Selected works 2017 - 2021: Including Revit works Chengyu Zhang M.Arch Degree / University of California Berkeley / Architectural Designer C: 416.732.5812 | E: arch_cyzhang@berkeley.edu
Part I - Revit works Krug - Downtown Showroom, Toronto
Store Interior
Interior/finish/detail/lighting
Changchun Deer Valley - Changchun, Jilin, China Residential/landscape/detail/material
Model Study
Part II - Academic works The Shed - Street Sports Centre
Landscape/structure/detail/lighting
The Last Cemetery of the Red Guards Exhibition/landscape/history
Homo Bathroom on Church street Structure/detail/materiality
The Babel Tower
Technology/sociology/religions/history
Urban design Memorial design Architectural design Fictional design
C:\Users\Barcelona\Desktop\1825 - DKS Arch D Titleblock.dwg, 2019/01/10
1 LOCATION PLAN Krug - Downtown Showroom, Toronto
3
PROJECT STATISTICS
SCOPE OF WORK WORK UNDER THIS APPLICATION IS LIMITED TO INTERIOR ALTERATION AT THE PREMISES NOTED ABOVE.
OWNER
MEP ENGINEERS
KRUG 215 QUEEN STREET WEST TORONTO, ONTARIO M5V 1Z4
SMITH + ANDERSON 4211 YONGE STREET SUITE 500 TORONTO ONTARIO CANADA M2P2A9 TEL 416-487-8151 WWW.SMITHAND ANDERSEN.COM
THE TENANT SPACE IS COMPRISED OF FURNITURE SHOWROOM AND OFFICES. THE PROJECT INVOLVESNEW ARCHITECTURE, FINISHES, MILLWORK FIXTURES, MECHANICAL, ELECTRCIAL, PLUMBING, FIRE AND LIFE SAFETY.
ARCHITECT
THE G.C SHALL PROVIDE ALL LABOUR, MATERIAL, EQUIPMENT AND SERVICES AND PERFORM ALL OPERATIONS REQUIRED TO COMPLETE WORK AND RELATED WORK DESCRIBED AND SPECIFIED HEREIN, AND AS MAYBE RESONABLY IMPLIED AS NECESSARY TO COMPLETE THE WORK IN ALL RESPECTS.
DKSTUDIO ARCHITECTS INC. 443 ST. GERMAIN AVENUE TORONTO, ONTARIO CANADA M5M1W9
THE G.C SHALL EXAMINE ALL SPECIFICATIONS, PLANS, APPENDICES AND ALLOTHER CONTRACT DOCUMENTS OF THE WORK AND BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT. WHERE CONTRACT DOCUMENTS VARY INTERNALLY OR WITH APPLICABLE LAW THE MORE STRINGENT REQUIREMENT SHALL APPLY. ALLL DRAWINGS SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS SHALL BE READ IN CONJUNCTION WITH EACH OTHER. AWAIT CLARIFICATION FROM ARCHITECT PRIOR TO PROCEEDING AS APPLICABLE.
DMYTRIY PEREKLITA,OAA PRESIDENT TEL. +1 416-342-8017
FILIP SIMPSON SENIOR ASSOCIATE filip@dkstudio.ca
THE G.C IS RESPONSIBLE FOR COORDINATION OF THE WORK OF ALL TRADES WITH ALL OF THE INFORMATION CONTAINED WITHIN THIS SET BETWEEN ARCHITCTURAL AND ENGINEERING DRAWINGS. NOTE: ALL OF THE INFORMATION IS NOT LOCATED IN ANY ONE DRAWING. IF THE A SERIES OF DRAWINGS CONTAINS INFORMATION RELEVANT TO THE CONTRACTOR OR SUB-CONTRACTOR AND IS NOT SHOWN IN THE S,M,FP,OR E SERIES DRAWINGS THE G.C IS STILL RESPONSIBLE FOR THAT INFORMATION, AND VICE VERSA. NO VARIATION IN PRICE WILL BE ALLOWED SHOULD THE CONTRACTOR OR SUBCONTRACTOR OMIT ANY INFORMATION ON EITHER SETS OF DRAWINGS.
BHAVIKA SAGAR, B.ENG PROJECT DESIGNER Bhavika.Sagar@smithandandersen.com
JASON WONG, P.ENG PROJECT DESIGNER jason.wong@smithandandersen.com
BASE BUILDING 130 SPADINA AVENUE, SUITE 707 TORONTO ON M5V2L4 CHRISTOPHER ISHMAEL Cishmael@malibutoronto.com
THE DR COPYR AND O CANNO OR USE ELECTR FOR RE CODE AUTHO
DO NO BE VERI ANY DI IMMED
PROJ DRAW CHEC SHEET
REFER TO RESPONSIBILITY SCHEDULE FOR CLARIFICATION OF WORKS.
ISSUE
2
KEY PLAN
4
3D view SW
Key Plan SCOPE OF WORK
4
PROJECT DIRECTORY
NO. 01 02 03 04 04
D 2 2 2 2 2
MOST REMOTE POINT WITHIN SPACE P-X PATH OF TRAVEL
21877 71' - 9 1/4"
A
E
H
J 4706 15' - 5 1/4"
L 1194 3' - 11"
N 2164 7' - 1 1/4"
O 2032 6' - 8"
Q 1704 5' - 7"
S 4696 15' - 5"
POINT OF EGRESS
1474 4' - 10"
476 1' - 6 3/4"
EGRESS WIDTH 1100mm
5 | CHAIR DISPLAY
EXISITING FIRE SEPARATION
2 JOR8-SR
3 | SHOWROOM
00 ø 17
11 | OFFICE 1
ISSUES
2220 7' - 3 1/2"
12
MECHANICAL ROOM
NO. 01 02 03 04 04
0 50 ø1
14 | CORRIDOR
DATE DESCRIPTION 2019/01/11 95% DD SET 2019/02/07 PERMIT SET 2019/05/03 PRICING SET 2019/08/01 PRICING SET REV.1 2019/08/13 PERMIT REVISION
FHC
FHC
15 | ELEVATOR LOBBY
2
0 50 ø1
00 ø 17 9 | UNIVERSAL WASHROOM
OPEN TO BELOW
MECHANICAL ROOM
SEAL
TRANSFORMER ROOM
SHEET TITLE
EGRESS PLAN 1 : 75
SHEE
3D
SHEE
A05
EGRESS PLAN
EQUIPMENTS ACCESS DOOR, NOT AN EXIT
1
SEAL
13 | LIBRARY
1
10
C:\Users\Barcelona\Desktop\1825 - DKS Arch D Titleblock.dwg, 2019/01/10
12 | OFFICE 2
1825 DK TEAM DP ARCH D (24"X36")
219 QUEEN STREET WEST TORONTO ONTARIO
10 | STORAGE
PROJECT NO. DRAWN BY CHECKED BY SHEET SIZE
4 | SERVERY/RECEPTION
ers\Barcelona\Desktop\1825 - DKS Arch D Titleblock.dwg, 2019/01/10
166 6 1/2" 2704 8' - 10 1/2"
8
DO NOT SCALE THE DRAWINGS. DIMENSIONS ARE TO BE VERIFIED BY THE CONTRACTOR ON SITE. REPORT ANY DISCREPANCIES TO THE ARCHITECT IMMEDIATELY.
1 : 50
3 | SHOWROOM
KRUG - SHOWROOM
6929 22' - 8 3/4"
00 ø 17
7
EGRESS LEGEND
THE DRAWINGS AND SPECIFICATIONS ARE COPYRIGHTED PROPERTY OF dkstudio architects inc. AND OTHER RESPECTIVE COPYRIGHT HOLDERS. THEY CANNOT BE REPRODUCED, COPIED, TRANSFERRED, OR USED, IN WHOLE OR IN PART, PHYSICALLY OR ELECTRONICALLY, FOR ANY OTHER PURPOSE THAN FOR REVIEW FOR CONFORMANCE WITH BUILDING CODE AND ZONING BY-LAW OR AS EXPRESSLY AUTHORIZED BY THE ARCHITECT IN WRITING.
2 | CONFERENCE ROOM 1 | HEALTHCARE
C:\Users\Barcelona\Desktop\1825 - DKS Arch D Titleblock.dwg, 2019/01/10
4
EXIT# EGRESS WIDTH=1100mm (43.3")
REMOTE DISTANCE POINT TO EXIT 2 = 15.0 M
3286 10' - 9 1/4"
3
5424 17' - 9 1/2"
1190 3' - 10 3/4"
2
G
6172 20' - 3"
1
TRAVEL DISTANCE FROM REMOTE POINT X TO EXIT#
REMOTE DISTANCE POINT TO EXIT 2 = 16.0 M
1100
REMOTE DISTANCE POINT TO EXIT 1=14.0 M
3' - 7 1/4"
REMOTE DISTANCE POINT TO EXIT 1 = 13.6 M
KRUG - SHOWROOM
DIRECTION OF TRAVEL
Egress Plan
SHEET NUMBER
A010
3D view SE
REV.
Krug - Downtown Showroom, Toronto
FINSIHES 21877
P-1: P-2: PL-1: GYP-1: GYP-2: GL-1: MR-1: E-1: PC-1: CPT-1: TL-1: ACT-1: MTL-1: MTL-2:
71' - 9 1/4"
11 | OFFICE 1
GYP 2
6826
CPT 1
2840 9' - 3 3/4"
EXISTI NG DOOR
GYP 2
P-1 GLOSSY PLASTIC LAMINATE
1 GYP
2
2166
W
J
7' - 1 1/4" 3266
PC
EXISTING DOOR
GYP 2
1
C-2
1984
1
W
1
7| COAT CLOSET
GYP 2
1
1562
PC
MR 1
8 | WASHROOM
GYP 2
1
E 1
9 | UNIVERSAL WASHROOM
GYP 2
717
GYP 2
TL
ACT-2
PC
1
1
CPT 1
2' - 4 1/4" 00 " 16 -3 5'
TL
1873
DATE DESCRIPTION 2019/01/11 95% DD SET 2019/02/07 PERMIT SET 2019/05/03 PRICING SET 2019/08/01 PRICING SET REV.1 2019/08/13 PERMIT REVISION
MIRROR
1
P-1 GLOSSY EPOXY
P-2 TINTED POLISHED CONCRETE
CARPET
TILES
SEAL
6' - 1 3/4"
CEILING FINISH ACT-1
ACT-2
P-1 ACOUSTIC CEILING TILE
P-2 ACOUSTIC CEILING TILE
C-1
P-1 FINISH ON EXPOSED CEILING
C-2
P-2 FINISH ON EXPOSED CEILING
SHEET TITLE
1
FINISH PLAN
FLOOR FINISHES SHEET NUMBER
1 : 50 MATERIAL PEGBOARD
S
Q
O
N
L
J
SLANTED SHELVES
A110 H
OPEN SHELVING
G OPEN SHELVING U/S LEVEL 3
U/S COLUMN CAP
5"
127
500
1' - 7 3/4"
3300
3140 U/S SHOWROOM 2919
PAINTED EXISTING DUCT TO REMAIN
EXISTING EXIT DOOR P-2 FINISH
U/S NEW CEILING 2404
ASSISTANCE REQUIRED LIGHT & SOUND
1000 3' - 3 1/4"
890 2' - 11"
8' - 10 1/4"
2700
1000 3' - 3 1/4"
1034 3' - 4 3/4"
2470 8' - 1 1/4"
2750
9' - 0 1/4"
2259 7' - 5"
2800
ACCESS BUTTON
9' - 2 1/4"
1/2" PAINTED MDF THE DRAWINGS AND SPECIFICATIONS ARE COPYRIGHTED PROPERTY OF dkstudio architects inc. AND OTHER RESPECTIVE COPYRIGHT HOLDERS. THEY CANNOT BE REPRODUCED, COPIED, TRANSFERRED, OR USED, IN WHOLE OR IN PART, PHYSICALLY OR ELECTRONICALLY, FOR ANY OTHER PURPOSE THAN FOR REVIEW FOR CONFORMANCE WITH BUILDING CODE AND ZONING BY-LAW OR AS EXPRESSLY AUTHORIZED BY THE ARCHITECT IN WRITING. DO NOT SCALE THE DRAWINGS. DIMENSIONS ARE TO BE VERIFIED BY THE CONTRACTOR ON SITE. REPORT ANY DISCREPANCIES TO THE ARCHITECT IMMEDIATELY.
T/O LEVEL 2 0
FILE CABINETS
PROJECT NO. DRAWN BY CHECKED BY SHEET SIZE
FILE CABINET MATERIAL SAMPLE DRAWERS MATERIAL LIBRARY MTL-1 FRAME SYSTEM
South Elev.
GLASS
FLOOR FINISH
3783 12' - 5"
NO. 01 02 03 04 04
P-2 ON GYP.
ACT-2
5' - 1 1/2"
ISSUES
P-2 FINISH
2
GYP 2
GL
ACT-2 PC
15 | ELEVATOR LOBBY
EXISTI NG DOOR
1
C-2 PC
6' - 8 1/2"
GYP 2
P-1 ON GYP.
1825 DK TEAM DP ARCH D (24"X36")
P-1 FINISH
1
10' - 8 1/2" 2042
C-2 PC
W 2
22' - 4 3/4"
12 | OFFICE 2
2862
3190
2328
3' - 7 1/4"
3' - 1 1/2"9"
9' - 4 3/4"
PL
6 | STORAGE
ACT-1 GYP 1
WALL FINISH
PROJECT NO. DRAWN BY CHECKED BY SHEET SIZE
219 QUEEN STREET WEST TORONTO ONTARIO
CPT 1
10' - 0 1/2"
13 | LIBRARY
DO NOT SCALE THE DRAWINGS. DIMENSIONS ARE TO BE VERIFIED BY THE CONTRACTOR ON SITE. REPORT ANY DISCREPANCIES TO THE ARCHITECT IMMEDIATELY.
KRUG - SHOWROOM
GL 1
1100
25' - 6 1/2"
4' - 1"
ACT-1 GYP 1
955 230
3059
22' - 0 3/4" 7784
2' - 0"
1245
460
THE DRAWINGS AND SPECIFICATIONS ARE COPYRIGHTED PROPERTY OF dkstudio architects inc. AND OTHER RESPECTIVE COPYRIGHT HOLDERS. THEY CANNOT BE REPRODUCED, COPIED, TRANSFERRED, OR USED, IN WHOLE OR IN PART, PHYSICALLY OR ELECTRONICALLY, FOR ANY OTHER PURPOSE THAN FOR REVIEW FOR CONFORMANCE WITH BUILDING CODE AND ZONING BY-LAW OR AS EXPRESSLY AUTHORIZED BY THE ARCHITECT IN WRITING.
FLOOR TRANSITION
PL-1 MILLWORK
1' - 6"
3083
GL 1
MTL-1
10' - 1 1/2"
3915
5' - 7 1/4"
610
EXISTING WALL
1
14 | CORRIDOR
1
CEILING FINISH
1
GYP
1006
1707
PC
C-X
524 1' - 8 3/4"
653
1
C-2
861
3' - 7 1/2" 2' - 10"
2' - 1 3/4" 3' - 3 1/2" 6727
W 2
1105
3347
7' - 2 1/2"
FLOOR FINISH
X
4 | SERVERY/RECEPTION
10' - 11 3/4"
1105
861
1238
1125 PC
12' - 10"
5094 ACT-1
16' - 8 1/2"
3814
12' - 6 1/4"
GYP 1
10 | STORAGE
22' - 0 1/2"
6719
847
GYP 2
7 3/4" 3' - 1 1/2"
9' - 11 1/4"
PC
6' - 6"
C-1
200 955
3027
1
F
1' - 0 1/4"
C-2
6114
1
3' - 8 1/4"
3027
-
WALL FINISH
X
W 2
PL 1
C-1
---
20' - 0 3/4" 2196
2' - 9 1/4"3' - 7 1/2"
9' - 11 1/4"
E
MTL-2
W
312
GYP 2
2' - 10"
E
2' - 7 1/2"
4' - 0 3/4"
7581 13' - 3 3/4"
800
24' - 10 1/2"
PL 1
3 | SHOWROOM
LEGEND
GFI
3282
GL 1
10' - 9 1/4"
ACT-1
7' - 7 3/4"
1745 5' - 8 3/4"
10' - 5 1/2"
260
862
26766 87' - 9 3/4"
1 | HEALTHCARE
4056
10 1/4"
2649
8' - 8 1/4"
674
21 | CONFERENCE ROOM
C:\Users\Barcelona\Desktop\1825 - DKS Arch D Titleblock.dwg, 2019/01/10
14' - 2"
2' - 2 1/2" E
Finish Plan
4316
2' - 10"
0
1067
1
3' - 6"
1728
PC
C-2
5' - 8"
8' - 9 1/2"
W 2 5 | CHAIR DISPLAY
0"
845
2' - 9 1/4" 2678
558 1' - 10"
WHITE PAINT FINISH DARK GREY PAINT FINISH P-1 GLOSSY PLASTIC LAMINATE TBD P-1 GYP. P-2 GYP. CLEAR GLASS MIRROR P-1 GLOSSY EPOXY P-2 DARK GREY TINTED POLISHED CONCRETE CARPET TILES TBD ACOUSTIC CEILING TILE P-1 POWDER COATED METAL FRAME P-2 POWDER COATED METAL FRAME
HEAVY DUTY TRACKS
1
SOUTH ELEV. @GRID 7 - PART 1 1 : 25
E
A
BROCHURE FILE CABINET
1825 DK TEAM DP ARCH D (24"X36")
ISSUES NO. 01 02 03 04 04
DATE DESCRIPTION 2019/01/11 95% DD SET 2019/02/07 PERMIT SET 2019/05/03 PRICING SET 2019/08/01 PRICING SET REV.1 2019/08/13 PERMIT REVISION
REV.
Krug - Downtown Showroom, Toronto
1470
3' - 1"
1"
1"
25 25
697
25
697
25
1"
2' - 3 1/2"
1"
2' - 3 1/2"
1" BUILT-IN STAND SUPPORT
HEAVY DUTY TOP SLIDING TRACK
462
1"
GLASS SAMPLES PROVIDED BY CLIENT
1' - 6 1/4"
25
462
939
1' - 6 1/4"
25
1"
25
4' - 9 3/4"
PROVIDE BLOCKINGS TO SUPPORT FLOATING SHELVES
WOOD SAMPLES BY CLIENT
1"
25
1"
25
WHITE COLOUR CORE LAMINATE FLOATING SHELVES
26 2"
53
9X9 GLASS SAMPLES SHELVES
1"
3 A413
L METAL WALL BRACKETS
PROVIDE BLOCKING TO SUPPORT FLOATING SHELVES
3
DO NOT SCALE T BE VERIFIED BY T ANY DISCREPAN IMMEDIATELY.
DETAIL SECTION THROUGH GLASS SHELVES 1:2 722
70
2 3/4"
2 3/4"
PROJECT NO DRAWN BY CHECKED BY SHEET SIZE
ISSUES NO. 01 02 03 04 04
DATE 2019/01 2019/02 2019/05 2019/08 2019/08
1 1/2"
38
1"
25
70
2' - 4 1/2" 1/2"WHITE COLOUR CORE PLASTIC LAMINATE ON PLYWOOD FINISHED GRADE ON BOTH SIDES
THE DRAWINGS A COPYRIGHTED P AND OTHER RESP CANNOT BE REP OR USED, IN WH ELECTRONICALL FOR REVIEW FOR CODE AND ZON AUTHORIZED BY
BOTTOM MOUNT DRAWER SLIDES
DETAIL SECTION THROUGH SAMPLE DRAWERS 2 A413
SUPPORTS FOR BOTTOM MOUNT DRAWER SLIDES TO SIDE PANELS
891 2' - 11"
4
SIDE SUPPORT PANELS
2 SUPPORTS FOR CENTER MOUNT DRAWER SLIDES TO SIDE PANELS
710
2' - 4"
SEAL 2 BOTTOM MOUNT DRAWER SLIDES
SHEET TITLE
1
LIBRARY - SECTION THROUGH WOOD SAMPLE TRACKS 1:5
2
1"
LIBRAR
25
\Users\Barcelona\Desktop\1825 - DKS Arch D Titleblock.dwg, 2019/01/10
A413
219 QUEEN STREET WEST
1:2
KRUG - SHOWROOM
2212
4 7' - 3"
2212
7' - 3"
SAMPLE DRAWERS
LIBRARY - SECTION THROUGH GLASS SHELVES 1:5
SHEET NUM T/O LEVEL 2 0
5
PULL OUT DRAWER PLAN DETAIL 1:5
A413
CCY
ERTY PROP 4600 1000
1400 2900 4500 2000 6500
TRADITIONAL
100
BUILDING ENVELOPE GOLF CART PARKING
2 200
A4.1
5518
5050
5550
1900 3600
3150 100 450
645
2500
830 900
SPECIAL VILLA 3
3880
ING EN BUILD
AUTOCOURT (STONE) -200 mm
3255
2040
10
VELO PE
1270
796 660 854
11
MAIN LEVEL FLOOR PLAN PROPERTY LINE SCALE: 1 : 100
PROPERTY LINE
3480
3840 100
PLANTER
TYP.
920
400
1550
PROPERTY LINE
7
9 A6.1
-200 mm
SKYLIGHT
A4.1
-200 mm
2500
G LKIN W A ATH P
2510
220
OP-O FF T DR
DN DN
1050 600 TYP.
6 1
1330
9 200
300
PLANTER
PLANTER
2035
BUILDING ENVELOPE
GARAGE 113
1900
ISSUE: 100% BASEMENT SCHEMATIC DESIGN REVISIONS:
STAFF ENTRY
900 1150
2050
MECH 114
2600
CARPET
7700 1200
PLANTER
2300 1400
660 640
W AL PA KIN TH G
1690
BREAKFAST PATIO (STONE)
-600 mm
DN
1900
WOOD
ISSUE: 100% BASEMENT SCHEMATIC DESIGN
1 A6.1
100 1900
LARGE POND
TILE
3080
1250
SKYLIGHT
DN
5100
1250 500 1000
1400
2600
2300
F.P.
DN
400
DINING PATIO (STONE) 0 mm
1 A5.2
8
1400
D.W.
CHECKED BY: CCY
PROJECT NUMBER: 10144
UP
2050
RANGE & HOOD
0 mm
PLANTER
5735
5000
D.W.
TYP.
WATER LEVEL
880
200
2-STORY LIBRARY 111
HALL 112
900
-1450 mm
PLAN MATERIAL KEY - TRADITIONAL
3770
9 A6.1
1400 TYP.
900 150
CHINESE KITCHEN 116
900
5600
DN
3 A6.1
400
ENTRY PORCH 0 mm
OPEN BOOKSHELVES
4800
150 900
2480
WATERFALL
1320
500
STOR.
5
LINE
ROOF ABOVE
150 1200
BUILT-IN OVENS
1930
STREAM
THEATER 108
ENTRY 110
DN
BREAKFAST ROOM 118
WINE
900
STOR.
DRAWN BY: CCY
4050
0 mm
1800
COATS
POWDER 117
BUILT-IN FRIDGE
PROP
DATE: 2012-02-03
4
DESK
mm
mm 00
R 4900 482
RANGE & HOOD
PNTRY
2750 1600
DINING RM. 120
-1350 mm
BRIDGE
2650
CHANGCHUN CHINA
SINK
1325
TYP.
1325
BUILT-IN FRIDGE
POND PATIO (STONE)
STREAM
2225
WESTERN KITCHEN 119
2 A6.1
925
DN
3825
R 61
600
3825
GALLERY 121
800
2500
OPEN TO BELOW
UP
BUILT-IN OVENS
1100
WATERFALL
HALL 109
56.000°
STAIR: 165mm RISERS, TREADS VARY
4 A10.1
4015
2660
65.000°
950
800
275
3300
DIST TO
1800
1300 3300
4400
2550
4
(SEE LOWER LEVEL PLAN)
200 325
0 mm 900 200
1300
CLOSET 105
3
8500
A4.1
HALF LEVEL PLANTER
1 7 1100
3 VILLA SV3 - TRADITIONAL STYLE - SOUTHWEST PERSPECTIVE VIEW
CHANGCHUN CHINA
DIST TO PROP LINE
2500
410
A4.2
1390
GUEST BEDROOM 2 104
1200
GUEST LIVING RM. 107
A4.1
3
ARCADE 122
1 A10.1
-4350 mm
Southwest Perspective View
1025
1375
GARDEN COURTYARD (STONE)
F.P.
4
SMALL POND
2080
890
750
600 525
1860
WALKING PATH
HALL 124
2000 200
1630
1885
950
1600
0 mm
2100
100
5
500
2000
GUES
DN
800 450
1750 1000
DECK
PROJECT NUMBER: 10144
1975
BATH 102
150 900
195 800 195
VESTIBULE 106
510 3550
-2600 mm
1500
650
910
100
WATER LEVEL
CHECKED BY: CCY
2725
150 900
A4.1
DN
PORCH (STONE)
LIVING ROOM 123
DRAWN BY: CCY
0 mm
GUEST BEDROOM 1 103
-2600 mm
2000
PATIO (STONE)
A4.2
DATE: 2012-02-03
900
PLANTER SUNROOM 125
ROOF ABOVE
100
13
2
1800
(SEE LOWER LEVEL PLAN)
2200
PLANTE R
600
CLOSET 101
PLANTER BELOW
300
7000
DN
DN
1000
CHANGCHUN DEER VALLEY
6210
1400
1200
A4.2
3
HOT TUB TERRACE BELOW
OVERHEAD DOOR
-3200 mm
200
228 Midland Avenue Post Office Box 529 Basalt, Colorado 81621 970-927-4925 fax 970-927-8578 ccyoffice@ccyarchitects.com
1
GE NV EL OP E
7000
4180
A4.2
BATH 100
1250
6000
4205
1155
4900
2600
300
LINE PROP
3590
TO DIST
CHANGING ROOM 126 900
2500
BU ILD IN
6050
A R C H I T E C T S
P
4100
2000
PE VELO
6050
LINE
5
ING EN
POOL ROOM 127
INDOOR/ OUTDOOR POOL
2 A5.2
2
N
2 A5.1
4000
BUILD
3750
200 130
12
M
2800
860
ERTY PROP
CHANGCHUN DEER VALLEY
C 5600
4000
3845
1005 1100
A4.2
PE VELO
L 4600
6320
6
1185
ING EN
K 1300
D
B A
J 7650
DIS T
BUILD A4.2
H 2600
368
G 5300
34 35 TO PR OP LIN E
F 2700
R 7950 mm
E
A R C H I T E C T S
228 Midland Avenue Post Office Box 529 Basalt, Colorado 81621 970-927-4925 fax 970-927-8578 ccyoffice@ccyarchitects.com
CCY
LINE
Changchun Deer Valley
3350
1 A5.1
PROJECT NORTH
PL AN
LEVEL FLOOR PLAN 1 MAIN 1 : 100
NO
RT H
Main Floor Plan 1:200
A3.1 © COTTLE CARR YAW ARCHITECTS, LTD.
CC
REVISIONS:
A R C H I T ERTY PROP
CCY
LINE
228 Midland Post Office Basalt, Colora 970-927 228 Midland Avenue Post Office Box 529 fax 970-92 Basalt, Colorado 81621 970-927-4925 ccyoffice@ccya fax 970-927-8578
A R C H I T E C T S
E
F
G
2700
5300
H
J
2600
7650
K
L
1300
M
4600
N
2800
P
4100
2500
2 A5.1
A4.2
ccyoffice@ccyarchitects.com 2
C
ROOF BELOW, SEE UPPER LEVEL FLOOR PLAN
4000
5600
900
TERRA COTTA TILE ROOFING STANDING SEAM METAL ROOFING
900
MEMBRANE ROOFING
R 900
SLOPE SLOPE
D
500
A4.1
ISSUE: 100% BASEMENT SCHEMATIC DESIGN
4 SLOPE - .5:10
SLOPE - .5:10
GUTTER WITH DOWNSPOUT
SLOPE
R
TYP.
700
500
D
700 4600
TYP.
SLOPE - .5:10
STANDING SEAM METAL ROOFING
500
DN
GUTTER WITH DOWNSPOUT
ROOF CRICKET 1250
STONE CHIMNEY CAP
4 A6.2
PROJECT N 1014
10
TYP.
SPECIAL VILLA 3
ISSU 100% BAS SCHEMATIC
6500
ROOF BELOW, SEE UPPER LEVEL FLOOR PLAN
DN
TRADITIONAL ROOF PLAN
11
SCALE:
1 A5.1
PROPERTY LINE
PLAN. 1 ROOF 1 : 100
2 A4.1
SCALE: 1 : 100 PROPERTY LINE
3 VILLA SV3 - TRADITIONAL STYLE - SOUTHWEST PERSPECTIVE VIEW
© COTTLE CARR YAW ARCHITECTS, LTD.
9 2000
STANDING SEAM METAL ROOFING
CHEC BY CC
STANDING SEAM METAL ROOFING TYP. 600
900
DN
DRAWN CC
4500
5 A6.2
TYP.
DAT 2012-0
8
900
1 A6.2
A4.1
7
TERRA COTTA TILE ROOFING
SLOPE - .5:10
TRADITIONAL
1 2 A7.1
700
SLOPE - 1.5:10
900
WALL BELOW, TYP.
6
MEMBRANE ROOFING ROOF BELOW, SEE UPPER LEVEL FLOOR PLAN
SLOPE
3600
700
SLOPE
500
3 A6.2
500
SLOPE
SLOPE
SLOPE - .5:10
2 A6.2
D
900
TERRA COTTA TILE ROOFING
R
SLOPE
SLOPE - .5:10
1250
1 7
CHANG CHIN
WALL BELOW, TYP.
900
1600
SLOPE
REVISIONS:
STANDING SEAM METAL ROOFING
GUTTER WITH DOWNSPOUT
A4.2
1 A5.2
TERRA COTTA TILE ROOFING TYP. 500
6 A6.2
GUTTER WITH DOWNSPOUT
2900
ROOF BELOW, SEE UPPER LEVEL FLOOR PLAN
Roof Plan 1:200
CHECKED BY: CCY
PROJECT NUMBER: 10144
8500
A4.1
3
A4.2
PERSPECTIVES
DRAWN BY: CCY
4
500
4
SPECIAL VILLA 3
DATE: 2012-02-03
3
5
SLOPE
DN
13
South Garden Perspective View
1400
D
DN
CHANGCHUN CHINA
1900
R 700
5
SLOPE
900
7000
SLOPE
SLOPE
4200
A4.1
SLOPE - .5:10
COLUMNS BELOW, TYP.
5 A4.2
1 VILLA SV3 - TRADITIONAL STYLE - NORTHEAST AERIAL PERSPECTIVE
2
1250
700
2600
2 A5.2
WALL BELOW, TYP.
7000
ROOF BELOW, SEE UPPER LEVEL FLOOR PLAN
12
SLOPE - .5:10
1250
700
SLOPE
LINE
A4.2
2 A7.2
A4.3
CHANG DEE VALL
GUTTER WITH DOWNSPOUT
3
2 VILLA SV3 - TRADITIONAL STYLE - SOUTH DETAIL PERSP
CHANGCHUN DEER VALLEY
4000
1250
ERTY PROP
B A
1
D
6
4600
A4.2
PROJECT NORTH
PL AN
NO
RT H
A3.3 © COTTLE CARR YAW ARCHITECTS, LTD.
REVISI
SECTION LOOKING SOUTH 2 EAST/WEST 1 : 100
Changchun Deer Valley
1
2
3
4
5
6
7
8
9
10
11
3 A6.2
1 A5.2
15 0T YP .
1 A6.2
8065 mm
SPRING PT.
DROPPED CLG, TYP. BEAMS, TYP.
6230 mm
SPRING PT.
4600
3760 mm
MASTER BEDROOM 215
SPRING PT. 4 A6.2
10 A6.1
DROPPED CLG, TYP. BEAMS, TYP. 4460
3760
250
UPPER LEVEL 3465 mm
SUNROOM 125
LIVING ROOM 123
GALLERY 121
DINING RM. 120
9 A6.1
MAIN LEVEL 0 mm
CHANGING 018
3000
MASSAGE RM 020
3090
DROPPED CLG, TYP. SAUNA 022
FITNESS 017
TOILET ROOM
GAME RM 016
SPECIAL VILLA 3 TRADITIONAL
BAR 015
LOWER LEVEL -3465 mm
CRAWLSPACE
BUILDING SECTIONS SCALE: 1 : 100
A5.1
SECTION LOOKING NORTH 1 EAST/WEST 1 : 100
East Section Looking North 1:100 © COTTLE CARR YAW ARCHITECTS, LTD.
CCY
A R C H I T E C T S
11
10
9
8
7
6
5
4
3
2
1 228 Midland Avenue Post Office Box 529 Basalt, Colorado 81621 970-927-4925 fax 970-927-8578 ccyoffice@ccyarchitects.com
1 A5.2
SECTION JOGS AT THIS LOCATION 7215 mm
SPRING PT.
TY P. 15 0
3 A6.2
DROPPED CEILING, TYP.
6365 mm
CLOSET 202
GUEST BEDROOM 3 203 2900
BATH 204
SPRING PT.
UPPER LEVEL 3465 mm
ENTRY 110
STAFF ENTRY
CARD ROOM 006
CRAWLSPACE
WINE 005
REC. ROOM BEYOND
THEATER 108
GUEST LIVING RM. 107
VESTIBULE 106
GUEST BEDROOM 1 103
CLOSET
MECH. ATTIC
DROPPED CEILING, TYP. THEATER 003
CRAWLSPACE
BATH 100
CHANGCHUN CHINA
3265
2-STORY LIBRARY 111
B.O. ROOF 6665 mm
3265 mm
SIM
150 TYP.
CLOSET 206
MAIN LEVEL 0 mm
POWDER 001
CRAWLSPACE
DATE: 2012-02-03 DRAWN BY: CCY
DROPPED CEILING
3200
3215
STAFF BATH 008
STAFF LIVING 007
GUEST BEDROOM 4 207
SPRING PT.
1 A6.2
BOOKSHELVES
BEAMS, TYP. DROPPED CEILING TYP. GARAGE 113
SITTING 210
450450450
4 A6.2
3750
2-STORY LIBRARY 111
3215 mm
DROPPED CLG, TYP. BEAMS, TYP.
BEAMS, TYP.
SPRING PT.
CHANGCHUN DEER VALLEY
DROPPED CLG. MECH ATTIC
LOWER LEVEL -3465 mm
CHECKED BY: CCY
PROJECT NUMBER: 10144 ISSUE: 100% BASEMENT SCHEMATIC DESIGN
SECTION LOOKING SOUTH 2 EAST/WEST 1 : 100
East Section Looking South 1:100
REVISIONS:
Changchun Deer Valley
STEEL SCREEN SPARK ARRESTOR
H
WOOD FLOORING, EXACT PRODUCT & FINISH BY INTERIOR DESIGNER
F
F
LINE OF EXHAUST HOOD (SHOWN DASHED) 50
TOWEL BAR: EXACT MODEL & FINISH BY INTERIOR DESIGNER
A R C H I T E C T S
420
1930
420
50
50
420
1930
STONE CHIMNEY CAP, SLOPE TOP TO DRAIN
NOTE: INSTALL BACKSPLASH AT WOOD FLOORING, EXACT BACK AND SIDE WALL OF VANITY PRODUCT & FINISH BY (TYPICAL) INTERIOR DESIGNER WOOD PARTITION WALL 700
RANGE & HOOD
600
BY INTERIOR DESIGNER
500
700
PAPER HOLDER: EXACT MODEL & FINISH BY INTERIOR DESIGNER
700
600
435
435
1900
435
450
1900
435
500
900
900 1100
PLAN - MASTER BATH 214 2 1ENLARGED : 30 900
1100
900
900
1500
900
1100
1500
EQ.
EQ.
1425
900
9
400
400
100 260
OPERABLE GLASS & STEEL DOORS
1425
1425
50 TOWEL BAR: EXACT MODEL & ENLARGED FINISH BY INTERIOR 1 DESIGNER 3
1 : 30
100 50
FIRE BRICK
A10.1
50
625
100
STONE HEARTH 50
220
SPECIAL ENLARGED VILLA 3PLANS
100
100 50
STONE VENEER BELOW STONE VENEER BELOW HEARTH
STONE MANTLE ABOVE
625
625
220
220
PLAN - LIVING ROOM 123 FIREPLACE WOOD FLOORING
A10.1
FIRE FIRE BRICKBRICK
HEARTH
STONE VENEER BELOW HEARTH OPERABLE GLASS & STEEL OPERABLE GLASSDOORS STONE MANTLE ABOVE
& STEEL DOORS
TOWEL BAR: EXACT MODEL & FINISH BY INTERIOR DESIGNER 100 625 220 1080
100 260
100 260 625
FULLMASONRY MASONRY FULL WOOD-BURNING WOOD-BURNING FIREPLACE FIREPLACE WOOD FLOORING
3
380
9
220
STONE HEARTH
700
1080
700
220
120
625
TRADITIONAL
STONE MANTLE ABOVE
5
380
100
STONE VENEER BELOW HEARTH
120
700
100 260
EQ. BAR: EXACT MODEL EQ. TOWEL & FINISH BY INTERIOR DESIGNER
50
700
9 EQ.
ISSUE: 100% BASEM SCHEMATIC D PROJECT NUMBER: 10144
REVISIONS
ISSUE: 100% BASEMENT SCHEMATIC DESIGN REVISIONS:
MAIN LEVEL 0 mm
SPECIAL VILLA 3 5 5
FIRE BRICK
120
SLOPE
600
EQ.
FULL MASONRY WOOD-BURNING FIREPLACE
FRAMELESS FROSTED FRAMELESS FROSTED OPERABLE GLASS GLASS PANELS & DOORS GLASS PANELS &DOORS DOORS & STEEL
FIREPLACE
900
CHECKED BY: CCY
MAIN LEVEL 0 mm
ELEVATION - FIREPLACE
5
INSTALL BACKSPLASH NOTE: INSTALLNOTE: BACKSPLASH AT BACK AT BACK AND SIDE WALL OF VANITY, AND AT AND SIDE WALL OF VANITY, AND ATMASONRY FULL WALLS SURROUNDING TUB WALLS SURROUNDING TUB WOOD-BURNING
BENCH
1500
PROJECT NUM 10144
DRAWN BY: CCY
F
SMALLER COMPLIMENTRY TILE SMALLER COMPLIMENTRY TILE PATTERN TO ALLOW SLOPES TO PATTERN TO ALLOW SLOPES TO NOTE: INSTALL BACKSPLASH AT BACK DRAIN DRAIN
NOTE: INSTALL BACKSPLASH AT BACK AND SIDE WALL OF VANITY, AND AT WALLS SURROUNDING TUB
900
900
100
SLOPE
FRAMELESS FROSTED STONE 200 TOWEL BAR: EXACT MODEL & STONE PANELS & DOORS FINISH BY BENCH INTERIOR DESIGNER
200GLASS
CHECKED BY: CCY
DATE: 2012-02-03
STONE HEARTH
50
STONE BENCH
200
EQ. 1425
500
500
600
EQ.
DRAWN BY
CHANGCHUN CCY CHINA
F
PAPER HOLDER: EXACT MODEL & FINISH BY INTERIOR DESIGNER
FRAMELESS FROSTED GLASS PANELS & DOORS
SLOPE
600 900
DATE: 2012-02-03
SHOWER DRAIN
AND SIDE WALL OF VANITY, AND AT SMALLER COMPLIMENTRYWALLS TILE SURROUNDING TUB PATTERN TO ALLOW SLOPES TO DRAIN
SLOPE 900
850
100
100
900
800
STONE BENCH
CHANGCH CHINA
SHOWER F HEAD SHOWER DRAIN
9
1500
600
VANITY, LAVATORIES & FAUCETS BY INTERIOR DESIGNER MIRRORS
VANITY, LAVATORIES & FAUCETS BY INTERIOR DESIGNER MIRRORS
SLOPE
SHOWER DRAIN
CHANGCHUN DEER VALLEY
SHOWER HEAD
SMALLER COMPLIMENTRY TILE PATTERN TO ALLOW SLOPES TO DRAIN SLOPE
SLOPE
400
SLOPE
SLOPE
800
1250
SLOPE
400 800
1250
SHOWER HEAD
SLOPE 200
EQ.
PAPER HOLDER: EXACT MODEL & FINISH BY INTERIOR DESIGNER
EQ.
SLOPE
VANITY, LAVATORIES & 500 900 FAUCETS BY INTERIOR DESIGNER1100 MIRRORS
800
EQ.
SLOPE
400
800
EQ.
TUB, TUB FILLER & TUB DECK AND APRON BY INTERIOR DESIGNER VANITY, LAVATORIES & FAUCETS BY INTERIOR DESIGNER MIRRORS
900
TUB, TUB FILLER & TUB DECK AND APRON BY INTERIOR DESIGNER
1250
1250
1000 1250
SLOPE
TUB, TUB FILLER & TUB DECK AND APRON BY INTERIOR DESIGNER
1000
1250
400
SLOPE
600
TUB, TUB FILLER & TUB DECK AND APRON BY INTERIOR DESIGNER
3 ENLARGED ELEVATION - FIREPLACE
: 30 PAPER1HOLDER: EXACT MODEL & FINISH BY INTERIOR DESIGNER
SHOWER HEAD FLOOR TILE: EXACT PRODUCT & LAYOUT BY INTERIOR DESIGNER SHOWER DRAIN EQ. EQ.
1000
1220
1250
800
TOWEL BARS: EXACT MODEL & FINISH BY INTERIOR DESIGNER
PAPER HOLDER: EXACT MODEL & FINISH BY INTERIOR600 DESIGNER
228 Midland Avenue Post Office Box 529 Basalt, Colorado 81621 970-927-4925 fax 970-927-8578 ccyoffice@ccyarchitects.com
ELEVATION - FIREPLACE 3 1ENLARGED : 30
FLOOR TILE: EXACT PRODUCT F & LAYOUT BY INTERIOR DESIGNER
EQ.
SLOPE
1250
1000
8 EQ.
900
1220
400
8
LAYOUT BY INTERIOR DESIGNER
600
TOWEL BARS: EXACT MODEL & FINISH BY INTERIOR DESIGNER
50
600
3
LEVEL 1 : 30 Enlarged Elevation - Fireplace 1:30 MAIN 0 mm FLOOR TILE: EXACT PRODUCT &
380
1220
ELEVATION - FIREPLACE 3 1ENLARGED ENLARGED : 30
CHANGCH DEER VALLE
OPERABLE STEEL & GLASS DOORS (SHOWN DASHED)
REVISIONS: MAIN LEVEL 0 mm
STONE HEARTH
50
800
1220
8 FLOOR TILE: EXACT PRODUCT & LAYOUT BY INTERIOR DESIGNER
800
TOWEL BARS: EXACT MODEL &
FINISH BY INTERIOR DESIGNER TOWEL BARS: EXACT MODEL & 500 900 FINISH BY INTERIOR DESIGNER
8
900
120
500
OPERABLE STEEL & GLASS DOORS (SHOWN DASHED)
CCY
A R C H I T E C T S
FIRE BRICK STONE HEARTH
OPERABLE STEEL & GLASS DOORS (SHOWN DASHED)
380
H
50
G
STONE HEARTH
FIRE BRICK
FIRE BRICK
STONE MANTLE
ISSUE: 100% BASEMENT SCHEMATIC DESIGN
OPERABLE STEEL & GLASS DOORS (SHOWN DASHED)
STONE MANTLE
400
450
H
PROJECT NUMBER: REVISIONS: 10144
FIRE BRICK
100
H
1900
STONE MANTLE 850
435
DATE: 435 2012-02-03 PROJECT NUMBER: 10144 DRAWN BY: CCY ISSUE: STONE MANTLE CHECKED 100% BASEMENT BY: SCHEMATIC DESIGN CCY 435
1900
435
850
900
CHECKED BY: CCY
BEAM BEYOND
450
200
500
CHANGCHUN DRAWN BY: CCY CHINA
DROPPED CEILING
MIRROR
G
900
DATE: DROPPED CEILING 2012-02-03BEAM BEYOND
CEILING BEAMS
350
PLAN - WESTERN KITCHEN 119 & POWDER 117 4 1ENLARGED LINE OF CABINET Enlarged Plan - Western Kitchen 119 & Powder 117 1:30 : 30 BELOW(SHOWN DASHED)
500
CEILING BEAMS
BEAM BEYOND
VANITY & FAUCET BY INTERIOR DESIGNER
BACKSPLASH
H
CHANGCHUN CHINA
MIRROR
LINE OF CABINET BELOW(SHOWN DASHED)
PLAN - WESTERN KITCHEN 119 &CABINETS POWDER 117 LINE OF UPPER 4 1ENLARGED (SHOWN DASHED) : 30
CEILING BEAMS DROPPED CEILING ROOF CRICKET (MATCH SLOPE BEAM OF ROOF) BEYOND
CEILING BEAMS ROOF CRICKET (MATCH SLOPE OF ROOF) DROPPED CEILING
LINE VANITY OF UPPER CABINETS & FAUCET (SHOWN DASHED)DESIGNER BY INTERIOR BACKSPLASH
350
G PLAN - WESTERN KITCHEN 119 & POWDER 117 4 1ENLARGED G : 30
ROOF CRICKET (MATCH SLOPE OF ROOF)
450
EQ.
700
1400
CHANGCHUN DEER VALLEY
NOTE: INSTALL BACKSPLASH AT BACK AND SIDE WALL OF VANITY (TYPICAL) VANITY & FAUCET WOOD PARTITION WALL
PAPER HOLDER: EXACT MODEL & FINISH BY INTERIOR DESIGNER
LINE OF CABINET DASHED)
1400
600
CHANGCHUN DEER ROOF CRICKET (MATCH SLOPE OF ROOF) VALLEY
MIRROR
PAPER HOLDER: EXACT MODEL & FINISH BY INTERIOR DESIGNER NOTE: INSTALL BACKSPLASH AT BACK AND SIDE WALL OF VANITY MIRROR (TYPICAL) WOOD PARTITION WALL VANITY & FAUCET BY INTERIOR DESIGNER
350
BELOW(SHOWN LINE OF UPPER CABINETS (SHOWN DASHED) BACKSPLASH
600
600
50
PAPER HOLDER: EXACT7MODEL & FINISH BY INTERIOR DESIGNER
350
300
1400
EQ.
STONE CHIMNEY CAP, SLOPE TOP TO DRAIN 228 Midland Avenue Post Office Box 529 81621 E Basalt, C T Colorado S 970-927-4925 STEEL SCREEN SPARK fax 970-927-8578 ARRESTOR ccyoffice@ccyarchitects.com
228 Midland Avenue Post Office Box 529 Basalt, Colorado 81621 970-927-4925 fax 970-927-8578 ccyoffice@ccyarchitects.com
STEEL SCREEN SPARK ARRESTOR
850
600
800
50
500
EQ.
200
EQ.
600
7
600
LINE OF UPPER600CABINETS (SHOWN DASHED) 600 600 BACKSPLASH
2450 EQ.
600
1400
600
600
600
RANGE & HOOD 900
BUILT-IN FRIDGE
50
EQ.
300
2450
300
2450
600
EQ.
500
EQ.
EQ.
625
450
RANGE & HOOD
1350
600
EQ.
600
200
600
900
PNTRY
600
1350
200
600
2450
STONE CHIMNEY CAP, SLOPE TOP TO DRAIN
WOOD FLOORING, EXACT PRODUCT & FINISH BY INTERIOR DESIGNER
7 625
OF CABINET PLAN - WESTERN KITCHEN 119 &LINE POWDER 117 BELOW(SHOWN DASHED) 4 1ENLARGED : 30 600
WOOD FLOORING, EXACT PRODUCT & FINISH BY INTERIOR DESIGNER 600 450
450
300 600
600
600
800
550
50
50
STEEL SCREEN SPARK ARRESTOR
50
NOTE: INSTALL BACKSPLASH AT BACK AND SIDE WALL OF VANITY (TYPICAL) WOOD PARTITION WALL
800
625
EQ.
EQ.
EQ.
600
EQ.
750
600
420
7
TOWEL BAR: EXACT MODEL & FINISH BY INTERIOR DESIGNER
EQ.
TOWEL BAR: EXACT MODEL & FINISH BY INTERIOR DESIGNER KITCHEN SINK
1930
800
TOWEL BAR: EXACT MODEL & FINISH BY INTERIOR DESIGNER
600
900
LINE OF EXHAUST HOOD (SHOWN DASHED)
RANGE & HOOD
600
BUILT-IN OVENS
600
1350
900 750
KITCHEN SINK
900 550
900
BUILT-IN FRIDGE
1350
900
900
PNTRY
BUILT-IN FRIDGE 600
750
BUILT-IN OVENS
625
75
75
BUILT-IN FRIDGE
600
LINE OF EXHAUST HOOD (SHOWN DASHED)
LINE OF EXHAUST HOOD (SHOWN DASHED)
550
KITCHEN SINK
600
600
WOOD FLOORING, EXACT PRODUCT & FINISH BY INTERIOR DESIGNER
WOOD FLOORING, EXACT PRODUCT & FINISH BY INTERIOR DESIGNER
75
PNTRY
550
H BUILT-IN OVENS
PNTRY
75
EQ.
KITCHEN SINK
WOOD FLOORING, EXACT PRODUCT & FINISH BY INTERIOR DESIGNER
420
A R C H I T
WOOD FLOORING, EXACT 50 420 PRODUCT & FINISH BY INTERIOR DESIGNER
450
H
500
600
750
BUILT-IN OVENS
F H
CCY CCY
Basalt, Colorado 8 970-927-4925 fax 970-927-85 ccyoffice@ccyarchite
1080
10803 A10.1
3
A10.1
TRADITIONAL 220
220
625
625
100 50
100 50
STONE MANTLE ABOVE
STONE HEARTH
SCALE: 1 : 30
TRADITIONAL
TRADITIO
STONE HEARTH
WOOD FLOORING
A10.1
ENLARGED PLANS
SPECI SPECIAL VILLA 3 VILLA
WOOD FLOORING
ENLARGED ENLARGE PLANS
PLANS
SCALE: 1 : 30
PLAN - MASTER BATH 214 2 1ENLARGED : 30 PLAN - MASTER BATH 214 2 1ENLARGED Enlarged ENLARGED PLAN - MASTER BATH 214 Plan - Master Bath 214 1:30 : 30
2
1 : 30
SCALE: 1 : 30
PLAN - LIVING ROOM 123 FIREPLACE 1 1ENLARGED : 30 PLAN - LIVING ROOM 123 FIREPLACE 1 1ENLARGED 1:30 PLAN - LIVING ROOM 123 FIREPLACE ENLARGED : 30 Enlarged Plan - Living Room 123 Fireplace
1
1 : 30
© COTTLE CARR YAW ARCHITECTS, LTD.
A10.1
SCALE: 1 : 30
A10.1
A10.
© COTTLE CARR YAW ARCHITECTS, LTD. © COTTLE CARR YAW ARCHITECTS, LTD.
A D
C
B
A
12 650
C
D
13
H
12
J
C
A R
13
GLASS AND ALUMINUM OVERHEAD DOOR 900
B
550
3000
500
900
900
600
B
100
- POOL HOUSE - WEST ELEVATION 13 WINDOWS 1 : 100
G
2400
2400
POOL ROOM 128
2400
2400
ccy CHANGING ROOM 127
POOL ROOM 128
POOL ROOM 128
LOWER LEVEL -3465 mm
- POOL HOUSE - SOUTH ELEVATION 12 WINDOWS 1 : 100
H
POOL ROOM 128
CHANGING ROOM 127
ENTRY 126
POOL HOUSE LEVEL -2400 mm
LOWER LEVEL -3465 mm
CHINESE KITCHEN 116
- POOL HOUSE - EAST ELEVATION 10 WINDOWS - POOL HOUSE - NORTH ELEVATION 11 WINDOWS 1 : 100 1 : 100
6
5
4
3
1
2
2
3
4
MAIN LEVEL 0 mm
CH
CHINESE KITCHEN 9 WINDOWS1 : 100
5
6
C
J
H
6
GUEST BEDROOM 203GUEST BEDROOM 203 VESTIBULE 205
UPPER LEVEL 3465 mm
HALL 209
GUEST LIVING 206
21 10
10 21 1071
MAIN LEVEL 0 mm
2950
SUNROOM 125
1071
1071
1071
BATHROOM 100 1030
ARCADE 122
SUNROOM PARTIALEAST ELE. 8 WINDOWS1 : 100
P
N
M
STAIR WINDOWS PLAN 7 WINDOWS1 : 100
L
K 4964
J
H
SUNROOM 125
2
E
3
4
5
6
7
8
9
1218
MASTER BEDROOM 215
GUEST LIVING 206
GUEST BED 103
SC
- NORTH COURTYARD ELEVATION 5 WINDOWS 1 : 100
1600
GUEST BED 203
BATHROOM 100
PR
GUEST BEDROOM 103 VESTIBULE 106
- SOUTH COURTYARD ELEVATION 6 WINDOWS 1 : 100
F
MAIN LEVEL 0 mm
HALL 109
GUEST LIVING 107
HALL 124
G
GALLERY 211
BATHROOM 201
GUEST BEDROOM 103
570
GUEST LIVING 107
STAIR
SUNROOM 125
UPPER LEVEL 3465 mm
BATHROOM 214
BEDROOM 215
MAIN LEVEL 0 mm
LIVING ROOM 123 570
SUN ROOM 125
1030
STAFF BATH 115 MECHANICAL 114
HALL 124
DINING ROOM120
GALLERY 121
LIVING ROOM 123
- WEST ELEVATION 4 WINDOWS 1 : 100
- SOUTH ELEVATION 3 WINDOWS 1 : 100 LOWER LEVEL -3465 mm
F
G
H
J
K
L
M
N
10
P
9
8
7
6
5
4
3
2
1
SP V
3300 5 :1
0
0
2000
1541
5 :1
3200
200
5 :1
4800
5 :1
0
TR
DINING ROOM 120
1000
BREAKFAST 118
GARAGE 113
- EAST ELEVATION 2 WINDOWS 1 : 100
STAFF ENTRY
1250
800
400
2- STORY LIBRARY 111
850
1200
700
1760
ENTRY 110
700
220
700
1400
THEATER 108
700
BATH 204
450
1550
1350 700
700
1800
GUEST LIVING 107
600
BATH 204
800
600 410 700
1050
700 200
700 200
UPPER LEVEL 3465 mm
BATH 201
490 210
GUEST BEDROOM 104
W PA
1550
CLOSET 206
300 700
750
1000
1550
800
1000
1350
1700
1350
1350
2940
FROSTED GLASS
750
GUEST BEDROOM 207
700
700
BATH 102
1910
700
1050
CLOSET 101
1000
2400
GUEST BEDROOM 104
200
LIVING ROOM 123
2-STORY LIBRARY 111
700
1000
900
1400
1550
550
700
1000
600
1200
390
2500
SITTTING 210
390
300
850
1550
2500
2- STORY LIBRARY 111
1550
1200
CLOSET 202
2500
GARAGE 113
EQ
1550
MASTER CLOSET 212
750
390
MASTER BEDROOM 215
BATH 204
1200
2300
2-STORY LIBRARY 111
MASTER BATH 214
EQ
750
1250
1000
800
1000
1250
2600
GUEST BEDROOM 207
1700
1700
500
600
260
0
1021
200
500
900
2160
700
1700
BATH 100
- NORTH ELEVATION 1 WINDOWS 1 : 100
MAIN LEVEL 0 mm
A
© CO
THE SHED COMMUNAL STUDY, INTEGRATED DESIGN, TORONTO University of California, Integrated Design Studio Instructor Marcel Sanchez Prieto Fall 2020
This project takes the decaying skatepark in Oakland - Lower Bob’s as its site. The project is aiming to create a communal stage for the thriving street sport culture, juxtaposing different scenarios side by side, constructing a heterotopia for the street culture. Architecturally, the project makes use of the existing urban elements to create attachment from sporters, meanwhile, offering more qualified playground and activity spaces of different scale and for multiple uses.
itz Fr ee w ay
on Fr
e Fr
Ni m
Ni
m
itz
g
ta
ay ew
d
oa eR
Port of Oakland
12
th
11
th
10
th
Railway & Highway
Existing site objects
Abandoned
9th
Str ee
t
Str ee
t
Str ee
t
Str ee
t
Communal group
“Decaying street culture.”
“At the end of space.”
Lower Bob’s, San Francisco
Deadend of 9th Street
The existing skateboarding park is still regularly occupied by hippies and holding events. While without architect’s intervention, the site is decaying day by day.
The site and the Lower Bob’s are located at the end of the 9th Street, Oakland, going against the Nimitz freeway, staring the port of oakland. Like the noisy culture, the site is being pushed to the end of urban space. Without archtect’s intervention, the space will shortly be destroyed by metropolis’s regulation.
Conceptual Illustration The project is hiring a universal roof claiming the boundary and controlling the spaces below it.
Sloped roof: anwsering to site.
Lifted volumes: open spaces.
Angled walls: more interactive.
Hollows: ‘Interior’ courtyards.
1.Open play ground for skateboarding. 2.BMX trail. 3. Interior BMX and bouldering preparation. 4.Basketball court. 5.Cafe. 6. Exterior event space. 7.Circulation core complex. 8.Office. 9. Universal canopy. 10. Existing warehouse. 11.Existing skate park. 12. Plaza. 13. Renovated parking lot.
B
A
A B
1.wheel ramp 2.lobby 3.dry storage 4.mechanical room 5.skatepark 6.egress 7.classroom 8.metal shop 9.wood shop 10.medical examination 11.public restroom 12.locker/bathroom storage
13.BMX track 14. BMX 15.bouldering
7.classroom 16.cafe 17.office 18.maintenance room 19.conference 20.restrooms 21.kitchen 22.water tanks
A - A section
B - B section
Admin programmes: offices, classrooms & Mach.
Roof space: event space and basketball court below the universal canopy.
Circulation core connecting floating volumes in air.
Street sports facilities route.
Semi-exterior event space, connected to the playground routes and sight communication.
What the ROOF brings:
Surrounding circulation from nearby neighbors, existing Lower Bob’s skatepark.
- Shading & light patterns: being a playful sports complex, the light and shadow patterns cast from the canopy always add on pleasure and atmosphere. Playground flexible routes and sight communication.
- Flexbility: the roof free the site as it doesn’t has to be a ‘building’ so that the circulation is flexible and the spaces below are of different scale and use.
- Controllability: the universal roof welcomes the street with angled, lowered entrance, frees the inside with higher and opener height.
Secondary structure in the roof Primary beam structure in facade Top anchor connecting cables Cable counters lateral force
Secondary structure in the roof
Dead load cable holding skateboards weight Cable size not determined; but should be based on cable weight, skateboards weight, connectors weight.
Skateboard connecting kit Standard skateboard size: 3’ Horizontal metal structure Connector holding cables Connector holding cables Connecting cable unit
Connector between cables
Connector type not determined; but should be based on cable pattern, size and weight.
Bottom anchors connecting cables
Primary base beam connected to base Base of the underground rooms
Feature Facade The facade for shading, meanwhile, exhibits the hundreds of skateboards as a feature of street culture which corresponses to the existing atmosphere of the Lower Bob’s; newer techniques of facade system is introduced as well.
Cable Facade System
BMX trail with skateboards background.
Event space with feature graffiti wall.
Multi-functional palyground.
Symmetrical space: temple of sports.
Materiality: steel, wood and white concrete.
Roof event and sport space.
West facade facing highway.
South facade facing neighbor.
Date:21/06 Time: 12:00 Elevation:69.06 Azimuth:128.28
Date:21/06 Time: 15:00 Elevation:42.7 Azimuth:246.06
Date:21/06 Time: 18:00 Elevation:27.75 Azimuth:279.24
Date:21/09 Time: 12:00 Elevation:49.86 Azimuth:155.55
Date:21/09 Time: 15:00 Elevation:43.65 Azimuth:222.89
Date:21/09 Time: 18:00 Elevation:12.3 Azimuth:260.52
Date:21/11 Time: 12:00 Elevation:30.61 Azimuth:164.89
Date:21/11 Time: 15:00 Elevation:25.04 Azimuth:212.43
Date:21/11 Time: 17:00 Elevation:8.43 Azimuth:236.22
The Last Cemetery of the Red Guards in China
Thesis studio 204 Instructor: Tom Buresh Advisor: Greg Castillo Chengyu Zhang Presentation date: 2021.05.06
This project is trying to construct a memorial with multiple narratives. Realiz-
ing that most existing memorials are strong and single-narrative, this memorial tries to convey multiple narratives and memories, and by generating conflicts between those contents, it is capable of presenting the whole image of one historical event.
The object of the memorial is the last cemetery of the Red Guards in China, and
the history to which it belongs to is the period of the Cultural Revolution. Due to its unique existence and the fact that the memories of that time is almost fading away with the decease of those who have been through the history and survived, this project is neccessary and can function as an archive for those disappearing memories.
Imagine visiting the Vietnam Veterans Memorial:
In a modern context like our time, population with mixed backgrounds crowd in
Washington DC, including Vietnamese for sure. What would one see in the reflection on this heavy marble memorial? Is it simply the images of American soldiers? Or it depends so much on the visitors’ identities?
This raises the first concern about the singularity of memories in memorials.
American guy visiting Vietnam Veterans Memorial
Imagine addressing the Vietnam Veterans Memorial:
Maybe it is too late to hesitate on this imagination, while are there any groups
of people that would address the war ‘the American War’ instead of ‘the Vietnam War’? Would they hope to reveal the stories of the other side of this historical event?
Vietnam guy visiting Vietnam Veterans Memorial
This raises the second concern about the lack of narratives in memorials.
Memory is not an image, but an model: From the observation on the Vietnam Veterans Memorial one can say that:
-memories would be affected by the identities and backgrounds of the visitors
-memories have a dimension of time - they are not stable but mutable
-memories are flatten in the documentary in memorials while there is a layer of
‘lived’ memories in the place
Memorials should be responsible for multiple narratives:
It is a world of politics, while under this globalization, memorial in one place
can become the symbol of meanings in many other places. It is then responsible for those positions it takes in the web of meanings.
Multiple narratives can reveal a confident and thorough not image but dynamic
model of the historical event.
Site Analysis
Location: Shapingba District, Chongqing, China Area: approx. 2000 sqm. Buried: the deceased in the Cultural Revolution in 1960s and 70s Topography: mountainous. Height diff around 4-6 meters. Context: Near to local university and government. To the south is Chongqing old district which residents mainly elder people. Diversity of visitors and passers by: Government stuff, students of higher education, elderlys who have been through history.
Regional Map
Accessibility: In the deep decayed corner of the local park, pathway to it hardly found, covered by wild plants. Not accessible during the year except for the tomb-sweeping day - April 4th to 6th. The weather then is rainy almost every year. Government policy: Do not mention it, do not renovate it, do not demolish it. Let it go by itself.
Conflict between the name of the park and the deceased: The name of the cemetery is the cemetery/memorial of the Red Guards. While the deceased who were buried here are actually of three groups: -Red Guards -Intelligentsia victims -Innocent victims Voices to “whether should this cemetery be demolished” varies then: -Red Guards: -No. This is a symbol of honor. -Yes. We have caused a lot of death. -Intelligentsia: -No. We should remember the trauma. -Yes. Out of anger. -Victims: -Definitely yes. They are no heroes, just murderers.
Site Map
Memorial as BOUNDARY: Responding to government’s policy, this project keeps the inaccessibility and make the memorial itself the fence. Meanwhile by doing this, it is highlighting that this place is different from our time. It belongs to a time of mystery, in distance and in memory.
Memorial as EXHIBITION: Though inaccessible during most of the year, this project is still trying to include the tombs in the exhibition part by expanding the memorial to the cemetery part. Visitors both inside and outside the memorial can access it in different ways.
Memorial as LANDSCAPE: The memorial is legibal and simple from the outside, with mountainous terrain and tombstones in the background, it creates a quiet while deeply passionate view of landscape.
Site Plan
Chapter Cemetery Categorized tombstones
Chapter Reversion Exits to the cemetery can cause reverse selection of tombs to visit.
Chapter Recall Exhibition of namewall including both Red Guards and victims’ names
Chapter Meditation Activity happens here is paper burning, a Chinese tradition to memorize the deceased.
Chapter Revolution This part is an epitome or reduced version of the Cultural Revolution which aims to immerse visitors in the history and memory. Chapter Choice Different choices of circulation based on the emotions after visiting the exhibition.
Chapter Exhibition Exhibition hall that opens to public during the year. It contains multiple sets of exhibitions of different narratives and conflicts.
Emplotments in the memorial:
Plan
Exhibition 1 - Utopian Relics Content: Projection wall. Visual propaganda works from 1960s to 70s, including opera documentary film, posters, photos and literature. Exhibition 2 - Intelligentsia Confession Writing Archives Content: Archive exhibition. Arrested intelligentsia were forced to write confession diaries, this reveals strong conflict between the communitst ideal and the social context.
4
Exhibition 3 - Aug. 6th & Aug. 15th Content: Projection wall. In the year of 1966, Bian Zhongyun, the first publicly executed intelligentsia was beaten to death by her students on Aug. 6th; while on Aug. 15th, 9 days after, the leader of the murders, Song Binbin was being honored by president Mao and showed him her Red Guard badge.
2 1
3
6
5
Exhibition 4 - Communist violence Content: Film. In strong contrast to the Utopian Relics, holocaust was actually the main trend in southen China. This wall shows the documentary film of eating people in local Yunnan area. Exhibition 5 - Intelligentsia tombs. Content: The tomb itself. There are some chalk characters carved on the tombs translated as “History reflects here” and “Blind devotion and trauma”. Exhibition 6 - Victims tombs. Content: The tomb itself.
Exhibition map - narrative conflicts
From entrance to exhibition hall
Strong conflicts both in narratives and colors. First projections and colors on smoke wall matches the expectations of utopian ideal, while the second sight through the smoke wall seeing the victim’s tombs will make vistors rethink the loss in that history; also the confession diaries on the right construct a different narratives from the smoke wall projection, it underlines the other side of the utopian revolution.
Confession diaries
Victim tomb
Smoke wall projection
Exhibition 1 - Utopian Relics Content: Projection wall. Visual propaganda works from 1960s to 70s, including opera documentary film, posters, photos and literature. Exhibition 2 - Intelligentsia Confession Writing Archives Content: Archive exhibition. Arrested intelligentsia were forced to write confession diaries, this reveals strong conflict between the communitst ideal and the social context. Exhibition 4 - Communist violence Content: Film. In strong contrast to the Utopian Relics, holocaust was actually the main trend in southen China. This wall shows the documentary film of eating people in local Yunnan area. Exhibition 5 - Intelligentsias tombs. Content: The tomb itself. Exhibition 6 - Victims tombs. Content: The tomb itself.
From tombs to exhibition wall
Scrolling pictures of the murdered and the murderer’s being honored, overlapping on interval, constructs a question and a conflict clearly. Then vistors can see the victims’ tombs and inscriptions with the utopian ideal projection being background - conflict again.
Faded color
Collage - conflict
Saturated
Red Guard badge
Chairman Mao Quotations
Weapon 1 - stick
The displayed artifacts are a mixure of: 1. Honored Red Guards badge; 2. Chairman Mao’s Quotations book; 3. Weapon 1 - nailed stick; 4. Weapon 2 - rope. This is an epitome of the Revolution - ideal, passion, murder, death. Exhibition 1 - Utopian Relics Content: Projection wall. Visual propaganda works from 1960s to 70s, including opera documentary film, posters, photos and literature. Exhibition 3 - Aug. 6th & Aug. 15th Content: Projection wall. In the year of 1966, Bian Zhongyun, the first publicly executed intelligentsia was beaten to death by her students on Aug. 6th; while on Aug. 15th, 9 days after, the leader of the murders, Song Binbin was being honored by president Mao and show him her Red Guard badge. Exhibition 5 - Intelligentsia tombs. Content: The tomb itself. There are some chalk characters carved on the tombs translated as “History reflects here” and “Blind devotion and trauma”. Exhibition 6 - Victims tombs. Content: The tomb itself.
Weapon 2 - rope
Violence in the Revolution
Exhibition 4 - Communist violence Content: Film. In strong contrast to the Utopian Relics, holocaust was actually the main trend in southen China. This wall shows the documentary film of eating people in local Yunnan area. This is a backside/hidden exhibition from the main exhibition room. It brings shocks to whichever group. This part is essential to the choice of circulation.
Choice of Circulation - Categorization
After the exhibition of violence, in conflict with the utopian relics, which way will the Red Guards(involved group) choose? To go below the intelligentsia and victims’ way or above them to face the people already on the roof? Meanwhile, the intelligentsia and the victims have to bend their waist so they can pass this pathway. Here is an epitome of the choices and suffering during the Revolution.
Immersive revolution discussion
Paper buring
Epitome of the Revolution. The program here is discussiong room. Due to the choice of circulations, visitors would be placed at specific position and face other groups.
Pattern of emotions and relations. This activity, paper burning memorizing the deceased/past, is the clearest way to show emotional patterns among crowds:
Material of each pavilion is glass with LED screens which would display the words each people say, trying to generate a reflection on their own words. Larger spaces are for the Red Guards - same in history and smaller end is for the Intelligentsia. Innocent victims are located in the middle in the pavilions as narratage or observers.
-Red Guards. Collectivity and uniform direction. -Intelligentsia. Collectivity while having each own’s way of suffering. -Innocent victims. Dispersion in each location.
Victims namewall and Murderer’s Confession
Blue colorized names are of those fragmentary collection of intelligentsia and victims in alphabetical sequence. Victims namewall is located face-to-face to a projection wall. The content of the projection is a recent-year documentary film, Murderer’s Confession or another name, A Red Guard’s Regret. History and memories could have reached a compromise.
Using a Mobius ring model to construct the exit to the cemetery, the staircase is connecting visitors and tombs reversely.
Same for the red colorized names of the Red Guards. Red Guards namewall is located right before Red Guard (involed) vistors can see the victims’ tombs. It is the same situation on the other side of this mobius exit, the victims (involved) visitors would see the Red Guards tombs at the first sight out of the memorial. The conclusion or the attitude of the memorial: By setting the delineated conflicts above, the memorial at this point is trying to express that after considering all the narratives and memories and following regrets or compromises, one can say that no one winned or succeeded in the Cultural Revolution.
Lake Shaping Main Circulation in the park
S
SITE PLAN DOWN
DOWN
UP
UP
Hard Fence
M
Outside of Cemetery
L
Circulations can be controlled in this way, which may strength the intentions of the exits. Also, the changing level of water also indicates that the memories within this memorial is floating and changing all the time.
0m
25m
50m
75m
For the landscpae design, this project tries to combine the atmosphere on that Tomb-Sweeping Day that being rainy, cloudy, depressed... The water puddles on the roof which visitors can see right after exiting to the cemetery provides reflections in eyes and in minds.
Water starts to accumulate...
Water accumulates more...
Accumulating enough to control the circulations on the roof The circulations within the landscape become rough and hard, while this is the feeling one should have wandering in this memory mixed and narrative conflicting cemetery. Lawn spreads from cemetery to the roof, water puddle reflections double the thoughts and memories, tombstones strongly strike hearts and rainy Tomb-Sweeping Day is the entrance to that piece of history....
Looking back at the memorial
Hopefully visitors will have a different knowledge about the history after they come out of and look back at the memorial. Instead of sticking to their own perspective, they may have those conflicts of narratives, compromises of memories all in mind and know that we should always rethink history and at the end of the day no one could win a revolution like this.
HOMO BATHROOM ON CHURCH STREET COMMUNAL STUDY, ARCHITECTURAL DESIGN, TORONTO University of California, Integrated Design Studio Instructor Tom Brush Spring 2019
This project takes the most integrated LGBTq community - Church street in downtown Toronto as its site, offering a qualified public space for bathing and communal affairs. Together with the 519 Homosexual centre next to it, the site is endowed with more publicity for the group.
Architecurally, the bath house is trying to define an oriental atmosphere for the LGBTq group in the city - introverted, quiet while substantial - which is quite different from the locally well-defined, sounding and brighten atmosphere. No judgement on which side is better or not, the project is inserting an oriental possibility which may lead to a more comfortable identity for some users.
“On the rainbow safely.”
Toronto downtown context, Church street and others.
Church street, Toronto
This project takes the most integrated LGBTq community - Church street in downtown Toronto as its site, offering a qualified public
space for bathing and communal affairs. Together with the 519 Homosexual centre next to it, the site is endowed with more publicity for the group.
Nested with other heated streets, the Church street has its own attraction as the LGBTq street. Churches, bars, hospitals and communities on the street also see a expanding trend of the homosexual group. The site is located right off the core of Toronto downtown which endows it the accessibility as well as some privacy.
Church Street
Integrated Homo Community
The existing 519 homosexual cen-
Gloucester Street
tre is located right at the core of
the Church street. It contains mostly admin tasks, such as consulting,
communal care, LGBTq rights and
14
12 15
medical care etc. Basically it is a
11
functional spot on Church street.
Monteith Street
While what is newly constructed here in the project is to insert a recreational complex. Mainly contains
9 13 8
10
spa, shower, bath, homo shows and
cafe etc. Nothing serious but adding
The 519
on a relaxing and private/public
Homo Centre
6 7
vibe to the site.
The 519(admin) and the Bath(rec-
Church Street
reational) working together, construct an integrated communal core
4
5
3
2
1
for the LGBTq group to seek no mat-
ter serious or relaxing goals, which will effectively help the interaction
Wellesley Street E
in this area.
1. Bathing pool 2. Event space/Show theatre 3. Collaboration 4. Consulting/Reception 5. Cafe 6. Changing area 7. Individual bathing room 8. Collaboration with less clothes on 9. To balcony 10. Shading/Facade 11. Balcony 12. Backside corridors 13. Elevation facing Church street 14. Shading/Canopy 15. Skylight
Concrete
Wood
Light grey
Brown
Concrete
Wood
Light grey
Concrete
Light grey
Concrete
Light grey
Glass
Brown
Wood
Brown
Wood
Brown
Trans.
Glass
Trans.
Glass
Trans.
Chrome
Dark grey
Chrome
Dark grey
Vibe Transition
Materiality Transition
As mentioned, there is an oriental soul hidden inside the western architectural linguistics. As people heading on from Church street the lawn, to the first floor and upper floors, a vibe transition is brought to them, guiding them from the metropolis of Toronto into an oriented wooden space. Linguistically, from arches to wooden beams and roofs.
The vibe transition is mainly realized by a transition of material. According to the diagram on the left, the portion using concrete goes down while the wood part goes up. Glasses appears only when you try to know more about the building - you can see inside of it. The steel portion is only for the details and joints, not meant to be considered into composition.
A
A
1st floor plan Structural Intervention One challenge here is how to pen-
etrate the rigid wood structure. As illustrated in the zoomed in plan,
some variant columns is produced to accommodates the penetration portion.
The inside wooden structure and
the outside concrete facade can be
cast together through these variants.
Variant columns
2nd floor plan
3rd floor plan
A-A section
Outer layer: 3/4’’ thick glass; inner layer: 3/8’’ thick glass
Metal window frame Metal structure holding lateral force
Connector between skylight window frame and beam
Primary beam structure holding roof panels
Roof finish Water barrier for snow Rigid insulation & structure Water barrier for bathing Ceiling finish Variant wooden column connected to beam
Facade finish
Prefabricated window frame fitting into the precast columns
Wooden gasket
Double glazed glass
Metal gasket between wooden and concrete column
One-piece wooden column at grid corner
Prefabricated shaped concrete column piece for assemble Prefabricated shaped concrete column Prefabricated wall panels Metal gasket between column and base
Base connnected to concrete column
Assembly details
Fictional Design - The Babel Tower Digital Design, Tech-history Study
Tsinghua University, Digital Design Studio Instructor Hui Wang Spring 2018
Brought up by Marshall McLuhan that “...media (interface) is the extension of human body...”, the post-human opinion still functions today as the rapid evolutions and revolutions in technology realm have dominated the topology of our modes of behaviors so much.
In this context, such as Herbert Marcuse - One-Dimensional Man had foretold the dilemma where communal/horizontal connections would be cut off by the exclusive technological interfaces/ terminals. And in a more fictional way, Aldous Leonard Huxley rendered a ‘future world‘ where technologies would dominantly shape our modes of physical body, mental logic or even religions.
Based on McLuhan, Marcuse and Huxley, this project is trying to figure out what and where technological revolution will bring us and lead us to.
Marshall McLuhan
Herbert Marcuse
Aldous Huxley
‘Understanding the Media’
‘One-Dimensional Man’
‘Brave New World’
Criticism on technologies
Diagnosis on post-human
Foretell a future world
Technological Interfaces
Modes of communities New entertainments
Orientation of interfaces
Cut off horizontal connection
Site: Times Square, New York, United States
Entertainment terminals
Technological Babel Tower: humans become terminals individually
As a most mediumized square around the world, Times Square shows its power in technological interfaces and entertainments. Though with thousands of people standing side by side, the screens effectively seperate them into individuals. One-axis expressions through terminal interfaces lead them to a new Babel Tower in modern city where no general or grand narratives are constructed, only left the individual cyborgs using different ‘entertaining linguistics’.
Tech. milestones (McLuhan)
Society transition (Marcuse)
Fiction (Huxley)
the Babel Tower
......
......
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
3min
60s
4min
75s
5min
......
......
......
6min
......
......
......
90s
......
......
......
Multiple linguistics
Collections of thoughts
15s
1min
......
......
......
30s
2min
......
......
......
......
......
......
1min
45s
3min
30s
2min
......
......
......
60s
4min
45s
3min
......
......
......
75s
5min
......
......
......
60s
4min
......
......
......
90s
6min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
Generations of Post-human
......
......
......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
15s
......
Cyborgs wit different words
No orientation in narration
Seperately linked Top - down one - axis delivery Decentralization
Selfness
......
......
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
......
......
1min
......
15s
1min
2min
......
......
......
30s
2min
......
......
3min
......
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
4min
......
......
Genenic Engineering
......
75s
5min
......
......
......
90s
6min
......
......
......
15s
Tech. oriented
......
2min
45s
45s
BNW: Brave New World BNW: Oosperm classification
......
1min
30s
30s
60s
"There's no God in my body"
......
15s
15s
Biomedicine Control
Revolutionary Gap
Bio - tech.
......
45s
Ideology transitions
Individual cyborgs
Internet
......
15s
Excitement 1: Helicopter
1min
...... ......
...... ......
...... ......
30s
2min
45s
3min
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
......
Calculators
......
the Babel ......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
New God: the Fordism (Assembly Line)
the Fordisn and Bank
Medicine - politics
......
......
1min
30s
2min
......
......
......
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
45s
Medicine - politics
......
15s
Technological Rationality ......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
BNW: Trans-breeding
Assembly line
"OH MY FORD"/"OMG"
Value oriented
Exploded working procedures
the Age of Electricity
Technology of Image
Excitement 2: Drugs and Intercourse
Serious Issue 1: Debate
Isolation Belt1: Cultured Soldier
Isolation Belt2: Paper Making
Community Church
Serious Issue2: Logic and Rhetoric
Ideology Control
Media of Image
Repetition BNW: Entertaining death
One-Dimensional
15s 30s
Tele - tech.
1min 2min
45s
3min
60s
...... ...... ......
...... ...... ......
Nation Ideology or Religion?
...... ...... ......
4min
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
Time: number discipline Propoganda
BNW: Nested intercouse
......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
State power
Centralization State power
Nation Ideology or Religion?
Private Talk from Priests
Paper media
Paper: deliverable Church in power
Religious society
......
......
......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
......
the Reformation
Universalness of Bible
New Interpretations of Bible
Information Monitor
Serious Issue3: Printing
Serious Issue4: Expressing
90s
6min
......
......
......
......
15s
1min
30s
2min
......
......
45s
3min
......
......
......
60s
4min
......
......
......
75s
5min
......
......
......
90s
6min
......
......
......
......
Isolated Prison for the Enlightened