FALL ISSUE 2019
A PUBLICATION OF CROSSL AND CONSTRUCTION COMPANY
AWARD-WINNING PROJECTS 2018 -19
A P U B L I C A T I O N O F C ROS S L A N D C ON S T RU C T ION C OM P ANY • F A L L 2 0 1 9
04
p4 OSAGE CASINO
06
Tulsa, Oklahoma
p6 THADEN FIELDHOUSE Bentonville, Arkansas
p7 JOPLIN EARLY CHILDHOOD CENTER Joplin, Missouri
p8 THE FOUNTAIN PLAZA Bentonville, Arkansas
p9 GEIGER READY-MIX Kansas City, Kansas
p10 FORT OSAGE SCHOOL DISTRICT Independence, Missouri
p12
Featured Story GATHERING PLACE Tulsa, Oklahoma
FEATURED STORY 12
22
p16
Crossland Heavy Contractors GATHERING PLACE: PEDESTRIAN BRIDGE AND LAND BRIDGES Tulsa, Oklahoma
p18 WAR EAGLE BRIDGE War Eagle, Arkansas
p19 LAKE HEFNER WATER TREATMENT PLANT Oklahoma City, OK p20 SAINT FRANCIS HEALTH SYSTEMS Tulsa, Oklahoma p21 FEDEX GROUND
Oklahoma City, Oklahoma
25
26
p22 HOPE CITY CHURCH Joplin, Missouri
p24 2018-19 AWARD-WINNING PROJECTS p25 NICK PENNER
named in Wichita Business Journal 40 Under 40
p26 CROSSLAND CARES 2
Red Iron’s Corner I spend a lot of time visiting our office locations and job sites. One of the best parts of my job is getting to interact with everyone throughout the organization. Every office and every job site is unique, but one thing that I consistently come across is the competitive nature of our people. From the bragging rights of our Company Retreat to the pride that comes from having the largest project, most extensive concrete pour, biggest precast set, or tallest building erected - at Crossland, competition is a fun and welcomed challenge. I enjoy seeing and experiencing our people living the company’s core values (Trust, Responsibility, Integrity, Passion), which I believe have been the source of our competitive culture. Established by our late founder, Ivan Crossland Sr., these simple but powerful four values have continually shaped our culture over the years. A competitive drive, coupled with our company’s humble beginnings, continuously fuels our employees. It’s this drive that pushes our teams to go above and beyond for our clients. They put their hearts into the communities they serve and never give up. Our leadership in the field and the office always strive to be better. It’s incredible to see their hard work pay off and recognized amongst their peers and our competitors for the projects they’ve completed. We dedicated this issue of the Red Iron to celebrating our competitive drive and award-winning spirit. Our featured project is the Gathering Place in Tulsa, Oklahoma. This project has received local, regional, and national awards on several global platforms, and it’s an excellent representation of our company’s competitive drive and commitment to client satisfaction. Congratulations to all of our employees for these fantastic projects and a continued safe 2019!
John Priest President
3
ABC
OF OKLAHOMA
EXCELLENCE IN CONSTRUCTION AND
BUILD OKLAHOMA Fast Facts: Owner: Osage Nation Architect: Marnell Architecture Delivery Method: Construction Management Self-Performance: Concrete, Steel Square Footage: 729,000 SF
ABC of OK, Excellence in Construction, Other General all contract amounts, 2018 AGC of OK, Build Oklahoma, Commercial, $50m+, 2018
OSAGE CASINO TULSA, OKLAHOMA
When you arrive at the Osage Casino, you are greeted by
Crossland Construction was honored to team up with Marnell Architecture to construct the Osage Casino. Marnell is an architectural firm from Las Vegas known for its work on well-known casinos – Bellagio, Caesar’s Palace and the Wynn in Las Vegas as well as Harrah’s in Atlantic City. With a team like this, you can expect to have a finished product that hits the jackpot.
an extravagant Porte-cochère, a roofed structure where guests can be dropped off to begin their fun. Inside you will see that no expense was spared on the custom features, from high-end wall coverings to stone tile and countertops throughout. • 729,000 square feet – includes the casino, hotel, garage and event center • Exterior insulation Finishing System • $9 million self-performed concrete • Large architecturally designed columns • Custom metal fabrications • Custom light fixtures • Custom detailing in ballrooms
Project Team: Tommy Plahitko, Project Manager; Ethan Johnson, Superintendent; Todd Roberts, Superintendent; Quinton Taylor, Superintendent; Jordan Northcutt, Project Manager; John Victor, Assistant Project Manager; Brianna Whetzell, Project Engineer; Brad Dyer, Project Engineer; Ivan Castaneda, Field Engineer 4
Crossland’s ability to provide value engineering made it possible for us to expand the parameters of our original plans. They are strong communicators and created a teamwork mentality with every person on the job site. The result of their dedication is a facility of which Osage Nation is truly proud. Byron Bighorse – Chief Executive Officer of Osage Casino
This multi-level casino project has a full concrete basement as
More Than Games
well as a 12-inch-thick overhead slab of concrete – all poured by
The casino, of course, features a state-of-the-art gaming floor,
our own Crossland crews. Coming in at over $9 million worth of
but there’s so much more for guests to do. To start, they can visit
the project, this was a massive self-performance undertaking for
the pizza bar, café, or an event in one of the ballroom spaces. In
our teams – that they nailed.
the Thunder Bar and Grill, they can dine and listen to live music
Dare to Dream Bigger
while sitting on the terrace that overlooks the new pool area. At the Skyline Event Center, guests will find themselves cheering
The owner provided their vision for the Osage casino and
with 1,800 of their best friends as the next act blows them away.
the project scope – a $120 million budget, with a 20-month
After the show, they can visit the pub, a place that guests can
schedule. After bidding out the project, as well as calculating
enjoy a cold one brewed in the first-ever brewery attached to a
what would be self-performed, we came back with a plan that
casino in the state of Oklahoma.
was $30 million under their initial budget. This payout gave the owner a chance to dream bigger - adding guest pleasing components like an event center, a pool area, a parking garage, and an expanded site package. Crossland made these dreams a reality, all while staying within the original 20-month time frame.
• 1,500 gaming machines • Three new ballroom spaces • 108,000-gallon pool • 1,800 seat event center • Indoor and outdoor parking for nearly 3,000
5
ABC
Fast Facts:
OF ARKANSAS
Owner: VBT Flying Centre, LLC
EXCELLENCE IN CONSTRUCTION
The synergy created by the Crossland team was measurable and key to success. Rusty Thompson, Project Superintendent, always had a firm grip on the project, while both while managing his forces and directing the subcontractors. Tom Keller, Project Manager, was well organized and prepared.
Architect: Hufft Projects Delivery Method: Construction Management Self-Performance: Concrete, Rough & Finish Carpentry, Steel Site Utilities, Earthwork Square Footage: 26,280 SF
David Swain, Construction Manager, WEI, VBT Flight Center
ABC of Arkansas, Excellence in Construction, Other Specialty Construction all amounts, 2019
Project Team: Tom Keller, Project Manager; Rusty Thompson, Superintendent; Daniel Coon, Field Engineer; and Craig Luper, Mentor
THADEN FIELDHOUSE BENTONVILLE, ARKANSAS
Nature is an inspiring work of art – wind blowing through the trees, birds singing, the glistening ripples of the lake, and the radiant glow of the sun setting over the water. When building in a location as beautiful as Lake Bentonville, the structure must also be a work of art. The Thaden Fieldhouse project located on Lake Bentonville at the Bentonville Municipal Airport is a destination worth visiting. • 26,280 square feet • Two-stories
We are proud to have been a part of this unique project. It features a two-story multi-use building that houses Summit Aviation’s FBO Office, Exhibit Hangar, Café Louise, FAAapproved Flight School, and OZ1 Flying Club. Café Louise is a restaurant that seats 175 patrons who can dine either inside or on the outdoor patio. Guests can canoe, kayak, or fish from the boardwalk that extends into the lake.
Distinct features This design is far from typical – from the varying height and
• 750 square feet balcony overlooking the runway
overhang of the roof to the tongue and groove decking
• 250 feet boardwalk
exposed throughout the exterior and interior of the building. All
• Structural wood glulam rafter system • Standing seam metal panel roof
6
A Unique Place for Guests
of the structures of this imaginative project come together to create an airplane wing when viewed from above.
ABC
Fast Facts:
OF ARKANSAS
Owner: Joplin Schools
EXCELLENCE IN CONSTRUCTION
Architect: Hollis & Miller Architects Delivery Method: Hard Bid Self-Performance: Concrete, Structural Steel Erection, Rough and Finish Carpentry, Hollow Core Panel Erection Square Footage: 43,500 SF
Our relationship with Crossland during the construction has been nothing short of amazing. What impressed me most was the fact that we weren’t a customer; we were a friend. Their ability to establish relationships based on community went well above what we typically experience. ...Crossland’s dedication to professionalism and best practices fell perfectly in line with the District. Their supervision of subontractors and adherence to plans and details was impeccable.
ABC Heart of America, Excellence in Construction, Institutional Over $5M, 2018
David Pettit, Director of Facilities, Joplin Schools
JOPLIN EARLY CHILDHOOD CENTER JOPLIN, MISSOURI
Joplin Early Childhood Center was located in mobile trailers at McKinley Elementary School for six years following the
Inspiring Creativity Through Design The Early Childhood building was created to inspire children
devastating tornado in 2011. When resources were available,
from the moment they step foot inside the building. From
the Joplin School District was more than ready to have its
grand entryways, various exterior colors and patterns, and a
early childhood program back in a permanent building. The
state-of-the-art playground - this environment is sure to get
new structure also allows for expansion – providing space for
children excited about learning.
more than 320 students ages three to five and preschool and daycare services.
The inside of the building is both visually impressive and
The project included:
tangibly functional with many features that foster creativity
• 43,500 square feet • 14-month completion time
and expose children to different textures. Every classroom has a unique color and theme.
• 20 classrooms • 4 classrooms double as storm shelters • Administrative wing • Common learning spaces
Project Team: Danny Langerot, Division Manager; Aaron Hight, Project Manager; and Aaron Keeton, Superintendent 7
ABC
OF ARKANSAS
EXCELLENCE IN CONSTRUCTION
Fast Facts: Owner: Dynamic Development, Inc. Architect: BiLD Architects Delivery Method: Negotiated Self-Performance: Rough & Finish
ABC of Arkansas, Excellence in Construction, Commercial $5-10M, 2019
THE FOUNTAIN PLAZA // HERSHEY COMPANY BENTONVILLE, ARKANSAS
The Fountain Plaza, home to the Hershey Company in Bentonville, Arkansas had a tight timeframe for the tenant to move-in. Even though design plans weren’t 100% completed, our crews fast-tracked the building shell and got to work on
Carpentry, Concrete, and Steel Square Footage: 46,300 SF
Throughout the entire design & construction process you treated our entire team fairly and delivered a building that everyone can be proud of…the building has brought incredible feedback from all our corporate leaders who have traveled from Hershey, PA to visit the space. Mark Swank, Manager-Corporate Facilities, The Hershey Company
the foundation and steel to move the project along. As the final scope of this project came to completion, our team
Interior Features:
worked hard to make sure the project stayed on budget, and
• Extensive audio/visual equipment with Planar Screens
the tenants were able to move in on-time.
• Fixed and electronic sound control devices
A New Office Space
• ECOVET recycled wood interior features from old tractor-trailer beds
Hershey’s new office space occupies half of the first floor and
• Sliding glass office doors
all of the second floor (35,000 square feet) of the two-story
• Exposed structural designs
Class-A multi-tenant office building (43,600 square feet). The areas occupied by the Hershey Company were built to
• Curtain wall glazing
meet specifications for LEED v4 for Commercial Interiors.
• Black onyx brick
These specifications included the installation of two large
• Architectural metal panels
solar arrays on the roof, car charging stations, energy-
• Aluminum composite panels
efficient building systems, and eco-friendly materials. These
• Cantilevered tube steel at the entries that support a glass a stainless-steel canopy system
adjustments would bring sweet benefits for years to come.
8
Exterior Features
Project Team: Robert Adams, Project Manager; Scott Brogan, Supererintendent; Taylor Rowling and Markus Koch, Assistant Superintendents
MBCEA METAL BUILDING
CONTRACTORS & ERECTORS
GEIGER READY-MIX
ASSOCIATION
AWARD OF EXCELLENCE
KANSAS CITY, KANSAS As a family-owned company, we take pride in maintaining that family feel, even after growing to 1,500 plus employees. That’s why getting to work with other family-owned companies, like the Geiger Family, always feels so special. The Geiger Family has been part of the pulse of the Kansas City area construction industry dating back to the 1860s. In 1976 the company’s roots spread even further when Geiger’s opened a cement batch plant in Kansas City, Kansas. The Ready-Mix plant was outdoors, exposing it to weather conditions that affect the region. Crossland was selected to improve plant efficiency by enclosing the existing batch plant without interfering with the daily operations.
MBCEA, Award of Excellence, 2018
Finding Solutions This project presented several challenges, but our teams are no strangers to thinking outside the box. The unique shape and height of the structure presented an obstacle along with constructing the building over the top of an existing concrete batch plant. Our crews assembled as many pieces as possible at ground level before hoisting them into place. Erection crews followed suit, and erected the roof structure in finished “pods”. These methods minimized the need for workers to be exposed to dangerous heights and reduced the potential for dropping tools and other materials below.
A Partner for Life We don’t just consider ourselves a contractor that executes a set of plans. We pride ourselves on being an active partner throughout the entire project and creating lasting relationships with our valued customers along the way.
Fast Facts: Owner: Geiger Ready-Mix Engineer: AGC Engineers Delivery Method: Negotiated Self-Performance: Concrete, Demo, Earthwork Square Footage: 16,000 SF 9
ABC
HEART OF AMERICA
EXCELLENCE IN CONSTRUCTION
ABC Heart of America, Excellence in Construction, Institutional Under $5M, 2018
Fort Osage Stadium
FORT OSAGE SCHOOL DISTRICT INDEPENDENCE, MISSOURI
Crossland Construction started the project and then faced meeting a completion date that seemed nearly impossible. Together, we worked concisely to proactively address all issues successfully. Their team of professionals were excellent communicators and outstanding executers. Crossland was responsive and cooperative during the construction process and delivered a project that surpassed all expectation. John R. Clement, RA, Senior Architect DLR Group
When we do work for school districts, our teams have a chance to be a part of structures that inspire, protect, and create opportunities for our children. Contributing to a project that will impact a community for years to come is a great feeling. Our team recently had the chance to build a new football stadium, breezeway, and the early childhood center for the Fort Osage School District in Independence, Missouri. Friday Night Lights We know the importance of a high school football stadium to its community. We were proud to take the field on this one and build a fantastic new sporting complex for the district. The project included new artificial turf, an eightlane track, bleachers, press box, concession stand, and a brand new scoreboard - bringing a whole new meaning to Friday Night Lights.
10
We couldn’t be more thrilled with the quality of their work, the efficiency in which they do it, the professionalism of their staff and the fact that they met and/or exceeded our expectations throughout the process. Woodland Early Childhood Center
Dr. Steve Morgan, Assistant Superintendent, Finance & Operations Fort Osage R-1 School District
Making Connections
A Winning Team
Ensuring students are safe and have easy access to their
Education projects typically have tight, non-negotiable timelines
classrooms are two essential factors for a school. The Fort
and special safety considerations to ensure students have a
Osage High School improved school functionality by adding
dependable place to learn. Meeting (and exceeding) these
a fully-enclosed breezeway that connects all sides of their
expectations requires dedication and focus.
building. The new breezeway gives students access to each hall quickly without having to exit the building and keeps them out
Regular meetings with our subcontractors, in conjunction
of the weather.
with rigorous, three-week schedules allowed us to tackle any obstacles and identify any conflicts that could render
A Foundation for Lifelong Learning
the timeline. Our ability to self-perform concrete, steel, and
The Fort Osage Early Woodland Childhood Center is designed
carpentry alleviated some of the stress of the tight schedule.
to help teachers inspire young minds. From the brightly colored
These and other self-performance capabilities enable us to set
classrooms and windows to the shapes and patterns that line
the tone and pace of the construction phase, control project
the hallways, the design gives teachers and students a firm
costs, and establish standards of quality and safety.
foundation to enhance their learning. This new building offers eight classrooms, five therapy rooms, two padded sensory
It is always a pleasure to be able to walk away from a project
rooms, and a multi-purpose room to help meet the needs of
knowing the impact it will have on a community moving forward.
their students. For the staff, there are new office areas, as well
These projects remind us what it truly means to be community
as new administration areas and break rooms. Last but certainly
builders.
not least, this project includes a FEMA Safe Room to ensure the safety of the students and staff.
Project Team: Matt Crossland, Project Manager; Zach Cole, Superintendent; and Brian Meyer, Field Engineer
High School Breezeway Fast Facts: Owner: Fort Osage School District Architect: DLR Group Delivery Method: Hard Bid Self-Performance: Breezeway – Concrete, Demo, Steel Stadium – Concrete, Rough Carpentry Early Childhood Center – Concrete, Rough Carpentry Square Footage: Breezeway – 2,300 SF Stadium – 4,400 SF Early Childhood Center – 19,975 SF 11
465
MILLION DOLLAR DE STIN ATION AT TRACTIO N
65.5
AC R E S O F L AND
LODGE
M ULTI - L E V EL / 25,0 00 SF V I S ITOR S C ENTER & EATERY
BOATHOUSE 3 - L E V E L / 2 1,0 00 SF
RESTAURANT/EDUCATION AL CENTER
1-DOZEN THEMED A R EA S
160
P L AY S TRUCTURES
1 MILLION PL A NTS ADDED
6,000
TR EE S P L ANTED
20,000
TON S O F SA N D STO N E 12
ABC of OK, Excellence in Construction, Mega Projects over $100M, 2018 JLT Award, Build America Awards, CM-New or Renovation $100M+, 2018 AGC of OK, Build Oklahoma, Institutional $50M+, 2018 ENR Best Projects, Landscape/Urban Development, 2019 ENR Texas & Louisiana Project of the Year, 2019 TIME Magazine, Greatest Places, 2019
GATHERING PLACE TULSA’S RIVERFRONT PARK TULSA, OKLAHOMA Named America’s Best New Attraction by USA Today and one of Time Magazine’s World’s Greatest Places in 2019, the Gathering Place is a world-class riverfront park in Tulsa, Oklahoma. The park was designed to welcome residents and visitors to a vibrant and inclusive space that engages, educates, and excites its guests. The idea was created from the George
Fast Facts:
Owner: Gathering Place LLC, a Subsidiary of Tulsa’s RiverParks Authority Lead Design Firm:
Kaiser Family Foundation’s vision to build a place to connect the people of
Michael Van Valkenburgh Associates Inc.
Tulsa.
Civil/Bridge/Electrical Engineer: HNTB Corp.
The park transformed 66.5 acres of flat land adjacent to the Arkansas
Structural Engineer (Williams Lodge, ONEOK Boathouse, Maintenance Building): Structural Engineering Associates
River into an interactive work of art. With intricate design and elaborate
Architect: Mack Scogin Merrill Elam Architects
architecture, the scale of this project has been compared to the construction
Delivery Method: Construction Management
of a small city and took several years to complete. This park will enrich the
Self-Performance: Concrete, Steel
lives of a community forever, putting Tulsa on the map as a must-see travel destination.
Stepping into Wonderland The park’s playground equipment will transport children to their very own wonderland. Brought over from Germany and Denmark, these play structures are as charming as they are durable. The beauty of these structures encourages inspiration and exploration and offers plenty to do for children of all ages. • Pirate ships • Rope-netted tower bridges • Slides • Water features • Skate park • BMX bike park • Basketball Courts 13
From massive topographical changes to intricate landscape installations to one-of-a-kind buildings, Crossland effectively managed the project with the utmost professionalism and a can-do spirit. Their ability to execute on value engineering and intricate project management allowed us to deliver the project on schedule and in a financially responsible manner. From Crossland’s leadership to their workers in the field, their integrity is obvious.” - Jeff Stava, Executive Director & Trustee, Tulsa’s Gathering Place, LLC
Williams Lodge: • Grand staircase
• Walk-in stone fireplace • Custom stone flooring • Six species of wood covers the walls and ceilings • Ice cream soda fountain and sweets shop
• Three-story natural stone façade and glass exterior • European metal panels
Tackling the Project Head-On
The Park
Gathering Place was initially under contract with another
A series of park paths measuring six miles in totality, two land
construction firm. It was nearing the completion of the
bridges spanning Riverside Drive, and three wood timber
demolition phase and already $50 million over budget when
bridges link the Gathering Place together. Plans included the
The Kaiser Foundation contacted the Crossland team. This type
construction of numerous buildings, state-of-the-art playground
of project doesn’t come along every day, and we were honored
equipment, and acres of customized green space.
to take on the challenge. Site work was often dependent on the weather and the river’s After meeting with the Kaiser Foundation, we had a good
waterline. From day one, crews were working around-the-clock
grasp of their vision and we were positive we could improve
to make sure the schedule stayed on track. Through the hottest
the project’s trajectory. Our team visited top-ranked parks in the
and coldest days, year-round, our teams powered through to
nation to assess what worked and what didn’t work. We worked
ensure the quality of this project. On any given day, between
hand-and-hand with the architect, Michael Van Valkenburgh, to
150-500 construction staff were on the job site.
move the project in the right direction.
14
Working with Nature
architect reviewed many mockups from subcontractors before
We worked closely with the Corps of Engineers to preserve
any installation was performed to ensure everything was perfect
the environment and improve the Arkansas River shoreline.
when complete. We engaged approximately 90 subcontractors
Using 425,000 yards of river sand, crews began the process of
for the different project phases and features of the 66.5-acre
constructing the park’s elevations. Stone was brought in from
project. Utilizing subcontractors previously vetted by Crossland
quarries in Podeau, OK.
was a calculated maneuver that simplified the management of the various project scopes.
Thousands of trees were brought in from all over the country – and arborists closely monitored hundreds of mature trees. When
Because of unseasonal rainfall, rescheduling became a regular
we dug down in one area, we used the excavated material to
occurrence. Each instance created a ripple effect across the
build up other areas of the park. Root lines were marked, and if
entire job site, so crews worked countless overnight shifts to
design plans got in the way of those roots, we redesigned the
keep propelling the project forward.
plans. Careful planning went into the location and timeframe of planting trees, including engineering 200,000 yards of soil,
Proud to be part of the Family
customized to meet the individual pH needs of the landscape.
Just one month after the park’s doors opened, more than
Planting was done year-round, depending on each plant’s
300,000 visitors had come through its entrance. Gathering Place
optimum maturity season to maximize growing time. As seasons
stands ready for the long haul, with state-of-the-art polishes and
come and go, the natural beauty will continue to be preserved
construction standards set to perfection.
by watering systems and onsite maintenance crews. Ultimately delivering Gathering Place well within budget
Doing the Work
parameters and anticipated completion date, we are proud to
Crossland teams self-performed the Boathouse building
have become an extended part of the Gathering Place Family.
concrete, the structural steel in the Lodge, and other areas
So much so, that we brought our entire company in for our 2018
across the park. We also supplemented several of the
Company Picnic.
subcontractors, whose scopes included site concrete, earthwork, and landscaping. Each time we engaged our self-performance
When planning your next family outing, consider the Gathering
crews, we were able to ensure the quality of the project and
Place. Once you visit, you will find yourself wanting to visit
make up for any lost time in the schedule.
it again and again, each time, bringing a new experience. From fitness classes, story-time, sports tournaments, outdoor
Gathering Place was a unique project, so making sure our
concerts, and multiple dining options – the park offers
subcontractors and anyone providing work on the job
something for everyone in the family.
understood the bigger vision was critical. The owner and
ONEOK Boathouse:
• Fiberglass Pavilion Canopy • Cantilevered concrete staircases • German slate-clad stair enclosure • Natural stone flooring • Water access, patron-available kayaks
Project Team: Eric Lopp, Teece Davenport, and Chris Bilby, Project Managers; Jeff Machado, Brandon Smith, Eric Koons, Scotty Brice, Jason Olsen, Koy Ramsey, Wyatt Hughes, Michael Merrill, Nick Fields, Superintendents
15
We bring a wide range of expertise and resources to our clients. We believe that some of the most valuable work is done below the soil, and we strive to make a difference, every day, from the ground up.
ABC of OK, Excellence in Construction, Infrastructure-Heavy, 2018 Crossland Heavy Project Team: Jason Smith, Sr. Project Manager; Rick Stevens, Project Superintendent; Justin Hill, Concrete Superintendent; and Nathan Vantriest, Field Engineer
RIVERSIDE DRIVE PEDESTRIAN BRIDGE AND LAND BRIDGES AT GATHERING PLACE TULSA, OKLAHOMA
PEDESTRIAN BRIDGE Crossland Heavy Contractors built the 3,430 square foot free-spanning Pedestrian Bridge that
Fast Facts:
rises over Riverside Drive. The bridge connects Gathering Place’s green space and offers park
Owner: City of Tulsa
guests views of the Arkansas River.
Designer: HNTB Corp. Contractors:
The bridge created out of cast-in-place concrete has interior styrofoam voids to reduce the
Crossland Heavy Contractors
overall weight. Post-tension cables were also used to increase bridge strength.
Becco Manhattan Road and Bridge
The bridge’s unique underbelly yields a wood-grain appearance. Special form liners were used
Tri-Star
during production to create a unique façade.
Wildcate
Known for our self-performing capabilities, we used these skills to help drive the schedule and quality of this project. We self-peformed: structural support piling, forming and pouring all concrete, forming the haunches, creating small board forms, placing post-tensioning components, and installing an ornamental handrail system with LED lighting. 16
ABC of OK, Excellence in Construction, Infrastructure Heavy, 2017 Crossland Heavy Project Team: Brett Rogers, Project Manager; Chip Wolken, Superintendent; Sean Westley, Concrete Superintendent; Nathan Vantriest, Field Engineer; and Shane Wolken, Crane Operator
THE LAND BRIDGES Tulsa’s Riverside Drive is one of the city’s busiest roadways and takes
Features
travelers right through Gathering Place. Continuing with the dream of
• Four two-lane tunnels
creating a place where Tulsa residents can come together, our Crossland Heavy crews gladly took on the task of building the land bridges.
Innovative Design
• 408 feet long, 89.5 feet wide • Each bridge contains 98 precast concrete arches, weighing 25 tons
These land bridges are the only pair of structures like this in the world. The
• 20-foot clearance to accommodate all transportation
bridges constructed with cast-in-place concrete and precast arches were
• 16-foot tree-lined median
extensively waterproofed and then soundproofed with berms. Around 15-25 feet of backfill was used to complete the structures and then planted with lush grass and vegetation. These tunnels also make bridges that guests can
• Self-performed: Pier caps, cast-in-place headwalls, wingwalls and sloped concrete caps
walk on while traffic flows silently beneath them. Allowing guests to walk on top of the archways enables seamless flow, despite cutting through one of Tulsa’s busiest roadways.
GATHERING PLACE BRIDGES LISTED IN TOP 10 ROADS RANKING #9 IN ROADS AND BRIDGES MAGAZINE OCTOBER ISSUE
“We did a pavement design specifically for the area,” Morgan said. “It’s right on the banks of the Arkansas River, so it’s really sandy. Previously there were a lot of groundwater problems, so we went all the way down, pulled everything out. We took a cautious approach to make sure we were providing 100-year protection for the street. The pavement was in terrible shape. It had to be completely reconstructed. Now it’s an incredible road and looks great.” Tim Morgan, HNTB Project Manager told ROADS & BRIDGES. 17 17
Fast Facts:
ABC
Owner: Benton County Arkansas Engineer: Great River Engineering Delivery Method: Hard Bid
OF ARKANSAS
EXCELLENCE IN CONSTRUCTION
ABC of Arkansas, Excellence in Construction, Historical Restoration/Renovation all amounts, 2018
WAR EAGLE BRIDGE
Project Team: Cole Rink, Project Manager and Jerry Heath, Superintendent
WAR EAGLE, ARKANSAS
Bridging the past to the future is a concept that we understand well at Crossland. Our company’s history inspires us daily, and we lead with our core values of trust, responsibility, integrity, and passion in mind. We build our workforce based on these values, ensuring our teams not only care about quality and safety – but also care about their neighbors and communities. Our team brings a particular dedication to each project that can not be artificially generated. The War Eagle Bridge rehabilitation project gave Crossland Heavy Contractors a way to care for our neighbors and ensure
Jeff Banderet, PE, Project Manager, Great River Engineering
Bridging the past with the future
that history and beauty can continue for generations to come.
As we well know, time affects all things, and the bridge had
Historical Meaning
Our crews repaired and futureproofed the structures.
The War Eagle Bridge, located in War Eagle, Arkansas, was built in 1907 and serves as a landmark on the National Historic Registry. Resting adjacent to the War Eagle Mill, built in 1832, the two structures create a beautiful, historic setting for people to enjoy year-round. Some 120,000 people visit the area for a well-known bi-annual craft fair.
18
Their expertise, patience, and desire to work as team to help resolve the complicated issues that arose on this project helped get this project done ahead of schedule.
been rendered unsafe for both vehicle and pedestrian traffic.
Great measures were taken throughout the project to improve structural strength. Additional verticals were added to the four corners of the bridge to increase the load limit. Sandblasting and painting the structure reduces future deterioration. The restoration project increased the longevity of the bridge by an additional 50 years with regular maintenance.
ABC
OF OKLAHOMA
EXCELLENCE IN CONSTRUCTION
Fast Facts: Owner: Oklahoma Water Utilities Trust Engineer: CP&Y Delivery Method: Hard Bid
ABC of Oklahoma, Excellence in Construction, Public Works / Environmental all contract amounts, 2018
LAKE HEFNER
WATER TREATMENT PLANT EXPANSION
Project Team: Jason Smith, Sr. Project Manger; Mitch Ralston, Assistant Project Manager; Chance Tucker, Project Superintendent; Matt Zimmerman, Superintendent; Mark Walters and Jaime Ezparza, Concrete Superintendents; and Justin Smith and Jeff Wolken, Mechanical Foremen
OKLAHOMA CITY, OKLAHOMA “For 25 years, Crossland Heavy has pursued construction
Self-Performance Driven Schedule
solutions that leave the world a little better than we found it.
Crossland Heavy is known for our ability to self-perform multiple
Our projects may not be glamorous on the outside, but they do
aspects of nearly every type of project. Lake Hefner WTP utilized
have a big community and environmental impact,” stated Jason
a multitude of these services. Our ability to self-perform parts
Smith, CHC Senior Project Manager. The recently completed
of the project enabled us to meet their 24-month, fast-track
Lake Hefner Water Treatment Plant Expansion is a perfect
schedule.
example of this impact. The expansion included 22,000 cubic yards of structural concrete and increased the plant’s processing capacity from 75 million gallons to 100 million gallons daily. This
• 16,000 cubic yards of cast-in-place concrete • Installation of site utilities
added capacity helps increase the underground treated water
• Installation of all mechanical piping
stores, which in return supplies more water to the communities
• Installation of all equipment
of Oklahoma City.
Teamwork at its Finest Engaging the project team in regular coordination meetings and executing pre-planning methods were critical to the success of the project. We had a tight timeline of 24-months to complete the project, and the existing plant remained in service during the construction. Daily teamwork, communication, and executing tasks with quality precision ensured that the project stayed on track.
• Site excavation and dirt work “CP&Y, Inc. was impressed with Crossland Heavy’s attention to detail and observed a focus on planning. On numerous
occasions Crossland Heavy identified potential conflicts or
ways to improve project delivery. Solutions were well thought
out and presented clearly saving both time and money on the overall delivery of the job,” stated Adam Marsh, PE of CP&Y.
19
ABC
OF OKLAHOMA
EXCELLENCE IN CONSTRUCTION
Fast Facts: Owner: Saint Francis Health System Architect: KKT Architects Delivery Method: Negotiated Self-Performance: Concrete, Demo, Finish Carpentry, Steel
ABC of Oklahoma, Excellence in Construction, Healthcare $2-5M, 2018
SAINT FRANCIS HEALTH SYSTEMS TULSA, OKLAHOMA
Square Footage: 15,000 SF
Project Team: Matthew Gleeson, Project Manager and Director of Healthcare; Jorge Cruz, Assistant Project Manager; Bruce Carpenter and Chuck Major, Superintendents; Dustin Slattery and Ryan Shaw, Assistant Superintendents
Innovation at its finest In healthcare, there is a minimal margin for error. Hospital staff
After nearly a decade of working with Saint Francis Health
must have fully equipped facilities to care for their patients.
Systems in multiple locations in Oklahoma, we were more than
Staff involvement in the construction process and decision-
ready to take on the renovation of their 6th floor. This area was
making was crucial. We created a mock room and ran through
specifically designed to meet the unique needs and treatment
regular shift duties to ensure all items were adequately placed
options for medical-surgical patients requiring Behavioral
and within reach of a patient’s bed.
Health Services.
The project included: • 34-patient rooms with individual restrooms • Staff break room
The renovated floor was between two patient levels, right above and below it, which posed some challenges. Demolition noise, as well as the containment of dust, water, and any other construction elements, had to be considered and reduced to ensure safety and to minimize patient and staff disruption.
• Nutrition room • Multiple offices • Clean, soil and dirty storage areas • 96 linear foot nurse’s station with integrated LED lighting
To meet an accelerated schedule and deliver the project on time despite significant design changes, our team had two separate crews working around the clock. The result was a successful project and a great addition to the Saint Francis Health Systems facility.
20
ABC
OF OKLAHOMA
EXCELLENCE IN CONSTRUCTION AND
BUILD OKLAHOMA
MBCEA AWARD OF EXCELLENCE
Fast Facts: Owner: Jones Development Company Architect: Jones Development Company Self-Performance: Steel, Concrete Square Footage: 276,700 SF
ABC of Oklahoma, Excellence in Construction, Commercial $10-25M, 2018 AGC of Oklahoma, Build Oklahoma, Commercial $10-20M, 2018 MBCEA, Award of Excellence, Manufacturing, 2019
FEDEX GROUND OKLAHOMA CITY, OKLAHOMA
We’ve been in the construction business long enough to know
Challenge After Challenge
there is no such thing as a cookie-cutter project. We know to
When pre-engineered metal buildings were delivered before the
always anticipate variables – especially when doing multiple
final project design was complete, our crews got to work and
projects, simultaneously, for a large corporation like FedEx.
started driving the schedule. Teams began pouring a partial slab with footings and then started the erection of the steel structure.
Our team was prepared and ready when tasked with the job of
As finishes for the first part of the project were being completed,
completing three separate buildings on one constricted jobsite.
slab prepping and metal frame erection began on the other end,
Increased collaboration and planning allowed us to handle
which allowed multiple crews to complete different portions of the
numerous challenges thrown our way and still achieve a timely
job at once. Tilt-up concrete walls finished the structure’s integrity.
and successful conclusion. The Project Included:
A Force of Nature
• Three buildings
Being hit with extremely wet weather during the project did
• 276,700 total square feet • 277,000 total man-hours • 16-month completion
not stop us from delivering the project on time. Our team was dependant on efficient decision-making, working long hours, and persistence. They never gave up, and the outcome was an awardwinning project. 21
MBCEA METAL BUILDING
CONTRACTORS & ERECTORS
ASSOCIATION
MBCEA, Award of Excellence, 2018
HOPE CITY CHURCH JOPLIN, MISSOURI
Christ’s Church of Oronogo had an expanding congregation
worship. Short term, they signed a one-year lease with Joplin
with many members traveling from the Joplin, Missouri area.
Public Schools to meet in their new performing arts center.
The church leadership decided they needed a satellite church
This meant our crews would need to work faithfully to give the
location to accommodate their membership. This idea came to
church congregation a permanent home before reaching the
life as Hope City Church.
end of their lease. The new worship space was handed over
The project included:
with two months to spare thanks to great leadership and close
• 38,400 square feet • Varco Pruden structure • Standing seam roof with R-30 Sky Liner System • Girts and metal studs • Eave Height: 31 feet, 6 inches
Fast Schedule The church outgrew its temporary location after two short years, and it was clear they would need a permanent place of 22
collaboration with the owner and architect.
Everything a Church Could Need Upon arrival at Hope City, you will notice a wide-open lobby filled with natural light and high top tables where members can visit the coffee bar and chat before the service. The modern yet relaxed feel continues throughout the facility with features like large barn doors and sealed concrete floors.
From beginning to end, Crossland worked not only to meet our aggressive deadline, but did it with excellence. While the quality of the build was proven in the details, the relationships we established with their team along the way made it feel as though it was much more than just a building project. It was a joint effort and collaboration on both sides to develop the vision that we had dreamed about. Cody Walker, Lead Pastor for Hope City Church
Fast Facts: Owner: Hope City Church Architect: Hunter & Millard Delivery Method: Construction Management Square Footage: 39,400
Project Team: Aaron Hight, Project Manager and Curt Fletcher, Superintendent
The new sanctuary features enough seating for 800 people
new. This look helped add to the modern feel of the building.
in each of Hope City’s service times. The mezzanine around
Another unique feature of the exterior was the canopy, which
the sanctuary offers room for members to move freely during
has an upslope instead of the usual downslope, which required
services and provides the much-needed space for those who
unique gutters for the building.
serve the church. Off the second floor of the mezzanine area, there is a 1,000 square feet outdoor patio that allows members
Homegrown Team
to enjoy fellowship. Hope City’s kid’s area offers a state-of-the-
Much of the team building the church was homegrown from
art indoor play area for elementary-aged children and below.
the Joplin area which gave the crews an enhanced sense of
Another area, specially designed for middle school students
ownership over their portion of the project.
features a black box theater type room with space for 100 students to worship.
Every detail of the Hope City Church project became a way for us to love our neighbors better.
The exterior of the structure boasts Corten Metal Panels which arrive looking like rusted metal, but the sheets are brand
23
Crossland Companies
AWARDS 2018-19
Associated General Contractors of America (AGC) Build Oklahoma Awards Institutional, $50M+ - Tulsa Gathering Place, CCC Commercial, $50M+ - Osage Casino, CCC Institutional, up to $5M - Expo Square Stage, CCC Industrial, $5-10M - Solaris, CCC Commercial, $10-20M - FedEx Ground, CCC
Associated General Contractors of America (AGC) Build Kansas Awards
State Building Awards, New Construction - Meadowlark Elementary School Saferoom, CCC
American Builders and Contractors (ABC) Oklahoma Chapter, Excellence in Construction Awards Commercial, $10-25M - FedEx Ground, CCC Industrial, $5-15M - Solaris, CCC Other General - Osage Casino, CCC Healthcare, $2-5M - Saint Francis 6 West, CCC Mega Projects, Over $100M - Tulsa Gathering Place, CCC Public Works/Environment - Haikey Creek Basin Improvements, CHC Public Works/Environment - Hefner WTP Sludge, CHC Infrastructure: Heavy - Pedestrian Bridge, Riverside Drive, CHC
American Builders and Contractors (ABC) Heart of America Chapter Excellence in Construction Awards Institutional, Over $5M - Joplin Early Childhood Center, CCC Institutional, Under $5M - Fort Osage Stadium and Breezeway, CCC Commercial - Fletcher Subaru, CCC
American Builders and Contractors (ABC) Arkansas Chapter, Excellence in Construction Awards
Historical Restoration/Renovation - War Eagle Bridge, CHC Public Works, Environment - Johnson, Robinson Lane, Brush Creek Lift Stations, CHC Historical Restoration/Renovation - Haas Hall Academy, CCC Other Specialty Construction - Thaden Fieldhouse, CCC Commercial $5-10M - Hershey Company, Fountain Plaza, CCC
ABC STEP PLATINUM Award Winner Crossland Construction Company, Inc.
ABC STEP PLATINUM Award Winner Crossland Heavy Contractors
Metal Building Contractors and Erectors Association, Awards of Excellence Geiger Ready-Mix, CCC Hope City Church, CCC
JLT Build America Awards
CM, New or Renovation, 100M+ - Tulsa Gathering Place, CCC
Engineering News Record (ENR) - Best Projects
Landscape/Urban Development -Tulsa Gathering Pace, CCC 24
40 UNDER 40 WICHITA BUSINESS JOURNAL
HALL OF FAME
NICK PENNER NAMED
WICHITA BUSINESS JOURNAL 40 UNDER 40 CLASS OF 2019 WICHITA, KANSAS
Nick Penner, Project Manager for Crossland Construction was
He also chaired the Boys & Girls Club Barry Sanders Golf
named in the Wichita Business Journal 40 Under 40 Class of
Tournament and served as Secretary of the Board for the Boys
2019. The Wichita Business Journal has been presenting these
& Girls Club of South Central Kansas. Nick’s philanthropy shines
awards since 1998. Nick joins this elite class of Wichitans who
brightest through his involvement with the Young Professionals
are recognized for their contributions, work, and achievements
of Wichita Community Enhancement Program. For three years,
to make Wichita a better place.
Nick selected ten area homes annually in need of exterior renovations. He donated his time to develop scopes, procured
When Crossland’s management chooses our nominations,
sponsors and materials, and coordinated the teams to complete
we look for team members who fit our company culture.
these projects – for a total of 30 homes. That kind of dedication
Education and experience, paired with drive, a passion for their
is truly inspirational.
community, and a desire to see those communities succeed were some of the considerations. Nick Penner was a perfect
From a professional standpoint, Nick was instrumental in the
candidate!
success of the Wichita State University Student Housing facility. The project won an Award of Excellence in the Associated
Crossland encourages our employees to get involved in
General Contractors of Kansas 2017 Build Kansas awards
programs that serve the communities we help build. With
program.
Nick, no encouragement was necessary – a lifelong resident of Wichita, Nick, was already fully invested. Nick demonstrates
After residing in Wichita for 38 years, Nick has established
his outstanding commitment to the Wichita community by
himself as an integral part of the cities landscape with
his involvement in the Chamber of Commerce, the Historic
unshakable integrity. We are proud to call him one of our own.
Preservation Board (appointed by Councilman Bryan Frye), and the Wichita Area Builders Association Commercial Council. 25
Crossland Cares is committed to enriching and supporting our communities and world through acts of volunteerism and philanthropic efforts. As small-town based companies, we understand the importance of lending a hand to neighbors in need and have created Crossland Cares to put this mindset to work. Crossland Construction believes in working hard, not only for our clients but for our community and future generations. Crossland Cares intends to do this by actively pursuing avenues of taking care of our Communities, Clients, and those within the Company.
Y O J F O E L BUND CRO
E M P LOY SSLAND
RA EE PROG
M
NEW CROSSLAND EMPLOYEE BENEFIT
‘BUNDLE OF JOY’ PROGRAM The ‘Bundle of Joy’ Program
137 Crossland Families and 179,744 Diapers
We take pride in being a family-oriented company,
We genuinely hope this new benefit helps families
and that’s why we’re proud to celebrate the
out in a happy, yet often challenging, time of their
‘Bundle of Joy’ program. This program was
life. We are pleased to announce that, so far, this
established to help support Crossland employees
program has helped over 137 Crossland families
by giving nearly a year’s worth of diapers to their
and supplied over 179,744 diapers.
growing families.
Coming up with the Concept As we brainstormed ideas for how to show our appreciation for employees, we thought about all the young people that work for the company. We strive to develop our talent organically and from the ground up. We strategically select employees that fit our company culture and train them in the Crossland Way. Over the last decade, we’ve developed into a predominately young company. 26
“We have so many young families that work for us, and everyone is a part of the Crossland family. I think that this program solidifies that. A lot of times, the wives don’t know much about the company, but this program demonstrates that Crossland cares about our employees and their families.” Loretta Maine, Crossland Employee and recipient of the Bundles of Joy Program.
CREWS HELP OUT KANSAS CITY HOSPICE AND PALLIATIVE CARE This spring, Kansas City Hospice, and Palliative Care recognized the need for sidewalks to enhance accessibility at their four locations. Our Kansas City division partnered with our friends at Geiger Ready Mix to complete the project. It was a privilege to come together to help an organization that impacts our communities so profoundly. Other companies involved in this endeavor included; Palmer Electric, Sunbelt Rentals, Decorative Concrete Suppliers, Remco, Crossland Heavy Contractors, Goedecke, Kiwi Landscaping, and Mercer Zimmerman also provided their resources.
LOCAL EMPLOYEES HELP OUT HIGHLAND ELEMENTARY Over the summer, several of our local employees replaced the playground equipment at Highland Elementary School in Columbus, Kansas. The original playground equipment was old, made out of wood, and ready for an update. It was a very wet summer, but the construction couldn’t wait. Our crews muddied up their boots and got to work. We completed the project before the beginning of the school year. “This new piece is easily the most used part of our playground every recess. It has been made known in my class that Crossland Construction put it together for us, and the kids are appreciative of that. Our theme this week was engineering, so we discussed Crossland Construction in many aspects. Mainly in how the whole Crossland team works together to make big dreams become realities. We learned how each job has many different roles, and each role is important to achieve the overall project, and you have to work as a team. Thanks for being our role models this week while learning about that. My class wants to thank the crew members that put it together for them to make lasting memories on.” - Mrs. Malarie Studebaker – 3rd Grade Teacher
TULSA LEVEE FIX SAVES THOUSANDS FROM EVACUATION In May of 2019, the Arkansas River floodwaters were pushing levees to capacity in Tulsa, Oklahoma, causing the City to issue a State-of-Emergency. When we received the call from the City of Tulsa that floodwaters could compromise the levee, we knew we had to help. Our team got to the site immediately to assess the problem. The waters had reduced the levee to a width of two feet. Our crews worked around the clock to construct a new levee that would withstand the rising waters. Stepping in helped save thousands from evacuating their homes and businesses, and we were overwhelmed with the community gratitude. We are proud to be a part of the Tulsa community and to help serve in any capacity we can.
27
Prsrt Std U.S. POSTAGE PAID Columbus, KS Permit No. 18
Crossland Construction Company, Inc. PO Box 45 833 S East Avenue Columbus, KS 66725
First Last Company Name Street Address City, State Zip
FOUR COMPANIES.
ONE FAMILY. Our Story
Over forty years ago, one man’s pursuit of The American Dream propelled our small family operation to huge success. Started in 1977 out of the family garage, Crossland has now grown to over 1,500 employees and ranks as one of the largest construction firms in the nation. Ivan, Sr. built the company on his optimism, integrity, work ethic, and grit. We continue to serve under the belief that if you dream big, remain humble, and work hard, great things are possible. We are very proud to be a part of building the communities where we live, work, and play.
www.crossland.com 282019 Crossland Construction Company, Inc. — All Rights Reserved ©