Eco 8pp final artwork 2

Page 1

Dedicated Transport Solutions

New goods in - waste out all on the same vehicle Reduce carbon

www.gbaservices.com ECO 8PP d.indd 2

Reduce waste

Dedicated

Reduce costs

Enterprising

Family Values 14/04/2014 15:00


GBA Introduction Vehicles

Mercedes-Benz Sprinter • Mercedes-Benz Sprinter Curtain • 7.5 Tonne Curtain/Box • 18 Tonne Curtain/Box • 40-44 Tonne Curtain/Box

Depots 1. Northwest and Head Office t: +44(0) 1772 816622 e: office@gbaservices.com

9

2. GBA Midlands t: +44(0) 1283 229688 e: midlands@gbaservices.com 3. GBA Southeast t: +44(0) 1753 650120 e: southeast@gbaservices.com 4. GBA Ashford t: +44(0) 1233 613084 e: ashford@gbaservices.com

8

5. GBA North East – Seaham t: +44(0) 191 5239889 e: ops@gbaseservices.com 6. GBA Royston, North London t: +44(0) 1763 248139 e: southeast@gbaservices.com 7. GBA North East – Newton Aycliffe t: +44(0) 1325 300830 e: ops@gbaseservices.com 8. GBA Scotland 07809 522 173 e: cameron.geddes@gbaservices.com 9. GBA Services Europe Sp. z.o.o +48 58 341 40 56 e: europe@services.com

5 7

1

2 6

3

4

John Furzer Profile: t: +44(0) 1772 816622 John Furzer is our head of sustainability John has extensive knowledge of the construction industry after serving 8 years with one of the countries leading fit out contractors – Styles & Wood John has worked at all levels of construction starting out as a joiner, moving into site Management on large and fast track food, retail, office and banking projects As a project Manager for Styles & Wood, John pioneered the service now being offered by GBA eco

ECO 8PP d.indd 3

John’s experience means GBA eco is structured to give maximum support to construction projects no matter how small, fast moving or large they are John currently holds an NVQ level 5 in construction management, Prince 2 construction project Management, is a trained SKA assessor and is currently under training to become accredited with the ISO14064-2 Carbon Reduction Projects Expert Course

14/04/2014 15:00


Traditional Project A typical retail fitout can require up to 12 separate deliveries/collectionsDedicated Transport Solutions

First aid kit Desks/furniture Site set up

Carpet/flooring Fire Points

Hoardings

PROJECT

Welfare

Materials Skips

Chairs Merchandising

ECO 8PP d.indd 4

14/04/2014 15:00


Dedicated Transport Solutions

The GBA eco Model

1 2 3

Visit one

Materials Site set up and Componentry

The Eco Hubs

Site set up in Materials in Waste vessels in Wait & Load to remove waste

Visit two

Materials in Componentry in Waste vessels swap out

Your Project

Visit three Site set up out Waste out Materials out

www.gbaservices.com ECO 8PP d.indd 5

14/04/2014 15:00


Recycling Initiatives GBA eco are in talks with WRAP to develop processing on site Carpet – full tiles segregated for re-use / charity project donations Carpet – off cuts shredded for energy recovery Plastics – soft / hard segregated and shredded for onward processing Timber – Chipped for compost / agricultural use / energy recovery Chairs – Broken down into metal / plastic / timber / foam / fabric Metals – Segregated into type for onward processing Mineral ceiling tiles – Sent for closed loop recycling Cardboard – Bailed for closed loop recycling Polythene – Bailed for closed loop recycling White goods – cleaned and PAT tested for use on future sites / charity

After 19 RBS refresh projects were completed – the following carbon and cash savings have been made : • Average reduction in miles driven between 47% and 81% diversion from landfill – 98% • Average cost saving per project £522 • Average GBA eco fee per project £2496 This includes: • All site set up equipment including fire points in and out • All inward deliveries checked and stowed • Waste vessels supplied and collected when full • 3 separate visits (all out of hours and timed / tracked) • Chair delivery and old chair processing • Merchandising removal • Removal of all inert and segregated waste via supplied vessels • All merchandising delivered • New carpet / flooring delivered • New staff room items delivered • Old staff room items removed • Waste summary

ECO 8PP d.indd 6

14/04/2014 15:00


Workstreams RBS GBA eco have been working closely with main contractors to deliver all site set up equipment to these projects on the first night. Going on to provide out of hours, timed and consolidated deliveries to these projects. Bulk deliveries of chairs, carpets, merchandising, staff room items, materials are taken in from the tier 2 suppliers for multiple projects; these are then split and allocated to the individual project. On large projects where counters or dividing walls are being removed, GBA eco have provided a large 18 tonne box vehicle to wait on site for the required time. Then taking all bulky items away on a wait and load basis. These items are then taken for recycling and a full breakdown is provided.

Barclays GBA have provided an almost identical service to the main contractors for this work stream. GBA have also added a recovery operation, seeing valuable componentry that would normal go into the skip, carefully separated and reused on future projects. These items include under counter safes, chairs, staff room carpets and hearing loop systems. GBA’s unique approach to waste management makes this level of fine tuning possible.

Post Office GBA have been working closely with the main contractors to provide consolidated deliveries to site, waste management and a re-use programme which see’s expensive or discontinued items being saved for future projects

Lidl GBA have been accepting large, heavy and often bulky material deliveries direct from the manufacturers on the near continent. Our services have also enabled large quantities of heras fencing to be purchased rather than hired, this is then delivered to site, along with site set up at the beginning of a project. At the end of the project the same vehicle collecting recyclables also collects the site set up and the fencing, placing it back into stock and avoiding costly delivery, hire and collection charges.

www.gbaservices.com ECO 8PP d.indd 7

14/04/2014 15:00


Pricing Grid

Dedicated Transport Solutions

Vehicle

Typical use

Payload

Wait & Load

Day Cost

Mercedes Sprinter

Site set up / materials

1.2 tonne

No

£295

7.5 tonner

Consolidated deliveries / waste vessels collection

2.7 tonne

Yes

£595

18 tonner

Bulky deliveries / bulky waste collection

7 tonne

Yes

£695

Artic

Collection of materials from manufacturers

22 tonne

Yes

£995

Recycle all waste including waste report

Client reporting / environmental credentials ISO 13.030

N/A

N/A

£225

www.gbaservices.com ECO 8PP d.indd 8

14/04/2014 15:01


Dedicated Transport Solutions

Charity

Contact us: John Furzer, Head of sustainability, GBA Services Moss Lane, Hesketh Bank,

GBA eco will make a £10 donation for every project we are involved in for 2014 / 2015. Many of our drivers and staff are ex British service men and women and this charity is dear to our hearts. GBA eco are also working with several other charities in order to place reusable products that are derived from the projects we are involved in. We regularly donate chairs, carpets, furniture and electrical goods to local charities…. The first rule of recycling is re use!

Preston, Lancs PR4 6XJ Mobile: 07812 317841 Tel: 01772 816622 - (ext 186) eco@gbaservices.com

www.gbaservices.com ECO 8PP d.indd 1

14/04/2014 15:00


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.