Skip to main content

CABLEtalk August/September 2021

Page 1

August/September 2021 £4.50

Tynecastle’s winning team SELECT Member SPIE UK tackles the challenge of fitting new LED floodlights at Hearts’ stadium podcasts and the risk to overvoltage 36 Guide more at BSG Hub 20 New 24 Managing of material costs protection recording


CONTENTS AUGUST/SEPTEMBER 2021 OPINION

05

Alan Wilson on being prepared for the challenges that lie ahead

NEWS

06 10

FEATURES

14

Installing new LED floodlights at Hearts’ Tynecastle stadium

FEATURES

29

The IET celebrates 150 years of making a difference

The latest from our campaign for regulation of the industry Record number of apprentices choose the electrical sector

FEATURES

FEATURES

32

SELECT’s Walled Garden HQ gets a bright new look

20

BSG Hub launches new range of health and safety podcasts

22 24

Discover how the Local Authority Forum is widening its influence Rudi Klein on managing the risk of the rising cost of materials

26

How the Fair Work Convention is helping the construction industry

TRAINING

34

New courses available on smart homes and drone surveying

TECHNICAL

36

Bob Cairney discusses the issues around overvoltage protection

APPRENTICES

40

APPRENTICES

42

FOCUS

Apprenctices get off to a safer start with free lockout kits

MANAGING EDITOR Iain Mason iain.mason@select.org.uk EDITOR Sarah Wolstencroft sarah.w@connectcommunications.co.uk 0141 560 3022 DESIGN & PRODUCTION Ryan Swinney ryan@connectcommunications.co.uk

Meet award-winner Dean Callan, our latest Talent of Tomorrow

ADVERTISING David Hughes davidh@connectcommunications.co.uk 0131 561 0022

CABLEtalk is produced by Connect Publications on behalf of SELECT connectcommunications.co.uk

44 47 50 52

Practical advice on how to keep stress levels under control Shining a spotlight on the rise of LEDs after the halogen lamp ban Help from the EDA on navigating a perfect storm of challenges Len Bunton explains the contractor’s designed portion

PRODUCT SHOWCASE

54

Round-up of the latest gear and gadgets to help you at work

CABLEtalk

AUGUST/SEPTEMBER 2021

3


COMMENT

Bring on the next challenge!

A

s recovery from the pandemic continues, businesses are now facing a new set of challenges, especially around material price increases and shortages, and while the economic prospects appear to be positive and most Members are busy, the issues of rising material costs and availability are beginning to impact on many. Unlike the ‘heavy side’ of the construction sector, where more than 75% of materials are ‘home grown’, the electrotechnical sector imports the vast majority of its raw materials or finished goods from Europe or the Far East and a combination of global and local (UK) factors means that the issue of cost and availability isn’t going to go away any time soon. There are several factors behind the issue of shortages and increases: ● Significant and unexpected upturn in worldwide workload – there has been a huge increase in demand, especially from the US and China, which has led to shortages in key products. ● COVID-19 recovery and logistical constraints – during the COVID-19 pandemic a significant portion of manufacturing facilities were closed for varying durations and the world’s distribution network was significantly impacted and is still recovering. This is resulting in delays to manufacturing and increased cost and time for delivery of

materials around the world’s distribution network. ● Supply from the EU – although there is now a trade agreement, the borders and customs processes and practices add administration, time, and cost to obtaining products. ● Hedging and bulk ordering – materials suppliers, main contractors, and many major UK projects have sought to offset disruption and delays by stockpiling or bulk securing manufacturing and supply slots. This hedging activity is resulting in increased pressure for the rest of the industry. ● Raw materials costs - the COVID-19 pandemic, post-Brexit trading rules and rising oil prices have led to soaring material prices. For example, copper has increased by 49% and steel by 25% in the past six months. Unfortunately, there is no easy answer to fix the issues around materials, and just around the corner is another problem, related to product testing. At the moment, materials are subject to an EU mark, but from 1 January 2022, a new UK mark will be required to allow products to be sold and installed. If mutual recognition is not agreed before 1 January 2022 then EU manufacturers will be forced to use UK Approved Bodies to enable them to comply with mandatory UKCA marking as from 1 January 2022. The problem this causes is that the UK does not have sufficient test capacity to meet this demand, so disruption to EU exports to the UK will

ensue, and EU recognition of existing European Technical Assessments issued by UK bodies and new UK Technical Assessment Certificates is required now. A UK/EU agreement on mutual recognition would overcome most of the immediate issues for the UK, and from 1 January 2022, for the EU. Failure to address those areas of concern will lead to a further shortage of materials in the UK construction sector as we will no longer be able to import many of the products currently obtained from Europe. With these challenges to be faced, it’s important that Members consider forward planning. SELECT has produced a series of guides for our SELECT TV channel, which feature our legal consultant, Professor Rudi Klein, explaining the steps Members can take when faced with cost rises and shortages from a contractual perspective. Through the CICV Forum we are also represented on a Scottish Government and industry group which is collaborating on preparing a detailed investigation into the current and future impact of the materials shortages. Via our membership of Actuate UK, we have asked the UK Government to reach agreement on mutual recognition of technical standards or seek an extension to the date of 1 January 2022. Lots of challenges lie ahead, but we can assure you that SELECT will be working hard to ensure that Members’ views are effectively represented on these important issues.

Alan Wilson Managing Director, SELECT CABLEtalk

AUGUST/SEPTEMBER 2021

5


NEWS SELECT CAMPAIGNS The Walled Garden, Bush Estate, Midlothian EH26 0SB Tel: 0131 445 5577 Fax: 0131 445 5548 admin@select.org.uk

Follow SELECT online at: TWITTER @Updates_SELECT @Training_SELECT @Regulate_SELECT FACEBOOK SELECT.TheECAofS INSTAGRAM @SELECT_Trade_Association

Visit our websites at:

select.org.uk select.org.uk/training cabletalkmagazine.com selectawards.co.uk

Please phone our membership team on 0131 445 5577 to apply to become a Member of SELECT or if you would like more information about joining. Alternatively you can email us on memberservices@select.org.uk or submit an online enquiry.

CABLEtalk is the official magazine of SELECT and is distributed free to qualifying readers. ISSN 1365-3288 SELECT is the trading style of the Electrical Contractors’ Association of Scotland. The SELECT logo is a registered Collective Mark.

6

CABLEtalk

Wall of Support is building momentum

S

ELECT has welcomed a number of Member businesses to the Wall of Support as our ongoing crusade for regulation of the electrical industry continues to gather momentum. We’ve responded to demand from the industry by allowing qualified electricians to add a digital ‘brick’ to the online resource to show their support for protection of title. Some 17 SELECT Member firms from across Scotland have now put forward their names to show their support, ranging from individual electricians to large electrical businesses. Among them is Atalian Servest AMK, whose Director Mike Stark said: “It is vitally important that consumers are helped to make informed choices whenever they employ an electrician. That’s why I am backing SELECT’s campaign to regulate electricians by introducing protection of title for the

Gerard Constantin

profession of electrician.” As well as SELECT Member firms and their staff, leading trade bodies EuropeOn, the National Federation

Retentions report could lead to a ‘cash lifeline’ SELECT has hailed a new report on cash retentions as “a potential game-changer” – and says its recommendations could lead to greater reinvestment in the industry. The association says the in-depth review by the short life working group (SLWG) could bring an end to the practice of withheld retention payments and deliver “an essential

AUGUST/SEPTEMBER 2021

financial lifeline” for contractors. Among its many practical proposals submitted to the Scottish Government, the new report recommends a retention deposit scheme, the introduction of best practice policy and automatic release of

retentions as early as possible. SELECT President Donald W Orr said: “The issue of retentions is one that has blighted the industry for many years, and this report makes it clear that there is a widely-held belief that change is long overdue.


NEW BRICKS

Visit the Wall of Support at bit.ly/selectwall ofsupport

● Select Member firms Atalian Servest AMK, Stensons, John Noble Electrical Contractors Ltd., Calder Electrical, David W H Smith Heating and Electrical Services, E Rae & Son, A E S Electrical Ltd, Macform Ltd, Robert A S Crockett & Partners Ltd, Unitech Services Ltd, Ness Electrical, 2 Core Electrics, Alistair Grant Electrical, Powertec Electrotechnical Services Ltd, Logic Systems, Electro Installations (Scotland) Ltd and GP Services (Dumfries) ● MSPs Martin Whitfield and Michelle Thomson ● Other organisations EuropeOn, National Federation of Roofing Contractors and The Scaffolding Association

of Roofing Contractors and The Scaffolding Association have also added their names to the online Wall. EuropeOn President Gerard Constantin said: “We agree that it is vital that only properly trained and qualified people design and carry out electrical works and we fully support the campaign to ensure that anyone calling themselves an electrician in Scotland would have to hold appropriate, industry-recognised qualifications.” The latest signatories have been joined by Martin Whitfield, Labour MSP for South Scotland, and the SNP’s Michelle Thomson, who was elected as the representative for Falkirk East at the Holyrood elections in May. Ms Thomson said: “Poor quality “We welcome its recommendations and, if implemented, believe they could provide an essential financial lifeline that could save many businesses thousands of pounds every year. “Retention monies could be reinvested by businesses in employing more apprentices, upskilling operatives or investing in new technology – bringing benefits to the wider industry and helping the whole

electrical work carries huge risks to people’s homes, businesses and lives, which is why I’m backing SELECT’s campaign.” The new names join more than 70 politicians, trade unions, professional bodies and other organisations that have already indicated their support for SELECT’s campaign for regulation of the industry. Their public stance underlines their backing for legislation in Holyrood which would make it an offence for someone to call themselves an electrician when they have no, or inadequate, qualifications. Alan Wilson, Managing Director of SELECT, said: “We are delighted that these SELECT Members, key organisations and Holyrood politicians

have joined our campaign by showing public support for regulation of the industry. “Our campaign has already made a huge impact, not least in its progress through the Scottish Parliament, and it is imperative that we continue to build momentum. “To this end, we are widening access to the Wall of Support, in order that that the groundswell of opinion in favour of regulation which we know is out there is able to achieve its maximum expression.”

i

Skills to consider construction sector and make build a stronger and recommendations more sustainable on the practice future. We hope of cash that the powersretentions under that-be heed the construction advice in this Donald W Orr contracts. Its report and have findings have also the courage to adopt been warmly welcomed what could be a potential by fellow Scottish trade body game-changer for contractors.” the Scotland and Northern The SLWG was established Ireland Plumbing Employers’ in January 2021 by the Minister Federation (SNIPEF) and for Business, Fair Work and CABLEtalk

To enquire about adding your name to the Wall of Support, please email yvonne.wilson@ select.org.uk engineering services alliance Actuate UK, of which SELECT and SNIPEF are both key members. SELECT Managing Director Alan Wilson said: “We are grateful to the group’s work and it is heartening to see progress being made via an ongoing spirit of collaboration. “Only by continuing to listen, talk and work together will we find a solution that works for us all.” AUGUST/SEPTEMBER 2021

7


NEWS ROUND-UP

Members who missed the live versions of our recent online Toolbox Talks can watch them again on our dedicated YouTube channel. Held via Teams webinar in June and July, this year’s digital sessions were designed to answer some of the topical issues raised by Members during conversations with Technical Advisers and in recent calls to our Technical Helpline. The first live session was held on Wednesday 23 June, during which Training and Development Adviser Malcolm Duncan discussed cable calculation and answered Member questions on other topical technical matters. Watch it again at bit.ly/TTalk-1 The second session on Wednesday 30 June was held in partnership with Prysmian Group, and saw Martyn Corbishley discuss the changes to clause 11 of BS 8519:2020, which deals with cable selection. Watch it again at bit.ly/TTalk-2 The final live session on Wednesday 7 July saw Technical Standards Adviser Bob Cairney discuss the rise of hot tubs and home offices during lockdown and answer related questions from Members. Watch it again at bit.ly/TTalk-3 Director of Technical Services Dave Forrester said: “Feedback was extremely positive for all three events.” 8

CABLEtalk

Card is a winner

A

s part of its ongoing rollout of online grade card applications, the Scottish Joint Industry Board (SJIB) has introduced the new Academically Qualified Person (AQP) card. The new card is for operatives and managers who have further education or higher education electrotechnical qualifications that do not fit the standard industry-recognised electrotechnical occupations. Like other Electrotechnical Certification Scheme (ECS) cards, it can be applied for using a computer, laptop, tablet or mobile phone via the dedicated ECS Card portal, which was launched by the SJIB in May. Fiona Harper, Director of Employment and Skills at SELECT and The Secretary of the SJIB, said: “We are delighted to introduce this new AQP card as one of the options offered by the ECS Card portal. “The portal has proved very successful so far and will help make things quicker and easier for SELECT Members and the wider industry. We will keep listening to feedback and add further resources as they are needed.” To be eligible for the new card, applicants must hold an electrical engineering degree or a further education qualification in an electrotechnical discipline at SCQF Level 8 or 7, e.g. an HND or HNC. They must also have completed the ECS Health, Safety and

Environmental Assessment within the last 30 months, or hold a valid approved exemption. Applicants will have the opportunity to select one of the following specialisms which will appear on the AQP card: ● Electrical Engineer (Power) ● Electrical Engineer (Control) ● Electrical Engineer (Instrumentation) ● Electrical Engineer (Communications) ● Electrical Engineer (Systems) ● Electrical Engineer (Electronics) ● Electrical Engineer (Building Services) ● Electrical Engineer (Environmental) The new card follows the successful Phase 1 of the new service which means cards can now be applied for, renewed and upgraded online in the following specialist areas: ● Electrotechnical – Electrician, Approved Electrician, Technician Electrician, Electrical Labourer and Operative ● ECS Related Discipline – Field Engineer, Equipment Installer, Aerial and Satellite Engineer and Control Systems Engineer ● Management – ECS Site Support, ECS Manager including Electrical Site Manager, Electrical Contract Manager, Site Manager, Project Manager and Contract Manager. Using the portal is quick and easy, with applicants guided through a simple step-by-step process. More details can be found at www.sjib.org.uk and the portal itself can be accessed at bit.ly/ ECS-portal

Website is nearly here SELECT’s new website is almost ready for launch, with final checks and testing being carried out. The new site – which is scheduled to go live in September – has a clean, fresh look, with improved navigation, easy-to-follow

AUGUST/SEPTEMBER 2021

sections, updated shop and dedicated MY SELECT area for Members. A new SELECT TV section will also offer a range of technical, commercial and employment videos. Details of the launch will be revealed on our social media channels and e-newsletter soon.


Certificate will bring simplicity

New infographic is packed with facts SELECT has released its second infographic of quarterly statistics which shows the wide range of activity carried out by the association over the last three months. Hosted on the SELECT website, the graphic has been updated to show the

developments in technical, training, membership, communications, employment and skills between 1 April and 30 June. It follows the release of our first infographic which tracked the association’s progress in the first three months of 2021.

Iain Mason, SELECT’s Director of Membership and Communications, said: “The first graphic was well received by Members and staff, so we will continue to issue it every three months to show the broad spectrum of work we do and our progress in key areas.”

SELECT has welcomed the introduction of a new Single Certificate of Construction which is designed to help simplify the process of certification. The new certificate is a single, multi-page document that combines the certificates of construction and electrical installation certificate to help further increase standards across the industry. Its launch is the culmination of a positive and successful collaboration between SELECT – a long-standing and highly-regarded Building Standards Scheme provider – CertSure, the Local Authority Building Standards Scotland (LABSS) and the Scottish Government’s Building Standards Division (BSD). Launched on 1 July, the certificate will meet the requirements of a building warrant to confirm that any electrical works carried out are fully compliant with all aspects of Scottish Building Standards, thus increasing the safety of all buildings now and in the future. Dave Forrester, SELECT’s Director of Technical Services, said: “As the trade body for the electrotechnical sector in Scotland, SELECT has been a Scheme Provider since 2005, and is acutely conscious of the vital role certification has had in delivering new buildings and improved facilities. We have been pleased to be so directly involved in discussions with local authorities and certification providers about the move to a single certificate, with a view to improving efficiency and productivity across the industry.” CABLEtalk

AUGUST/SEPTEMBER 2021

9


NEWS APPRENTICESHIPS

Make a bright decision

A

s young people prepare to receive their exam results across Scotland this month, SELECT is encouraging schoolleavers to make their future an electric one. Thousands of teenagers will currently be mulling over their life choices – and SELECT says an electrical apprenticeship is the first step to an exciting and fulfilling career. The association points to recent figures that showed a record intake of 738 apprentices for the electrical sector so far in 2021 and says an increasing number of youngsters are choosing an apprenticeship over traditional higher education routes. Fiona Harper, Director of Employment and Skills, said: “From electric vehicles and battery storage to heat pumps and the Internet of Things, more youngsters are realising that the complexities of modern electrotechnology will put electricians in pole position in the employment market. “There’s never been a more exciting time to be an electrotechnical professional, and the opportunity to be at the forefront of the technology of tomorrow is one that we hope will be willingly embraced by Scotland’s current

Paul Maxwell

cohort of school-leavers.” Fiona, who is also The Secretary of the Scottish Joint Industry Board (SJIB), added: “It’s clear that young people are recognising that becoming a qualified electrician can provide an extremely rewarding and highly remunerative career. As part of this, the opportunity to ‘earn while they learn’ and gain practical skills in a real-life setting while studying is also an attractive proposition for many. “The number of young people who have been taken on by companies this year has not only defied the pandemic but also suggests that more young people

are seeing electricians as custodians of the future – an image we would heartily endorse.” Fiona said the sector is hearing more stories like that of aspiring young electrician, Paul Maxwell, who changed his initial career choice and now works with established Glasgow-based electrical contractors A Alexander & Son. The 27-year-old recently told CABLEtalk: “I studied marketing at university but soon realised it wasn’t for me. Becoming an electrician gives you a skill for life; it’s probably the best decision I’ve ever made.” In addition to the opportunities provided by an apprenticeship, Fiona said electrical apprentices of the future would benefit from the long-standing campaign for regulation, the momentum of which continues to build. She said: “The recognition of our trade as a profession will finally acknowledge the skill and dedication required to become a fully-qualified electrician, with training as in-depth and detailed as many university degrees. The electricians of tomorrow will be viewed as highly skilled, expertly trained professionals, equipped with the specialist tools needed to build and maintain a society that depends on electricity. Who wouldn’t want to be part of such a future?”

Visitors see how donation makes a difference SELECT and SECTT recently welcomed two representatives from Electrium to the Assessment Centre in Cambuslang. Business Development Manager Gary Shirkey and Regional Sales Manager John Richmond were given a tour of the facility to check on the progress of equipment donated 10

CABLEtalk

From left: Gary Shirkey, David Henderson and John Richmond by the manufacturer. Electrium helped upgrade the centre’s Approved Competency Assessment (ACA) training booths by contributing a range of equipment, including a Crabtree range PowerStar Panel

AUGUST/SEPTEMBER 2021

Board and Loadstar Distribution Boards and Wylex NM range Dual RCD consumer units. And the duo saw their products in action thanks to a socially distanced update by SECTT Training Centre Manager

David Henderson and SELECT Technical Standards Adviser Bob Cairney. Bob said: “It’s essential that these training booths simulate the type of environments and electrical installations that an Approved Electrician would encounter and that they are relevant and up to date with requirements introduced in BS 7671:2018.” David added: “This generous donation will help keep our facilities up to date and ensure that all trainees have access to cutting edge technology."


Apprentices in demand

T

he Scottish Electrical Charitable Training Trust (SECTT) and Scottish Joint Industry Board (SJIB) have saluted Scotland’s employers after a record number of apprentices were welcomed into the electrical sector. A total of 738 new entrants to the industry were recruited in 2021, confounding fears that recruitment could be a casualty of the ongoing effects of the COVID-19 pandemic. SECTT says the new cohort exceeded all expectations, being nearly 50% up on 2020 and in excess of the 700 which would be closer to a normal year’s intake. Anne Galbraith, CEO of SECTT, said: “This really has been a remarkable year. We took on 500 apprentices in 2020 and we are taking on a further 738 starting in the autumn of 2021. In a normal year, I would expect to take approximately 700 new starts, so this year has exceeded expectations already. In addition, nearly

all colleges are full to capacity and SECTT is now exploring further opportunities for next year. “We would like to thank all employers who have stepped up and taken on an apprentice this year. It shows a real commitment and a recognition that we need to train the electricians of the future now. “ Fiona Harper, The Secretary of the SJIB, added: “It is clear that the future is electric and becoming an electrician is evolving into an aspiration for many young people, which is the way it should be. “The industry as a whole is committed to the next generation of talent coming through, and employers are clearly supportive of creating a pool of highly trained, highly qualified personnel to take their business and the sector forward.”

NEW MEMBERS 12 firms have become SELECT Members since 1 June 2021

1 8

10

2 4 6

3 5 9 7

12

11

1. SWL Electrical, Invergordon 2. PM Electrical Perth, Perth 3. JCS Electrical, Livingston 4. S J Barker Electrical Ltd, Cumbernauld

SECTT donates lockout kits: Pages 42 & 43

5. Leading Electrical Solutions Ltd, Edinburgh 6. Energize Electrical Solutions, Glasgow

Colleagues recently congratulated John Gillespie after he celebrated 30 years with SECTT on 24 June. As a key part of the administration team, John provides essential support to training officers,

apprentices, colleges and employers, delivering vital information and dealing with a range of queries on a daily basis. SECTT CEO Anne Galbraith said: “On behalf of everyone in the SECTT team, I’d

New top team is announced SECTT marked its AGM with a new team at the top and a ringing affirmation of the vital importance of apprenticeships to the future of the electrical contracting industry in Scotland. The annual meeting elected Scott Foley, Regional Officer at

like to thank John for all his hard work and dedication over the last three decades. “He has often been commended on his excellent telephone manner and for going the extra mile to help. “Here’s to the next 30 years!”

Unite the Union, as its new Chair, with former SELECT President John Noble, Managing Director of John Noble Electrical Contractors, elected as Vice-Chair. Scott said: “I am extremely honoured to take the Chair and great thanks are due to employers for their unwavering support and their continued faith in today’s young people."

7. MacDonald Electrical, Lasswade 8. R W Baikie Electrical Services Ltd, Aboyne 9. Livingston Building Services Ltd, Livingston 10. Ian McDonald, Blairgowrie 11. DG Project Solutions Ltd, Lockerbie

John Gillespie

John said: “I am also delighted to take on this role with SECTT. The apprentices of today are the people we will need tomorrow as the country transitions to net-zero carbon. "Properly trained and qualified professionals will reassure customers, improve safety, boost consumer confidence and keep Scotland safe.” CABLEtalk

12. Russell Joinery & Construction Ltd, Strathaven

Scott Foley

AUGUST/SEPTEMBER 2021

11


NEWS CICV FORUM

Committed to success

T

he Construction Industry Coronavirus (CICV) Forum has pledged its ongoing commitment to the Scottish Construction Leadership Forum (CLF) and has warmly welcomed its new Chair, Scottish Government Minister Ivan McKee. The Forum is now a key contributor to the CLF, having realigned its infrastructure to be consistent with the mission of its fellow sector body. At its full meeting on 17 June, the Forum said that it is looking forward to working closely with Mr McKee, the new Minister for Business, Trade, Tourism and Enterprise, who takes over the Chair from Kevin Stewart, who is now Minister for Mental Wellbeing and Social Care. SELECT Managing Director and Forum Chair Alan Wilson said: “We are keen to continue the constructive and positive dialogue which we have enjoyed so far with the CLF, and to build on the strong foundations we have established.” As an illustration of the Forum’s commitment to continuing dialogue, it welcomed to its meeting a Scottish Government official, who updated Forum members on a meeting of the

Guide offers PII advice

The CICV Forum has unveiled a new guide to the crucial and increasingly complex issue of professional indemnity insurance (PII). The easy-to-understand downloadable document, produced by the Forum’s unique collaboration of trade associations, professional bodies, companies and individuals, outlines the state of the insurance market, the precautions firms should take 12

CABLEtalk

Ivan McKee Scottish Government, CC BY 2.0 creativecommons.org/licenses/by/2.0, via Wikimedia Commons

CLF held the previous day. Alan added: “The Forum is very pleased to be so closely linked with the CLF as it carries out its important work and we are sure that we will enjoy the same productive relationship with Mr McKee as we did with his predecessor. “We are delighted that the CLF continues to be chaired at ministerial level and we will continue to provide practical suggestions and solutions in a spirit of collaboration and cooperation.”

and the pitfalls they face. And it warns that over the last 18 months or so, a variety of reasons have seen the cost of PII increase hugely while businesses have often suffered reductions in the scope of cover. The free guide offers advice on subjects ranging from extending liability to contractual liability, the nature of PII cover, insurance limits, obligations under ancillary documents and risk management. SELECT Managing Director Alan Wilson, who chairs the Forum, said: “PII is a necessary

AUGUST/SEPTEMBER 2021

The CLF was formed in 2019 by Construction Scotland and the Scottish Government to focus on the sector as a key economic driver and has been instrumental in detailing the industry’s longer-term recovery plan. Along with the Forum, it is now firmly committed to the ideals of co-operation and collaboration within the industry and to demonstrating the sector’s determination that it can flourish by working together. Business Minister Mr McKee said: “Through collaboration, the CICV Forum provides valuable contributions to the work of the CLF. “It has quickly become a major influence on the construction industry’s direction of travel, offering practical guidance and support at a time when it was most needed. “I hope that support will continue as we work together on delivery of the CLF’s long-term Recovery Plan, which is showing steady progress and on the transformation which is vital for the sector. I look forward to working with the CICV Forum and our other partners to build the sustainable, innovative, diverse and successful industry we all want to see.”

The guide is free to download at www.cicvforum.co.uk tool for protecting business owners who provide a service or give advice if a client claims a service is inadequate. Until the past few years, the construction insurance market has been soft,

in that there has been plenty of capacity leading to broad coverage and premium reductions driven by competing insurers. The market has now become very hard with the


Call to keep a firm focus on safety issues As Scotland moves towards further easing of restrictions, the CICV Forum has issued more timely guidance and sounded a cautionary note, urging the sector to keep its focus on health and safety to protect colleagues, customers and families. The unique collective says the sector is “not out of the woods yet” and, with COVID-19 still a very real threat, insists each worker has a vitally important role to play in continuing to maintain good hygiene. With Scotland set to follow England with its own so-called “Freedom Day” on 9 August, the Forum stressed that companies should continue to adhere to standard operating procedures (SOP) to ensure maximum focus on health and safety. Rebecca Crosland, Chair of the Forum’s Health and Safety group, and Head of Health and Safety at the Building Engineering Services Association (BESA), said: “The past 15 months have been an extremely difficult period for everyone, and we have only come this far by pulling together and following the rules. This

consequence that premium rates have increased, cover has been restricted and, indeed, several insurers have left the market altogether.” The guide explains that market attitudes have changed following a number of incidents, including: ● A review of unprofitable insurance classes by Lloyds of London ● Advances in the size and complexity of the design and construction process ● Over-eating, or businesses taking on higher levels of risk

The new guidance will help ensure safety at work

spirit of collaboration and cooperation must now continue as we prepare for restrictions to be eased further, both in our professional and personal lives. “Make no mistake – COVID-19 is still a very real threat and we are not out of the woods yet. Vaccinations can only help so much and it is vital that the sector continues to be careful when it comes to health and safety. “We will still have one-metre distancing and businesses should continue to follow the SOP and domestic guidance issued by the CICV Forum until we meet with Scottish Government to discuss what action will be taken next.”

● The effects of the Grenfell tragedy, and ● A series of natural disasters globally. Len Bunton, construction consultant and co-Chair of the Forum’s Pipeline and Commercial Sub-Group, said: “The issue of PII appears to be a potentially massive problem for the industry. “This guide outlines the nature and likelihood of liability and looks at how businesses can manage their risks by identifying them, evaluating their impact and taking steps to control them.

To help further, the Forum has produced a secure site risk assessment template that can be downloaded from www.cicvforum.co.uk to help contractors plan COVID-safe working practices. It has also produced a close working checklist to help construction professionals plan for projects that involve close contact in enclosed conditions. Fiona Hodgson, CEO of SNIPEF, another leading member of the Forum, said: “Once again, we are keen to do all we can to ensure the sector follows correct protocols to stay safe at this crucial time, and this new guidance will help provide clarity and advice.”

“It offers advice on negotiating with insurers and stresses that full disclosure of risk is vital, despite the onus placed on underwriters by the Insurance Act of 2015 to ask the relevant questions of a business. “Demonstrating that you have a solid risk management culture, robust financial resources and controls, as well as providing insurers with proof and documentation of risk mitigation, internal practices, cashflow and profit margins, will all help to lower your premiums.” CABLEtalk

GOT IT COVERED SELECT also runs a bespoke PII scheme for Members, with preferential rates and sector-specific cover. To find out more, call 0117 325 0967 and ask to speak with Lewis Oliver or email select@brunelpi.co.uk. You can also get an instant quote at select.hccint.com/scheme/32379 AUGUST/SEPTEMBER 2021

13


FEATURES TYNECASTLE FLOODLIGHTS

SPIE’s Gary Meechan at Tynecastle

14

CABLEtalk

AUGUST/SEPTEMBER 2021


Pitch perfect SELECT Member business SPIE UK scored a winner when it took on the task of fitting energy efficient floodlights at Hearts’ Tynecastle stadium. The company’s UK Design Manager, Gary Meechan, describes the challenges of working on the towering structures and installing the new LED set-up, part of a £400,000 revamp of the Edinburgh ground By Tim Power

Continued on page 16 >>> CABLEtalk

AUGUST/SEPTEMBER 2021

15


FEATURES TYNECASTLE FLOODLIGHTS

T

to providing mechanical and electrical (M&E) services, our company has he spotlight was on a facilities management arm which does Heart of Midlothian a lot of work with schools in Scotland Football Club in July and other organisations, one of which when they returned was managing the Hearts stadium for to the Scottish Premier more than five years. League after “At Tynecastle, we provide QUICK FACTS a season away, planned and reactive but that was partly thanks to maintenance to the M&E the work of Gary Meechan assets within the stadium and his team at SPIE UK who as well as providing an managed the installation of electrician on standby for new LED floodlights at the each of the games to deal Tynecastle ground. with any emergencies, and The famous old stadium a back-up generator for had undergone a £400,000 UEFA regulation games. renovation programme to “More recently, our Asset welcome Jambos fans back Condition team has worked to the new season and a large with the Hearts Stadium SPIE UK part of that included the Manager to carry out BASED: essential replacement of surveys throughout the Glasgow the halogen floodlights. ground covering M&E assets PHONE: SPIE UK, a technical as well as fabric-related 0141 613 7400 engineering solutions provider areas such as steelwork, WEB: for the built environment and roofing and internal finishes, spie.org subsidiary of SPIE, the to help provide the football independent European leader club with budgetary and for multi-technical services in cash flow projections. the areas of energy and communications, “Thanks to our successful was invited to tender for the contract to relationship with the football club replace the floodlights as it already and the technical expertise we have provided facilities management (FM) provided them, Hearts also asked us services to the Edinburgh club. to tender for the pitch floodlights that Glasgow-based SPIE UK Design needed to be replaced.” Manager Gary explained: “In addition SPIE UK also has a long working >>> Continued on from 15

* 800 lux Average Eh, 0.5 Uo (U2), 0.4 Min/Max (U1) MF = 0.90

The new LED lights will cut costs and carbon emissions

Halogen lamps have been replaced with new LEDs

relationship with Signify (formerly known as Philips Lighting) so they partnered with this world leader in lighting solutions on the Tynecastle contract to replace the old halogen lamps with an energy efficient LED lighting system. The new lighting system comprises 14 Philips ArenaVision LED gen3.5* 800 lux luminaires mounted on the headframe of each of the floodlight

DID YOU KNOW? National and international football governing bodies provide floodlighting regulations to clubs to ensure pitch lighting meets the standards for safety and performance. However, for clubs playing in the English Football League, Premier League, Scottish Premier League and Cymru Premier, the floodlighting standards are set by UEFA so that additional considerations for broadcasting can be taken into account. In addition, European standard BS EN 12193:2018 also presents recommendations and requirements for sports lighting. Source: https://bit.ly/3xiTuYV

16

CABLEtalk

AUGUST/SEPTEMBER 2021


SCHOOL FLOODLIGHT PROGRAMME While the Hearts contract was Gary’s first major lighting project for a football club, he is not finished with floodlights quite yet. SPIE UK, as part of its schools FM contract, will be partnering again with Signify to replace the

stanchions at each corner of the pitch. These 14 luminaires are arranged in two rows of four, plus three rows of two, and conform with Scottish FA 800 lux Eh Gold criteria. There is extra space available on each headframe for more lux to be added at a future date to increase the level to UEFA Level B criteria. The new Philips LED floodlights will give Hearts a big reduction in running costs and provide a much more efficient system, which should save the club more than 34,000 kilos of CO2e each year, resulting in an energy saving of circa 78%, as the original 56 halogen lamps in each of the four floodlight arrays have now been replaced with just 14 long-life Philips ArenaVision LED luminaires. Describing his role on the project, Gary said: “Although I’m designated as a Design Manager, I’m an electrician by trade so my role early on in the contract was to liaise with Signify to

lighting at a number of school football pitches around Scotland. Gary said: “As part of this contract we will be replacing the school football pitch lights in the same vein as we did at Hearts but obviously not to the same magnitude.

develop a system to ensure the new floodlight installation was compliant with Scottish FA floodlight regulations and UEFA regulations for potential European games in the future.” The floodlight array headframes have been retained on the existing floodlight support stanchions, so Gary’s team was responsible for the installation of the new Philips light fittings with their associated drivers; the drivers providing a regulating buffer between the current source and the high output lamps, making them less vulnerable to electrical overload. In addition to the installation of the lights, the team also took the opportunity to re-engineer the power and wiring infrastructure for the floodlights as Gary explained: “Hearts originally had a low-level power unit in each of the floodlight support stanchions, which contained all remotecontrol gear. We decided to change the strategy because it was more efficient to have the distribution board at a higher level and feeding into the fittings locally as opposed to running loads of separate circuits up the side of the stanchion as they had previously done. “So we have installed new distribution boards up on the top gantry of the stanchion local to the floodlights, some 60 feet above the ground, which then

“Owing to the high voltage load on the lamps, we decided to only put three lamps on a single circuit”

“The school floodlights comprise around 12 light fittings per stanchion to produce around 200 lux of illumination for football, but for those pitches which are also used for hockey they will require a higher level of illumination.”

David and Tom inspect the stadium’s floodlights

feed into the new light fittings. Owing to the high voltage load on the lamps, we decided to only put three lamps on a single circuit. “We’ve installed four-way TP&N 100A distribution boards in each stanchion, which essentially means you have 12 circuits, so we have three light fittings per circuit at 32A per supply. We also installed remote switching in the ground’s control room to provide 50% and 100% power options. “The previous 56 halogen lights per floodlight array used to fill most of the Continued on page 19 >>> CABLEtalk

AUGUST/SEPTEMBER 2021

17


FEATURES TYNECASTLE FLOODLIGHTS

DID YOU KNOW? ● Hearts was formed in 1874. ● The club’s name was influenced by Walter Scott’s novel The Heart of Midlothian. ● The club crest is based on the Heart of Midlothian mosaic on the city’s Royal Mile ● Hearts originally played at the Meadows, Powburn and Powderhall before moving to the Gorgie area of Edinburgh in 1881. Tynecastle became their home in 1886. ● The Edinburgh derby with Hibernian first took place on Christmas Day in 1875 in a challenge match. Hearts won 1-0 in what was Hibs’ first ever fixture. ● Tynecastle has a seating capacity of 20,099, which makes it the sixth-largest football stadium in Scotland. Source: https://spfl.co.uk/news/10-things-about-hearts

“We decided to change the strategy because it was more efficient to have the distribution board at a higher level and feeding into the fittings locally” 18

CABLEtalk

AUGUST/SEPTEMBER 2021


>>> Continued on from 17

lighting rig but the new 14 replacement LED light array now only fills about half of this, which helps to give Hearts flexibility going forward. With the installation of the 100A distribution boards, and extra space on the floodlight gantry, it effectively future-proofs the stadium. This allows for any ‘bolt-ons’, such as if they require more illumination because of new regulations or, for example, to incorporate specialist lights and management software to host light shows like other large clubs put on.” Working closely with the SPIE FM team, Project Manager Tom Crockatt supervised the team, who were under pressure to complete the three-month project in time for the start of the 2021/22 Scottish Premier League season in late July. Once Signify had delivered the lights to the ground, the team used Hearts’ mobile elevating work platform (MEWP) to load the lights and drivers onto the top gantry of each floodlight stanchion for installation. Tom explained some of the challenges of the work: “Obviously, working at height meant that harnesses were required to maintain the safety of our operatives and tool lanyards were used to minimise risk, but we also had to make sure the areas around the base of each tower were barriered off to ensure the safety of Hearts staff and other contractors. “The big job was to bolt the lights –

David and Tom at work on the lights

which, with their drivers, weighed about 32kg – to the existing headframe with M20 marine-grade bolts and nuts following the manufacturer’s installation guidelines, and also install the distribution boards on each of the stanchions, which were supported on Unistrut channel bolted to the structure.” Electrical Supervisor David McCann described the cabling work involved. He said: “We also had to run armoured cabling to and from the distribution boards to junction boxes located beside the lamp drivers, where cable type changed to rubber for final connection to drivers and flood lights. “The existing infrastructure cabling was used from the main switch room to the incoming supply cubicle on each stanchion tower, and, as part of

upgrading the existing installation, new main switches, control contactors and isolators were installed. Then the complete system was tested and certificated.” While the team enjoyed panoramic views across Edinburgh and the surrounding countryside, the working conditions were sometimes challenging, as Tom explained. “The weather conditions were not always favourable, but they did not delay the works,” he said. “High winds would have had an impact but thankfully we did not encounter any during the work.” Another challenge was working together with the Hearts stadium team while observing COVID-19 regulations. Tom said: “COVID has had to be part of our working regime for some time now and our operatives are very mindful when working in client’s properties and alongside other contractors. The benefit to this project was that 90% of it was outside, so it was easier to deal with in terms of social distancing.” The team finished the installation work on Friday 18 June and Signify returned on-site on 30 June to set up the precision aiming points across the pitch, with SPIE UK engineers assisting with the adjusting and final settings of the floodlight angles. Looking back on the project, Gary is pleased with the way it has gone. He said: “The big challenge for the team was taking the old halogen lights down because you’ve got 56 fittings per stanchion – that’s 224 lamps that have to be removed and replaced with 56 new ones and also fitting new distribution boards into the centre of the stanchions on the gantry. However, it went fairly seamlessly, and our team received positive feedback from the client.” Tom added: “It was a pleasure to be involved in this rewarding project and be a part of the successful outcome, which will provide the client with ongoing cost and energy savings to help reduce the club’s carbon emissions. As a company, we have had a long-standing relationship with Hearts and wish them every success for the future.” Images: Mike Wilkinson and Richard Campbell Commercial Photographers Network CABLEtalk

AUGUST/SEPTEMBER 2021

19


FEATURES BUILDING SAFETY GROUP HUB

S

ELECT Members can now enjoy an expanded range of health and safety advice, podcasts and practical tools thanks to our ongoing partnership with the Building Safety Group (BSG). BSG has recently updated its online Hub, launching an extensive variety of health and safety toolbox talks and enhancing its comprehensive range of risk assessments. It has also published a range of guidance to help Members prepare for potential COVID-19 inspections and spot checks by the Health and Safety Executive (HSE). Members who are registered with the BSG Hub can now access this new wealth of content absolutely FREE to help them stay compliant and safe in all areas of their business. Dave Forrester, Director of Technical Services at SELECT, said: “These new additions to the BSG Hub cover all aspects of health and safety and will provide even more fantastic help for our Members. “If you haven’t done so already, I would recommend signing up to the Hub to take advantage of its many easy-to-use and flexible benefits.”

Toolbox talk podcasts

A series of BSG toolbox talk podcasts has been uploaded to the Hub, with short information resources available to view on YouTube. There are a wide range of topics to choose from, including: ● Health and welfare – including first aid, PPE, hazardous substances, dust and fumes, noise and vibration, manual handling, health and safety law, design and management regulations ● General safety – including site organisation, fire prevention and control, temporary works, work equipment and hand-held tools, site transport safety and lifting operations and equipment ● High-risk activities – including working at height, excavations, underground and overhead services, confined spaces and specialist activities 20

CABLEtalk

AUGUST/SEPTEMBER 2021

Safe and sounds

Get advice on a huge range of health and safety issues with a new series of podcasts on BSG Hub ● Environment – including environmental management and waste management. Members can access them by logging into the Hub and selecting ‘BSG InTel’ > ‘BSG Information Videos & Podcasts’ > ‘BSG Tool Box Talks’.

Enhanced risk assessments

A number of enhancements have also been made to the Hub’s functionality and user experience, including: ● Task-based risk assessments – users now have the option to build task-based risk assessments so multiple hazards can be included and assessed for one job. This will save Members a considerable amount of time when risk assessing larger projects.

● COSHH assessments – new ‘Location of use’ options are now available for ‘Outside’, ‘Inside – well ventilated’, ‘Inside – poorly ventilated’ and ‘Confined space’. A ‘Method of use’ box is also available so users can provide a description of how the substance is applied. ● Method Statements – a new ‘Plant or Equipment’ field has been added to the module.

Spot checks and inspections guidance

The final new feature has seen BSG update its guidance to help Members ensure they are COVID secure ahead of potential spot checks and inspections. The HSE is currently visiting all types


NEW TOOLBOX TALK PODCASTS Health and welfare ● General health and wellbeing ● First aid ● Needlestick injuries ● Skin protection ● Sun protection ● Leptospirosis (Weil's disease)

General safety ● Site set up and security ● Slips, trips and falls (housekeeping) ● Material storage ● Safety signs ● Fire ● Compressed gases ● Petrol, diesel and LPG

High risk activities ● Working at height ● Fragile roofs ● Ladders and stepladders ● Low-level access equipment (trestles, podiums and hop-ups) ● Working on scaffolds

Environment ● Being a good neighbour ● Environmental nuisance ● Wildlife

● ● ● ●

● ● ● ●

Drugs and alcohol Mental health Work-related stress Welfare facilities, including personal hygiene Personal protective equipment Eye protection Respiratory protection COSHH

● Asbestos ● Lead, lead paint and lead dust ● Dust and fumes (Respiratory hazards) ● Silica dust ● Noise ● Hand-arm vibration ● Manual handling ● Legal duties ● CDM Regulations

● ● ● ● ●

Temporary works Plant and equipment Abrasive wheels Diamond blades Cartridgeoperated tools ● Gas-powered tools ● Woodworking machines ● Portable, hand-held electrical tools

● Mobile plant ● Lifting operations ● Site transport and pedestrian segregation ● Signallers and slingers ● Lifting equipment and accessories ● Hoists and hoist towers

● Mobile access towers and access equipment ● Mobile elevating work platforms ● Personal fall protection equipment ● Working over safety nets or soft-landing systems ● Excavations ● Overhead services

● Underground services ● Confined spaces ● Road and street works ● Piling ● Trackside safety ● Demolition safety ● Hydro demolition ● Steel erection ● Water jetting

● Emergency spill control ● Cement, concrete and plaster ● Pumping, overpumping and washing down plant

● Fuel and oil ● Energy and water efficiency ● Invasive plants ● Working around trees and hedgerows ● Waste

of businesses to ensure they are complying with guidelines, with failure to participate potentially leading to enforcement action. To help Members, BSG has therefore published a range of guidance which includes: ● 713 Coronavirus Hard Copy Risk Assessment ● BSG COVID-19 Office Risk Assessment ● Ventilation and air conditioning during the coronavirus. All of the documents can be downloaded from the hub in the Health & Safety Documentation/ Coronavirus COVID-19 section. John Puck, Membership Development Officer at BSG, said: “These new Hub resources are designed to help SELECT businesses of all sizes, with a variety of functionality available all on one screen. “We hope SELECT Members will find them useful, and will continue to review and refine our Hub services to keep pace with the latest health and safety developments.” The new updates follow the success of BSG’s popular online risk assessments, which are now used by more than 180 SELECT Member businesses. More than 115 different types of assessments are available – including electrical tasks first and second fix and test and commissioning – with each template pre-configured with its own set of unique control measures relevant to the hazard being assessed.

i

HOW TO REGISTER To register for the Hub, go to www.bsgltd.co.uk/bsgsoftware-registration

HOW TO LOG IN To access the BSG Hub, go to hub. bsgonlineservices.co.uk/login.phtml and log in with your email address and password, which should be your membership number. If you tick the ‘Remember Username’ box you won’t have to log in again. HELPLINE SELECT Members can also access BSG’s health and safety telephone advice support centre five days a week during office hours by calling 0300 304 9099. CABLEtalk

AUGUST/SEPTEMBER 2021

21


FEATURES LOCAL AUTHORITY FORUM

By Yvonne Wilson Specifier and Client Relations Manager

H

ousing associations, universities and NHS estates are all being invited to share their knowledge as SELECT expands the remit and membership of its influential Local Authority Forum. The expansion – which will help the Forum deliver its collective expertise and experience to an even wider audience – is reflected in dynamic new branding and a new name, with the collective being retitled the Local Authority & Client Forum. As the industry moves to a future based on electricity, the revamped Forum will now continue to foster and encourage a unique support network with even more professionals, sharing electrical best practice and identifying key areas of concern. The expansion will also help drive improvements in service delivery mechanisms and the effectiveness of operatives through a consistent approach to working and

22

CABLEtalk

Working together for change SELECT has significantly widened its influence among key stakeholders by expanding the Local Authority Forum, with a new name and logo to reflect the range of organisations now being invited to take part the standardisation of documentation across all Forum members. Alan Wilson, Managing Director of SELECT, said: “We have played a leading role in the Forum since it was established in 2007, allowing councils and housing associations across

AUGUST/SEPTEMBER 2021

Scotland to come together to share experience, develop ideas and resolve common issues. “The expansion of the Forum to now include non-local authority members will leverage the combined skills of its participants to promote

a shared approach to maintaining excellence in electrical standards. “This is another encouraging sign that the electrical industry in Scotland is emerging stronger and more focused from the pandemic, and demonstrates our ongoing commitment to


Andy Graham from Fife Council is Forum Chair

Local Authorities

Housing Associations

Universities

NHS Estates

a spirit of collaboration and cooperation.” Forum Chair Andy Graham, who is also Housing Services Business Change Manager at Fife Council, said: “Since its inception, the Forum has helped local authorities to consistently deliver best value, which is a critical aspect of operations. “By widening its remit, we propose to embrace a new cohort of key stakeholders and build a new network of partnerships where people are willing to share their knowledge and expertise for the benefit of others.” A second group, which was established in 2010 for electrical engineers, has also been expanded and will be known as the Local Authority Engineers & Client Forum, with both groups meeting regularly via digital platforms. Andy added: “Before COVID-19, the Forum met quarterly at The Walled Garden, with informative and engaging discussions. This

effort has been maintained through virtual meetings on an impromptu basis. “This ongoing commitment shows there is an appetite for sharing ideas and helping each other.” An article in CABLEtalk in February outlined the role and aims of the Forum, which includes improving service delivery mechanisms and the effectiveness of operatives. Alan added: “The experience gained by the Forum so far will prove invaluable as we share ideas and expertise even wider, helping even more organisations deliver best value and best practice on a consistent basis.” To find out more about joining the Local Authority & Client Forum or Local Authority Engineers & Client Forum, email Yvonne Wilson at yvonne.wilson@ select.org.uk

i

CABLEtalk

AUGUST/SEPTEMBER 2021

23


FEATURES INFLATION & AVAILABILITY

Managing the materials risk Our in-house specialist responds to an issue currently impacting the industry and offers some timely advice for Members facing ongoing uncertainty over supplies and cost

By Professor Rudi Klein Barrister and SELECT Consultant

A

while ago, I happened to be talking to a mechanical services contractor who had bid for some work back in November 2020. At the time, the

price of copper was £4,500 per tonne, yet when he was awarded the contract and started work six months later, the cost had doubled. Since he’d bid on a lump sum price as usual, he was forced to take the hit. From recent feedback, I know that SELECT Members are facing concerns over the same issues, so I thought it might help to set out some advice in this easy-to-follow table. Feel free to cut it out and stick it on your office wall so your options are always in plain sight! I’ve also prepared further Memberonly guidance about materials in two

BIDDING STRATEGIES

Watch no w In his first new film, Rudi offers bit.ly/ST at Vexclusive guidance on bidding matbid strategies, including the risk of lump sum bidding, getting suppliers on side, creating separate contracts for installation and materials, pricing and stockpiling of materials, and what to do when quoting for domestic jobs.

videos which you can access via the excellent SELECT TV resource. Details are below. And don’t forget – forecasters are saying that material price hikes and shortages are likely to last well into 2022. So if you’re having problems, let SELECT know. We’re always here to help. GOT A QUESTION FOR RUDI? If you have a query you would like Rudi to help with, please email iain.mason@select.org.uk

CONTRACTUAL STRATEGIES Watch no In his second film about w bit.ly/ ST at material price increases, Vmatcon our in-house expert gives an overview of the risks associated with existing contracts, addressing potential issues in future contracts, fluctuations clauses and identifying problem clauses in your SBCC and NEC contracts.

WATCH ALL OUR EXCLUSIVE MEMBER VIDEOS AT BIT.LY/SELECT-TV 24

CABLEtalk

AUGUST/SEPTEMBER 2021


MATERIALS INFLATION & SHORTAGES: MANAGING THE RISKS ACTION

COMMENTARY

Review all your current and future jobs to assess risks arising from the price hikes/ lack of availability

Unless you have a clear oversight of existing and likely risks you are not in any position to manage them effectively

Stay close to your suppliers/distributors

Always keep your communication channels open to suppliers/distributors. Ensure they have knowledge of your long-term needs and ask them to give you early warning of problems. Forewarn clients/customers of likely problems

Maintain adequate stocks of commonly used materials/components

Self-explanatory

If you are ordering materials/ components well in advance of commencing work, seek an advance payment or at least insist that they be included in your first payment

You are likely to be asked to provide a vesting certificate. This simply indicates where the materials are located, that they are ensured and that they are held to the order of the client/customer. You may be asked for an advance payment bond if you want early payment

If you are submitting a lump sum bid, make sure that your price remains open for acceptance over the shortest possible time

You could also consider making the price conditional on work commencing within a certain period following award of contract/subcontract

One option – if at all possible – is to submit a price for the work, leaving the prices for materials/components to be determined on delivery

You will need to make clear that the materials prices will be based on their actual cost to you plus a stated percentage uplift to cover overheads and profit

Consider having two contracts – one for work and the other for supply of the materials/components

The materials contract can include a price adjustment clause

When doing domestic work, it is likely to be easier to include a price adjustment clause

You will need to bring to the householder’s attention that your price could be increased in line with any upward movement in materials prices

When working for a householder, make sure you warn of possible material shortages and delays

Reserve a right to substitute other suitable materials. Go to SELECT’S website for the relevant amendments to SELECT’S standard domestic contract

When you have existing lump sum contracts, you may be able to pursue options to mitigate price hikes/delays in obtaining materials

Always notify the other party as soon as you become aware of issues affecting your performance of the contract. NEC contracts, for example, have risk management provisions. These enable you to give early warnings of matters affecting contract performance. You can have early warning meetings with relevant parties (including suppliers) to mitigate the risk. Across all your contracts you may be able to seek a design change (or change in specifications) to enable you to substitute alternative materials

Consider addressing the risks in your future contracts

It’s rare to have price adjustment clauses (or fluctuations clauses) in construction contracts. But there are optional clauses in both SBCC and NEC contracts which cater for increases in prices for labour, materials and fuel. Given the current uncertainty you should try to negotiate a price adjustment clause. Delays/availability of materials are more problematic since you are unlikely to have a right to an extension of time. Consider the other options in this chart such as the above action CABLEtalk

AUGUST/SEPTEMBER 2021

25


FEATURES FAIR WORK CONVENTION

Working for a fairer future The Fair Work Convention was set up in 2015 and is improving conditions in the construction industry with a special inquiry group focused on the sector – so how is it making a difference to Member businesses? It’s separate from government but has very strong links to it and acts as an independent advisory body to Scottish ministers. It has five dimensions: respect, fulfilment, security, opportunities and an effective voice. These are the factors that are required to make sure Scotland is a good and fair place to work and they want to achieve these by 2025.

How are you involved?

By Fiona Harper Director of Employment and Skills, SELECT What is the Fair Work Convention?

The Fair Work Convention (FWC) was created six years ago and is a collaboration between groups including trade unions, employers and academics.

26

CABLEtalk

Last year the FWC launched the Construction Industry Inquiry Group to look at issues within the sector and I’m a member of this group through my role as The Secretary of the SJIB. The FWC’s five dimensions are the same objectives that are in the SJIB agreement – there’s a slight difference in emphasis and language, but the ethos is there. The SJIB agreement is now 50 years old but it’s withstood the passage of time.

AUGUST/SEPTEMBER 2021

It embraces those same dimensions as the FWC and that’s why we got involved. They’re also interested in what our part of the industry does. Construction often gets a bad press but electrical contractors and electricians are viewed by many as the elite – and that’s where we should always aspire to be.

What are some of the issues the inquiry group has looked at?

Procurement is one the of the issues. It’s difficult to see a clear path to resolve this aspect of the sector because we’ve got to deal with issues such as retentions and low value tendering which the current procurement models don’t help with. It’s interesting to see the work that Alan Wilson, SELECT’s Managing Director, has done, as well as others


“It’s about raising standards and creating the sort of industry in which people want to work” like Len Bunton and Rudi Klein, in terms of project bank accounts and retentions and how it all connects with procurement and how that in turn connects with the employment package. It’s also looked at disputes and how to manage them. We have a very mature disputes process which works well but that might not be so true in other sectors within the construction industry. Again, it’s related to the five elements and how to make sure things are fair and equitable. We have a great mix of voices and that gives us a range of different perspectives on the issues. I think everyone there has learned a lot from what they’ve heard and it’s helped them to look at things in a different way and get a better and more multifaceted understanding.

Why is the inquiry group important?

It’s about raising standards and creating the sort of industry in which people want to work. I’ve worked on sites and I can remember times when the mud was so bad you’d lose your boots in it. On days like that all you want to do is get somewhere

warm and dry, and that’s why it’s so important to have the right facilities and to raise standards. You hear stories about people being bullied and harassed in construction and we need to find ways of changing that. Diversity is another issue, and we need to get more women and different ethnicities interested in the industry. Construction also has quite a lot of issues with mental health. The electrical industry is doing a good job with this but these are aspects we need to look at as a whole industry. If we can make it a great place to work, then it will keep the talent pool flowing into the industry.

Why is it relevant to SELECT Members?

The FWC’s work connects with their desire to regulate and

protect the title of electrician. It’s helping to build that reputation, end bad practice and to be the type of sector that construction aspires to be. It puts them at the heart of the decision-making process. It’s also got the potential to improve things around procurement and contracts. If contracts are packaged in such a way that more of our members can bid for them, then that’s good for them and the economy as a whole. Electrical employers are some of the best. They take pride in their work, they pay their people well and there’s a sense of respect because it’s a highly skilled workforce. We’re a great example but there’s always something more you can learn and always something that can be improved. There’s no complacency and it’s a great way of refreshing things.

How can SELECT Members find out more?

The inquiry group’s report, with all its recommendations, is now being written and it will be published in autumn. In the meantime, you can find out more about the work of the FWC and read its manifesto at its website, fairworkconvention.scot

CABLEtalk

AUGUST/SEPTEMBER 2021

27


We’re on a journey to become the trades’ most trusted destination for electrical and ironmongery products

Our promise to you Trusted to deliver what you need, when you need it Trusted to deliver quality service Trusted to deliver quality products Trusted to deliver stress-free shopping Whether you’re working on a large project, complete retrofit, or a smaller, urgent repair, we have over 28,000 products in stock to meet the different demands of each job, all with flexible delivery options that work around you. It’s why thousands of customers shop with ElectricalDirect and IronmongeryDirect every single day.

0808 168 22 77 ElectricalDirect.co.uk 28

CABLEtalk

AUGUST/SEPTEMBER 2021

0808 168 28 28 IronmongeryDirect.co.uk


FEATURES IET ANNIVERSARY

Making a difference for 150 years 1871

● The Society of Telegraph Engineers (STE) is founded on 17 May

1872

● The first Ordinary Meeting of the STE is held on 28 February ● The Society’s first journal is published ● Sir Charles Siemens elected as first STE President

1878

1882

● Sir William Preece demonstrates Edison’s phonograph – the first demonstration in the UK

● The first Wiring Regulations published as Rules and Regulations for the Prevention of Fire Risks arising from Electric Lighting

1883

● The STE&E is registered under the Companies Act

1884

● The Vulcanic Society is founded, later the Junior Institution of Engineers

1881

As the Institution of Engineering and Technology (IET) celebrates a famous birthday, we look at some of the major milestones in its history...

1873

● The STE Honorary Fellowships are first awarded. ● Willoughby Smith presents a paper on the photoconductivity of selenium – technology which led to early television cameras and solar cells

1874

● Sir William Thomson, later Lord Kelvin, becomes President of the STE

1875

1877

● Sir Francis Ronalds bequeathes his library of rare books and pamphlets to the STE, forming the core of the Library collection

● Alexander Graham Bell presents his paper Researches in electric telegraphy

● The STE changes its name to the Society of Telegraph Engineers and of Electricians (STE&E)

1885

● Sir Joseph Swan presents a paper on The subdivision of the electric light (i.e. incandescent lamps for interior lighting)

1887

1892

● First Student meetings held

1889

● The STE&E changes its name to the Institution of Electrical Engineers (IEE)

1890

● The IEE Benevolent Fund is established

1892

● Nikola Tesla gives a lecture on ‘Experiments with Alternate Currents of High Potential and High Frequency’ – this was so popular it was held at the Royal Institution to allow more members to attend CABLEtalk

● The first scholarship is founded as the Salomons Scholarship, from a bequest by Sir David Salomons

Continued on page 30 >>>

AUGUST/SEPTEMBER 2021

29


FEATURES IET ANNIVERSARY >>> Continued from page 29

1900

1899

1898

● Science Abstracts is first published, later the basis of IET Inspec

1899

● Hertha Ayrton becomes the first woman member of the IEE (also the first woman to present a paper to the IEE)

1941

1948

● Coat of Arms granted to the IEE

1953

● Elizabeth II becomes Patron of the IEE

● The IEE hosts a convention on radiolocation, the first to discuss wartime developments in radar and radiolocation

● Honours graduates in physics made exempt from the IEE membership exam

1961

● British Institution of Radio Engineers (later the IERE) is granted its first Charter

Graphic adapted by kind permission of the IET. For further details about its work, please go to www.theiet.org

30

CABLEtalk

● Inspec reaches 20 million records

2021

● The IET celebrates its 150th anniversary

● The IEE Post-War Planning Committee on Electrical Installations begins work – it later publishes a report recommending the three-pin plug and ring circuit

1946

1960

2020

● The Northern Society of Electrical Engineers merges with the IEE and forms the Manchester Local Section

● The first Local Sections are established in Newcastle, Glasgow, Dublin and Cape Town in South Africa ● Guglielmo Marconi gives a lecture on ‘Wireless Telegraphy’ – it is so popular it is repeated at Exeter Hall

● The IEE endows a five-year Chair of Electrical Engineering at the University of Cambridge

1962

IEE membership reaches 50,000

1963

IEE is registered as a charity

1965

● Electronics Letters is launched

2018

● IET Volunteer Core Value Awards are launched

2019

● The Present Around the World competition goes online, widening global access

AUGUST/SEPTEMBER 2021

1944

1966

● IET Guide to Electrical Installations in Medical Locations is published ● 40-year anniversary of the IET Young Woman Engineer of the Year Awards ● Gender Diversity Ambassador Award launched

● Recording past Faraday Medallists and Honorary Fellows begins.

1936

● George VI becomes Patron of the IEE

1967

● The IEE acquires its first computer ● Charles Kao and George Hockham publish their paper on fibre optics in the Proceedings of the IEE

2017

1934

● First IEE book is published

1969

● Inspec is established ● CEI examinations replace IEE examinations

2015

● Naomi Climer becomes first female IET President ● The IET Volunteer Medal is launched

2016

● Savoy Place officially reopened by HRH The Princess Royal after a major refurbishment

2013

● IET Achievement Medals are launched, amalgamating previous medals into five annual awards for excellence ● First scholarship established ● Apprentice and Technician of the Year awards launched


1914

● The IEE Library starts lending books to members

1908

● The IEE purchases a lease for the Medical Examination Hall, Victoria Embankment, which becomes Savoy Place ● First Kelvin Lecture held

1928

● A joint meeting with the American Institute of Electrical Engineers is held via transatlantic wireless telegraphy

1912

● The Associate Membership examination is established (the first exam is held in 1914)

1925

The Institute of Wireless Technology is founded, later the Institution of Electronic and Radio Engineers

1971

● The IEE celebrates its centenary

1976

● IEE set up a committee to consider the education and training of Chartered Electrical Engineers

● IEE accredits first undergraduate degree course

2012

● IET Code of Practice for Electric Vehicle Charging published ● IET FIRST® LEGO® League launch in UK ● Wiring Regulations Digital go live

2011

● The Wireless Section is established as the IEE’s first separate technical group ● Regulations for the Electrical Equipment of Ships is first published

1921

● The IEE is granted a Royal Charter ● George V becomes Patron of the IEE ● The Institution of Production Engineers is founded, later the Institution of Manufacturing Engineers

1924

● The term Chartered Electrical Engineer is approved for members of the IEE ● First National Certificates and Diplomas in Electrical Engineering set up by the IEE and the Board of Education

1987

● IEE merges with the Institution of Electronic and Radio Engineers

1991

1980

1919

● IEE merges with the Institution of Manufacturing Engineers

● Requirements for medical locations fincluded in BS 7671 Requirements for Electrical Installations (IET Wiring Regulations)

2007

● The Mark Sargeant Career Achievement Medal for Young Professionals is launched

2008

● IET Faraday Challenge Days launched

1922

● Ernest Rutherford gives the Kelvin Lecture on ‘Electricity and Matter’ ● Faraday Medal first awarded to Oliver Heaviside

1923

● First Faraday Lecture is held as a travelling lecture aimed at the public

1997

1992

● Austin Court in Birmingham opened ● US office in Edison, New Jersey, opened

● Mountbatten Medal established by the National Electronics Council ● The IEE Wiring Regulations are adopted by the British Standards Institute as BS 7671

2006

● India office in Bangalore opened ● The IEE and IIE merge to form the Institution of Engineering and Technology (IET) ● The first edition of E&T magazine is published ● IET Skills Survey launched

2001

● The Institution of Incorporated Engineers (IIE) is granted its first Charter

2005

● China office in Beijing opened

CABLEtalk

2005

● Engineering Open House Day launched

AUGUST/SEPTEMBER 2021

31


FEATURES THE WALLED GARDEN

By John McGhee Director of Finance & Resources, SELECT

SELECT’s HQ has a bright new look after an energy efficient upgrade carried out by Thorn Lighting

Our HQ has received a lighting upgrade

W The light hen SELECT required an upgrade for the lighting at its HQ, former association president and experienced electrical contractor John Noble invited Thorn Lighting to provide an energy efficient solution. Working on a brief to modernise the spaces and take into consideration daylight levels, a variety of luminaires have now been fitted in the entrance foyer, main office, car park and subsidiary offices at The Walled Garden. The main challenge for the responds to presence/absence lighting design, was to provide detection and the amount a new dimmable solution in of daylight in the space. a continuous row system No new wiring points were without introducing any required for the lighting additional wiring. The design as all the existing chosen solution was points were utilised by Thorn’s IQ Wave John and his team, who suspended continuous carried out the work. John Noble luminaires with integral IQ Wave suspended LED through wiring, dimming gear luminaires have now provided and mini sensors. the optimum solution in the main IQ Wave is an intelligent lighting office by offering a seamless lighting system with integral controls that solution with clean, flowing lines.

fantastic

32

CABLEtalk

AUGUST/SEPTEMBER 2021

The new system saves energy


For more images see CABLEtalk magazine.com

“Thorn has helped to create an improved working environment as our teams return to the office”

Incorporating Thorn’s patented MV Tech Optic the luminaire allows for excellent uniform light distribution and glare control UGR<19 and is available in 3000K/4000K colour temperature, CRI>80, with a lifetime of 50,000 hours. Up to 40% energy saving is achieved with the MWS Microwave Sensor for presence detection and with the HFSX Dual Sensor up to 70% energy saving is achieved, while the integrated sensors allow flexible lighting control. Thorn’s ability to achieve an optimum lighting solution in the main office also allowed for a full package offering for the other spaces at SELECT HQ. To create a consistent look throughout the building, IQ Wave recessed LED luminaires were installed in the back office spaces, focusing on intelligent controls, optics, design and installation. The IQ Wave recessed luminaire incorporates Thorn’s unique MV-Tech light optic and has a highly reflective back, creating a smooth, homogenous illuminance with no visible LED. The low glare (UGR 19, <3 000 CD/m2 at 65°) also ensures a comfortable ambient light while the high efficacy Road lanterns illuminate the car park

(>100Llm/W) achieves significant energy savings in comparison to traditional light sources. Lightweight Chalice 200 LED2000 downlights now illuminate the main entrance foyer at SELECT HQ. With an IP44 rating as standard, this delivers an efficacy of >100Llm/W and a low maintenance lifetime of 50,000 hours. Thorn’s R2L2 road lanterns also now illuminate the car park at The Walled Garden. The super-efficient solution achieves up to 153lm/W, with the R-PEC optic offering 15 types of light distribution for precise light placement with no waste light. R2L2 also provides maximum energy savings with a wide range of intelligent lighting control solutions from standalone dimming to full remote control via central monitoring system. All the luminaires were selected for their high quality and advanced functionality and were simple for John and his team to install in all locations around SELECT HQ. We are delighted with the results and thanks to their great lighting quality and high user comfort, Thorn has helped to create an improved working environment as our teams continue to make a phased return to the office. Images: Niall Hastie Photography.

CABLEtalk

AUGUST/SEPTEMBER 2021

33


TRAINING NEW COURSES

By Jenny Cryans Training Manager

T

he future is electric – and we want to continue equipping Members with the skills and know-how to successfully work with the next generation of technology. That’s why we’re excited to be adding to our range of training courses with two new modules in smart homes and drone surveying. Held in partnership with our friends at West College Scotland (WCS) in Paisley, Renfrewshire, they’ll help give Members an insight into both topics and understand more about how the technology of tomorrow works. Exact details and costs are currently

Moving with the times As part of our mission to help Members keep pace with the latest technology, we’re currently preparing to launch new training courses in smart homes and drone surveying

being finalised, but we hope to launch both courses later in the summer in line with COVID-19 health and safety guidelines. Watch this space! Smart homes will be the focus of one course

34

CABLEtalk

AUGUST/SEPTEMBER 2021

Smart homes course

This course is designed to give learners an insight into the benefits of using smart controls for heating, lighting and power circuits in buildings. Focusing specifically on Lightwave and Salus products, it will lead learners into the Lightwave Pro Installer program. It will also integrate voice assistants such as Alexa, Google Home and Apple Home Kit, as well as using tablets and smart phones to both program and activate the devices and routines. Structured to maximise participant engagement, the course uses a blend of lectures, video presentations and practical hands-on demonstrations. Learners will be able to add additional products on to existing systems, program them in and develop programmes, as well as


OTHER UPCOMING SELECT COURSES BS 7671 TRAINING

DURATION

VENUE

1 & 1/2 days

SEPTEMBER

OCTOBER

Online (Day 1) & 24 & 25 Edinburgh (Day 2)

13 & 14, 28 & 29

19 & 20

1 & 1/2 days

Online (Day 1) & Aberdeen (Day 2)

1&2

2 days

Online (Day 1) & Edinburgh (Day 2)

7&8

2 days

Edinburgh

22 & 23

218 Requirements for Electrical Installations

1 day

Online

19, 25

1, 8, 16, 21, 27

7, 14, 21, 27

HEALTH & SAFETY TRAINING

DURATION

VENUE

AUGUST

SEPTEMBER

OCTOBER

102 ECS Health, Safety & Environmental

1 day

Online

28

12, 26

217 Safe Isolation

1/2 day

Online

20

221 Emergency Lighting

1 day

Online

21

222 The Electrotechnical Site Safety Assessment (TESSA)

1 day

Online

24, 31

2, 9, 14, 15, 30

13, 19, 28

TECHNICAL TRAINING

DURATION

VENUE

AUGUST

SEPTEMBER

OCTOBER

207 In-service Inspection & Testing of Electrical Equipment

1 day

Online

26

216 Scottish Building Standards

1 day

Online

209 Initial Verification

214 Inspection & Testing (including periodic inspections)

switching routines. They will also be issued with notes and documentation on the various products, which they can work on further after the course. No home study is required and the course lasts one day, from 9am to 4.30pm. There is no formal exam and no entry requirements, although it is recommended that learners have, or are working towards, an SVQ III MA in Electrical Installation or equivalent. The course isn’t recommended for non-electricians and it is not advised for anyone who is not an electrically skilled person to install these products, as per the definitions in BS 7671 and The Electricity at Work Regulations (Regulation 16).

Drone surveying course

Also held in partnership with WCS, the new drone surveying course is designed to give learners an insight into the benefits of using drones to survey buildings, sites and land. The course will show off the

AUGUST

You can learn about drone surveying

technological advancements in recent drone technology, as well as highlighting the safety benefits of using this equipment, e.g. avoiding the need to work at height. WCS will cover the Drone Code in detail, highlight key dos and don’ts of drone flight, and will also look briefly at the requirements of flight planning and the tools to do this. Delegates will also learn about preand post-flight checks and safety and

5 & 6, 26 & 27

6 5

emergency planning, highlighting the fact that drones should be treated as seriously as any other form of flight. The course will use a combination of lectures, video presentations and practical drone flights. Learners will also be issued with notes and documentation on the Drone Code and a flight planning assessment, which they can work on further after the course. No home study is required and the course lasts half a day, from 9am to 12.30pm. There is no formal exam or specific entry requirements. Further details on these and all our other courses can be found at www.select.org.uk/training, by calling SELECT Training on 0131 445 5577 or by e-mailing training@ select.org.uk

i

CABLEtalk

AUGUST/SEPTEMBER 2021

35


TECHNICAL OVERVOLTAGE PROTECTION

By Bob Cairney I Eng MIET Technical Standards Adviser, SELECT

D

uring the erection and completion of a new electrical installation, before putting it into service it is important to verify compliance with BS 7671: 2018 as amended to ensure that the installation operates correctly and is safe to use. It is therefore essential to carry out relevant inspection and testing as part of the initial verification process and to issue correct certification on completion of work. The certification should include details of the extent of the work covered and provide a record of the items inspected, and the tests carried out, with the details of these normally recorded on schedule(s) of inspections and schedule(s) of test results. It would however appear that there is some concern in the industry that not all relevant checks are being properly carried out and recorded, i.e. where overvoltage protection has been provided and surge protective devices (SPDs) have been installed. The failure to record the outcome of the checks carried out on these devices may be due in part to a lack of industry guidance providing details on what to check and where to record it. For instance, minimal detail is given on what to check in the requirements given for initial verification in Chapter 64 of BS 7671, and there is nothing specific provided for indicating the presence of

36

CABLEtalk

Going on the record

Our expert provides more timely guidance after recent concerns were raised over the recording of overvoltage protection through the installation of surge protection devices SPDs when recording information in the model forms given in Appendix 6.

Requirements for overvoltage protection

Requirements to provide protection against voltage spikes and current surges due to lightning strikes or switching are given in Section 443 of BS 7671:2018. These include new requirements which have, since being introduced, undoubtedly resulted in SPDs becoming more commonly installed in new electrical installations. The assessment methods previously given for determining if this type of protection was required or not included application of the AQ criteria, therefore protection against overvoltages of atmospheric origin was not usually necessary in Scotland as the environment would have met the AQ1 criteria, i.e. the risk associated with surge currents and overvoltages caused by lightning was negligible with fewer than 25 thunderstorm days per year. SPDs were therefore not commonly installed other than perhaps where a lightning protection system was necessary for a building.

AUGUST/SEPTEMBER 2021

The introduction of the new requirements in BS 7671:2018 however changed this, with overvoltage protection now dependant on whether the consequences could result in: ● Serious injury or loss of human life, or ● The interruption of public services and/or damage to cultural heritage, or ● The interruption to commercial or industrial activity, or ● A large number of co-located individuals being affected. For all other situations, a risk assessment method is necessary and only where the outcome from this indicates the protection is not required may it be omitted. Note: A risk assessment method and examples of applying this calculated risk level (CRL) are given in Regulation 443.5 and there is also an exception for single dwelling homes. However, to apply this a cost analysis must be carried out to see if any subsequent losses due to damage caused by an overvoltage are tolerable.


Typically, when applying the new regulations (Regulations 443.4 and 443.5) the outcome in many instances will require overvoltage protection to be provided. Therefore, the presence, correct selection, erection, and correct operation of SPDs should be included as a part of the inspection process for initial verification purposes and details should be included in the record of the inspector’s checks provided in the certification.

Figure 1

Note: There is no specific test that can be performed to verify that a device is operating correctly. However, most SPDs have a status indication that should be checked to ensure the status indicates normal operating conditions – reference to manufacturer’s instructions will be necessary.

It is also worth noting from a designer’s perspective that to satisfy requirements in larger installations it may be necessary for more than one SPD to be installed within an installation. As well as being aware of these different ‘Types’ of SPD, the inspector will also need to be able to verify that they have been correctly selected and erected in line with the requirements given in Section 534. Type 1 devices are typically installed where there is a risk of direct lightning current and will be located at the origin of the installation. These should be expected in a building provided with a lightning protection system to BS EN 62305. Type 2 and 3 devices may also be located downstream in such an installation close to sensitive and critical equipment, e.g. distribution equipment, comms room equipment etc. Type 2 devices however can also be found located at the origin of an installation in a building – specifically one without a lightning protection system and then also located downstream close to sensitive and critical equipment, e.g. near each distribution board. Type 3 would normally be found located at the end of any final circuits

supplying sensitive equipment, e.g. supplies to server equipment. Note: Combined Type SPDs also exist – e.g. Type 1 and 2 – which provide high-surge-current-handling and better overvoltage protection level (Up).

What should be checked and how should the presence of SPDs be recorded?

After establishing that overvoltage protection is actually necessary and has been provided, locate where the SPDs have been installed and also check the manufacturer’s instructions carefully to determine if there are any specific installation requirements and make sure that these have been followed.

The details of the installed devices should be obtained during the inspection process and recorded on the circuit chart schedule of test results. The type of SPD is normally clearly visible and is indicated on the front of the device, as shown in the image on this page. In some instances, an SPD will need to be supplied via its own dedicated overcurrent protective device (OCPD). To protect it against short circuit faults and to limit the length of connecting cables to it, this OCPD should be located in the circuit way in the distribution board nearest to the incoming supply – this is outlined in guidance provided in Appendix 16 of BS 7671:2018 and is shown above in Figure 1. Continued on page 38 >>> CABLEtalk

AUGUST/SEPTEMBER 2021

37


TECHNICAL OVERVOLTAGE PROTECTION Figure 2 CIRCUIT DETAILS Wiring details

No.

Circuit description

No. of points

Protective device (Lowest breaking capacity .......10... (kA)

Conductor csa Type (see code below)

Ref. method

mm2 Live

Type

cpc

Amps

1L1

Lift supply

1

D

B

16

16

C

63

1L2

Lift supply

1

D

B

16

16

C

63

1L3

Lift supply

1

D

B

16

16

C

63

2L1

Type 2 SPD

1

D

B

16

16

C

63

2L2

Type 2 SPD

1

D

B

16

16

C

63

2L3

Type 2 SPD

1

D

B

16

16

C

63

as it provides protection for all connected final circuits. The presence of the SPD can therefore again easily be identified in the circuit description section of the circuit chart schedule of test results. However, for clarity it may be preferable not to allocate a circuit number to it as shown in Figure 3 on the top of the opposite page. Regarding recording the outcome of an inspection of an SPD, there is unfortunately no item provided for this in the current Schedule of inspection given in Appendix 6 for ‘Domestic and similar premises with up to 100A supply’. However, the inspection of SPDs is mentioned in the ‘Examples of items requiring inspection during initial verification’ which is a simple checklist also provided in Appendix 6 to aid the

>>> Continued from page 37

The presence of an SPD installed in a distribution board, as shown in Figure 2, above, should be identified in the circuit description section of the circuit chart schedule of test results and the position of this should correspond to the circuit way that has been allocated to it in the DB, e.g. Circuit No 1L1,1L2,1L3 or 2L1, 2L2,2L3.

Domestic consumer units

In domestic consumer units (CUs) an SPD will typically be rated for a 100A supply, in which case fault protection will be provided by the DNO cut out fuse and not provided by a separate OCPD in the CU. It will however be located close to the CU’s main switch or switch disconnector

inspector carrying out an inspection. Recording the outcome is probably not strictly necessary and if a record of inspection is required or requested by the client it may be necessary to identify this in a separate attachment to the schedule of inspections. Where overvoltage protection is not installed it may also be necessary to record this and it may be appropriate to insert a comment to this effect, perhaps in the ‘Remarks’ column of the circuit chart schedule of test results as shown in Figure 4 (shown below). Similarly, where a Type 3 SPD is to be installed, e.g. to protect an item of IT equipment, the device will be located at the end of the final circuit supplying the equipment. Therefore, it is also appropriate to record this information in the ‘Remarks’ column in the relevant row,

CIRCUIT DETAILS Wiring details Circuit description

No.

No. of points

Type (see code below)

Ref. method

Conductor csa mm2 Live

1

Shower

1

A

Figure 4 38

CABLEtalk

AUGUST/SEPTEMBER 2021

101

10

cpc 4

Protective device (Lowest breaking capacity = 6kA) Type

B

Amps

40

Continuity (R1 + R2) or R2

Ring final circuit

Ω

Ω

(R1 + R2) 0.1

R₂

L-L

N-N

cpc-cpc


Figure 3 CIRCUIT DETAILS Wiring details No.

Circuit description

Protective device (Lowest breaking capacity = 6kA)

Conductor csa

No. of points

Type (see code below)

Ref. method

mm2 Live

Type

cpc

Amps

Type 2 SPD

NA

NA

NA

NA

NA

1361

100

1

Shower

1

A

101

10

4

B

40

2

Ring final circuit Kitchen

9

A

101

2.5

1.5

B

32

3

Central Heating

1

A

101

1.5

1

B

6

4

Upstairs lighting

5

A

101

1.5

1

B

6

5

Spare

NA

NA

NA

NA

NA

NA

NA

providing the circuit details and test results for the final circuit.

‘Remarks’ column is again the most appropriate place for this.

SPD status indication

SPDs and testing

In most SPDs, a visual indicator window is typically incorporated and would either normally be transparent or show a green status indication when initially installed. Where the indication is red, this means that either the device has operated or that it is defective and requires to be replaced. Some SPD manufacturers also may provide for remote status indicating facilities, such as connections for an audible alarm. A check should be made on each SPD installed that the status indicator is showing correctly for normal operation and as per the manufacturer’s information. This should then be recorded, and the

The future

As mentioned earlier, there is no specific test that can be performed to verify SPDs are operating correctly. However, with regard to testing, where they are present, care should be taken when conducting insulation resistance testing. If carried out at 500V DC with an SPD connected, the SPD will operate and conduct what it sees as a surge current to earth as the value of its continuous operating voltage will have been exceeded. Regulation 643.3.2 allows for this and advises that where the SPD is likely to influence the test result and where it is not reasonable to disconnect the device a test can be conducted with the SPD connected but using a reduced test voltage of 250V DC.

This information should hopefully be useful in raising awareness of what to check and where to record relevant information regarding overvoltage protection. However, it should be noted that work is currently progressing on Amendment 2 to BS 7671:2018 and this is likely to include a review of the requirements given in Chapter 42, as well as the model forms given in Appendix 6. The requirements for overvoltage protection in Chapter 42 may be altered and include the recording of information relating to SPDs within the model forms provided in Appendix 6. This is something that those responsible for verifying compliance of electrical installations should be mindful of in the future.

TEST RESULTS Insulation resistance (Lowest values measured)

Polarity

MΩ L-L

L-E

RCD protection

Z3 (Max measured values)

( )

(500% test for RCDs rated at 30 mA or less only) I∞

Ω

mA

Time (ms) 100%

500%

Functional tests of switch gear etc. ( )

Remarks Indicate points of note e.g.: ● Additional outlets or equipment supplied ● Provision of AFDD for circuit ● Reduce IR test voltage SPD protection not provided

299+

299+

0.45

30

300

40

CABLEtalk

AUGUST/SEPTEMBER 2021

39


APPRENTICES TALENT OF TOMORROW

Off to a winning start Dean Callan was named Apprentice of the Year by bosses at SELECT Member business TClarke, which also saw him awarded a place on their Future Leaders Programme By Stephanie Koetsier Why did you want to become an electrician?

I’ve always liked working with my hands and technology. My dad also works in the construction industry so when I told him about my interests, he suggested being an electrician. I’d also done a short course in high school called Practical Electronics, and I enjoyed working with electricity, building something and watching it work at the end. I tied the two together and that’s why I’m here.

How did you find your apprenticeship?

I really enjoyed it. It gives you a wide insight into the industry so that by the end of it you’ve got your trade but you also have a general idea of what direction you want to go down. It does have its difficult moments, but so does everything!

Was the college training what you expected?

I expected to learn how to wire a house 40

CABLEtalk

or an installation and connect it all up, but it was quite good to then see what happens behind the scenes too, like what happens in the office, quantity surveying, take-off sheets and the design side of things. It was good to see all the things that you don’t often see on a site and gain experience in it.

What did you enjoy the most and was anything challenging?

I think the project part of it was probably the most challenging just because there’s so much you have to do in quite a limited space of time. But it’s probably also the most enjoyable part, because by the end of it you’ve got this big portfolio of drawings that you’ve designed yourself and you’ve also gained experience in things like pricing the job and testing. That was great to have and look back on at all that you’ve achieved.

How about on site?

I started off as a 16-year-old in retail, so coming out onto a building site is a culture shock. You’re getting up early in the morning and working hard but the

AUGUST/SEPTEMBER 2021

NAME: Dean Callan AGE: 25 POSITION: Recently qualified electrician WORKS: TClarke STUDIES: Forth Valley College, Falkirk HOBBIES: Sergeant in Royal Air Force Air Cadets, delivering training and opportunities to young people in his local town of Denny guys look after you. My supervisor Barry Scott and my tradesman at the time, James McMilan, were two really good, knowledgeable guys who showed me the trade and showed me as much as they could. Barry still supports me as my supervisor now, so it’s been really good.

Has there been anything about the job that’s surprised you?

I think once you’ve done your time as an apprentice and you’re going out it’s quite surprising that an electrician is just given a site and that’s it. You’ll maybe see your supervisor once or twice a week,


supportive. I didn’t really have any issues, but I know of a few apprentices who did. They got in contact with their training officer and they were out as soon as they could to help find a resolution. They’re always there and always willing to help. They’ll visit you at least once a year out on site just to see where you are and what skills you’ve learned. They are really beneficial.

How does it feel to be named TClarke’s Apprentice of the Year and be the first Scottish winner in the competition’s ten-year history?

It’s definitely something I couldn’t have done without the support of people from the Scotland office. They’ve been with me every step of the way and helped train me. It’s a massive achievement and I find it difficult to put into words. I’m really pleased and proud that I’ve been given that opportunity to be recognised. I’m now on the TClarke Future Leaders Programme because of it, where I’m going to be shown different aspects of the business and they’re going to train me to be a future leader in the company. It’s all a bit surreal, and very gratifying!

What does the future hold?

Dean appreciates the support he has received and is looking to the future

but it’s up to you to organise your work, make sure you’ve got enough materials, and liaise with site agents and the other trades. I always thought that was done for you – not in a lazy way! I like it, though, because it means I have to organise myself, but you do still have a supervisor who will come out and make sure it’s all done properly.

How helpful have the Scottish Electrical Charitable Training Trust (SECTT) and your training officers been during your journey? They’re really helpful. I’ve had two training officers and they were really

“I want to be the person making the tough decisions and moving the company in a direction that’s good for the future”

I’d like to move up in the company. I really enjoy my work, and I enjoy being out on site, but I’d also like to grow and progress to see myself in an operational or managerial role. I want to be the person making the tough decisions and moving the company in a direction that’s good for the future.

Do you have any advice for those considering apprenticeships? Follow your dreams and listen to your gut. If it’s something you think you might want to do, then you need to go for it. It’s easy to get distracted when you’re at college, but stick in because there’s so much knowledge that gets passed to you in such a small space of time and it’s easy to miss the really important things that’ll just give you that edge. Without doing that, I wouldn’t have been recognised by SECTT to do the Apprentice of the Year competition. It’s a really important and crucial stage to just really get stuck in.

CABLEtalk

AUGUST/SEPTEMBER 2021

41


APPRENTICES SAFE ISOLATION

Trainees in Paisley

Lessons in life-saving The next generation of electricians have been given a safe start in their careers after free lockout kits were once again donated to trainees across Scotland by SECTT and ESF

By Anne Galbraith Chief Executive, SECTT 42

CABLEtalk

T

he talent of tomorrow is in safe hands thanks to the ongoing partnership between the Scottish Electrical Charitable Training Trust (SECTT) and Electrical Safety First (ESF). Our organisations have teamed up to distribute free lockout kits to Scotland’s trainee electricians for the

AUGUST/SEPTEMBER 2021

13th year running, ensuring that they get the message about the importance of safe isolation. More than 650 apprentices and adult trainees are now being supplied with the kits, which could potentially save their lives. Worth £30, the kits will help them avoid serious injury by ensuring that electricity is turned off until work is completed. The partnership will see SECTT


Trainees in Ayr

training officers visit 21 SECTT Approved Centres from the Shetland Isles to the Borders, handing out kits to 3rd Stage apprentices and adult trainees. Among the recipients so far have been trainees at Ayrshire College, Ayr Campus and West College Scotland in Paisley, with physical distancing and other COVID-19 safety measures being observed at all times. Our continuing partnership with ESF means we have been able to share the cost of these indispensable safety

devices and help safeguard the next generation of Scottish electricians. Apprentices and adult trainees should become familiar with the kits as they are the same ones used when they sit the Final Integrated Competence Assessment (FICA). Lesley Rudd, CEO of ESF , told me: “It’s vital that everyone in the industry adopts safe working practices and procedures and it’s important that this is established right at the start of an electrician’s career. “By providing free lockout kits to

Apprentices with the kits in Paisley

young electricians we not only give them crucial safety equipment, we also hope to help them make safe working an ingrained habit. Because, as we know, it could mean the difference between life and death.”

SPREADING THE MESSAGE SELECT is running an ongoing campaign to raise awareness of safe isolation and the importance of following correct procedures at all times. Running under the banner ‘Work dead safely: Stay alive’, our campaign highlights the steps operatives should take and reinforces the importance of using lockout kits. It also graphically outlines the dangers of not safe isolating correctly, with case studies of electricians who have been burned, scarred for life and killed in preventable accidents.

Designed to be shared online, on-site and in offices and colleges, the campaign includes a free downloadable brochure and infographic, plus an easy-to-follow Ten Steps to Safe Isolation video. Download the brochure at bit.ly/10-steps-book Download the infographic at bit.ly/10-steps-info Watch the video at bit.ly/10-steps-safe Print copies of the brochure are also available by emailing member services@select.org.uk CABLEtalk

AUGUST/SEPTEMBER 2021

43


FOCUS DEALING WITH STRESS We often talk about ‘feeling stressed’ but what IS stress, what triggers it and how can we deal with it to help make sure we’re not negatively impacted?

By Vicki Leslie Client Relationship Manager, EC Insurance Services Limited

I

t’s fair to say that the past 18 months have been extremely stressful. Not only have there been long hours and high work intensity, but the global pandemic and Brexit have impacted the bottom line and significantly changed the way we all work. Remote meetings, material delays and staying ‘COVID-safe’ have all impacted our day-to-day working lives and brought a whole new set of challenges. So how can we deal with this added stress? The Mental Health Foundation explains that stress is “our body’s response to pressures from a situation or life event”. Interestingly, factors contributing to stress are not all situational as our ability to tolerate stress is coded in our genetic make-up. Understanding this helps us to recognise that something we find relatively straightforward, may be extremely stressful for someone else and vice versa. It’s also important to note that some 44

CABLEtalk

How to stay in control

stress can be beneficial. It helps drive us and keep us motivated. For peak performance, a degree of pressure is necessary for most people otherwise we can get bored and disengaged. It’s when we feel that we have no control and the situation is persistent and overwhelming, that stress is experienced as negative and ultimately damaging.

The stress container

One way to help us understand how we experience stress and to address our stress levels is to think of it as a stress container which represents a receptacle into which everyday stresses flow. Everybody’s container is a different size based on different factors such as life experiences. When the container overflows, difficulties develop. Helpful coping strategies can

AUGUST/SEPTEMBER 2021


from a good set of trainers and you can burn 150 calories in 30 minutes. Sleep is also a powerful stress reducer. A regular sleep routine helps calm the body and improves concentration, regulates mood and sharpens decisionmaking. To help get a good night’s sleep, stop doing any mentally demanding work several hours before going to bed so that you give your brain time to calm down. Try taking a warm bath or reading a calming, undemanding book for a few minutes to relax your body, tire your eyes and help you forget about the things that worry you. As much as we all love that first cup of coffee in the morning, caffeine is a stimulant and will increase your level of stress rather than reduce it. We might need that first cup but throughout the day, try swapping it for water, squash or herbal teas. Keeping hydrated also helps your body cope with stress. A glass of wine at the end of a busy day may seem appealing and make you feel less stressed, but alcohol can also increase feelings of anxiety so it’s best avoided if it’s been a stressful day. We all have stress and it’s a natural reaction to many things in our life. The important thing is to recognise when it starts to negatively impact us and take appropriate steps to look after our mental wellbeing.

The stress container ... Stress flows into the container

Vulnerability is shown by the size of the container If the container overflows, problems develop “emotional snapping”

Helpful coping strategies tap working, lets the stress out

function as a tap to help let stress out of the container. These can be things such as asking for help, getting plenty of rest and taking time to do things which help you relax. Unhelpful coping methods such as working late or drinking alcohol, which we may think is helping us relax but could be doing the opposite, could block the tap and cause the container to overflow. As our stress reactions were originally designed to protect us from hungry predators as opposed to worrying about being late for an important meeting, it’s no wonder that the ‘fight or flight’ response doesn’t quite cut it any more. Stress has evolved and comes in many forms including physical, emotional and chronic stress. Physical reactions to stress can include a low immune system which increases vulnerability to infection, gastric problems, musculoskeletal issues and skin conditions such as psoriasis. Stress can also alter our behaviour. Stressed people are

Unhelpful coping strategies tap blocked, stress fills container and overflows

more likely to respond with anger or irritability which risks diminishing personal and professional relationships. In addition, prolonged exposure to stress can lead to formal mental health problems such as depression or anxiety disorders.

How can we reduce our stress levels?

Pressured situations increase the level of stress hormones such as adrenaline and cortisol in the body. Physical exercise can be used to metabolise excessive stress hormones and increase production of your brain’s feel-good neurotransmitters, called endorphins. You don’t have to be an athlete or run miles every day to feel the benefits. One of the best forms of exercise is going out for a walk. No equipment is needed, apart

Through our partnership with EC Insurance Services Limited, SELECT Members have access to a range of healthcare options to support both mental and physical health. For more information, email ecis@ecins. co.uk or visit www.ecins.co.uk

i

“For peak performance, a degree of pressure is necessary for most people otherwise we can get bored and disengaged” CABLEtalk

AUGUST/SEPTEMBER 2021

45


FOCUS LED LIGHTING

Spotlight on the rise of LEDs

With halogen lamps on the way out, we examine what the future of lighting could now look like

By Simon Greenwood Sales Director, Trade and Specification, Signify UK&I

lamps could result in significant savings for the end user on their energy bills. Signify UK&I data also shows that a complete switch to LED lighting across the UK over five years would help reduce the UK’s carbon footprint by equivalent to one of our four coal power plants, 636 thousand cars, or nearly half a million (496,000) households. LED lamps currently account for around 60% of all lamps sold in the UK, with this figure set to grow to about 85%, in line with the new regulation. As of September 2021 for EU and October 2021 for UK, the UK will

implement two updated regulations – the Ecodesign Regulation and the Energy Labelling Regulation. Both have the goal of further expanding the lighting industry’s leadership in sustainability by delivering significant energy savings for lighting products and systems. The goal of the Ecodesign Regulation is that manufacturers of energy-using products (EuP) will, at the design stage, be obliged to reduce the energy consumption and other negative Continued on page 48 >>>

T

he ban on halogen lamps first implemented by the European Commission in 2018 and more recently announced by the Department of Business, Energy and Industrial Strategy (BEIS) will put LEDs well and truly in the spotlight as they become the new normal for lighting. Moving to LED CABLEtalk

AUGUST/SEPTEMBER 2021

47


FOCUS LED LIGHTING

60% current LED lamp sales in the UK

>>> Continued from page 47

environmental impacts of products. This is done for better product sustainability and efficiency. Products that fail to meet the regulation requirements will be phased out. At Signify, we welcome this move from the government and feel this is a step in the right direction for progress in achieving net-zero by 2050. Indeed, our CEO Stephen Rouatt said: “We welcome the UK Government’s next step in the transition towards more sustainable lighting products. Using energyefficient LED equivalents for halogen, and fluorescent lighting on an even broader scale will significantly help the UK on its journey to decarbonisation, as well as lowering the annual electricity bills for consumers.”

Halogen sales

From 1 September 2021, retailers in the UK will no longer sell most halogen lamps for general household use, although retailers can continue to sell old stock till it is cleared. Under legislation brought forward recently, sales of fluorescent lamps will also be banned from September 2023.

Currently, around two-thirds of lamps sold in Britain are LED and that makes a considerable impact in improving the energy efficiency of the country’s buildings.

Energy labels

To help make the switch, BEIS has also announced that from September, all lamps will feature new energy efficiency advice via ‘rescaled’ energy labels on their boxes. The labels will simplify the way energy efficiency is displayed on a new scale from A-G, doing away with the A+ and A++ ratings. The new labels will raise the bar for each class, meaning very few lamps will now be classified as A, therefore helping consumers choose the most energy-efficient lamps. Just as they have already done with household appliances, the government is rescaling the energy efficiency labels on lamps to make it harder for lamps to achieve an A-rating. This will empower buyers to make the right choices driven by clearer information.

What this means for the industry

From 1 September, relevant product characteristics will be needed in the newly documented EPREL2 database (European Product Database for Energy Labelling). It will be the manufacturer’s responsibility to upload their product information onto the database. If a product is not registered on the EPREL2 database, the product cannot be sold in the EU and will also not be CE marked. In addition, a QR code on the energy label, clearly displayed on the packaging

LED use is set to grow after halogen ban

NEW LOOK FOR LABELS

2012-2020 label

2021 -> label

Class

lm/W

Class

lm/W

A++

120

A

210

A+

55

B

185

A

50

C

160

B

15

D

135

C

12

E

110

D

9

F

85

E

0

G

0

The revised scale raises the bar for each energy class

of the product, will direct consumers to detailed product specifications within the EPREL database, which was not available prior. This QR code provides a user-friendly link. The Ecodesign and Energy Labelling Regulations for lighting products also take into account the impact on human safety and comfort. In line with this, manufacturers will also need to update EPREL 2 on the stroboscopic visibility measures and flicker (Pst LM). These need to be in line with harmonised standards (SVM <0.9 from 1 September 2021, SVM < 0.4 from 1 September 2023) as flicker can cause visual discomfort and in extreme cases, can also cause migraines and even epileptic seizures.

What this means for the UK

For the UK, a similar regulation will come into force on 1 October, with

85% anticipated sales under new regulation 48

CABLEtalk

AUGUST/SEPTEMBER 2021


£75 estimated annual saving for customers to choose more energy efficient lamps and appliances by making better informed choices.

In conclusion

a few small differences, such as there being no requirement to use an EPREL style database as long as the data is documented in a publicly accessible web page. For simplicity, many manufacturers, Signify included, may well choose to utilise the EPREL2 database. This regulation will be a key component in UKCA compliance. Between now and September 2021, manufacturers can continue to put products that don’t meet the new standards on the market, but these must be sold by March 2023. The measures are estimated to save customers £75 a year on their energy bills due to LED lamps having a far longer lifetime, while stronger labelling across the board will enable customers

The ban by the UK Government on halogen lamps is taking a step in the right direction to ensure that only exceptional quality products can enter the market and consumers are provided with all information at the time of purchase. The changes and regulations will impact every manufacturer and are in line with sustainability goals that are pushing for more efficient lighting practices and circular products. These are beneficial for the global economy and put human health and comfort first while also furthering the UK’s journey to reaching net-zero. Signify is the world leader in lighting for professionals, consumers and the Internet of Things, with around 38,000 employees and a presence in more than 70 countries. For further details, go to www.signify.com

i

SWITCH-OFF FOR HALOGEN The sale of mains voltage halogen non-directional lamps was banned in the UK on 1 September 2018, meaning low voltage non-directional halogen lamps could continue, as long as they comply with eco-design requirements. The new regulations will phase out most remaining halogen lamps from September 2021 and the traditional fluorescent tube lighting, which is common in offices, from September 2023 onwards. HL R7 halogens will remain available on the market, and some fluorescents such as T5s. Exemptions will be in place for lamps designed and marketed specifically for scene-lighting use in film studios, TV studios, and photographic studios, or for stagelighting use in theatres or other entertainment events. The wider package of energy efficiency measures includes the right to repair, new energy labels and higher energy efficiency standards for white goods, TVs and other electrical appliances. UK Energy Minister, Anne-Marie Trevelyan, said: “We’re phasing out old inefficient halogen bulbs for good, so we can move more quickly to longer lasting LED bulbs, meaning less waste and a brighter and cleaner future for the UK. “By helping ensure electrical appliances use less energy but perform just as well, we’re saving households money on their bills and helping tackle climate change.”

CHANGE FOR THE BETTER

A UK-wide switch to LED over five years would save the same amount of carbon as:

1

coal-fired power plant

636k 496k cars

homes

CABLEtalk

AUGUST/SEPTEMBER 2021

49


SPONSORED EDITORIAL

Challenge of adjudication decisions By Rebecca Barrass Associate Adjudications can be a useful tool for parties who want a dispute decided quickly and cost-effectively. But what happens when you receive an adjudication decision that you are not happy with? Usually, a party can only challenge an adjudicator’s decision on one of the following grounds: ● There has been a breach of ‘natural justice’ by the adjudicator; or ● The adjudicator has acted outside of their ‘jurisdiction’. A breach of natural justice can be argued where there has been some sort of procedural or inherent unfairness in the adjudication procedure. For example, if one party has not been given proper opportunity to set out its case, or there is some evidence of bias on the part of the adjudicator. Arguments in relation to an adjudicator’s jurisdiction can be more complex, but in broad terms, refer to whether the adjudicator had the power to make the decision that they did. Common challenges include: ● The adjudicator did not decide the dispute put to them in the Notice of Adjudication; or ● The adjudicator was not properly appointed to decide the dispute. 50

CABLEtalk

Case law shows that the courts are reluctant to interfere in the decisions of adjudicators and will only do so if there has been a very clear breach of natural justice or jurisdictional issue. Importantly, a party cannot challenge an adjudicator’s decision just because they think they got the decision wrong, either because they made an error in relation to the facts or because there has been an error in law. In that scenario, a party wishing to challenge a decision would normally have to raise its claim afresh in court (or arbitration depending on the terms of the contract). There are merits in this approach. Court actions give parties more time to assess a claim and give proper thought to all of the issues, but that does mean there is a time and cost implication. Overall, a party’s options when it comes to challenging the decision of an adjudicator are limited and potentially costly so it is important for them be aware of the risks and potential outcomes should the decision not go their way. ● For more advice, contact Rebecca Barrass on 0141 303 1164 or email rebecca. barrass@macroberts.com

AUGUST/SEPTEMBER 2021

FOCUS MATERIALS From COVID-19 to the South China Sea, there’s currently a perfect storm of challenges for electrical wholesalers – but greater communication and collaboration with contractor customers could help both parties

By Anne Vessey Head of Marketing & Communications, Electrical Distributors’ Association

F

or the last 18 months, UK businesses have been grappling with a barrage of inter-connected supply chain issues: COVID-19, Brexit, shipping container shortages and sky-high prices, shipping delays in the Suez Canal and the Pearl River Delta/South China Sea, a shortage of HGV drivers and so on. According to our regular Electrical Distributors’ Association (EDA) surveys, which we introduced in the early part of 2020, ‘product availability’ has featured in the top three of the most pressing businesses

challenges faced by electrical wholesalers in every EDA survey since July 2020. And in every EDA survey we’ve published this year, electrical wholesalers have voted ‘product availability’ their most pressing business challenge, with ‘manufacturer price increases’ and ‘lack of awareness of supply chain issues amongst contractors’ in second and third place respectively. Product availability is an issue right across the construction sector, not only electrotechnical. Timber, cement, roofing products – you name it, all are experiencing challenges. Electrical wholesalers are telling us that they are doing everything they can to help ease the situation: increasing stock holdings (where possible), having “open and honest” conversations with contractor customers across the trade counter, regular email bulletins to customers, posting product lead times on websites, and working collaboratively with customers to plan ahead. Since the start of the pandemic, the EDA has held regular ‘Talking Shop’ meetings on Zoom at which wholesalers and manufacturers exchange views and information that help keep the supply chain flowing. Guest speakers from


Weathering

the storm along the supply chain contribute to these sessions, including Steve Bratt, Group CEO at SELECT’s counterpart down south, ECA. At his most recent appearance on 26 July, Steve called for greater collaboration and understanding between wholesaler and contractor regarding product availability. The EDA, like every trade association along the supply

chain, is playing its part to raise issues, collaborate on solutions, and signpost resources which can be used to educate and spread understanding. We want SELECT Members to be aware that each part of the supply chain is dealing with similar issues and is doing everything it can to deal with the current challenges. Rest assured, we’re all doing our bit to keep the

conversation flowing and to invite collaboration and to help manage expectations. After all, no one wants unhappy customers – least of all electrical wholesalers.

You can read the results and analysis of the EDA’s wholesaler and manufacturer surveys at www.eda.org.uk/support-andresources/research CABLEtalk

ABOUT THE EDA Founded in 1914, the EDA is the trade body for UK electrical wholesale distributors. Wholesalers are the essential link between manufacturers of electrotechnical products and the electricians and contractors who install them. Membership includes leading national wholesalers Edmundson Electrical Ltd, Rexel UK, CEF and Stearn Electrical Co Ltd as well as many independent firms, most of whom are members of the UK’s largest buying groups ANEW, AWEBB, FEGIME UK and The IBA Buying Group.

AUGUST/SEPTEMBER 2021

51


FOCUS CONTRACTOR’S DESIGNED PORTION

By Len Bunton

FRICS FCIArb, HON FRIAS

Contract Expert

I

n my ongoing series of articles for CABLEtalk, I have endeavoured to focus on issues I continually see as an adjudicator which cause problems. Just to reinforce some previous messages: ● Read the sub-contract you are signing up to and take advice ● Make sure there is a payment schedule in your contract, which sets up the date of your application for payment, due date, final date for payment, etc and stick to them rigidly ● Make sure your application for payment is fully detailed and substantiated. A very common problem area is the contractor’s designed portion (CDP). This is where the contractor or sub-contractor takes some responsibility for elements of the

Caution! Dangerous process ahead! In the complicated world of contracts and sub-contracts, you may well come across the contractor’s designed portion. But what is it? And what should you beware of? Our industry expert explains all… design. However, sometimes this is more than designing an element and in fact almost the whole design is carried out – so be wary. There is no doubt that over the past 20 years or so the extent of CDP has increased dramatically. One of the

Ensure there’s a payment schedule in your contract

52

CABLEtalk

AUGUST/SEPTEMBER 2021

reasons for this has been the fact that designers’ fees have been slashed to the point that, in many cases, a limited design is in place and the rest of the responsibility has been dumped onto contractors and their supply chain. I was looking at contract documents recently in which there were more than 40 CDP packages in the tender. I was also involved in a situation advising a client, and 15 sub-contractors were involved in several communications all relating to the design of various CDP elements. Incredible! The type of issues I see emerging in disputes include design development, extent of design responsibility, approval periods, extent of design necessary and interface issues. Of these, interface issues probably cause the biggest problem area. By that I mean how the specialist’s design integrates into the design of the rest of the building.


Communication can be the key to cutting CPD risks

How to mitigate risk and exposure Firstly, read the sub-contract and scope carefully to understand the extent of your design responsibility. Next, set that out clearly in your submissions and qualify for tender if necessary. Make sure there is engagement with the employer contractor and/or subcontractor to discuss and iron out any qualifications/design issues. And finally, make sure you are fully aware of any interface issues. The main thing is constant communication. There is a further issue emerging which relates to the increasing costs of professional indemnity insurance (PII) and these issues have been a big part of discussions within the Construction Industry Coronavirus (CICV) Forum. Several contractors and consultants have seen very big increases in the cost

of PII and, indeed, are having difficulty getting coverage. The impact of this is that contractors are being extremely cautious about taking on any design responsibility, due not only to the issues I have raised earlier but also in relation to increased costs. However, I was encouraged recently by discussions with several Scottish local authorities who indicated that, due to the contractual and financial issues resulting from CDP, they were reducing the extent of these in tender documents and were considering paying designers additional fees in order that projects could be fully designed at tender stage. Very positive news for the industry! So going back to my banner for this article – treat CDP with extreme caution, as you could be buying trouble for your business in the months ahead.

“There is no doubt that over the past 20 years or so, the extent of CDP has increased dramatically” CABLEtalk

AUGUST/SEPTEMBER 2021

53


PRODUCT SHOWCASE Our guide to the latest industry solutions 1 SNICKERS’ ALL-WEATHER COMFORT Upgraded, innovative and sustainable – Snickers Workwear climate control clothing delivers exceptional comfort and performance. The range includes garments that use socially and environmentally responsible fibre technology, such as 100% recycled polyester, as well as others made from high-tech breathable fabrics. For consistent comfort, the seamless designs are also available in 37.5® ventilating technology for efficient body moisture transport as well as odour-reducing merino wool. These cutting-edge AllroundWork, FLEXIWork

54

CABLEtalk

and LITEwork designs and fabrics will keep you cool, warm and dry when you need to be. All the garments are made from quick drying, lightweight fabrics that come with special ventilation features to control and regulate the heat from your body. Snickers Workwear baselayer clothing will give you the kind of fresh working comfort you wouldn’t have thought possible. Call 01484 854788, visit www. snickersworkwear.co.uk or email sales@ hultaforsgroup.co.uk

AUGUST/SEPTEMBER 2021

2 SCOLMORE LAUNCHES ELUCIAN RANGE The result of Scolmore’s latest product development programme completes the firm’s wiring accessories offer with a comprehensive consumer unit and circuit protection range – Elucian by Click. The launch follows months of consultation with contractors to create products that best suit their requirements and comply with the latest regulations.

Scolmore has also made a significant investment to ensure that stock levels are high to meet the anticipated demand. Elucian is an extensive range of metal consumer units that covers a variety of installations and offers features that enhance the products’ convenience, flexibility and safety. Call 01827 63454, email sales@scolmore. com or visit www.scolmore.com


3 KEEPING SOCKET SAFETY UP TO STANDARD THANKS TO TIMEGUARD VALIANCE+ The gold standard for residual current device (RCD) socket safety is BS7288:2016 yet there are still RCD devices being installed that do not comply with its safety precautions. For all installers, the replacement market is a golden opportunity to retrofit new RCDs and provide their customers with both the latest stylish designs and best possible protection. In 2019, Timeguard was the first company to achieve UK-approved certification to the new BS7288:2016 Specification for residual current devices with or without overcurrent protection for socket-outlets for household and similar uses. Its Valiance+ range of RCD-protected sockets and switched fused spurs can quickly

be retrofitted into a 25mm deep recessed box (excluding ML range) to replace old RCD devices or bulk standard, unprotected wiring accessories. The new BS7288:2016 standard calls for an RCDprotected socket or fused spur unit to achieve much higher levels of testing and

4 FORTRESS PROTECTION UPGRADED BG’s Fortress circuit protection range has been recently improved from contractor feedback. The updated internal wiring configuration makes it a lot easier for the incoming and outgoing cables to be installed. A quick release DIN rail and offset incomer allows more space around the board to dress the cable. Combi-style screws are used throughout which only requires one screwdriver for installation,

with backed-out and retained terminal screws preventing the inconvenience of losing screws. The range offers great flexibility, with a highly customisable range of devices that include A Type RCDs (including 100A), A Type RCBOs, SPDs and variable board configurations. To find out more about Fortress, visit www.bg-fortress.uk

performance than products built to the older BS7288:2009 standard. It also introduces RCD type classification, and all the Timeguard SRCD products are certified for both Type A (for single phase DC loads up to 6MA including vehicle charging) and Type AC (for AC sinusoidal

waves only). Active and passive options are offered so you can decide whether the power is automatically restored when the power supply returns to normal or if it remains isolated until manually reset, essential for products such as hedge trimmers, power tools, etc where an unexpected restart would be a danger to the user. Making sure that the RCD sockets you provide for your customers meet the latest safety standards, are designed and supplied with a high-quality three-year guarantee and look good for installation anywhere in the home or workplace means Timeguard Valiance+. For more information, visit www.timeguard.com

5 LIGHTEN UP WITH LUCECO FTYPE

Luceco has upgraded its well-known FTYPE range. New features include a more compact height, NHBC certified for I-JOIST applications and new 4W versions that are Part L exempt. Fixed and adjustable versions are available alongside regressed Dim2Warm and Colour Changing versions. The range uses the

latest Samsung chips, with up to 100Lm/W output. All the easy installation benefits are carried over, including Speedfit™ loop-in loop-out push fit terminals, which eliminate cable crossover. The Clip&fit™ cable clamp housing secures both solid and stranded cable. View the range at www.ftype-compact.com

CONTACT OUR TEAM TO SHOWCASE YOUR GREAT NEW PRODUCTS HERE

David Hughes: 07767 407 402 davidh@connectcommunications.co.uk CABLEtalk

AUGUST/SEPTEMBER 2021

55


SPONSORED EDITORIAL

New consumer unit range from PowerBreaker –the electrical safety specialists As experts in the field of circuit protection, the PowerBreaker brand has been synonymous with quality and safety for many years. It has been a natural progression for PowerBreaker to move into consumer units as an extension to our market-leading range of Type A RCD sockets and spurs. As long-standing members of BEAMA, the UK electrical industry’s leading manufacturing association, GreenBrook has always played an active role in promoting product safety and helping to drive the industry forward, ensuring products are manufactured and tested to the highest standard. In order to ensure the high-quality products you would expect from PowerBreaker, we have taken our time to perfect our offering and can now proudly show the new range that is easy to install and that fully complies to all the latest regulations, delivering optimum safety with some great installation benefits. GreenBrook is now the only supplier to be able to offer both Type A consumer units and socket RCDs from our PowerBreaker brand. With the recent changes to the 18th Edition of the wiring regulations, PowerBreaker has created a stylish, minimalistic metal enclosure with a top hinged door that is unobtrusive whilst very functional. Designed with the installer in mind, we have incorporated an increased area of cabling space, multiple large clear knockouts, Type A RCDs and

56

CABLEtalk

AUGUST/SEPTEMBER 2021

RCBOs, surge protection options and a built-in spirit level. We also offer high integrity boards. Available in split load and preassembled units, you can be confident of a configuration to fit any residential or small commercial environment. Here are the features of the new range in line with the 18th Edition regulations. Metal enclosures The regulations state that enclosures should be designed to encase a fire within it and restrict the fire spreading. PowerBreaker enclosures are manufactured from non-combustible steel and comply with BS EN 61439-3. Lighting circuits The additional protection of a 30mA RCD is now required on all lighting circuits in a domestic property. All PowerBreaker RCDs are rated 30mA and Type A. Knockouts A wide selection of 20, 25, 32mm and large oval knockouts for rear entry making the boards easy to install and adaptable for any type of installation. Surge protection PowerBreaker SPD boards have built-in Type 2 surge protection devices which prevent over-voltages in electrical circuits that can potentially damage electronic equipment such as TVs, computers, washing machines, alarms etc. A Type 2 SPD is the main protections

system for all low voltage electrical installations. It protects against overvoltages from switching and indirect lightning strikes. Installed in the consumer unit, it prevents the spread of over-voltages in electrical installations and protects the loads. Type A RCDs PowerBreaker offers Type A RCDs that detect pulsating DC residual currents in addition to the detection characteristics of Type AC RCDs. In modern households, the goods connected to the consumer unit will be electronic equipment such as LED TVs, multi-media systems, laptops, EV chargers etc, which, if at fault, can cause a rush of DC current into the circuit. RCBOs PowerBreaker RCBOs are Type A and rated 6kA. They feature Type B tripping characteristics (Instantaneous Tripping B Curve) for the protection of circuits with equipment that have low surge currents. Our RCBOs also offer a longer cable length to help with installation. PowerBreaker – the safest bet With a wealth of features together with the peace of mind of PowerBreaker quality and componentry, there really is no safer bet than to use a PowerBreaker consumer unit. ● For further details, please visit our website www.greenbrook.co.uk


COMPETITION

WIN

£50 OF

COMPETITION VOUCHERS

SCOTTISH BEACHES WORD SEARCH L

A

B

C

D

E

F

G

H

I

J

K

L M N

O

P

Q

R

S

T

U

O

O

N M L M K

J

I

S

H

G

F

E

D

C

B

A

Z

Y

C

X W

W P

Q

R

S

O

U

V

C W E

X

Y

Z

Y

A

B

C

D

L

E

F

E

Q

P

L

O

N N M L

A K

L

J

I

H

E

R

I

S

K A

Y

G

R

R

N

O

R

T

H

B

E

R W

I

C

K

S

L

T

U

V W

I

X

Y

L

O

N

S M R

L

K

J

I

I

E

H

G

F

L

E

D

C

B

G

A

Z

A

P

Q

S

R

O

S

T

U

S

V W X

Y

Z

O

A

B

C

D

A

E

F

R

P

O

I

N

S M L

S

T

A N

D

R

E W S

K

J

I

N

H

G

G

Q

R

E

S

E

T

U

V A W X

Y

Z

A

C

B

C

D

E

F

B

G

O

V

U M T

S

R

Q

P

O

N M N A

I

R

N

L

K

J

I

A H

W X

P

O

L

L

A N

B

A

Y

Y

A

Z

A A

B

C

D

E

F

L

G

T

S

R

U

Q

P

O

N M L

K

J

V

I

F

I

N

D

H

O

R

N

H

U

P

V

T W X

C

Y

Z

A

B

C

R

D

E

G

F

G

H

I

J

A K

L

O

C

H M O

R

A

R

V

U

T

I

S

R

S

Q

P

O

N M K

L

W R

X

Y

Z

A A

B

C

D

E

F

G

G

H

I

E

J

K

L M E

N

E

T

D

C

B

A M Z

Y

X

P W V

U

T

S

R

A

Q

G

P

I

O

F

O

G

H

I

J

O

L M E

V

K

B

J

I

L

U

N A N H

L

E M N

O

P

D

Q

R

O

L

N M L

K

J

I

P

L

O

C

H M O

R

S

O

R

Q

P

T

U

V W X

T

K

V

N

O

P

Q

R

S

T

C

U

U

L

T

G

F

E

D

C

B

A

Z

L

Y

X W

S

T

A

L

I

S

K

E

R

T

L

I

U

H

G

Y

F

E

D

C

B

A

Z

Y

A X

L

I

C

H

Q

R

S

T

U

V W N X

Y

F

O

N M L

K

U

J

I

H

G

F

E

D

C

E

B

A

Z

Y

Z

G

R

U

I

N A

R

D

C

D

E

F

G

H

A

B

V

F W

Here’s your chance to win £50 of Amazon vouchers with our prize wordsearch about Scottish beaches compiled by SELECT Training Administrator Laurie Burns. Find the words, take a pic of your finished grid and email it to memberservices@select.org.uk by 17 September. The winner will be drawn at random. T&Cs are online. Congratulations to June/July winner Lorriane Gray from the Elgin branch of CEF. 58

CABLEtalk

AUGUST/SEPTEMBER 2021

June/July 2021 answers: S F T A Q U A M A A R R O C K Y W A R T E R M I S H J O H NW I R S P T H E O C V E N O M T B R E R A D I E H D A V E N G R

J

A M E

● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●

K A R A T E K I D I N G B S P I D E R M A N M D A G B N A T O R O D Y C K Z S I L L E Q U A L I Z E R X T R A C A R D T I E R S O N

S

B

O N D

BALNAKEIL CLAIGAN CRAMOND ELIE ERISKAY FINDHORN GIRVAN GRUINARD GULLANE LOCH MORAR LOCH MORLICH LOSSIEMOUTH LOWER LARGO LUNAN MONTROSE NAIRN NORTH BERWICK PETTYCUR POLLAN BAY PORTOBELLO SCARISTA SEACLIFF ST ANDREWS TALISKER YELLOWCRAIGS


Keep up to date with SELECT Due to the ongoing coronavirus outbreak, all SELECT meetings and events are currently postponed. We will update Members with new information as soon as possible. In the meantime, follow our website www.select.org.uk and social media channels for the latest developments Twitter @Updates_SELECT

Instagram @SELECT_Trade_Association

@Training_SELECT @Regulate_SELECT Facebook SELECT.TheECAofS select.org.uk

cabletalkmagazine.com

select.org.uk/training

selectawards.co.uk

HELPLINES Technical Advice Helpline: 0131 445 5577 or email technicalhelp@select.org.uk Employment Advice Helpline: 0131 445 9216

Commercial Support (Len Bunton): 07769 670 089 Main switchboard: 0131 445 5577 or email admin@select.org.uk

Legal Helpline (MacRoberts): 0141 303 1111

The Walled Garden, Bush Estate, Midlothian EH26 0SB Tel: 0131 445 5577 Fax: 0131 445 5548 admin@select.org.uk


Turn static files into dynamic content formats.

Create a flipbook
CABLEtalk August/September 2021 by CTSELECT - Issuu