QUALITY CONCRETE | PRAIRIEVILLE, LOUISIANA CAPPED & FULLY-WELDED— PAINTED STOCK WHITE
Pump - Hyd., New, RH A-Pad, RE Control 5423-925 745415 CTM / mtm
$3,100
Pump - Hyd., New, RH A-Pad, Man Control 5423-832 745420 CTM / mtm
$2,466
Chute - Extension, 4’ Lightweight Steel 770066 CTM / mtm
$275
Vibrator - Main Chute, Air, VS250HS, 4” Mount Center 760180 CTM / mtm
$234
Sight Tubes CTM / mtm Valve - MAC, Chute Lock, “AAH”, Manifold 760052 CTM / mtm
CTM Rock Guard Assembly - Orange 225365 CTM / mtm
Safety Bar - CTM, Upper Ladder Platform 799811 CTM / mtm
Valve - MAC, Hopper, “FAH”, Manifold 760053 CTM / mtm
Scraper Aluminum, 47” Handle 799865 CTM / mtm
Scraper - Chute (Head Only)
$120
$157
$190
$46
$197
730076 CTM / mtm
$7
Nozzles
Valve - MAC, Axle, “DAH”, Manifold 760054 CTM / mtm
$165
CTM / mtm PART # 730030 730034
DESCRIPTION Standard Insulated
SALE
$5 $6
Handle Chute Scraper 730077 CTM / mtm
$7
Con-Tech Manufacturing, Inc. reserves the right to limit quantities. · Prices valid 10/01/26 to 10/31/26 · October 2026
PART # 730027 730028 730032 730033
DESCRIPTION 27.25” L (26” Head) 31.25” L (30” Head) 37.25” L (36” Head) 36.00” L Stripe
SALE
$6 $6 $9 $10
Spend $4,500 on a single qualified order in October, receive a FREE Milwaukee® M12 FUEL Cordless Hammer Drill & Impact Driver combo kit from CTM Parts.
VALID ONLY ON A SINGLE TRANSACTION EXCLUDES DRUM PURCHASES
MIXER SERVICE & MAINTENANCE SCHEDULE UPDATED 06/17/2025
a, b, c
(Passenger Side)
REFERENCE
UNIT ASSEMBLY
LUBE TYPE
APPLICATION
1
Drive Shaft U-Joints & Slip Yoke
Spicer Ultra-Premium Synthetic High Temp
Zerk fitting (x3)
First 100 hours & weekly thereafter
2
Drum Drive - PMP / ZF
Recommended: Gear Lube 80W90 / 85W140
Service
Change oil after first 100 hours. Thereafter, change every 6 months or 1,000 hours.
3 4
Chute Pivot System
General Purpose EP #2 Lithium Grease
Zerk fitting
Weekly
Drum Rollers
General Purpose EP #2 Lithium Grease
Zerk fitting
Weekly
5
Rear Control Box Handle
General Purpose EP #2 Lithium Grease
Zerk fitting
Weekly
6
Hydraulic Filter & Fluid Service
ISO 68 under 80° F ISO 100 over 80° F
Fill to sight gauge level
Change oil after first 100 hours. Thereafter, change every 6 months or 1,000 hours.
Replace (All)
Change oil after first 100 hours. Thereafter, change after every 1,000 hours. (All)
a b c
FREQUENCY
Spin-on Suction Filter 735000 (All models) High-Pressure Filter 735003 (BridgeKing®) Parker Pump Suction Filter 735102 (BridgeKing®)
7
Gearbox Mounting Bolts
Torque to 300 lbs. - 7/8” bolt
Check
Weekly
8
Debouncer
Adjustment range 3/8” to 1/2” maximum clearance
Check
Every 6 months
9 10
Main Frame Bolts
Torque to 310 lbs.
Check
Weekly
Drum Drive Flange Bolts
Torque to 200 lbs. (5/8” bolt)
Check
First 100 hours & monthly thereafter
11
Oil Reservoir Breather 735013
N/A
Change
Change every 1,000 hours
12
Wheel Lug Nuts
N/A
Check wheel lug nut torque after the first 50 -100 miles & every Auxiliary Axles 10,000 miles thereafter. Torque lug nuts to wheel manufacturer’s recommendations.
Water Tank 13 Hydraulic Hoses 14 All Mixer Lights 15 BridgeKing®
N/A
Inspect
Daily
N/A
Inspect
Daily
N/A
Inspect
Daily
REFERENCE
UNIT ASSEMBLY
16
BridgeKing® Pivot Bushings & Cylinder
BridgeKing® Axle Attaching Bolts 17 507-374-2239
LUBE TYPE
APPLICATION
FREQUENCY
General Purpose EP #2 Lithium
Zerk fitting
Weekly
Torque bolts to 450 lbs.
Check
First 5,000 miles & annually thereafter
Check torque (to750 ft./lbs.)
Check
First 5,000 miles & every 10,000 miles thereafter
www.ctmmixers.com