Bid
160
Gre
TCBs
Playground
ings
24.5m
24
15.9m
2
Hast
The British Library TCB
20.7m
PCs
ay Railw
to
64
BM
ay Subw
NC
rs
ST
44
ET
ton
118
17.2m
20
PA
Chambe
N
ON
ur House Seymo
to
Y CHWA D
nd grou Play
26
RE UA SQ
27
122
ound
156
21 23
Posts
Bollards
68
30
ST PANCRAS
St Pancras
ROAD MIDLAND
TO
46
ALT
Hou
RE
ST
GS IN
oug
FT
130 132
126
Community Centre
Station
(disused)
Road
70 to 78
York
30
2b
D D ROA
use
54
CH
ULS
Ho
239
to
OSS
ita
48
1 to
Lev
56
Hou
King’s Cross
Ancient Monument Appendix EN2
District Shopping and Service Centre Policies SH3, SH6, SH8
Gatt’s Yd
38
WHARFDALE ROAD
PH
Posts
BM 21.8m
105
32 to 24 to 31
8 to 15
PH
LB BM
272 to 276
Green Chain Missing Link EN47
134
Gardens
80
CRINAN STREET
to
m 16.85
MIDLAN
Box
ET
58
lair
FB
100
to
7
BM 19.65m
ROAD PENTONVILLE16.9m
16.2m
Club
16.7m
ST PANCRAS
74
73
PH
ST HA
se
Sinc
to
STREET
142 Tiber Gardens
Tiber
60 to 108
3
21
BM
Signal
RE
16
1 to 30
69
ON
e
to
ge
Exc
one
eph
Tel
e
Pa
W
Post
Plac
53
278
19.8m
ag
eir’s
LB
16 to 23
1 to
Battlebridge Court
48
368
PH
dra xan ns Ale nsio en Ma Que
20.0m
TCB
M
Gatti’s Wharf
PH
OMEGA PLACE
278 280
284 282
288 286
292 290
294 to 300
304 302
16.2m
TCBs
King’s Cross Station
T7
y
lwa
Rai
nd
RO
ON
han
Hou
ss
Mabledon Court
ET RE ST
London Canal Museum
16.5m
King’s Cross Station
16.1m
BM 16.59m
(Terminus)
rou
ST
18
ST
34
CHUR
36
T
EU
70
N
URG
TO
BO
EL M
CO
Figure 1.1 Extract from Camden Adopted UDP Proposals Map
l
n Hal Tow
The British Library
H
ORO
Works
GP
(Terminus)
ay SubwVent Pipe
m 17.49
AD
UG
RO
AD
St Pancras Station
BM
Policy EN41
Pontoon
Bollards
7
PH
PH
Police Office
El Sub Sta
N
20
38
71
EE
AC
EY
T8
AD
se Hou
KING’S CROSS CALEDONIA STREET
Car Park
16.2m
(a)
GP
PH
PL
Fire Station
2
FB
TO
22
42
ON
82 to 96
20
se
24
62
House
TCBs
44
STR
ph
to
ris
6
GRA
Playground
22
AD
(PH)
The Depot
KING’S CROSS
ULS
12
k Hou
26
am
n
46
er
5
22.9m
ter
1
30
to
74 to 64 28
Winsh
erso And ett ital Garr Hosp
OLT SH
Flaxman House
1a
E
Shel
el
Derb
n ilto se HamHou
22.2m
PH
Ch 1 to
TCBs
Air Shaft
40 48
144
126
Tunnel
SM
ST PANCRAS
SM
1
stoc
239
60
beth
El Sub Sta
DELHI STREET
57 59
130 132
30
38 to 48
OSS
Had
62
Eliza
56
s age
erto
Som
on Graft bers Cham
24.0m
Statue
Hot
Great Northern Hotel
erg
se
gh
se
80
Playground
h
n
Und
DB
orou
ria Victo (PH)
se
n Hou
32
27.2m
53 55
134
ET
to
SE
D
53
66
Cott
ER EV
ille
ge
14
Nev
8 to
1 to
4
RE 21
CLO
D ROA
1 to 30
40
h
l Geor (PH)
Edit
Roya
Hou
ey
lesl Wel
26
T2
ther
BM 21.8m
BI
Bidb
21.4m
1 to
se Hou
RO
ks
Waterside Inn
Warehouse
19.3m
PH
Nor
5m 19.9
32
76
38
Lion b Lam and (PH)
70
Clifton House
PCs
122 124
ay Railw
on
ALBION YARD
16.9m
CH EN
(Terminus)
The British Library 19.5m
Clift
30 38 46
51
142
ST
.25
Box
MIDLAN
ne
LE
84
Signal
to
SM
IL
74
s La
EV
er
N
BM
34
ET
36
RE
20.7m
28 36 44
49
144
Y
MP
90 92
op
8
ST
1 to 30
118
17 19
Vibart Walk
45 47
Brydon Walk
41 43
DELHI STREET
LE
88 86
t Cour
1 to
se
44
ve
ro
22
rch
26 34 42
Walk
37 39
WAY
Campbell
9
M
Co
nix Phoe
Hou
84
N
Y
to
E
T
RE
RE ST
Chu
Tan
at
PH
to
2 FB
FB
(Terminus)
yshi
TCBs
1 El Sub Sta
King’s Cross Station
The British Library
18.7m
100
Brydon Walk
33 35
8
CA
SM
SM
ET STRE
ita
1 to
Lev
86
46
TO
WA
16
ST
R
NG
NCI
S Gantry
ET
FB
rt Cou
46
e
ET 88
AL
CH
r House
RCH
Seymou
72
22.4m
ET
LA
S Gantry
4
RE
to
SE
54
nG
32
ON
ST
EU
22.2m
e
TCBs
36 to 26
The Depot
(Terminus)
Works
Unde
AD RO
160
ings
17.2m
Pa
eir’s
Hous (PH)
D1
St Pancras Station
W
Towne
7
Posts
ST
Post
e
Build
oss
Warehouse
Gatt’s Yd
38
S Bridge
RAILWAY STREET
16
to
250 to 278
Ice Wharf
PH
Culr
Posts
AS
ss
Posts
Plac
PH
nd
se Hou
Bank
43
1a
er
Post
13
37 to 40
EU
rgrou to
CR
Gre
18.2m
278
13 15
YORK
7
ET
ST
Tunnel
38 to 48
1
HE RE
ols’ to 90 48 92 Scho ment re 56Cent Treat 94
do
House
en
am
1 to 30
ar
1
to
76
26
N
EE
ST
Euston Station
to
5
ph
ris
s
Flat
156
ton Eus
Playground
ch
1 to
to
RO
IDGE
Major Shopping and Service Centre Policies SH3, SH4, SH5, SH8
Conservation Area Archaeological PriorityPolicy Area EN31 - 37
201 to 220
32 to 24 to 31
8 to 15
PH
32
N
Club
18.7m
ag
39
ur
rs Some e Coffe
way
41
to
Ch
Sta
12a
30
AD
rd
RE
ST
Y
AD
ne
RC
ST
58
96
Cl
d roun Playg
78
ent Reg se Hou to 8
(PH)
80
ur Arth
TO
EL
G
STR
UR
SOMERS TOWN
M
BO
N GTO
CO
DIN
er Shelt
Sub
4a
to
AY
RO
Bolla
Y
LE
LE
RO
84
PU
N
98
se Hou 35 lton 1 to
ce
82
AR
TCBs
6 El
14
12
PA
SL
SL
T7
Canal KING’S CROSS Regent’s Canal
WHARFDALE ROAD
Posts
16.7 2m
SL
se
Cha
34
Prin
CHU
36
ET
38
RE
1 to
W
AD
BM
D Fn
19.8m
HAVELOCK
39 43 47 40 44 48
29 31
28.5m
6
RF
M
M
AS
to
Clyd
TO 12
k Hou 100
42
ria Victo (PH)
Posts
7
RO
Car Park
(Terminus)
El Sub Sta
Works
Fire Station
BA
EY
BR
LE
TT
EN
16.3m
62
44
ST
1 to
EAnne’s ACSt
C
RI
DO
CH
St Pancras Station
Sta
16 to 23
1 to
SL
Green Chain Missing Link EN47
EN47
Local Services
Heritage
Conservation Area Policy EN31 - 37
Towing Path
Gatti’s Wharf
Battlebridge Court
BM 19.65m
PH
Route
Green Chain and Corridor EN47
Shopping and Conservation and Heritage Conservation Local and Services Shopping and
Grand Union
El Sub Sta
SL
4
1 to
AD KING’S CROSS
T8
Canal Regent’s Canal
Albert Wharf
London Canal Museum
16
ST PANCRAS
The British Library
Playground
35
n Grafto bers Cham
PL
N TO
AF
40
to
ings
Warehouse
St Pancras Station
The British Library
Playground
Ch
se y Hou lesle to 80 1 Wel Flat s
GR
13
Build
ss
16.2m
28
to
74
46
Ma ry’s
38 42 46
8 16 24
37 41 45
6 14 22
m
5
HA
Path
CA
CA
.25
CR
MP
N
74
s La
8m 18.7
ACE
PL
BR
1
stoc
to
OLT
St
22.9m
LB
Culro
Grand Union
Signal Box
48
19.3m
Centre
Posts
Trough
18.7m
ty
munie ComCentr
ULS
64
56
ages
Winsh
Cott
ET
RE
ST
Chur
ler Whee ns Garde
4 12 20
2
10 18
29.85
25 27
BM
4
Vibart Walk
W
al n Can al Can
ET
IDG
LB
22
Maiden Lane
Ice WharfBridge
21.8m
Car Park
Housing Density Boundaries HG10
Bollards
16.8m
s
18.7m
El
Sub
Battle Bridge
9m
21.5
26
RO
AD
Tank
se
Hou in 54 erla 1 to
mb
Flats
180
TCBs
Cha
1 to 36
St Joseph’s
ds
Bollar
Unio ent’s and G Reg
RE
90 92
er
32
N
17.1m
Hall
TCBs
11
174 172
21 23
3
AD
12
rd
ST
88 86
op
E N E LA S RS CLO PE LE O IL CO NEV
Co
PA
CR AS
BM
9
32
30 38 46
2
RO Bolla
Y
SM
OSS
Had
lle
SOMERS TOWN
N
GTO
NC
LA
e 1 Hous 8 ch to
AD
Warehouse
Camden Town Special Policy Area Policy CT1 - 4
Pontoon
22.5m
Culros
Post
16.5m
ILL
Chamberlain House
CRESCENT
RE
7
28 36 44
17 19
1
RF
LE M
16
Track
2m
SL
SL
5
13 15
Brydon Walk
CK STREET HAVELO
11
to 178
9
176
40 44 48
ras Panc Lock
HA
Path
CA
Squar
to
8
3
7
39 43 47
St
l
W
20.3m
Oakley
24
9
1
5
37 41 45
38 42 46
er Wheel s Garden
Y K WA
m 25.33
ds
Bollar
n Cana l Unio Cana nt’s and G Rege
PA
1 to
AR
40
3
40 48
YOR
BM
12
1m
18.4
32
Cycle
t Cour
53
Nevi
IN
Depot
ET
9 to 16 St Mary’s Ho
ST
SL
BM
to
E
nix Phoe
1 to
60
Edith
ET
AY
G
24.3m
90
17
N LA
84 to 87
to
1
26 34 42
174 172
Path
as Pancr Lock
AD
RS
53
30
m
to 178
29.85m
ing Tow
St
RO
PE
23 to
2
STREET
Hopper
30.64
176
BM
25.33m
ing
AS
O
28 86
House (PH)
Post
DRUMMOND IN
Air Shaft
Some Coffee
43
62
57
88
W
C
to
66
Lion Lamb and (PH)
to
RE
SH
ER
se Hou
RI
se Hou
RO
IX
Town
D Fn
40
13 to 24
29.28m
KE STREET
BM
Hopper
m
30.64
BM
Slop
CR N
CO
m
46
14
EV
dale Rye
DO
Prim
Brereton
Bank
Statue
19.95
to
27
21
ST
118
RC
ton Eus Cotts
OEN
rs
Posts
way
41
ch
SOMERS TOWN
LB
Depot
E
16.7
SL
BM
to
37
to
8
ur
4a
Flat
Ann
round
42 44
2
PEMBROKE
BM
29.28m
30.9m
BM
Path
20.3m
PA
8
76
22
e
113 114
ov
15
5 to
se
12a
to
se Hou
’ sius ool Aloy Sch St ary
40
e’s
12
TCBs
32
m 18.78
18.7m
PL
59
84
106 108
n Gr
27
35
12a
St Aloysius RC Church
PH
19.8m
AY
BM
37 to 40
86
to
46
105 107
do
to
22
ery Nurs Day to 39
Ch
Maria Fidelis Convent School
Sta
Sub
St Aloysius’ Convent 30 to s 14 1 to
St
21.5m
Hall
AC
BM
17.2m
19.5m
TCB
98 100
37
en
ar
Hou
12
90
El
s
Playg
46 48
80 to 108
80 to 108
PEMBRO
BM
31.6m
30.9m
ing Tow
1m 23.6
1m
18.4
1 to
88
97 99
Cl
Tave(PH)
RO
IX
OEN
PH
Flat
21.8m
Hotel
31.6m
Tunnel
BM
BM
ET
90
90 92
1 to
ne’s
70
59
’s ard Rich
1 to
St
ET
1 to 36
20.7m
Mar y’s
The Cock rn
LB
SW OD
s Hall Culros
19.4m Playground
Posts
AD
CRESCENT
St
TCBs Joseph’s Flats
St
Sta
(PH)
s Hall
E RO 20.1m
16.5m
17.1m
s
24.5m
Waterside Inn
4
1 to
0
BR
LE
18.7m
se Hou 35 lton 1 to
91
usti
72
RE
8
22.2m
T
110 to 162
186
AD
102
m
90
27 to
22
194
F RO AR WH
AD F RO
23.0
ing
67
to
110 to 162
186
to
Gantry
AR
Tunnel
ET Slop
64 to
14
194
188
Signal
WH 104
ET
RE
1 to
28
to
75
Gantry
ST
rt
Cou
46
e
6 to
to
188
41
41
19 24
RY to
92
El
SL
GO
23.2m
PlayGroun
El Sub Sta
Garden
201 to 220
Centre
Housing Density Boundaries HG10
250 to 278
22.9m
LB
19.2m
se
1
Bollard
Battle Bridge
AD
Tiber
TCBs
Warehouse
Towing Path
Car Park
Pond
Sts
TT
SM
BM
29
WB
21.8m g Path al Towin Can on Uni El Sub Sta al nd ’s Can Gra ent Reg
Signal Box
BM 25.00m
BA
Warehouse Trough
CLO
York Way Court 24.2m
24.44m
WB
El Sub Sta
24.6m
Pond
Playground
Oakshott Court
N TO NG
Aug
1
ST
76
1
to
Ho ’s 11 Joan1 to
N
E PD
Kate Greenaway Nursery School
274 to 293
s
Towing Path
Metropolitan Walk EN47
Metropolitan Walk Potential Connection or Alternative Metropolitan Walk Potential Connection or Alternative Route EN47
Posts
PH
BM
Canal Regent’s Canal
Posts
116
El Sub Sta
PlayGroun
El Sub Sta
Albert Wharf 22.5m
22.9m
El Sub Sta
Depot
90
Policy LC10
Playg
Library
Shelter
Grand Union
DW
AY
Pond
9m
(Terminus)
Walker House Sub
Cha
89
RI
St
78
ent Reg se Hou to 8
118
rd’s e Richa Hous
(PH)
80
St
ur Arth
OLT
ce
82
Prin
SH
ER W
ER
130
se Hou
EV
ARD 40
24
ry
75
200
46
y Factor
181
Y WA
47
181
16 21
RE Y ST MLE
1
Clyd
TreatCentr 94
88
87
130
SOMERS TOWN
Depot
9 to 16 St Mary’s Ho
17
St
ols’ Scho mente
96
86
88
dale Rye
4m
Cotts
Hou rlainto 54
mbe
SW
S Bridge
16.8m 114
SM
Playground
Canal KING’S CROSS Regent’s Canal
25.2m
Regent’s Canal Open Space Regent’s Canal Open Space Appendix EN3, RC8 Appendix EN3, RC8
Area for Green Chain and Corridor Community Regeneration Area for EN47 Policy LC10 Community Regeneration
1 to 11
Towing Path
OD
21.5
BM 20.80m
0
49
SM
15
11 13
9
Grand Union
24.3m
GO
BM
Play Area
Hall
TCBs
42 44
40
200
Facto
224
46
RK YO
202 to
Y WA
47
171
ROAD
20
CA
T
98
21
22.3
Sta
Cou
4 1 to 14 9 to
24.0m
EE
PH
51 to 82
Naish Court
Posts
Garden
Air Shaft
Maiden Lane Bridge
24.5m
BM 25.00m
180
20.8m
112
47
51
SE
Court
Chamberlain House
151
Post
SOMERS 36 TOWN rt
to
hott Oaks
Playground
46 48
to
224
LANE
171
RK YO
Walk
6
Walk
Walk
WHARF
15
Signal
se Hou
to
8
ET RE
BM
Sub
28
D Fn
60
6
52
163
52
163
Linkwood
LANE OADFIELD
OADFIELD
53
Walk
202 to
Elm Friars
Linkwood
53
Walk
Walk
Elm Friars
Bowmore
Rosebank
Walk
Tunnel
14
8
D ROA des
100
15
46
5 to
ET RE
se
118
ST
to
s Hou
90
57
62 64
48 50 52
ol
M HA
ILL
BR
ET
to
27
82
Prim
DRUMMOND
Brereton
Play Area
El Sub Sta
85
7880
ound
TR
N LANE
RESCENTN LANE
Rosebank
SM
WHARF
il Rho Cec
86
Tiber
TCBs
LB
110
104 102 106 108
53
19.2m
Cha
Transfer
17.2m
71
73
RE
to
37
84
21.8m
23.8m
York Way Court
Station
77
75
Monica Shaw
to
Waste
17.7m
93
87
79
3
19.5m
TCB
40
ery
77 7981
Scho
91 89
85
81
5
19.4m
LY
Nurs
Day
63
’
32
unity e
19.8m
PO
Maria Fidelis Convent School 60
59 St Aloysius’ Convent 61
47 49 51
St ary
RC
Garage
Hotel
16
1
22
113 114
AD 83
PH
Euston Station
Depot
1 to
2
106 108
RO
OEN
St Augustine’s sius House Aloy
PH PH
Euston Station
STREERS M SE SO O CL
27
ST
to
N
14
Prim
59
ard’ Rich
TO
1 to
St
12a
El
t’s gare se Mar Hou
St Aloysius
n’s e RC Church Marti Hous
21.5m
SE HE
to
46
105 107
to
22
12
NG
1 to
RI
138
se RC Hou ol sius ne’s Scho TOWN Aloy usti SOMERS ary St
Aug
ET
N TO NG
146
RE ST
ER
St
RI
W
ER W
118
rd’s Richa Sta House Sub
El
St
150
OLT
Ho ’s 11 8 Joan1 to 1 to
St
Tave(PH)
43
20.7m
CE 83
59
AD RO D IXROA OENN PHGO
The Cock rn
LB
20.9m
IX
S
Monica Shaw
ST
37
79
154
SH
St
St
Club
PLA
SM
IE
N TO
98 100
77
th
You
SOMERS TOWN
ras Panc ol StTCBsScho y and ary Mar E Prim of C
SM
142 144 146 148
20.4m
26
21.1m
9m
97 99
75
ER
130
EV
use
d Woo e Hous
Day e Centr
21.4
ET
Oakshott Court
St
29
Comm Centr
90 92
RE
116
EN
9 to
8991
ST
t Cour
hott
17
oodGarage se
Hill-W Hou
9 to
3
88
ET
RE
ET
ST
RE
N
36
4 1 to 14 9 to
St Mary’s Church
Day Centre
87
ST
BM
Flats
to
Oaks
LS SU OS
86
N
82
33
ael’s
M HA EN ALD
114
SM
CH
Hall
Walker House
85
7880
60 621 64 to
Mich
St
SE
PD
Edith Neville Primary School
AD
151
PH 130
TO NG
67
130
Ho
School
Euston Station
EE
RC
17
134
69
65
RI
m
lt
ST
M
34
ER
22.34
160
ho
ers
162
Ev
ET
RE
s ony’ AnthFlats 84 83
St
48 50 52
28
Hou
PU
16
to to
40
Adventure Playground
23.8m
TR
NA GRA
Track
ET
18 19
RE
W 47 49 51
73
Cycle
1
79
’
E RE ST
3
RO
N
El Sub Sta
77 7981
59 61 63
47
olas Nich Flats
21.7m
T
102
N TO G
ST
2
29 130
se Hou
77
GO
Sts
32
N
ex Suss
16
LY
112
The Doreen Bazell Hall
CLO
EN
HA
47 49
Place
Lawrence
Delhi Street
Library
Camden Town Special Policy Area Policy CT1 - 4
Playgr
COPENHAGEN STREET
24.2m
WB
Natural Park
110
104 102 106 108
53 51
SM
40
to
ate
se
Hou
18
Est
1 to
land
wn To
1 to
St
Playg
BM 27.18m
274 to 293
WB
g Path al Towin Can on al Uni nd s Can Gra ent’ Reg
138 23.2m
18.4m
The Chenies
3
ET
RE
to
9
ET RE
Sports Centre
Bollard
Park
17.7m
71
SM
Court
235
PO
Towing Path
Natural
Playground
5
31
GTO
30
IN
ET
18
RE
17
8
26 21.2m
20.9m
Hardwick House
h
to
ST
16
1 to
35
ST
se
Hou
Depot
FB
17
14
N
ARR
134
ON
cis’
St Augustine’s House
se
26
am
M HA EN ALD
FB
NRY
S E
41
CH
40
104
ALT
don ren
Mor
BM
Sub Sta
El
Ald
10
ER M SO OS CL
ET
18 19
RE
CH
1 to
ras her’s 32 Panc ol stop 1 to St Scho and aryChri St MaryE Prim of C
PH
Depot
PE
ST
42 43 44
N
45 46
ins Coll ol iam y Scho
158
Cla
rs
174
RC ol sius Scho SOMERSAloy TOWN ary to 36 se St Prim 1 Hou
St
8
s aret’ e MargHous
PH
1 to
IN
31
to
TO
me
138
So
Chri
1 to
enh
LD O
30
147
Club 37
Fran
St
Sts
St Pancra Church Old
73
5
ST
ATT
PL
El Sub Sta
24.1m
25.2m
Pond
Pond
2
4
6
8
Towing Path
El Sub Sta
Pond
20.8m
BM 20.80m
77
75
20.4m
se Hou
her’s se stopHou
32
St
BP
Kate Greenaway Nursery School
DW
20.1m
93 87
85
79
PH
21.1m
ET
th
You
se
rge’s
21.6m
Transfer
Station
PLACE
OUTRAM
Playground
25.4m
Shelter
24.6m
s
142 144 146 148
91 89
83 81
1
7
11 13
17
Edith Neville 19 18 Primary School
South Camden
21.49
RE
22
Hou
Geo
E AC
PL
S IE
9
Will ndar Sir Seco
NG
to
seSt Martin House
Hou
G
18
53 54
34
RI
Sta
1
St
Wo
T
40
e
to
ER
St
The Doreen Bazell Hall
EN CH
Community School
1 to45
’s
18
19
5
9
43
d Woo e Hous
1 to
lcot
EE
14
29
Hous
75
1 to
DE
AL
Hill
Playgr
104
m 23.61
se Hou
STR
61 63 62 64 65
ET
ex Suss
m
40
BM
ST
STEW G
ID AM BR NH
103
71
ETY REA
ael’s Mich
St
to
Playground
PH
BM
Depot
Shelter
Adventure Playground
m
1 to
Flats
73
21.7m
t
AnthFlats
St
1 to 33
47
W
Sub
7m 23.1
Hill
ood e
22.1m
12
kfoo
10
TO NG
to
RE
22.21
35
BM
ST
ET
El
ET
RE
School
Day Centre
Hardwick House
Bec
12
eck ckb Sto
235
Posts
Hill-W Hous Day Centre
ore
1 to 1 to
PE
RI
N TO
103
ony’s
T
1 to
The Chenies
Post
Sports Centre
1 to45
e Hous
olas’ Nich Flats
St
des
N
S EW ET M RE Y ST IT N UN NRY
AR
AL
CH 146
RE
4
BM
Mic
24
73
12
kled
ns Colli ol y Scho
to
ST
ate
146
186
1 to
to
EE
ST
St Mary’s Church
PH
3
9
Air Shaft
Air Shaft
24.44m
26.1m
Waste Transfer Natural Park Station
ET
1
7
11
Waste
King’s Cross Opportunity Area 90 Chapter 13
Playgro
24.1m
PCs
18.4m
TO
41
CH
am
119
69
Est
150
m
Alde
AM NH
Hou
DE
AL
22.6m
1 to
32
ses Hou
to
13
RE ST RN REET BU ST ED T M PLAT 13
17
St Pancras Gardens
Post
CRESCENT
9
7
8
19 18
Community School
21.7m
21.2m
e
Hous
18.6m
G
ET
IN LD
S
O
42 43 44
Willi ndar Sir Seco
to
67
se
n Tow
Hou
36
on
188
use
154
Ho
192 190
foot
Geor
STR
tune Nep (PH)
Hou
se
18
n
12
37
cis’
Fran
St
Waste Transfer Station
D Fn Playground
The Gardener’s Cottage
TCBs
51 to 82
Naish Court
FB
Depot
Natural Park
Park
Monument
G
EW
ON
RE
6
Sts
maso nry
Natural
272
St Pancras Church Old
Hosp ital
King’s Cross Opportunity Area Chapter 13
LB
33
24.2m
138
21.6m
20.0m
Shelter
Panc
il Rho Cec
M
m
9
65
1 to
end
H
se
26
nha 1 to
dwi
Gla
22.1m
1 to
Beck
PH 1 to
e
gh 40 er’s 32 er’s e 33 to nlei toph 1 to toph Hous Cra Chris Chris St
IG
1 to
Mick
12 k kbec Stoc
1 to
ST
AY
22
32
St
se
Hou
Y R WA
BM
Y
22.21
1 to
163 8 184
102 to 110 97 to 105
Clar
18
secot Wol Hou
26
n
10
IT
BM
to 159 to 180 16
to
N
se1 to
Hou
18
olt re
1
LE
1 to
1 to
nso
23.0m
UN
45 46
104
TO NG
1 to
land
160
rsh 12
ledo
St
25
AN
ses
Joh
ET
RE
71
1 to
ge’s
CR
12
ok
8
ET
RE
37 to 48
Track
42
INGT
19
53 54
158
RI Mor
162
Eve 1 to
1 to
GEW
ID
BR
17
nd grou Play
rs
174
to
2
ST
Cycle
61 63 62 64 65
to
ER me So
m
23.17
Bro
ET
49 to 56
se
147 103
BM
5
Hou
22
RE
er Shelt
24
St
ras
LD
South Camden
21.7m
FB 94 to 96 116 to 118
26.1m
Natural Park
uary
PCs
FB Post
GO
PH
School
Hous
Hou
PH
9
33
Y
ET
1 to
ehou Ston
146
se
18
win
3
FB
to
Posts
3
114
63
AR
RE
tock
24
to
186
1 to
Glad
to
24
19 24
to
AN
20.6m
37 to 48
1 to
Cals
119
se
15
to
ses
115
to
111
73
Hou
22.6m
23.2m
32
93
ET
Mayford 103
W
188
192 190
26
1 to
to
h Hou leig
40
Cran
RE
une 92 to Nept (PH) 88
nson Joh
15
49
GR
m
E
ET
102 to 110 97 to 105
to
ST
Y ST
21.51
Track
AC
24
land
E ST
Cycle
1 to
Hart
EG
RE
163 to 184 159 to 180
4
Bro
H
MLE
BM
49 to 56
LL
ock
24
n
ST NN MDE
to
15
FB
13
CR
1 to
er Shelt
Calst
ET
L CO
RE
YA
22
ingto
1 to
E PL
CA
1
23.2m
ses
CA
20.6m
EG
r
ET
17 25
IG
LE
AN CR
12
ok
1 to
15
El Sub Sta
FB
21.5m
maso
Gardens
St Pancras Gardens
Post Goldington Crescent Gardens
21.7m
PH
164 to 179
33
nd grou Play
to
Hou
22
16
24
LL
se
Dart
24
ehou
1 to
Shelte
RE
115
to
79 15
24
1 to
1 to
RO
m
CO
E Ston
ST NN MDE CA
80
5
to
Games Court
Car Park
M
Games Court
94 to 96 116 to 118
FB
111
to
to
E ST EGLydford
21.51
27
r
Shelte
The Gardener’s Cottage
18.6m
ENT
9
8
ON
21.7m
FB
93
en l Geff enta nis Den ronm exe Envi th Ann Heal
20.0m
St Pancras
D Fn
80 LT
Slipway
SM
Hosp ital
TCBs
BM 19.28m
ST T RN EE STR EDBU
7
6
A CH
28.5m
11 13
Posts
25.2m
British Waterways St Pancras Yacht Basin
St Pancras Coroner’s Court
ras
Post
20.3m 13
School
Place
Lawrence
1 to 11
Depot
FB
British Waterways St Pancras Yacht Basin
nry
272
Panc
CRESC Trough
Crowndale Court
Court
St Pancras Coroner’s Court
Monument
Games Court
164 to 179
Tunnel
65
1
CR
BM
and Hartl
1 to
n
lyn AC
22
ngto
1 to
New
E PL
LL
EG
LL
8
ton Kings e Hous
1 to
42
to 59
1
ew’s Matth e Lodg
Mayford
CEDA
16 21
31
24
CO Darti
8
ton e Norbi Hous
1 to
CH
Games Court
St
Goldington Court
TCBs
20.3m
FB
Playgr
Posts
24.2m
l for s pita ase Hos l Dise pica Tro
21.5m
ary
Posts
33 25
LB
33
25.2m
Mort
(PH)
2 to 22
LB
ST
N
PH
FB
29 21
COPENHAGEN STREET
Gardens
20.2m
TO
25.4m
El Sub Sta
FB
GO College Arms LD CAMDEN TOWN INGT ON
PH
2 to 2
2 to 22
Car Park
n Geffe is ental xe Denn onm Envir th Anne Heal
2
4
6
8
Oblique Bridge
St Pancras
Warehouse
El Sub Sta
Goldington Crescent Gardens
to 59
1
Crowndale Court
AL
Air Shaft
BM 24.93m
Mortu
WB
Post
26
25.4m
Oblique Bridge 23.6m
3 to 24 82
36a
T
Delhi Street BM 27.18m
BM 24.93m
El Sub Sta
64 80
36e
36 Playgro 28
Playground
Posts
STREE
PLACE
OUTRAM
Playground
El Sub Sta
Slipway
Other Public and
217
Other Public and Private Open Space Private Open Space Policy EN48, Appendix EN3 Policy EN48, Appendix EN3
Area of Special Character Metropolitan Walk Area of Special Character Chapter 15 EN47 Chapter 15
50 66
58 74
Garage
FB
FB Driving Range
25.4m
Chy
FB
90
Garage
29.8m
Posts
33 25
29 21
BP
LBs
l for pita ases Hos Dise ical Trop
St Pancras Hospital
E
AC
PL
E COLLEG
1 to 114
92
20
17 to
1 to
24
ord
8
on Kingst House
1 to
L CO YA ROerton
Dulv
1 to
Lydf
be
lyn
27
24
1 to
scom
1 to
Bran
New
8
Sta
on Norbit House
1 to
Sub
Theatre
46
to
El Sub Sta
al
m
BM 19.28m
Trough
Calsto
28.5m
Can
22.7 Chy
ELL
3 to 24
FB
Lt Twr
Driving Range
El Sub Sta
St Pancras Hospital
88
8
47
rd
n
El
El
Godwin
ion
al
AD
’S RO
(London
RAND
64 80
82
to
t
23
elfo
1 to
Cam
24
erto
1 to
Dulv
be
TCBs
24 ck
1 to
Sub Sta
1 to 20
21.4m
Un Can
SM
Goldington Court
E
TCBs
Court
21.0m
FB
87
d
24
scom
Sta
1 to
Sub
Bran
Cran
22.7m
Warehouse
College Arms
44
The Lodge
81 to
23
El
broo
14
65 to 87
1 to
mon Beau als Anim ital Hosp
elfor Cam
15
AC
e
Men’s
nd
Adventure Playground
City
50 66
58 74
90
T
26.3m
Gra
21.8m
24
1 to
land Hart
30.3m FB
28
30.3m
36 28
Playground
Posts
STREE
Tank
90
Path
Central London Local Areas Chapter 14 217
47
14
16
29.8m
El Sub Sta
tal
20.2m
1 to 114
Godwin
Colleg
ng
ing
al
’s
WB
L’S
DEL RAN
36a
Lt Twr
T9
26.3m
Can
Central London Covent Garden Local Areas Chapter 14
Policy EN62
El Sub Sta
Paget n Centre Christia Mission)
Garage
Conveyor
ent
RAS WAY ST PANC
6
ks 21.0m
Worki
28
Conveyor
T9
Reg
ROAD DALE Helston CROWN ET RE The Lodge
ion
Ancient Woodland Policy EN62
47
Playground 18 20 26
22 24
ROAD
36e
Conveyor
El Sub Sta
CAMDEN TOWN (PH)
LB
Bingfield Park
Adventure Playground Depot Playground
(London
Chy
2 to 22
2 to 2
8
Covent Garden
7
30.2m
Bingfield Park
El Sub Sta 14
16
City
Depot
LBs
Beaum Hospi als
El Sub Sta
64
5
7
Paget Centre Christian Mission)
30.3m
Warehouse
Sorting Office 23.6m
RAS WAY
t mon Beau als Anim ital Hosp
72
Wor
ont
PH
Posts
Bingfield Park
5
Depot
Sta Sub
El
Conveyor
e
Anim
PL
EGE
COLL
7
k
Sub
27.0m
El Sub Sta
2 to 22
26
1
Sta
Tank
Tow
ST PANC
22
6
15
24 ck Calsto
1 to
e rival
Mer
WB
El
Un Can
al
yal Ro ary erin e leg Vet Col
TCBs
Sub 1Sta
21.4m
57 to 63
58
s
and
Theatre
to
17 to 31
to
22
82
72
Work
El 21
14
24
ET
E 8
1 to 20
46
10
RE
90
82
AC
7
Cran
6
58
PL
23.1m
ROAD ALE Helston CROWND Workin
8
13
to
90
GE LE
al Roy ary erin e leg Col
Vet
24
1 to
Hartl
k broo
14
16
14
E ST
24
100
E AC PL
Hall
1
2
8 to
EG
GE
ET
LE
7
den Cam ios Stud
ivale Merr
en 44 ool
6
LL
100
RE 10
21
Y
15
14
L CO YA
E ST EG
LL rake
STREET
to
16
8 to
RO
L CO YA
Chy
64
Playground
30.2m
Silo
WB
WB
WB
BM 27.94m
Garage
90
Reg
’s
Sta
Sub
El
Anima
(Upper)
29.3m
PH
Posts
Silo
WB
Silo
WB
WB
ov
21.8m
Land
9
1
16
r
RO
23.1m
24.0m
BM 24.21m
137
3
31
20
Shelte
8
1 to
17 to
to
r
Shelte
12 1 to Court er Plend
Boys School
Posts
Silo WB
Silo
WB
47
18
86 7
to
20
to ont al Beaum Hospit ls
TCB
7
33
to
60
BM 24.21m
8
York House
LB
RC Secondary
Warehouse
Tank
Depot
WB WB Silo
Warehouse
Jubilee Waterside Centre
Path
ent
Gr
ge
(Upper)
Bingfield Park
30.3m
nd
lle Co
St William of York
Posts
27.4m WB
Central London Area Ancient Woodland Chapter 14
Central London Area Chapter 14
TAYPORT
RE
m 28.9
GIF
Playground
WB WB
BM 27.94m Depot
Gra
Warehouse
Boys School
29.3m
Tank
27.0m
Sorting Office
42 41
Warehouse
ST
RD FO
100
Depot
Tank
63
18
86
24.0m
1 to
ing
WB
Sta
Sub
El
Warehouse
RC Secondary
29.9m
Conveyor
29.1m
ET
90
TAYPORT
St William of York
Tank
Conveyor
1
Warehouse
23.9m
8
York House
41
LB
n l
Tow
Warehouse
e
29.1m
28.9m
29.9m Hoppers
29.66m
BM
64
29.66m
BM
ET
RE ST
D OR
FF
GI
22 24
4
5
21.7m
12 1 to Court r
Depot 29.0m
29.0m
Tank
27.4m
R WA
CEDA
Depot
12
Jubilee Waterside Centre 21.7m
ov Gr
ge
Depot
Depot
27.5m
Hoppers
LEGEND
64
78
29.1m
78
Kings Cross Freight and Freightliner Terminal
Tank
LEGEND
Viadu
ct 29.1m
SL
to
to
1
5
WB
lle
TCB
Colleg
Viadu
BM 30.60m
Depot
Depot
CLOSE
49
60
12
Warehouse
Warehouse
Co
Plende
den Cam ios Stud
114
79
S
AN
M
GH
OU
PL
Warehouse
24.1m
23.9m
g Men’s
Warehouse
ct
Warehouse
Y
113 to 127
4
CLOSE
to
A
M
GH
PL
22
21.5m
65
NS
OU
21.5m
24.1m
89 to 111
87
4
81 to
W AY
22
8
33 to 55
113 to 127
AS
4
ew’s Matth Lodge
Works
18 20 26
5
24
CR
AY
CE
81
12
5
N
W
Lion en Gold (PH)
e
Community Centre
27.5m
Y
WEAVERS WAY R WA DA
89 to 111
12
AS
El Sub Sta
26
26
65 to 87
l
33 to 55
na
81
tre Cen
23.5m
40
40
cial
tre l Cen rcia
mer
63 El Sub Sta
97
WEAVERS WAY
s Ca
n Lion Golde (PH)
n l
Community Centre Allensbury Place
Kings Cross Freight and Freightliner Terminal
28
97
ge nt’
Posts
57 to 63
Com
me Com 63
22
28
Re
38
PA
Warehouse
2
1
232 to 246
R WA CEDA
22
Path
na
al
ST
101 99
Ca
Wharf
Can
105
18
Tow ing
ion
Star
’s
22.2m
216 to 230
2
1
166
Posts
17 to 31
Un
l
ent
24
200 to 214
184 to 198
160 to
DRIVE
232 to 246
1 to 15
d
Reg
CR
216 to 230
BARKER
ET
an
Path
al
N
101 99
Can
38
PA
Close
105
cras Pan
cras Pan
St
St
Tow ing
ion
Star Wharf
ney
DW
168 to 182
200 to 214
184 to 198
166
Blake
18
1 to 15
8
8
7
Un
ST
168 to 182 160 to
BARKER DRIVE
STRE
6
6
7
Gr nd
22.2m
10
Close
WEAVERS WAY
4
42
S
ney
S
115
4
Blake
WEAVERS WAY
4
2
M EW
10
115
2
2
42
GH OLT
4
CAMLEY
44
44
BER
2
CAMLEY
144 to 158
120 to 142
34 34
M EW
DW
4
BE RG HO LT
Gra
en ool
Place
Allensbury
SL
SM
144 to 158
120 to 142
8
Prat Wha t rf
Pratt Wha rf
Hall
Playground
196
BM 30.60m
10
(PH)
10
VA
YA RO
LE
VA
13
Works
196
100
4
Gray’s Inn Bridge
137
Beamish Gate
29
to
25
L
29
to
Warehouse
Constitution
42
L
YA RO
LE
2
8
(PH)
7
25
32.6m
13
2
10
gor arf
rake
Playground
Gantry
6 4
90
Constitution
Land
Beamish Gate
Warehouse
Gray’s Inn Bridge
1 to
Gantry
SL
CLO SE
gor arf
23.5m
32.6m
Tunnel
SE
Tunnel
El Sub Sta
6
4
SL
W
CLO
Walk
El Sub Sta Playing Court
SM
Court
CH VIE W
Playing Court
SM
FB
St James Gate
masonry
2
St James Gate
masonry
2
120
Young Family Centre
SP Caulfield
CH VIE
Walk
Sloping
FB
S Gantry
SP
Court
BM 27.86m
Bowmore
Frampton
Sloping
S Gantry 120
Young Family Centre
1 to 12
Broadstone
Walk
Frampton
1 to 5
BM 27.86m
1 to 12
128
Abbotsbury
128
Posts
Broadstone
1 to 5
E
1
1 to 137
Lulworth
SL
SL
Abbotsbury
RESCENT
Lulworth
ngbank
1 to 137
54a
54a
Caulfield
SL
SL
1
Sturminster
AC
Posts
56
SP
(PH)
SP
Sturminster
1 to 9
Sherborne
1 to 9
PL
58
5
WROTHAM ROAD
en Camd Arms
LB
WROTHAM ROAD
E AC PL
3
1
E
OV
Sherborne
5
3
1
56
(PH) Court
GR
AR
136
LB
58
dento 9 Cam 1 ArmsLinton
27.7m
E
OV
9 1 to n Linto Court
136
GR
AR
AR AG
27.7m
DW
28.4m
AG
28.4m
AR AG
rt
DW
rt
AG Cou
ngbank
Cou
Co
St Pancras Station extension
30
Model and illustration of St Pancras Station extension Model and illustration of
ROYAL COLLEGE OF ART
>
ADS 5
The St in Pancras 2007; International and Domestic Station, CTRL site restoration and landscaping be completedstation >infrastructure, The King’s Cross-St Pancras LondonwillUnderground in 2007; upgrade, with two new ticket halls, entrances and public realm The King’s Cross-St Pancras London Underground station improvements, will be completed by 2007; upgrade, with two new ticket halls, entrances and public realm > P&O Developments have started the redevelopment of the four improvements, will be completed by 2007; blocks immediately to the of King’s Cross referred P&O Developments have started theeast redevelopment of the Station, four to as ‘Regent’s Quarter’. The development should be complete blocks immediately to the east of King’s Cross Station, referred by 2007;Quarter’. The development should be complete to as ‘Regent’s >by 2007; The restoration of St Pancras Chambers, with proposals for hotel The restoration of St Pancras proposals hotel works. and residential uses, Chambers, by 2007-8,with alongside theforCTRL and residential uses, are by 2007-8, the CTRL works. 2004; Applications likely toalongside be submitted in Spring Applications are likely to be submitted in Spring 2004;
>
The development is currently referred to as ‘King's Cross Central’ and it is likely to take place over the period 2007-2018. Initial applications are expected in early 2004;
4
6
11
Figure 3: An aerial view of the illustrative KXC masterplan.
12 MID-RISE URBAN BLOCKS
2 EXISTING CONDITION
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
13
ADS 5 ROYAL COLLEGE OF ART
BACKGROUND
This submission for R5 North comprises the North, West and East Blocks of Plot R5. The North Block ranges from 8 to 16 storeys in height; the West Block is 8 storeys; and the East Block is 2 storeys (all including ground floors). When complete, the four buildings making up R5 North and R5 South will be linked at ground floor level to create a complete urban block footprint. The accommodation within R5 North comprises: • 63 GNSR residential apartments, including 21 larger three bed units, at levels 1 to 7 of the North Block; • 40 Shared Ownership residential apartments at levels 8 to 15 of the North Block; • 40 Extra Care residential apartments with associated communal facilities at levels 1 to 7 of the West Block; • 1 Open Market apartment at level 1 of the East Block; • 5 Commercial units at ground floor (capable of sub-division) totalling 675sqm and providing for a variety of use classes • Associated amenity, plant, refuse and cycle storage
14
CUB
ITT
PAR
K
CUB
ITT
PAS
SAG
E
MID-RISE URBAN BLOCKS
2.0 EXISTING CONDITION
12
EAST LANE GARDEN
ADS 5
2.0 EXISTING CONDITION
ROYAL COLLEGE OF ART
DESIGN SUMMARY
Site
Lower: Site plan for Kings Cross R5 by Maccreanor Lavington
Kings Cross R5
MID-RISE URBAN BLOCKS
Plot R5 is located in Development Zone R, which sits on the northeastern edge of the broader KXC masterplan. R5 North will form an interface with the existing buildings on York Way and mark an important entry point into the site, with the masterplan’s primary green open space and north-south route (Cubitt Park) running along the western side of the West and North Blocks. R5 North is bound by very different environments on its four sides: • York Way, forming the northern boundary to the site, is an existing busy vehicular route • Cubitt Park and North Square: To the west of Plot R5, a succession of routes and spaces are proposed from north to south, namely, North Square, Cubitt Passage and Cubitt Park • East Street, forming the eastern edge to Plot R5, will be a new street within the KXC site. When complete, it will be a no through road for vehicles (with the exception of emergency vehicles), terminating just beyond R5 South where it meets the Zone R Garden.
Constructions Completed 2 no. disabled parking bays for residents and visitors
On-going Constructions
N
40
15
Figure 41: Plan showing temporary location of visitor parking bays to the West Block and the disabled bays along York Way
Fenman House
ADS 5 ROYAL COLLEGE OF ART
Massing The plot has set out its own aims whilst designing the blocks Public Realm: Maintaining a clear hierarchy yet connections to the major streets and public spaces surrounding zone R
16
MID-RISE URBAN BLOCKS
Built Form, Character and Identity: A relationship with the townscape that is not only visual - the height and form of the buildings - as well as functional - the nonobstruction of daylight to not only the apartments but also the streets Residential Environment: Creating communal spaces that are liveable for the residents among the blocks themselves. Internally, the overall massing accommodates the provision of outdoor spaces from cut-outs, compensating such with the heightened towers that reach the allowed maximum heights, and creating openings towards the South so natural daylight could reach the courtyard.
ADS 5
1.3
1.3
Massing Massing and Townscape and Townscape
ROYAL COLLEGE OF ART
Scheme Scheme Description Description
The Outline The Permission Planningand Permission associated associated Plans Parameter Plans 16 storey tower 16 storey is positioned tower ison positioned North onBlock, the witha pair aBlock, further with a further The size of Helping to create a continuous strong facade alongPlanning the Outline Taller elementsand areParameter carefully positioned to look past each The massing of the the North Block of R5 North forms on York perimeter of the R-Zone. other and the other local tall buildings. Way withelement R4, the location the tallon element a described indescribed Section 1.1inarticulate Section 1.1 the articulate concept of thea concept consistent of aand consistent courtyard to 16 and storey tower 16 storey element tower envisaged on envisaged theofSouth Block the setting South whenupBlock this when this regular rhythm of tall elements along York Way. legible public legible face to public the edge face of to the Development edge of the Development Zones, with Zones, a with a is brought forward is brought in due forward course. in due Thecourse. tall element The tall on the element Northon the for North housing. Figure 8: Diagrams showing how the R5 massing works with the local massing and townscape theless rigid less rigidof approach internal approach to each internal Zone.toThe each design Zone.for The R5design North for R5Block Northis positioned corners, ope Block isoff-centre positionedtowards off-centre the towards north-eastern the north-eastern corner, corner, KXC masterplan, R5 is shown front centre.
MID-RISE URBAN BLOCKS
respects these respects parameters these along parameters its twoalong edges itsfacing two edges York Way facing York Way places which which it centrally places between it centrally S5 between (which isS5 permitted (which isuppermitted to family up to of thr and Cubitt Park, and Cubitt while Park, at thewhile sameattime the reacting same time to the reacting likelyto the alikely a maximum a height maximum of 84m height AOD),ofand 84mthe AOD), 16 storey and the element 16 storey of R4 element(all of linked R4 geometry and geometry massingand of its massing neighbours, of its neighbours, in particularinBuildings particular Buildings (74m AOD). This (74msets AOD). up This a cluster sets of uptall a cluster buildings of tall along buildings York Way along York program. Way R2, R4 (both R2, approved), R4 (bothR3 approved), and S5. R3 and S5. and providesand theprovides North Block the tower North with Blocka tower bright,with southerly a bright, aspect southerly aspect A smaller 2 overlooking overlooking the R5 courtyard. the R5 courtyard. The maximum The allowable maximum height allowable of development height of development for Plot R5 is for set Plot out R5 is set out courtyard, in Parameterin Plan Parameter KXC014.Plan This KXC014. plan permits This plan a maximum permits height a maximum of height of The shoulder The level shoulder of 12 storeys level ofestablished 12 storeys established by R2 and R4 bysteps R2 and R4asteps deliberate 78.5m AOD in78.5m the north AOD of inthe theR5 north site,ofreducing the R5 site, to 77.0m reducing AODtoin77.0m the AODdown in theto 8 storeys down to on8the storeys Northonand theWest North Blocks and West of R5,Blocks offering of R5, offering street. south. The proposed south. The heights proposed for R5 heights Northfor areR5 below North these are below levels thesealevels more modest a more but urban modestscale but urban to Cubitt scale Park. to Cubitt The heights Park. The on R5 heights on R5 A colonnade with the tallest with element, the tallest the element, 16 storeythe North 16 storey Block North tower, Block at 77.9m tower, at North 77.9m were North carefully were considered carefully in considered order thatinthe order tall that elements the tall elements between the AOD and theAOD West and Block theat West 54.1m Block AOD. at 54.1m AOD. are perceived are as perceived “towers” as and“towers” the lower and elements the loweraselements “urban as “urban floor is acti blocks”, withblocks”, the tower with having the tower morehaving of an object more character of an object and character the and the The emerging The buildings emerging within buildings Development within Development Zone R haveZone tended R have tended units and a shoulders being shoulders part ofbeing a perimeter part of3)block aTowers perimeter context. block context. R5 Footprint is extruded to a 30m to incorporate 1) East facade 2) Cuts introduced to allow introduced to relate to to a incorporate variety of forms, a variety typically of forms, with typically a lowerwith shoulder a lower shoulder an urban bl A courtyard formed by a a pair on York cut away to allow light into additional light into the courtyard and surrounding building heights and The massing ofdatum. the North Block-of R5 forms and level of taller a series elements of taller positioned elementson positioned each building. on each With the location With for the the location towerfor element the tower on long R5 element North on identified, R5 North the identified, façade: the An ‘o perimeter block 16m - does not level theand courtyard and adjacent reducebuilding. overlooking. facilitate views. Way with R4, the location of of the tall element setting upaa series allow sufficient light into the central R4 plot. Thissize is exemplified This is is by exemplified the approved the Building approved R4 Building and thecreate R4 current public spac remaining volume remaining was volume developed wastodeveloped optimise indoor to optimise and outdoor indoor and outdoor of Plot TheR5 size of such Plot that R5 by itisrequires such thata itcut requires out to acurrent cutand out a the to create a storey is positioned tower is onpositioned the North on Block, the North with aBlock, further with a The further regular rhythm of tall elements along York Way. space. proposals forone proposals R5side, North. for R5 taller North. elements The taller areelements carefully are placed carefully into the bloc spaces spaces foruse. residential use. courtyard to courtyard leaving to The one a side, reasonable leaving adepth reasonable ‘C’ shape depth block ‘C’ shapeplaced block for residential element storey tower envisaged element onenvisaged the South on Block the when Souththis Block when this Figure 9: The stages of design development for R5 Building as a whole. to respect proximity, to maximize proximity, maximize and aspect reinforce and key reinforce views key views uses are de housing. Cuts forrespect housing. are made Cuts through areaspect made the remaining through the ‘C’remaining shape at the ‘C’ shape at the ard brought in due forward course. in due The course. tall element Theon tallthe element North on thefor North and public spaces and public at ground spaces level. atthe ground In thesunlight level. casetoof In R5 thedefining North, case ofthe R5 North, thea corners, opening corners, up the opening courtyard up to more courtyard more and sunlight aand defining ned ck is off-centre positioned towards off-centre the north-eastern towards the north-eastern corner, corner, family family majorofbuildings; three major thebuildings; North, South the and North, West South Blocks and West Blocks ich centrally placesbetween it centrally S5 (which between is S5 permitted (which up is permitted to up toof three (alloflinked (all linked floor), at ground each containing floor), each a different containing part a different of R5’s part of R5’s maximum ght of 84mheight AOD),of and 84m theAOD), 16 storey and the element 16 storey of R4element R4 at ground program. program. m sets AOD). up aThis cluster setsofuptall a cluster buildings of tall along buildings York Way along York Way edNorth provides Block thetower Northwith Block a bright, tower with southerly a bright, aspect southerly aspect A smaller 2 storey A smaller East 2Block storey is East placed Block on the is placed eastern onside the of eastern the side of the erlooking R5 courtyard. the R5 courtyard. courtyard, activating courtyard, theactivating frontage the to East frontage Streettoand Eastproviding Street and providing a steps deliberate a contrast deliberate in scale contrast within in scale the smaller within space the smaller of thisspace of this vel e shoulder of 12 storeys level of established 12 storeysby established R2 and R4by steps R2 and R4 wn ys on to 8 the storeys North on and the West North Blocks and of West R5,Blocks offering of R5, offering street. street. more but urban modest scale butto urban Cubitt scale Park. toThe Cubitt heights Park.on The R5heights on R5 A colonnade isAwrapped colonnade internally is wrapped around internally the courtyard around the to mediate courtyard to mediate efully rth were considered carefullyinconsidered order that in theorder tall elements that the tall elements between the human between and the building human scales. and building Streetscales. frontage Street at ground frontage at ground easperceived “towers” and as “towers” the lower andelements the lower as elements “urban as “urban floor is activated floorall is around activated theallblock around by the entrances, block by commercial entrances, commercial cks”, towerwith having the tower more of having an object morecharacter of an object andcharacter the and the units and a special units and façade a special treatment. façade The treatment. identity of The R5identity North as of R5 North as oulders part of being a perimeter part ofblock a perimeter context.block context. an urban block an is urban articulated block isbyarticulated the use of by twothe different use of two types different of types of façade: façade: face’ An wrapping ‘outside face’ around wrapping the block around addressing the block alladdressing all nthfor thethe location tower element for the tower on R5element North identified, on R5 North theidentified, the An ‘outside o allow 3) Towers - introduced to relate4)toThe East Block 4) The - added East Block to provide - added to provide 5) Courtyard Garden 5) Courtyard - a canopy Garden - a canopy 6) Street frontage 6) Street - animates frontage the- animates the public spaces, public and aspaces, lighter type and aoflighter façadetype to all ofelevations façade to all facing elevations facing me maining was developed volume was to developed optimise indoor to optimise and outdoor indoor and outdoor he courtyard and surrounding building heights and a deliberate contrast a deliberate in scale contrast and ain scale and a introduces a human introduces scalea to human the scale to the plot’s plinth. plot’s plinth. aces entialfor use. residential use. into the block. into This the treatment block. This andtreatment the arrangement and the arrangement of ground floor of ground floor facilitate long views. human moment. human moment. space. space. uses are described uses are in more described detailinlater more in detail this section. later in this section.
ription
n - a canopy scale to the
Floorplan and Configuration of Uses As stated previously, the various residential tenures are distributed The proposals for R5 North provide a total of 14,237sqm (GEA, across the three blocks, with GNSR and Shared Ownership being excluding plant, refuse and infrastructure elements as per Table located in the North Block between 1st to 7th floors and 8th to 15th 1 and Annex B of the Outline Planning Permission) of mainly floors, respectively. The Extra Care facility is accommodated at residential accommodation. Overall, 144 units are proposed, of 1st to 7th floor level of the West Block, whilst a single Open Market which 21 are family sized 3 bedroomed units. As stated above, unit occupies the 1st floor of the East Block. The arrangement of the blocks also provide 5 commercial units at street level as these tenures is illustrated in Figure 12 below and is described well as extensive communal areas, amenity space and servicing infacades further detail in relation to the building entrances, cores and facilities, as shown in Figure 10. describes ‘Internal’ and 7)‘External’ ‘Internal’ and ‘External’ facades 6) Street frontage 6) Street - animates frontage the - animates the The following7)section amenity spaces in the following pages. the configuration of these uses, their relationship to each other plot’s plinth. plot’s plinth. and the public ream.
Site boundary
King’s Cross Central King’s Cross UrbanCentral Design Urban ReportDesign R5 North Report 15 R5 North 15
Listed buildings Commercial unit Residential entrance Communal courtyard with openings to street Commercial street frontage Commercial unit with street frontage Residential entrance
Brown roof
Shared Ownership Tenure
Communal terrace
tion of entrances for the various Private terrace Figure 12: Diagrams indicating the distribution of tenures and amenity spaces throughout R5 North
ute
Cubitt Park Residential entrance Commercial unit Commercial street frontage Major vehicular route
Social Rent Tenure
17
Green roof Extra Care Tenure
ADS 5 ROYAL COLLEGE OF ART
Programme
MID-RISE URBAN BLOCKS
The facades of the development are designed as a continuous streetscape facing the major traffic - two main streets North and East of the property, and becoming the backdrop of the green space in the West. The proposals for R5 North provide a total of 14,237sqm of mainly residential accommodation. Overall, 144 units are proposed, of which 21 are family sized 3 bedroomed units.
1.3 Scheme Description
The various residential tenures are distributed across the three blocks, with GNSR and Shared Ownership being located in the North Block between 1st to 7th floors and 8th to 15th floors, respectively. The Extra Care facility is accommodated at 1st to Courtyard 7th floor level of the West A central courtyard of approximately 560sqm ope Block, whilst a single Open main residential entrances to the North and We Market unit occupies the courtyard will provide private amenity space fo 1st floor ofisthe East Block. although it anticipated that the GNSR tenants are
primary users due to the availability of other am
18
Terraces are located onCare residents. This Shared Ownership and Extra the heart the proposals, being surrounding on the 1st offloor and 8th component blocksaccessible of R5, and is intended be the floor, providing residents can meet and outdoor spaces - interact the in a safe, peacef The space will also specifically provide for ‘unde courtyard flanked by the play. building blocks are situated Allprovide blocks will overlook the space, although additio to communal living be all created by the location of the cycle stores at gro for the residents as well North Block and theentrance. openings in the eastern colon as better sunlight
provide glimpses out onto East Street (and vice ver
Figure 16: Illustrative sketch of one of the 1st floor roof terraces
The design of the courtyard will include a colon perimeter providing a unifying element and hum larger residential blocks. The colonnade will b structure; the thin leading edges and cross-m colonnade construction contrasting with the heavy surrounding buildings. The underside of the colonn
ADS 5 ROYAL COLLEGE OF ART
Area schedule with gross internal floor area of each floor.
Residential (including circulation spaces)
Alternative Uses
Offices
Utility Elements
Total
Ground
223
599
76
746
1644
1
1493
1493
2
1413
1413
3
1413
1413
4
1413
1413
5
1413
1413
6
1413
1413
7
1413
1413
8
421
421
9
421
421
10
421
421
11
421
421
12
421
421
13
421
421
14
421
421
15
421
421
MID-RISE URBAN BLOCKS
Floor
14,983
19
20 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
DRAWINGS
Ground Floor
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
First Floor
21
22
2nd - 7th Floors
MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
8th - 15th Floors
23
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 24
“Kings Cross R5 North” will be the focus of this research and exploration.
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
25
26 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
27
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
Flats Layout of rooms at different types of unit remain similar and typical - bathrooms for the elderly homes are accessible and hence occupy a larger area.
28
All rooms are provided with full-height bay windows whilst balconies are provided only to rooms facing inwards and Southwards to the courtyard.
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
In the North Block over 67 of the 103 units are dual aspect, together with the position of the core it was aimed to maximise apartments between North and West block overlooking each other. Usable balconies have a minimum area of 4.7 sqm, provided to 35 units.
29
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 30
2.0 EXISTING CONDITION
MATERIAL STUDIES The two main specific materials that Kings Cross R5 comprises of are concrete and bricks - concrete solely for the load-bearing structure and brick as the enveloping material. We should understand these two materials in all perspectives before suggesting any substituting proposal that would produce any change.
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
31
ADS 5 ROYAL COLLEGE OF ART
CONCRETE Composition Raw materials for concrete are available cheaply and in abundance for most places around the globe, hence used so widely and extensively disregarding geographical distinctions. Concrete is formed by mixing the aggregates with water and the binding agent that is cement, the process known as hydration.
32
MID-RISE URBAN BLOCKS
Viable aggregate can include gravel, crushed stone, sand, slag or geosynthetic aggregates - this makes up 60-80% of the the concrete mix. Cement on the other hand is a chemical combination of calcium, silicon, alluminium, iron and etc.
Sand and gravel quarry, both material, one coarse and one fine suit different types of concrete mix.
ADS 5 ROYAL COLLEGE OF ART
Strength Concrete is popular not just because of available material compositions, but also ts performance. It is plastic and malleable when newly mixed - giving possibility to create fluid forms that any possible formwork can be created - and it is strong and durable when hardened. The other most noteable quality it has is sharing the same thermal expansion properties with steel, which makes reinforced concrete a far stronger and flexible material than on its own - handling both compression and tension forces well as one unified, monolithic material that is joined by pouring.
MID-RISE URBAN BLOCKS 33
Meiso no Mori Funeral Hall, Toyo Ito, 2009, utilises reinforced concrete’s bespoke qualities to create a form that is complicated to produce and assemble otherwise.
ADS 5 ROYAL COLLEGE OF ART
Embodied Carbon: Production and Transportation
34
MID-RISE URBAN BLOCKS
In the overall production of concrete, the making of cement itself is energy intensive and therefore contribute heavily to its carbon footprint. To manufacture portland cement, the most common type of cement, raw material principally of limestone, clay, slate and others are quarried and crushed, then put into a cement kiln. The material is heated at 2, 700 degrees Fahrenheit, and the amount fuel that the burning would take forms the major carbon footprint.The mixing of aggregates, cement and water can take place off-site or on-site; whilst transportation of concrete can account for carbon footprint, over 95% of UK’s concrete is produced within UK, with an average 12 km delivery distance from concrete mixing to construction site.
Possible Reduction in Carbon Emission One argument to the high carbon factor of concrete calls for accounting its durability - that it being low-maintenance and long-lasting means reduction in overall production of new material to replace them. Regarding fuel consumption to fire them, concrete industries suggests that the use of biofuel or renewable energy could reduce its carbon footprint; whilst adding Ground Granulated Blast-furnace Slag or fly ash could make up to 15-30% of the cement, reducing abiut 35% of carbon emission - that is yet confined by weight, cost and availability, making these substitution still uncommon to implement with few examples.
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
Cement industries: Material grinding and burning sites in UK
35
Precast floor element made of slag / fly ash-based geopolymer concrete, cementfree, in Queensland’s University GCI Building, 2013
ADS 5 ROYAL COLLEGE OF ART
BRICK Composition
MID-RISE URBAN BLOCKS
Bricks are often clay-based, being a type of fine-grained natural soil, mixed with water to form wet clay. The mixture then is pressed into a mould - therefore enabling unique though most of the time regular, shapes - sent to the kiln to burn, in order for them to dry and harden. Bricks could be categorised into facing bricks or engineering bricks. The former used mainly for external aesthetics, being weather resistant, they could be mouled differently to achieve certain textures; the latter have a higher compressive strength and is used structurally such as groundworks, manholes and retaining walls.
Facing bricks: Extruded and wirecut with machines
Facing bricks: Soft mud bricks with hand-made processes
Engineering bricks: Clay-based or mixed with other materials
Strength
36
Bricks are formed with clay - the most abundant material possibly on Earth. They are often associated with vernaculars because of how primitive it could be made with hands in the lack of machines. A local circular economy could be one upside to using bricks most sustainably. Bricks have a high compressive strength, they were used as structural load-bearing walls before the popularity of concrete that deferred them into mainly an enveloping material.They are durable under harsh weather carrying rainwater stains and dirts. Chosen as an enveloping material, they often aim to “echo” a certain history in a literal sense; but practically the mortar joined brick envelope also reduces the need for complex secondary fixtures and hence simplifying the process.
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 37
Tate Modern, Adaptation of the Turbine Hall and the new extension: Bricks are used almost reminiscently to evoke historical reference, only as a cladding material - hinted by the punctured joints
ADS 5 ROYAL COLLEGE OF ART
Embodied Carbon: Production and Transportation
38
MID-RISE URBAN BLOCKS
The main carbon footprint that clay bricks posess lie within their production process. The brick kilns to burn the wet clay usually involve the use of fossil fuels, or other forms of energy - this is particularly true when producing engineering bricks that have to undergo excessive heat to have a stronger compressive strength. Specially moulded bricks at specific conenctions or angles means a brand new formwork is needed; or rather bricks would have to be cut and hence becoming unnecessary waste. Below: The Interlock: bespoke facade of twisting bricks compromising 5000 special bricks of 44 different types
Despite being a common material, brick demands in UK are particulalrly high that lcoal sourcing and production cannot fulfill - in 2017 of the 2.4 billion bricks 20% have to be imported, adding to embodied carbon in transportation.
ADS 5 ROYAL COLLEGE OF ART
Possible Reduction in Carbon Emission Bricks in ancient times were sun-dried to harden and strengthen, now replaced by machinery burning to accelerate the process - the efficiency of such is maximised by a monitoring system that effectively dry the bricks minimising excessive heat.
39
Newport Street Gallery: 6000 special bricks were handmade or standard machine made; and blended with vast variety of bricks to match the existing building
MID-RISE URBAN BLOCKS
Shapes of tunnel kilns were made more efficient; natural gas to fuel the firing; and modes of retrieving waste heat were investigated to reduce the carbon footprint of the burning process. Later material such as the use of sand lime bricks could also reduce the amount of mortar needed to form joints. Local brick material sourcing should also be conducted to minimise transport especially viable in small scale productions.
40 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
2.4 General 4: Adjacent Development and Townscape General 7: Reinforcement of Street Hierarchy
and/or scale of façade elements.
In contrast to the buildings with a longer history in the surrounding neighbourhood General Guideline 7: - bricks were deployed structurally in the external wall; whereas the King Cross R5 mobilises the bricks onlydetailed as a cladding layer, along otherreinforces “delicate”the materials How the design of buildings street including the glazed for ceramic panels and the concrete hierarchy, through, example, location of precast entrances. ledges which adorn the building.
2.10
Entrances are centrally located within both the West an Blocks, their treatment contrasting with the shopfronts w either side to highlight their presence in the street scen strong, colourful residential entrance to the North Blo positively address the street by creating a front door on Way and alongside ground floor commercial uses, will e the diversity of uses along this route. As a result, York W benefit from 24 hour activity and begin to feel like a ‘mai rather than simply a traffic artery. Similarly, the entranc West Block on Cubitt Park will establish this space as an ‘a alongside other emerging buildings which will overlook t
Facade Detailing
ROYAL COLLEGE OF ART
General Guideline 4: refers back to the historical The materials of the facade buildings of medium sized workshops and warehouses in the How the detailed design of the building responds to adjacent vicinity and their choices are mainly aesthetic, besides the development and its townscape qualities, through, for weathering properties of bricks.Lighter bricks in the inward example, setbacks, choice of materials, and arrangement facing facade supposedly reflect more light into the courtyard.
ADS 5
Envelope Detail
The three proposed blocks are designed to form a ‘family similar approach to order and scale, but with varied deta those facades which present themselves onto the public and those which face into the communal spaces. In this treatment of the facades is a direct reflection of the hi of spaces onto which they face. This is most pronounced ‘internal’ facades which are much simpler in articulation of materials than those facing the public realm, building traditional architectural language of buildings and blocks Clarity and Simplicity fronts and backs. Further detail on the treatment of these The has been to strive for a clarity and simpli is setintention out in Section 1.3 and our response to Design Guid planning the building which reflects itself in a rati in Section of 2.10 based facade. Space planning, appearance, structure, There are also subtleties in the ‘external’ facade design b and performance become intrinsically linked with the the different public spaces. For example, the York Way there is an honest and inherent quality and legibility to th is the most rigid and ordered of the facades, whilst the The bays are clearly defined through the regularly spac to Cubitt Park is more informal in its ordering with vary and horizontal projections. The typical details are k widths and window sizes reflecting the internal progra and crisp, whilst providing depth to the facades. For ex communal and private spaces. typical window is deep set from the line of the brickwo Special treatments areare employed element jambs offacade the window frame detailed on in key aluminium building mark out a change form the or an important ord jun thinnest to possible profile. It isinfrom considered the public realm. For example, on the north facade of th proportioning of elements, and the texture and pattern o Block, verticality of theistower element is highlight that thethe building’s richness derived. deviation from the regular order through the application of Repetition and below Difference tone of ceramic the windows and through the omi the horizontal pre-cast concrete spandrel at every other le The facades of each block are carefully ordered, wi consideration given to those facing onto the commu (‘internal facades’) and those looking out over the pu (‘external facades’). The composition of elements and arc language is deliberately repetitive but with subtle va detailing and materiality to reflect the orientation an functions of the buildings.
General 12: Quality and Attention to Detail General Guideline 12:
In a residential building of this scale and complexity, certain governing principles were established to help maintain the original design aspirations and to contribute to the realisation of a coherent group of buildings. The same rationale has been applied to each of the blocks making up R5 North, and the emerging scheme for R5 South, with both being considered side by side as the design has progressed. The principles that have informed the proposed design and choice of material detailing is set out below alongside an explanation of their application. Further details can also be found in our responses to General Guidelines 1, 2 and 7 in Sections 2.1, 2.2 and 2.4, respectively. Figure 55 (left and above): Illustrative view of R5 North from East Street showing the contrasting treatments of the external and internal facades and example (above) of typical Clerkenwell warehouse building
MID-RISE URBAN BLOCKS
How the detailed design of the building maintains quality and attention to function and detail on all elevations.
‘External’ Facades
41
The external facades are richly detailed, rigorously or highly articulated brick facades. They are articulated regular rhythm of vertical brick piers projecting from t with a series of horizontal pre-cast concrete spandrels lines of the floors that project forward in line with the pie each bay created by these features, further articulation i by a profiled glazed ceramic panel above and below eac that provides a level of detailing that can be appreciat moves closer to the building. These panels also serve a purpose by concealing the ventilation systems into the fl
The ground floor facade is unified through the use of finel specially designed, pre-cast concrete elements which projecting frame around each bay to provide emphasis to and shopfront. The profile of this frame is carefully co
ADS 5 ROYAL COLLEGE OF ART
2.0 EXISTING CONDITION
ANALYSIS
STRUCTURE The building structure is entirely composed of a concrete frame that would be cladded with bricks as an outermost weathering layer. The choice of the mode of construction and structural materials have not been mentioned or discussed in the report - but mostly concern labour and material costs, as well as time of construction.
42
MID-RISE URBAN BLOCKS
The mid-rise typology that the building is maintained at 15 storeys reduces the urge of employing a steel frame construction that is applied more widely at higher rise buildings with its lower dead load.
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
Loadbearing
43
- Stud walls in between concrete piers - Pre-installed concrete ledges to carry bricks
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
The outward facing facade is cladded with a darker colour of bricks, whilst surfaces built up of metal C-sections provide the interfaces for brick claddings where there are no concrete structures. Bricks are fixed by extensions from the edge of the slabs, as well as the precast ledge every two floors.
44
Ceramic spandrel panels are installed which also covers the insulation layer.
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
The inward facing facade is installed with full height openable windows, as insulation is installed behind the brick claddings that were extended from the edge of the slab. The wall buildup consists of the outermost layer of brick, behind such is a cavity followed by insulation touching the external face of the structure.
45
Ventilation ducts go through the ceilings and release through the outlet at the edge of the envelopes behind the bricks.
46 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
PLANS
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
47
1:200 GF - 7F Floor Plan - Existing Conditions
48 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
49
1:200 8F - 15F Floor Plan - Existing Conditions
ADS 5 ROYAL COLLEGE OF ART
SECTION DETAILS
1 Dark facing bricks 2 Precast concrete ledge
50
MID-RISE URBAN BLOCKS
3 Glazed ceramic panel 4 Brick parapet 5 EPS (assumed) Insulation 6 235 mm Concrete Slab 7 Plasterboard 8 Plywood Flooring 9 70 mm EPS Insulation
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
51
52 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
53
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
EMBODIED CARBON ANALYSIS MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E/M3
Aluminium Sheet (Powder Coated)
Envelope
174.0
3,356,634
Galvanised Steel
Fixings
1.6
27,011
Concrete Blocks
Partitions
2275.0
737,100
Reinforced Concrete
Superstructure 3092.4
2,065,456
Clay Bricks
Envelope
226.7
124,850
EPS Insulation
Envelope
415.0
40,255
Flat Glass
Envelope
49.4
178,125
Plasterboard
Fit Out
381.0
99,822
Vapour Barrier
Envelope
11.1
918.81
Cermic Tiles
Envelope
15.4
16,170
54
TOTAL
7,368,237
ADS 5 ROYAL COLLEGE OF ART
COST ANALYSIS
ELEMENT
AMOUNT
COST
Clay Bricks
Envelope
3,270 m2
£ 196,200
Concrete Floors
Superstructure
8,750 m2
£ 1,137,500
Concrete Walls
Superstructure
3,302 m2
£ 660,400
Concrete Blocks
Partitions
5,000 m2
£ 375,000
Galvanised Steel
Fixings
2 m3
£ 4,000
Plasterboard
Fit Out
19,050 m2
£ 381,000
Reynaers Windows and Glazing
Envelope
1333 m2
£ 333,125
EPS Insulation
Envelope
5,190 m2
£ 51,900
TOTAL (AS CALCULATED) TOTAL COST OF TOTAL SCHEME (ONLINE) TOTAL COST OF SELECTED AREA (ONLINE)
£ 3,406,625 £ 26,000,000 £ 18,117,315
PERCENTAGE OF PRICE THAT WILL CHANGE
18.8 %
MID-RISE URBAN BLOCKS
MATERIAL
55
ADS 5 ROYAL COLLEGE OF ART
2.0 EXISTING CONDITION
OPERATIONAL CARBON
MID-RISE URBAN BLOCKS
OVERVIEW
Passive Design
- Thermal performance of the envelope - Natural lighting
Internal Building Systems
- Heat Interface Unit - Mechanical ventilation - Intelligent lighting system - Sanitary ware and appliances - Building Management System
Landscape
- Sustainable drainage system - Ecology - Material recycling - Excavation and re-use of top soil
Wider Site Systems
- Low-carbon district energy system - Site-wide drainage infrastructure
Construction
- CO2 Monitor, report and set targets for
56
• • •
materials productions off-site; transportation to site; and construction on site
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
57
ADS 5 ROYAL COLLEGE OF ART
KINGS CROSS CE ENTRAL R5 NOR RTH ENVIRON NMENTAL SU USTAINABILIT TY PLAN
KINGS CROSS CE ENTRAL R5 NOR RTH ENVIRON NMENTAL SU USTAINABILIT TY PLAN
PASSIVE C DESIGN Colour:
MID-RISE URBAN BLOCKS
Thermal:
Neutral 0.7 (min n)
V Visible light transmission t n (LT Factor) :
The external envelope can significantly reduce energy demand - the need to address thermal comfort issues innsmittance Summer whilst(G minimising the use of mechanical cooling. T Thermal tran G-Value): 0.40 (max) The building fabric performance will exceed the requirements of Part L of the
lding constr ruction proce ess shall inccorporate ro obust details s as de The buiRegulations Building 2010. ment (BRE) in order to e ensure building air tightness for Researcch Establishm The appli insulation the envelope the building is of high performance, an ed of pressure e of of50pa orr less. These ant imp e figuresmainly are ofatheir significa build-up in terms of the use of insulation and air-tightness. 3 2 Fig 2: Orien ntation of R5 North h overlaid on a dia agram showing thee sun paths uirement of 1 10 m /hr/m at a an applied d pressu Regulation Part L minimum requ ding energy consumption n by improving the air tig ghtness in reducing the build 3.1.3 Build ding Envelope, specific cation and th hermal perfo ormance Lighting:w will reduce the e energy required to heatt the spaces. result, ernal envelope can act as a an importtant climatic modifier. A well-designeed external envelope The exte Daylight factorred that the filtration oftosunlight apartments, that isin summer, can sign nificantly duceencourages energy demand. Th ermal comforrt issues he need addressinto the while miinimising e use ofform mec chanical oling, has opening ha ad a strong influence the uppon the design of R5 assisted by thethe building with thecoo courtyard that exposes blocks. North. Pass sive solar de esign 3.1.4
p in terms off the specifie ed glazing sttandard and insulation le evels will The building fabric performance mportant visionments of of na atural htingRegu islations an i2010 onsideration The prov tthe requirem Partt L ofdayligh the Bu uilding w with low U-va alues in will pass . Materialsco exceed be speci ified to ensur re that infiltra ation rates al lso exceed th he requireme ents of Part L L. design tteam have made a conscious effo ort to optimise daylight penetr
commen t osed the high den nsity environm the(2010 co0)nstraints imp posed b Elemen nt nsurate with Propo constru uction Bu uilding ment, Regu ulation 2 2 U ent Valu ueplots (W/m K) Valueation (W/m K)of the different adjoining g developme and d the Uorienta d bloc cks of R KXC sch heme. Co ommercial Residentia ial Externa al Wall
0.26
0.3 35
0.30
Roof 0.18 0.2 25 0.20 day ates the reco ommended d dwelling ylight factors from th Table 2 below indica Expose ed floor 0.22 0.2 25 0.25 and Sunlig to Good P ractice 1”, which is also re Daylight Glazing g 1.8ht:(including ( A Guide w window 2.2 2 2.0 1991 frame) ) able Homes – Technical guide g 2008” Sustaina Table 1: C Comparison of proposed p and cu urrent Building R Regulation U-Va alues
Area
R Recommend ded Dayligh ht Factor (DF F)
Bedroo om
1 1%
olar gains in nto the aparrtments but maintain a high level of o natural In orderr to reduce unwanted so Kitchen 2 high 2% h perform mance double glazing will be used oon all facades. The lighting andn energy efficiency, w will R have the following1.5% glazing Living Room 1characteristics :
58
JANUARY Y 2011/DM/0511 1131 ENVIROM MENTAL SUSTA AINABILITY PLA AN
Pag ge 8 of 41
Table 2: S Summary of dwe elling recommen nded daylight faactor from Code for sustainable homes
The perfformance of the key habitable spacess within the apartments a have h be year usin ng a dynamiic modelling software pa ckage to ens sure that, as s extern winter to o summer, the quality of daylight w within the spa aces remains consi calculate ed daylighting levels com mply with the e standards in the BRE guidance
ADS 5 ROYAL COLLEGE OF ART
Glazing
Reynaers aluminium window systems were used. These solutions address the challenges and optimised thermal ratings. They meet the latest insulation requirements (at the time of design), being a thermally improved, three chamber energy-efficient system. The thermal breaks - sandwiched between each frame’s interior and exterior - is made from polyamide which prevents heat loss through the frame. This was chosen in order to match Camden Council’s goal to enhance and improve standards of affordable living for King’s Cross residents.
MID-RISE URBAN BLOCKS
Thermal insulation properties for King’s Cross R5 were considered to be a “crucial considetation”. All residences connect to the district heating network for high insulation and ventilation, and the window systems installed helped enhance this.
59
ADS 5 ROYAL COLLEGE OF ART
INTERNAL BUILDING SYSTEMS Heat Interface Unit:
MID-RISE URBAN BLOCKS
Retrieving heat energy as well as utilsing the energy through a control system - to provide for hot water and heating to apartments. Mechanical Ventilation: Integrated with heat recovery - preheating the incoming air with exhaust air that is warm; an automatic system that responses to internal humidity - a slim duct system would direct air indoors from the ceiling, outwards to the grilles in the facade. Lighting: Energy efficient lighting - low energy, high efficiency compact fluorescent light fittings; lighting control system with intelligent dimming that would respond to lighting necessity. Sanitary ware and appliances: Hardwares that utilises water usage in households; irrigation water to be utilised.
60
Building management system (BMS): Automatic control system and monitoring operation that records and controls the building services to operate at maximum efficiency.
ADS 5 ROYAL COLLEGE OF ART
1.6
Environmental Performance and Eco 1.6
The proposals cases exceedi the KXC Outlin A combination services and a that will return Building Regu The proposals cases exceedi In developing the KXC Outlin on the minimu A combination Permission to services and a equivalent to that will return (CfSH), or a ‘ Building Regu assessment ha which shows In developing 4 As onrating. the minimu apartments an Permission to pre-assessmen equivalent to resulting (CfSH), orinaa ‘p assessment ha Outlined below which shows part of the R5 4 rating. As •apartments High build an u-values th pre-assessmen resulting in a p • Passive so shading (e Outlined below partofofthe thebuild R5
Environmental Performance and Eco LANSCAPE Sustainable Drainage Systems (SUDS):
MID-RISE URBAN BLOCKS
Green and brown roof as well as the internal courtyard would attenuate slightly to the peak surface runoff by detaining rainfall through retention and infiltration and by encouraging evapotranspiration in warmer days. Ecology: Provision of brown/ green roof accommodates wildlife habitats that are undisturbed by the residents. Recycled materials: The brown roof uses crushed masonry and spoil that is planted with wild grasses that slightly mobilises upcycling.
•
Connectio High build hot waterth a u-values
•
High speci Passive so shading (e Installation of the build to monitor Connectio High efficie hot water a integral he ventilation High speci
• • •
Top soil:
•
Possibility to re-employ the excavated soil that could be used as landscaping material from the construction site. Figure 45: Stony grassland roof (top) and semi intensive living roof (bottom).
•
Installation to monitor
•
High efficie integral he ventilation
Figure 45: Stony grassland roof (top) and semi intensive living roof (bottom).
61
MID-RISE URBAN BLOCKS
3
62
CARBON COPIES
MID-RISE URBAN BLOCKS
63
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 64
3.0 CARBON COPIES
INTRODUCTION
Following the analysis of the original structure, sustainability and cost analysis of the original structure, this report then begins to look at alternative structrual scenarios and their respecture wall build-ups to analyse the best carbon-copy lower carbon and lower cost response. Carbon Copy 1.
CLT Interior Structure with a Self Standing Stone Facade
Carbon Copy 2.
CLT Interior Structure with a Stone Veneer Facade
Carbon Copy 3.
Loadbearing Stone Structure
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
65
ADS 5 ROYAL COLLEGE OF ART
3.0 CARBON COPIES
MATERIAL STUDIES TIMBER
MID-RISE URBAN BLOCKS
Sustainable timber is timber that has been harvested responsibly from well-managed forests that are continuously replenished and ensure that there is no damage to the surrounding environment. Trees also absorb carbon very rapidly while they are growing and absorb less as they age, so sustainably managed forests where timber is harvested and replaced can potentially be more of an effective carbon store than an undisturbed forest. Morevoer, timber is durable, and can be easily maintained, has warm aesthetic properties, is highly versatile, quick and simple to build with, great in earthquakes, is a good insulator, non-toxic and is a humidity regulator. The UK’s two main certification schemes – the Forest Stewardship Council (FSC) and Programme for the Endorsement of Forest Certification (PEFC) – assure that all wood and wood-based products originate from sustainable sources. Therefore, as much as 90 per cent of timber used in the UK is certified at present.
FIRE REGULATIONS In a fire, the outer layer of mass timber will char in a predictable way that effectively self-extinguishes and shields the interior, allowing it to retain structural integrity for several hours in an intense fire – a big contrast with steel. However, the UK government has released details of its ban on combustible building materials in the wake of the Grenfell Tower tragedy, revealing that it will limit the use of cross-laminated timber in construction.
66
The legislation states that no combustible materials will be permitted on the external walls of any new buildings taller than 18 metres. In the legislation, it specified timber as one of these materials.
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
67
ADS 5 ROYAL COLLEGE OF ART
CLT PANELS Murray Grove is built in 2009, with the superstructure entirely in mass timber. The CLT panels for external and internal walls, floor slabs and shafts are all pre-fabricated with solid timber.
MID-RISE URBAN BLOCKS
Termed as “honeycomb” structure, lateral forces are taken by shear walls that are arranged perpendicularly.
68
CLT panels are finished by plasterboards in complaince with fire regulations and also servicing needs
ADS 5 ROYAL COLLEGE OF ART
Structural walls include the entire periphery of the plan and most of the walls containing the service core in the middle
MID-RISE URBAN BLOCKS
Murray Grove was the first to suggest building alternatively with CLT, where residential layouts are often regular and demand partitions already. Prefabricated wall panels can easily accommodate the spaces required whilst saving time on site with the assembly of dry elements.
69
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 70
GLULAM BEAM AND COLUMN STRUCTURE Mjøstårnet is built in 2019 with a glulam frame structure - this is adopted mainly to accommodate the need for open office spaces at the top floors. It is 10 storeys taller than Murray’s Grove and hence adding technical difficulties in terms of taking up wind load. The frame is erected independently to the prefabricated floor slabs and envelope sandwhich panels, which are also installed at the same time to protect the exposed frame from weather.
The prefabricated casette floor panels include both finishes, service space and sound insulation; whilst wall panels are installed in the same fashioned then applied with finish
ADS 5 ROYAL COLLEGE OF ART
The structural column grids accommodate both the residential and office space at different floors
MID-RISE URBAN BLOCKS
CLT cores are merely carrying their own weight rather that the dead loads of the building
The main load-bearing structures are the column and beam structures that are strengthened by the diagonal bracing at the building peripheries. At the uppermost 5 floors concrete slabs are used instead of the prefabricated panels of laminated veneer lumber to add weight against the wind.
71
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
GLULAM BEAM AND COLUMN / PREFABRICATION Treet is a 14 storey building that uses the glulam frame of columns and beam to further accelerate the construction process carrying prefabricated modular units. The units are made of conventional timber frames and are stacked on top of each other - the load is taken by the frame every 5 floors. The frame is then finished externally with insulation infills and rainscreen cladding, as well as curtain walling panels.
Section showing the integration of multiple prefabricated layers - the external finishing, the structural frame and the modular unit
72
Crane picking up the prefabricated CLT lift shaft
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
Concrete slabs are used at 3 different levels when the load of the modules are transferred to the frame - adding weight to the frame but also taking copressive force - utlising its material properties. This construction methodology again aims at enhancing the delivery speed by involving even more elements for prefabrication - even though not the most material-saving. 73
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
COMPARISON: GLULAM VS CLT Mass timber can be employed in various ways - CLT panels / glulam beams and columns. They are distinguished from the above examples by different needs of spaces; as well as different delivery criterias ie. time and cost. In King’s Cross R5 our consideration takes place mostly in 3 areas that would form the basis of choosing how to work with mass timber for the alternative of this residential building.
Comparing wall and floor buildup of Murray’s Grove (left) and Mjøstårnet (right) and their respective dimensions
1. EFFECTIVE CEILING HEIGHT In the example of Mjøstårnet, the beams alone are 600mm deep, yet such is justified by the service spaces provided in between for cooling and ventialtion that office spaces require. In residential developments the demand for servicing spaces would be less.
74
The depth of members can influence hugely the dimensions of spaces such as floor to ceiling heights - with maximum building height stipulated this could contribute to a lot of design constraints in delivering room spaces.
ADS 5
Internal constraints in Mjøstårnet the office spaces and a specific Treet flat occuring every 5 storeys.
ROYAL COLLEGE OF ART
2. LAYOUTS: FLEXIBILITY VS CONSTRAINTS In the two examples of glulam beam and column structures lateral stability is provided by diagonal trusses that are contained internally. Flexibility in some spaces mean constraints in others - whilst open office plan can accommodate these structures in circulation spaces, residential flats might be harder to accommodate.
Comparing internal walls and floor buildup of Murray’s Grove (left) and Mjøstårnet (right) - CLT panels already act as partition walls
MID-RISE URBAN BLOCKS
3. MATERIAL USE In King’s Cross R5, the layouts for residential flats are regular and many partitions are needed - the use of CLT is more beneficial in terms of material spending where vertical load bearing structures takes the place of the stud walls as partitions, saving additonal secondary strcutures. Together with the floor to ceiling heights and regularity in rooms, CLT panel structure is hence adopted in our later proposals using CLT structures as walls and floors, instead of beam and columns - that is specific to this case study.
75
ADS 5 ROYAL COLLEGE OF ART
EXPRESSION The use of CLT wall and floor panels can be detailed differently according to both preference and performance. In some cases CLT panels are exposed internally in the walls and the ceiling to utilise its visual effects. Yet these decisions need to be paired with the considerations for performance and other requirements such as serrvicing that require detailing.
MID-RISE URBAN BLOCKS
Barrett’s Grove (top left) exposes its CLT walls compared to other additional requirements as needed (below)
76
The build-up of the wall depends heavily on use of spaces - where particular noises is known there would be need for additional sound insulation, amongst party walls and also ceilings. The location and detailing of these devices would influence the overall perception of the spaces.
ADS 5
Servicing of pipes, electric cables and air ducts need to traverse both the vertical and horizontal elements. Depending on the desired expressions (exposed or concealed CLT), these hardwares are deployed differently - mainly by drilling out the timber or adding new layers on top of them.
ROYAL COLLEGE OF ART
SERVICING
MID-RISE URBAN BLOCKS
Drawing of hollow floor slab to enable servicing CLT handbook from Swedish Wood:
77
https://www.woodcampus. co.uk/wp-content/ uploads/2019/05/SwedishWood-CLT-Handbook.pdf
ADS 5
Connections
CLT handbook from Swedish Wood:
MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
https://www.woodcampus. co.uk/wp-content/ uploads/2019/05/SwedishWood-CLT-Handbook.pdf
floor to beam
Wall to wall
Wall to Floor
CONNECTIONS Connections of timber members can be done differently with various elements.
78
The choices can be again based on the visual effect that wants to be delivered, as well as the secondary elements that need to go on top of them, the choice of connections is to assist these additons.
Load-bearing CLT
MID-RISE URBAN BLOCKS
Eliminating the external walls and all load-bearing CLT structures are internal, with options of for the external walls.
ROYAL COLLEGE OF ART
Ideal direct replacement of CLT honeycomb structure loadbearing external walls and internal party walls
ADS 5
Existing building concrete frame of blade columns
Structural stone cavity wall accounting for all vertical structural elements Load-bearing stone
FROM CLT TO STONE
79
The proposal for alternatives instigated from an entirely timber solution, that is met with the ban of using combustible material like CLT for the external walls in buildings over 18 metres tall. The CLT is henced pushed back, and the external wall opened up with options to using stone differently. The main idea is to use stone like how Mjøstårnet used concrete slabs - to add weight and stabilise the building from the taking the lateral forces of the wind load.
ADS 5 ROYAL COLLEGE OF ART
a) Self-standing stone tied back to main structure / Carries its own weght b) Stone cladding as rainscreen / Carried by studwalls and the primary structure c) Structural stone cavity walls / Carrying reversely the load of the building
MID-RISE URBAN BLOCKS
EXTERNAL ENVELOPE IN STONE The following proposals look into how stone can be most effectively incorporated with CLT structures to achieve a building alternative, options include:
Stone Studwall Load-bearing CLT
a)
b)
c)
A)
B)
C)
80
The three options of using stone have each a different impact to overall material consumption and construction - weighing differently in benefits and drawbacks. For example in self-standing stone (A) internal structures of the building can be reduced, compared to stone cladding (B) which is carried by the building; yet amount of stone in (A) will far exceed the other option whilst CLT thickness increase would have less impact in embodied carbon than the increase in amount of stone used - also raising the cost.
ADS 5
INTERNAL STRUCTURE IN STONE
Structural plan for stone cavity walls (C) accounting for all vertical primary element / compared to internal partition walls (red line)
ROYAL COLLEGE OF ART
With all external walls being load-bearing stone cavity walls the internal structural walls are limited to the central corridor where CLT span between the maximum distance of 7 metres - reducing the amount of strcutural walls between flats.
MID-RISE URBAN BLOCKS
Option (C) is a result derived from the two previous options, where the amount of material of stone is most justified - not wasting the mass nor diminishing it, but making it load-bearing to the building. Internal partition walls would only have to fulfill the needs for sound insulation and dividing layouts, erected in timber studs; whilst stone cavity walls internally and externally add weight to and brace the building.
Two types of internal walls, load-bearing stone cavity walls with acoustic insulation and timber stud wall as partitions - thickness to be increased for party walls
81
ADS 5 ROYAL COLLEGE OF ART
3.0 CARBON COPIES
MATERIAL STUDIES STONE
MID-RISE URBAN BLOCKS
Structure Dimension stone has been employed as a structural material for thousands of years, but its use has declined in recent times. The loss of traditional skills and the rise of tindustrialisation has led this material to be perceived as expensive to quarry, cut and transport, being seen in the eyes of many as suitable only for cladding or flooring. Yet when paired with a modern approach to structural analysis, design and detailing, and a rigorous statistical analysis of material strengths, stone can realise its potential as a material fit for the 21st century. Used more recently by Fernand Pouillon in southern France after the Second World War, the idea of stone construction method seems anti-modern and raises concerns of progressive collapse. The current and conventional alternative is complex: employ a steel or concrete frame superstructure, fire rate, insulate, water proof, fix stainless steel rails through the former back to the frame, tape and seal vapour barriers. Then fix stainless steel clamps to the back of stone cladding panels before carefully hanging them, with grout being unnecessary but commonplace, due to its allusion to the traditional load-bearing nature of blocks.
82
Late 19th and early 20th century innovations in steel and concrete frames no longer required the visible masonry to be load-bearing, leaving it free to become a selfsupporting façade tied back to a frame, becoming thinner still and supported by shelves at all floor levels. These incremental innovations and requirements for better thermal, fire and waterproofing performance have gradually created an overly complex building system that has become normalised for buildings of all scales.
ADS 5 ROYAL COLLEGE OF ART
Types of Stone
MID-RISE URBAN BLOCKS
Many types of stones are available such as basalt, marble, limestone, sandstone, quartzite, travertine, slate, gneiss, laterite, and granite which can be used as construction materials. The stones used for building construction should be hard, durable, tough, and should be free from weathered soft patches of material, cracks, and other defects that are responsible for the reduction of strength and durability. Stones for construction purposes are obtained by quarrying from solid massive rocks
Basalt Stone was chosen for all schemes due to its light red colour, which resembles the colour of brick. It was also chosen due to its strength, which allows for smaller thicknesses to be used to achieve structural stability.
83
ADS 5 ROYAL COLLEGE OF ART
3.0 CARBON COPIES
PROPOSALS CARBON COPY 1 SELF STANDING STONE AND CLT The first investigation looked at developing the existing design to explore new (and more sustainable) materials, such as CLT, stud walls and stone. The first proposal aims to change the design to into a post and lintel self standing stone facade that would connect to an interior stud wall and CLT floor and wall structure. The facade structure here is separated from the interior structure, where each work stand on its own.
84
MID-RISE URBAN BLOCKS
Case Studies Baretts Grove - Groupwork This case study utilises self standing bricks where the double-stacked and openbond of brickwork shows that the envelope is not load bearing, but a screen enveloping the whole facade.
ADS 5
ROYAL COLLEGE OF ART
21% IN PROJECT COST
115%
IN EMBODIED CARBON
MID-RISE URBAN BLOCKS
85
86 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
PLAN
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
87
1:200 Floor Plan - Carbon Copy 1
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 88
SECTION DETAILS
1
200 mm Basalt
2
20 mm Air Gap
3
100 mm Themal Insulation
4
Wall Ties
5
Stud Walls
6
Bracket Connections
7
12 mm Plasterboard
8
275 mm CLT Floors
9
50 mm Acoustic Insulation
10
15 mm Floor Boards
ADS 5
ROYAL COLLEGE OF ART
10
6
4 9
MID-RISE URBAN BLOCKS
8
1 3
2 5 7
89
90 MID-RISE URBAN BLOCKS
4
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
6
5
3
2
91
Detail Floor Plan - Carbon Copy 1
MID-RISE URBAN BLOCKS
7
1
92 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
AXONOMETRIC
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
93
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 94
21%
115%
IN PROJECT COST
IN EMBODIED CARBON
EMBODIED CARBON ANALYSIS MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E/M3
Aluminium Frame (Powder Coated)
Envelope
87.0
1,678,317
Galvanised Steel
Fixings
1.2
20,258
Cross Laminated Timber
Superstructure 3,561.5
- 2,995,179
Plywood
Fit Out
125.9
- 64,240
Thermacork Insulation
Envelope
519
- 44,634
Basalt
Envelope
520.8
98,438
Flat Glass
Envelope
74.2
176,153
Vapour Barrier
Envelope
11.1
919
TOTAL
- 1,129,966
PERCENTAGE DIFFERENCE
- 115.3 %
ADS 5 ROYAL COLLEGE OF ART
COST ANALYSIS
ELEMENT
AMOUNT
COST
Aluminium
Envelope
4,480 kg
£ 336,000
Galvanised Steel
Fixings
1 m3
£ 3,000
Basalt
Superstructure
521 m3
£ 260,400
Thermacork Insulation
Envelope
5,190 m2
£ 103,800
CLT
Superstructure
3,561 m3
£ 890,363
Plywood
Fit Out
6,298 m2
£ 94,470
VELFAC Window
Envelope
1,333 m2
£ 506,350
Vapour Barrier
Envelope
11,000 m2
£ 55,000
TOTAL TOTAL (WITH ADDED COSTS)
£ 2,651,253 £ 14,331,097
PERCENTAGE DIFFERENCE
- 20.8%
MID-RISE URBAN BLOCKS
MATERIAL
95
96 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
RENDERED AXONOMETRIC
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
97
98 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
EXTERIOR - EXISTING
ADS 5
ADS 5
ROYAL COLLEGE OF ART
EXTERIOR - PROPOSED
MID-RISE URBAN BLOCKS
99
100 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
INTERIOR - EXISTING
ADS 5
ADS 5
ROYAL COLLEGE OF ART
INTERIOR - PROPOSED
MID-RISE URBAN BLOCKS
101
ADS 5 ROYAL COLLEGE OF ART
CARBON COPY 2 STONE VENEER AND CLT STRUCTURE The second proposal for the envelope suggests a stone or slate veneer / cladding to replace the bricks currently in the exisitng building. The envelope is entirely dependent on the secondary structures behind them, that is carried by the primary load-beaing structures.
102
MID-RISE URBAN BLOCKS
Slate used to be the most important building material in Scotland with over 80 quarries, the material is a kind of metamorphic rock (most commmon example being marble) sourced locally and used mainly as roofing material - it is a “found” material that would not requiring synthesising but cutting into appropriate forms and shapes. Improving: on minimising stone use:The previous proposal of self-standing stone already requires a studwall formed by windposts - to enclose the room and carry the insulations as well as necessary waterproofing layers. This option considers that the amount of stone - despite their minimised carbon footprint - can be further reduced as it becomes a form of cladding that does not even carry its own forces, but merely a thin weathering layer against rain and wind.
ADS 5
ROYAL COLLEGE OF ART
12% IN PROJECT COST
121%
IN EMBODIED CARBON
MID-RISE URBAN BLOCKS
103
104 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
PLAN
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
105
1:200 Floor Plan - Carbon Copy 2
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 106
SECTION DETAILS
1
30 mm Stone Veneer
2
30 mm Air Gap
3
100 mm Themal Insulation
4
Wall Ties
5
Stud Walls
6
Bracket Connections
7
12 mm Plasterboard
8
275 mm CLT Floors
9
50 mm Acoustic Insulation
10
15 mmTimber Floors
ADS 5
MID-RISE URBAN BLOCKS
8
ROYAL COLLEGE OF ART
6 9
1 2 3 5 7
4 10
107
108 MID-RISE URBAN BLOCKS
4
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
6
5
3
2
109
Detail Floor Plan - Carbon Copy 2
MID-RISE URBAN BLOCKS
7
1
110 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
AXONOMETRIC
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
111
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 112
12%
121%
IN PROJECT COST
IN EMBODIED CARBON
EMBODIED CARBON ANALYSIS MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E/M3
Aluminium Frame (Powder Coated)
Envelope
87.0
1,678,317
Galvanised Steel
Fixings
2.6
43,893
Cross Laminated Timber
Superstructure 4,038.7
- 3,396,522
Plywood
Fit Out
61.1
- 31,161
Thermacork Insulation
Envelope
519
- 44,634
Basalt
Envelope
77.9
14,732
Flat Glass
Envelope
74.1
176,153
Vapour Barrier
Envelope
11.1
919
Plasterboard
Fit Out
64.8
16,993
TOTAL
- 1,541,308
PERCENTAGE DIFFERENCE
- 120.9 %
ADS 5 ROYAL COLLEGE OF ART
COST ANALYSIS
ELEMENT
AMOUNT
COST
Aluminium
Envelope
9,480 kg
£ 711,000
Galvanised Steel
Fixings
5 m3
£ 12,500
Basalt
Superstructure
78 m3
£ 38,950
Plasterboard
Fit-Out
3,240 m2
£ 64,800
Thermacork Insulation
Envelope
5,190 m2
£ 103,800
CLT
Superstructure
4,039 m3
£ 1,009,668
Plywood
Fit Out
3,055 m2
£ 45,825
VELFAC Window
Envelope
1,333 m2
£ 506,350
Vapour Barrier
Envelope
11,000 m2
£ 55,000
£ 2,949,763 £ 15,944,665
PERCENTAGE DIFFERENCE
- 11.9% 113
TOTAL TOTAL (WITH ADDED COSTS)
MID-RISE URBAN BLOCKS
MATERIAL
114 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
RENDERED AXONOMETRIC
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
115
116 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
EXTERIOR - EXISTING
ADS 5
ADS 5
ROYAL COLLEGE OF ART
EXTERIOR - PROPOSED
MID-RISE URBAN BLOCKS
117
118 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
INTERIOR - EXISTING
ADS 5
ADS 5
ROYAL COLLEGE OF ART
INTERIOR - PROPOSED
MID-RISE URBAN BLOCKS
119
ADS 5 ROYAL COLLEGE OF ART
CARBON COPY 3 STRUCTURAL STONE The previous proposals require an interior load bearing structure to enclose the room and carry the insulations as well as necessary waterproofing layers. The final investigation explores the potential of incorporating the stone facade into the structural performance of the building.By depositing the structural load on the structural stone facade, it is anticipated that the amount of primary load-bearing structures of mass timber is eliminated, yet still an improvement to carbon footprint as amount of metal and plasterboard required is reduced.
120
MID-RISE URBAN BLOCKS
Case Studies Perraudin Architecture recently completed a stone house in Lyon.The building is entirely built up in load-bearing limestone walls of 40 cm. Precise coursing elevations define each stone, to be extracted, dimensioned and numbered in the quarry and then transported to the site. There, they are assembled using nothing but a thin bed of lime mortar.
ADS 5 ROYAL COLLEGE OF ART
106% IN EMBODIED CARBON
24% IN PROJECT COST
MID-RISE URBAN BLOCKS 121
The work of Fernand Pouillon focused on the reutilisation of stone in construction during post-war urbanism and the modernism.
122 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
PLAN
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
123
1:200 GF - 7F Floor Plan - Carbon Copy 3
124 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
125
1:200 8F - 15F Floor Plan - Carbon Copy 3
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 126
SECTION DETAILS
1
100 mm Basalt
2
20 mm Air Gap
3
100 mm Thermal Insulation
4
100 mm Basalt
5
Steel Cable Reinforcement
6
Wall Ties
7
Steel Bracket
8
Mortar
9
50 mm Acoustic Insulation
10
15 mm Timber Floorboard
11
275 mm Cross-Laminated Timber Floors
ADS 5
8
MID-RISE URBAN BLOCKS
11
1 5 2 3 4 5
7 9
ROYAL COLLEGE OF ART
6
10
127
128 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
6
3
2
1
129
Detail Floor Plan - Carbon Copy 3
MID-RISE URBAN BLOCKS
4 5
130 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
AXONOMETRIC
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
131
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 132
24%
106%
IN PROJECT COST
IN EMBODIED CARBON
EMBODIED CARBON ANALYSIS MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E/M3
Aluminium Frame (Powder Coated)
Envelope
87.0
1,678,317
Galvanised Steel
Fixings
1.2
20,258
Steel Cables
Fixings
1.6
23,679
Cross Laminated Timber
Superstructure 2,844.0
- 2,391,804
Plywood
Fit Out
237.7
- 121,227
Thermacork Insulation
Envelope
519
- 44,634
Basalt
Superstructure 1,178.1
222,661
Flat Glass
Envelope
74.2
176,153
Vapour Barrier
Envelope
11.1
919
TOTAL
- 435,676
PERCENTAGE DIFFERENCE
- 105.9%
ADS 5 ROYAL COLLEGE OF ART
COST ANALYSIS
ELEMENT
AMOUNT
COST
Galvanised Steel
Fixings
1 m3
£ 3,000
Basalt
Superstructure
1,178 m3
£ 589,050
Thermacork Insulation
Envelope
5,190 m2
£ 103,800
CLT
Superstructure
2,844 m3
£ 711,000
Plywood
Fit Out
11,885 m2
£ 178,275
VELFAC Window
Envelope
1,333 m2
£ 506,350
Vapour Barrier
Envelope
11,000 m2
£ 55,000
£ 2,551,345 £ 13,791,054
PERCENTAGE DIFFERENCE
- 23.8%
133
TOTAL TOTAL (WITH ADDED COSTS)
MID-RISE URBAN BLOCKS
MATERIAL
134 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
RENDERED AXONOMETRIC
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
135
136 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
EXTERIOR - EXISTING
ADS 5
ADS 5
ROYAL COLLEGE OF ART
EXTERIOR - PROPOSED
MID-RISE URBAN BLOCKS
137
138 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
INTERIOR - EXISTING
ADS 5
ADS 5
ROYAL COLLEGE OF ART
INTERIOR - PROPOSED
MID-RISE URBAN BLOCKS
139
ADS 5 ROYAL COLLEGE OF ART
3.0 CARBON COPIES
OPERATIONAL CARBON
OVERVIEW
MID-RISE URBAN BLOCKS
While a reduction in embodied carbon can be achieved as demonstrated in Section 3.3, operational carbon throughout the lifecycle of the building must also be analysed in order to achieve a reduced Whole Life Carbon. Whole Life Carbon (WLC) includes embodied carbon, as defined in Section 1, and operational carbon. This includes carbon emissions associated with all in-use energy and embodied carbon associated with production and transport of materials for use in constructing, maintaining and deconstructing the building. The purpose of using WLC as a general aim is to help towards a building that can generate the lowest possible carbon emissions over its whole life (cradle-to-grave). Operational carbon is the carbon dioxide and GHGs emissions associated with the building's energy use due to heating, cooling, hot water, ventiltion, and lighting systems, as well as those associated with cooking, equipment, and lifts. Operational emissions can vary over the lifetime of the building and are governed by several factors, including building fabric efficiency, Heating, Ventilation and Air Conditioning (HVAC) system efficiency, fuel type, carbon factors and the way the building is used by the occupiers. While some aspects of these carbon emissions would not be able to change in a carbon copy version of the building (due to the programme, window areas, and height of the building), others, such as heating, cooling and ventilation, can be alterered to lead to reduced emissions quantity. According to the current Part L methodology to reduce operational carbon and the LETI design guide, passive design and energy efficiency measures can be used to reduce peak and annual loads.
140
This sections looks at various changes that can be made to the design of the Kings Cross R5 Commercial and Residential Development that can aid in reducing the overall operational carbon (and hence WLC) of the typology.
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
141
ADS 5 ROYAL COLLEGE OF ART
HEATING
142
MID-RISE URBAN BLOCKS
1. Using a heat pump An efficiently designed, installed and operated heat pump system, either at a building or heat network scale, can deliver immediate carbon emissions savings of 60-70% compared to conventional electric heating and 55-65% compared to an efficient gas boiler. As the grid decarbonises further in coming decades, the carbon savings delivered by heat pumps is expected to increase further towards 90-100% CO2 emissions reductions by 2050. Urban areas can bring additional challenges for heat pump retrofit in terms of strict limits on noise and finding suitable external and internal space. However, heat pump technology is diverse and versatile and, with appropriate design, installation and operation, heat pumps are technically viable across all London building types.
ADS 5 ROYAL COLLEGE OF ART
2. Improving Fabric U-Values
FABRIC ELEMENT
EXISTING U-VALUE (W/m2K)
PROPOSED U-VALUE (W/m2K)
Walls
0.26
0.13
Floor
0.22
0.08
Roof
0.18
0.10
Windows
1.80
0.80
MID-RISE URBAN BLOCKS
The fabric of the building has a very significant effect on the thermal performance as well as the overall costs of heating a space in the colder months. Moreover, due to its impact on operational carbon, the thermal conductivities of the materials are utilised to optimise the U-value of the resulting wall. These are extracted from BRE BR443 to help achieve the U-values presented in the table above. In all carbon copy proposals presented, the insulation used is Mineral wool, due to its low thermal conductivity (0.035 W/mK) and low embodied carbon (as explained in the previous section). It’s thickness is changed from one proposal to the next (where structural and facing materials are chosen for their embodied carbon content) to ensure an equal U-value of all three proposals that adhere to the 2020 LETI guide recommendations.
143
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
COOLING An increasing problem in homes in London (as well as most urban centers) is the issue of overheating. Tighter Building Regulations have made homes more energy efficient. As a result, new builds require much less energy to create a safe and comfortable environment for occupants; significantly reducing bills, improving health in winter and reducing heating requirements.These higher standards, however, combined with hot city temperatures increase the risk of overheating. Moreover, climate change is set to increase peak temperatures in London by 6.5 degrees Centigrade by the 2050s, thus increasing the urge to develop a sustainable ventilationa and cooling strategy. Additionally, there is an increase in the demand or housing in London in the form of dense flats. This then leads to added overheating risks as flats tend to suffer to a much greater degree when termpatures rise. This is due to the overcrowding and ventilation limits in flats. Overheating can be discussed as a factor of thermal comfort, which has a supposedly simple definition; ‘that condition of the mind that expresses comfort with the thermal environment’. However, as each of us has a very different idea of what being too hot or too cold means, creating a simple threshold comfort level is virtually impossible. Other variables also need to be taken into account; the ability of an occupant to change clothing and open windows, the availability of cooler rooms and the vulnerability of an occupant, will all have an influence on an individual’s thermal comfort. This creates a problem for the construction and property industry. Overheating risk is currently assessed using different criteria from one building to another.
144
One of the many risks this issue poses is the need for increased access to cooling and ventilation methods in the future. In the future, homes may simply be uninhabitable, or at the very least, they will require very expensive retrofitting.
ADS 5 ROYAL COLLEGE OF ART
GLAZING
In terms of cost, VELFAC windows would cost less that the existing Reynaers aluminium windows, with an estimated cost of 380 GBP/m2 compated to an existing estimated cost of 510 GBP/m2.
MID-RISE URBAN BLOCKS
VELFAC composite windows (shown in the figure below) will be used. These allow for the durability and versatility of aluminium and the sustainability of natural wood/. Aluminium is both highly durable and low maintenance, ensuring the windows will last 40 years or more. The wood frame contributes to great energy performance with U-values as low as 0.8 W/m²k .
145
ADS 5 ROYAL COLLEGE OF ART
GLAZING
MID-RISE URBAN BLOCKS
Triple glazing thermochromatic Smart Glass can be applied to the current double glazing system at Kings Cross R5. This glass works by changing it transmittance when struck by incident solar radiation and becomes darker as temperatures increase. Benefits of Thermochromic Smart Glass Can be installed just as normal glass into a building facade Internal PVB lamination gives improved safety and noise insulation Glass changes between tinted and clear states within minutes Maintains a view to the outside at all times Reduces glare and hence the resulting discomfort and loss of productivity There are no wires to route, since it is not electrically-powered Reduces air-conditioning usage thanks to rejection of infrared
146
The dynamic tinting results directly from radiant solar energy but could also be due to indirect thermal exchange, such as conduction or convection from adjacent building materials such as the glass itself, or from bricks, spacers or the metallic frame after they have been heated by the sun.
ADS 5 ROYAL COLLEGE OF ART
A triple-glazed unit typically comprises:
The front piece of glass is needed as a wind barrier. The back piece of low-E coated glass keeps the heat which is retained in the thermochromic layer from re-radiating to the interior of the building. Single glazed windows, allowing for frames: U-Value = 4.5 W/m²·K; Double glazed windows, allowing for frames: U-Value = 3.3 W/m²·K; Triple glazed windows, allowing for frames: U-Value = 1.8 W/m²·K;
MID-RISE URBAN BLOCKS
a front sheet of glass a gas space (filled with air, argon or krypton) the thermochromic layer another gas space and a back low-E coated sheet of glass.
Triple glazing can aid in reducing heat loss through the windows, thus reducing heating costs. Moreover, thermochromic smart glass has clear benefits in reducing solar heat gain into buildings, reducing air conditioning costs and contributing to ‘net-zero’ construction. Since the transmittance in the dark state is around the 10% mark, the view to the outside world is maintained, but glare is also reduced. Comparison Study 1m2 of a double glazed window will achieve a U-value of 1.4W/m2K, at a carbon cost of 142.5 kgCO2e. 1m2 of a triple glazed window will achieve a U-value of 0.8W/m2K, at a carbon cost of 213.8 kgCO2e. This demonstrates that triple glazing has superior insulative performance at a given thickness but at the cost of higher embodied carbon (increased by 50%).
147
148 MID-RISE URBAN BLOCKS
4 FINDINGS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
149
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
4.0 FINDINGS
COMPARISONS The table below compares the conditions of the existing building to the conditions of all three carbon copy proposals presented.
INFORMATION
EXISTING CONDITIONS
CARBON CO SELF STANDIN
ENVELOPE
Bricks
Self-Standing
INTERIOR LOADBEARING WALLS
Reinforced Concrete
Cross Laminate
INTERIOR FLOORS
Reinforced Concrete
Cross Laminate
EMBODIED CARBON
7,368,237 kgCO2e
- 1,129,966 k
COST
3,346,625 GBP
2,651,253
BENEFITS
150
DRAWBACKS
The facade system is the main structure - redu thickness Follows building regulations at the time of Replacing of bricks construction (with regards to sustainability) intensive in production Thermal mass Replacing of concr Durable. A brick typically has a useful life of elements - with mass ti 150 years or more. Less EC and cost than t Trusted by the market Construction time can the brick laying option Lateral stability to be pro and weight of stone
High embodied carbon emissions High costs
Stone does not aid the can it be integrated? Stone will need to be ca to the original building and time less labour cost metal connections will will lead to added emb could be avoided
ADS 5 ROYAL COLLEGE OF ART
CARBON COPY 2: STONE VENEER
CARBON COPY 3: STRUCTURAL STONE
g Stone
Stone Veneer
Structural Stone
ed Timber
Cross Laminated Timber
Stone
ed Timber
Cross Laminated Timber
Cross Laminated Timber
kgCO2e
- 1,541308 kgCO2e
- 435,677 kgCO2e
GBP
2,929,763 GBP
2,551,345GBP
MID-RISE URBAN BLOCKS
OPY 1: NG STONE
independent from ucing load and wall
which is energy - with stone Reduced cost of material in terms of stone rete load-bearing thickness imber the original design be reduced from
Less CLT - lowering construction costs Utilising exterior as a load bearing structure Increasing thermal mass No secondary steel - less fixings
ovided by the mass
151
interior structure - dry asembly (better time) Fixings complexity increases / labour cost arved to look similar in assemby more labour costs secondary steel work Plasterboards Building is less carbon negative increased weight of clt structure - stability be needed - this Shear walls size need to be increased to bodied carbon than hold the facade - contrary to self-standing stone
ADS 5 ROYAL COLLEGE OF ART
4.0 FINDINGS
OVERALL SAVINGS EMBODIED CARBON
8000000 7000000
EMBODIED CARBON / KGCO2E
MID-RISE URBAN BLOCKS
6000000 5000000 4000000 3000000 2000000 1000000 0 -1000000 -2000000 EXISTING
CARBON COPY 1
CARBON COPY 2
CARBON COPY 3
0
EMBODIED CARBON / KGCO2E
-200000 -400000 -600000 -800000 -1000000 -1200000 -1400000 -1600000
152
-1800000 CARBON COPY 1
CARBON COPY 2
CARBON COPY 3
ADS 5 ROYAL COLLEGE OF ART
COST
4000000 40000000 3500000 35000000 3000000 30000000 2500000 25000000
1500000 15000000 1000000 10000000 500000 5000000 00 EXISTING
CARBON COPY 1
CARBON COPY 2
CARBON COPY 3
MID-RISE URBAN BLOCKS
2000000 20000000
40000000 20000000 3000000 35000000 19800000 2900000 30000000 19600000 2800000 25000000 19400000 2700000 20000000 19200000 2600000 15000000 19000000 2500000 10000000 18800000 2400000 5000000 18600000 2300000 18400000 22000000 CARBON COPY 2
CARBON COPY 3
153
CARBON COPY 1
ADS 5 ROYAL COLLEGE OF ART
4.0 FINDINGS
EMBODIED CARBON
MID-RISE URBAN BLOCKS
ANALYSIS
The two main aims of this project were to achieve a low-carbon, low-cost alternative to the existing building, while not changing the overall design or function of the spaces. This section focuses on the changes in embodied carbon (calculations demonstrated in Section 3), which shows that this aim was achieved in all three Carbon Copies explored. The first carbon copy begins with the idea of introducing stone and CLT into the building instead of the existing brick and concrete materials. This led to an overall reduction of 115% of the embodied carbon emissions in comparison to the existing conditions of the case study. Following this, we explored the idea of reducing stone materials and increasing the CLT available. This led to a further decrease in the embodied carbon, leading to a reduction of 121%. Finally, we explored utilising the stone facade for its structural qualities.Thus, bringing the stone structure into the wall and reducing the requirements for stone, which led to a slight increase of embodied carbon (a reduction of 106%).
154
Due to the CLT and plywood materials used in all three proposals, they all present a chance for a negative carbon building scheme.
ADS 5
4.0 FINDINGS
ROYAL COLLEGE OF ART
COST
ANALYSIS This section focuses on the changes in the overall envelope cost (calculations demonstrated in Section 3). The aim of developing a cheaper solution was acheived in all three Carbon Copies explored. The original conditions were calcualted to have a cost of £3,346,625. Following the changed made in the first carbon copy, this cost was calculated to have a 21% reduction. MID-RISE URBAN BLOCKS
The second carbon copy, while it does achieve lower embodied carbon values, does cost 11%more than the first carbon copy, with an overall decrease of 12% when compared to the original scheme. This due to the increased requirement for metal fixings, plasterboard, and CLT to support the facade. On the other hand, the third carbon copy is the cheapest. It costs 13% less than the second carbon copy and 24% less than the existing conditions.
TOTAL MATERIAL USED / KG
AMOUNT OF FOUNDATION REQUIRED
CONSTRUCTION DELIVERY
OVERALL COSTS / GBP
EXISTING CONDITIONS
STONE
CLT
CONCRETE
MATERIAL PRICE / M3
155
156 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
4.0 FINDINGS
CARBON COPY 1
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
BENEFITS The facade system is independent from the main structure reducing load and wall thickness Replacing of bricks which is energy intensive in production with stone Replacing of concrete load-bearing elements - with mass timber Less EC and cost than the original design Construction time can be reduced from the brick laying option Lateral stability to be provided by the mass and weight of stone
changing the overall design or function of the spaces.
DRAWBACKS Stone does not aid the interior structure - can it be integrated? Stone will need to be carved to look similar to the original building - more labour costs and time Less labour cost metal connections will be needed - this will lead to added embodied carbon than could be avoided
157
158 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
4.0 FINDINGS
CARBON COPY 2
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
BENEFITS Reduced cost of material in terms of stone thickness
DRAWBACKS Dry asembly (better time) Fixings complexity increases / labour cost in assemby secondary steel work Plasterboards increased weight of clt structure - stability Shear walls size need to be increased to hold the facade contrary to self-standing stone
159
160 MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
ADS 5
4.0 FINDINGS
CARBON COPY 3
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
BENEFITS Less CLT - lowering construction costs Utilising exterior as a load bearing structure Increasing thermal mass No secondary steel - less fixings
DRAWBACKS Building is less carbon negative
161
ADS 5
CONCLUSIONS
MID-RISE URBAN BLOCKS
ROYAL COLLEGE OF ART
4.0 FINDINGS
Primary
Volume of CLT
Volume of Stone
CC 1
3,562 m3
521 m3
CC 2
4,039 m3
78 m3
CC 3
2844 m3
1178 m3
162
Original
Volume of Concrete
Volume of Bricks
3,092 m3
227 m3
ADS 5 ROYAL COLLEGE OF ART
Comparing the total carbon footprint and cost, as below, it can be seen that, based on the current calculations, the best carbon footprint achieved is in the second scheme. This scheme, however, was also found to be the more expensive. On the other hand, the first and third schemes were found to be very close in cost (100,000 GBP difference). However, the first scheme did seem to have a more negative footprint, attributed to its increased use of CLT as a building material.
Secondary
Results
Studwall
Fixings
Carbon Footprint
Cost
100%
100%
7,368,237
3,346,625
100%
50%
-1,129,966
2,596,308
100%
200%
- 1,541308
2,894,818
0%
150%
- 435,676
2,496,401
MID-RISE URBAN BLOCKS
Regarding the cost, it is important to note that these results will not be entirely accurate as it does not take into account the cost of prelimeraries in construction, the cost of labour, or the time taken to complete the construction. Literature review has found that with CLT floors added in exchange of concrete ones, a further percentage reduction of 15% can be achieved. Thus, in comparison, it is believed that Carbon Copies 1 and 2 should achieve lower costs.
163
164 MID-RISE URBAN BLOCKS
5 FURTHER APPLICATIONS FOR TYPOLOY
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
165
ADS 5 ROYAL COLLEGE OF ART
5.0 FURTHER APPLICATIONS FOR TYPOLOGY
BACKGROUND
MID-RISE URBAN BLOCKS
OVERALL APPLICATION This section looks into the Kings Cross development masterplan in terms of its overall building uses, as well as understanding their respective existing building methodologies. We want to discern outside of our case study building R5 how relevant the proposals could be applied equally to the buildings built at the same period of time, in regards to their uses and forms.
LAND-USE Among the development plan, all the newly built residential land use, except site E, are mid-rise urban blocks of 18 metres or above. They are of different floor areas and have each a different visual expression.
166
Apart from that, half of the builings are office spaces and the rest retail and institutional spaces - these different uses demand a different typology and hence are less relevant to our proposals, yet informs us of the level of sustainability and the more common mode of practice in the same context.
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
Office Space Retail Cultural / Institutional
R5 (Site)
167
ADS 5
5.0 FURTHER APPLICATIONS FOR TYPOLOGY
ROYAL COLLEGE OF ART
APPLICATION
Floor area (m2)
Storeys
Total Floor Area
Construction Material for Concrete (m3) = FA*0.2 + FA*0.3*2.5
MID-RISE URBAN BLOCKS
Office 18166
9
163494
13370
6
80220
76209
9554
9
85986
81687
16200
11
178200
169290
4803
12
57636
54754
4281
14
59934
56937
5
11205
10645
2241
155319
Retail 1260
4
5040
4788
1348
3
4044
3842
10902
2
21804
20714
8833
2
17666
16783
603
3
1809
1719
1036
2
2072
1968
4283
12
51396
48826
Institutional 22656
6
135936
129139
3351
10
33510
31835
1556
2
3112
2956
Residential
Data for new building - uses and material construction in King’s Cross redevelopment Highlighted are the buildings in concrete and their respective volume of material (taking vertical elements as 30% of floor area)
1087
7
7609
7229
3527
10
35270
33507
5195
11
57145
54288
4992
14
69888
66394
2902
8
23216
22055
3372
10
33720
32034
11698
13
152074
144470
168
1038569
ADS 5 ROYAL COLLEGE OF ART
SCALE: R5 AS A MICROCOSM OF USE OF CONCRETE FRAME Our case study building represents one of the most dominant typology in the building industry being the concrete frame. In the new King’s Cross redevelopment alone over 80% of the developments are built in such way - and in material terms accounting for approsimately 1, 000, 000 m3 of concrete.
Use of concrete frame amongst building volumes
MID-RISE URBAN BLOCKS
Relative proportions (in volume) of building uses in King’s Cross redevelopment responding to table
SCALE: AMPLIFICATION OF CARBON REDUCTION Our alternative proposals suggest the use of stone and mass timber to replace in R5 bricks and concrete. Whilst so many other buildings are built in the similar fashion, the impact of our proposals would be amplified extended to a larger context - when our alternative proposals can readily substitute the studied typology of concrete frame buildings - not just in R5 itself.
169
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS
Construction for sites P2 and Q2, predominantly in concrete and otherwise steel frame
Besides the “conventional” building materials of concrete and steel, mass timber is currently employed only in the two-storey sports hall as well as the Google headquarters where CLT floor slabs are matched with steel and concrete.
170
King’s Cross Sports Hall at Q2 - made entirely out of mass timber and exposed internally. Google’s GQ in construction
ADS 5 ROYAL COLLEGE OF ART
CURRENT STATE AND LIMITS The model of our proposal using mass timber and stone cannot be applied directly when certain subjective elements need to be delivered for example forms and visual expressions. Yet through our proposal it is to posit that there can be more sustainable way to emulate the same language given enough investigations.
MID-RISE URBAN BLOCKS
Coal Drops Yard’s signature form need to be tailored if replaced with mass timber; it has to be acknowledged that the looks of bricks and pigmented percast concrete will not be fully recreated, in site T1, S4.
171
172 MID-RISE URBAN BLOCKS
6 CATALOUGE OF MATERIALS AND METHODS
ROYAL COLLEGE OF ART
ADS 5
ADS 5
ROYAL COLLEGE OF ART
MID-RISE URBAN BLOCKS
173
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 174
The following section includes details of componement/element connections.
ADS 5
EXTERNAL WALL TO INTERNAL FLOOR CONNECTION CARBON COPY 1 - SELF STANDING STONE AND CLT
ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 175
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 176
EXTERNAL WALL TO INTERNAL FLOOR CONNECTION CARBON COPY 1 - STONE VENEER AND CLT
ADS 5
EXTERNAL WALL TO INTERNAL FLOOR CONNECTION CARBON COPY 3 - STRUCTURAL STONE
ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 177
ADS 5 ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 178
INTERNAL WALL TO INTERNAL FLOOR CONNECTION CARBON COPIES 1 AND 2 - CLT
ADS 5
INTERNAL WALL TO INTERNAL FLOOR CONNECTION CARBON COPY 3 - STRUCTURAL STONE AND CLT
ROYAL COLLEGE OF ART MID-RISE URBAN BLOCKS 179
2 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
3
ADS 5 2
AIRPORTS AND BIG SHEDS
Royal College of Art
CONTENT
1.0 INTRODUCTION Purpose of research Terminal 4 Barajas Airport Site location Design concept Typical structural bay Existing components Structural solutions Construction methodology Ventilation system
6 8 10 12 14 16 18 24 26
2.0 EXISTING CONDITION Building section Detail 1 - roof Detail 2 - V column to branches Detail 3 - Y column to branches Detail 4 - Y column to floor
30 34 36 38 40
3.0 CARBON COPY A Summary Building sections Detail 1 - roof Detail 2 - V column to branches Detail 3 - Y column to branches Detail 4 - Y column to floor
44 46 50 52 54 56
3.1 CARBON COPY B Summary Building sections Detail 1 - roof Detail 2 - V column to branches Detail 3 - Y column to branches Detail 4 - Y column to floor
60 62 64 66 68 70
Royal College of Art ADS 5
74 76 80
4.1 WHAT IF? ... B Summary Building sections Detail 1 - roof
84 86 90
5.0 DATA COMPARISONS Summary Embodied carbon (existing) Cost analysis (existing) Embodied carbon (Carbon copy A) Cost analysis (Carbon copy A) Embodied carbon (Carbon copy B) Cost analysis (Carbon copy B) Embodied carbon (What if?...A) Cost analysis (What if?...A) Embodied carbon (What if?...B) Cost analysis (What if?...B)
94 95 96 97 98 99 100 101 102 103 104
6.0 FINDINGS Final comparitive findings
106
7.0 APPENDICES Sketches and mark-ups from tutors / consultants
108
8.0 MENU OF COMPONENTS Roofing details V support details Y support details
122 128 130
AIRPORTS AND BIG SHEDS
4.0 WHAT IF? ... A Summary Building sections Detail 1 - roof
3
4 AIRPORTS AND BIG SHEDS
1 INTRODUCTION
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
5
ADS 5 Royal College of Art
1.0 INTRODUCTION
PURPOSE OF RESEARCH
AIRPORT AND BIG SHEDS TYPOLOGY
AIRPORTS AND BIG SHEDS
We are in a climate emergency. The construction industry contributes an estimated 40% of total carbon emissions in the world annually. 11% of which resulted from manufacturing materials and products such as steel, cement and glass, which has always been the superior choice for airport construction. With these two facts in mind, this research investigates the methods and envirionmental impact of the biggest airport terminal in Spain:Terminal 4, Barajas Airport. Through a detailed analysis of the existing condition, we propose alternative solutions that are both econimcally viable and radically better for the environment. Terminal 4, Barajas Airport, designed by Rogers Stirk Harbour + Partners and Estudio Lamela, is a typical modular design building constructed mainly of steel and concrete. This project uses a typical Structural bay of the terminal as a research module. Through this research, we have concluded that by changing materials and construction methedology it is possible to build a carbon copy development of that proposed by Rogers Stirk Harbour + Partners that is faster, cheaper and greener.
6
EMBODIED CARBON COMPARISON
Royal College of Art ADS 5 AIRPORTS AND BIG SHEDS
Figure 1.1 Exterior view of Terminal 4, Barajas Airport
COST COMPARISON
7
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS 8
1.0 INTRODUCTION
TERMINAL 4 BARAJAS AIRPORT LOCATION
Terminal 4 Barajas Airport, Madrid, Spain
ARCHITECT
Estudio Lamela & Richard Rogers Partnership
AREA
470,000m
COMPLETION
2005
CLIENT
AENA
ENGINEERING FIRM STRUCTURE
Anthony Hunt Associates, TPS with OTEP; HCA SERVICES.
LIGHTING CONSULTANT
Arup/Speirs and Major Associates
FACADE ENGINEER
Arup
INSTALLATIONS
TPS; INITEC. Façade: OAP Façade Engineering.
STRATEGIC DESIGN AUTHORS
Warrington Fire Research
COST CONTROLLERS
Hanscomb y Gabinete de Ingeniería
ACOUSTIC
Sandy Brown
ILLUMINTARIOS ASSESORS
Jonathan Speirs
LANDSCAPE
dosAdos
CONTRACTOR
UTE Ferrovial, FCC, ACS, NECSO, SACYR
Royal College of Art ADS 5 AIRPORTS AND BIG SHEDS
Figure 1.2 Interior view of Terminal 4, Barajas Airport
9
ADS 5 Royal College of Art
1.0 INTRODUCTION
SITE LOCATION
TERMINAL 4
AIRPORTS AND BIG SHEDS
The site is located in the northeast of Madrid, in the district of Barajas, 12 kilometers from the center of the capital of Spain and separate 2km northwest of the rest of the T1, T2 and T3 with which it communicates with a shuttle bus (Airport Shuttle) free. The entire operation of the airport system also extends the municipalities of Alcobendas, San Sebastián and Paracuellos de Jarama.
10
Figure 1.3 Site plan of Terminal 4, Barajas Airport
Figure1.4 OS map
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
11
ADS 5 Royal College of Art
1.0 INTRODUCTION
DESIGN CONCEPT
Madrid’s Barajas Airport, designed by Richard Rogers Partnership in collaboration with Estudio Lamela, features a kilometre-long undulating steel roof, shaped in cross-section to resemble a bird in flight. This roof is supported on a bank of central columns painted in the colours of the spectrum and is punctuated by a series of roof lights providing natural lighting throughout the upper level of the terminal.
AIRPORTS AND BIG SHEDS
Light-filled ‘canyons’ divide the parallel floors that accommodate the various stages of passenger processing - from point of arrival, through check-in and passport and security controls to departure lounges and, finally, to the aircraft. https://www.ajbuildingslibrary.co.uk/projects/display/id/898
12
Figure 1.6 Facade terminal, cross section
Royal College of Art ADS 5 AIRPORTS AND BIG SHEDS
Figure 1.5 Interior view of Terminal 4, Barajas Airport
13
ADS 5 Royal College of Art
1.0 INTRODUCTION
TYPICAL STRUCTURAL BAY
18m x 121 for Rooftop
72m
x 46.5 for Level 2 x 106 for Level 1 x 121 for Level 0 x 85 for Level -1
14
AIRPORTS AND BIG SHEDS
x 89 for Level -2
Royal College of Art ADS 5
0m
27m
54m
108m
216m
AIRPORTS AND BIG SHEDS
Figure 1.7 Terminal section
Figure 1.8 Roof of Terminal 4 Barajas Airport
15
ADS 5
1.0 INTRODUCTION
Royal College of Art
EXISTING COMPONENTS
SIMPLE STRUCTURAL BAY WITH STANDARD DETAILS
AIRPORTS AND BIG SHEDS
The basic element of the terminal is a system of post-stressed concrete beams (fig. 1) and columns from which metal supports (fig. 2) branch off that support the winding main beams of the building roof. Thus, a double-curvature, modular, and repetitive surface is generated that spans over the entire area occupied by the buildings.
16
Figure 1.9 typical structural bay
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
Figure 1.10 Exploded axonometric drawings
17
ADS 5 Royal College of Art
1.0 INTRODUCTION
STRUCTURAL SOLUTIONS METAL V-SUPPORTS Each main beam has four support points - two in the centre and two on the sides - all of which lean on metal supports embedded in concrete plinths of a special design for the building structure support. (Fig1.11) The trunco-conical central supports are inclined forming a V with a section of 750 mm in the base and of 400 mm at the head. These elements were fabricated from 16-mm thick S355 steel plate and are joined to the main beams by means of a spherical joint with a 42 CrM04+QT steel pin. (Fig1.12)
AIRPORTS AND BIG SHEDS
METAL Y-SUPPORTS RODS The support points of the main beam ends consist in Y-shaped columns at an angle of 19º. Like a Y letter, the top section branches off in two separate arms each supporting a main beam. (Fig1.13) The selection of this structural option gave rise to a significant architectural constraint: these elements must cause minimum visual impact through the facades while contributing, at the same time, to the spatial definition of the canyons. They are formed by two elliptical tubes made of 14-mm thick steel plate in grade S355 with sections of 480 mm and 240 mm. Even though they receive only a vertical reaction and despite their inclination and Y-shape, a very important bending effect is generated, partially reduced by the stays located at the head of either arms and by the bottom flexible connection. (Fig1.14) In the sections where they run parallel, these tubes are plate-joined at different heights, thus yielding a performance equivalent to that of battened columns. The arm top sections are joined by a tubular stay (Ø159.20). The bottom support is articulated by means of a 42 CrM04+QT steel pin, whereas the upper end is joined to the main steel beam using a spherical joint with a 42 CrM04+QT steel pin.
FACADE CURTAIN WALL & STAINLESS STEEL RODS
18
The facade curtain wall contributes significantly to the stability of the assembly by bracing the roof structure to the concrete beams by means of a system of stainless steel rods distributed over the entire building perimeter. (Fig1.15)
Royal College of Art ADS 5
Figure1.12 V supports (indoor) Figure 1.11 V supports (outdoor)
AIRPORTS AND BIG SHEDS
Figure 1.14 Y supports (outdoor)
Figure 1.13 Y supports (indoor)
Figure 1.15 Facade curtain wall & stainless steel
19
ADS 5 Royal College of Art
1.0 INTRODUCTION
MAIN BEAMS
20
AIRPORTS AND BIG SHEDS
With a length of 72 m, on-site measured, and arranged at 9 m from each other under the entire roof surface, the main beams allow for a geometric profile that has a great relevance to the eye-catching shape of the building. These seagullwing profiled beams are symmetric I sections with variable edge dimensions, ranging from a 1500 mm depth in the centre to a 750 mm depth in the area of the leaning shores. The wings have a section of 500 x 30 mm, with the web being made of 15 mm thick plate. For this, steel grade S355 J2G3 was selected except in the areas with higher curvature radii where, due to the stress increase produced by the deviation of the longitudinal strains, it was necessary to use a higher steel grade in the wings (S420N).
SECONDARY BEAMS Forming arches between the main beams, perpendicular secondary beams were used leaving a 3.5 m span between them. They were fabricated from rolled sections (IPE-500, HEB-500, and HEB-700) in grade S355 J2G3 that support UPN100 purlins in grade S275, on which the roof surface leans.
Royal College of Art ADS 5
EXPANSION JOINTS They are arranged at 72-m intervals to correspond with the building expansion joints, placed cross-sectionally on one the sides of the main beam, with a sliding bearing system for all the secondary beams set on to it.
A SPECIAL BRACING SYSTEM RODS It was set up to prevent buckling in some components along the roof, to distribute horizontal forces, and to optimise load transmission to the support elements. AIRPORTS AND BIG SHEDS
Figure 1.16 Secondary beams and bracing system
21
ADS 5 Royal College of Art
1.0 INTRODUCTION
CONCRETE STRUCTURES They are made up of 40 circular & rectangular pillars and reinforced & posttensioned beams. (Figure 1.17) 40 rectangular section forming porticoes with the structural modulation of 18 by 9 m of the building.
22
AIRPORTS AND BIG SHEDS
The circular pillars have diameters between 1.2m and 0.8m. The rectangular pillars are found in the central and central porticoes. (Figure 1.18) Paired form forming a rigid transverse action gantry post-tensioned beams. 180m wide by 0.8 meters deep both on Level 0 or lower and on Level 1 & Level 2. Their length is 18m spans with the expansion joint. The active reinforcement it consists of tendons of 15 cords each measuring 0.6 inches. (Figure 1.19) The slab on its surface is made up of precast pre-stressed alvelar plates of 7 with 38m between supports and 20cm / 30cm deep and a layer of compression of 10cm thk. The rest of the floors are reinforced concrete slabs. There are areas of smaller surface executed with prefabricated plates with a section for passage of facilities.
Royal College of Art ADS 5
Figure 1.17 Rectangular and circular concrete pillars
Figure 1.19 Post-tensioned concrete beams
AIRPORTS AND BIG SHEDS
Figure 1.18 Central concrete support
23
24 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
1.0 INTRODUCTION
CONSTRUCTION METHODOLOGY
A E
B F
C G
D
H
Royal College of Art ADS 5
M
J
N
K
O
L
P
AIRPORTS AND BIG SHEDS
I
Figure 1.20 Hypothesis of the Construction Process T4 Madrid Barajas Airport
https://www.deepl.com/en/translator#es/en/ Hip%C3%B3tesis%20del%20Proceso%20 Constructivo%20Aeropuerto%20T4%20Madrid%20 Barajas
25
ADS 5 Royal College of Art
1.0 INTRODUCTION
VENTILATION SYSTEM
Displacement ventilation systems are widely used in spaces of small and medium heights (up to 7.5 m), taking advantage of their high efficiency in removing contaminants by means of the air stratification. The higher the return is placed, the lesser airflow rate is needed to match the additional cooling load due to radiation from the ceiling.
AIRPORTS AND BIG SHEDS
The system consists of displacement diffussers on both sides of the central V-support, supply jet nozzles in totem where the exhaust air returns, and jet nozzles air curtain right at the bottom of facade curtain wall.
26
Figure 1.21 Ventilation system
Royal College of Art ADS 5
Return air
4 air nozzles
Return air duct
AIRPORTS AND BIG SHEDS
Supply air duct nozzles
Exhaust air (return)
Supply jet nozzles in totem
Jet nozzles air curtain
Displacement diffusser
Displacement diffusser
Figure 1.22 Ventilation diagram
27
28 AIRPORTS AND BIG SHEDS
2 EXISTING CONDITIONS
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
29
ADS 5 Royal College of Art
2.0 EXISTING CONDITIONS
DRAWINGS BUILDING SECTION Steel roof with zinc cover + concrete & steel support + steel facade + concrete slabs & beams
AIRPORTS AND BIG SHEDS
1:200
5.775m
±0.000m
-8.400m
-15.135m
72 m
30
Front Section
Royal College of Art ADS 5
1
2
3
5
6 1 1mm thk. zinc 2 Steel grade
7
8
9
10
S355 J2G3 Roll Section Secondary beam 3 Steel grade S275 UPN-100 purlins 4 5mm laminated bamboo strips 5 Steel grade S355 double-elliptical tubes 6 Facade curtain wall & Stainless steel rods 7 Concrete plinth Reinforced concrete slab
AIRPORTS AND BIG SHEDS
4
8 Poststressed concrete beams 9 Concrete columns
11
10 Reinforced concrete slab 11 Reinforced concrete
Foundation beams
1:200
0
2
10
20M
31
ADS 5 Royal College of Art
2.0 EXISTING CONDITIONS
DRAWINGS BUILDING SECTION Steel roof with zinc cover + concrete & steel support + steel facade + concrete slabs & beams
1:200 1
2
3
AIRPORTS AND BIG SHEDS
4
5.775m 5
6
±0.000m
-8.400m 1 1mm thk. zinc 2 Steel grade
S355 J2G3 I beam Section Main beam 3 50mm Steel rod 4 Steel grade S355 double-elliptical tubes 5 Facade curtain wall & Stainless steel rods 6 Concrete plinth
-15.135m
4.5 m
32
Side Elevation
9m
4.5 m
Royal College of Art ADS 5
1
2
3
1 Steel grade
5 6
7 8
S355 J2G3 Roll Section secondary beam 2 Steel grade S355 J2G3 I beam Section Main beam 3 Ø400-750x16 mm Steel grade S355 double-trunco-conical central support 4 Concrete plinth 5 Reinforced concrete slab
AIRPORTS AND BIG SHEDS
4
6 Poststressed
concrete beams 7 Concrete columns 9
8 Reinforced
concrete slab 9 Reinforced concrete
Foundation beams
Side Section
1:200
0
2
10
20M
33
34 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
2.0 EXISTING CONDITIONS
DRAWINGS
DETAIL 1
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
35
36 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
2.0 EXISTING CONDITIONS
DRAWINGS
DETAIL 2 1:20
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
37
38 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
2.0 EXISTING CONDITIONS
DRAWINGS
DETAIL 3 1:20
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
39
40 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
2.0 EXISTING CONDITIONS
DRAWINGS
DETAIL 4 1:20
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
41
Royal College of Art AIRPORTS AND BIG SHEDS
3
42
CARBON COPY A: ENTIRELY TIMBER
ADS 5
ADS 5 AIRPORTS AND BIG SHEDS
Royal College of Art
43
ADS 5 Royal College of Art
3.0 CARBON COPY A
SUMMARY ENTIRELY TIMBER In order to reduce the overall emboided carbon, we bagan by changing the most carbon intensive elements of the existing structural solution - the reinforced concrete and concrete blocks. Why use concrete when you can use the inherient strength of stone in a carbon negative and more efficient process?
AIRPORTS AND BIG SHEDS
We have investigated four options, two carbon copies and two what if...options to assess which method is the greenest, fastest and cheapest. Our investigations show that with extended thinking about material qualities, Structural feasibility and detail node construction that it is possible to build carbon copies of the Barajas Terminal 4 that are cheaper and greener. Carbon copy A using mostly timber makes it a negative embodied carbon and the greenest option among all. However, using a large amount of laminated wood, which also makes it the most expensive option, is even more costly than the existing building made with steel and concrete, making it the least preferable choice in reality.
152.3% IN EMBODIED CARBON
44
EMBODIED CARBON COMPARISON
Royal College of Art ADS 5
36.3% IN PROJECT COST
COST COMPARISON
AIRPORTS AND BIG SHEDS
Figure 3.0 EMBT’s Timber Central Station in Naples
45
ADS 5 Royal College of Art
3.0 CARBON COPY A
DRAWINGS BUILDING SECTION Timber roof with stone tiles + timber support + timber facade + timber slabs & beams
1:200
AIRPORTS AND BIG SHEDS
Refer Detail 3
R
5.775m
Refer Detail 4
±0.000m
-8.400m
-15.135m
72 m
46
Front Section
Royal College of Art ADS 5
1
2
3
Refer Detail 2
5
6 7
8
1 20mm thk. limestone tile 2 500x750mm section Glulam hardwood secondary beam 3 hardwood purlins
9
4 5mm laminated bamboo strips
AIRPORTS AND BIG SHEDS
4
5 Timber “V”-supports 6 Timber “Y”-supports 10
7 CLT softwood slab 8 Glulam hardwood beams 9 Glulam hardwood column
11
10 Stone slab 11
1:200
0
2
10
Stone foundation beams
20M
47
ADS 5 Royal College of Art
3.0 CARBON COPY A
DRAWINGS BUILDING SECTION Timber roof with stone tiles + timber support + timber facade + timber slabs & beams
1:200 1
2
3
AIRPORTS AND BIG SHEDS
4
5
5.775m
6 7
±0.000m 1 20mm thk.
8
limestone tile 2 500x750mm
Glulam hardwood Main beam 3 50mm Steel rod 4 250mm Hardwood branches 5 Steel Connector to branches 6 700mm Hardwood central support 7 150 x 400 mm Hardwood support facade window 8 Steel Connector
-8.400m
-15.135m
4.5 m
to floor
48
Side Elevation
9m
4.5 m
Royal College of Art ADS 5
Refer Detail 1
1
2
3
5
1 500x750mm section
6 7
8
9 10
Side Section
1:200
0
2
10
Glulam hardwood secondary beam 2 500x1500mm Glulam hardwood Main beam 3 250mm Hardwood branches 4 Steel Connector to branches 5 700mm Hardwood central support 6 CLT softwood slab
AIRPORTS AND BIG SHEDS
4
7 600x1800mm
Glulam hardwood beams 8 Glulam hardwood column 9 Stone slab 10 Stone foundation beams 20M
49
50 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
3.0 CARBON COPY A
DRAWINGS
DETAIL 1
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
51
ADS 5
3.0 CARBON COPY A
Royal College of Art
DRAWINGS DETAIL 2 1:20
1
1
AIRPORTS AND BIG SHEDS
1
2
1
2
2
3
23
4 5
3
4 5 6
34 5 4 56 6
7
7 8
52
Timber “V”-supports connection detail isometric cutaway
6
7 8
8 7 8 1 700x700mm Hardwood glulam column
5 40mm Bea
6 40mm Cro steel plate 2 20mm Cross connection 1 700x700mm 5 40mm7 Bearing Hardwood steel plate ø60mm ste Pin Timber “V”-supports glulam column 6 40mm Cross conn 3 40mm Bearing steel plate 8 1400x700m connection detail steel plate 2 20mm 4 Cross 40mmconnection Connection steel plate isometric cutaway glulam colu 1 700x700mm 57 40mm Hardwood Bearing stee steel plate 1 700x700mm Hardwood 5 40mm Bearing steel plate ø60mm Pin Timber “V”-supports 6 40mm Cross conne 3 glulam 40mm column Bearing steel plate connection detail glulam column 6 40mm Cross connection 8 1400x700mm Hard steel plate 24 20mm Cross connection 40mm Connection steel plate isometric cutaway glulam column steel plate 2 20mm Cross connection steel plate 7 ø60mm Pin Timber “V”-supports steel plate 7 ø60mm Pin Timb 3 40mm Bearing steel plate 8 1400x700mm Hardw connection detail 3 40mm Bearing steel plate 8 Connection conn 1400x700mm Hardwood 4 40mm steel plate isometric cutaway glulam column 4 40mm Connection steel plate glulam column
Royal College of Art
1
ADS 5
2
3 4 5 6 7 8
AIRPORTS AND BIG SHEDS
1 2
3 4 5 6 7 8
el plate
ection
wood
Timber “V”-supports connection detail section
1:20
0
0.2
1M
53
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS
3.0 CARBON COPY A
DRAWINGS DETAIL 3 1:20
1
1 2 3 4 5
1 2 2 3 3
4 5
4 5
6
6
7
54
Timber“Y”-supports connection detail isometric cutaway
Timber“Y”-supports 1 ø250mm connectionglulam detail column isometric cutaway 2 20mm Cross connection Timber“Y”-supports steel plate connection detail isometric 3 20mm Bearing steel plate cutaway 4 40mm Joint steel plate
6 7 7
1 ø250mm glulam column 2 20mm Cross connection 1 ø250mm 5 20mm Bearing st steel plate glulam column 6 Cross connection 3 20mm Bearing steel plate 40mm Joint steel plate 2 4 20mm Cross connection 7 Hardwood glulam 5 20mm Bearing stee steel plate 5 20mm Bearing steel plate Timber“Y 6 Cross connection s 3 20mm Bearing steel plate 6 Cross connection steel plate 40mm connectio 4 40mm Joint steel plate 7 Hardwood glulam c 7 Hardwood glulam column 700mm ø
Royal College of Art
2
3
ADS 5
4
5 6 7
AIRPORTS AND BIG SHEDS
el plate steel plate 40mm column 700mm ø
1
1 2 3 4
5
6 7
Timber“Y”-supports connection detail section
1:20
0
0.2
1M
55
ADS 5 Royal College of Art
3.0 CARBON COPY A
DRAWINGS DETAIL 4 1:20
1 1 1
AIRPORTS AND BIG SHEDS
2 2 2
3 34 3
4
4
5 5
5 6 6 6
1 ø700 mm Hardwood glulam column
56
2 40mm Cross connection steel plate Timber “Y”-supports connection 3 30mm Bearing detail isometric cutaway Timber “Y”-supports connection steel plate detail isometric cutaway 4 40mm Bearing Timber “Y”-supports connection steel plate detail isometric cutaway
1 ø700 mm Hardwood glulam mmcolumn Hardwood 1 ø700 40mmcolumn Cross connection 2glulam steel plate Cross connection 2 40mm plate 30mm Bearing 3steel steel Bearing 3 30mm plate 40mm Bearing 4 steel plate steel plate Bearing 4 40mm 40mm Joint 5steel plate steel plate 6 30mm Anchor bar
5 40mm Join steel plate Joint 5 40mm 6 30mm Anch steel plate 6 30mm Ancho Timber tion de
2
ADS 5
3 4
5 6
AIRPORTS AND BIG SHEDS
or bar
Royal College of Art
t
1
1
2 3 4
5 6
Timber “Y”-supports connection detail section
1:20
0
0.2
1M
57
Royal College of Art AIRPORTS AND BIG SHEDS
3
58
CARBON COPY B: TIMBER + STONE
ADS 5
ADS 5 AIRPORTS AND BIG SHEDS
Royal College of Art
59
ADS 5 Royal College of Art
3.1 CARBON COPY B
SUMMARY HYBRID TIMBER + STONE In order to reduce the overall emboided carbon, we bagan by changing the most carbon intensive elements of the existing structural solution - the reinforced concrete and concrete blocks. Why use concrete when you can use the inherient strength of stone in a carbon negative and more efficient process?
AIRPORTS AND BIG SHEDS
We have investigated four options, two carbon copies and two what if...options to assess which method is the greenest, fastest and cheapest. Our investigations show that with extended thinking about material qualities, Structural feasibility and detail node construction that it is possible to build carbon copies of the Barajas Terminal 4 that are cheaper and greener. Carbon copy B uses mainly stone, making it almost a zero embodied carbon solution. Theoretically, stone can be used half of the volume compared to the existing building which can help reduce almost half the price and make it the best choice in carbon copy.
98.4% IN EMBODIED CARBON
60
EMBODIED CARBON COMPARISON
Royal College of Art ADS 5
47.1% IN PROJECT COST
AIRPORTS AND BIG SHEDS
Figure 3.1 New Fundamentals Research Group, in partnership with S.N.B.R., designed and fabricated a stone vaulted pavilion for Rocalia
COST COMPARISON
61
ADS 5 Royal College of Art
3.1 CARBON COPY B
DRAWINGS BUILDING SECTION Timber roof with stone tiles + hybrid timber/stone support + timber facade + stone slabs & beams
1:200
AIRPORTS AND BIG SHEDS
Refer Detail 3
R
5.775m
Refer Detail 4
±0.000m
-8.400m
-15.135m
72 m
62
Front Section
Royal College of Art ADS 5
1
2
3
Refer Detail 2
AIRPORTS AND BIG SHEDS
4 5 6
7
8
1 20mm thk. limestone tile 2 500x750mm section
9
Glulam hardwood secondary beam 3 hardwood purlins 4 5mm laminated bamboo strips
10
11
5 Hardwood branches 6 Stone column support 150 x 400 mm Hardwood 7 Stone slab 8 Post-tensioned stone
beams
9 Stone columns 10 Stone slab 11 Stone foundation
beams
1:200
0
2
10
20M
63
ADS 5 Royal College of Art
3.1 CARBON COPY B
DRAWINGS BUILDING SECTION Timber roof with stone tiles + hybrid timber/stone support + timber facade + stone slabs & beams
1:200 1
2
AIRPORTS AND BIG SHEDS
3 4
5
5.775m
6 7
±0.000m 1 20mm thk.
limestone tile
8
2 500x750mm
Glulam hardwood Main beam 3 50mm Steel rod
-8.400m
4 250mm Hardwood
branches 5 Steel Connector
to branches 6 700mm
-15.135m
Column support
7 150 x 400 mm Hardwood support facade window 8 40mm Steel bracket
4.5 m
64
Side Elevation
9m
4.5 m
Royal College of Art ADS 5
Refer Detail 1
1
2
3
5
1 500x750mm section
6 7
8
9 10
Side Section
1:200
0
2
10
Glulam hardwood secondary beam 2 500x1500mm Glulam hardwood Main beam 3 250mm Hardwood branches 4 Steel Connector to branches 5 700mm
AIRPORTS AND BIG SHEDS
4
column support 6 Stone slab 7 600x900mm
Post-tensioned stone beams 8 Stone columns 9 Stone slab 10 Stone foundation beams
20M
65
ADS 5 Royal College of Art
3.1 CARBON COPY B
DRAWINGS DETAIL 2 1:20
1
AIRPORTS AND BIG SHEDS
1
2
1 2
3
3
4
2 3
4
5
5 4
6
5 6 7 6
7
8
8 7 8
66
Timber+stone “V”-supports connection detail isometric cutaway
1 Timber+stone “V”-supports connection detail isometric 2 cutaway Timber+stone 1 “V”-supports 700x700mm Hardwood 3 connection detail isometric glulam column 4 cutaway 2 20mm Cross connection steel plate 3 40mm Bearing steel plate 4 40mm Connection steel plate
1 700x700mm Hardwood 5 40mm Be glulam column 6 20mm cem 2 20mm Cross connection 7 60mm Te 700x700mm Hardwood 5 40mm Bearing s steel plate 8 700x680 La glulam column 3 40mm Bearing steel plate 6 20mm cement 20mm Cross connection 7 60mm Tension r 4 40mm Connection steel plate steel plate 8 700x680 Laminate 5 40mm Bearing steel plate 40mm Bearing steel plate 6 20mm cementsteel plate 40mm Connection 7 60mm Tension rod 8 700x680 Laminated Limestone Timber+ connecti
Royal College of Art
1
ADS 5
2
3 4 5 7 8
AIRPORTS AND BIG SHEDS
1 2
3 4 5
7 8
steel plate
rod ed Limestone
Timber+stone “V”-supports connection detail section
1:20
0
0.2
1M
67
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS
3.1 CARBON COPY B
DRAWINGS DETAIL 3 1:20
1
1 1
2
2 3 4
2 3 4
3 4
5
5 6
5 6
7
6 7
1 ø250mm Hardwood 5 20mm glulam column 6 60mm 2 20mm Cross connection 7 800x7 Timber+stone “Y”-supports steel plate Lamin 1 ø250mm Hardwood 5 20mm Bearing st connection detail isometric 3 20mm Bearing steel plate linest glulam column cutaway 4 40mm Joint steel plate 6 60mm Tension st connection 2 20mm Cross 1 ø250mm Hardwood 5 20mm Bearing steel plate7 800x700x690mm Timber+stone “Y”-supports steel plate glulam column 6 60mm Tension steel rod Laminated tensio connection detail isometric 3 20mm Bearing steel plate linestone column 2 20mm Cross connection 7 800x700x690mm cutaway 4 40mm Joint steel plate Timber+stone “Y”-supports Tim steel plate Laminated tension connection detail isometric con 3 20mm Bearing steel plate linestone column cutaway 4 40mm Joint steel plate
68
7
Royal College of Art
2
3
ADS 5
4
5
6 7
AIRPORTS AND BIG SHEDS
teel plate teel rod m on n
1
1
2 3
4
5 6 7
Timber+stone “Y”-supports connection detail section
1:20
0
0.2
1M
69
ADS 5 Royal College of Art
3.1 CARBON COPY B
DRAWINGS DETAIL 4 1:20
1 1
AIRPORTS AND BIG SHEDS
1 2
2
2 3
3
3
4 4
4 5 5 6
70
1 20mm cement Timber+Stone “Y”-supports connection 2 Laminated tension detail isometric cutaway linestone column 800x700x690mm Timber+Stone “Y”-supports connection 3 Tension steel rod 60mm r+Stone “Y”-supports connection detail isometric cutaway 4 Steel bracket 40mm isometric cutaway
6
5 6
1 20mm cement 2 Laminated tension 1 20mmcolumn linestone cement800x700x690mm 2 Laminated tension 3 Tension steel rod 60mm 5 30mm Anch column 800x700x690mm 4 Steellinestone bracket 40mm 6 Bearing stee 3 Tension steel 5 30mm “Y”-suA 5 30mm Anchor bar rod 60mm Timber+Stone 4 Steel bracket 40mm 6detail Bearing connection sec 6 Bearing steel plate 40mm
Royal College of Art
2
ADS 5
3
4 5 6
AIRPORTS AND BIG SHEDS
Anchor bar g steel plate 40mm
1
1 2
3
4 5 6
Timber+Stone “Y”-supports connection detail section
1:20
0
0.2
1M
71
Royal College of Art AIRPORTS AND BIG SHEDS
4
72
WHAT IF ? ... A: TENSILE TIMBER
ADS 5
ADS 5 AIRPORTS AND BIG SHEDS
Royal College of Art
73
ADS 5 Royal College of Art
4.0 WHAT IF?... A
SUMMARY TENSILE TIMBER In order to reduce the overall emboided carbon, we bagan by changing the most carbon intensive elements of the existing structural solution - the reinforced concrete and concrete blocks. Why use concrete when you can use the inherient strength of stone in a carbon negative and more efficient process?
AIRPORTS AND BIG SHEDS
We have investigated four options, two carbon copies and two what if...options to assess which method is the greenest, fastest and cheapest. Our investigations show that with extended thinking about material qualities, Structural feasibility and detail node construction that it is possible to build carbon copies of the Barajas Terminal 4 that are cheaper and greener. What if A option uses alternative roof timber tensile structure advised by the structural engineer. The main difference is changing the shape of the beam in a more structurally natural form, which can reduce the number of timbers used to less than a half compared to Carbon Copy A. The structurally natural shape of the beam can help reduce the cost significantly. Also, it can still have a similar structure to the original design and requires no extra vertical support.structure to the original design and requires no extra vertical support.
93.6% IN EMBODIED CARBON
74
EMBODIED CARBON COMPARISON
Royal College of Art ADS 5
50.7% IN PROJECT COST
AIRPORTS AND BIG SHEDS
Figure 4.0 AA Design + Make students test the limits of timber in tensile woodland canopy
COST COMPARISON
75
ADS 5 Royal College of Art
3.2 WHAT IF? ... A
DRAWINGS BUILDING SECTION Tensile timber roof with stone tiles + hybrid support + timber facade + stone slabs, columns & beams
AIRPORTS AND BIG SHEDS
1:200
5.775m
±0.000m
-8.400m
-15.135m
72 m
76
Front Section
Royal College of Art ADS 5
1 2
3
AIRPORTS AND BIG SHEDS
4 5
6
7 1 1mm thk. ZINC Sheet 2 400x400mm Glulam
8
hardwood secondary beams 3 Φ100mm Bamboo bracing system 4 Hardwood branches 5 Stone column support 6 Stone slab 7 Post-tensioned stone
9
10
beams
8 Stone columns 9 Stone slab 10 Stone foundation
beams
1:200
0
2
10
20M
77
ADS 5 Royal College of Art
3.2 WHAT IF? ... A
DRAWINGS BUILDING SECTION Tensile timber roof with stone tiles + hybrid support + timber facade + stone slabs, columns & beams
1:200 1
2
AIRPORTS AND BIG SHEDS
3 4
5
5.775m
6 7
±0.000m 1 2
3 4 5 6 7
8
20mm thk. limestone tile 500x750mm Glulam hardwood Main beam Φ100mm Bamboo bracing system 250mm Hardwood branches Steel Connector to branches 700mm Stone
8
-8.400m
-15.135m
column support
150 x 400 mm Hardwood support facade window
Stone slab
4.5 m
78
Side Elevation
9m
4.5 m
Royal College of Art ADS 5
Refer Detail 1
1
2 3 4
6 1 800x400mm
7 8
9
10 11
Glulam hardwood Main beam 2 1mm thk. ZINC Sheet 3 400x400mm Glulam hardwood secondary beams 4 Φ100mm Bamboo bracing system
AIRPORTS AND BIG SHEDS
5
5 250MM Hardwood branches 6 700mm Stone column support 7 Stone slab 8 600x900mm
Post-tensioned stone beams 9 Stone columns 10 Stone slab 11 Stone foundation
beams
Side Section
1:200
0
2
10
20M
79
80 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
3.2 WHAT IF? ... A
DRAWINGS
DETAIL 1
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
81
Royal College of Art AIRPORTS AND BIG SHEDS
4
82
WHAT IF ? ... B: TENSILE TIMBER
ADS 5
ADS 5 AIRPORTS AND BIG SHEDS
Royal College of Art
83
ADS 5 Royal College of Art
4.1 WHAT IF?...B
SUMMARY STONE VAULT In order to reduce the overall emboided carbon, we bagan by changing the most carbon intensive elements of the existing structural solution - the reinforced concrete and concrete blocks. Why use concrete when you can use the inherient strength of stone in a carbon negative and more efficient process?
AIRPORTS AND BIG SHEDS
We have investigated four options, two carbon copies and two what if...options to assess which method is the greenest, fastest and cheapest. Our investigations show that with extended thinking about material qualities, Structural feasibility and detail node construction that it is possible to build carbon copies of the Barajas Terminal 4 that are cheaper and greener. What if...B option uses alternative roof stone tensile structure advised by the structural engineer. Compared to timber tensile structure in What if?...A, it eliminates the use of the bamboo bracing system, which can significantly reduce the amount of timber used, making it the cheapest option among all.
91.4% IN EMBODIED CARBON
84
EMBODIED CARBON COMPARISON
Royal College of Art ADS 5
70.6% IN PROJECT COST
AIRPORTS AND BIG SHEDS
Figure 4.1W Amin Taha + Groupwork Amin Taha designed a sculptural pavilion for the 2018 Venice Biennale
COST COMPARISON
85
ADS 5 Royal College of Art
4.1 WHAT IF?... B
DRAWINGS BUILDING SECTION Stone vault with stone tiles + hybrid timber/stone support + timber facade + stone slabs, columns & beams
AIRPORTS AND BIG SHEDS
1:200
5.775m
±0.000m
-8.400m
-15.135m
72 m
86
Front Section
Royal College of Art ADS 5
1 2
3 4
6
7
1 1mm thk. ZINC Sheet
8
AIRPORTS AND BIG SHEDS
5
2 5 layers of 10mm
Limestone 3 800x400mm Glulam hardwood Main beam
9
4 Hardwood branches
10
5 Hardwood branches 6 Stone column support 7 Stone slab 8 Post-tensioned stone
beams
11
9 Stone columns 10 Stone slab 11 Stone foundation
beams
1:200
0
2
10
20M
87
ADS 5 Royal College of Art
4.1 WHAT IF? ... B
DRAWINGS BUILDING SECTION Stone vault with stone tiles + hybrid timber/stone support + timber facade + stone slabs, columns & beams
1:200 1
2
AIRPORTS AND BIG SHEDS
3 4
5
5.775m
6 7
±0.000m
1 1mm thk. ZINC
Sheet 2 500x750mm
Glulam hardwood Main beam 3 5 layers of 10mm
-8.400m
Limestone 4 250mm Hardwood
branches 5 Steel Connector
to branches
-15.135m
6 700mm Stone column support 7 150 x 400 mm Hardwood support facade window
4.5 m
88
Side Elevation
9m
4.5 m
Royal College of Art ADS 5
Refer Detail 1
1
2 3
5
1 800x400mm
6 7
8
9 10
Side Section
1:200
0
2
10
Glulam hardwood Main beam 2 1mm thk. ZINC Sheet 3 5 layers of 10mm Limestone
AIRPORTS AND BIG SHEDS
4
4 250MM Hardwood branches 5 700mm Stone column support 6 Stone slab 7 600x900mm
Post-tensioned stone beams 8 Stone columns 9 Stone slab 10 Stone foundation beams
20M
89
90 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
4.1 WHAT IF? ... B
DRAWINGS
DETAIL 1
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
91
92 AIRPORTS AND BIG SHEDS
5 DATA COMPARISONS
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
93
ADS 5
5.0 DATA COMPARISONS
AIRPORTS AND BIG SHEDS
Royal College of Art
EMBODIED CARBON (EXISTING)
MATERIAL
ELEMENT
VOLUME M³
EMBODIED CARBON KGCO2E
Zinc Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof finish Insulation Vapour barrier Vapour control Acoustic Insulation
147 38,906 220 147 125
6,019,412 1,789,674 64,525 17,177 1,955,876
Galvanised steel profile Stainless steel
103 6,263
2,377,908 67,524,822
Bamboo
Metal deck Rod, roll section I beam and purlin Laminated strip
734
-687,075
Steel Concrete
Tube and support Plinth
2,012 2,584
21,698,068 1,725,951
Stainless steel
Window frame
605
6,520,678
Reinforced concrete
Beam, column, slab and foundation
275,493
120,941,501
94
TOTAL
293,036,452
Royal College of Art
COST ANALYSIS (EXISTING)
ADS 5
ELEMENT
VOLUME M³
COST £
Zinc Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof finish Insulation Vapour barrier Vapour control Acoustic Insulation
147 38,906 220 147 125
14,681,492 22,756,312 7,340,746 7,340,746 14,681,492
Galvanised steel profile Stainless steel
103 6263
11,745,193 23,308
Bamboo
Metal deck Rod, roll section, I beam and purlin Laminated strip
734
489,383
Steel Concrete
Tube and support Plinth
2,012 2,584
3,976 258,376
Stainless steel
Window frame
605
5,036
Reinforced concrete
Beam, column, slab and foundation
275,493
171,254,067
TOTAL
AIRPORTS AND BIG SHEDS
MATERIAL
250,580,126
95
ADS 5
5.0 DATA COMPARISONS
AIRPORTS AND BIG SHEDS
Royal College of Art
EMBODIED CARBON (CARBON COPY A)
MATERIAL
ELEMENT
VOLUME M³
EMBODIED CARBON KGCO2E
Limestone Aluminum EPDM rubber sheet Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof tile Channel and fixing Waterproofing Insulation Vapour barrier Vapour control Acoustic Insulation
2,936 44 220 38,906 220 147 125
554,960 713,303 708,861 1,789,674 64,525 17,177 1,955,876
Galvanised steel profile Hardwood
103 28,592
2,377,908 -29,249,629
bamboo
Metal deck Bracing,secondary beam, main beam and purlin Laminated strip
734
-687,075
Hardwood Steel
V support and column Rods and connector
5,690 296
-5,821,126 3,194,837
Hardwood
Window frame
751
-768,059
Hardwood Softwood Limestone
Beam and column Slab Foundation
67,541 108,023 90,193
-69,094,185 -75,940,324 17,046,401
96
TOTAL
-153,136,876
Royal College of Art
COST ANALYSIS (CARBON COPY A)
ADS 5
ELEMENT
VOLUME M³
COST £
Limestone Aluminum EPDM rubber sheet Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof tile Channel and fixing Waterproofing Insulation Vapour barrier Vapour control Acoustic Insulation
2,936 44 220 38,906 220 147 125
880,889 1,763,300 1,468,149 22,756,312 7,340,746 7,340,746 14,681,492
Galvanised steel profile Hardwood
103 28,592
11,745,193 19,061,342
bamboo
Metal deck Bracing system,secondary beam, main beam and purlin Laminated strip
734
489,383
Hardwood Steel
V support and column Rod and connector
5,690 296
3,793,500 585
Hardwood
Window frame
751
500,527
Hardwood Softwood Limestone
Beam and column Slab Foundation
67,541 108,023 90,193
42,702,685 180,038,700 27,057,780
TOTAL
AIRPORTS AND BIG SHEDS
MATERIAL
341,621,331
97
ADS 5
5.0 DATA COMPARISONS
AIRPORTS AND BIG SHEDS
Royal College of Art
EMBODIED CARBON (CARBON COPY B)
MATERIAL
ELEMENT
VOLUME M³
EMBODIED CARBON KGCO2E
Limestone Aluminum EPDM rubber sheet Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof tile Channel and fixing Waterproofing Insulation Vapour barrier Vapour control Acoustic Insulation
2,936 44 220 38,906 220 147 125
554,960 713,303 708,861 1,789,674 64,525 17,177 1,955,876
Galvanised steel profile Hardwood
103 28,592
2,377,908 -29,249,629
Bamboo
Metal deck Bracing, secondary beam main beam and purlin Laminated strip
734
-687,075
Hardwood Limestone Steel
V Support Column Tension rods and connector
2,747 4,888 200
-2,810,220 923,832 2,154,110
Hardwood
Window frame
751
-768,059
Limestone Steel
Slab, beam and column Tension rod
137,747 80
26,034,104 858,764
98
TOTAL
4,638,112
Royal College of Art
COST ANALYSIS (CARBON COPY B)
ADS 5
ELEMENT
VOLUME M³
COST £
Limestone Aluminum EPDM rubber sheet Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof tile Channel and fixing Waterproofing Insulation Vapour barrier Vapour control Acoustic Insulation
2,936 44 220 38,906 220 147 125
880,889 1,763,300 1,468,149 22,756,312 7,340,746 7,340,746 14,681,492
Galvanised steel profile Hardwood
103 28,592
11,745,193 19,061,342
Bamboo
Metal deck Bracing, secondary beam main beam and purlin Laminated strip
734
489,383
Hardwood Limestone Steel
V Support Column Tension rods and connector
2,747 4,888 200
1,831,358 1,466,400 395
Hardwood
Window frame
751
500,527
Limestone Steel
Slab, beam and column Tension rod
137,747 80
41,323,975 157
TOTAL
AIRPORTS AND BIG SHEDS
MATERIAL
132,650,365
99
ADS 5
5.0 DATA COMPARISONS
AIRPORTS AND BIG SHEDS
Royal College of Art
EMBODIED CARBON (WHAT IF? ... A) MATERIAL
ELEMENT
VOLUME M³
EMBODIED CARBON KGCO2E
Limestone Aluminum EPDM rubber sheet Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof tile Channel and fixing Waterproofing Insulation Vapour barrier Vapour control Acoustic Insulation
2,933 44 220 38,867 220 147 125
554,398 712,580 708,143 1,787,860 64,460 17,160 1,953,893
Galvanised steel profile Hardwood Hardwood
Metal deck Secondary & main beam Tensile structure
103 12,923 2,679
2,375,498 -13,220,024 -2,507,448
Hardwood Limestone Steel
V Support Column Tension rod and connector
2,747 4,888 200
-2,810,220 923,832 2,154,110
Hardwood
Window frame
751
-768,059
Limestone Steel
Slab, beam and column Tension rod
137,747 80
26,034,104 858,764
100
TOTAL
18,839,050
Royal College of Art
COST ANALYSIS (WHAT IF? ... A)
ADS 5
ELEMENT
VOLUME M³
COST £
Limestone Aluminum EPDM rubber sheet Rock wool Bitumen elastomer Fibre felt Perforated aluminum sheet
Roof tile Channel and fixing Waterproofing Insulation Vapour barrier Vapour control Acoustic Insulation
2,933 44 220 38,867 220 147 125
879,997 1,761,512 1,466,661 22,733,245 7,333,305 7,333,305 14,666,610
Galvanised steel profile Hardwood Hardwood
Metal deck Secondary & main beam Tensile structure
103 12,923 2679
11,733,288 8,615,200 1,785,980
Hardwood Limestone Steel
V Support Column Tension rod and connector
2,747 4,888 200
-2,810,220 923,832 2,154,110
Hardwood
Window frame
751
500,527
Limestone Steel
Slab, beam and column Tension rod
137,747 80
41,323,975 157
TOTAL
AIRPORTS AND BIG SHEDS
MATERIAL
123,431,915
101
ADS 5
5.0 DATA COMPARISONS
AIRPORTS AND BIG SHEDS
Royal College of Art
EMBODIED CARBON (WHAT IF? ... B)
MATERIAL
ELEMENT
VOLUME M³
EMBODIED CARBON KGCO2E
Limestone Aluminum EPDM rubber sheet Rock wool
Roof tile Channel & fixing Waterproofing Insulation
2,933 44 220 22,000
554,398 712,580 708,143 1,011,996
Limstone Resin Hardwood Bamboo
Vault Adhesive Main beam & purlin Laminated strip
7,333 587 10,776 733
1,385,995 6,073,704 - 11,024,045 - 686,379
Hardwood Limestone Steel
V Support Column Tension rod and connector
2,747 4,888 200
- 2,810,220 923,832 2,154,110
Hardwood
Window frame
751
- 768,059
Limestone Steel
Slab, beam and column Tension rod
137,747 80
26,034,104 858,764
102
TOTAL
25,128,923
Royal College of Art
COST ANALYSIS (WHAT IF? ... B)
ADS 5
ELEMENT
VOLUME M³
COST £
Limestone Aluminum EPDM rubber sheet Rock wool
Roof tile Channel & fixing Waterproofing Insulation
2,933 44 220 22,000
879,997 1,761,513 1,466,661 14,666,610
Limstone Resin Hardwood Bamboo
Vault Adhesive Main beam & purlin Laminated strip
7,333 587 10,776 733
2,199,991 Unknown 7,184,128 488,887
Hardwood Limestone Steel
V Support Column Tension rod and connector
2,747 4,888 200
1,831,358 1,466,400 395
Hardwood
Window frame
751
500,527
Limestone Steel
Slab, beam and column Tension rod
137,747 80
41,323,975 157
TOTAL
AIRPORTS AND BIG SHEDS
MATERIAL
73,770,599
103
104 AIRPORTS AND BIG SHEDS
6 FINDINGS
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
105
ADS 5 Royal College of Art
6.0 FINDINGS
FINAL COMPARITIVE FINDINGS CARBON COPY A: ENTIRELY TIMBER
AIRPORTS AND BIG SHEDS
Carbon copy A using mostly timber makes it a negative embodied carbon and the greenest option among all. However, using a large amount of laminated wood, which also makes it the most expensive option, is even more costly than the existing building made with steel and concrete, making it the least preferable choice in reality.
CARBON COPY B: HYBRID TIMBER + STONE Carbon copy B uses mainly stone, making it almost a zero embodied carbon solution. Theoretically, stone can be used half of the volume compared to the existing building� which can help reduce almost half the price and make it the best choice in carbon copy.
WHAT IF?... A: TENSILE TIMBER What if A option uses alternative roof timber tensile structure advised by the structural engineer. The main difference is changing the shape of the beam in a more structurally natural form, which can reduce the number of timbers used to less than a half compared to Carbon Copy A. The structurally natural shape of the beam can help reduce the cost significantly. Also, it can still have a similar structure to the original design and requires no extra vertical support.
WHAT IF?...B: STONE VAULT
106
What if...B option uses alternative roof stone tensile structure advised by the structural engineer. Compared to timber tensile structure in What if?...A, it eliminates the use of the bamboo bracing system, which can significantly reduce the amount of timber used, making it the cheapest option among all.
ADS 5 AIRPORTS AND BIG SHEDS
COST COMPARISON
Royal College of Art
EMBOODIED CARBON COMPARISON
107
108 AIRPORTS AND BIG SHEDS
7 APPENDICES
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
109
110 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
7.0 APPENDICES
PROPOSED ELEMENTS
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
111
112 AIRPORTS AND BIG SHEDS
Royal College of Art
ADS 5
7.0 APPENDICES
NOTES AND SKETCHES
28 Oct 2021
Royal College of Art
2 Nov 2021
ADS 5 AIRPORTS AND BIG SHEDS
113
114 AIRPORTS AND BIG SHEDS
Royal College of Art
9 Nov 2021
ADS 5
Royal College of Art
16 Nov 2021
ADS 5 AIRPORTS AND BIG SHEDS
115
116 AIRPORTS AND BIG SHEDS
Royal College of Art
23 Nov 2021
ADS 5
Royal College of Art
28 Nov 2021
ADS 5 AIRPORTS AND BIG SHEDS
117
118 AIRPORTS AND BIG SHEDS
Royal College of Art
2 Dec 2021
ADS 5
Royal College of Art
17 Jan 2022
ADS 5 AIRPORTS AND BIG SHEDS
119
120 AIRPORTS AND BIG SHEDS
8 MENU OF COMPONENTS
Royal College of Art
ADS 5
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
121
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS 122
8.0 MENU OF COMPONENTS
ROOFING DETAILS CARBON COPY A AND B
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
123
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS 124
8.0 MENU OF COMPONENTS
ROOFING DETAILS WHAT IF ?... A
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
125
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS 126
8.0 MENU OF COMPONENTS
ROOFING DETAILS WHAT IF ?... B
Royal College of Art
ADS 5 AIRPORTS AND BIG SHEDS
127
ADS 5 Royal College of Art
8.0 MENU OF COMPONENTS
V-SUPPORT DETAILS CARBON COPY A
1
1
21 1 3
AIRPORTS AND BIG SHEDS
2
4 2 3
53 64
2 3
5
4 5
4 6
5
7 6 8
6
7 8
7 8
Timber “V”-supports connection detail Timber “V”-supports isometric cutaway connection detail isometric cutaway
1 700x700mm Hardwood glulam column
128
V”-supports n detail cutaway
2 20mm Cross connection steel plate Timber “V”-supports 3 connection 40mm Bearing detailsteel plate 4 isometric 40mm Connection cutaway steel plate
7 1 700x700mm Hardwood glulam column
8
1 700x700mm Hardwood 2 20mm Cross connection glulam column
steel plate 2 20mm Cross connection 3 40mm Bearing steel plate steel plate 4 40mm Connection steel plate 3 40mm Bearing steel plate 4 40mm Connection steel plate
5 40mm Bearing stee
6 40mm Cross conne
5 40mm steel Bearing plate steel pla
6740mm Cross connection ø60mm Pin steel plate 1400x700mm Hardw Pin 78ø60mm
glulam column 8 1400x700mm Hardwood glulam column
5 40mm 1Bearing steel plate 700x700mm Hardwood glulam column 6 40mm Cross connection steel plate 2 20mm Cross connection 7 ø60mm Pin steel plate 3 40mm Bearing steel plate 8 1400x700mm Hardwood 40mm Connection steel plate glulam4column
5 40mm Be
6 40mm Cr steel plate ø60mm 7 Timber “V”-P connection 8 1400x700d glulam co
Royal College of Art
CARBON COPY B
ADS 5
1
2 2 3
1
2
2
3
3
4
4
5
5
3 4 4
5
6
6
AIRPORTS AND BIG SHEDS
1
1
5 7 6 6
7 8
8
7 7 8 Timber+stone “V”-supports connection detail isometric Timber+stone “V”-supports cutaway
1 8 700x700mm Hardwood glulam column 1 700x700mm Hardwood 5 2 Cross connection glulam20mm column 6 steel plate 2 20mm Cross connection 3 40mm Bearing steel plate 7 steel plate 4 40mm Connection steel plate8
5 40mm Bearing steel p 6 20mm cement 40mm Bearing steel plat 7 60mm Tension rod 20mm cement 8 700x680 Laminated Lim
60mm Tension rod 700x680 Laminated Limest
129
3 40mm Bearing steel plate connection detail isometric 1 700x700mm Hardwood 4 40mm Connection steel plate Bearing steel plate cutaway 5 40mm glulam column 1 700x700mm Hardwood 6 20mm cement 5 40mm Bearing steel plate 2 20mm Cross connection glulam column 7 60mm Tension rod 6 20mm cement steel plate 2 20mm Cross connection Timber+stone “V”-supports 7 60mm Tension rod 8 700x680 Laminated Limestone 3 40mm Bearing steel plate steel plate connection detail isometric 8 700x680 Laminated Limestone stone “V”-supports Timber+stone “V”-supp 4 40mm Connection steel plate 3 40mm Bearing steel plate cutaway on detail isometric connection detail sectio 4 40mm Connection steel plate
ADS 5 Royal College of Art AIRPORTS AND BIG SHEDS
8.0 MENU OF COMPONENTS
Y-SUPPORT DETAILS CARBON COPY A
1
1 2
1
2
1 3
2
3 4
2
4 5 3
3
5
4
4 5
6
5
6 7
6
7 Timber“Y”-supports connection detail isometric cutaway
130
er“Y”-supports ection detail isometric way
Timber“Y”-supports 1 ø250mm connectionglulam detail column isometric cutaway 2 20mm Cross connection Timber“Y”-supports steel plate detail steel isometric 3connection 20mm Bearing plate 4cutaway 40mm Joint steel plate
7
6
1 ø250mm 7 glulam column 2 20mm Cross connection steel plate 1 ø250mm 3 20mm Bearing steel plate glulam column 4 40mm Joint steel plate
5 20mm Bearing steel plate 6 Cross connection steel plate 4 7 Hardwood glulam column 70
2 20mm Cross connection 5 20mm Bearing steel plate steel plate 1 ø250mm 6 Cross connection steel plate 3 20mm Bearing plate glulam steel column 4 40mm2Joint steel plateconnection 7 Hardwood glulam column 7 20mm Cross 5 20mm Bearing stee steel plate 5 20mm Bearing steel plate Timber“Y”-supports 6connection Cross connection s 20mm Bearing steel40mm plate 6 Cross 3connection steel plate detail sec 4 40mm Joint steel plate 7 Hardwood glulam c 7 Hardwood glulam column 700mm ø
Royal College of Art
CARBON COPY B
ADS 5
1
22 1
2 3 4 5
1
33
2
44
3
5
5
AIRPORTS AND BIG SHEDS
1
4 6
5
6 7
6
Timber+stone “Y”-supports 7 connection detail isometric cutaway
6
7
1 ø250mm Hardwood glulam column 2 20mm Cross connection 7Hardwood 1 ø250mm steel plate glulam column Bearing steel plate 3 20mm 4 40mm Jointconnection steel plate Cross 2 20mm
5 20mm Bearing steel plate 6 60mm Tension steel rod 7 800x700x690mm 20mm Bearing steel plate 5Laminated tension 60mm column Tension steel rod 6linestone
7 800x700x690mm Timber+stone “Y”-supports steel plate Laminated tension connection detail isometric 3 20mm Bearing steel plate linestone column cutaway 4 40mm Joint steel plate 5 20mm Bearing steel plate 1 ø250mm Hardwood 1 ø250mm Hardwood 5 20mm Bearing steel plate glulam column 6 60mm Tension steel rod glulam column Tension steel rod7 800x700x690mm 6 60mm connection 2 20mm Cross Timber+stone “Y”-supports 2 20mm Cross connection steel plate 7 800x700x690mm Laminated tension +stone “Y”-supports Timber+stone “Y”-supp connection detail isometric steel plate steel plate 3 20mm Bearing Laminated tension linestone column ion detail isometric connection detail sectio cutaway 4 40mm Joint linestone 3 20mm Bearing steel plate steel platecolumn y 4 40mm Joint steel plate
131
ADS 5 Royal College of Art
8.0 MENU OF COMPONENTS
Y-SUPPORT DETAILS CARBON COPY A
1
1
AIRPORTS AND BIG SHEDS
1
1
2
2 2
2
3 4 3 4 3
3
4
4
5
5
6 5
5 6
6
6
1 ø700 mm Hardwood glulam column
1 ø700 mm Hardwood glulam column Timber “Y”-supports connection
132
40mm Cross connection detail 2isometric cutaway steel plate Timber “Y”-supports connection detail isometric cutaway3 30mm Bearing steel plate Timber “Y”-supports connection 40mm Bearing 4 Timber “Y”-supports connection detail isometric cutaway steel plate detail isometric cutaway
2 40mm Cross connect 1 ø700 mm Hardwood steel plate glulam column 3 30mm Bearing 2 40mm Cross connection 1 ø700 mm Hardwood steel plate steel plate glulam column 4 40mm Bearing 30mmCross Bearing 3 connection 2 40mm steel plate steelplate plate steel 5 40mm Join 4 40mm Bearing steel plate Bearing 3 30mm steel plate 6 30mm Anch steel plate 5 40mm Joint 5 40mm Joint Bearing 4 40mm Timber steel plate steel plate plate Ancho 6 30mmtion de 30mm Anchor bar 6steel
Royal College of Art
CARBON COPY B
ADS 5
1
1 1 2 2
3
2 3
3
3 4
4 4
AIRPORTS AND BIG SHEDS
1
2
5 6
4 5
5
5
6
6
6
Timber+Stone “Y”-supports connection detail isometric cutaway
1 20mm cement 2 Laminated tension linestone column 800x700x690mm 3 Tension steel rod 60mm 4 Steel bracket 40mm
1 20mm cement 2 Laminated tension linestone column 800x700x690mm 1 20mm cement 1 20mm cement Tension steel rod 60mm Timber+Stone “Y”-supports connection2 Laminated3tension 5 30mm Anchor 2 Laminated tension 4 Steel 800x700x690mm bracket 40mm detail isometric cutaway linestone column 800x700x690mm 6 Bearing steel p linestone column 3 Tension steel rod 60mm 3 Tension steel Timber+Stone Stone “Y”-supportsTimber+Stone connection “Y”-supports 5 30mm Anchor bar rod 60mm connection 5 30mm Anchor bar“Y”-supp 4 Steel bracket 40mm connection detail40mm sectio ometric cutaway detail isometric cutaway 6 4 Steel bracketBearing 40mm steel plate 40mm6 Bearing steel plate
133
ADS 5
ADS 5
CONTENTS 1.0_INTRODUCTION Architecture and Health
4
2.0_CASE STUDY: EVELINA LONDON CHILDREN’S HOSPITAL 6 7 8 10 12 14 18 20 22 26 27 HOSPITAL / LAB
HOSPITAL / LAB
Case Study Key Figures Site Overview Program Requirements Existing Structural Plans Existing Section Existing Elevation Existing Material Selection Existing Details (Concrete Frame, GRC Cladding) Existing Embodied Carbon Analysis Existing Cost Analysis 3.0_PROPOSED OPTION A: CLT TRUSS + STONE COLUMNS/CORE An Introduction to Timber Construction How can timber be applied to healthcare? CLT Healthcare Precedent: Dyson Neonatal Unit, Bath CLT Healthcare Precedent: Maggie’s Oldham CLT Structural Precedent: Sara Cultural Centre CLT Structural Precedent: Congress Centre, Agordo Proposed Structural Plan (Typical Floor) RCP (Typical Floor) Proposed 1:150 Wall Section Proposed Key Details (1:20) Proposed Embodied Carbon Calculations Proposed Cost Analysis
30 31 34 36 38 40 42 44 46 48 54 55
4.0_PROPOSED OPTION B: PRE-STRESSED STONE FLOORS, STONE COLUMNS/CORES
Royal College of Art
2
58 60 62 64 66 68 70 82 84 85
Royal College of Art
An Introduction to Stone Construction The Use of Stone in Healthcare Precedent: Stone Exoskeletons Proposed Structural Plan Proposed RCP Proposed 1:50 Section Key Details (1:5/1:10) Facade Detail Embodied Carbon Calculations Cost Analysis
3
ADS 5
ADS 5
1.0_INTRODUCTION
PURPOSE OF RESEARCH ARCHITECTURE & HEALTH
HOSPITAL / LAB
HOSPITAL / LAB
Advances in modern medicine mean we are now living longer than ever and spending an increasing amount of time in hospitals, either as patients or carers. Today, we automatically associate hospitals with an almost antiseptic architecture, one of disinfectant and sterilisation. Charles Jencks refers to hospitals as “huge, impersonal factories for manufacturing health.” Even the term “Health”, Edwin Heathcote argues has been commodified, commercialised, personalised and politicised. Traditionally, hospitals were a monument to the Gods, and later a monument to the sciences. Health was positioned at the heart of the city. In modern times there was a shift; the hospital became a machine, a highly complex and functional box that accommodates technology designed to prolong life. Heathcote suggests that this is where architecture “flatlined”. How can we reintroduce architecture into the medical process? How are we able to de-institutionalise the experience and create healthier buildings? With time, this particular typology will inevitably morph into something more complex. More recently, the NHS has become conscious of the role the built environment plays as a tool of “healing”. This year they even referenced the role of design within their long term plan and how they are unveiling a “healthier built environment”, despite using the most toxic materials. Can stone and timber be integrated within the hospital/laboratory typology?
Royal College of Art
Royal College of Art
Left to right: UCL Cancer Institute, Maggie’s Barts Central Atria
Aerial view of Evelina London Children’s Hospital extension Hawkins\Brown, 2021
4
5
ADS 5
ADS 5
2.0_EXISTING CONDITION
EVELINA LONDON HAWKINS\BROWN, 2021 KEY FIGURES AT A GLANCE Submission: 2021 Evelina London Children’s Hospital is an internationally renowned centre in children’s healthcare. It opened on the St Thomas’ Hospital site in Lambeth in 2005, bringing together the local paediatric services of St Thomas’ Hospital with the internationally recognised services at Guy’s Hospital. It is one of the largest providers of children’s healthcare in the UK. Activity in the hospital has doubled over the last 15 years. Despite Trust investment to expand facilities within the existing building and maintain the quality of care, the original hospital (designed by Hopkins Architects) is now too small to meet demand.
HOSPITAL / LAB
Aerial Rendering of Evelina London Children’s Hospital Extension, Image Credit:
6
Gross Internal Area (GIA): 27,306 m2 Typical Floor Gross Internal Area (GIA): 2,080 m2 Net Internal Area (NIA): 15,877 m2
KEY INFORMATION (BY LEVEL) LEVEL
FUNCTION
HEIGHT
SLAB DEPTH
LAYOUT TYPE
B2
Plant
6600
300
1 - Basement
B1
High Tech
5000
300
1 - Basement
0
Med Tech
3910
300
2 - Ground
1
High Tech
4950
250
3 - Typical
2
High Tech
4950
250
3 - Typical
3
High Tech
4950
250
3 - Typical
4
High Tech
4950
250
3 - Typical
5
Plant
4900
250
3 - Typical
6
Med Tech
4300
250
3 - Typical
7
Med Tech
4300
250
3 - Typical
8
Med Tech
4300
250
3 - Typical
9
Med Tech
4350
250
3 - Typical
10
Plant
4900
250
4 - Upper
11
Terrace/Plant
3850
250
4 - Upper
Roof
-
-
200
-
Royal College of Art
Royal College of Art
The proposal was submitted for planning in May 2021.
Storeys: 13, including 2 basement levels
HOSPITAL / LAB
The proposals include the demolition of St Thomas’ House and the Dunhill Fitness centre, to accommodate a new 11-storey building located directly south of the existing Evelina London Children’s Hospital, with connections from basement level B1 up to and including level 03. The two buildings will operate as a single entity. New accommodation will be provided over 13 floors, with two basement levels, three dedicated plant floors at B2 level, level 05 and level 10, an external terrace at level 03 and a roof terrace at level 11. Critical care, operating theatres and in-patient beds are provided with associated clinical support spaces. Space is also provided for research, imaging, dedicated staff and family areas, public reception and cafe space.
Height: 61.50m (AOD)
7
ADS 5
ADS 5
2.0_EXISTING CONDITION
SITE OVERVIEW The proposal site is located directly south of the existing Evelina London Children’s Hospital which sits at the southern end of the St Thomas’ Campus. The site faces onto the River Thames and towards the Palace of Westminster and the associated UNESCO World Heritage site. The site is within the Albert Embankment Conservation area and also the Waterloo Opportunity area. To the south east, on the opposite side of Lambeth Palace Road, is the Lambeth Palace conservation area. Westminster Bridge is located to the north and Lambeth Bridge to the south. The site sits within several protected viewing corridors as defined by the London View Management Framework (LVMF). These provide constraints to the overall scale of the proposals and the architectural character of any proposals.
HOSPITAL / LAB
8 7 6 1
5
4
2
3
HOSPITAL / LAB
Lambeth Palace Road is a busy, main route into central London. It is a TFL red route and also provides the main emergency access ‘Blue Light Route’ to and from the hospital approximately 50m north of the site. The busy road contributes to increased pollution levels (both in terms of particulates and noise) in the local environs. The air-borne particulates are mitigated somewhat by the relative strength of the prevailing south-westerly winds that approach the site having run up the river and along Lambeth Palace Road. Careful consideration of the microclimate is needed.
9
Aerial View of St Thomas’ Campus
The proposal site is located at the southern end of the St Thomas’ Hospital Campus, currently occupied by St. Thomas’ House (4) and the Dunhill Fitness Centre (10). The existing Evelina London Children’s Hospital (5) is immediately to the north, into which the new building will connect. Hospital Street (11) sits to the west of the site with the south wing to its west adjacent to the River Thames. The taller buildings in the central part of the campus are East Wing (6), Lambeth Wing (8), and North Wing (1), with Gassiot House beyond at the northern edge of the campus.
Royal College of Art
Royal College of Art
8
9
ADS 5
ADS 5
2.0_EXISTING CONDITION
HOSPITAL / LAB
HOSPITAL / LAB
PROGRAM REQUIREMENTS
Stacking Section Source: DAS, Planning Portal
The spatial requirement of the proposed building has been agreed as circa 28,000sqm (GIA) to accommodate the following: •
100 in-patient beds, including clinical research beds, and 20 critical care beds, provided in a range of en-suite and shared wards.
•
14 operating theatres and intervention rooms, as well as comprehensive diagnostic services and other supporting clinical functions to care for patients.
•
Diagnostic imaging suites in order to provide a variety of non-invasive methods of diagnosis using scanners like X-ray, MRIs and CT Scanners.
•
Research spaces and laboratories to support research into new medicines, technologies and therapies (such as gene therapy, which can mean individual patients are able to be treated more specifically and illnesses targeted at a genetic level.)
10
Day Rooms, Parent Rooms and Staff Welfare Spaces to provide space for rest, relaxation and respite - all of which are vital in providing a healthy and caring environment.
The result is a set of flexible and adaptable floor plates that can accommodate future change. As a result of this need for flexibility, the building height becomes pre-determined based on the number of floors of each type contained within the proposals. The diagram above shows a broad 50:50 allocation of high tech and medium tech spaces borne out of clinical studies and healthcare planning with the Trust. The floor typologies are arranged in clusters of high tech on the lower levels and medium tech on the upper levels, split by an interstitial plant floor serving the floors below and capped by a second plant floor serving the upper floors. This arrangement offers the most efficient use of internal area to minimise space required for M&E risers.
Royal College of Art
Royal College of Art
• •
The brief for the development calls for an adaptable estates response: a flexible and reworkable solution that can accommodate changes to the internal clinical environment with minimal impact to the building fabric. The response to this requirement is an internal stacking diagram providing floor types to meet specific performance criteria of required clinical fit-out typologies. These principles revolve around two fundamental types of floor plate: high tech and medium tech areas. The former requires an increased floor to floor and ceiling void to enable flexible servicing of high tech environments such as operating theatres, critical care facilities and/or imaging equipment. The latter, medium tech floors, require lower levels of servicing and have a reduced floor to floor height as a result of less intensive use. These are typically for non-critical care in-patient wards and therapy spaces.
11
ADS 5
ADS 5
2.0_EXISTING CONDITION
EXISTING STRUCTURAL PLANS - LEVEL 00
HOSPITAL / LAB
HOSPITAL / LAB
EXISTING STRUCTURAL PLANS - LEVEL B2
Existing Structural Plan: Level B2
Existing Structural Plan: Level 00 Non-Loadbearing Wall
Loadbearing Wall (Concrete)
Column
Non-Loadbearing Wall (Plasterboard)
Glazed Wall
Column (Concrete)
GRC Cladding
Glazed Wall
Pile Foundation
N
N
0 Scale 1:200
5
10
0
5
10
Scale 1:200
12
13
Royal College of Art
Royal College of Art
Loadbearing Wall
ADS 5
ADS 5
2.0_EXISTING CONDITION
EXISTING STRUCTURAL PLANS - LEVEL 00
HOSPITAL / LAB
HOSPITAL / LAB
EXISTING STRUCTURAL PLANS - TYPICAL
Existing Structural Plan: Level 10
Existing Structural Plan: Typical Floor Loadbearing Wall (Concrete) Non-Loadbearing Wall (Plasterboard)
Non-Loadbearing Wall (Plasterboard)
Column (Concrete)
Column (Concrete)
Glazed Wall
Glazed Wall
GRC Cladding
Royal College of Art
GRC Cladding
N
N
0
0
5
10
5
10
Scale 1:200
Scale 1:200
14
15
Royal College of Art
Loadbearing Wall (Concrete)
ADS 5
ADS 5
2.0_EXISTING CONDITION
HOSPITAL / LAB
HOSPITAL / LAB
EXISTING FOUNDATIONS
Existing Pile Foundation: Layout Ground-Bearing Concrete Floor Slab
Royal College of Art
Royal College of Art
800mm x 25m Concrete Pile Foundation
N
0
5
10
Scale 1:200
16
17
ADS 5
ADS 5
2.0_EXISTING CONDITION
HOSPITAL / LAB
HOSPITAL / LAB
EXISTING ELEVATION
Royal College of Art
Royal College of Art
18
19
ADS 5
ADS 5
2.0_EXISTING CONDITION
EXISTING MATERIAL SELECTION
Ribbed GRC Panel to match Portland Stone RIBBED GRC PANEL TO MATCH PORTLAND STONE
FRAMELESS GLASS Frameless glass panels PANELS
• Grey PPC performance louvres GREY PPC PERFORMANCE LOUVRES
• SolidGRC GRC panel tie inLAMBETH with Lambeth SOLID PANEL TO TIEto IN WITH RED TONES red tones
• Concrete columns to match
CONCRETE COLUMNS TO MATCH PortlandSTONE Stone PORTLAND
• •
Royal College of Art
20
•
GRC cladding is used across all areas of the façade and provides a harmonious and versatile palette that responds to the two distinct characters of local and city scale context. Three-dimensional panels give the cladding qualities of craft, solidity and permanence. Textured finishes and visible aggregate add quality, interest and life to the material at a closer scale. Large scale frameless structural glazing keeps details clean and crisp, de-cluttering the façade and working successfully with the scale of the horizontal banding. Ribbed slotted GRC panels add texture to the façade whilst allowing the ventilation louvres behind to function where required. Powder coated metal ventilation louvres alternate between the GRC slotted panels at level 5 balancing the rhythm of the elevation with the performance requirements of the plant floor. Light warm grey tones will be harmonious with the curtain walling and the upper levels GRC Perforated aluminium cladding will be used to clad the projecting fins which mitigate the wind velocity along the south east
Royal College of Art
FRAMELESS GLAZED CURTAIN Frameless glazed curtain WALLING, GREY MULLIONS INTERNALLY.grey MIX OF SEMI OPAQUE walling, mullions & CLEAR GLASS internally. Mix of semiopaque and clear glass.
elevation and on Lambeth Palace Road. Twin skin glazing allows the larger outer panels to appear seamless, with smaller internal openable windows enabling ease of cleaning and maintenance. The slab edge follows the sawtooth profile of the façade for consistent fire stopping, weathering detailing and structural support. Furthermore, highperformance specification of glazing and insulation reduces unwanted solar gain in summer and heat loss in winter, optimised with the building services to reduce energy use in heating and cooling.
HOSPITAL / LAB
HOSPITAL / LAB
Solid GRC panel to match Portland Stone SOLID GRC PANEL TO MATCH PORTLAND STONE
The materials palette selection for the proposal must have the versatility to address the two distinct characteristics of the site’s immediate and wider contexts. Glass reinforced concrete (GRC) was chosen by the Architect as the cladding material because it provides a versatile platform for a contextual response: variation in colour, tone and texture can easily be achieved, whilst maintaining a consistency of material to homogenise the building. Opportunities to vary the amount of texture and visible aggregate, as well as its three dimensional form, give the material a quality which can respond to its sensitive context positively to improve and enhance the conservation area.
21
PRODUCED BY AN AUTODESK STUDENT VERSION ADS 5
ADS 5
2.0_EXISTING CONDITION
EXISTING DETAILS DETAIL A. GRC PANEL HEAD/BASE 2
The proposed substructure is composed of: • Reinforced concrete piles, pile mats; • Reinforced concrete lowest floor slab, lift pits; and • Reinforced concrete retaining walls.
5 8
6
1
The proposed superstructure of the building is composed of: • Reinforced concrete frame and upper floors; and • Steel frame and composite slabs with concrete on metal deck.
C
PRODUCED BY AN AUTODESK STUDENT VERSION
B
7
The external wall systems for the proposed structure are: • Double glazed curtain wall with PPC aluminium frame; • Single glazed curtain wall with PPC aluminium frame; • Precast GRC rainscreen cladding; • Aluminium rainscreen cladding • Architectural rainscreen with decorative cement render finish The façade is to be constructed using a unitised façade system, allowing off-site manufacture and increasing the speed of installation compared to a site-assembled curtain walling system. It was conceived as a kit of parts that enables glazing and some of the solid panels to be interchangeable, allowing adaptability and reconfigurability for the internal environment. This inherently prolongs the life of the building and its components, and reduces the whole life cycle carbon usage of the project. This approach forces repetition into the design which enables a rigorous modular basis for construction with high levels of repetition to drive cost efficiencies.
DETAIL B. INTERSTITIAL BLIND 1. 150mm Rigid Insulation 2. 40mm Curtain Walling System 3. Motorized Blind System 4. Skim Coat 5. Head Rail
1
4 5 3
2
2
4 6
DETAIL C. GRC PANEL BASE/BAND JUNCTION
5
1
7 3
1. 350mm Concrete Floorslab 2. 40mm Curtain Walling System 3. 150mm Rigid Insulation 4. GRC Panel 5. GRC Support Bracket 6. 10mm x 24mm Isolation Pad 7. S. Steel Hollow Section
HOSPITAL / LAB
HOSPITAL / LAB
A
3
PRODUCED BY AN AUTODESK STUDENT VERSION
1. 350mm Concrete Floorslab 2. 40mm Curtain Walling System 3. 150mm Rigid Insulation 4. GRC Panel 5. GRC Support Bracket 6. Top Hat Bracket Fixing 7. Steel Frame 8. 10mm x 24mm Isolation Pads
4
Royal College of Art
Royal College of Art
PRODUCED BY AN AUTODESK STUDENT VERSION
22
23
ADS 5
HOSPITAL / LAB
HOSPITAL / LAB
ADS 5
2.0_EXISTING CONDITION
Royal College of Art
24
≠Proposed Elevation
25
Royal College of Art
≠Proposed Ground Floor entrance collonate
ADS 5
ADS 5
2.0_EXISTING CONDITION
COST ANALYSIS
EMBODIED CARBON CALCULATIONS
MATERIAL
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E
MATERIAL
QUANTITY M3
COST
COST £
Concrete
Core/Floor Slabs
32450
77,360,852
Concrete
32450
£100/ M2
£3,245,002
262
2,072,992
Galvanised 262 Structural Steel
£2500 / t
£644,500
Plasterboard
Internal Partitions/ Linings
2936
2,789,571
Flat Glass
163
£500/ M2
£32,600,000
GRC
Facade Cladding
2655
5,177,809
Fiber Felt
1320
£50/ M2
£16,500,000
Rockwool Insulation
Insulation
1814
54,409
Intumescent 2 Paint (For Steel)
£50/ M2
£400,000
Flat Glass
Curtain Walling
163
407,258
Plasterboard
2936
£20/ M2
£4,697,600
87,868,020
Vapour Barrier (Polyethylene)
26
£5/ M2
£32,500
Alumnium Sheets
8
£75/ Kg
£1,500,000
GRC
2655
£500/ M2
£88,500,000
TOTAL
26
Royal College of Art
Royal College of Art
TOTAL
HOSPITAL / LAB
HOSPITAL / LAB
Galvanised Columns/ Structural Steel Connections
£117,429,602
27
ADS 5
ADS 5
3.0_CARBON_COPY_A
CARBON COPY A: CLT EVELINA LONDON CHILDREN’S HOSPITAL
96%
78%
IN EMBODIED CARBON
IN PROJECT COST
CORE
Stacked stone; Granite / Basalt / Marble
COLUMNS
Pre-tensioned limestone,
LINTELS
Pre-tensioned stone, 600mm thickness all the time Limestone
BEAMS
Glulam beams + Partial cellular beams Softwood glulam + Hot rolled structural steel
FLOOR SLAB
Sustainably sourced CLT
OUTRIGGER
Granite / Basalt / Marble
HOSPITAL / LAB
HOSPITAL / LAB
STONE EXOSKELETON + TIMBER TRUSSES + STONE CORE
CONSTRUCTION METHODOLOGY Royal College of Art
28
Royal College of Art
Taking 15 Clerkenwell Close as a reference, the alternative proposal will build a stone exoskeleton for Evelina London. Simultaneously, the project will replace the original concrete core with stacked stone (using granite, basalt or marble). Timber trusses are used as the primary structural support for the flooring.
29
ADS 5
ADS 5
3.0_CARBON_COPY_A
TIMBER CONSTRUCTION
CROSS LAMINATED TIMBER
HOSPITAL / LAB
Left to right: Surrey Memorial Hospital, Maggie’s Leeds,
HOSPITAL / LAB
The emergence of cross-laminated timber (CLT) over the last two decades has provided a viable alternative to traditional construction methods (use of concrete, steel, cement). The production and use of cement is responsible for approximately 8% of the world’s CO2 emissions, a figure that will only increase if urban construction trends continue. If we were to build in timber, instead of materials with high levels of embodied carbon, we would save an average of 45 tons of CO2 per building. Development of mass timber products such as CLT has enabled timer to compete structurally at scale. Highly engineered products as such overcome many of the issues associated with the ‘timber frame’. Devised less than 25 years ago in Austria, CLT utilises a range of species and grades for high performance applications. Cross-laminating is a way of optimising varying grade softwood to create boards with a high and predictable strength. CLT panels themselves consist of layers of structural boards stacked in perpendicular layers and glued together under high pressure. A cross section of a CLT panel is typically fabricated with 3 to 9 layers of boards. By alternating the orientation of the layers of wood, expansion and shrinkage in the plane of the panel is minimised. The end result is an overall increase in stability and structural capacity. In short, CLT allows us to construct lighter, better quality buildings, more quickly, with reduced foundations and far fewer deliveries to site. This particular method of construction leads of safer, cleaner, quieter sites, with a reduced number of workers and consequently less nuisance to neighbours. The material itself performs as a form of thermal and acoustic insulation and also has verifiable health and well-being benefits.
IS IT APPLICABLE IN A HEALTHCARE SETTING? Alex de Rijke believes that in wood “there is hope, humanity, scale, warmth, and nature’s clever plan to absorb carbon.” Numerous healthcare architects have already started to explore the physiological benefits of using wood and natural materials in hospitals. Wood in particular is visually warm and contributes to a socially positive experience for building occupants. Despite the rise of mass timber construction, it has yet to be incorporated into a clinical setting. Timber is already being used in healthcare facilities but is typically relegated to nonclinical areas such as exterior canopies, lobbies, atria, and various other public spaces. Could this be applied to a clinical setting, to reverse the norms of hospital architecture, where clinical environments and management procedures make patients feel disempowered? It is important to note that among the physical requirements for human health, wood contributes naturally to humidity control by absorbing moisture from the air and releasing it when it is less humid. Finishes can also contribute to the control of air-borne contaminants as they are durable, easily maintained, dust-free after installation and emit few, if any, harmful vapours. Despite this, there are various considerations and roadblocks to adopting the use of mass timber within clinical areas of healthcare facilities. These include structural systems, fire protection and infection control.
Royal College of Art
Royal College of Art
30
31
ADS 5
ADS 5
3.0_CARBON_COPY_A
1. STRUCTURAL SYSTEMS
3. FIRE PROTECTION As wood is combustible it leads to an inevitable concern about fire performance of timber buildings, especially if being proposed in a high tech/energy intensive setting. As a result, local fire codes globally generally prevent the use of timber (alongside other combustible materials) in buildings over a certain height. On the other hand, UK building regulations, Part B relating to fire, essentially imply that any system can be used so long as it meets the objectives of the regulations. Specialist fire engineering is essential in order to minimise risk and ensure that the structure and linings present an appropriate solution. The nature of CLT is that it will begin to char once it is exposed to temperatures of over 300 degrees celsius. As the face of the timber chars, the zone of wood inside is heated, known as the pyrolysis zone in which the wood begins to undergo thermal decomposition. A “zero strength layer” of heated wood exists directly behind the char which has lost any form of structural performance. However, beyond this the wood is unaffected and will perform as normal structurally. By oversizing various elements to allow for a “sacrificial zone”, relevant fire performance can be met. Additional fire protection can be achieved through adding fire protective barriers such as plasterboard or fire-board, which typically provides up to 90 minutes of protection. In addition, do individual surfaces need protection in order to prevent the charring or ignition of the timber structure? Chemical retardants can also be used to reduce or prevent the spread of flame, however this may have an impact in that it might limit the timber’s re-use at the end of the building’s life. Can these
HOSPITAL / LAB
HOSPITAL / LAB
Entuitive, a Canadian engineering consultancy completed a research project with Forestry Innovation Investment (FII) to study the various structural systems that would meet the requirements to allow for timber as a building material in healthcare facilities. When comparing wood to more conventional elements used in healthcare architecture such as steel or concrete, wood beams must be deeper in order to achieve the long spans required for operating theatres and laboratories. This also presents issues with regards to servicing the structure as the structural elements will be deeper. Within the study, several flat ceiling hybrid floor systems were examined and proposed. These hybrid systems include the use of steel or concrete elements and are key to the introduction of mass timber to the healthcare realm, as the report states. The report also references use of a Glulam Truss that is manufactured within a controlled environment using lumber laminations that have been kiln dried. Could these particular systems be studied for the purpose of this exercise but be made entirely from engineered timber, instead of a combination of timber and steel?
2. INFECTION CONTROL
Royal College of Art
32
Royal College of Art
Infection control is a major roadblock and consideration for the use of timber within a healthcare setting. In high-tech/clinical specialist areas such as operating theatres , intensive care units, and imaging suites, surfaces have to be smooth and monolithic, as well as durable enough to withstand constant cleaning and disinfection. Exposed cellulose-based materials are not allowed due to their reaction to excessive moisture and sensitivity to wear. It is common that surfaces are required to be easy to clean, resistant to microbial spread and growth, smooth and non-porous, and seamless. Some authorities, including here in the UK reject the use of mass timber in specialist clinical environments. Concrete is also a porous material, however it is typically covered with epoxy flooring to meet various requirements. Can this be applied in the case of timber? Or can the floor finish itself be UV cured? Entuitive even suggests that the requirements to encapsulate mass timber for fire performance can be used to meet the requirements for infection control.
33
ADS 5
ADS 5
3.0_CARBON_COPY_A
CLT PRECEDENTS (HEALTHCARE) THE DYSON CENTRE FOR NEONATAL CARE, BATH FEILDEN CLEGG BRADLEY STUDIOS
HOSPITAL / LAB
HOSPITAL / LAB
This project was of interest due to the fact that it is the first example of use of CLT in a healthcare environment within the UK. Located within Bath’s Royal United Hospital, the project consists of a single-storey new build extension, alongside the refurbishment of the space occupied by the existing NICU (Neonatal Intensive Care Unit) facility. The new build element accommodates the clinical, support and reception functions whereas the refurbishment accommodates the staff and parents’ facilities. A “route” is created through the architecture where treatment rooms are arranged in sequence with intensive care units at the start and recovering patients at the end. The superstructure of the centre was constructed entirely from CLT, manufactured by KLH Massivholz, (which is exposed on the interior) and built over the period of 3 weeks. The building demonstrates that CLT can meet the requirements for infection control and create a calm and somewhat domestic environment within an acute clinical setting. In addition, various medical equipment is hidden to further enhance this sense of well-being for patients and families. Following the opening, a research team was set up to measure and understand the effect of the architecture on the environment and its users. The results demonstrate that the new building is quieter and more efficient: construction U-values and air permeability are up to 50% better than the minimum standards; overall regulated annual CO2 emissions of about 118kg CO2/sqm, are 28% better than the ‘Target Emission Rating’. In addition, the project has also achieved a Breeam “Excellent”, and also incorporates a sedum roof for rainwater attenuation, and to increase biodiversity on the site. The study also shows that the architecture has had a profound impact on parents and baby interaction, and babies are also sleeping 20% longer.
34
Source: Feilden Clegg Bradley Studios
TEMPLATE FOR FUTURE HEALTHCARE PROJECTS? Sustainability in construction and use has been central to the design of the extension. Part of the brief states that the project should “lead the way” for sustainable healthcare design. Timber construction has huge benefits with regards to embodied energy, and is quick and clean to construct within a healthcare environment. The team did not want the building to be a “one-off” showcase for sustainability but rather a template and catalyst for sustainable healthcare design by challenging existing standards, identifying and defining new goals, and developing strategies that are easy to replicate elsewhere in the healthcare sector.
Royal College of Art
Royal College of Art
An additional aspect that was of particular interest was the strategy for servicing the building. The extension incorporates a range of both mechanical and electrical services that can be maintained without access to the clinical areas. A central, high-level walkthrough duct distributes services throughout the building and will allow for as the architects say “unobtrusive replacement of equipment in the future.”
35
ADS 5
ADS 5
3.0_CARBON_COPY_A
MAGGIE’S OLDHAM, GREATER MANCHESTER DRMM ARCHITECTS
HOSPITAL / LAB
HOSPITAL / LAB
Maggie’s Centres seek to provide as Charles Jencks describes, the “architecture of hope”. They are centres built in the grounds of NHS cancer hospitals that offer free practical and emotional support for people affected by cancer. Maggie’s Oldham was examined as it is the first permanent building constructed using sustainable tulipwood CLT, following on from DRMM, AHEC and Arup’s development of this specific material in 2013, a new material that outperformed existing CLT. Alex de Rijke believes that in wood “there is hope, humanity, scale, warmth, and nature’s clever plan to absorb carbon.” Externally, the building is draped in corrugated, heat-treated wood. Inside and out, structure, furniture and thermally-modified cladding is all of American tulipwood, a fastgrowing deciduous Magnolia tree. Maggie’s Oldham is the first CLT hardwood building in the world. Although the Maggie’s Centres are not clinical in any way, this particular centre was examined for the use of wood as part of a bigger design intention to reverse the norms of hospital architecture, where clinical environments and management procedures make patients feel dispirited and disempowered.
Source: DRMM Architects
TIMBER COMPONENTS
Royal College of Art
36
Royal College of Art
The centre itself is constructed from over 20 prefabricated panels of crosslaminated American tulipwood, ranging from 0.5m to 12m long. The tulipwood CLT was engineered for its unique strength and lightness, as well as its sustainability and holistic qualities. Wood fibre insulation (as seen in the plan above) ensures a breathable, healthy environment while the huge window frames are constructed out of American white oak. Externally, the building is enclosed in a custom-fluted, thermally modified tulipwood.
37
ADS 5
ADS 5
3.0_CARBON_COPY_A
CLT PRECEDENTS (STRUCTURE) SARA CULTURAL CENTRE SKELLFETA, SWEDEN WHITE ARKITEKTER
HOSPITAL / LAB
HOSPITAL / LAB
Skellefta’s municipality was witnessing significant population decline and this particular scheme sought to reverse this trend. The scheme was actually conceived of in 1905 as part of a wider masterplan that was never built. It is essentially a 20-storey mixed-use building that houses a theatre, library, various art galleries and a hotel. The competition was won by White Arkitekter for its sustainable attributes, namely the use of timber. The structure is exposed inside and out. In addition, one is able to dismount everything and all parts are prefabricated off-site. Even the hotel rooms are three module ready-made boxes that can be staked on-site. The cultural centre is a gluam post-and-beam construction with CLT slabs. The walls of the stages are also made from CLT and these are connected to the hotel. What was of particular interest to us was the hybrid truss system that the architects have proposed, in order to free up space. More specifically, the steel elements are acting in tension, and the timber elements act in compression. The cultural centre was unveiled earlier this year, having been constructed from 13,000m3 of wood from locally harvested trees. In addition, building in wood shortened the construction time by 60%. Can the module-based construction approach used here be applied to hospitals? Or the use of a hybrid truss in the performance venues, in order to eliminate the need of columns?
Source: Architects Journal, October 2021
WORKING DETAIL
Royal College of Art
Royal College of Art
38
39
ADS 5
ADS 5
3.0_CARBON_COPY_A
CONGRESS & EXHIBITION CENTRE, AGORDO STUDIO BOTTER & STUDIO BRESSAN
HOSPITAL / LAB
HOSPITAL / LAB
This particular case study was examined for the use of the timber frame and more specifically the roof truss. The building is a Congress and Exhibition Centre in Agordo, Italy. The architects, Studio Botter and Studio Bressan have cited the surrounding mountainous landscape as inspiration for the form of the roof. The extensive use of local wood was influenced by traditional alpine construction methods, as well as a desire to build in a sustainable manner. The load-bearing structure is made from Glulam, including the pillars, roof beams and trusses, which span 45 metres. The use of the truss means that the main hall is able to be free of any form of structural element and is able to be divided into sub-modules and partitioned freely. The adaptable nature of the space has been demonstrated recently when the building was converted in August 2020 into a mask production plant for the Italian State to contain the Covid 19 pandemic. There are also minimal interior finishes, allowing for the timber structure to be both practical and aesthetic.
Royal College of Art
Royal College of Art
40
41
ADS 5
ADS 5
3.0_CARBON_COPY_A
HOSPITAL / LAB
HOSPITAL / LAB
STRUCTURAL PLANS - TYPICAL FLOOR
Proposed Structural Plan (Timber): Typical Floor Loadbearing Limestone Wall Non-Loadbearing Wall Stone Column Glazed Wall
N
Royal College of Art
5
10
Royal College of Art
0 Scale 1:200
42
43
ADS 5
ADS 5
3.0_CARBON_COPY_A
HOSPITAL / LAB
HOSPITAL / LAB
RCP - TYPICAL FLOOR
Proposed RCP (Stone): Typical Floor Loadbearing Limestone Wall Stone Column Glulam Truss CLT panels Glazed Wall
0
5
Royal College of Art
Royal College of Art
N
10
Scale 1:200
44
45
ADS 5
ADS 5
3.0_CARBON_COPY_A
PRODUCED BY AN AUTODESK STUDENT VERSION A. MED TECH/TYPICAL (CLINICAL WARDS, CONSULTING ROOMS)
PROPOSED 1:150 SECTION
22mm Bio Tile 4mm Bond Coat 12.5 Cementitious Board 18mm Plywood Sheet 150mm Timber Raised Floor w/ Rockwool Insulation 150mm BauBuche Gang-nail Truss with 500mm Service Zone Suspended Ceiling System w/ 100x40mm Sustainable Timber Battens
E
B. HIGH TECH/CLINICAL SPECIALIST (OPERATING THEATRES/IMAGING SUITES)
HOSPITAL / LAB
C. CIRCULATION/HEAVY TRAFFIC (CORRIDOORS/LOBBY) 22mm Bio Tile 4mm Bond Coat 12.5 Cementitious Board 18mm Plywood Sheet 150mm Timber Raised Floor w/ Rockwool Insulation 150mm BauBuche Gang-nail Truss with 500mm Service Zone Suspended Ceiling System w/ 100x40mm Sustainable Timber Battens
A
D. FACADE
C
500mm Load-bearing Limestone blockwork Fixed to 20mm Galvanised Steel Plates (exposed faces painted white) 18mm Stone Connection Plate 250mm Maintenance Deck 6mm Fixing Plate 40mm Curtain Wall System w/ Roller Blind System
HOSPITAL / LAB
PRODUCED BY AN AUTODESK STUDENT VERSION
B
D
12.5mm Anti-Static/Resin Floor 20mm Recycled Rubber Sound Absorption Layer 18mm Playwood Sheet 150mm Timber Raised Floor w/ Rockwool Insulation 220mm BauBuche Gangnail Truss w/ 1100mm Service Zone 50x50mm Timber Noggins fixed to 12.5mm Plasterboard w/ Vinyl Finish
E. ROOF
Royal College of Art
Royal College of Art
46
47
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION ADS 5
ADS 5
3.0_CARBON_COPY_A
C
PRODUCED BY AN AUTODESK STUDENT VERSION
HOSPITAL / LAB
PRODUCED BY AN AUTODESK STUDENT VERSION
B
5 2 3 4
9
8 7
HOSPITAL / LAB
A
10
PRODUCED BY AN AUTODESK STUDENT VERSION
D
14 6
1
DETAIL A, SCALE 1:20 (FACADE TO TYPICAL MED TECH FLOOR) 1. 500mm Loadbearing Limestone Blockwork 2. Galvanised Steel Plates (exposed faces painted white) 3. Stone Connection Plate 4. Fixing Plate 5. 230mm Rockwool Insulation 6. 40mm Curtain Walling System 7. Roller Blind (Ceiling Mounted) 8. Suspended Ceiling System with 100 x40mm Recycled Timber Battens 9. 150mm BauBuche Timber Truss with 500mm Service Zone 10. 150mm Timber Raised Floor with Rockwool Insulation 11. 18mm Plywood Sheet 12. 12.55 Cementitious Board 13. 4mm Bond Coat 14. 22mm Bio Tile (Floor Finish)
PRODUCED BY AN AUTODESK STUDENT VERSION
Royal College of Art
PRODUCED BY AN AUTODESK STUDENT VERSION Royal College of Art
48
49
PRODUCED BY AN AUTODESK STUDENT VERSION
KEY DETAILS
11
5
6
13
4
HOSPITAL / LAB
9
7
14
PRODUCED BY AN AUTODESK STUDENT VERSION
10 8
13
14
12 11
10
9
HOSPITAL / LAB
PRODUCED BY AN AUTODESK STUDENT VERSION
ADS 5
2
5
6
7
2
8 1 4
DETAIL B, SCALE 1:20 (FACADE TO GROUND/RETAINING WALL)
DETAIL C, SCALE 1:20 (FACADE TO GROUND/RETAINING WALL)
1. 500mm Loadbearing Limestone Blockwork 2. Ground 3. Galvanised Steel L Plate, bolted to blockwork (exposed faces painted white) 4. 4mm Vapour Control Layer 5. Stone Connection Plate 6. Fixing Plate 7. 230mm Rockwool Insulation 8. 40mm Curtain Walling System 9. Joist Hanger 10. 12.5mm Anti-Static/Resin Floor 11. 20mm Recycled Rubber Sound Absorption Layer 12. 18mm Plywood Sheet 13. 200mm BauBuche Timber Truss with 1100mm Service Zone 14. 50x50mm Timber Noggins fixed to 12.5mm Plasterboard with Vinyl Finish
1. 500mm Loadbearing Limestone Blockwork 2. 200m BauBuche Truss with 500mm Service Zone 3. 40mm Curtain Walling System 4. Roller Blind (Ceiling Mounted) 5. Galvanised Steel Plates (exposed faces painted white) 6. Stone Connection Plate 7. Fixing Plate 8. 230mm Rockwool Insulation 9. 200mm Rigid Insulation (Roof) 10. 4mm Waterproof Tanking Membrane 11. 100 x 50mm Sustainable Timber Deck Joists 12. Sustainable Timber Decking 13. 25mm Structural, toughened and heat-soaked glass 14. 1mm Silicone Sealant
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
50
Royal College of Art
Royal College of Art
3
51
PRODUCED BY AN AUTODESK STUDENT VERSION
3
PRODUCED BY AN AUTODESK STUDENT VERSION
1
ADS 5
3.0_CARBON_COPY_A
ADS 5
ADS 5
3.0_CARBON_COPY_A
PRODUCED BY AN AUTODESK STUDENT VERSION
HOSPITAL / LAB
HOSPITAL / LAB
PRODUCED BY AN AUTODESK STUDENT VERSION
DETAIL D, SCALE 1:20 (COLUMN/PLATE/JOIST CONNECTION)
Royal College of Art
Royal College of Art
1. 500mm Loadbearing Limestone Blockwork 2. Ground 3. Galvanised Steel L Plate, bolted to blockwork (exposed faces painted white) 4. 4mm Vapour Control Layer 5. Stone Connection Plate 6. Fixing Plate 7. 230mm Rockwool Insulation 8. 40mm Curtain Walling System 9. Joist Hanger 10. 12.5mm Anti-Static/Resin Floor 11. 20mm Recycled Rubber Sound Absorption Layer 12. 18mm Plywood Sheet 13. 200mm BauBuche Timber Truss with 1100mm Service Zone 14. 50x50mm Timber Noggins fixed to 12.5mm Plasterboard with Vinyl Finish
PRODUCED BY AN AUTODESK STUDENT VERSION
52
53
ADS 5
ADS 5
3.0_CARBON_COPY_A
Royal College of Art
QUANTITY M
Concrete
3067
439
1,345,420
Concrete
3067
£100/ M3
£306,700
Galvanised Structural Steel
109
16,882
1,840,156
Galvanised Structural Steel
109
£2500/ t
£268,140
Flat Glass
163
2375
387,170
Flat Glass
163
£500/ M2
£32,600,000
Light Concrete
1875
288
540,196
Light Concrete
1875
£100/ M3
£187,500
Intumescent Paint
0.8
5650
4520
Intumescent Paint
0.8
£50/ M2
£160,000
Plasterboard
410
262
107,395
Plasterboard
410
£20/ M2
£656,000
Vapour Barrier (Polyethylene)
11
83
913
Vapour Barrier (Polyethylene)
11
£5/ M2
£13,750
Natural Stone
780
1515
1,181,700
Natural Stone
780
£500/ M3
£390,000
Rockwool Insulation
1320
46
60720
Rockwool Insulation
1320
£50/ M2
£440,000
Sustainably Sourced CLT
8690
-841
-7,311,122
Sustainably Sourced CLT
8690
£250/ M2
£86,900,000
Sustainably 3150 Sourced Plywood
-510
-1,606,926
Sustainably 3150 Sourced Plywood
£15/ M2
£2,625,000
-3,449,858
TOTAL
3
EMBODIED CARBON KGCO2E
MATERIAL
QUANTITY M3
COST PER UNIT
COST £
Royal College of Art
MATERIAL
EMBODIED CARBON KGCO2E/M3
TOTAL
54
COST ANALYSIS
HOSPITAL / LAB
HOSPITAL / LAB
EMBODIED CARBON CALCULATIONS
£95,207,090
55
ADS 5
ADS 5
4.0_CARBON_COPY_B
CARBON COPY B: STONE EVELINA LONDON CHILDREN’S HOSPITAL
96%
18%
IN EMBODIED CARBON
IN PROJECT COST
STONE EXOSKELETON + INTERNAL STRUCTURE + PRETENSIONED STONE TILE FLOOR
Limestone
COLUMNS
Pre-tensioned Limestone with Steel Reinforcement
LINTELS
Pre-tensioned Portland Stone on Galvanised Steel Plates
FLOOR SLAB
100x100mm Pre-tensioned Limestone Floor Slabs With Galvanised Steel String and Washer Fastenings
INNER FACADE
Triple-glazed Curtain Walling System
OUTRIGGER
Loadbearing Portland Stone Exoskeleton with Various Surface Finishes
HOSPITAL / LAB
HOSPITAL / LAB
CORE
CONSTRUCTION METHODOLOGY Royal College of Art
56
Royal College of Art
Taking 15 Clerkenwell Close as a reference, the facade will be made up of curtain walling behind a stone exoskeleton. The concrete frame will be replaced with 1000 x 1000mm pre-tensioned stone tiles with string and washer connections at each edge. The tiles, some of which are concave in shape, are arranged to optimise load distribution to the columns and loadbearing walls. These columns and walls, originally of concrete, will be replaced with stacked stone (using granite, basalt or marble).
57
ADS 5
ADS 5
4.0_CARBON_COPY_B
THE USE OF STONE IN HEALTHCARE THE KIRCHE AM STEINHOF Throughout history, religion and healthcare have maintained an enduring relationship and, even today, The Roman Catholic Church is the largest nongovernment provider of health care services in the world. Naturally, this implies a correspondence between healthcare insitutions and stone construction. This case study explores the Kirche am Steinhof, completed in 1907 in the western suburbs of Vienna. It is the church of a psychiatric hospital. The Kirche am Steinhof can be considered the culmination in a series of experiments by Otto Wagner in using the architectural and ornamental vocabularies of the archaic Near East and West in association with the utilitarian values or ‘Nütz-stil’, which he had been developing over the previous decade.
HOSPITAL / LAB
HOSPITAL / LAB
Carrera marble panels are used extensively to dress the building. On the external walls, these panels sit above a rusticated granite base. Stone panels are considered by Semper to be part of the evolution of the textile wall hanging; the philosophy and symbols of the textile are transmuted into a new material, which continues to ‘dress’ the wall. The marble panels contain obvious bolt head fixings through to the solid brick masonry structure behind, purely symbolic of the Semperian idea of fabrication. The marble panels would have been cemented to the brick structure, so whilst the bolts would initially have helped to hold the panels in place for the first few weeks, until the mortar had set, they subsequently would not have a structural purpose, so are in essence a decoratively treated formwork. Here, one sees Wagner’s functionalist philosophy come to the fore: as specified in ‘Moderne Architektur’, the interior surfaces of the church being entirely clad in marble tiles meant that they were easy to clean. There are also no absorbent materials in the nave. The tiled floor is sloped, improving sight lines whilst also making it easier to sluice clean. All of the timber pews are much shorted than normal (and are all the same size), to make it easier to quickly extract patients in distress. Even the marble font has been designed to improve hygienic standards, with a continuous flow of holy water, to ensure that patients do not transmit disease.
Royal College of Art
Royal College of Art
60
61
ADS 5
ADS 5
4.0_CARBON_COPY_B
STONE PRECEDENTS: FACADE 30 FINSBURY SQUARE, LONDON ERIC PARRY ARCHITECTS
HOSPITAL / LAB
HOSPITAL / LAB
30 Finsbury Square was conceived in 2002 for Scottish Widows, who sought to replace a locally-listed Edwardian building and a post-war building on the edge of Finsbury Square. The square was originally laid out in the 18th century as a residential square but, due to its location, it became an important commercial centre close to the City of London. Eric Parry himself said he wanted to create an “egalitarian” building, unlike its classical neighbours. The project is essentially one whole side of the square and comprises 16,660 square metres of office space, which is arranged over 7 storeys. Being located in one of the Borough of Camden’s Conservation Areas meant that the facade had to relate to the existing buildings which were largely constructed of Portland Stone. What was of particular interest was not merely the visual aspect of the facade but the way in which stone is used as a load-bearing element. Parry has used pre-stressed external Portland Stone columns to support the various floor slabs, which allow for uninterrupted floor plates and no internal columns. As you move up the building, the structural elements are more spaced out as the structural loads reduce. At ground level, the structural elements are thicker where the stone needs additional capacity.
Source: Eric Parry Architects
Royal College of Art
Royal College of Art
62
63
ADS 5
ADS 5
4.0_CARBON_COPY_B
HOSPITAL / LAB
HOSPITAL / LAB
STRUCTURAL PLANS - TYPICAL FLOOR
Proposed Structural Plan (Stone): Typical Floor Loadbearing Limestone Wall Non-Loadbearing Wall Stone Column Glazed Wall
N
Royal College of Art
5
Royal College of Art
0
10
Scale 1:200
64
65
ADS 5
ADS 5
4.0_CARBON_COPY_B
HOSPITAL / LAB
HOSPITAL / LAB
RCP - TYPICAL FLOOR
Proposed RCP (Stone): Typical Floor Loadbearing Limestone Wall 1000x1000mm Stone Floor Tile Stone Column Glazing
0
5
Royal College of Art
Royal College of Art
N
10
Scale 1:200
66
67
Proposed Condition: Structural Stone Med Tech / Typical Clinical Wards, Consulting Rooms (L06 / L07 / L08 / L09)
ADS 5
PROPOSED: 1:50 SECTION
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 400 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 80 mm 275 mm
Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 1000 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Raised services floor with Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 165 mm 80 mm 275 mm
Terrace (L11)
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 400 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 80 mm 275 mm
High Tech / Clinical Specialist Operating Theatres, Imaging Suites (B1 / L01 / L02 / L03 / L04)
Level 10: Plant
275 mm 1000 mm
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Raised services floor with Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 165 mm 80 mm 275 mm
Plant (B2 / L05 / L10 / L11) Floor:
Roof
Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Services zone
275 mm 400 mm
Floor:
1. Portland Stone floor tiles 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
24 mm 40 mm 20 mm 80 mm 275 mm
1. Limestone floor tiles 2. Mortar bed 3. Screed 4. Rockwool insulation 5. Damp proof membrane 6. 1000x1000 mm limestone floor slabs or Limestone raft foundation at B2 No Ceiling Finish.
15 mm 15 mm 30 mm 160 mm 2 mm 275 mm 800 mm
2. Battens 3. Waterproof membrane 4. Rockwool insulation 5. Screed 6. 1000x1000 mm limestone floor slabs
75 mm 2mm 60 mm 60mm 275 mm
1. Topsoil 80 mm 2. Drainage / Protection Mat 35 mm 3. Rockwool insulation 60 mm 4. Vapour barrier 2 mm Terrace Decking 5. 1000x1000 mm limestone floor 1.slabs 275 mm 30 mm
Level 06: Typical (Med Tech)
Level 05: Plant
Roof
1. Topsoil mm 1. Loadbearing Portland Stone blockwork 300 mm 80 2. Drainage / Protection Mat 35 mm 3. Rockwool insulation 60 mm on Galvanised steel plates 20 mm 2 mm 4. Vapour barrier 5. 1000x1000 mm limestone floor slabsmm 275 mm 2. Maintenance gap 250 3. Triple-glazed curtain walling 60 mm Facade (L00 - L11)
1. Loadbearing Portland Stone blockwork on Galvanised steel plates 2. Maintenance gap 3. Triple-glazed curtain walling
Retaining Wall (B2 - B1) Circulation / Heavy Traffic Corridors, Lobby, Stairs (L00)
Level 09: Typical (Med Tech)
HOSPITAL / LAB
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
Corridors, Lobby, Stairs (L00) 1. Decking 30 mm Ceiling: 1. 1000x1000 mm limestone floor slabs 275 mm 2. Battens 75 mm 400 2. Services zone mm 3. Waterproof membrane 2mm Floor: 1. Portland Stone floor tiles 24 mm 2. Recycled rubber sound absorption layer 40 mm 4. Rockwool insulation 60 mm 3. Counter floor 20 mm 4. Rockwool insulation 80 mm 5. Screed 60mm 5. 1000x1000 mm limestone floor slabs 275 mm 6. 1000x1000 mm limestone floor slabs 275 mm
Facade (L00 - L11)
HOSPITAL / LAB
Plant
Circulation / Heavy Traffic
Ceiling:
Floor:
Level 11: Terrace
High Tech / Clinical Specialist Operating Theatres, Imaging Suites (B1 / L01 / L02 / L03 / L04)
Med Tech / Typical Clinical Wards, Consulting Rooms (L06 / L07 / L08 / L09)
Ceiling:
Ceiling:
ADS 5
4.0_CARBON_COPY_B
300 mm 20 mm 250 mm 60 mm
Retaining Wall (B2 - B1) 1. Porous boards 60 mm 1. Porous boards mm 2. Limestone blockwork 400 mm 60 2. Limestone blockwork 400 mm 3. Rockwool insulation 140 mm 3. Rockwool insulation 140 mm 4. Vapour control layer 2 mm 5. Gypsum boards 4. Vapour control layer 2 mm 60 mm 5. Gypsum boards 60 mm
Level 04: High Tech
Level 01: High Tech
Level 00: Entrance / Lobby
Plant (L05 / L10 / L11) Floor:
1. Limestone floor tiles
15 mm
2. Mortar bed 15 mm 3. Screed 30 mm 4. Rockwool insulation 160 mm 5. Damp proof membrane 2 mm 6. 1000x1000 mm limestone floor slabs 275 mm No Ceiling Finish.
Level B1: High Tech
Level B2: Plant
Royal College of Art
Floor:
Royal College of Art
Basement Plant (B2) 1. Limestone floor tiles 15 mm 2. Mortar bed 15 mm 3. Screed 30 mm 4. Rockwool insulation 160 mm 5. Damp proof membrane 2 mm 6. Limestone raft foundation 800 mm No Ceiling Finish.
68
69 0
1
Scale 1:50 at A1
2
3
4
5
ADS 5
ADS 5
Proposed Condition: 4.0_CARBON_COPY_B Structural Stone
D
Med Tech / Typical Clinical Wards, Consulting Rooms (L06 / L07 / L08 / L09) Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 400 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 80 mm 275 mm
High Tech / Clinical Specialist Operating Theatres, Imaging Suites (B1 / L01 / L02 / L03 / L04) Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 1000 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Raised services floor with Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 165 mm 80 mm 275 mm
Level 11: Terrace
Plant
C Level 10: Plant
Circulation / Heavy Traffic Corridors, Lobby, Stairs (L00) Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Services zone
275 mm 400 mm
Floor:
1. Portland Stone floor tiles 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
24 mm 40 mm 20 mm 80 mm 275 mm
E A
5 Level 09: Typical (Med Tech)
7
Plant (B2 / L05 / L10 / L11)
Terrace
1. Limestone floor tiles 2. Mortar bed 3. Screed 4. Rockwool insulation 5. Damp proof membrane 6. 1000x1000 mm limestone floor slabs or Limestone raft foundation at B2 No Ceiling Finish.
15 mm 15 mm 30 mm 160 mm 2 mm 275 mm 800 mm
1. Decking 2. Battens 3. Waterproof membrane 4. Rockwool insulation 5. Screed 6. 1000x1000 mm limestone floor slabs
30 mm 75 mm 2mm 60 mm 60mm 275 mm
Level 06: Typical (Med Tech)
3
8
4
Level 05: Plant
9
1 Roof
1. Topsoil 2. Drainage / Protection Mat 3. Rockwool insulation 4. Vapour barrier 5. 1000x1000 mm limestone floor slabs
HOSPITAL / LAB
HOSPITAL / LAB
Floor:
2
80 mm 35 mm 60 mm 2 mm 275 mm
6
Facade (L00 - L11) 1. Loadbearing Portland Stone blockwork on Galvanised steel plates 2. Maintenance gap 3. Triple-glazed curtain walling
300 mm 20 mm 250 mm 60 mm Level 04: High Tech
Retaining Wall (B2 - B1) 1. Porous boards 2. Limestone blockwork 3. Rockwool insulation 4. Vapour control layer 5. Gypsum boards
60 mm 400 mm 140 mm 2 mm 60 mm
Level 01: High Tech
Level 00: Entrance / Lobby
1. 500mm Rough Cut Loadbearing Portland Stone Blockwork 2. Galvanised Steel Plates (exposed faces painted white) 3. Stone Connection Plate 4. Fixing Plate 5. 40mm Curtain Walling System 6. Roller Blind (ceiling mounted) 7. 165mm Raised Services Floor 8. 1000 x 1000mm Limestone Floor Slab Tiles & Floor Finishes 9. Suspended Ceiling System with 100x40mm Recycled Timber Battens Royal College of Art
Royal College of Art
B
DETAIL A, SCALE 1:20 (FACADE TO TYPICAL MED TECH FLOOR)
Level B1: High Tech
Level B2: Plant
70
71
ADS 5
ADS 5
4.0_CARBON_COPY_B
2
3
4
9
4
6
8
5
7
3
HOSPITAL / LAB
2
11 6
HOSPITAL / LAB
5
7
10
4 1
72
DETAIL B, SCALE 1:20 (FACADE TO GROUND/RETAINING WALL)
DETAIL C, SCALE 1:20 (FACADE TO L11 TERRACE)
1. 500mm Limestone Blockwork Retaining Wall 2. Ground 3. 500mm Rough Cut Loadbearing Portland Stone Blockwork 4. Galvanised Steel L Plate, bolted to blockwork (exposed faces painted white) 5. Paving Stone 6. 40mm Curtain Walling System 7. 1000 x 1000mm Limestone Floor Slab Tiles & Floor Finishes
1. 500mm Smooth Cut Loadbearing Portland Stone Blockwork 2. 300mm Smooth Cut Loadbearing Portland Stone Blockwork 3. 500mm Portland Stone Blockwork 4. Galvanised Steel L Plate, bolted to blockwork (exposed faces painted white) 5. Galvanised Steel Plates (exposed faces painted white) 6. Stone Connection Plate 7. Fixing Plate 8. 40mm Balustrade System 9. 25mm Structural, Toughened and Heat Soaked Glass 10. Roller Blind (ceiling mounted) 11. 1000 x 1000mm Limestone Floor Slab Tiles & Floor Finishes
Royal College of Art
Royal College of Art
1
73
ADS 5
ADS 5
4.0_CARBON_COPY_B
1
2
1
8
4
2 6
3
5
HOSPITAL / LAB
HOSPITAL / LAB
3
7 6
4
5
DETAIL D, SCALE 1:20 (PARAPET AND GREEN ROOF)
DETAIL E, SCALE 1:20 (COLUMN/PLATE/JOIST/FLOOR CONNECTION)
1. 300mm Smooth Cut Portland Stone Parapet 2. Planting 3. 80mm Topsoil 4. 40mm Curtain Walling System 5. Roller Blind (ceiling mounted) 6. 1000 x 1000mm Limestone Floor Slab Tiles
1. 300-600mm Limestone Column, Steel Reinforced 2. Galvanised Steel Hanger, bolted to blockwork 3. Galvanised Steel Pin 4. Galvanised Steel L Plate, bolted to blockwork 5. 1000 x 1000mm Limestone Floor Slab Tiles & Floor Finishes 6. Galvanised Steel String and Washer Connections 7. Suspended Ceiling System with 100x40mm Recycled Timber Battens 8. 165mm Raised Services Floor
Royal College of Art
Royal College of Art
74
75
ADS 5
ADS 5
4.0_CARBON_COPY_B
CEILING
Ceiling: 1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
76
SCALE 1:20 HIGH TECH / CLINICAL SPECIALIST Operating Theatres, Imaging Suites B1 / L01 / L02 / L03 / L04 275 mm 400 mm
1. Vinyl-faced gypsum board 20 mm 2. Recycled rubber sound absorption layer 40 mm 3. Counter floor 20 mm 4. Rockwool insulation 80 mm 5. 1000x1000 mm limestone floor slabs 275 mm
Ceiling: 1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 1000 mm
Floor:
1. Vinyl-faced gypsum board 20 mm 2. Recycled rubber sound absorption layer 40 mm 3. Counter floor 20 mm 4. Raised services floor 165 mm with Rockwool insulation 80 mm 5. 1000x1000 mm limestone floor slabs 275 mm
Royal College of Art
Royal College of Art
Floor:
HOSPITAL / LAB
FLOOR
FLOOR
HOSPITAL / LAB
CEILING
SCALE 1:20 MED. TECH / TYPICAL Wards, Consulting Rooms L06 / L07 / L08 / L09
77
ADS 5
ADS 5
4.0_CARBON_COPY_B
CEILING
CEILING HOSPITAL / LAB
HOSPITAL / LAB
FLOOR
FLOOR
SCALE 1:20 CIRCULATION / HEAVY TRAFFIC
SCALE 1:20 PLANT
Corridors, Lobby, Stairs L00 (All)
B2 / L05 / L10 / L11
Ceiling: 1. 1000x1000 mm limestone floor slabs 2. Services zone
78
1. Portland Stone floor tiles 24 mm 2. Recycled rubber sound absorption layer 40 mm 3. Counter floor 20 mm 4. Rockwool insulation 80 mm 5. 1000x1000 mm limestone floor slabs 275 mm
Floor:
1. Limestone floor tiles 15 mm 2. Mortar bed 15 mm 3. Screed 30 mm 4. Rockwool insulation 160 mm 5. Damp proof membrane 2 mm 6. 1000x1000 mm limestone floor slabs 275 mm (at B2) 7. Limestone raft foundation 800 mm Royal College of Art
Royal College of Art
Floor:
275 mm 400 mm
No Ceiling Finish.
79
ADS 5
ADS 5
4.0_CARBON_COPY_B
HOSPITAL / LAB
FLOOR
HOSPITAL / LAB
CEILING
SCALE 1:20 ROOF/PARAPET L11
Royal College of Art
Royal College of Art
1. Topsoil 80 mm 2. Drainage / Protection Mat 35 mm 3. Rockwool insulation 60 mm 4. Vapour barrier 2 mm 5. 1000x1000 mm limestone floor slabs 275 mm
80
81
ADS 5
4.0_CARBON_COPY_B
ADS 5
Proposed Condition: Structural Stone
FACADE DETAIL
Med Tech / Typical Clinical Wards, Consulting Rooms (L06 / L07 / L08 / L09) Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 400 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 80 mm 275 mm
Level 11: Terrace
Plant
High Tech / Clinical Specialist Operating Theatres, Imaging Suites (B1 / L01 / L02 / L03 / L04) Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Suspended ceiling with services zone
275 mm 1000 mm
Floor:
1. Vinyl-faced gypsum board 2. Recycled rubber sound absorption layer 3. Counter floor 4. Raised services floor with Rockwool insulation 5. 1000x1000 mm limestone floor slabs
20 mm 40 mm 20 mm 165 mm 80 mm 275 mm
Level 10: Plant
Circulation / Heavy Traffic Corridors, Lobby, Stairs (L00) Ceiling:
1. 1000x1000 mm limestone floor slabs 2. Services zone
275 mm 400 mm
Floor:
1. Portland Stone floor tiles 2. Recycled rubber sound absorption layer 3. Counter floor 4. Rockwool insulation 5. 1000x1000 mm limestone floor slabs
24 mm 40 mm 20 mm 80 mm 275 mm
Level 09: Typical (Med Tech)
Plant (B2 / L05 / L10 / L11)
Terrace
Roof
1. Limestone floor tiles 2. Mortar bed 3. Screed 4. Rockwool insulation 5. Damp proof membrane 6. 1000x1000 mm limestone floor slabs or Limestone raft foundation at B2 No Ceiling Finish.
15 mm 15 mm 30 mm 160 mm 2 mm 275 mm 800 mm
1. Decking 2. Battens 3. Waterproof membrane 4. Rockwool insulation 5. Screed 6. 1000x1000 mm limestone floor slabs
30 mm 75 mm 2mm 60 mm 60mm 275 mm
1. Topsoil 2. Drainage / Protection Mat 3. Rockwool insulation 4. Vapour barrier 5. 1000x1000 mm limestone floor slabs
80 mm 35 mm 60 mm 2 mm 275 mm
Level 06: Typical (Med Tech)
HOSPITAL / LAB
HOSPITAL / LAB
Floor:
Level 05: Plant
Facade (L00 - L11) 1. Loadbearing Portland Stone blockwork on Galvanised steel plates 2. Maintenance gap 3. Triple-glazed curtain walling
300 mm 20 mm 250 mm 60 mm Level 04: High Tech
Retaining Wall (B2 - B1) 1. Porous boards 2. Limestone blockwork 3. Rockwool insulation 4. Vapour control layer 5. Gypsum boards
60 mm 400 mm 140 mm 2 mm 60 mm
Level 01: High Tech
Royal College of Art
Royal College of Art
Level 00: Entrance / Lobby
Level B1: High Tech
82
Level B2: Plant
83
ADS 5
ADS 5
4.0_CARBON_COPY_B
EMBODIED CARBON CALCULATIONS
HOSPITAL / LAB
EMBODIED CARBON KGCO2E
MATERIAL
QUANTITY M3
COST PER UNIT
COST £
Portland Stone (Exoskeleton)
2655
790
2,097,450
Portland Stone (Exoskeleton)
2655
£500/ M3
1,327,500
Limestone (Structural)
13,708
697
9,554,476
Limestone (Structural)
13,708
£300/ M3
4,112,400
Flat Glass
163
2375
387,125
Flat Glass
163
£500/ M2
8,150,000
64
-1,023
-65,491
Sustainably Sourced Hardwood
64
£100/ M2
640,000
Galvanised Steel
114
16,882
1,924,567
Galvanised Steel
114
£2500/ t
285,000
Aluminium
2
19,291
38,582
Aluminium
2
£75/ kg
202,425
Polyethylene (Vapour Barrier)
11
83
913
Vapour Barrier (Polyethylene)
11
£5/ M2
605
Rockwool
1814
46
83,444
Rockwool
1814
£50/ M2
907,000
Screed
124
439
54,436
Screed
124
£100/ M3
124,000
Plasterboard
2936
2936
769,050
Plasterboard
2936
£20/ M2
2,348,800
Intumescent Paint
0.8
5650
4520
Intumescent Paint
0.8
£100/ M2
80,000
14,849,117
TOTAL
TOTAL
Royal College of Art
QUANTITY M3
HOSPITAL / LAB
Royal College of Art
EMBODIED CARBON KGCO2E/M3
MATERIAL
Sustainably Sourced Hardwood
84
COST ANALYSIS
£18,177,730
85
ACKNOWLEDGEMENTS
4
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
CONTENTS 1.0
INTRODUCTION Purpose of Research
4
2.0
EXISTING CONDITION Introduction History Existing uses Photographs Existing Drawings Construction Carbon calculations Cost analysis Existing Condition Summary
8
3.0
CARBON COPY - TIMBER Introduction Cross Laminated Timber Form Development Proposed Drawings Construction Methodology Components Visualisation Carbon calculations Cost analysis Conclusion
34
4.0
CARBON COPY - STONE Introduction Tensile Stone Form Development Proposed Drawings Construction Methodology Components Visualisation Carbon calculations Cost analysis Conclusion
60
5.0
FINDINGS Carbon Cost Comparison
88
6.0
CATALOGUE OF MATERIAL COMPONENTS
96
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
5
6 BRIDGES AND INFRASTRUCTURE
1 INTRODUCTION
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
7
1.0 INTRODUCTION
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
PURPOSE OF RESEARCH
M25 Overpass
BRIDGE TYPOLOGY
8
Bridges are a key element in transport infrastructure, providing more efficient access across various geographies. They are a simple, yet energy intensive structure, formed with safety and structural capacity as the key design drivers. This has led to a unanimous use of concrete and steel as the primary materials due to their strength and reliability. These are, however among the biggest contributors to carbon emissions, and within the current context of the climate crisis, we must look for alternative materials and construction methodologies which could reduce our environmental impact.
ROYAL COLLEGE OF ART
This report analyses the existing conditions of bridges and infrastructure, focussing on the case study of London Bridge; a typical example of the construction materials and techniques used today within the typology.
ADS 5
ABSTRACT
Our analysis focusses on the structural methodology and the environmental impact this causes through its use of high embodied carbon materials such as concrete and steel. Within the current context of the climate crisis, the construction industry must find alternative methods and materials which reduce their environmental impact. BRIDGES AND INFRASTRUCTURE
This report explores how two different materials could be used - timber and stone, as an alternative to concrete and steel to generate a ‘Carbon Copy’ of the existing form. We examine the difference in embodied carbon that these materials would offer, and the successes and difficulties that might arise from working with these elements, with the ultimate goal being an alternative solution to current construction methods which could transform the construction industry into a carbon sequestering industry.
9
10 BRIDGES AND INFRASTRUCTURE
1 EXISTING CONDITION
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
11
ADS 5
LONDON BRIDGE
ROYAL COLLEGE OF ART
2.0 EXISTING CONDITION
PURPOSE OF CASE STUDY We are analysing a standard example of the bridge and infrastructure typology in order to provide a base for our alternative proposal. By looking at an existing example, we can propose a ‘Carbon Copy’ which provides an alternative solution to the brief.
BRIDGES AND INFRASTRUCTURE
WHY LONDON BRIDGE London Bridge represents the typology in both its construction being precast reinforced concrete and in its purpose as it provides both pedestrian and vehicular access across the Thames. LOCATION The bridge spans 269m, connecting the Northern and Southern banks of the Thames between the City of London and Southwark. DATE OF CONSTRUCTION The modern London Bridge was constructed between 1967 and 1972 and was opened to the public in 1973. It was designed by Architect Lord Holford and Engineers Mott, Hay and Anderson, with John Mowlem and Co. as contractor. CONSTRUCTION MATERIAL/METHODOLOGY
12
The bridge is a concrete and steel box girder construction which spans over the river using three arches with two concrete piers standing in the water. The largest arch spans 104m, giving a clearance of 8.9m above the maintained water level.
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
13
ADS 5
HISTORY
ROYAL COLLEGE OF ART
2.0 EXISTING CONDITION
ROMAN BRIDGES The first bridge was probably a Roman military pontoon type, giving easier access across the river to the Roman army. Around AD 50, the temporary bridge over the Thames was replaced by a permanent timber piled bridge, maintained and guarded by a small garrison.
BRIDGES AND INFRASTRUCTURE
EARLY MEDIEVAL BRIDGES After the fall of the Roman Empire Londondinium was abandoned and the bridge destroyed. The river became a boundary between the kingdoms of Mercia and Wessex. The bridge was rebuilt around 990 and proceeded to be destroyed and rebuilt in timber multiple times until 1163 when the final timber bridge on the site was built. OLD LONDON BRIDGE King Henry II commissioned a new bridge to be built from stone which began construction in 1176. This was not completed until 1209The bridge was about 280m long, and had nineteen piers linked by nineteen arches and a wooden drawbridge. There were ‘starlings’ around the piers to protect them and the bridge, including the part occupied by houses, was from 6-7.5m wide. All the houses were shops, and the bridge was one of the City of London’s four or five main shopping streets. NEW LONDON BRIDGE
14
The New London Bridge was designed by John Rennie as part of a competition in 1799. Work began in 1824, with the old bridge still in use, and was demolished in 1831 when the new bridge was opened. Rennie’s bridge was 283m long and 15m wide and was constructed from Haytor granite. In 1896 the bridge was the busiest point in London, and one of its most congested; it was widened by 4m, using granite corbels. Subsequent surveys showed that the bridge was sinking an inch every eight years, and by 1924 it was decided that the bridge would have to be removed and replaced.
ROYAL COLLEGE OF ART ADS 5 BRIDGES AND INFRASTRUCTURE
Artist’s impression of Roman London
The Frozen Thames (1677) by Abraham Hondius
New London Bridge in the late 19th century
15
ADS 5
USE
ROYAL COLLEGE OF ART
2.0 EXISTING CONDITION
VEHICULAR
BRIDGES AND INFRASTRUCTURE
The current London Bridge is a busy route for traffic, providing access for the A2 across the Thames. There are 2 traffic lanes and a bus lane on either side of the bridge, creating an overall road width of 9.75m on either side.
16
Aerial map of London Bridge Source: Bing Maps
ROYAL COLLEGE OF ART ADS 5
PEDESTRIAN Each side of the bridge has a wide pedestrian walkway - 6.8m on one side and 4.8 on the other, with granite clad steel handrails and a temporary steel barrier between road and pavement.
BRIDGES AND INFRASTRUCTURE
Photograph of bridge carriages
17
18 BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
PHOTOGRAPHS
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
19
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
CONSTRUCTION
HOW WAS IT BUILT? The bridge superstructure was designed as four pre-cast concrete box beams with steel reinforcement.
20
BRIDGES AND INFRASTRUCTURE
The existing London Bridge was used as the framework for the construction as well as a temporary gantry built across the river on column supports. The Existing bridge remained open to traffic, while they constructed a girder on either side, allowing traffic to then be rerouted to the new girders while the existing bridge was demolished and the final two central girders constructed. The traffic congestion and limited working space at the bridge meant that the pre-cast box parts were brought up the river by barge from the casting yard in Surrey Commercial Dock. Construction was carried out using the cantilever method, with segments being built outward from two piers, each segment tied to the previous one by high-strength steel tendons. In the centre the two cantilevers did not meet but stopped short, leaving a space into which the builders placed a concrete beam to complete the span.
1. Existing London Bridge traffic flow
2. Existing bridge used as framework for new girders on either side, maintaining traffic flow across the bridge. Temporary gantry erected to lift and move concrete box sections
3. Once completed, traffic flow redirected onto new girders. Existing bridge demolished and final two central girders constructed
4. Completed bridge comprised of 4 concrete box beam girders
ROYAL COLLEGE OF ART ADS 5
Images of the construction of the Modern London Bridge, taken from the film New London Bridge by British Pathe, 1969; accessible at {https://www.youtube.com/ watch?v=rtIlkcX9tjI}
The precast elements were transported to the site via boat from Surrey Quays
BRIDGES AND INFRASTRUCTURE
The elements were craned into place by the temporary gantry
Steel framed elements craned into place
New precast concrete girders placed alongside the existing bridge
21
EXISTING DRAWINGS
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
22
BRIDGES AND INFRASTRUCTURE
STRUCTURAL SECTION The superstructure is made up of 4 pre-cast reinforced concrete box girders which span the river across 2 concrete piers. These hollow sections provide space for services and reduce the mass of concrete. On top of this structure sits a poured concrete slab and the road build up of aggregate, waterproofing and tarmac.
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
23
24 BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
EXISTING DRAWINGS
ELEVATION
PLAN
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
25
EMBODIED CARBON
This break down illustrates the different structural and non-structural elements that make up the existing bridge, and the embodied carbon of each element. The heavy use of reinforced concrete as the primary material has led to a high value of embodied carbon. This is due to the energy and carbon intensive processes of manufacturing cement and steel.
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
26
DETAIL OF SHORT SECTION THROUGH EXISTING
VOLUME M3
EMBODIED CARBON KGCO2E/M3
REINFORCED CONCRETE PIERS
2,424
1,619,232
REINFORCED CONCRETE DECK
8,628
5,763,504
REINFORCED CONCRETE PERPENDICULAR STRUCTURE
1167
779,556 TOTAL - 257,144
Granite Cladding
81
20,280
Stainless Steel Handrail
8
185,104
Steel Frame
0.25
5,785
Cement Blocks
142
45,975 TOTAL - 207,077
Steel Rail
8
185,104
Steel frame
0.25
5,785
Cement Base
50
16,188
ROAD SURFACE
TOTAL - 137,590
Tarmac Wearing Coat
732
129,543
Reclaimed Concrete Aggregate
732
7,218
Polyethylene Vapour Barrier
10
829
PAVEMENT SURFACE
TOTAL - 232,275
Sandstone tile
149
25,926
Concrete Pad
298
199,064
Concrete Curb
22.5
7,285
TOTAL
BRIDGES AND INFRASTRUCTURE
PEDESTRIAN GUARDRAIL
ADS 5
BALUSTRADE
ROYAL COLLEGE OF ART
ELEMENT
8,996,378
27
28
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
COST ANALYSIS
This table illustrates the cost of each element of the existing bridge. The minimal use of materials has meant that the bridge is relatively cheap and is efficient in its use of materials.
AMOUNT
COST
REINFORCED CONCRETE PIERS
2,424m3
£4,040,000
REINFORCED CONCRETE DECK
8,628m3
£5,752,000
REINFORCED CONCRETE PERPENDICULAR STRUCTURE
1,167m3
£778,000 TOTAL - £ 2,202,138
Granite Cladding
81m3
£2,025,000
Stainless Steel Handrail
63,200 kg
£158,000
Stainless Steel Frame
1,975 kg
£4,938
Concrete Blocks 40MPa
142 m3
£14,200 TOTAL - £ 167,938
Steel Rail
63,200 kg
£158,000
Steel frame
1,975 kg
£4,938
Cement Base
50 m3
£5,000
ROAD SURFACE
TOTAL - £ 552,627
Tarmac Wearing Coat
4,855.87 m2
£291,352
Reclaimed Concrete Aggregate
1,369,000 kg
£18,481
Bitumen Elastomer
4,855.87 m2
£242,794
PAVEMENT SURFACE
TOTAL - £76,750
Sandstone tile
149m3
£44,700
Concrete Pad
298m3
£29,800
Concrete Curb
22.5m3
£2,250
TOTAL
BRIDGES AND INFRASTRUCTURE
PEDESTRIAN GUARDRAIL
ADS 5
BALUSTRADE
ROYAL COLLEGE OF ART
ELEMENT
£ 13,569,453
29
30 BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
2.0 EXISTING CONDITION
ADS 5
CONCLUSIONS
ROYAL COLLEGE OF ART
EXISTING CONDITION SUMMARY
London Bridge provides an essential route across the Thames for vehicles and pedestrians alike. It is a simple, minimal design which has very little visual impact. It’s construction is elegant and austere in the amount of material used, but the reinforced concrete and steel materials have a significant environmental impact. SET OUT OF BRIEF
TIMBER AND STONE
BRIDGES AND INFRASTRUCTURE
In order to create a ‘Carbon Copy’ of the bridge, various factors must remain constant. The span of the bridge and its position must remain, along with the placement of the piers in order not to impact river traffic. The air draft underneath the bridge must also be kept the same for this reason. The bridge width and the number of carriages and pavement area must remain the same in order to allow the same amount of traffic to pass over the bridge. The road level must be retained and the visual impact of the bridge’s height should be kept as low as possible. The same safety measures should also remain in place; guard rails at the edges of the bridge and between the pedestrian and vehicle zones. Due to a lack of accessible information of the bridge’s foundations, this study will address the parts of the bridge above the mean low water line.
The proposed materials are timber and stone; two naturally sourced materials which have a low embodied carbon value thanks to their natural structural qualities and lack of need for additional processing, as well as their carbon sequestering characteristics. Each material option will seek to use as little steel and concrete as possible, creating a bridge which mimics the existing, maintaining the factors set out in the above brief, but using materials which have a significantly lower environmental impact.
31
32 BRIDGES AND INFRASTRUCTURE
CARBON COPIES
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
33
ADS 5
PROPOSALS
ROYAL COLLEGE OF ART
CARBON COPIES
Following the analysis of the existing structure and its environmental and financial costs, this report begins to look at alternative structural scenarios which make use of low embodied carbon materials in order to propose a ‘Carbon Copy’ which improves the structure’s environmental and financial credentials. The two solutions explored are:
BRIDGES AND INFRASTRUCTURE
Carbon Copy A: Timber Carbon Copy B: Stone
34
CARBON COPY A: TIMBER
126%
41%
IN EMBODIED CARBON
IN PROJECT COST
ROYAL COLLEGE OF ART ADS 5
83%
IN EMBODIED CARBON
IN PROJECT COST
BRIDGES AND INFRASTRUCTURE
77%
CARBON COPY B: STONE
35
BRIDGES AND INFRASTRUCTURE
3
36
CARBON COPY: TIMBER
BRIDGES AND INFRASTRUCTURE
37
ADS 5
TIMBER
ROYAL COLLEGE OF ART
3.0 CARBON COPY - TIMBER
INTRODUCTION Timber has long been a common material used in bridge construction, from the first ever trees which fell across rivers and ravines, to the great Roman pontoon bridges, timber has provided a readily available solution to spanning across inaccessible terrain.
BRIDGES AND INFRASTRUCTURE
Bridge innovation has led to the development of complex forms and shapes which utilise the natural properties of the material to carry load over longer distances. GRUBENMANN BROTHERS The Grubenmann brothers were two Swiss carpenters who operated in the second half of the eighteenth century, creating several examples of timber bridges which spanned significant lengths. The bridge at Schaffhausen over the Rhine, in 1755, comprised of two spans of 52m and 59m that met at an angle in midstream, resting on a central stone pier. This was achieved through using the principles of the arch and the truss in timber. BEAM TRUSS It was in the first half of the nineteenth century that the beam-like truss as now known really emerged, particularly in North America under the stimulus of an almost insatiable demand first for road and then for railway bridges. The drawing below shows a few of the most significant from among the very large number of designs proposed and constructed up to 1848. The first three were intended for construction wholly or primarily in timber; the others marked the transition to iron.
38
- Developments in Structural Form by Rowland Mainstone
ROYAL COLLEGE OF ART ADS 5 BRIDGES AND INFRASTRUCTURE
Side elevations (top and bottom) of the timber framing of the two spans of the Grubenmann brothers’ covered bridge at Schaffhausen, together with typical cross sections and a plan of the lateral bracing at floor level of the shorter span, from J. Rondelet, Traite theorique et pratique de I’art de bdtir, vol.4, part 1, Paris, 1814.
Bridge trusses of the first half of the nineteenth century: (a) Burr, 1804; (b) Town, 1820; (c) Howe, 1841; (d) Pratt, 1844; (e) Whipple, 1846; (f) Warren, 1848. Single lines represent the ties in (c) to (e).
39
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
CROSS LAMINATED TIMBER Cross Laminated Timber is manufactured by gluing multiple layers of timber together perpendicular to each other to create a thicker and stronger compound beam.
BRIDGES AND INFRASTRUCTURE
CLT provides a new structural solution for larger spans and heavier loads. Although it is yet to be tested at the scale of London Bridge, some examples such as the Mistissini Bridge in Quebec and the Duchesnay Creek bridge in Ontario have used CLT as the superstructure, spanning distances of up to 43m.
40
Mistissini Bridge
ROYAL COLLEGE OF ART ADS 5 BRIDGES AND INFRASTRUCTURE
Duchesnay Creek Bridge, Ontario uses timber arches bolted in between the beams to achieve its span.
41
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
With help from the structural engineer, the cross sectional area needed for a timber bridge spanning the same distances and holding the same load was established as being 30m x 1.5m of solid timber. This area could then be divided into beams capable of performing the same function of the existing bridge in timber. In order to create a form which closely resembles the existing London Bridge in timber, shallow arches and extremely deep CLT beams would need to be used.
Existing cross section: Reinforced concrete hollow structural girders
17m2
Cross sectional area needed for equivalent structural support in timber
45m2
Cross sectional area divided into CLT beams to achieve bridge span
42
45m2
ROYAL COLLEGE OF ART ADS 5
Timber does not perform well in an arched form and for the spans needed, 3.5m deep beams would have to be manufactured. This combination of inefficient form and amount of material means that this option would not be viable and an alternative form must be found which responds better to the properties of the material. The most effective way of spanning these distances in timber would be to employ a truss beam. This, however, would have a large visual impact and would not be an exact carbon copy. In response to the feedback from the Structural Engineer, a better structural solution to form these spans in timber would be to use steel pylons and cables which could be set to the same height as the existing street lamps in order to minimise any visual impact.
Chart Datum
61720m
8773m 15973m
Mean High Water Springs
103730m
93520m
Existing elevation
258980m
BRIDGES AND INFRASTRUCTURE
existing street lamp level
Timber arch form
existing street lamp level Fink truss timber suspension bridge
43
3.0 CARBON COPY - TIMBER
ROYAL COLLEGE OF ART
ADS 5
TIMBER PROPOSAL
The proposed form employs a Fink Truss, locating steel pylons at the joins between each CLT beam and connecting these to each other using steel cables. This allows the beams to be supported at the key junctions where they join and reduces the need for the larger CLT beams previously explored, instead using smaller beams as a secondary structure spanning between the large beams supported by the cables in tension.
BRIDGES AND INFRASTRUCTURE
This has allowed the constraints set out in the brief to be adhered to, maintaining the span, height, air draft and width of the bridge. This allows the existing use of the bridge to be maintained, supporting 3 traffic lanes and a pedestrian walkway either side, and allowing river traffic to pass beneath.
62m
44
ELEVATION
103.7m
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
93.8m
45
46 BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
62m
PLAN 10
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
93.8m 03.7m
47
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
1. Limestone piers
2. CLT Beams
3. Steel fixings
4. Steel pylons
5. Steel cables
6. CLT secondary structure
7. Timber railings
8. Road and pavement build-up
48
SUMMARY OF COMPONENTS
ROYAL COLLEGE OF ART ADS 5 BRIDGES AND INFRASTRUCTURE
AXONOMETRIC SECTION - ABOVE
AXONOMETRIC SECTION - BELOW
49
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
CONSTRUCTION METHODOLOGY The superstructure is made up of 3 large CLT beams formed out of a series of smaller beams bolted together. These are made up of central thicker beams of 3.5m depth and smaller beams of 2m depth either side. The larger central beams are joined through a steel shoe which wraps around where the beams are joined at the piers and pylon junctions, and the tensile steel cables are connected to these steel joints. The steel pylons also sit on top of the steel shoe and are welded in. Cables are connected at the top and bottom of the 11m verticals. The secondary structure is formed of 500mm deep CLT beams which run perpendicular to the large beams and are supported on top of the smaller beam sections. These are also supported underneath using diagonal timber struts.
BRIDGES AND INFRASTRUCTURE
The road build up above these is made up of timber panels, limestone aggregate and sandstone paving.
11000mm
3720mm
3720mm
3000mm
4000mm
3000mm
mean high water
7170mm
mean low water
50
SHORT SECTION
ROYAL COLLEGE OF ART
800mm
1 1. Steel cables connect to top of pylon 2. Steel pylon 3. Cable connection at base of pylon 4. Steel shoe 5. Road build-up 6. CLT beams primary structure 7. CLT secondary structure 8. Timber hand rail 9. Limestone pier
2
ADS 5
1000mm
3 4
11000mm
5
300mm 500mm 3500mm
6
2000mm
7
BRIDGES AND INFRASTRUCTURE
8
1000mm 1000mm 1000mm
5410mm
9
4665mm
SHORT SECTION 51
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
1. Steel pylon 2. Steel cables 3. Steel shoe 4. CLT primary structure 5. CLT secondary structure 6. Road build-up 7. Limestone pier 8. Steel plate and bolts
300mm
BRIDGES AND INFRASTRUCTURE
2 1
900mm 500mm 2000mm
250mm
8 5000mm
2000mm
7 8600mm
2950mm
3950mm
SECTION THROUGH PIER 52
6
3
5 4
ADS 5
1
5 8
BRIDGES AND INFRASTRUCTURE
4 7
ROYAL COLLEGE OF ART
2
3
AXONOMETRIC DETAIL THROUGH PIER JUNCTION
53
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
2
DETAIL A
BRIDGES AND INFRASTRUCTURE
1
DETAIL B
5 3
6
1. Steel pylon 2. Steel cables 3. Steel shoe 4. CLT primary structure 5. CLT secondary structure 6. Steel plate and bolts
54
AXONOMETRIC DETAIL THROUGH PYLON BEAM JUNCTION
4
ROYAL COLLEGE OF ART ADS 5
DETAIL A At the top of each pylon, a welded steel plate provides a connection point for the cables.
BRIDGES AND INFRASTRUCTURE
These are bolted together through the plate and allow for any movement.
DETAIL B At the base of the pylon, it is welded to the steel shoe which connects two primary CLT beams. Here, there is another plate which provides the connection for the steel cables at low level in the same way as the at the top of the pylons.
55
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
56
VISUALISATION: VIEW FROM SOUTH BANK
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
57
ADS 5
The analysis of embodied carbon of the proposed timber bridge has shown a 126% reduction from the existing bridge. The majority of this has come from the use of timber as the primary material. Because it sequesters carbon throughout its lifetime, timber can dramatically offset the carbon that is produced in the production of steel and stone, yielding a negative carbon value.
BRIDGES AND INFRASTRUCTURE
EMBODIED CARBON
ROYAL COLLEGE OF ART
3.0 CARBON COPY - TIMBER
ELEMENT
VOLUME M3
EMBODIED CARBON KGCO2E/M3
EMBODIED CARBON DIFFERENCE
LIMESTONE PIERS
3,413
645,057
-974,175
SUSTAINABLY SOURCED CLT SUPERSTRUCTURE
7,285
-6,129,059
-12,672,119
TIMBER BALUSTRADE
134
-137,122
-394,266
TIMBER PEDESTRIAN GUARDRAIL
0
0
-207,077
STEEL FIXINGS
65
1,097,341
1,097,341
STEEL CABLES
24
405,932
405,932
STEEL PYLONS
129
2,177,799
2,177,799
-345,503
-483,093
ROAD SURFACE Sandstone slabs
525
91,350
Quarried Sandstone aggregate
525
4,843
Timber load protection layer
525
-441,696
PAVEMENT SURFACE
-126,356
Sandstone tile
192
33,408
Quarried Sandstone aggregate
192
1771
Timber load protection layer
192
-161,535
TOTAL
-2,411,911
-358,631
-11,408,289
58
126% reduction in Embodied Carbon
ROYAL COLLEGE OF ART
COST
AMOUNT
COST £
COST DIFFERENCE
LIMESTONE PIERS
3,413m3
£1,023,900
-3,016,100
SUSTAINABLY SOURCED CLT SUPERSTRUCTURE
48,566m2
£12,141,500
+5,611,500
TIMBER BALUSTRADE
986.1m2
£98,610
-2,103,528
STEEL FIXINGS
513.5t
£1,283,750
+1,283,750
STEEL CABLES
189.6t
£474,000
+474,000
STEEL PYLONS
1,019.1t
£2,547,750
+2,547,750
£1,190,000
+637,373
ROAD SURFACE Sandstone slabs
525m3
£157,500
Quarried Sandstone aggregate
525m3
£157,500
Timber load protection layer
3,500m2
£875,000
PAVEMENT SURFACE
£435,200
Sandstone tile
192m3
£57,600
Quarried Sandstone aggregate
192m3
£57,600
Timber load protection layer
1,280m2
£320,000
TOTAL
£19,194,710
BRIDGES AND INFRASTRUCTURE
ELEMENT
ADS 5
The cost of the proposed timber bridge is 41% higher than the existing concrete bridge. The analysis below shows that this cost predominantly comes from the CLT beams which form the superstructure of the bridge. The added steel also accounts for much of the added cost. The alternative stone piers and timber balustrade, however, provide a much cheaper alternative to the existing elements.
+358,450
+£5,625,257 41% increase in cost
59
ROYAL COLLEGE OF ART
ADS 5
3.0 CARBON COPY - TIMBER
CONCLUSION
This exploration has shown how timber could be used as the primary material in bridge design, providing a solution to large spans for heavy loads which is carbon sequestering.
BRIDGES AND INFRASTRUCTURE
However, due to the loads, spans and weathering factors, the amount of timber that would need to be used would not make the option realistically viable. Although the bridge satisfies the brief in terms of use and dimensions, it does not have the same visual simplicity and elegance of the existing London Bridge. The pylons and cables do create a visibility barrier, which could pose a problem for the visitors to the city, obstructing views of the surrounding buildings and bridges. This is not to say, however, that timber should not be used in bridge design. The large 103m span of London Bridge is what has led to the amount of timber needed, and with a smaller span or lighter load, timber could provide a solution, fulfilling all areas of the brief. This has been shown in the precedents of Duchesnay Creek and Mistissini where the shorter span has been achieved without the use of pylons. WHAT IF A more efficient timber bridge form would employ a truss form, creating a beam which could span longer distances without the use of pylons and cables. The problem with creating a timber truss bridge in this context is the visual impact that it would have. For the sake of creating a ‘Carbon Copy’, this option has not been explored further.
60
This is an example of efficiency of form in relation to particular materials having the greatest influence on the design of the bridge. In future bridge design, a CLT truss could provide the required span and hold the required load.
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
61
62 BRIDGES AND INFRASTRUCTURE
4 CARBON COPY - STONE
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
63
4.0 CARBON COPY - STONE
ROYAL COLLEGE OF ART
ADS 5
STONE
THE SHALLOW STONE ARCH
BRIDGES AND INFRASTRUCTURE
The Romans are most commonly attributed to be the greatest masonry bridge builders of antiquity. They built passages and aqueducts still standing today. These immensely robust structures would only get more robust as they carried heavier loads, thanks to their great understanding of forces and the art of cutting stone. Semicircular arches would transfer their loads on their typically thick piers. “The legacy of the Roman bridge builders is encompassed within the six span bridge over the river Tagus at Alcantara in Spain, which contains individual spans of up to 30m.” Roman masonry bridge building was extremely expensive due to the shear mass and amount of material necessary. While roman bridges became an icon representing masonry bridge construction, a whole new revolution of masonry bridge building was happening in China. “the Chinese were also developing bridges with new geometries (segmental, elliptical, parabolic, etc.) and the Zhaozhou Bridge, built from 595 to 605 AD during the Sui Dynasty in China, is historically significant as it is the world’s oldest open-spandrel, stone, segmental arch bridge. This bridge demonstrates an advanced level of understanding of the forces exerted on the arch, piers and abutments, which was not demonstrated in Europe until the Renaissance period.” Segmental bridge building has had a more visible impact on how we build bridges today in both reducing the amount of material and keeping the walkway relatively low in respect to the span more commonly having to go up by 1 meter in height for every 8 meters in span.
64
The New Stone Age Exibition at the Building Centre
ROYAL COLLEGE OF ART ADS 5 BRIDGES AND INFRASTRUCTURE
La Balme Bridge Source: https:// structurae.net/en/ structures/la-balmebridge
NEED FOR IT Highways agency BD91/04: ‘Experience has shown that arch bridges are very durable structures requiring little maintenance in comparison to other bridge forms. BD 57 (DMRB 1.3.7) says their use should be considered. However, there has not previously been a standard for the design of new unreinforced arch bridges. The objective of this Standard is to encourage a renaissance in arch building using unreinforced masonry materials.’ https://www.thenbs.com/PublicationIndex/documents/ details?Pub=HA&DocID=329043
65
4.0 CARBON COPY - STONE
ROYAL COLLEGE OF ART
ADS 5
TENSIONED STONE
HOW DOES IT WORK The concept of tensioned stone capitalizes on the stone’s unparalleled ability to perform in compression. A bar is threaded through a series of blocks, stretched and secured at the ends by a metal plate. As the bar attempts to return to its former length, the stone will be compressed by the metal ends that are trying to come closer to each other.
BRIDGES AND INFRASTRUCTURE
This allows us to build elements like beams out of stone, that unlike a column are affected by tension as well as compression. Wile this technique is not new in itself and is widely used to stiffen spanning concrete elements, it’s application in combination with cut stone is uncommon with only a few instances in construction where it has been used structurally. A reevaluation of this technique could allow us to treat stone with the same freedom as we do with concrete.
The New Stone Age Exibition at the Building Centre
66
The New Stone Age Exibition at the Building Centre
ROYAL COLLEGE OF ART ADS 5
PERFORMANCE Coupled with the form of the arch tensioning stone is then able to achieve much wider spans while also performing a structural role. The tensioning increases the failure load of the stone in bending, while the form of the arch minimizes the bending stress by transferring it onto the piers. Tensioning stone just as we pre/post tension concrete can amplify and empower the architectural language of the material just as reinforcing concrete with rebar did for Modernism. Photograph of assembly of a masonry arch. An arch a framework and its drilled masonry elements in the foreground.
BRIDGES AND INFRASTRUCTURE
Photograph of a structural threaded masonry arch inside Padre Pio Pilgrimage Church
67
4.0 CARBON COPY - STONE
68
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
ASSEMBLY
TRANSPORTATION AND PHASING In the construction of the six central towers of the Sagrada Famìlia, tensioned stone panels played a central role in making the building process quicker and safer, than laying each stone individually. It made it possible to safely assemble the sections at ground level and review the work before lifting it in place. It minimizes the work done on site, making it easier to schedule tasks, as the finished panels can be stored before using. This allowed the type of work to be standardised both on site and in the manufacturing plant.
AFTERLIFE Tensioning stone makes it possible to have dry joinery between elements making it easier to re purpose or replace individual blocks if necessary. Its lighter structure lends itself to being easily demountable. Just as the previous stone Bridge had a second life in Arizona, the proposed tensioned stone London Bridge could be dismantled and reassembled with much more easr somewhere else if necessary.
A postcard of the Old London Bridge reassembled in Lake Havasu City, Arizona , U.S.A.
ROYAL COLLEGE OF ART ADS 5
Photograph of the stone panels being stored off-site in preparation of assembly.
BRIDGES AND INFRASTRUCTURE
Photograph of a worker tensioning the stone elements of a structural panel for the construction of one of the central towers of the Sagrada Famìlia.
Photograph of the tensioned stone panels being guided into place by two workers on site.
69
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
4.0 CARBON COPY - STONE
PROPOSAL
The proposal for a light weight stone bridge that spans a total of 150m with only two piers has to be achieved through the strategic use of parabolic geometry and the tensioning of the primary structure. In the proposal the arch form a parabolic shape to account for the uneven loading of the road above. From a visual perspective the proposal assumes an even slimmer profile than the existing pre cast bridge while still having the same pier position. The arches pierce through the deck and making the bridge even slimmer and the open spandrels create unprecedented views on the Themes.
70
LONG ELEVATION LOOKING EAST
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
SKETCH OF STRUCTURE
71
72 BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
4.0 CARBON COPY - STONE
PROPOSAL
PLAN OF BRIDGE
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
73
ROYAL COLLEGE OF ART
ADS 5
4.0 CARBON COPY - STONE
ELEVATION USE OF BRIDGE The bridge retains the same profile of the existing bridge providing an additional 3m height throughout most of the central span. While the bridge does provide this additional height it does so without compromising on the camber of the road surface above, the road surface maintains the same pitch as the existing bridge, so that not only vehicular but also pedestrian access is effortless even for those with impaired mobility. The structural arches pierce the road surface making the profile exceptionally thin. And the loading of the arch is made uniform through the parabolic shape of the arch as well as secondary parabolic arches to distribute the weight that would otherwise go directly on the piers.
BRIDGES AND INFRASTRUCTURE
This allows a light profile design that works with open spandrels.
74
DETAILED ELEVATION WITH TRANSIT
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
75
76 BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
4.0 CARBON COPY - STONE
SECTION
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
SHORT SECTION THROUGH TOP OF MAIN ARCH
77
ADS 5 ROYAL COLLEGE OF ART BRIDGES AND INFRASTRUCTURE
2.
3.
RELEVANCE The menu of components represents an order of structure going from the interface with the water to the touch of the hand. 1. The Pier to Arch component presents the tensioning strategy for the primary structure and a pier design which is friendlier to the water life of the Themes. 2. The Arch to Beam component is representative of how a post tensioned system can work at different scales and the way these come together. How secondary beams can be tied to the primary structure through he use of the tensioning element on itself.
78
3. The Beam to Balustrade component shows an elegant way to anchor the tensioning system in such a way to hold the balustrade in place. This simplifies the detailing and reduces the amount of joinery required.
4.0 CARBON COPY - STONE
ADS 5
PIER TO ARCH ARCH TO BEAM BEAM TO BALUSTRADE
ROYAL COLLEGE OF ART
MENU OF COMPONENTS
BRIDGES AND INFRASTRUCTURE
1.
79
4.0 CARBON COPY - STONE
ROYAL COLLEGE OF ART
ADS 5
PIER TO ARCH
BRIDGES AND INFRASTRUCTURE
1.
2. 3. 4.
5.
10.
8.
80
9.
6.
The interface to the pier is the most vital part of the tensioned arch as it has to withstand forces coming from different directions and contain the space for the tensioning component at the base of the arch as well.
ADS 5
The stone piers sit within the same footprint as the previous concrete one, with ashlar construction to support the arches and rough stone crib construction as infill. The additional ashlar on the ends holds the cross bracing in place and prevents possible damage from impact with boats. The stone crib construction decreases the amount of material used while providing shelter for the resilient water life of the Themes.
ROYAL COLLEGE OF ART
HOW DOES IT WORK
The stone arches taper at the base to redistribute the forces onto the piers more evenly. The base of the arches contains the elements of a Fressinet inspired tensioning system. This comprises of a steel anchor, a bearing plate and cable grips to keep the tendons in place. BRIDGES AND INFRASTRUCTURE
11.
1. Ashlar Arch 2. Limestone Arch Base 3. Cable Guide 7.
4. Bearing Plate and Cable Grips 5. Access for Tensioning 6. Steel Anchoring Plate 7. 19 x 12,7mm Steel Tendons 8. Cross Bracing Steel Tendon 9. Stone Pier 10. Connection to Pier 11. Stone Crib Infill
81
ROYAL COLLEGE OF ART
ADS 5
4.0 CARBON COPY - STONE
ARCH TO BEAM
PRESSED METAL PLATE CONNECTION The connection between the secondary beam and the arch primary structure relies on the compression of the tendons running through the beams. A metal plate is pressed between the beam and the arch to compensate for small variances in beam length. The metal plate moulds to the texture of the arch, in turn creating a firm grip.
82
BRIDGES AND INFRASTRUCTURE
KEYSTONE BEAMS While an arch typology works entirely in compression, beams need to withstand bending. While this could be achieved with multiple tendons in the stone, to decrease the amount of steel necessary the stones are cut in rhombus and trapezoidal forms to keystone in each other. This redistributes the live loads in the beam.
ROYAL COLLEGE OF ART
1.
ADS 5
2.
5.
3.
6. 4.
BRIDGES AND INFRASTRUCTURE
7.
1. Limestone Ashlar Primary Arch Structure 1600mm x 1250mm 2. Limestone Ashlar Beam 600mm x 400mm 3. Limestone Ashlar Cantilever Beam 300-600mm x 400mm 4. 12,7mm Diameter Steel Tendon 5. 19 x 12,7mm Diameter Steel Tendon 6. Hot Rolled Metal Plate 7. Hot Rolled Metal Cable Sheath
83
ROYAL COLLEGE OF ART
ADS 5
4.0 CARBON COPY - STONE
BEAM TO BALUSTRADE
FIXINGS The design of the balustrade integrates the anchorage of the tendons and the fixing of the handrail/safety net into one detail.
BRIDGES AND INFRASTRUCTURE
Metal plates press on the vertical stone element which supports the handrail and hold the bottom fixing for the safety net. The cable safety net is kept tort by the handrail cable and the bottom fixing attached to the metal plates. The metal plate acts as the anchor for the tensioning system, on which washers and nuts are threaded. The tensioning system employed for the secondary beams which support the carriage way is a Lee McAll Tensioning System. This system employs the use of a threaded nut to tension the tendon, and is much simpler than other analogous tensioning systems.
POST TENSIONING CABLE Sandstone planks act as the tertiary structure for both the walkway and the vehicular lanes. The choice of sandstone over other types of stone is justified by the coarse texture of sandstone that does not wear with use. It is important for sandstone to be scanned for fissures and cracks. This is especially important due to the change in temperatures and humidity in the London climate.
84
Stone is proportionally a lot less carbon intensive than steel, this proposal tried to minimise the amount of steel necessary. This was achieved by using steel only when used in tension in the form of steel tendons. The use of galvanized steel has also been reduced in the joinery as the secondary structure is threaded to the primary through the same tendons that keep the structure in compression.
ROYAL COLLEGE OF ART
1.
ADS 5
2. 4. 3.
6.
7. 8.
BRIDGES AND INFRASTRUCTURE
5.
1. Handrail Cable 2. Cable Mesh 3. Stone Balustrade 4. Rough Sandstone Plank 1500mm x 150mm 5. Hot Rolled Metal Sheath 6. Washer and Nut 7. 12,7 mm Steel Tendon 8. Limestone Cantilever beam 600-300mm x 400mm
85
86
VISUALISATION: VIEW FROM SOUTH BANK
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
87
4.0 CARBON COPY - STONE
ROYAL COLLEGE OF ART
ADS 5
CARBON CALCULATION Element
Volume m3
Primary Arches
Total - 457,639
Lime Stone
1522.00
287,658
Galvanized Steel Plates
7.20
121,552
Cables
2.86
48,429
Spandrels
BRIDGES AND INFRASTRUCTURE
Embodied Carbon kgCO2e/m3
Total - 177,127
Lime stone
774.00
146,286
Cables
1.82
30,841
Secondary Beams
Total - 328,508
Lime Stone
1090.00
206,010
Galvanized Steel Plates
6.70
113,111
Cables
0.55
9,387
Path Slabs Sand Stone
Total - 202,884 1166.00
Balustrade
202,884 Total - 28,693
Stone
28.00
5,292
Cable
0.05
846
Netting
0.03
567
Galvanizes Steel Plates
1.30
21,988
88
Total - 1,198,227
4.0 CARBON COPY - STONE
Element
Amount
Primary Arches
Cost Total - £655,285
1,522.00 m3
£456,600
Metal Plates
56,880 kg
£142,200
Cables
22,594 kg
£56,485
Spandrels
Total - £268,145 774.00 m3
£232,200
Cables
14,378 kg
£35,945
Secondary Beams
Total - £470,188
Lime Stone
1,090.00 m3
£327,000
Metal Plates
52,930 kg
£132,325
Cables
4,345 kg
£10,863
Path Slabs
BRIDGES AND INFRASTRUCTURE
Lime stone
Sand Stone
ADS 5
Lime stone
ROYAL COLLEGE OF ART
COST CALCULATION
Total - £349,800 1,166.00 m3
Balustrade
£349,800 Total - £35,656
Stone
28.00 m3
£8,400
Cable
395 kg
£988
Netting
237 kg
£593
Metal Plates
10,270 kg
£25,675 Total - £ 2,305,874
89
90 BRIDGES AND INFRASTRUCTURE
5 FINDINGS
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
91
EMBODIED CARBON
It is clear that both options dramatically reduce the embodied carbon of the bridge through the use of alternative materials. The natural carbon sequestering values of timber and stone allow for reductions of 126% and 77% respectively.
10,000,000
8,000,000
EMBODIED CARBON KGCO2E/M3
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
5.0 FINDINGS
6,000,000
4,000,000
2,000,000
0
-2,000,000
-4,000,000
92
EXISTING
TIMBER
STONE
5.0 FINDINGS ROYAL COLLEGE OF ART
COST
ADS 5
The material costs of each option provide another view of each proposal. The inadequacy of timber for large spans and heavy loads is emphasized in the cost projected, highlighting the need for a much larger amount of material with a 41% cost increase. The stone, however, illustrates the strength of the material through the reduction of material and cost, providing a solution which is 83% cheaper. This figure, however appears to be far too low which could be due to an inaccurate cost value of Limestone, or an error in calculations. Illustrated below is also a stone value of £1500/ m3 which seems to provide a more realistic value.
BRIDGES AND INFRASTRUCTURE
25,000,000
20,000,000
COST £
15,000,000
10,000,000 If the cost of Limestone was assumed to be £1500/ m3, this would seem to be a more reliable figure
5,000,000
Cost of Limestone assumed as £300/m3. This figure seems too low
0
EXISTING
TIMBER
STONE
93
ROYAL COLLEGE OF ART
ADS 5
5.0 FINDINGS
COMPARISON TIMBER
126%
41%
IN EMBODIED CARBON
IN PROJECT COST
PROS Dramatic reduction in embodied carbon CONS
BRIDGES AND INFRASTRUCTURE
Visual impact increased due to steel pylons Material qualities not suited for the existing form and span An excessive amount of material is needed, leading to an increase in project cost
STONE
77%
83%
IN EMBODIED CARBON
IN PROJECT COST
PROS Large reduction in embodied carbon Large reduction in project cost Material suited to shallow arch form and span, providing a more efficient alternative to concrete CONS
94
More skilled labour and construction techniques required
ROYAL COLLEGE OF ART ADS 5
Existing photograph
BRIDGES AND INFRASTRUCTURE
Proposed timber bridge
Proposed stone bridge
95
ROYAL COLLEGE OF ART
ADS 5
5.0 FINDINGS
CONCLUSION
In conclusion, these two options have illustrated the possibilities of using alternative, low carbon materials to create bridges with large spans and heavy loads. This is an important intervention into the bridge typology which is dominated by reinforced concrete and steel construction.
BRIDGES AND INFRASTRUCTURE
For the constraints given by London Bridge, the stone bridge has provided a more viable option in terms of material use, cost, and fitness for purpose in its material choice. This is due to the natural compressive strength of stone which is what is required to carry the heavy traffic load. Although the timber bridge provided a possible solution, the sheer amount of material and the weathering and structural properties of timber would mean that it is less applicable. However, if the spans were to be smaller and the load lighter, timber could provide a better alternative to stone, as is the case with many footbridges and short crossings around the world. The stone option provides a possible future to masonry arch building which integrates tendons to achieve shallow arches that work entirely in compression just like a full arch. It is very difficult to predict the amount of tendons necessary for the arches to work and they would need to be protected from weathering and rusting. Stone becomes a viable option although it would require a new set of engineering knowledge for the tensioning of the arches.
96
Overall this exercise has been extremely useful in analysing the common construction techniques which are taken for granted and exploring how alternative materials and techniques could provide better solutions.
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
97
98 BRIDGES AND INFRASTRUCTURE
6 MENU OF COMPONENTS
ROYAL COLLEGE OF ART
ADS 5
ROYAL COLLEGE OF ART
ADS 5 BRIDGES AND INFRASTRUCTURE
99
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
1. Steel pylon 2. Steel cables 3. Steel shoe 4. CLT primary structure 5. CLT secondary structure 6. Road build-up 7. Limestone pier 8. Steel plate and bolts
300mm
BRIDGES AND INFRASTRUCTURE
2 1
900mm 500mm 2000mm
250mm
8 5000mm
2000mm
7 8600mm
2950mm
3950mm
SECTION THROUGH PIER 100
6
3
5 4
ADS 5
1
5 8
BRIDGES AND INFRASTRUCTURE
4 7
ROYAL COLLEGE OF ART
2
3
AXONOMETRIC DETAIL THROUGH PIER JUNCTION
101
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
2
DETAIL A
BRIDGES AND INFRASTRUCTURE
1
DETAIL B
5 3
6
1. Steel pylon 2. Steel cables 3. Steel shoe 4. CLT primary structure 5. CLT secondary structure 6. Steel plate and bolts
102
AXONOMETRIC DETAIL THROUGH PYLON BEAM JUNCTION
4
ROYAL COLLEGE OF ART ADS 5
DETAIL A At the top of each pylon, a welded steel plate provides a connection point for the cables.
BRIDGES AND INFRASTRUCTURE
These are bolted together through the plate and allow for any movement.
DETAIL B At the base of the pylon, it is welded to the steel shoe which connects two primary CLT beams. Here, there is another plate which provides the connection for the steel cables at low level in the same way as the at the top of the pylons.
103
1.
2.
BRIDGES AND INFRASTRUCTURE
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
3. 4.
5.
10.
8.
9.
104
AXONOMETRIC DETAIL - PIER TO ARCH
6.
ROYAL COLLEGE OF ART ADS 5
1. Ashlar Arch 2. Limestone Arch Base 3. Cable Guide 7.
4. Bearing Plate and Cable Grips
BRIDGES AND INFRASTRUCTURE
11.
5. Access for Tensioning 6. Steel Anchoring Plate 7. 19 x 12,7mm Steel Tendons 8. Cross Bracing Steel Tendon 9. Stone Pier 10. Connection to Pier 11. Stone Crib Infill
105
ROYAL COLLEGE OF ART
ADS 5
6.0 MENU OF COMPONENTS
1.
2.
BRIDGES AND INFRASTRUCTURE
5.
7.
3.
6. 4.
1. Limestone Ashlar Primary Arch Structure 1600mm x 1250mm 2. Limestone Ashlar Beam 600mm x 400mm 3. Limestone Ashlar Cantilever Beam 300-600mm x 400mm 4. 12,7mm Diameter Steel Tendon 5. 19 x 12,7mm Diameter Steel Tendon 6. Hot Rolled Metal Plate 7. Hot Rolled Metal Cable Sheath
106
AXONOMETRIC DETAIL - ARCH TO BEAM
ROYAL COLLEGE OF ART
1.
ADS 5
2. 4. 3.
6.
7. 8.
BRIDGES AND INFRASTRUCTURE
5.
1. Handrail Cable 2. Cable Mesh 3. Stone Balustrade 4. Rough Sandstone Plank 1500mm x 150mm 5. Hot Rolled Metal Sheath 6. Washer and Nut 7. 12,7 mm Steel Tendon 8. Limestone Cantilever beam 600-300mm x 400mm AXONOMETRIC DETAIL - BEAM TO BALUSTRADE 107