PIPPITA RAIL TRAIL MASTERPLAN
CUMBERLAND CITY COUNCIL
PIPPITA RAIL TRAIL: 2522145 FEBRUARY 2024
CONTENTS 01 Introduction
04 Masterplan
1.1 Background 1.2 Project Scope
4.1 The Vision
06 Concept Plans
4.2 Active Transport Typologies 4.3 Green Belt 4.4 Shared Space 4.5 Co-creation 4.6 The Masterplan
02
05
2.1 Pippita Rail Trail
5.1 Southern Bridge
2.2 Statutory and Regional Planning
5.2 Northern Bridge
2.3 Cycleway Strategic Intent
5.3 Boardwalk
2.4 Understanding Place
5.4 Cycleway
2.5 Pre-design Consultation Outcomes
5.5 Planting Character
Planning and Site Context
ACKNOWLEDGMENT OF COUNTRY Place Design Group acknowledges the Wangal and Dharug people, the traditional custodians of this land. We pay respect to Elders past and present and extends this respect to all Aboriginal people living in or visiting on what are
Design Character
07
Conclusion
now known as the Strathfield, Cumberland and Parramatta areas. Aboriginal People have had a custodial role with the Parramatta River and the land surrounding it since time immemorial. It is internationally recognised that Aboriginal nations manage land and waterways as living entities and Aboriginal principles of sustainable preservation of the land and waterway are based in
03
Site Analysis 3.1 Site Analysis
beliefs, tradition, customs and practices.
3.2 Key Consideration Areas
These principles will provide insight into the proposed design
3.3 Opportunities and Constraints
interventions at the Pippita Rail Trail as outlined in this document.
3.4 Separated Cycleway Options 3.5 Rail Corridor Options
Report title
Pippita Rail Trail
Document number
2522145
Prepared for
Cumberland City Council
Authors
AM LI
Revision number
10
Revision issue date
08.02.24
Approved
TF
Reason for revision
2
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
INTRODUCTION
3
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
PLACE DESIGN GROUP, 2023
01
Place Design Group February, 2024
1.1
BACKGROUND The Pippita Rail Trail from Lidcombe to Sydney Olympic Park has been identified as a priority project for cyclists and pedestrians as Cumberland City grows and changes. The increase of population in Western Sydney has accelerated the need to enhance connections across Cumberland City Council. Place Design Group has been engaged by Cumberland City Council to prepare a masterplan and design of the Pippita Rail Trail. Whilst providing for the everyday commuter cyclist, local and leisure tourist, and the extensive community who utilise the rich historical trail, this project will meet the aspirations of the broader public with an outcome of design excellence which compliments the iconic location. Cumberland City Council proposed development of the new cycle link has arisen from the ‘Rail Trail’ program, which turns unused rail lines into cycle connections. The project objectives respond to NSW Government Get NSW Active Program 2022/23 and Cumberland 2030: Strategic Planning Statement. The Pippita Rail Trail pedestrian path and cycle way is proposed to link Lidcombe to Sydney Olympic Park. A feasibility assessment was carried out in January 2021 by Cumberland City Council. The trail is being developed as part of a grant from the NSW state government under the Get NSW Active Program 2022/23.
What the masterplan is proposing: •
Provide a detailed understanding of the site, its strategic importance and understanding of opportunities and challenges
•
Promote the relationship between social and economic activity
•
Assess pedestrian and cycle options to ensure the design fits seamlessly within the landscape and is safe and fit for purpose
•
Contribute to a wider cycling green belt which facilitates sustainable practices
•
Create placemaking opportunities guided by an integrated approach to accessibility, resilience and urban vibrancy
•
Allow for a range of experiences for all
•
Review and incorporate community consultation results
•
Document innovative design solutions which respond to a diverse range of people
•
Minimise impact on heritage assets and provide a connected narrative that expresses the essence of the site
•
Understand stakeholder requirements to ensure a consolidated design outcome
PLACE DESIGN GROUP, 2023 4
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
1.2
PROJECT SCOPE The Pippita Rail Trail proposes a 2.4 kilometre walking and cycling connection between Lidcombe Train Station and Sydney Olympic Park. The trail proposes a separated bike path and wider footpaths between Lidcombe Station and Bachell Avenue and a new shared path between Bachell Avenue and Sydney Olympic Park, revitalising part of the former Abattoir Branch railway line into a walking and cycling link. The name for the project, the Pippita Rail Trail, was chosen to reflect the vicinity of the former Pippita Train Station along the alignment.
Site Boundary
NF
Council Boundary
WA Y
MA
TT AR
E
RA
Road Connection
AV
OT OR
CK
NM
LA
ER
PARRAMATTA
Rail Corridor Bridges
D
Sydney Olympic Park
BA
AUBURN/LIDCOMBE SPORTS CENTRE
AV E NIE BIR
CH
ELL
AV
E
LIDCOMBE
R
PHILLIPS PARK
PIC D
STRATHFIELD
AVE
ST
DALLEY
ST
MARTIN
ST SWETE
CH
IC D
R
UR
JOHN ST
OLYM
CH
MP
RAILWAY ST
OLY
Rail Corridor – The section in the Sydney Trains rail corridor from Bachell Avenue including the two bridges over Parramatta Road and the M4.
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
ST
PA R
Road Connection – The on-road section from Lidcombe Train Station to the corridor entry on Bachell Avenue.
5
SYDNEY OLYMPIC PARK
WI
WE
The link is broken into three key areas including:
Gateway to Sydney Olympic Park – In peak periods and during major events, commuters and the community will have the opportunity to leave their car or skip the train and walk or ride between Lidcombe Train Station and Sydney Olympic Park.
Pippita Rail Trail
ED
The Pippita Rail Trail is part of Council’s long term strategic vision for Cumberland. The proposed trail will provide an important link for commuters and the community to cycle or walk directly between Lidcombe Train Station and Sydney Olympic Park, as well as view places of interest and local history landmarks. The project will also provide connections to Cumberland’s parks and open spaces along the trail.
LEGEND
ROCKWOOD CEMETRY
Site Plan 01
NTS 0
250
500 m
Place Design Group February, 2024
PLANNING & SITE CONTEXT
6
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
PLACE DESIGN GROUP, 2023
02
Place Design Group February, 2024
2.1
PIPPITA RAIL TRAIL Pippita Rail Trail is located within the suburb of Lidcombe within Cumberland City Council in Sydney’s Western Suburbs, around 15km from Sydney CBD and 7km from Parramatta CBD. The trail has been identified as a key corridor by Cumberland City Council, Parramatta Council and Transport for NSW as part WEBBS AVE of their respective active transport frameworks. The PLAYING FIELDS project is called Pippita Rail Trail to reflect the name of the former Pippita Station located on the former Abattoir Branch railway line. It once serviced the State Abattoirs, State Brick Works and Homebush Salesyards with stations including Pippita, Metropolitan Meat Platforms, Saleayards, Abattoirs and Brickworks.
Local Context
ILI ER SR D
W ES TE RN
T
DUCK R IVER
4
M OT OR W AY
3
L RA
MA
BICENTENNIAL PARK
T CONCORD WEST
SYDNEY OLYMPIC PARK TT AR
D
BRESSINGTON AND MASON PARK
DFO HOMEBUSH
AR
YD
R
WE ST ER N
CE NT EN
T
LIDCOMBE
LIDCOMBE
NORTH STRATHFIELD
MO TO RW AY
T
PADDY’S MARKET FLEMINGTON FLEMINGTON
T
REMEBERANCE PARK HOMEBUSH
T
AINEY PARK
Site Context
HUDSON PARK
BERALA
JOSEP
T
STRATHFIELD
7
H ST
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
SYDNEY OLYMPIC PARK
SYDNEY OLYMPIC PARK AQUATIC CENTRE
5
The proposed corridor traverses a variety of land uses from mixed use, low rise residential through to light WATERGANA The trail will provide a multiindustrial and warehouses. RESERVE ROSNAY GOLF modal transport option to a variety COURSEof residents, workers and recreational users within the area.
7
T
PHILLIPS PARK
PROGRESS RESERVE
The 2.4km trail will provide a new recreation and active transport connection from Lidcombe to Sydney Olympic Park with its expansive parklands, business centre and EVELY PARK restaurants, sporting and entertainment venues and events, residential precincts and cycle and pedestrian connections to Rhodes, Concord West, Wentworth Point, Newington Village, Carter Street and Parramatta. The trail will also provide connections to other local and regional active transport routes for both Cumberland City Council and Parramatta Council. As Cumberland City Council plans for future growth and development, access to high quality open space becomes increasingly important. Accessing this open space via alternative modes of transport has an even greater importance to allow a more sustainable approach to the planning of the Lidcombe area.
L
ACCOR STADIUM & QUDOS BANK ARENA
PA R
The trail has been identified as a strategic corridor connecting key open space and infrastructure through AUBURN equitable active transport opportunities. BOTANIC GARDENS A key outcome for the project is to enhance and improve connectivity but also promote RAY MARSHALLa healthy lifestyle. RESERVE
PARRAMATTA
ST H
AUBURN
SYDNEY SHOWGROUND
2
DR E PIC MB YM CO E OL LID NTR RN CE BU TS AU POR S
Regional Context
1
6
ROOKWOOD CE
METRY
Context Plan 01
CARNARVON GOLF CLUB
NTS
KEY T
L
Pippita Rail Trail
Schools
Train Station
Roads
Rail Line
Hospitals
Proposed Light Rail Line
Leisure
1
Existing M4 Cycleway
LGA Boundaries
2
Existing Haslams Creek Shared Path
Religious Centre
Existing Cycleway
3
Proposed Carter St Link
Proposed Light Rail Stop
Retail
Proposed Cycleway
4
Town Centre
Entertainment
Existing On Road Cycle Lane
5
Proposed Route 5 Lidcombe to Duck River Cycleway
6 Prospect Pipeline Corridor to Olympic Park (via Berala)
7
Auburn to Cooks River (via Rookwood)
Place Design Group February, 2024
2.2
STATUTORY AND REGIONAL PLANNING A series of strategic policies, frameworks and guidelines relevant for the Pippita Rail Trail have been reviewed to understand the site context, opportunities and connections for the active corridor.
TRANSPORT FOR NSW
DEPARTMENT OF PLANNING
CUMBERLAND CITY COUNCIL / PARRAMATTA COUNCIL
AUSROADS GUIDELINES & STANDARDS
ACTIVE TRANSPORT STRATEGY
NSW GUIDE TO WALKABLE PUBLIC SPACE
LIDCOMBE TOWN CENTRE PUBLIC DOMAIN PLAN
GUIDE TO ROAD DESIGN PART 6
This Strategy provides longer term ambitions accompanied by five year priority moves to guide planning, investment and priority actions for active transport across NSW.
Outlines why walkable public spaces are needed. It includes ideas and opportunities for how they can be created, and methods for trialling and evaluating improvements.
Lidcombe Town Centre Public Domain Plan has been prepared to provide a consistent high quality public realm to promote the revitalisation of Lidcombe Town Centre. The document provides treatments including material palettes and surface treatments, street furniture and landscaping finishes.
Guide to Road Design Part 6: Roadside Design, Safety and Barriers provides guidance on roadside design and in particular guidance on evaluating the risk of a roadside and the selection and use of road safety barrier systems.
CUMBERLAND WALKING & CYCLING STRATEGY
Guide to Road Design Part 6A: Paths for Walking and Cycling provides guidance for designers and other practitioners on the design of paths for safe and efficient walking and cycling, both within the road corridor and outside the road corridor. When considering the unique challenges of the Pippita Rail Trail the road design safety for walking and cycling are paramount.
CYCLEWAY DESIGN TOOLBOX Provides guidance on desired outcomes for cycling and micro-mobility. It establishes design principles for cycleways in specific contexts, including temporary initiatives, and public bicycle parking facilities. WALKING SPACE GUIDE Provides a set of standards and tools to ensure that sufficient space is provided on streets to achieve comfortable environments which encourage people to walk. PRACTITIONERS GUIDE TO MOVEMENT AND PLACE
PARRAMATTA BIKE PLAN
Explains how built environment practitioners can apply a Movement and Place approach to projects and plans. The framework delivers on NSW policy and strategy directions to create successful streets and roads by balancing the movement of people and goods with the amenity and quality of places.
The Bike Plan has been developed to enhance the accessibility, sustainability, productivity and liveability of Parramatta through an increase in cycling, helping foster healthy and connected residents, students, workers and visitors.
STRATEGIC CYCLEWAY CORRIDORS
PIPPITA RAIL TRAIL PROPOSAL
The primary focus of the strategic cycleway network for the Central River City is to provide safe cycleway is for people of all ages and abilities to better connect centres, precincts, and places. The masterplan utilises the six building blocks outlines in the strategy to ingrain the Pippita Rail Trail as part of the wider cycleway corridor.
The Pippita Rail Trail proposal outlines the purpose, history and scope for the project. This informs the site analysis and masterplanning processes, to enable the preparation of a design for the project.
ABC, 2019
8
A Walking and Cycling Strategy has been developed from previous early engagement and planning work undertaken and Cumberland Council wants your feedback. The strategy identifies objectives, strategic considerations, an action plan and proposed active transport corridors for Cumberland.
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
GUIDE TO ROAD DESIGN PART 6A
SYDNEY MORNING HERALD, 2023
Place Design Group February, 2024
2.3
CYCLEWAY STRATEGIC INTENT The proposed Pippita Rail Trail will assist in connecting the existing and proposed regional cycleways.
1
T
W ED
The strategic intent of the Pippita Rail Trail aligns with the Active Transport Strategy (Transport for NSW, 2022) to encourage the use of walking and cycling.
2
RT E
R
ST
W
PA R
ES
TE
RN
RA
3
OLYMPIC PARK
D
TO R
H
RA
WA Y
CONCORD WEST
VE KA
C
RA
MO
MA TT AR
The Central River City corridor is one of the main corridors identified for cycleways, which the Pippita Rail Trail is located within.
VE KA
M4
Provision of well-designed and safe cycleways will help to reduce reliance on personal vehicles, and serve to relieve congestion on our roads.
LAC
T
T
IN F
CA
AUBURN
SA
DU
4
E
IV
H
Y BA
DR
S BU
ME
HO
The Pippita Rail Trail will strategically connect Lidcombe to Sydney Olympic Park to create an active transport corridor that links key destinations which are otherwise divided by Parramatta Road and the Western Motorway.
T NORTH STRATHFIELD
WATER ST
IL
RA
5
ITA
T AIL
R
P PIP
T
LIDCOMBE
6
T FLEMINGTON
T
L EL
ST
7
T BERALA
PB
M CA
Cycle Strategic Intent Plan 01
LEGEND 1
Existing M4 Cycleway
2
Existing Haslams Creek Shared Path
3
Proposed Carter St Link
4
9
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Existing On Road Cycle Lane
EAST ST
HOMEBUSH
5 Proposed Route 5 Lidcombe to Duck River Cycleway
6 Prospect Pipeline Corridor to Olympic Park (via Berala)
7
Auburn to Cooks River (via Rookwood)
KEY Pippita Rail Trail Existing Cycleway Proposed Cycleway Strategic Corridor Plan
Place Design Group February, 2024
2.4
UNDERSTANDING PLACE The Traditional Owners of the Lidcombe area are the Darug people, dwelling along the ridges and banks of the estuarine environment of the Parramatta River – meaning place of the eel.
FIRST NATIONS:
For generations, song-lines and trading routes have weaved across the landscape – allowing for knowledge and resources to be shared within First Nations communities across the Greater Sydney Basin and beyond.
•
“The study area has been completely cleared of native vegetation and old growth trees. Native trees have been planted on the periphery of the train line and exotic weeds proliferate.”
•
“The study area and the Cumberland plains were traditionally home to several clans of the Darug (Dharug, Daruk) people.”
•
“Clans travelled regularly to engage in ceremonial practices and to trade raw materials such as stone for tools, animal skins, shell for fish-hooks and decoration, nets, ochre and medicinal herbs with other groups,”
KEY FINDINGS:
A primary location for these trading routes were along the top of landforms and ridge lines. This allowed for clear vantage points across Country, assisting in navigation and anticipation of threats. Following European colonisation, many of the song-lines and trading routes were developed into train lines and roadways, with the route of the Pippita Rail Trail following the ridge-line of the Lidcombe area.
Through our design, we strive to continue the legacy of Traditional Owners for transport, navigation, relationship building and nurturing a deep respect for the land, water, sky, systems and resources that make up Country.
Parramatta River (Powerhouse Museum)
POST COLONIAL: KEY FINDINGS: •
“The soils in the area were mainly too poor for agriculture. Wianamatta shales, which underlay the area, were the source of the soils, but they quickly lost their fertility, while the watercourses were often salty for long distances away from the Parramatta River. Land holdings in the area was used for pastoral or small industrial activities and therefore the area was slow to develop, and large tracts remained vacant until the late 19th century (Dictionary of Sydney).”
•
A station was opened at Lidcombe on 1 November 1858.
•
Abattoir line built in 1911.
State Abattoir, 1927 (State Library, NSW) 10
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
2.5
PRE-DESIGN CONSULTATION OUTCOMES WHAT WE HEARD
94% of the respondents indicated that they would walk or cycle more if the Pippita Trail were to be implemented.
Council, through all channels, collected a total of 68 responses to
ENGAGED CYCLING GROUPS: Ride Blue Mountains INC.
Ecotransit
during the consultation period in November and December 2022.
CamWest
Bicycle NSW
All feedback came through online and email submissions.
There is a lack of interesting walking options in the Cumberland Council Area. Several responses noted that they would like more walking and riding paths along the pipelines to stay away from traffic.
Trees planted along the path would provide shade for pedestrians.
Cycling on the roads in Cumberland City at the moment is quite dangerous so a bike track would be welcome.
Currently a lack of storage facilities for bicycles at Lidcombe Station.
Include street lamps along the trail for cyclists.
11
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Suggestions to connect this trail to other walking/cycling tracks instead of it standing in isolation.
For those who use Lidcombe facilities, 26% of the respondents indicated that they use it occasionally, 25% more than twice a week, and 23% once a week.
Suggestions that the trail extend to Sydney Markets as it is hard to reach by public transport for Wentworth point residents.
Suggestions that parts of the railway remain intact to preserve railway heritage.
Suggestions for shaded areas to be included along the trail.
Suggestions to include a cafe along the trail.
Suggestions for engaging features along the trail including art installations, trivia questions, photographs of the area in the past, and stories of the Wangal people along the way.
Place Design Group February, 2024
SITE ANALYSIS
12
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
PLACE DESIGN GROUP, 2023
03
Place Design Group February, 2024
3.1
SITE ANALYSIS Place Design Group undertook extensive site analysis during 2023. Access & Movement
The project scope is defined as per the brief. • Church St, Bachell Ave and rail corridor from Lidcombe to Sydney Olympic Park. • The proposed masterplan is also to consider surrounding connections and adjacent streets • The proposed masterplan is to consider overall traffic movements and connections The initial site analysis encompassed a variety of categories to assist in understanding the context of the site and its surrounding influences. These included: • Land use • Connections • Trees and landscaping • Parking and traffic • Urban streetscape • Visual amenity • Safety
• • • •
A detailed review of the corridor was also undertaken which helped inform the final proposed route location and typology for the active transport link. These included: • Driveway locations • Intersection and type • Lane widths • Existing infrastructure • Steepness / comfort
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
• • • •
Vegetation
• • •
13
Review of key connections and links to existing and future cycleways and active transport corridors Circulation around Lidcombe Station Review of bus routes along the proposed corridor Identification of key intersections and their overall function and serviceability to the Lidcombe area
Topography & Site Features
Review of existing vegetation along corridor and its ecological significance Review of existing street trees and amenity Impacts to existing trees and possible tree removal
Review of existing site features, inclusive of light poles, furniture, bus stops, parking numbers and locations Review of road grades and steepness Overview of flooding and stormwater infrastructure Review of existing bridge structures
Function
• • • •
Number of driveways and egress points along the proposed route Operations of Sydney Trains and maintenance egress Review of bus routes along the proposed corridor Major works and network maintenance
Place Design Group February, 2024
3.2
KEY CONSIDERATION AREAS Throughout the site investigation phase of the project, key areas were reviewed in detail to understand all the opportunities and constraints were developed with careful consideration. Additional review and requirements were provided by key stakeholders and user groups to ensure all elements were captured and could be feed into the final masterplan design. Key considerations included: • Sydney Trains access and movement • Sydney Trains vehicle sizes and requirements • Hours of operations along the corridor • Ownership and site boundaries • Existing road and user conditions • Existing site infrastructure • Environmental and heritage constraints
Site heritage preserved through enhancing the bridge Existing gated entry limits public access
Heavy vehicle roads impact pedestrian safety
Significant changes in topography impact accessibility
Public access increased
PLACE DESIGN GROUP, 2023
GOOGLE MAPS, 2023
Bridge
Corridor Entry
Review of existing fencing and security
Review of driveway locations
Provision of separation throughout link
Narrow footpaths and existing infrastructure to be considered PLACE DESIGN GROUP, 2023
Road - Church Street
14
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
PLACE DESIGN GROUP, 2023
Corridor & Trail
Place Design Group February, 2024
3.3
OPPORTUNITIES AND CONSTRAINTS Post the design teams site inspections and visual analysis, opportunity mapping has been undertaken for the entirety of the Pippita Rail Trail.
MOVEMENT
This mapping assisted in determining areas of opportunity for enhancement and design development to provide greater amenity for the Pippita Rail Trail and the wider community. The constraints and opportunities of the Pippita Rail Trail have been classified into three major sections: • Movement • Landscape • Operations Movement The access and circulation analysis discovered that the major opportunities are the possibility of increasing access for the public around the site, with the aim to create a connection between Lidcombe Station and Sydney Olympic Park. To achieve this, the major constraints are the possible safety risks to pedestrians and cyclists. Further connection to Sydney Olympic Park is an important opportunity for the topography and site access areas. Landscape The existing vegetation is limited along the project scope with a majority of low value plantings within the rail corridor. The plantings within the corridor have been planted upon the closure of the Abattoir line, replacement planting is to be added at a minimum of a 2:1 ratio to strengthen the ecological value of the corridor. Similarly, there is limited tree planting along the road corridor from Lidcombe Station with a mix of native and exotic species within the street verge. A key principle for the project will be to replace trees that require removal and provide additional planting to enhance the ecological value and help provide cooling to the area. Function The function is dictated by the existing rail industry, which poses substantial restrictions. Although opportunities for additional access are also present throughout the corridor, the main principle will be providing separation between Sydney Trains operations and the new active transport corridor.
15
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
PLACE DESIGN GROUP, 2023
LANDSCAPE
PLACE DESIGN GROUP, 2023
OPERATIONS
PLACE DESIGN GROUP, 2023
Place Design Group February, 2024
3.3
OPPORTUNITIES AND CONSTRAINTS
Bus stops cause pinch points along path on both sides of Church St
Share path in front of shops and connecting to the station
Power poles along footpath causes pinch point - option to relocate or reduce shared path width
0
40 4
Existing wide verges to cater for separation for cyclists and pedestrians
CLEAR KEEP
CLEAR KEEP
Use existing signalised intersections for crossing points
Minimise the removal of parking along Bachell and the sides streets
Existing driveways located within 6m of intersection Complex movements on Church St due to the rail bridge
Review speed limit of road to a 40km zone
Opportunity for additional street tree planting along road corridor
Opportunities and Constraints Plan 01 NTS 16
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
3.3
OPPORTUNITIES AND CONSTRAINTS Steep embankment between holding yard and adjacent properties
Conflict with corridor entry and driveway Review speed limit of road to a 40km zone
Existing driveways located within 6m of intersection
Maintenance areas must stay in place and access must be maintained
Existing wide verges to cater for separation for cyclists and pedestrians Power poles along footpath causes pinch point - option to relocate or reduce shared path width
Narrow verges both sides of roundabout
Minimise impacts to conflicts between vehicle movements and operations
Ensure safe crossing points on Church St
Approach of Dalley Street provides issues with integrating separated cycleway
No relocation of electrical services within rail corridor
Opportunity for additional street tree planting along road corridor
Opportunities and Constraints Plan 02 NTS 17
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
3.3
OPPORTUNITIES AND CONSTRAINTS Possible opportunity for active transport connection to Birnie Ave. To be investigated
Possible opportunity for active transport connection to Birnie Ave. To be investigated
Used elevated section to complete grades of rail corridor (including embankments and access track crossing points)
Embankment to the north of Rail Emergency Response Unit may contain contaminated material
Vegetation to be used as visual screen between rail trail and active rail corridor
Access track to be 3m wide and allow for a height of 4.3m for heavy rigid vehicle use and operations
Potential removal of existing vegetation to maintain access and connections
Provision of security fencing between rail corridor and active transport link required No relocation of electrical services within rail corridor Existing native vegetation and mature street trees to be retained where possible
Access to be maintained to rail corridor at all times
Access to be maintained to rail corridor at all times
Minimum 3m offset required from rail corridor at all times
Opportunities and Constraints Plan 03 NTS 18
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
3.3
OPPORTUNITIES AND CONSTRAINTS
Access track to be 3m wide and allow for a height of 4.3m for heavy rigid vehicle use and operations
Major works and network Maintenance both occupy the site.
Must maintain access track for Sydney Trains from north of Rail Emergency Response Unit to Parramatta Road
Provide safe crossing of Parramatta Road and the M4 Motorway for active transport users
Utilise infrastructure to ensure its historic community value is maintained
Minimum 3m offset required from rail corridor at all times
Vegetation to be used as visual screen between rail trail and rail corridor
Connection through to Birnie Ave condition of consent for development site.
Strengthen and increase habitat area
Formalised connection between Lidcombe Station and Sydney Olympic Park
Limited access across Edwin Flack Avenue to connect to Sydney Olympic Park
Opportunity to connect from Parramatta Road to bridge
Opportunities and Constraints Plan 04 NTS 19
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
3.4
SEPARATED CYCLEWAY OPTIONS Option 01
Option 02
40 40
40 40
CLEAR KEEP
CLEAR KEEP
CLEAR KEEP
CLEAR KEEP
Road Crossings
3
Signals
2
Corridor Crossing
0
Total
4
Separation %
60%
Driveways
31
Parking +/-
-5
Alignment on the north side of the road allows for catchment of the residential part of Lidcombe and although has more driveways than other options provides a more ideal riding and walking environment.
Road Crossings
2
Signals
2
Corridor Crossing
1
•
The two crossings points at Swete St and Martin St provide some challenges but allow for a continual link and no need to stop at signalised intersection.
Total
5
Separation %
50%
•
It also has the largest percentage of separated cycleway along the path and only 3 key shared paths.
Driveways
11
Parking +/-
+2
•
Alignment on the south side of the road allows for less impact with driveways but creates more crossings points including signalised intersection.
•
There is a larger amount of shared path on the path and would require more intersections to have users from the north to cross safely on to the cycleway.
•
The tight verge along the rail line with a large drop is not an ideal path for the experience of the cycleway.
•
Alignment on the south side of Church St would be ideal to avoid crossing at John St however the narrow footpath is not safe for pedestrians and cyclists.
•
Crossing at the bridge would also not be safe and the grade of the cycleway not suitable for the cycleway and shared path.
Option 04
Option 03
40 40
40 40
CLEAR KEEP
CLEAR KEEP
CLEAR KEEP
CLEAR KEEP
Road Crossings
3
Signals
1
Corridor Crossing
1
Total
6
• •
Similar to option 2, option 3 crosses from the north side to the south at Martin St to avoid the large driveway part of the apartment buildings
Road Crossings
4
Signals
1
Similar to the reasons behind option 2 this option also has more driveway crosses and was considered further as an option.
Corridor Crossing
1
Total
4
Separation %
50%
Separation %
Driveways
18
Driveways
2
0
Parking +/-
N/A
Parking +/-
20
•
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
60%
Place Design Group February, 2024
3.4
SEPARATED CYCLEWAY OPTIONS Option 6
Option 5
40 40
40 40
CLEAR KEEP
CLEAR KEEP
CLEAR KEEP
CLEAR KEEP
Road Crossings
1
Signals
1
Corridor Crossing
1
Total
6
•
The alignment for a single direction separated cycleway on both sides of the road is a good outcome where space is possible however in this road would require larger impact on kerbs and roads.
Road Crossings
2
Signals
0
Corridor Crossing
1
There is more crossing points, which would make it difficult for cyclists to connect to the cycleway.
Total Separation %
5
60%
Driveways
20
Driveways
20
5
Parking +/-
+4
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
•
This alignment was not considered in detail as it did not align with the outcomes of the cycleway and shared path to link with the north side of Lidcombe Station and the construction of a bridge over the rail line would be to impractical.
80%
Separation %
Parking +/-
21
•
Place Design Group February, 2024
3.5
RAIL CORRIDOR OPTIONS
Southern Corridor
Central Corridor
Option 1
Option 2
Shared Path / Access track
Shared Path / Access track
Option 3 Shared Path
Option 1
Option 2 Shared Path Access track
Access track Shared Path Access track
Fill with minor cut to existing levels. No buffer between shared path and access track.
Road Connections
Fill to existing levels to avoid cut and allow for more width. Preferred option.
Cut existing levels to have wide corridor. Large impact on contaminated ground.
Regrading existing levels with shared path next to access track. Conflict points along path.
Raised boardwalk to keep shared path separate from access track. Preferred option. PLACE DESIGN GROUP, 2023
Sydney Olympic Park Option 1
Option 2 Shared Path
Option 1 Cut existing levels to link shared path to road. Impact on trees and ground. PLACE DESIGN GROUP, 2023
PLACE DESIGN GROUP, 2023
Shared Path
Option 2 Minor cut to existing levels to link shared path to road. Minor impact on trees and ground.
Option 3 Shared Path
Option 3 Fill to existing levels to link shared path to road. Minor impact on trees and no impact on existing levels. Preferred option.
Shared path along Parramatta Road. Subject to confirmation.
22
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
THE MASTERPLAN
23
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
CLAIRE TAKACS, 2015
04
Place Design Group February, 2024
4.1
THE VISION “Redefining a transport corridor into a unique linear park”
Green Belt
Design Vision The project team alongside Cumberland City Council have outlined a number of design drivers and principles which will be woven throughout the Pippita Rail Trail masterplan. These are: • • • •
Redefining the movement corridor as a unique approach to a linear park New mobility focused on prioritising pedestrians and cyclists Improved safety and flexibility for all road users Celebrating the historical use of the site and its rich history
Design Principles
Shared Space
Co-Creation
24
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
DALLEY
ST ST
MARTIN
ST JOHN
SWETE
BA
CLEAR KEEP
Green Belt Shared Space Co-creation
ST
CLEAR KEEP
• • •
MARY
40 40
Stretching from Lidcombe Station to Sydney Olympic Park, the Pippita Rail Trail is a key transport corridor made up of residents, local businesses and visitors to the area. Cumberland City Council and Place Design Group have prepared the masterplan and streetscape concepts for the Pippita Rail Trail to guide its future vision and improve the liveability and vitality of this area. The masterplan response has been broken up into four main principles which underpin the design ideas and future outcomes for Cumberland City Council’s strategies and places.
ST
4.1
CHURCH ST
CH
L EL
E AV
CHURCH
ST
RAILWAY ST
Masterplan 01
ED
WI
N
FL
AC
KA VE
NU
E
PARRAMATTA ROAD
NTS
Masterplan 02 NTS
25
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.2
ACTIVE TRANSPORT TYPOLOGIES
SHARED PATH
SEPARATED CYCLEWAY
Sections of the proposed cycleway which links Lidcombe Station to the Trail will be shared path of up to 3.5m in width. The shared path has been proposed in areas to allow better connections points for users such as a link to Lidcombe Station and the crossing on Church Road for connection over to the start of the Rail Trail adjacent the Sydney Trains facility.
Sections of the proposed cycleway will be a mix of flush separated cycleway and on-road cycleway to provide greater separation for cyclists from vehicles and pedestrians. The mix of cycleway has been determined due to existing road widths, infrastructure, trees, driveway locations and parking numbers. The proposed cycleway is proposed to be seamlessly integrated into the public domain to create a safe connection for all users of the road.
BOARDWALK A section of the trail adjacent to the Sydney Trains facility is proposed to be an elevated bridge / boardwalk structure which allows cyclists and pedestrians to move through a section of the site unimpeded and separated from the daily operations of the Sydney Trains facility. This boardwalk will also provide opportunity for artworks and resting points along the trail.
40 40
CLEAR KEEP
CLEAR KEEP 40 40
CLEAR KEEP
CLEAR KEEP 40 40
CLEAR KEEP
CLEAR KEEP
26
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.2
ACTIVE TRANSPORT TYPOLOGIES
CORRIDOR SHARED PATH
Throughout the rail corridor a variety of configurations of the trail are proposed. The trail aims to provide separation for pedestrians and cyclists from the operations of Sydney Trains to reduce safety risks and any impacts to operations within the rail corridor. Sections consist of: • 4m wide shared path and 2.5m wide vehicle path • 5m wide shared zone which allows both vehicles and cyclists to utilise the same corridor
27
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
BRIDGE
SYDNEY OLYMPIC PARK SHARED PATH
The Pippita Rail Trail will include two bridge crossings over Parramatta Road and M4. These bridges will be key pieces of infrastructure to connect cyclists and pedestrians from Lidcombe over to Sydney Olympic Park and beyond. The bridges will require significant works to the ground plane to allow safe and equitable access for cyclists and pedestrians while also increasing balustrades and coverings to provide safety for users and vehicles below. This also provides a unique opportunity for the inclusion of artwork, lighting and rest points to help continue to activate the trail.
The area of the rail trail once it connects over Parramatta Road will enter into the Parramatta LGA and Sydney Olympic Park Authority land, this section of the trail is proposed to be a mix of an at grade 3m wide shared path and a 4m wide elevated boardwalk which meanders through the existing trees and vegetation. The use of the elevated boardwalk will allow the retention of existing trees and minimise impacts to the surrounding landscape.
Place Design Group February, 2024
4.2
ST DALLEY
SYDNEY TRAINS HOLDING YARD
SWETE
ST
JOHN ST
MARTIN
ST
BA
CH
EL
LA VE
TYPOLOGIES PLAN
40 40
CLEAR KEEP
CLEAR KEEP
LIDCOMBE STATION
CHURCH ST
RAILWAY ST Typology Plan 01
LEGEND
0
50
100
200m
Site Boundary On Verge Shared Path
1:3500@A3
On Road Separated Cycleway Elevated Boardwalk Shared Path Corridor Shared Path Bridge Shared Path On Grade Boardwalk Shared Path
28
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.2
VE BACHELL A
IN ED W
AD
A ST PIPPIT
MOTORWAY
FL AC K
AV EN U
E
M4 WESTERN
AVE
RO PARRAMATTA
BIRNIE
Typology Plan 02
LEGEND
0
50
100
200m
Site Boundary On Verge Shared Path
1:3500@A3
On Road Separated Cycleway Elevated Boardwalk Shared Path Corridor Shared Path Bridge Shared Path On Grade Boardwalk Shared Path Stairs Potential active transport link to Birnie Ave Potential Future Bridge Connecting to Sydney Olympic Park 29
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.3
GREEN BELT Trees can contribute directly to environmental, social and economic benefits along with creating a welcoming environment for residents and visitors. While there is existing tree planting occurring along the road and rail corridor and adjacent side streets, the coverage and species is largely inconsistent and limited with spacing too lengthy to have any visual impact or provide environmental amenity. The road section along Church Street and Bachell Avenue consists of Callistemon sp. and Tristaniposis sp. which provide little shade and amenity along the street for pedestrians and cyclists. Within the rail corridor, planting consists of Casuarina sp. which provide screening along the industrial estate boundary and existing rail corridor. While this species provide a visual barrier, it provides little ecological value or shade along the project scope. Trees are of particular value within the urban setting and corridor, not only aesthetically, but negating the effects of heat. The proposed planting strategy provides a green framework for the Pippita Rail Trail, responding to the scale of the street and corridor with the benefit of highlighting key locations and precincts. Choosing different tree and plant species to different precincts helps with legibility of the framework with some precincts becoming known for its planting. Colour, shape, hardiness and seasonal variation have been considered when selecting species. The intention is to create a green overlay which provides both shade and visual amenity along the corridor and enhances the ecological value within.
TODCONSULTING.COM, 2018
30
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
LANDZINE.COM, 2022
Target 30% tree canopy cover
100% native species
Creation of ecological corridors
WILLIAM FEUERMAN, 2012
WORLD LANDSCAPE ARCHITECTURE.COM, 2020
Place Design Group February, 2024
Planting to separate between shared path and Sydney Trains road
EL
Feature planting at entry and replace removed trees
CH
Existing trees to be retained
DALLEY
ST MARTIN
JOHN
SWEET
ST
ST
ST
BA
Increase street tree planting in streetscape
LA VE
4.3
SYDNEY TRAINS HOLDING YARD
40 40
CH
UR
ST CLEAR KEEP
CLEAR KEEP
CH
LIDCOMBE STATION
RAILWAY ST
Green Belt Corridor Plan 01
0
50
100
200m
1:3500@A3
31
0
Pippita Rail Trail Masterplan Prepared for Cumberland City Council 250
500 m
Place Design Group February, 2024
4.3
VE BACHELL A
FL
AC KA VE
NU E
Removed trees to be replaced
AD
MOTORWAY
N
AVE
Planting to separate between shared path and Sydney Trains yard
RO PARRAMATTA
BIRNIE
Increase planting to extend green belt
ED WI
Existing trees to be retained
Planting along Birnie Ave entry and link to trail
M4 WESTERN
Planting to separate between shared path and Sydney Trains road
Green Belt Corridor Plan 02
0
50
100
200m
1:3500@A3
0
32
250
500 m
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.4
SHARED SPACE The public domain forms a backdrop to people’s lives. Good public domain encourages social engagement and activation. It encourages social inclusion and strengthens community resilience. The creation of an active transport corridor and green link will help reinforce this by providing activation throughout the Lidcombe area. Streets as shared spaces will redistribute the priority between vehicles, pedestrians, cyclists and amenity, providing a balance for all road users. The provision of a separated cycleway will allow for improvements to the overall streetscape along Church Street and Bachell Street. Opportunities for new street tree planting to provide a cooling effect will be a high priority for the project. Additionally, the provision of water sensitive urban design along the road reserve will improve the overall function of the stormwater network and water treatment. With capacity in the road corridor there is opportunity to interrogate the kerb locations to provide a better balance between the public domain and the road corridor. Providing the added space will allow for improved connectivity and movement for pedestrians and cyclists. With the improvements to the public domain and the reduced road corridor, this will achieve reduced traffic speeds and provide safer and shorter crossing distances for pedestrians. Similarly, along the rail corridor a balanced approach will be required to provide a safe space for cyclists and pedestrians to access and traverse the corridor while allowing the operation of Sydney Trains to function as it currently stands.
ARCCHINA.COM, 2012
33
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
LANDZINE.COM, 2012
Priority for cycle separated design
Complete separation between rail use
Pedestrian priority
PBOT, 2016
SIMON WOOD, 2012
Place Design Group February, 2024
EL
Pedestrian and cycle crossing to entry
ST MARTIN
ST SWEET
BA
CH
Separated bidirectional cycleway
ST
T
JOHN S
Pedestrian and cycle crossing
DALLEY
Extend kerb to widen shared path in front of shops
Improve link to shops and train station
LA VE
4.4
SYDNEY TRAINS HOLDING YARD 40 40
CLEAR KEEP
CLEAR KEEP
LIDCOMBE STATION
CHURCH ST
RAILWAY ST
Shared Space Users Plan 01
0
50
100
200m
1:3500@A3
34
0
Pippita Rail Trail Masterplan Prepared for Cumberland City Council 250
500 m
Place Design Group February, 2024
4.4
AC KA VE
Future Signalised Intersection
AD
A ST PIPPIT
MOTORWAY
FL
AVE
Link to Parramatta Rd with stairs and ramp
RO PARRAMATTA
BIRNIE
Crossing point of shared path and Sydney Trains road
N
Potential future connection to Birnie Ave
ED WI
Rest stops along the shared path
M4 WESTERN
Separated shared path from Sydney Trains road
NU E
VE BACHELL A
Link Carter St cycleway and Edwin Flack Ave cycle lane
Shared Space Users Plan 02
0
50
100
200m
1:3500@A3
0
35
250
500 m
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.5
CO-CREATION Celebrating the historical use of the site on the former abattoirs rail corridor alongside the architectural expression of the rail embankment and corridor will inform the alignment of the Rail Trail. The corridor will not only act as a movement corridor but provide a destination point and link which will attract visitors, optimise social value and create a greater sense of community.
Wayfinding
By creating a destinational space, it will create an emotive bond and attachment for residents and visitors throughout the green corridor. The link will provide a sense of safety, comfort and well-being for people. The creation of place is not only for human inhabitants, it will also be a key goal for the project to improve and enhance the biodiversity significance of the trail and surrounding area. Introducing native species will attract fauna and bring a sense of richness back to the site. Threading the historical narrative and sense of place together will be a wayfinding strategy that allows people to connect through the corridor.
ARTHUR ERNEST FOSTER, 1920-1030s
36
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
GRAEME SKEET, 1981
Integration of history
Retain and enhance existing rail bridge
ARCHDAILY.COM, 2008
BALDWINSIGNS.COM
Place Design Group February, 2024
LA VE
4.5
Lidcombe Town Centre start of the rail trail
Entry to be a feature with art
DALLEY ST
SYDNEY TRAINS HOLDING YARD
40 40
SWETE
ST
MARTIN ST
JOHN S
T
BA
CH
EL
Wayfinding used
CLEAR KEEP
CLEAR KEEP
LIDCOMBE STATION
CHURCH ST
RAILWAY ST
Co-creation Plan 01
0
50
100
200m
1:3500@A3
37
0
Pippita Rail Trail Masterplan Prepared for Cumberland City Council 250
500 m
Place Design Group February, 2024
4.5
AD
A ST PIPPIT
AC KA VE FL
MOTORWAY
N
AVE
RO PARRAMATTA
BIRNIE
Sydney Olympic Park end of the rail trail
ED WI
Rest spots to have heritage and wayfinding
Wayfinding used
Bridge to be upgraded with balustrade and handrail for safety. Opportunity for art overlay
M4 WESTERN
Materials to be used across the path
NU E
VE BACHELL A
Location of old Pippita Station
Co-creation Plan 02
0
50
100
200m
1:3500@A3
0
38
250
500 m
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
4.6
THE MASTERPLAN 11
10
15
12 14
1
7 9
5
2 40 40
3
13
6
CLEAR KEEP CLEAR KEEP
4
LIDCOMBE STATION
8 ACTIVE RAIL LINE
CHURCH ST OVERPASS
Masterplan 01
LEGEND
39
0
1
SIGNALISED INTERSECTION UPGRADED BIKE LANTERNS. SUBJECT TO APPROVALS
11
OPTION FOR RAISED SPEED HUMP TO SLOW AND WARN VEHICLES ALONG BACHELL AVENUE. SUBJECT TO APPROVALS
2
EXISTING BUS STOP TO BE UPGRADE / RELOCATED FOR WIDER PATH WIDTH
12
EXISTING TREES TO BE RETAINED WHERE POSSIBLE
3
EXTEND KERB TO WIDEN SHARED PATH
13
SEPARATED VEHICLE AND PEDESTRIAN ENTRANCES
4
PEDESTRIAN AND CYCLISTS SHARED PATH
14
4M ELEVATED BOARDWALK SHARED PATH
5
PEDESTRIAN AND CYCLISTS CROSSING AT SWETE ST. SUBJECT TO APPROVALS
15
EXISTING SYDNEY TRAINS ACCESS ROAD
6
ON ROAD SEPARATED BI-DIRECTIONAL CYCLEWAY
7
PEDESTRIAN AND CYCLISTS CROSSING AT MARTIN ST. SUBJECT TO APPROVALS
8
PLANTED MEDIAN STRIP
9
ON ROAD SEPARATED BI-DIRECTIONAL CYCLEWAY
10
PEDESTRIAN AND CYCLISTS CROSSING AT DALLEY ST. SUBJECT TO APPROVALS
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
50
100
200m
1:3500@A3
Place Design Group February, 2024
4.6
23
25
WAY RN MOTOR M4 WESTE
PARRAMATTA ROAD
22
28 27
21 18 16
19
17
29 20
24
26
Masterplan 02
LEGEND
40
16
SEPARATED SHARED PATH FROM SYDNEY TRAINS ROAD
26
BRIDGE CONNECTION - SHARED PATH TO BE ENCLOSED FOR SAFETY. OPPORTUNITY FOR ART OVERLAY
17
TRAIL FENCED OFF FROM INDUSTRIAL AREAS
27
PEDESTRIAN AND CYCLE SHARED PATH
18
SEPARATION BETWEEN SYDNEY TRAINS ACCESS TO SERVICES BUILDING
28
CONNECTION TO SYDNEY OLYMPIC PARK
19
REMOVE CONFLICT POINT BETWEEN PEDESTRIANS AND CYCLISTS AND SYDNEY TRAINS VEHICLES
29
POTENTIAL FUTURE BRIDGE CONNECTING TO SYDNEY OLYMPIC PARK
20
SLOW DOWN ZONE AT CROSS OVER POINT FOR EMERGENCY RAIL ACCESS
21
SEPARATED SHARED PATH
22
SYDNEY TRAINS YARD TO BE SEPARATED
23
RAMP PEDESTRIAN AND CYCLE CONNECTION TO PARRAMATTA RD
24
STAIR PEDESTRIAN CONNECTION TO PARRAMATTA RD
25
BRIDGE TO BE UPGRADED TO SHARED PATH
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
0
50
100
200m
1:3500@A3
Place Design Group February, 2024
Elevated boardwalk in rail corridor
ARTISTS IMPRESSION ONLY 41
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
Southern bridge over Parramatta Road
ARTISTS IMPRESSION ONLY 42
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
Boardwalk connection to Edwin Flack Ave
ARTISTS IMPRESSION ONLY 43
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
Church St at Lidcombe Station
ARTISTS IMPRESSION ONLY 44
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
DESIGN CHARACTER
45
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
LANDZINE.COM, 2022
05
Place Design Group February, 2024
5.1
SOUTHERN BRIDGE Serving as a gateway to connect Sydney Olympic Park and the Pippita Rail Trail. The bridge upgrade aims to create a safe and comfortable shared path on top of the existing structure that celebrates the over 80 years of industrial history unique to the site. The sites cultural significance has been exemplified in the continuation of the timber truss like frame. This is reminiscent of the Pratt truss style of bridge commonly used for railroad bridges at the time. The proposed design for the southern bridge takes into consideration the structures of both the up and down line bridges of the abattoir line. The design concept has been developed to enhance the existing structure and reflect the sites significant history.
Timber Frame
Existing Structure
Metal Mesh
The proposed 4m high timber and corten mesh balustrade provides a safety barrier for those using the bridge. The natural timber incorporates seamlessly into the natural look and feel of the trail.
Corten Steel
STATE ARCHIVES, 1928
Concrete
Steel Mesh
DEZEEN.COM, 2020
46
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
5.2
NORTHERN BRIDGE The corten steel and timber frame is continued through the northern bridge, unifying their character. However, the northern bridge utilises the support and visual interest of the existing bridge. The corten steel highlights the industrial past of the bridge while the adjacent mesh allows opportunity for visual connection to the existing sleepers. While acknowledging the past, the future of the area is considered through elements such as furniture, which has been incorporated into the design. This allows users a place of rest, creating a feature element unique to the northern bridge. Timber Frame
Metal Mesh
TOURINGPLANS.COM, 2019
Existing Structure
Timber Bench
GAINESVILLECRA.COM, 2012
47
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
5.3
BOARDWALK The boardwalk continues the design language of the site by taking the triangular supports of the existing northern bridge and using that geometry to inspire the balustrade design. Timber hand railing and concrete surfaces also celebrate the industrial history of the site, while creating opportunities for users to engage with their surroundings in a unique way.
Metal Railing ACCOYA.COM,2019
Timber Handrail
ARCHDAILY.COM, 2008
Concrete Slab
Shephotoerd, 2020
48
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
5.4
CYCLEWAY The cycleway section of Pippita Rail Trail is a bidirectional cycleway that is physically separated from motor vehicle traffic and pedestrians. It is exclusively for use by bicycles.
Raingarden / Planter
The cycleway minimises conflict and the risk of injury for all road users and also improves the level of service for people cycling, which will maximise potential ridership. To further increase level of service, bicycle paths are continued through intersections with crossing side streets, prioritising flow along the cycleway. Street Furniture
Bicycle Rack
Wayfinding
GOVERNMENTARCHITECT.NSW.GOV, 2017
Warning Marker and Separator Footpath
GOVERNMENTARCHITECT.NSW.GOV, 2017
49
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Travel Lane
Parking Lane
Separator
Bidirectional cycleway
Turf verge
Place Design Group February, 2024
5.5
PLANTING CHARACTER Trees Acacia dedurrens Acacia parramattensis Angophora costata Melaleuca decora Eucalyptus fibrosa Eucalyptus parramattensis Angophora bakeri Syncarpia glomulifera Eucalyptus punctata
Shrubs Banksia spinosola Kunzea ambigua Daviesia ulicifolia Dillwynia tenuifolia Pittosporum undulatum Polyscias sambucifolia Melaleuca nodosa Lissanthe strigosa Dillwynia tenuifolia Pultenaea villosa Groundcovers and Grasses Themeda australis Dianella revoluta Entolasia stricta Micolaena stricta Microlaena stipoides var stipoides Imperata cylindrica Platysace ericoides Panicum simile Micromyrtus ciliata Dichondra repens Note: This is an indicative planting pallete and does not include all species under consideration. 50
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
LANDSCAPEAUSRALIA, 2017
GROUPGSA.COM
LANDZINE.COM, 2012
GOVERNMENTARCHITECTS.COM
STEWARTINC.COM
Place Design Group February, 2024
CONCEPT DESIGN
51
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
GAINESVILLECRA.COM, 2012
06
Place Design Group February, 2024
PIPPITA RAIL TRAIL LIDCOMBE TO SYDNEY OLYMPIC PARK
SHARED PATH
ST JOHN
RELOCATION/REMOVAL OF BIN
CHANGE TO SLIM LINE BUS STOP RELOCATION/REMOVAL OF BIN
CLEAR KEEP
CLEAR KEEP
40 40
CHURCH ST
LIDCOMBE STATION
UPGRADE EXISTING BIKE RACKS
REFER DRAWING 01
A1
WARNING MARKING AT FIRE STATION
A1
ADD SIGNAGE AND WAYFINDING UPGRADE TO CYCLE LANTERNS SUBBJECT TO APPROVAL CYCLE RAMPS TO CONNECT TO SHARED PATH
LEGEND
SECTION AA1
SHARED PATH TRAVEL LANE TRAVEL LANE TRAVEL LANE TRAVEL LANE
PATH
SITE BOUNDARY
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
PARKING IMPACT EXISTING RETAINED LOSS GAINED
1:250 @A1, 1:500@A3
3 3 -
TREE IMPACT EXISTING RETAINED LOSS GAINED
-
0
CHURCH ST CYCLEWAY AND PEDESTRIAN PATH UPGRADE
DRAWING NO.
01
250
500 m
PIPPITA RAIL TRAIL LIDCOMBE TO SYDNEY OLYMPIC PARK
A2
REFER DRAWING 01
CHURCH ST
A2
1:250 @A1, 1:500@A3
SECTION A2
LEGEND
SHARED PATH TRAVEL LANE TRAVEL LANE VEGETATION TRAVEL LANE TRAVEL LANE
PATH
-
RETAINED LOSS GAINED
-
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
PARKING IMPACT EXISTING
SITE BOUNDARY
TREE IMPACT EXISTING
8
RETAINED LOSS GAINED
6 2 -
0
CHURCH ST CYCLEWAY AND PEDESTRIAN PATH UPGRADE SHARED PATH OPTION
DRAWING NO.
02
250
500 m
PIPPITA RAIL TRAIL LIDCOMBE TO SYDNEY OLYMPIC PARK
MEDIAN TO BE DEMOLISHED
MEDIAN TO BE DEMOLISHED
MEDIAN TO BE DEMOLISHED
SEPARATED BIDIRECTIONAL CYCLEWAY CONSTRUCT RETAINING WALL AND VEHICLE BARRIER
EXISTING KERB TO BE RETAINED
MEDIAN TO BE DEMOLISHED
REFER DRAWING 01
A3
MEDIAN TO BE DEMOLISHED
A3 LIDCOMBE STATION
TRAVERSABLE ROUNDABOUT TO ALLOW FOR ALL MOVEMENTS
1:250 @A1, 1:500@A3
LEGEND SECTION A3 PATH
TRAVEL LANE CYCLEWAY TRAVEL LANE SEPARATOR VEGETATION
ROUNDABOUT
-
RETAINED LOSS GAINED
-
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
PARKING IMPACT EXISTING
SITE BOUNDARY
TREE IMPACT EXISTING
8
RETAINED LOSS GAINED
0 8 -
0
CHURCH ST CYCLEWAY AND PEDESTRIAN PATH UPGRADE ROUNDABOUT OPTION
DRAWING NO. 02B
250
500 m
PIPPITA RAIL TRAIL SWETE ST
LIDCOMBE TO SYDNEY OLYMPIC PARK
C
CHURCH ST
B
C
T
S H C R
CHU
B SECTION BB
TURF
PATH
CYCLEWAY
TRAVEL LANE TRAVEL LANE
PARKING TURF PATH TURF
TURF PATH TURF CYCLEWAY
1:250 @A1, 1:500@A3
LEGEND
SECTION CC
TRAVEL LANE
TRAVEL LANE
PARKING
TURF PATH TURF
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
PARKING IMPACT EXISTING RETAINED LOSS GAINED
SITE BOUNDARY
33 20 13 -
TREE IMPACT EXISTING RETAINED LOSS GAINED
8 8 7
0
CHURCH ST CYCLEWAY AND SHARED PATH
DRAWING NO.
03
250
500 m
PIPPITA RAIL TRAIL
MARTIN ST
LIDCOMBE TO SYDNEY OLYMPIC PARK
D
E V LA
E
L E H
REFER DRAWING 05
C A B
E
CHURCH ST
D
SECTION DD
PATH
TURF
CYCLEWAY
LEGEND
SECTION EE
TRAVEL LANE TRAVEL LANE
PLANTED MEDIUM
TRAVEL LANE
TURF
PATH
TURF PATH TURF CYCLEWAY
TRAVEL LANE
TRAVEL LANE TRAVEL LANE TURF
SITE BOUNDARY
NEW PARKING
FOOTPATH
ROAD
EXISTING PARKING
EXISTING TREES
CYCLEWAY
REMOVED PARKING
PROPOSED TREES
SHARED PATH
MEDIANS
REMOVED TREES
KEY PLAN
PARKING IMPACT EXISTING RETAINED LOSS GAINED
1:250 @A1, 1:500@A3
10 3 7 -
TREE IMPACT EXISTING
30
RETAINED LOSS GAINED
25 5 7
0
CHURCH ST AT MARTIN ST MARTIN ST ROUNDABOUT AND CHURCH ST CYCLEWAY
DRAWING NO.
04
250
500 m
PIPPITA RAIL TRAIL
DA LL E
PARKING SPOTS GAINED
Y
ST
LIDCOMBE TO SYDNEY OLYMPIC PARK
RAISED PEDESTRIAN AND CYCLE CROSSING. SUBJECT TO APPROVAL
SHARED PATH
BIDIRECTIONAL SEPARATED CYCLEWAY
TRANSITION TO CYCLEWAY
SPEED BUMP SUBJECT TO APPROVAL
RAISED PEDESTRIAN AND CYCLE CROSSING. SUBJECT APPROVAL
RETAIN EXISTING PARKING
PROPOSED TREES
REFER DRAWING 04
F
ACHELL AVE
BACHELL AVE
PARKING SPOTS GAINED
F
PARKING SPOTS GAINED
SHARED PATH TRANSITION TO CYCLEWAY
SECTION FF
TURF
1:250 @A1, 1:500@A3
LEGEND
PATH
CYCLEWAY
PARKING
TRAVEL LANE TRAVEL LANE
PARKING
TURF
SITE BOUNDARY
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
PARKING IMPACT 30
EXISTING RETAINED LOSS GAINED
23 7 14
TREE IMPACT EXISTING RETAINED LOSS GAINED
11 11 5
0
CHURCH ST AT DALEY ST CYCLEWAY
DRAWING NO.
05
250
500 m
PIPPITA RAIL TRAIL REFER DRAWING 05
LIDCOMBE TO SYDNEY OLYMPIC PARK
PLANTING TO BUFFER ACCESS TRACKS AS A VISUAL BARRIER RAISED PEDESTRIAN AND CYCLE CROSSING. SUBJECT TO APPROVAL
RETAIN EXISTING PARKING
SPEED BUMP SUBJECT TO APPROVAL
NEW TREE PLANTING FOR CANOPY COVER ALONG SHARED PATH
FENCE BETWEEN SHARED PATH AND SYDNEY TRAINS ACCESS TRACK
ELEVATED SHARED PATH BOARDWALK
EXISTING ACCESS TRACK
H
G
ELL BACH
G
AVE
H
RAIL EMERGENCY RESPONSE UNIT (RERU) ACCESS DRIVEWAY
RAIL EMERGENCY ACCESS UNIT (RERU)
SYDNEY TRAINS ACCESS TO RAIL EMERGENCY RESPONSE UNIT (RERU)
SECTION GG
CORRIDOR
SHARED PATH
PLANTING ACCESS SHARED PATH BUFFER TRACK
CORRIDOR
1:500 @A1, 1:1000@A3
LEGEND
SECTION HH
RAIL CORRIDOR
SITE BOUNDARY
NEW PARKING
ROAD
MEDIANS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
0
BACHELL AVE CYCLEWAY AND CORRIDOR ENTRY
DRAWING NO.
06
250
500 m
EXISTING ELEC POLES EXISTING SIGNS
PIPPITA RAIL TRAIL LIDCOMBE TO SYDNEY OLYMPIC PARK
FENCE BETWEEN SHARED PATH AND SYDNEY TRAINS ACCESS TRACK PLANTING TO BUFFER ACCESS TRACK AS A VISUAL BARRIER
I EXISTING ACCESS TRACK
REPLACEMENT TREE PLANTING FOR CANOPY COVER ALONG SHARED PATH
ELEVATED SHARED PATH BOARDWALK
POTENTIAL FUTURE CONNECTION TO BIRNIE AVE RELOCATED ACCESS TRACK
J
I
J
SECTION II
CORRIDOR
SHARED PATH
PLANTING BUFFER ACCESS TRACK
RAIL CORRIDOR
1:500@A1, 1:1000@A3
LEGEND
SECTION JJ
CORRIDOR
SHARED PATH
ACCESS TRACK
SITE BOUNDARY
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
0
CORRIDOR PEDESTRIAN AND CYCLIST SHARED PATH
DRAWING NO.
07
250
500 m
PIPPITA RAIL TRAIL LIDCOMBE TO SYDNEY OLYMPIC PARK
ON GRADE CONNECTION TO PARRAMATTA ROAD RELOCATED ACCESS TRACK
ELEVATED SHARED PATH BOARDWALK
ACCESS TRACK UNDER ELEVATED BOARDWALK
REPLACEMENT TREE PLANTING FOR CANOPY COVER ALONG SHARED PATH
SYDNEY TRAINS YARD
EXISTING VEHICLE TRACK
FENCE BETWEEN SHARED PATH AND SYDNEY TRAINS ACCESS TRACK
J EXISTING DRIVEWAY
SHARED PATH ON PARRAMATTA ROAD STAIR ACCESS TO PARRAMATTA ROAD
K
J
PARRAMATTA ROAD
K
NEW DRIVEWAY FOR ACCESS TRACK
SECTION KK
SECTION JJ
LEGEND
SHARED PATH CORRIDOR
SHARED PATH
ACCESS TRACK
1:500@A1, 1:1000@A3
SITE BOUNDARY
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
0
CORRIDOR PEDESTRIAN AND CYCLIST SHARED PATH
DRAWING NO.
08
250
500 m
PIPPITA RAIL TRAIL LIDCOMBE TO SYDNEY OLYMPIC PARK
EXISTING DRIVEWAY TO ACCESS TRACK
FUTURE CYCLEWAY TO CARTER STREET CYCLE RAMP TO CONNECT TO CYCLE LANE
SHARED PATH ON PARRAMATTA ROAD STAIR ACCESS TO PARRAMATTA ROAD
EXISTING BRIDGES TO BE RETAINED AND STRENGTHENED WHERE REQUIRED. ADDITIONAL STRUCTURE TO BE BUILT TO FACILITATE SHARE PATH.
SHARED PATH
EXISTING VEGETATION TO BE RETAINED WHERE POSSIBLE
L
NEW TREES PROVIDED FOR CANOPY COVER ALONG SHARED PATH
EASTBOUND CYCLISTS TO ACCESS RAIL TRAIL VIA SIGNALISED CROSSING AT BIRNIE AVE AND EDWIN FLACK AVE.
RAMP ACCESS TO EDWIN FLACK AVENUE
X M
X PROPOSED STAIR CONNECTION TO EDWIN FLACK AVENUE
CONNECTION TO THE EXTENSIVE ACTIVE TRANSPORT NETWORK AT SYDNEY OLYMPIC PARK AND ONWARDS TO CONCORD, RHODES AND WENTWORTH POINT.
L
NU
E
X LOOKOUT POINT
AV E
OPPORTUNITY FOR HERITAGE INTERPRETATION AND SITTING
PLANNED FUTURE BRIDGE
AC K
X
M4 WESTERN MOTO
PARRAMATTA ROAD
RWAY
M
ED
WI
N
FL
NEW DRIVEWAY FOR ACCESS TRACK
SECTION LL
SECTION MM
LEGEND
SHARED PATH
SHARED PATH
1:500@A1, 1:1000@A3
SITE BOUNDARY
NEW PARKING
ELEC POLES
ROAD
MEDIANS
SIGNS
CYCLEWAY
FOOTPATH
SHARED PATH
EXISTING TREES
EXISTING PARKING
PROPOSED TREES
REMOVED PARKING
REMOVED TREES
KEY PLAN
0
SYDNEY OLYMPIC PARK LINK SHARED PATH, AND BRIDGE UPGRADE
DRAWING NO.
09
250
500 m
CONCLUSION
62
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
L & A DESIGN, 2021
07
Place Design Group February, 2024
7.0
CONCLUSION The Masterplan and concept design for the Pippita Rail Trail is key in providing a vision for the integration of both Cumberland City Council’s works and aspirations of the community. Following initial consultation in 2022, we have prepared for further consultation on the masterplan and concept designs for the project. The consultation will inform the final masterplan and concept design, which will then be used to seeking funding to progress the delivery of the project. The objectives of the masterplan will be accomplished through the completion of the project. They include: • Redefining the movement corridor as a unique approach to a linear park • New mobility focused on prioritising pedestrians and cyclists • Improved safety and flexibility for all road users • Celebrating the historical use of the site and its rich history
63
Pippita Rail Trail Masterplan Prepared for Cumberland City Council
Place Design Group February, 2024
PLACE DESIGN GROUP, 2023