Skip to main content

SERVICE & MAINTENANCE PARTS FLYER 2026

Page 1

SHOW ME / OZARK READY MIX | KANSAS CITY, MISSOURI

Emergency Jumper - Kit

Assembly - Vacuum Tool Generator

730050 CTM / mtm

600065 CTM / mtm

$321

Socket - Eaton Servo 54 Pump 740100 CTM / mtm

$126

Tool - Eaton Pump Seal Installer 799616 CTM / mtm

Tester - Metal Thickness 799900 CTM / mtm

$1,064

U-Joint - 1350, Cap Greaseable

795001 CTM / mtm

$240

$40

Assembly - Filter Schroeder H/P 735019 CTM / mtm

286330 CTM / mtm

$367

795003 CTM / mtm

$28

$93

Tool - Drum Roller Adjustment 799619 CTM / mtm

$22

U-Joint - 1350, Cross Grease Zerk

$28

735004 CTM / mtm

$234

Wrench - Spanner Roller Nut Tool

Hydraulic Tester - Kit 799600 CTM / mtm

Filter - Coalescing Camozzi

$9

Tester - Prox Switch

$221

799617 CTM

U-Joint - 1350, Non-Grease 795020 CTM / mtm

$27

Con-Tech MFG, Inc. reserves the right to limit quantities. · Prices valid 11/04/26 to 11/11/26 · Service & Maintenance Seminar 2026


MIXER SERVICE & MAINTENANCE SCHEDULE UPDATED 06/17/2025

aa,, b, b, cc

(Passenger Side)

REFERENCE

UNIT ASSEMBLY

LUBE TYPE

APPLICATION

1

Drive Shaft U-Joints & Slip Yoke

Spicer Ultra-Premium Synthetic High Temp

Zerk fitting (x3)

First 100 hours & weekly thereafter

2

Drum Drive - PMP / ZF

Recommended: Gear Lube 80W90 / 85W140

Service

Change oil after first 100 hours. Thereafter, change every 6 months or 1,000 hours.

3 4

Chute Pivot System

General Purpose EP #2 Lithium Grease

Zerk fitting

Weekly

Drum Rollers

General Purpose EP #2 Lithium Grease

Zerk fitting

Weekly

5

Rear Control Box Handle

General Purpose EP #2 Lithium Grease

Zerk fitting

Weekly

6

Hydraulic Filter & Fluid Service

ISO 68 under 80° F ISO 100 over 80° F

Fill to sight gauge level

Change oil after first 100 hours. Thereafter, change every 6 months or 1,000 hours.

Replace (All)

Change oil after first 100 hours. Thereafter, change after every 1,000 hours. (All)

a b c

FREQUENCY

Spin-on Suction Filter 735000 (All models) High-Pressure Filter 735003 (BridgeKing®) Parker Pump Suction Filter 735102 (BridgeKing®)

7

Gearbox Mounting Bolts

Torque to 300 lbs. - 7/8” bolt

Check

Weekly

8

Debouncer

Adjustment range 3/8” to 1/2” maximum clearance

Check

Every 6 months

9 10

Main Frame Bolts

Torque to 310 lbs.

Check

Weekly

Drum Drive Flange Bolts

Torque to 200 lbs. (5/8” bolt)

Check

First 100 hours & monthly thereafter

11

Oil Reservoir Breather 735013

N/A

Change

Change every 1,000 hours

12

Wheel Lug Nuts

N/A

Check wheel lug nut torque after the first 50 -100 miles & every Auxiliary Axles 10,000 miles thereafter. Torque lug nuts to wheel manufacturer’s recommendations.

Water Tank 13 Hydraulic Hoses 14 All Mixer Lights 15 BridgeKing®

N/A

Inspect

Daily

N/A

Inspect

Daily

N/A

Inspect

Daily

REFERENCE

UNIT ASSEMBLY

16

BridgeKing® Pivot Bushings & Cylinder

BridgeKing® Axle Attaching Bolts 17 507-374-2239

LUBE TYPE

APPLICATION

FREQUENCY

General Purpose EP #2 Lithium

Zerk fitting

Weekly

Torque bolts to 450 lbs.

Check

First 5,000 miles & annually thereafter

Check torque (to750 ft./lbs.)

Check

First 5,000 miles & every 10,000 miles thereafter

www.ctmmixers.com


Turn static files into dynamic content formats.

Create a flipbook
SERVICE & MAINTENANCE PARTS FLYER 2026 by ctmmixers - Issuu