Skip to main content

Viking Lakes Case Study

Page 1

TABLE OF CONTENTS

S HEADQUARTERS

P h a se 1 - Progra m Verif i cati on

DSCAPE Development P h a se 2 - Ma ster P l an n i n g & U rban D es i g n

Three Lakes and Trails

P h a se 3 - P UD | Zon i n g | E ntitl em ents & Pro j e ct D e l i ve r y


PHASE 0

PROJECT APPROACH

... The Best Ideas Win

STAKEHOLDERS

Reaching Consensus

All (3) Phases Are An Iterative & Simultaneous Design Process

PHASE 2 MASTER PLANNING & URBAN DESIGN

Our Approach is simple and humble: Expect integration and partnership where The Best Ideas Win, Not any one particular individual – No egos involved – No preconceptions brought to the table.

ALTERNATE CONCEPTS

We facilitate Interactive Work Sessions to establish Metrics for Success, create a succinct mission statement, core values and goals that are to be embraced throughout the project design.

CLIENT

ALTERNATE CONCEPTS

BUILD

PREFERRED CONCEPT PHASE 1 PROGRAM VERIFICATION

We identify clear roles and responsibilities, using timely communication. Honest dialogue is very important as not all conversations are easy to have.

ALTERNATE CONCEPTS

PHASE 3 PUD | ZONING | ENTITLEMENTS & PROJECT DELIVERY

Not all stakeholders will have the same interests – we create a detailed mapping of each element to identify the audience and understand ‘what’ success looks like. Our intent is to not politely receive input, but to actively engage the experience and creative potential of the widest possible group of contributors.

CONSULT -ANTS

Our goal in master planning your facilities, through renovation and expansion is to make space function in a fully integrated way. An alignment of program, physical resources and budget are developed early in Phase 1 Programming. Alternative program scenarios are tested in terms of cost and operational efficiency. We do the due diligence necessary, but the ‘Best Ideas’ always Win.

[

Program & Budget

Design Options

L I S T E N

] [ U N D E R S TA N D ] [

Metrics & Desired Outcomes E VA L U AT E

P R E F E R R E D

] [ C H A L L E N G E ] [ CO L L A B O R AT E ] [

CO N C E P T

Key Personnel DELIVER

]


PHASE 0

P ROJ ECT BAC KG RO U N D

Relationships

History with the Vikings - University of Minnesota Joint-Use Stadium To accommodate NCAA intercollegiate football and soccer events, Crawford Architects prepared concept designs for a new 50,000seat, on-campus, open-air stadium for shared use by the University of Minnesota and the Minnesota Vikings. The stadium was designed to be flexible and capable of expanding to 80,000 seats. Big idea strategies were developed to establish project scope, future expansion, and ancillary development. Much of our efforts focused on assisting the University of Minnesota to renew interest in their football program and garnering financial support from alumni. During the initial phases of design, preliminary GMPs were developed to serve as a basis for securing fundint from a variety of sources.

Crawford Architects also played a major role in fundraising providing design and support for negotiations with TCF Bank, the Minnesota Legislature, Minnesota Board of Regents, and Bonding Agencies. Our efforts contributed significantly to securing $239m in funding. Our work in these preliminary phases of development served as the ultimate basis for design. While the Minnesota Vikings ultimately went on to design and construct a standalone facility in the heart of downtown Minneapolis, the planning stages of this project proved to be beneficial to providing adequate facilities for the Team’s use during the NFL seasons coinciding with construction of their new stadium.


PHASE 0

P ROJ ECT BAC KG RO U N D

Relationships History with the Vikings

A successful project is not only measured in terms of on-time and on-budget. A close working relationship between Client and Architect is built alongside the construction of bricks, mortar, concrete and steel. Partnerships with our colleagues, consultants, and foremost our clients are the most important things we build. Proof of that bond extends far beyond the final punch list and ribbon cutting. Crawford Architects has been building that relationship with the Minnesota Vikings for almost two

decades. A decade prior to the inception of the TCO Performance Center Headquarters project and through ownership changes, we worked closely with the Minnesota Vikings to evaluate locations in the Twin Cities area for a new stadium, which built trust and bloomed into the design and construction of their ‘Home’ in Eagan, MN.


PHASE 0

P ROJ ECT BAC KG RO U N D

Relationships

History with the Vikings - Northern Lights The Minnesota Vikings envisioned the Northern Lights project as a 1.5-million-square-foot sports-anchored mixed-use development. It included an indoor lifestyle center, a 72,000seat retractable roof NFL stadium, corporate offices, hotels and more than 3,000 residential dwelling units.


PHASE 1

P R O G R A M V E R I F I C AT I O N

User Group Meetings Hit the Ground Running

One-on-one sit down discussions are facilitated with key designated staff and the core leadership team to determine User Needs, Program Requirements, Equipment, Operational Requirements, and Project Visioning and Objectives. We ask the tough questions; not only what works but what doesn’t work and Why. This extends beyond just functional program of space and into the realm of how each of the individuals approaches and utilizes the facilities day-to-day, beginning with when they walk out of the front door of their home and embark on the journey to the facilities, and to the ebbs and flows of daily regimine. Consider this the stage of the project to dream big, all wishes are outlined during a white page session to be prioritized during future planning stages of the project this is the large end of the ‘funnel’. An example of User Group Session breakdown includes:

›

Community Engagement and Outreach Staff

›

Marketing Staff-Fan Engagement Staff

›

Events & Hospitality Staff

›

Ticket Sales & Operations Staff

›

Security Staff

›

Player Development & Legal Counsel Staff

›

Community Relations Staff

›

Public Relations Staff

›

Information Technology Staff

›

Partnerships & Special Projects Staff

›

Corporate Development & Guest Relations Staff

›

Corporate & Technology Partnerships Staff

›

Administrative Staff

›

Human Resources Staff

›

Football Information Systems Staff

›

Football Administrative Staff

›

Football Operations Staff

›

Content & Production Staff

›

Finance & Controls Staff

›

Sports Medicine Staff

›

Equipment Management Staff

›

Public Affairs Staff

›

Food Service Operations Staff

›

Video Production Staff

›

Groundskeeping & Turf Management Staff

›

Performance & Strength and Conditioning Staff-Facilities Management Staff


PHASE 1

P R O G R A M M I N G / P R O G R A M V E R I F I C AT I O N

1. Team Qualities › What are you looking for in an Architect? › What makes a strong team? › What about our work interests you?

User Group Meetings

Goals & Objectives / Mission Statement

Our Mission To create a first-class facility that fosters champions, on and off the field.

2. Metrics for Success › What are the most important qualities associated with the Vikings Brand / Culture that should be emphasized by this project? › What are the three (3) most important ingredients to a successful project? › On opening day, what headline would you like to see? As you walk into the building, what do you want to see, hear, smell and feel?

Core Project Values Community Through Commitment Innovation Through Creativity Legacy Through Excellence Teamwork Through Collaboration

3. Benchmarking › NFL Training Facilities › Health & Human Performance › Mixed-Use Commercial Development

4. Long Term Goals / Your Legacy › › › › ›

Ownership Team Fans Community Corporate Partnerships

5. Design Goals

Goals & Objectives Create a lasting legacy for the Wilf Family Create the NFL’s best training facility Maximize value through commercial development Create an efficient, sustainable building Establish a sense of unity among all levels of team and facility operations Futureproof the design through resilient principles and timeless architecture Integrate indoor and outdoor space

› Style / Aesthetic › Resilient Design / Sustainibility › Environmental (Interior & Exterior) Space

Create a destination that is unique to Minnesota and the Vikings brand

6. Wrap Up, What Hasn’t Been Done Before?

Utilize biophilic design to create a functional and comfortable space

› Human Performance & Sports Medicine Research Partnerships › STEM / Tech Incubator › Typology of Fan Experiences › Other

Provide partnership opportunities that are impossible to resist.


PHASE 1

P R O G R A M M I N G / P R O G R A M V E R I F I C AT I O N

Inventory & Assessment Developing the Right Program On site review of existing facilties and program areas are tabulated so that they can be compared against User Needs discovered during this Phase. A side by side comparison is made between currently available space and Preferred Program and Facility Needs to create a Gap Analysis showing the amount of additional area potentially required for the facilities and also what departments and uses those gaps are associated with. A decision process begins to analyze the extent of repurposing existing areas for different uses through both extensive and intensive renovations along with alternative concepts for newly constructed areas to fulfill

these gaps. Both schedule of delivery, affects and disruption to existing operations, and budget are weighed heavily concurrent with design iterations to determine the optimal solution(s). As adjustments are required due to budget and schedule, affected elements are discussed with the core committee collectively and tracked in the tabular program document as wish-list items or add-alternates that can be integrated into the project at later stages if the market allows, or as the team chooses to integrate them later.


PHASE 1

P R O G R A M M I N G / P R O G R A M V E R I F I C AT I O N

Benchmarking

New Headquarters ‐ Minnesota Vikings | MVC LLC

FINAL

Developing the Right Program

New HQ ‐ Minnesota Vikings (GSF)

Description

to health and human performance in mind. The findings of a market analysis, economic impact, and feasibility study were overlaid with benchmarked facilities and existing facilities to establish a clear understanding of the facility’s needs, opportunities, and constraints that were unique to the Minnesota market. Summary of Enclosed Areas by Category ‐ HQ

Simultaneously, benchmarking of peer facilities was conducted to create baselines for the renovations and new construction of the team facilities. The inventory and evaluation of these peer facilities was conducted with industry best practices and emerging industry performance trends from sciences related

22 January 2016

Crawford Architects

Program Comparison

Public Areas ‐ Front Door | Valhalla

24103

Media | Press

5092

Team Suite

15991

Existing Vikings (GSF)

Description

Public Areas ‐ Front Door

980

Team Suite

5000

Seahawks | VMAC (GSF)

Description

Dallas Cowboys (GSF)

Description

Public Areas ‐ Front Door

3600

Media | Press

1500

Front Door | Retail | Team Store | Conf. Center | Network Broadcast Media | Press

Team Suite

10600

Team Suite

46869 3252 13886

Hydrotherapy

5334

Hydrotherapy

700

Hydrotherapy

2300

Hydrotherapy

Training Facilities | Medical

8718

Training Facilities | Medical

2200

Training Facilities | Medical

6400

Training Facilities | Medical

Strength & Conditioning

11436

Strength & Conditioning

5900

Strength & Conditioning

9900

Strength & Conditioning

15516

Equipment Room

7351

Equipment Room

3025

Equipment Room

6300

Equipment Room

10038

Staff Locker Rooms

6374

Staff Locker Rooms

975

Staff Locker Rooms

2800

Position Meeting Rooms

11424

Position Meeting Rooms

2750

Position Meeting Rooms

11300

Position Meeting Rooms

11220

Coaching Staff

7998

Coaching Staff

3700

Coaching Staff

5900

Coaching Staff

7100

Ownership & Consultants

9818

6040

Ownership & Consultants

8200

Finance | Human Resources | Legal

5957

7000

Finance | Human Resources | Legal

5000

Cowboys HQ Offices

64847

Marketing, Sales & Revenue Staff

12110

Winter Park Offices Olympic Place Offices (Finance | Legal | Media Work Room) 1010 Offices (Marketing, Sales & Revenue)

14600

Marketing, Sales & Revenue Staff

16000

Community | Public Relations

4244

Community | Public Relations

4600

Draft Room Suite

2289

Draft Room Suite

700

Draft Room Suite

2100

Draft Room Suite

2000

Player Personnel & Football Operations

6314

Player Personnel & Football Operations

3300

Player Personnel & Football Operations

7200

Player Personnel & Football Operations

4412

Coaching Video

4186

Video

800

Coaching Video

4800

Coaching Video

3270

Vikings Entertainment Network

1000

Information Technology

1656

Vikings Entertainment Network

11932

Quality of Life Areas

13639

Nutrition | Food Prep | Dining

11379

Nutrition | Food Prep | Dining

Facility | Operations | Maintenance

12499

Facility | Operations | Maintenance

MV Cheerleaders & Dance Academy

12858

Information Technology

2500

Production Studio

3700

Broadcast Studio

12503

Quality of Life Areas

900

Quality of Life Areas

18934

6150

Nutrition | Food Prep | Dining

8700

Nutrition | Food Prep | Dining

9540

7480

Facility | Operations | Maintenance

15000

Shared Support

26335

4198 Sub Total

204,042

Indoor Practice | Training Facility

95,080

Outdoor Stadium

89,530

Groundskeeping

7,692

Sub Total Indoor Practice | Training Facility

72,300 89,000

Sub Total Indoor Practice | Training Facility

139,300 88,000

Sub Total Indoor Practice | Training Facility Indoor Stadium Venue

Groundskeeping

3,700

IPF Storage

3,500

Groundskeeping

7,186

301,702

Cheerleaders & Dance Academy

7,802

Groundskeeping

4,180

Blue Star Imaging Center Total Possible additional program: Cheerleader | Dance Academy (stand alone) Warming House Expansion ‐ Hall of Honor Expansion ‐ IPF for Youth Football Note: Private Offices (net area) Open Offices (net area) Open Office Ratio

01/22/2016

396,344 GSF 48,229 4,359 8,000 15,000

Total

168,500

Note: Area at 1010 South 7th incudes area for staff to be relocated only.

Total Other Facilities Detroit Lions Practice Facility New York Jets

234,486 GSF 266,702 239,250

262,580 See Stadium

15,500 Total

Additional Program | Cowboys Unassigned Program | Spec Office Total Cowboys Building Area

591,764 GSF 373,689 965,453

NSF 29,010 9,080 23.84%

Pa New Headquarters ‐ Minnesota Vik 2016 Copyright Crawford Archit


PHASE 1

P R O G R A M V E R I F I C AT I O N

Vision Planning

Ideation - Brand Essence & Concept

1

2

Client Branding Materials

User Group Research/Card Game

3

Research

Key Brand Descriptors • Unifying • Innovative • Relentless

8

Every project is unique and requires a unique approach. Each project is treated not as our project, but our client’s project. As architects, it is our job to extract the essence of each project from our clients and transform that vision into a built representation of their goals, ideals and character. The Twin Cities Orthopedics Performance Center is not just a practice facility for the Minnesota Vikings. It is the Home of the Minnesota Vikings - players, coaches, ownership, staff, media, alumni, fans and community. All of these groups make up the Vikings family and are represented. US Bank Stadium is a location where the team plays 8-10 times per year; referred to as Grandma’s House. The team headquarters is where the organization calls ‘Home’ 365 days of the year. The level of thought that needs to go into creating a ‘Home’ cannot be understated. The process of bringing about the design of the TCO Performance Center involved all members of the organization, community representatives, the design team, and stretch back to the origins of the Vikings’ Heritage.

4

In-House Charrette

5

Presentation of Concept

Final Product

Unifying

Innovative

7

6

Further Refined Design Materials Guide

Relentless

Unifying

Innovative

Relentless

Unifying

Presentation of Designs (3D)

Innovative

Relentless


PHASE 1

P R O G R A M V E R I F I C AT I O N

Vision Planning

Ideation - Brand Essence & Concept

BRAND

The Minnesota Vikings had recently embarked on rebranding their entire football organization. The completion of that effort coincided with the opening of US Bank Stadium and the onset of the Viking Lakes project. Crawford Architects was provided that document, and from that document stemmed the whole of the project. Three words stand out to describe the Minnesota Vikings; Unifying, Innovative, and

Relentless. These three words became the foundation for the design and construction of the project.

THE CARD GAME

One of the tools that Crawford utilizes to kickoff concept design with its clients is by playing a Card Game. Images intended to invoke an emotional response are placed in a pile in the middle of the table. No order is assigned. The images can be specific to the project or seemingly random. Our clients are asked to select different cards in response to different questions. The goal of this game is two-fold. It

engages the client in a light-hearted and easy manner so any concerns about discussing anything are set aside. It also gives us an insight into a general sense of who our client is and what are their likes and dislikes; organized or chaotic, simple or complex, etc. For the Vikings, this process was repeated for all User Group Sessions.


PHASE 1

P R O G R A M V E R I F I C AT I O N

Vision Planning

Ideation - Brand Essence & Concept

RESEARCH

The brand statement and work sessions with the Vikings made it clear that they were not looking for a cartoon of a Viking Warrior, but were instead steeped in the tradition of the Historic Norsemen. They embraced their culture and history. Crawford Architects embraced that enthusiasm and took it upon ourselves to inject that history into the project. Research was conducted into the people, the culture, the

geography, the geology, their art, their rise and fall in Northern Europe, their exploration into the new work and their influence locally. All of this set the tone for the base of the project design.

THE CHARETTE

Crawford engaged in a several day design charette, discussing, throwing out ideas, finding precedent representations, sketching and covering our walls with all relevant material and imagery. Summary of these concepts were presented to the Vikings organization, and after much review and comment, and revision, a final statement was created to guide the process and maintain ‘true north’ throughout all phases of the

project:”The realized goal of this process will be a cohesive design that clearly states ‘this is the Home of the Minnesota Vikings.’ The completed project will display the 3 pillars of the Minnesota Vikings Brand Essence. It will unify all those that call it home; it will be innovative in its design and construction; it will be relentless in its demand for quality. These 3 things will be evident throughout every part of the building and site.


PHASE 1

Vision Planning

P R O G R A M V E R I F I C AT I O N

Ideation - Brand Essence & Concept

UNIFYING

The historical Viking people were tight knit groups of farmers and craftsmen living near the fjords of Denmark, Sweden and Norway. Families and extended families worked together to create a community of free peasants. Their location also gave them access to the sea and future exploration. The craftsmanship and art of the later ages of the Vikings (Urnes Style) is characterized with slim and stylized animals interwoven into tight patterns. It can be seen carved into their architecture, jewelry, ship details, armor and clothing.

The Unifying Shield manifests itself in the built environment as inviting materials such as wood and warm lighting. The forms and details take on the intertwining shapes that tie together like the late Viking Age designs. This shield is located at the entry of the Headquarters building where the Vikings Family greets the community and invites them in to the lobby, the VEN Studio, the auditorium, and cafeteria.

“Come together, right now, over me.” – The Beatles, Come Together.


PHASE 1

Vision Planning

P R O G R A M V E R I F I C AT I O N

Ideation - Brand Essence & Concept

INNOVATIVE

The historical Vikings were great explorers, using innovative methods to craft their longships and new techniques for navigation to places unknown to Europe at the time. The vision of a Viking longship quietly approaching the unknown, bravely gliding through the fog shrouded banks of an undiscovered land creates the picture of a people unafraid to try something new to advance their society.

This Innovative Shield takes its inspiration from that vision of the Vikings, seeking to explore. It uses the newest technologies and materials and occupies the center of the building, where the staff works to push the limits of the Vikings Football team. The marketing team, the technology department and video production team all work together to advance the team to new heights.

“Smoke on the water, a fire in the sky. Smoke on the water.” – Deep Purple, Smoke on the Water.


PHASE 1

Vision Planning

P R O G R A M V E R I F I C AT I O N

Ideation - Brand Essence & Concept

RELENTLESS

The relentless nature of the historical Vikings is seen in the geography / geology and climate in which they lived. The stone cliffs of the fjords of Scandinavia and the unrelenting glaciers moving down the mountains to the sea paint a picture of an unforgiving existence that bred strength in the Viking people. The materials are the fractured stone cliff walls; fissures, eskers and crevices; chunks of ice and massive glacial walls that crash into the sea.

The Relentless Shield is characterized by strong and solid materials, stone and iron. The details are chunky and solid, dark in color and unmoving. Subtle angles in the building throughout are reminiscent of the jagged post glacial landscape. Its location is at the football team area of the building, the players and coaches being the solid foundation of the Vikings Family.

“We come from the land of the ice and snow, from the midnight sun where the hot springs blow.” – Led Zeppelin, The Immigrant Song.


PHASE 1

P R O G R A M V E R I F I C AT I O N

Vision Planning

Ideation - Brand Essence & Concept

3 ESSENCES 3 SHIELDS 3 PILLARS The 3 Pillars of the Minnesota Vikings Brand Platform would later become the 3 distinct organizing elements of the TCO Performance Center; The Unifying Shield utilized warm and inviting materials such as wood, and the forms and architectural detailing take on the intertwining shapes that tie together. This Shield represents the entry and communal program elements of the facility; The Innovative Shield takes its inspiration from that vision of the Vikings, seeking to explore. Is utilizes the latest technologies and materials and occupies the center of the building, where the staff works to push the limits of the Football Organization. The marketing team, the technology department and video production team all work in unison to advance the team to new heights; The

Relentless Shield is characterized by strong and solid materials, stone and iron. The details are solid, forged, and dark in color and unmoving. Subtle angles in the building throughout are reminiscent of the jagged post glacial landscape. Its location is at the heart of the Football Operations, the players and coaching staff being the solid foundation of the Vikings’ Family.

RELENTLESS INNOVATIVE U N I F Y I N G


PHASE 1

P R O G R A M V E R I F I C AT I O N

The Vikings Campus Is... P O W E R F UL BOL D UNIQUE MODE R N P R OGR E S SI V E E NE R GI Z E D S OL ID F U T UR E C ONNE C T E D QU A L I T Y PA S SION IN T E NSI T Y T R A DI T ION A L HIS T OR IC RUG GE D GR E E N

INC L USI V E L O YA L P R OUD C OMMUNI T Y IN T R IC AT E A R T IS T IC SUS TA IN A BL E N AT I V E SE A SON A L E DUC AT ION A L C OL OR F UL W E L C OMING SAFE BE A U T IF UL HE A LT H Y C OMP E T I T I V E

INDIGE NOUS SUP P OR T I V E ACTIVE W OODE D R E F INE D E NG A GING T IME L E S S C ULT UR A L BR A NDE D C R E AT I V E W OR L D C L A S S OP E N SHE LT E R E D A C C E S SIBL E N AT UR A L PA S SI V E

RELENTLESS INNOVATIVE UNIFYING


PHASE 2

MASTER PLANNING & URBAN DESIGN

Place - Finding a Location Site Selection

Crawford Architects assisted the Minnesota Vikings in analyzing multiple properties surrounding the Twin Cities region, to determine feasibility, economic impact, and due diligence related to each of the site locations. Renovations to the existing facilities at Winter Park in Eden Prairie were considered, as well as new developments in Anoka, Golden Valley, and Chanhassent. Ultimately, the former site of the TWA Headquarters in Eagan, MN was selected. From there, test fits for the preferred site began. Considerations with the test fits included:

›

identifying how the training facility could leverage the highest commercial value for the entire site.

›

siting the training facility as an anchor for other uses without compromising its function and security.

›

creating the greatest economic, social, and experiential impact for the community.

›

creating degrees of flexibility in land use and phasing of development

›

infrastructure improvements with built in phasing and market flexibility

›

functional relationships between buildings and site features


PHASE 2

MASTER PLANNING & URBAN DESIGN

Due Diligence

Winter Park - Eden Prairie, MN

R E N OVAT I O N & E X PA N S I O N

VS .

N E W CO N ST R U CT I O N


PHASE 2

MASTER PLANNING & URBAN DESIGN

Minnesota FC

VISITOR/PRESS/ STAFF PARKING 145

C7 '-

Due Diligence

Joint Training Facility - Minnesota Vikings & MNUFC - Golden Valley, MN

. ..

Mi�Yit!""�"PfOC'.,,. Mi..-.fCONlic.ltlKI,..,,.,_,,

*

MINNESOTA VIKINGS SPECTATOR BERM

MINNESOTA FC SPECTATOR BERM

MINNESOTA FC TEAM AREA NATURA GRASS Fl D

ENTRY LOBBY HOF MUSEUM PUBLIC SEATING

INDOOR PRACTICE FACILITY 9Q'H£1GHT

l"f'A �EC WIOTW

Fl.Ill new rooTBALL

COVERED WALK

◊

0

◊

\

I I I -I I- -I

SIGN

MINNESOTA VIKINGS ENTRY

I I I -I I-

ii

PLAYER PARKING 190

�


PHASE 2

Due Diligence

Test Fits & Alternate Concepts Viking Lakes, Eagan, MN

MASTER PLANNING & URBAN DESIGN


scheme scheme

scheme scheme

2.3 2.5

2.4 2.6

2.5 3.0

2.6 Notes3.0

1

2.1

2.2 1

2.1 2.3

2.2 2.4

2.3 2.5

2.4 2.6

2.5 3.0

2.6

3.0

+ + −

− + −

++ ++ −+

−+ ++ −+

++ ++ +−

++ ++ ++

++ ++ −+

++ ++ ++

+ + +

+ + +

+ + b Controlled / MinimalbViewControlled of Practice/ Fields Minimal View of+Practice Fields + c Separation from Team c Entry Separation Area from Team Entry+ Area + Orientation / Natural5 Daylighting Orientation / Natural Daylighting + +

++ ++ ++ +−

++ ++ +− ++

+− +− ++ −−

+− ++ −− +−

−+ −+ +− −+

−+ ++ −+ −+

+ + − +

+ + + +

2.1

2.2 1

2.1 2.3

2.2 2.4

2.3 2.5

2.4 2.6

2.5 3.0

2.6

3.0

− + − + + + +

+− −+ +− −+ −+ +− −−

−− ++ −− ++ ++ +− ++

−− ++ −− ++ ++ −+ −+

−− ++ −− ++ ++ −− ++

−− ++ −− ++ ++ +− ++

−− ++ −− ++ ++ −+ ++

− + − + + − +

− + − + + + +

2.1

2.2 1

2.1 2.3

2.2 2.4

2.3 2.5

2.4 2.6

2.5 3.0

2.6

3.0

− + Field Locations (Proximity 2 Field to NW Locations property(Proximity line) to NW property + line) − Amount of Tree Removal 3 Amount of Tree Removal − + Impact of Shadows on 4 theImpact Practice ofFields Shadows on the Practice Fields + −

−+ +− −+ +−

++ −− ++ −−

++ −− ++ −−

++ −− ++ −−

++ −+ ++ −−

++ −+ +− −+

+ + + −

+ + − +

Office Building

Office Building

1

Practice Field Frontage 1 / Views Practice to the FieldFields Frontage / Views to the Fields

2

Flow between IPF / Team 2 Flow Area between / PracticeIPF Fields / Team Area / Practice Fields

3

Expansion Possibilities 3

Expansion Possibilities

4

Public Entry Locations 4

Public Entry Locations

a

5

Adjacency to the Lake a

Stadium 1 2 3 4 5

Adjacency to the Lake

Stadium

Test Fits & Alternate Concepts 6 7

Practice Fields 1 2 3 4

Site Layouts

1

+ Amount of Cut / Fill 2 Amount of Cut / Fill − Amount of Tree Removal 3 Amount of Tree Removal + Public Access 4 Public Access − Proximity to Public Parking 5 Proximity (in development) to Public Parking (in development) − Impact at Lake (cost,6retaining Impact walls, at Lake etc.)(cost, retaining walls,+ etc.) Cost of Seating Bowl7(S.O.G. Cost orof engineered) Seating Bowl (S.O.G. or engineered) − Stadium / Practice Fields 1 Elevation Stadium /Variance Practice Fields Elevation Variance

Practice Fields

1

scheme

scheme

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6Office 2.5Building 3.0 2.6Office Office Building 3.0 Building 2.5 2.6Parking 3.0 Parking

+ + −

− + −

+ + + + − −+

− −+ + + − −+

+ + + + + +−

+ + + + + +

+ + + + − −+

+ + + +

+ + + + + + + +−

+ + + + + +− + +

+ +− + +− + + − −

+ +− + + − − + +−

− −+ − −+ + +− − −+

3

Expansion Possibilities 3 3 Expansion Possibilities Expansion Possibilities

4

Public Entry Locations 4 4 Public Entry Locations Public Entry Locations

5

+ + c Separation from Team c c Separation Entry Areafromfrom Team Entry Area +Area Separation Team Entry Orientation / Natural 5 5Daylighting Orientation / Natural Daylighting Orientation / Natural Daylighting + a

Adjacency to theaLakea Adjacency to the Adjacency to Lake the Lake

b

Controlled / Minimal b bView Controlled of Practice / Minimal ViewView of Practice Fields Controlled /Fields Minimal of Practice Fields

Stadium 1 2 3 4 5 6 7

Stadium Stadium

2 3 4

2 3 4 5 6 7

2.2 2.4

2.3 2.5

2.4 2.6

2.5 3.0

2.6

3.0

2.6Stadium 2.6Stadium 3.03.0

Training Camp

Training Camp

1

2.1

1

2.1

− + − +− + + + 2.1

1 2.2 1

2.12.1 2.3

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6Site 2.5 Layout 2.5 3.0

+ + − −+ − −+ + +− − − + +− − −+

+ + + + + + − − − − − −+ + +

+ +− + + + + − − − − − − + +

+ +− + + + + − − − − + +− + +

a

Staff / Public Entry a a StaffStaff / Public Entry / Public Entry

b

Players / Coachesb Entry / Coaches Entry b Players Players / Coaches Entry

c

Loading / Unloading c c Loading / Unloading Loading / Unloading

+ − − −

Parking Exposure3(surface 3 Parking Parking / covered) Exposure Exposure (surface (surface / covered) / covered) a

Staff / Public Entry a a StaffStaff / Public / Public Entry Entry

b

Players / Coachesb Entry / Coaches Entry b Players Players / Coaches Entry

c

Loading / Unloading c c Loading Loading / Unloading / Unloading

Training Camp

Training Camp Training Camp

+ − − −

− − +

− − +

+ +− − −+ − −+ − −+

+ +− − −+ − − − −+

2.22.2 2.4

− −+ + + + + + +

2.32.3 2.5

− −+ + + − −+ + +

1

Highway Frontage / Visibility 1 Highway Frontage / Visibility

2.42.4 2.6Parking 2.52.5 3.0

+ + + + + +− + +

− − − − + +−

− −+ − −+ + +−

− −+ − −+ − −+

+ + + + − −

+ + + + + +−

2.6Site 2.6Site Layout Layout 3.03.0

1

− North − −Road 1 1Property North + North Line Frontage RoadRoad Property Property LineLine + −+ Frontage +Frontage 2 + NE + Drainage + Utility + 2 Easement 2 NE +Drainage NE +Drainage Utility Utility Easement Easement − 3 + Northwest + +Parkway + 3 Location 3 Northwest + Northwest + / Adjustment Parkway Parkway Location Location / Adjustment / Adjustment − 4 − Wetland − "D" − Setback − 4 4/Wetland −Impact Wetland − "D" "D" Setback Setback / Impact / Impact − 5 − Wetland − "E" − Setback − 5 5/Wetland Impact − Wetland − "E" Setback "E" Setback / Impact / Impact + 6 − Wetland − Setback Impact + Wetland "F" Setback / Impact / Impact + −+ "F" − 6 6/Wetland + "F" Setback 7 + Future + Development + + 7 7Sites Future + Future (N +Development of wetland Development "F") SitesSites (N of(Nwetland of wetland −"F") "F") 1

1 2

3

2.6Parking 3.03.0 2.6Parking

1

+ Loading Loading + Loading / Unloading Accessability Accessability + + / +Unloading + 1 1Accessability + / Unloading Proximity to Building 2 2Entry Proximity Proximity to Building to Building Entry Entry

+ +a + +b + +c

+ + + + − − + + Loading Loading / Unloading / Unloading + + / Unloading +c +cLoading

Staff / Public Entry a a StaffStaff / Public / Public Entry Entry

Players / Coaches b Entry b Players Players / Coaches / Coaches Entry Entry

+ + + + + + + + Loading Loading / Unloading / Unloading − − / Unloading +c +cLoading

Staff / Public Entry a a StaffStaff / Public / Public Entry Entry

Players / Coaches b Entry b Players Players / Coaches / Coaches Entry Entry

2.12.1 2.3

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6

2.52.5 3.0

2.62.6

3.03.0

2.2 1

− −− + ++ − −−+ + +−+− + ++ + +− + 2.1 ++ 2.3

2.1 2.3

− −− + ++ − −+−+ + +−+− + ++ − −+ − 2.2 −+ 2.4

2.2 2.4

− −− + ++ − −+−+ + +−+− + ++ − −− + 2.3 ++ 2.5

2.3 2.5

− −− + ++ − −+−+ + +−+ + ++ + +− + 2.4 ++ 2.6

2.4 2.6

− −− + ++ − −+−+ + +−+ + ++ − −+ + 2.5 ++ 3.0

2.5 3.0

− − + + − −+ + + + + − − + 2.6 +

2.6

− − + + − −+ + + + + + + + 3.0 +

+1+ 2.12.1 ++ +− +− −− −+ − 3.03.0 + 1 2.2 2.3 2.22.2 2.4 2.32.3 2.5 2.42.4 2.6 2.52.5 3.0 2.62.6 ++ ++ ++ +− +− −+ − + − −+− + ++ + −++− + ++ + −++ + ++− + + + +− + +− − −− − −− − −− − −+ − −+ + + + + − 2.2 −1+ + 2.1 ++ + 2.2 ++ + 2.3 ++ + 2.4 ++ + 2.5 +− + 2.6 + Notes − 3.0 − 2.3 2.4 2.5 2.6 3.0 +scheme +− −scheme −− −scheme −− −scheme −− −scheme −− −scheme −+ −scheme − +scheme + scheme scheme scheme scheme scheme scheme

+ +

+ +

− − −

− −+ − −+ − −+

− −+ − −− − −+

+ ++ + ++ + ++

+ ++ − −+ + ++

+ ++ + +− + ++

+ ++ + ++ + ++

+ + − − + +

+ + + + + +

− − +

− − +

− −− − −− + +−

− −+ − −+ + +−

− −+ − −+ − −+

+ ++ + ++ − −−

+ ++ + ++ + +−

+ ++ + ++ − −+

+ + + + − −

+ + + + + +

2.12.1 2.3

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6Training 2.52.5 3.0 Camp2.6Training 3.0 Camp Camp 2.6Training 3.0

1

2.1

1 2.2 1

2.12.1 2.3

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6

2.52.5 3.0

2.62.6

3.0SITE 3.0 CONCEPT 2.3

+ + − −+ − − + +

+ + + + − − + +

+ + + + − − + +

+ + + + − −+ + +

+ − + +

+ − − +

+ ++ − −+ + +− + ++

+ ++ − −+ − −− + ++

+ ++ + ++ − −− + ++

+ ++ + ++ − −− + ++

+ ++ + ++ − −+ + ++

+ ++ + ++ − −+ + ++

+ + + + + + + +

+ + + + + + + +

1

2.1

1 2.2 1

2.12.1 2.3

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6Indoor 2.5Practice 3.0 2.6 Facility Indoor (IPF) Practice 3.0Practice Facility (IPF) (IPF) 2.5 2.6Indoor 3.0 Facility

1

2.1

1 2.2 1

2.12.1 2.3

2.22.2 2.4

2.32.3 2.5

2.42.4 2.6

2.52.5 3.0

2.62.6

3.03.0

+ Orientation (Natural 2 2Daylighting) Orientation (Natural Daylighting) Orientation (Natural Daylighting) +

+ +

+ + + +

+ + + +

+ +− + +

+ +− + +−

− − + +−

− Highway − − 1 / Visibility 1 Highway + Highway Frontage / Visibility / Visibility + −+ Frontage + Frontage 2 − Orientation − (Natural Orientation + Orientation (Natural Daylighting) Daylighting) + −+ − 2 2Daylighting) + (Natural

+ +

+ ++ + ++

+ ++ + ++

+ +− + ++

+ +− + +−

− −− + +−

− −+ − −+

− − − −

+ + + +

2

Alotted Acreage 2

3

Visibility of All Fields 3 3 Visibility of AllofFields Visibility All Fields

4

Site Security

4

Acreage 2 Alotted Alotted Acreage Security 4 Site Site Security

Indoor Practice Facility Indoor (IPF) Practice Facility (IPF) Indoor Practice Facility (IPF) Highway Frontage 1 / Visibility Frontage / Visibility 1 Highway Highway Frontage / Visibility

1

PRESS BOX

NW PARKWAY

I - 494

O’NEILL DRIVE

O’NEILL DRIVE

ALT SURFACE PARKING

LOADING

PARKING GARAGE (3 LEVELS) IPF

PLAYERS/COACHES ENTRY

TEAM LOADING

SITE CONCEPT 2.6

PLAYERS/COACHES PARKING (COVERED)

IPF

PLAYERS ENTRY

GRNDS.

STAFF ENTRY

PUBLIC/MEDIA ENTRY S.

ND

GR

DINING/ VEN/ETC LOADING

PARKING GARAGE (2 LEVELS) STAFF/PUBLIC/ MEDIA ENTRY

Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113

VIKINGS HEADQUARTERS

Minnesota Vikin Site Concepts and 201

VIKINGS HEADQUARTERS

(WETLAND ‘E’)

(WETLAND ‘E’)

GRASS PRACTICE FIELDS GRASS PRACTICE FIELDS

LAKE (WETLAND ‘F’) STADIUM ARTIFICIAL SURFACE

(WETLAND ‘D’)

1 2.2 1

+ Public + + 1 1Public + Public Access + Access +Access 2 + Alotted + + 2 2Alotted + Alotted Acreage + Acreage + Acreage 3 − Visibility 3 3 Visibility + Visibility All Fields −+ of+All+Fields + of AllofFields 4 + Site + + 4 4Site + Site Security + Security + Security

FUTURE TRAINING CAMP STAGING

FUTURE EXPANSION

+ + − −+ + +− + +

1

STADIUM ARTIFICIAL SURFACE

01/19/2016

+ − − +

Access 1 Public Public Access

LAKE (WETLAND ‘F’)

I - 494

3.03.0

+ ++

GRASS PRACTICE FIELDS

Notes

+ + + SITE + CONCEPT 2.2 + + − − − − + + + +

+ ++

(WETLAND ‘E’)

FUTURE EXPANSION

PRESS BOX

− −+ + ++ + ++ − −− − −− − −+ + ++

− −+

LAKE (WETLAND ‘F’)

NW PARKWAY

2.52.5 3.0 2.62.6Crawford 3.03.0 2016 Copyright 2016 Architects Copyright Crawford Architects

− −+

VIKINGS HEADQUARTERS

S.

ND

GR

FUTURE TRAINING CAMP STAGING

+ +− + ++ + ++ − −− − −− + +− + ++

+ +−

(WETLAND ‘E’)

Minnesota Vikin Site Concepts and 201

(WETLAND ‘D’)

2.42.4 2.6

2.62.6

PLAYERS/ COACHES ENTRY STAFF/ PUBLIC/ MEDIA ENTRY

Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113

STADIUM ARTIFICIAL SURFACE

+ +− + ++ + ++ − −− − −− − −− + ++

2.52.5 3.0

STAFF/PUBLIC/ MEDIA ENTRY

PARKING GARAGE (3 LEVELS)

IPF

STAFF/PUBLIC/ MEDIA PARKING

FUTURE EXPANSION

2.1

1

GRASS PRACTICE FIELDS

2.32.3 2.5

2.42.4 2.6

SITE CONCEPT 2.5

(WETLAND ‘D’)

1

Public Access

S.

ND

GR

+ ++ + ++ + ++ − −− − −− − −+ + ++

2.32.3 2.5

WARMING HOUSE

WARMING HOUSE

LOADING

IPF

2.22.2 2.4

2.22.2 2.4

PLAYERS/ COACHES PARKING

LOADING

+ ++ − −+ − −+ + +− − −− + +− − −+

+ +−

− − −

PLAYERS/ COACHES ENTRY

2.12.1 2.3

2.12.1 2.3

O’NEILL DRIVE

O’NEILL DRIVE

1 2.2 1

1 2.2 1

WARMING HOUSE

I - 494

I - 494

+ ++ − −+ − −+ − −− + +− + +− − −+

2.1

FUTURE TRAINING CAMP STAGING

PRESS BOX

+ − − + − + −

01/19/2016

(WETLAND ‘E’)

NW PARKWAY

2.1

− − + + + + − − − − − − + +

STAFF/PUBLIC/ MEDIA ENTRY

STADIUM ARTIFICIAL SURFACE

FUTURE EXPANSION

PRESS BOX

3.0

+

Parking Exposure3 (surface 3 Parking Parking / covered) Exposure Exposure (surface (surface / covered) / covered)

+ +a + +b − −+c

1 2.2 1

+ +− − +−+ + −+−+ − +−+− − +−+ + +− − 2.2 −1−

+ − + +

1

2

− − 1 − Stadium − /−Practice − 1 Fields 1 Stadium −Elevation Stadium − / Practice /Variance Practice Fields Fields Elevation Elevation Variance Variance + + + 21 + Amount + Access of+Cut+/ 2Fill 1 2 Amount + Public Amount + ofAccess Cut of /Cut Fill/ Fill −+ Public − − 32 − Amount − Acreage of−Tree − Removal 3 2 3 Amount − Alotted Amount − of Tree of Tree Removal Removal +− Alotted Acreage + + 43 + Public + Access +All+Fields 4 3 4 Public + Visibility Public +Access Access −+ Visibility of of All Fields + + 54 + Proximity + Security +to Public + 5 Parking 5 Proximity + Site Proximity +(inSecurity development) to Public to Public Parking Parking (in development) (in development) −+ Site 4 + +− 6 − Impact 6 6retaining Impact + Impact Lake at Lake (cost, etc.)(cost, retaining retaining walls, walls, etc.) +etc.) −+ at −Lake−(cost, +atwalls, + + Indoor 7 + Practice Cost + of Seating +Facility +Bowl 7 7(IPF) (S.O.G. Cost + Practice Cost of +orSeating of engineered) Seating BowlBowl (S.O.G. (S.O.G. or engineered) or engineered) −1 Indoor Facility (IPF)

+ + − −+ − −+ − − + +− + +− − −+

Proximity to Building 2 2Entry Proximity to Building Entry Proximity to Building Entry

1

2.42.4 2.6Stadium 2.52.5 3.0

− − + + − − + + + + − − + +

+ − − + − + −

Loading / Unloading 1 Accessability / Unloading Accessability 1 Loading Loading / Unloading Accessability

3

2.32.3 2.5

Minnesota Vikin Site Concepts and 201

PLAYERS/ COACHES ENTRY

LAKE (WETLAND ‘F’)

(WETLAND ‘D’)

+ + + + + + + + + + + + + + + + CONCEPT 2.1 SITE

− − + + − − + + + + − −+ − −+

PARKING GARAGE (3 LEVELS)

Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113

(WETLAND ‘D’) Notes Notes

+ + + + + + − + + + + − +− + + −

2.22.2 2.4

2.12.1 2.3

GRASS PRACTICE FIELDS

+ ++ + ++ + ++ ++ − −++ + ++ − +−+ − +−+ −+

− − + + − − + + + + + +− + +

S.

ND

GR

(WETLAND ‘F’)

+ ++ + ++ − −++ +− − −++ − −+ + +−+ − +−+ +−

2.12.1 2.3

1 2.2 1

(WETLAND ‘E’)

+ +−+ + ++ + ++ −+ + +−+ + ++ − −+−+ + +−+ −−

1 2.2 1

IPF

IC BL PU TRY EN

+ +−+ + ++ + +−+ ++ + +−+ + +− + −++ − −−+ −+

+ +− − −+ + +− − −+ − −+ + +− − −

LOADING

SITE CONCEPT 2.4

IA ED F/M RY AF ST ENT

− +−+− + ++ − −+ −− + −++ + ++ + −+−+ + −++ +−

− + − + + + +

2.1

SITE CONCEPT 1

+ ++− + ++ − −+ −+ + −++ + ++ + −++− + −+− +−

2

DIA

E /M LIC UB ING F/P ARK P

AF ST

EXISTING DRAINAGE/ UTILITY EASEMENT

2.1 2.3

+ Practice + /Field +Unloading +Frontage 1 1Accessability Practice +/ Views Practice + Field to the Frontage Fields Frontage / Accessability Views / Views to the to Fields the +Fields −+ Loading Loading /Field Unloading + Flow +to Building Flow + Proximity Flow Area between / Practice IPFBuilding /IPF Fields Team / Team AreaArea / Practice / Practice +FieldsFields + + between +IPF2 / Team +between Proximity 2Entry to Entry 3 + Expansion +Possibilities 3 3Entry Expansion + Expansion Possibilities − − /+Public Staff / Public Entry + a Staff +a Possibilities 4 Public Locations 4 Public Public Entry Locations Locations b Entry Players /4Coaches Entry b Entry Players / Coaches Entry − − to the Adjacency to Lake the Lake − −+ac Adjacency + + / Unloading +aLake +acAdjacency +− +− Loading Loadingto/ the Unloading Controlled / 3Minimal bView Controlled Controlled of Practice / Minimal / Fields Minimal View View of Practice of+Practice Fields Fields +b Exposure + + (surface +bParking + 3 + Parking /+covered) Exposure (surface / covered) Entry Separation Area fromfrom Team Team Entry Entry Area − −+ac Separation − /−Publicfrom +cTeam +acSeparation +−Area +− Staff Entry Staff / Public Entry 5 − Orientation + / Natural 5Daylighting Orientation + Orientation Natural / Natural Daylighting Daylighting +− +− −+b Players +/5Coaches +b /Players Entry / Coaches Entry c Loading / Unloading c Loading / Unloading + + 1

2.1

2

O’NEILL DRIVE

VIKINGS HEADQUARTERS

2.2 1

3.03.0

+ + − − + + − −

1

PRESS BOX

I - 494

2.62.6

+ + − − + + − −

1

WARMING HOUSE

2.52.5 3.0

+ + − − + + − −

Parking Parking

PUBLIC/MEDIA PARKING

2.42.4 2.6

− −+ + +− − −+ + +−

Parking

FUTURE TRAINING CAMP STAGING

2.32.3 2.5

− + Field Locations (Proximity 2 2 FieldField toLocations NWLocations property (Proximity line) to NW property + line)line) − (Proximity to NW property Amount of Tree Removal 3 3 Amount of Tree Removal − + Amount of Tree Removal Impact of Shadows 4 on the Impact Practice of Shadows on the Fields + − 4 Impact ofFields Shadows on Practice the Practice Fields 1

PUBLIC PARKING

2.22.2 2.4

2.1

Field Construction 1 (sitework, 1 FieldField Construction cost, Construction settlement) (sitework, (sitework, cost,cost, settlement) settlement)

+ NE Drainage Utility 2 Easement Utility Easement − 2 NE Drainage NE Drainage Utility Easement Northwest Parkway 3 Location / Adjustment Parkway Location / Adjustment − 3 Northwest Northwest Parkway Location / Adjustment Wetland "D" Setback 4 4/Wetland Impact "D" "D" Setback / Impact − Wetland Setback / Impact Wetland "E" Setback 5 5/Wetland Impact "E" Setback / Impact + Wetland "E" Setback / Impact Wetland "F" Setback 6 6/Wetland Impact "F" Setback / Impact + Wetland "F" Setback / Impact Future Development 7 7Sites Future (N Development of wetland "F")SitesSites (N of(Nwetland −"F") "F") Future Development of wetland

STADIUM ARTIFICIAL SURFACE

PUBLIC/MEDIA ENTRY

(WETLAND ‘D’)

(WETLAND ‘D’)

2.12.1 2.3

2.32.3 2.5

SiteSite Layout Layout

(WETLAND ‘E’)

LAKE (WETLAND ‘F’)

1 2.2 1

2.22.2 2.4

North Frontage Road 1 1Property North Frontage Line RoadRoad Property LineLine North Frontage Property

IPF

GRASS PRACTICE FIELDS

LAKE (WETLAND ‘F’)

PUBLIC ENTRY

2.1

2.12.1 2.3

Site Layout 1

1

1 2.2 1

1

S.

ND

GR

(WETLAND ‘E’)

EXISTING DRAINAGE/ UTILITY EASEMENT

2.1

2.1

Practice Fields Fields Practice

PLAYERS/COACHES/ STAFF ENTRY

STAFF/MEDIA ENTRY

ING

1

+1 + 2.42.4 2.6Practice 2.52.5 3.0 Fields 2.6Practice 2.6Practice 3.0 Fields 3.0 Fields 2.1 2 Orientation (Natural2Daylighting) Orientation (Natural Daylighting) + + + + 13 + Field + Construction +Practice + 1 (sitework, 1 + Field +Construction cost, Construction settlement) (sitework, (sitework, settlement) settlement) − + Relation to Fields 3 Field Relation to Practice Fieldscost,cost, − −+ 2 − Field −+ Locations + +(Proximity 2 2 Field + Field to +Locations NW Locations property (Proximity (Proximity line) to NW to NW property property + line)line) − + + 3 + Amount +− of+Tree+ Removal 3 3 Amount − Amount − of Tree of Tree Removal Removal −1 + 2.1 − − 4 − Impact −+ of −Shadows − 4 on4Impact the + Impact Practice +of Shadows ofFields Shadows on the on Practice the Practice Fields Fields + − scheme scheme

Practice Fields 1

1

+ Amount of Cut / Fill 2 2 Amount of Cut Fill/ Fill − Amount of /Cut Amount of Tree Removal 3 3 Amount of Tree Removal + Amount of Tree Removal Public Access 4 4 Public Access − Public Access Proximity to Public 5 Parking (in development) to Public Parking (in development) − 5 Proximity Proximity to Public Parking (in development) Impact at Lake (cost, 6 6retaining Impact atwalls, Lake etc.) (cost, retaining walls, etc.) +etc.) Impact at Lake (cost, retaining walls, Cost of Seating Bowl 7 7(S.O.G. CostCost oforSeating engineered) BowlBowl (S.O.G. or engineered) − of Seating (S.O.G. or engineered) Stadium / Practice 1 Fields Elevation / Practice Fields Elevation Variance 1 Stadium Stadium /Variance Practice Fields Elevation Variance

EDIA F/M STAF RKING PA

EXISTING DRAINAGE/ UTILITY EASEMENT

2.12.1 2.3

Flow between IPF2 / Team between /between Practice IPF /IPF Fields Team / Team AreaArea / Practice Fields 2 FlowArea Flow / Practice Fields

PLAYER/COACH ENTRY

EXISTING DRAINAGE/ UTILITY EASEMENT

1 2.2 1

Practice Field Frontage 1 1 Practice / Views Field to the Field Frontage Fields Frontage / Views / Views to the to Fields the Fields Practice

PARKING GARAGE (3 LEVELS)

LOAD

Site Layout

North Frontage Road1 Property NorthLine Frontage Road Property Line

2.1

2

O’NEILL DRIVE LOADING

VIKINGS HEADQUARTERS

Site Layout

1

1

I - 494

NW PARKWAY

Field Construction (sitework, 1 Fieldcost, Construction settlement) (sitework, cost, settlement)

+ + ++ ++ ++ +− +− −+ − + 2 NE Drainage Utility Easement 2 NE Drainage Utility Easement − − −+ −+ ++ ++ ++ ++ + + New Headquarters New ‐ New Minnesota Headquarters Vikings ‐ Minnesota Vikings Vikings New Headquarters New ‐New Minnesota Headquarters Headquarters Vikings ‐ Minnesota ‐ Minnesota Vikings Vikings Headquarters ‐ Minnesota Parkway Location 3 Northwest / Adjustment Parkway Location / Adjustment −‐ DRAFT − −+ −+ ++ +++ Pro ++ + +++ ProPro + + Site Concept Layouts SiteSite ‐Concept Pros vs. Layouts Cons. Layouts ‐ DRAFT ‐ Pros vs. vs. Cons. ‐ DRAFT ‐Concept Pros Concept vs.Layouts Cons. Layouts ‐ DRAFT ‐ Pros ‐ Pros vs. vs. Cons. Cons. ‐ DRAFT + Pro Site3Concept + Northwest Concept ‐ Pros Cons. ‐ DRAFT ProSiteSite + ProLayouts 4 "D" Setback4/ Impact Wetland "D" Setback / Impact − + −− +− −− −−− Con−− − −−− ConCon− − − Con − Wetland − ConCon 5 Wetland "E" Setback5/ Impact Wetland "E" Setback / Impact + − +− −− −− −− −− −− − − 6 Wetland "F" Setback6/ Impact Wetland "F" Setback / Impact + + +− +− −+ −− +− −+ − + scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme 7 Future Development7SitesFuture (N of wetland Development "F") Sites (N of wetland −1 "F") 2.1 − 1 2.2 −1+ 2.12.1 −+ ++ ++ ++ ++ + 3.03.0 + 1 2.1 1 2.2 2.12.1 2.3 2.22.2 2.4 2.32.3 2.5 2.42.4 2.6 2.52.5 3.0 2.62.6 Notes 3.03.0 Notes 2.3 2.22.2 2.4 2.32.3 2.5 2.42.4 2.6 2.52.5 3.0 2.62.6 Notes 1 Notes Office Building Office Building

MASTER PLANNING & URBAN DESIGN

PLAYERS/COACHES ENTRY

1

Office Building

Notes

EXISTING DRAINAGE/ UTILITY EASEMENT

scheme scheme

2.2 2.4

EXISTING DRAINAGE/ UTILITY EASEMENT

scheme scheme

2.1 2.3

EXISTING DRAINAGE/ UTILITY EASEMENT

scheme scheme

2.2 1

VIKINGS HEADQUARTERS

scheme scheme

2.1

EXISTING DRAINAGE/ UTILITY EASEMENT

scheme

1

LOADING

PHASE 2

scheme

STADIUM ARTIFICIAL SURFACE

LAKE (WETLAND ‘F’)

(WETLAND ‘D’)

FUTURE TRAINING CAMP STAGING

FUTURE TRAINING CAMP STAGING

PRESS BOX NW PARKWAY

ALT SURFACE PARKING

WARMING HOUSE

PRESS BOX

NW PARKWAY

WARMING HOUSE

SITE CONCEPT 3

Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113

Minnesota Vikin Site Concepts and 201


PHASE 2

MASTER PLANNING & URBAN DESIGN

Test Fits & HEADQUARTERS AlternateVIKINGS Concepts CIRCULATION Circulation - Pedestrian & Vehicular CIRCULATION KEY

AUTOMOBILE TRAFFIC

PEDESTRIAN TRAFFIC

EMERGENCY & MAINTENANCE ROUTES

1/2 MILE LAKE TRAIL LOOP


PHASE 2

MASTER PLANNING & URBAN DESIGN

Test Fits & HEADQUARTERS AlternateVIKINGS Concepts PUBLIC VS PRIVATE SPACE Public vs. Private Realm

SPACE ALLOCATION

PUBLIC AREA

EVENT AREA PRIVATE/PUBLIC

PRIVATE AREA

EMERGENCY & MAINTENANCE ROUTES

ACCESS GATES IN FENCE


PHASE 2

MASTER PLANNING & URBAN DESIGN

VIKINGS HEADQUARTERS

EVENT PROGRAMMING TRAINING CAMP

Test Fits & Alternate Concepts

Event Programming - Site Population Zones

VIKINGS HEADQUARTERS

VIKINGS HEADQUARTERS

EVENT PROGRAMMING

EVENT PROGRAMMING

DAY TO DAY

GAMES - SPECIAL EVENTS


PHASE 2

MASTER PLANNING & URBAN DESIGN

Test Fits & HEADQUARTERS AlternateVIKINGS Concepts KEY DEVELOPMENT AREAS Key Development Areas

MINNESTOA LANDSCAPE ECO-ZONES Inspired by and celebrating iconic Minnesota Landscapes

NORTH SHORE

AGRARIAN HEDGEROW

PRAIRIE - SAVANNAH

BIG WOODS

LAKE / WETLAND


PHASE 2

Test Fits & HEADQUARTERS AlternateVIKINGS Concepts STORMWATER & DRAINAGE INFRASTRUCTURE Stormwater & Drainage

MASTER PLANNING & URBAN DESIGN


PHASE 2

MASTER PLANNING & URBAN DESIGN

Test Fits & Alternate Concepts Solar Studies

M A RC H

JUNE

9AM_March 21st Minnesota Vikings Training Facility 2016_01.22

NOON_March 21st Minnesota Vikings Training Facility 2016_01.22

5PM_March 21st Minnesota Vikings Training Facility 2016_01.22

N OVE M B E R

9AM_June 21st Minnesota Vikings Training Facility 2016_01.22

NOON_June 21st Minnesota Vikings Training Facility 2016_01.22

5PM_June 21st Minnesota Vikings Training Facility 2016_01.22

9AM_Nov. 21st Minnesota Vikings Training Facility 2016_01.22

NOON_Nov. 21st Minnesota Vikings Training Facility 2016_01.22

4PM_Nov. 21st Minnesota Vikings Training Facility 2016_01.22


PHASE 2

MASTER PLANNING & URBAN DESIGN

3

Test Fits & Alternate Concepts Programming Test Fits

FOOD PREP

SERVICE ENTRY MAIN PLAYER ENTRY

SERVERY

POSITION MEETING ROOMS

COACHING VIDEO + INFORMATION TECHNOLOGY

COACHING STAFF

DRAFT SUITE STRENGTH AND CONDITIONING

2 LOADING DOCK

EQUIPMENT

MAIN LOCKERS

FACILITY OPERATIONS / MAINTENANCE

COMMUNITY / PUBLIC RELATIONS

3

TEAM AUDITORIUM

DINING

FINANCE / HUMAN RESOURCES

OWNERSHIP + EXECUTIVE STAFF

MARKETING

SALES + REVENUE

WET AREAS

HYDROTHERAPY

ANCILLARY LOCKERS

NUTRITION

PLAYER PERSONNEL + FOOTBALL OPERATIONS

2

QUALITY OF LIFE

TRAINING + MEDICAL

PARTY ROOM

1

COMMUNITY AUDITORIUM

VIEWS OF LAKE

PARTY ROOM EQUIPMENT/ EDIT / STORAGE

VEN STUDIO

VEN VIEWING

VALHALLA VR

MEDIA ENTRY

MEDIA / PRESS

SECURITY

RECEPTION CHECK-IN

1

MAIN STAFF ENTRY

LOBBY

VALHALLA PARTY ROOM

MULTIPURPOSE MEETING ROOM

LOBBY / VESTIBULE

TEAM STORE

-1

MAIN PUBLIC ENTRY

-1 PUBLIC AREAS - FRONT DOOR SHARED - PUBLIC QUALITY OF LIFE AREAS RECEPTION AREAS PLAYER PERSONNEL AND FOOTBALL OPERATIONS PLAYERS AREA SHARED - PLAYERS / COACHES VIKINGS ENTERTAINMENT NETWORK COACHING VIDEO NUTRITION / FOOD PREP / DINING FACILITY / OPERATIONS / MAINTENANCE MARKETING / FINANCE

PROGRAM STACKING DIAGRAM

DRAFT SUITE / OWNERSHIP COACHING STAFF

MINNESOTA VIKINGS TRAINING FACILITY

2015.11.17


PHASE 2

MASTER PLANNING & URBAN DESIGN

Test Fits & Alternate Concepts Programming Test Fits

Architecture is about providing flexibility and adaptability in design. Programming is a key component of the design process to allow the client the ability to adjust to ever changing needs, without disrupting their operations. Providing them with programmatic solutions that allow the use of any one specific space that we have designed for them to be multifunctional, and the ability to transcend these difficulties. Training facilities are large buildings. Looking for commonalities in building program and ways to share space are key to providing a tight and efficient floor plan. Vertical adjacencies is just as important as horizontal adjacencies. The shortest connection is not always horizontal, especially in this facility type where there is a

lot of program adjacencies that are desired by the users. Getting this ‘right’ yields efficiency in circulation for the athletes and staff, and also capitalizes on their time spent within the facilities at the appropriate junctures vs. between point A and B.


PHASE 2

Test Fits & Alternate Concepts Programming Test Fits

The functions of a facility should transcend its users. People come and go, but what we have built needs to remain flexible enough to adapt to new philosophies. The design of training facilities are very much so influenced by coaching and team executive personnel. With a high turnover rate in the industry, these facilities have to be designed in a manner to meet the ‘must have’ requirements while maintaining enough flexibility to allow changes in use when new philosophies are applied. This is successful when this social change is allowed to occur without a great impact to the physical space. The TCO Performance Center, home of the Minnesota Vikings, was designed and constructed pre-pandemic. These same metrics for success tied to resiliency and scalability were integrated into the design of that facility. The ability of the Team to reoccupy the facility quicker than most of their other peers, and with little displacement, was a true testament to the necessity of this principle in design. The player lounge was combined with team locker space to maximize efficiency in use. This ensuite adjacency also allowed the team to continue to occupy the originally programmed locker space, converting ‘lounge’ to additional locker area while properly socially distancing. There was no need to invest in costly renovations or reconfigurations of other alternative program to accommodate this use; reconfigurations which have begun to demonstrate as being only temporary.

MASTER PLANNING & URBAN DESIGN


PHASE 2

MASTER PLANNING & URBAN DESIGN

Leveraging Commercial Value

The Deal - Partnering with Twin Cities Orthopedics (TCO)

VIKING LAKES - DESTINATION EAGAN Crawford Architects was instrumental in assisting the Vikings in their pursuit of a Naming Rights Partner for the project. Working closely with Kevin Warren, Vikings’ Chief Operating Officer, Crawford prepared multiple presentations and design collateral to attract local and regional businesses to join with the Vikings in the development of the site. Ultimately, the board of emergent local clinic, Twin Cities Orthopedics, unanimously voted to be that partner. The Vikings Headquarters became the Twin Cities Orthopedics Performance Center and the stadium became TCO Stadium. TCO also began their own process of locating an Urgent Care, Physical Therapy, Surgery Center and Sports Performance Center on site with the Vikings. Crawford Architects relationship with the Vikings grew to include the TCO team.

“”

It’s been very impressive to watch the TCO Performance Center come to life. I don’t think there is any question that the vision and the facilities that have been established here are creating a new model for the future of the NFL. – Troy Simonson, Twin Cities Orthopedics (TCO) CEO


PHASE 2

MASTER PLANNING & URBAN DESIGN

Leveraging Commercial Value

The Deal - Partnering with Twin Cities Orthopedics (TCO)

VIKING LAKES - DESTINATION EAGAN Crawford Architects was instrumental in presenting the Viking Lakes project, LiveWork-Play community to the Twin Cities Or thopedics (TCO) Board of Directors alongside representatives of the Minnesota Vikings and the City of Eagan. Prior to the presentation, the locations of existing TCO Medical Office Facilities and Orthopedics Clinics were catalogued throughout the Metro. There was a definitive need for increased presence in the Preferred Site location of Eagan, MN. This coupled with

the alignment of common values, goals, and objectives between TCO and the Minnesota Vikings presented itself as a unanimous decision to form a solid Partnership for the foreseeable future; garnering one of the largest monetary contributions associated with any NFL training facility to date in the League.

Scan here to listen to remarks from Twin Cities Orthopedics on this project.


PHASE 2

MASTER PLANNING & URBAN DESIGN

28.86%

0.00%

0.00%

24.02%

0.00%

149.60 2860000

8.15 140400

17.14 196880

28.57 424000

15.96 310000

7.92 264900

12.50 282830

1.99 40000

33.90 965600

15.04 235390

8.43 0

Parcel 2

Parcel 3

Parcel 4

Parcel 8

Parcel 9

Parcel 6

(4-6) 60' to 80'

980000

0

196880

0

0

264900

282830

0

0

235390

0

Corporate Headquarters

(2-3) 40' to 65'

240000

0

0

240000

0

0

0

0

0

0

0

Indoor Practice Facility

110' to 120'

100000

0

0

100000

0

0

0

0

0

0

0

Stadium

35' to 55'

84000

0

0

84000

0

0

0

0

0

0

0

Hotel (200 Rooms)

(5-8) 150'

80400

80400

0

0

0

0

0

0

0

0

0

Hotel | Conference Center (200 Roooms + 40K Meeting)

(5-8) 150'

190000

0

0

0

190000

0

0

0

0

0

0

(1-2) 20' to 40'

155600

0

0

0

0

0

0

0

155600

0

0

Parcel 7

Parcel 5

Parcel 10

27.03%

Multi-Family Residential Units

Retail | Restaurant

24.02% 0

0.00% 0

149.60 980000 2860000

8.15 60000 140400

17.140 196880

28.570 424000

15.96 120000 310000

7.920 264900

12.500 282830

1.99 40000 40000

33.90 760000 965600

15.040 235390

8.430 0

Total Impervious Area (SF Estimated) Total Impervious Area (Acres) Impervious Area (%) Anticipated Parking

2942446 67.55 45.15% 6875

190000 4.36 53.52% 366

192000 4.41 25.72% 151

470000 10.79 37.76% 460

310000 7.12 44.59% 1080

157967 3.63 45.76% 216

247191 5.67 45.41% 231

62000 1.42 71.52% 160

1029052 23.62 69.69% 4018

284236 6.53 43.39% 192

0 0.00 0.00% 0

0 0 0 0 0 0 0 0 160

0 0 0 0 0 0 778 200 3040

Multi-Family Residential Units Corporate Headquarters Indoor Practice Facility Stadium Hotel Hotel | Conference Center Retail | Restaurant Office above Retail Office | Medical Office

1

1.1/rm 2.0/rm 0.005 0.004 0.004

791 460 0 0 126 600 778 200 3920

0 0 0 0 126 0 0 0 240

151 0 0 0 0 0 0 0 0

0 460 0 0 0 0 0 0 0

0 0 0 0 0 600 0 0 480

216 0 0 0 0 0 0 0 0

231 0 0 0 0 0 0 0 0

192 0 0 0 0 0 0 0 0

Parcel 10

0.00% 50000

Parcel 9

0.00% 0

Parcel 8

28.86% 0

Parcel 7

27.03% 0

Parcel 6

0.00% 0

Parcel 5

0.00% 0

Parcel 4

20.09% 0

Parcel 3

0.00% 0

Parcel 2

50000

Parcel 1

(2-4) Development Scenario 2 Office above Retail 50' to 70' Proposed Comprehensive Plan Amendment (incl Retail) Vikings Headquarters | Eagan Site (3 to 15) Total Site Area (Acres) Office | Medical Office 225' Total Building Area Height (stories)

Parking

0.00%

TOTALS

Building Information

Planned Development

0.00%

TOTALS

Leveraging Commercial Value

20.09%

Height (stories)

Total Site Area (Acres) Total Building Area

0.00%

Parcel 1

Development Scenario 2 Proposed Comprehensive Plan Amendment Vikings Headquarters | Eagan Site

0 0 0 0 0 0 0 0 0


PHASE 2

MASTER PLANNING & URBAN DESIGN

Project Phasing

Successfully Building on Momentum

Phase 2

Phase 1

Phase 2

Phase 3

Phase 2

Phase 4

Phase 4

EX-5

Phasing Concept


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Meeting with Appropriate Parties

Proactive Engagement with the City of Eagan TRANSPARENCY BUILDS COMMUNITY SUPPORT Getting off on the right foot with the existing businesses and homeowners surrounding the site was critically important to the Vikings. Being a good neighbor when starting any project is a priority. Crawford prepared numerous presentations for the city of Eagan and the Vikings, attended public meetings

to engage the city, individual citizens and stakeholder businesses on discussions of what the development would become. Concerns were listened to and taken into consideration. City zoning guidelines were evaluated, and an exhaustive Planned Development plan was submitted and quickly approved.


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Zoning Analysis

ENGINEERING SURVEYING ENVIRONMENTAL PLANNING

Ensuring Compatibility in Land-Use

EVS, INC. 10025 Valley View Road, Suite 140 Eden Prairie, Minnesota 55344 Phone: 952-646-0236 Fax: 952-646-0290 www.evs-eng.com

Preliminary

Site

PROJECT

Lone Oak LOCATION

Eagan, MN SHEET

ZONING MAP

ENGINEERING SURVEYING ENVIRONMENTAL PLANNING EVS, INC. 10025 Valley View Road, Suite 140 Eden Prairie, Minnesota 55344 Phone: 952-646-0236 Fax: 952-646-0290 www.evs-eng.com

Site

Preliminary

PROJECT

Lone Oak LOCATION

Eagan, MN SHEET

ZONING MAP DATE

PROJECT #

7.29.2015 8.28.2015

p2015-108

SHEET NUMBER

EX-6

DATE

PROJECT #

7.29.2015 8.28.2015

p2015-108

SHEET NUMBER


PHASE 3

Due Diligence

Geotechnical & Environmental Investigations

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Documentation Required for Planned Development Submission; Project Narrative; Existing Site Plan; Survey Site And Context Photos Proposed Preferred Site Plan; Proposed Parking Scenarios; Sub Area Classification Diagram; Site Plan; Landscape Plan; Landscape Plant Palette; Landscape Details; Streetscape Plan; Streetscape Sections; Streetscape Elevations; Site Context Building; Massing Diagrams; Facility

Design Guidelines

Floor Plans; Facility Facade Studies & Material Palette3D Massing Images; Site Aerials; Vehicular Loading and Access Plans; Emergency Vehicle Access Plans; Pedestrian Routes & Connectivity Through Site; Landmark Details (If Any) Sustainable Development Policy; Checklist Field; Sports Lighting Illumination Analysis; Signage Plan Building & Monument Signage; Allowable Areas; Elevations

To view the full Design Guidelines Document, click here.

Integrated Standards for Each Land Use DESIGN GUIDELINES BOOKLET

BUILDING TYPE STANDARDS

For a comprehensive look into the depth of the project, a Design Guidelines book was prepared and submitted to the city for review and approval. It outlined a guide for the following: Land Use Districts, Building Type Standards, Green Infrastructure, Public Realm Guidelines, Street and Roadway Guidelines, Lighting, and Signage Guidelines.

The overall success of the Master Plan is closely linked with the quality of architecture in each of the districts. This section identified the principal building types, their defining features and the minimum requirements of their design and construction. Precedent buildings, materials, colors, design templates and lighting for buildings are meticulously laid out for the different building types. The standards are intended to complement other standards and to create a cohesive and high quality development across all districts.

LAND USE DISTRICTS

GREEN INFRASTRUCTURE

The 200-acre site is divided into seven districts:

The Viking Lakes Development complements the surrounding area and connects to the existing open space, network of trails, natural areas and wetlands. All districts within the development are designed to promote sustainable practices. The importance of cohesive public space and its impact on the people who use it and the environment it exists in is recognized and embraced. The streets will be active engaging spaces that place pedestrian safety first and vehicles second. The underlying goal of the Master Plan is to promote community, building transparency and encourage people to get outdoors and live active lifestyles.

›

District 1 – Commercial / Retail

›

District 2 – Low Density Housing

›

District 3/3A – Vikings Headquarters and TCO Campus

›

District 4 – Mixed Use Office, Retail and Hotel/Convention

›

District 5 – Medium Density Housing

›

District 6 – High Density Housing

›

District 7 – Commercial / Retail


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Design Guidelines

Integrated Standards for Each Land Use PUBLIC REALM GUIDELINES

LIGHTING GUIDELINES

The public realm is a vital aspect of the built environment that helps to give a place its identity. It primarily consists of the roadways, sidewalks, parks, plazas and other open spaces that comprise the arteries and focal points of the urban framework. It is the main space where civic interaction occurs and is often defined in contrast to private property. Green parks are woven through the fabric of the development, creating layers of pedestrian pathways and connections to the districts and lakes with minimal adjacency to vehicular traffic. The public realm, the heart of how one experiences this development is safe, sustainable and enriching.

Street lighting offers a significant opportunity to differentiate the development from surrounding developments and neighborhoods while also differentiating different districts within the development. Lighting standards that effectively light pathways, walkways, roadways and other outdoor active areas are specified. Light fixtures were selected and located to develop a district hierarchy. District lighting is environmentally sensitive to meet DSF and LEED standards, including minimizing light trespass and pollution and using minimal energy through lighting equipment selection and operation. The design of the lighting is as important as the guidelines for the architectural aesthetics.

STREET AND ROADWAY GUIDELINES

SIGNAGE GUIDELINES

The Development Plan defines a specific strategy for the layout of street and blocks. The size, type and configuration of this street hierarchy is based on a combination of projected traffic volume, existing and future road connections, level of service at intersections, adjacent land use and desired aesthetic character. The design promotes a street system that balances pedestrian and vehicular use not only providing streets that support traffic flow, but also creating safe and comfortable spaces for street-side activities, strolling promenades, pockets of green and other amenities.

A fully developed signage package was created to coordinate with the architectural guidelines, lighting standards and public realm standards. Locations, types of signs, style and size of signs that comply with the city and state standards while blending with the Viking Lakes development aesthetic serve to ensure a fully cohesive Master Plan.


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Planned Development Site Plan

New Headquarters - MVZ | Minnesota Vikings (Eagan) Phase 1 Parking

Parking Qty. Lot A Player | Coaching Staff | Ownership & Executive Staff Consultants | Full Time Staff Interns | Part Qty Time

Summary of Enclosed Areas by Category - HQ

Description

Public Areas - Front Door Media | Press Team Suite Training Facilities | Medical Strength & Conditioning Equipment Room Coaching Staff Ownership & Consultants Finance Human Resources | Legal Player Development Marketing Sales & Revenue Staff Community | Public Relations Player Personnel & Football Operations Coaching Video Information Technology VEN | Content Production Nutrition | Food Prep | Dining Facility | Operations | Maintenance MV Cheerleaders Groundskeeper - PEMB Staff Subtotals Total Staff

4

Flex Future Hire

Consultants | Full Time Staff Interns | Part Qty Time

Flex Future Hire

ADA Stalls

Parking Qty. Lot B Staff | Interns | Flex Future Hire Consultants | Full Time Staff Interns | Part Qty Time

30 50

90 5 3 4 21 7 9 5 1 42 15 28 3 6 22 12 4 4 3

5 2 6 2 3

2 2

90 5 3 4 20 5 1

30

0

0 0 0 1 2 8 5 1 41 14 26 3 6 22 12 4 4

5 0 2 6 0 3 0 2 0 4 4 0 0 0 0 0 0

0 0 0 0 0 2 2 0 15 3 2 0 3 0 0 2 0

153

56

2

2 4 6

15 3 2

1 1 2

2

132

4

Flex Future Hire

4

3

2

Parking Qty. Lot C Public | Media & Press Consultants | Full Time Staff Interns | Part Qty Time

ADA Stalls

Parking Qty. Lot D Groundskeeping PEMB

Flex Future Hire

ADA Stalls

110

32

0

5

29

0

4

7

0

80

3

0

3

0

141

245

84

8

Parking Provided (Base)

141

251

84

17

0 * No Future Parking Built-in (Delta + Future Hire)

6 * Future Parking Built-in (Delta + Flex Future Hire) =

0 35

216

Parking Provided (Optional Road)

* Future Parking Built-in (Delta + Flex Future Hire) =

* No Future Parking Built-in (Delta)

2

9 * Future Parking Built-in (Delta + Flex Future Hire) =

12

84

(29)

Parking Delta

ADA Stalls

3 3

430 Parking Delta

Flex Future Hire

30 50

3

288

Consultants | Full Time Staff Interns | Part Qty Time

0 0

* No Future Parking Built-in (Delta)

Future Expansion = 36,160 GSF Phase 1 Business GSF (78,481) / 250 Occupants = 314 GSF / 1 Occupant 36,160 / 314 = 116 Additional Occupants | Parking Required

Documentation Required for Planned Development Submission; Project Narrative; Existing Site Plan; Survey Site And Context Photos Proposed Preferred Site Plan; Proposed Parking Scenarios; Sub Area Classification Diagram; Site Plan; Landscape Plan; Landscape Plant Palette; Landscape Details; Streetscape Plan; Streetscape Sections; Streetscape Elevations; Site Context Building; Massing Diagrams; 06/14/2016

Facility Floor Plans; Facility Facade Studies & Material Palette3D Massing Images; Site Aerials; Vehicular Loading and Access Plans; Emergency Vehicle Access Plans; Pedestrian Routes & Connectivity Through Site; Landmark Details (If Any)Sustainable Development Policy; Checklist Field; Sports Lighting Illumination Analysis; Signage Plan Building & Monument Signage; Allowable Areas; Elevations

Page 1 New Headquarters - MVZ | Minnesota Vikings (Eagan) 2016 Copyright Crawford Architects


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Envelope Design + System(s) Selection BASELINE+

This simple payback analysis shows that design incentives helped reduce the incremental costs associated with the energy conservation strategy investments for the facilities, resulting in a payback of 7.7 years. We were able to utilize an energy rebate program for TCO Performance Center with that local energy provider, Xcel Energy. Working with the energy provider, the

design team developed design scenarios for the building envelopes and system(s) selection for HVAC equipment, lighting, plumbing, etc. to determine the optimal solutions; taking into considerations up front cost vs. long term cost. The simple payback analysis projected energy cost savings of over $129,000 per year in relation to the building baseline analysis with a 7.7 year payback related to the adjusted incremental construction costs.

E X A M P L E L I S T O F V E R I F I E D S T R AT E G I E S

PHASE 3

SIMPLE PAYBACK ANALYSIS PROJECTED ENERGY COST SAVINGS OVER $129K / YR 7.7 YEAR PAYBACK RELATED TO THE ADJUSTED CONSTRUCTION COST


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

IPF CIRCULATION CORE “RELENTLESS”

*

Design Development Process & Design Studies

CIRCULATION CORE “INNOVATIVE”

VERTICAL CONNECTION ‘NATURAL LIGHT TO INTERIOR OFFICES’

ORIENT VIEWS TOWARDS FIELDS OUTDOOR PRACTICE FIELDS

*

GROUND FLOOR OUTLINE STADIUM

CONNECTION WEIGHTS - STADIUM

* ORIENT VIEWS TOWARDS LAKE

VIEWS TO STADIUM | OBLIQUE VIEW TO FIELDS

CONNECTION WEIGHTS - PRACTICE FIELDS

STAFF ENTRY

OVERLAP FLOOR PLATE CREATES OVERHANG PROTECTION AT STADIUM CONCOURSE

OVERLAP FLOOR PLATE CREATES OVERHANG PROTECTION AT ENTRIES BELOW

ORIENT VIEWS TOWARDS LAKE MEZZANINE 01 OUTLINE MEZZANINE 02 OUTLINE CIRCULATION CORE “UNIFYING” LAKE PUBLIC | MEDIA ENTRY

The purpose of the design process is not simply to get an idea for a design, but to create the definitive design narrative to carry the project through completion. The design narrative is a constantly updating and growing document that is shared with the ownership and design team. It is used as a measuring stick to be constantly referenced throughout the design development and construction process. This way, everyone is on board with the concept and all members are working towards the same goal. The design narrative is as valuable on the day of presentation as it is for construction administration.

Minnesota Vikings Training Facility Plan Diagram 2016_02.16


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

A Groundbreaking to Remember On August 2, 2016, the Minnesota Vikings, along with partners Twin Cities Orthopedics (TCO), the City of Eagan, Crawford Architects, and Kraus-Anderson Construction Company, celebrated the official groundbreaking of the Twin Cities Orthopedics Performance Center and TCO Stadium - marking the first steps to developing Viking Lakes.

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Coming Home Project Completion

On June 15, 2018, the Minnesota Vikings opened the Twin Cities Orthopedics Performance Center to the visitors for the first time in a Ribbon Cutting Ceremony. Representatives from the NFL, the Ownership Group, the City of Eagan, Twin Cities Orthopedics and the Team all spoke to thank those responsible for creating the facility and to welcome their staff to their new home.

“”

We are moving into a new house today. We’re going to make this house into an incredible and special home for generations to come. – Mark Wilf, Owner / President, Minnesota Vikings

Staff continues to work tirelessly throughout the year to make sure all components are up-to-date and working. In the future there will be live broadcasts from the VEN and players and coaches working together to prep for future seasons. After decades in outdated and separate facilities, the Minnesota Vikings are finally now altogether under one roof.

“”

It’s a special place. Seeing the artwork, and remembering. This is as much about our past. Whoever you are, you are going to feel comfortable here and feel like this is home. – Kevin Warren, Big 10 Commissioner & Former Minnesota Vikings COO


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

Coming Home Project Completion

The Minnesota Vikings and Minnesota State High School League (MSHSL) announced today that the Farmington Tigers’ football team will play in the first-ever high school game at the Twin Cities Orthopedics Performance Center. The TCO Performance Center is the home of the Vikings’ new practice facility which iincludes a turf stadium that can seat up to 6,000 fans. Farmington will face off against Eagan (the home team) on Friday, Sept. 28, at 7:30 p.m.

The Vikings will host five high school games this fall. Farmington and Eagan will be the first, followed by Prior Lake and Lakeville North on Oct. 12. Three state tournament quarterfinal games will be played there as well.


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

LIVE - WORK - PLAY - SKOL Viking Lakes

Measurable Impact + Community Enhancements – Football fans from outside of Eagan, MN drove the majority of the increased economics in spending, as 93% of camp attendees came from outside the City of Eagan, MN.

Provides a best-in-class destination that transcends generations through a true live, work, play lifestyle that is uniquely ‘Minnesota’ ›

›

›

Space that inspires stakeholders, employees, residents, and fans while developing a safe, healthy and equitable state-of-the-art campus.

– 63,000 fan attendance over 17 days ›

– TCO Vikings 5K

Creates a sense of community by bringing people of different backgrounds and interests together, in one place, for the next 150 years. More than a place of business, more than a place of residence; delivers a full-service lifestyle people want to be part of. From daily health, well-being and recreational leagues and classes to professional and amateur sporting events, concerts, and farmer’s markets.

›

Attraction to other Professional Organizations | Development Growth – Version1 Minnesota Rokkr Esports calls Viking Lakes Home and USA Curling moving to Viking Lakes

›

Minnesota Vikings Training Camp – Economic Impact – Practice at Viking Lakes is now more accessible and less expensive to attend for local fans, resulting in increased fan attendance – Generated $4.9M in economic activity for the City of Eagan and it’s businesses, within one year (two week event) of hosting training camp at Viking Lakes

TCO Stadium Events – Summer Movie Nights – Market Fest – Concerts – Play 60 camps – Premier Lacrosse League – Anishinabe Baagaadowewin Demonstration – High School Games of the Week

›

Fifth Anniversary of the Development – Full build out is anticipated to be another five years away – including more than 3M SF of commercial and residential uses for the City of Eagan, MN


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

The purpose of the design process is not simply to get an idea for a design, but to create the definitive design narrative to carry the project through completion. The design narrative is a constantly updating and growing document that is shared with the ownership and design team. It is used as a measuring stick to be constantly referenced throughout the design development and construction process. This way, everyone is on board with the concept and all members are working towards the same goal. The design narrative is as valuable on the day of presentation as it is for construction administration.

“”

I can’t believe anyone in football has something like this – Sid Hartman, Sports Journalist for the Minneapolis Star Tribune


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

HEADQUARTERS PLAN The Plan of the headquarters building is organized along an east-west corridor that runs the length of the building, connecting the front of house entry to the team suite in the back. Called the “Super Highway” it is a way for people to easily orient themselves in a complicated building, get from place to place quickly and also serves to bring light into the heart of the building. The Super Highway is located between the office and the indoor practice facility. The main entry to the building is on the east, with a drop off and entry-drive parallel to the lakes. All of the public spaces look back out to the lakes and out over the stadium to the south. The concourse of the stadium creates an outdoor living area for staff when not in use for game day. The team suite is located at the west side of the building with a private entry for players and coaches. All of the player areas, weight room, training room and locker room, open directly onto four practice fields for quick access. The coaches’ and owner’s suite are above the team suite with views overlooking the practice fields and to the stadium.


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

PUBLIC ENTRY The public entry of the Headquarters is on the east side. Its views are to the lakes and to the future development of Viking Lakes to the east.

Initial Concept

Visitors enter via the drop off circle to the reception desk. Their travel path takes them into what appears to be a glass enclosed entry, through waves pushed before the prow of the Viking ship above them. Staff enters on a level above that is separated by landscaped terraces. Media enters through a private, secured corridor that brings them directly to the media work room and interview spaces.

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

LOBBY Upon arriving to the facility, visitors are greeted beneath a lower ‘ice like’ volume, that sets the frame for arrival. Directly ahead lies the main lobby and gathering area. Upon entering the communal space, the ceiling rises up revealing the hull of the longship. Light penetrates this two story space from two sides, with the glass exterior envelope invoking visions of waves crashing against the ship. A set of wood cladded stairs serve as the primary route for public to access the remainder of the facility, ascending from the lower lobby to the upper lobby. The lobby also serves as both a waiting area, as well as an assembly space for cocktail functions and TCO Stadium halftime events. There is direct connection from the lobby, via tunnel, to the TCO Stadium seating bowl.

Initial Concept

3D Graphic Rendering

3D Graphic Rendering

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

NUTRITION BAR Nutrition, diet and hydration are significant factors in the health of the professional athletes. The nutrition bar is situated at the main crux of the team suite North|South wing, bisecting the East|West Super Highway. It is positioned to influence constant bi passing of the players and coaches with this node in route to the weight room, training rooms, meeting rooms, and indoor practice facility. Anyone going to the weight room, team area and indoor practice facility will pass by it. Grab-nGo stations as well as a nutritionist office and smoothie bar make this vital part of everyday activity easy and quick. The nutrition bar location is also between the staff and team area, and at the foot of the coaches’ area making is usable by everyone in the facility.

Initial Concept

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

TRAINING & HYDROTHERAPY Positioned between the weight room and the team suite, lies the state-of-the art training and hydrotherapy areas. Ample light and visibility exist within the spaces, allowing constant monitoring of activity within the training areas, not excluding sight lines from the training suite to activity on the outdoor turf. The hydrotherapy room is the jewel of the training suite. Included are three fully recessed pools, one hot plunge pool with capacity for 12–15, one cold plunge pool with capacity for 12–15, and one treadmill pool with zero entry accessibility. The Vikings also have implemented state of the art technology in regards to their whole body electric Cryotherapy Chamber. The electric cryo-chamber allows more accurate skin temperature measures to be taken, provides zero exposure to gaseous air (fresh oxygenated air), and targets the entire body vs. just partial body cooling of lower extremities.

Initial Concept

Construction

Construction

Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

THE CAFETERIA Nicknamed “The Huddle,” the cafeteria serves as the communal area for the entire Vikings Family. Located on the top level and overlooking the lakes, the cafeteria is a gathering place for all the staff, players and coaches. The cafeteria was situated on the opposite end of the building from the team suite to take advantage of the panoramic views to the lakes and surrounding development, including the TCO stadium, while encouraging interaction of ‘Team’ with ‘Team Organization’ and the Vikings Entertainment Network. The cafeteria can also be utilized as an event space as well as a location for impromptu small to large group meetings. The cafeteria can also serve as a banquet facility for outside groups and meetings.

Initial Concept

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

THE AUDITORIUM Positioned directly above the longship hull (Lobby), the Auditorium seating rake spans between the Ground Floor and the Second Level of the facility. This allows visitors and team to enter at the back of the auditorium, filtering to their seats from the public areas of the building, while coaches, players, and staff can enter from the front (secured) of the auditorium respective to their position within the facility. Direct access for the Team from position meeting rooms on the Second Floor is also possible through this configuration. The auditorium has capacity for 175 occupants, features full black-out capability, and includes an acoustic operable wall at the front of the room providing direct connection and visibility into the Vikings Entertainment Network’s Studio. This acoustic separation allows for the auditorium to not only be used for Team meetings coinciding with studio productions, but also provides flexibility of use for live-audience viewing of VEN productions such as a weekly Coach’s show.

Initial Concept

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

THE WEIGHT ROOM The weight room is the jewel at the tip of the headquarters’ team suite. It is a glassy box visible from the west, south and east. Operable overhead doors on the west side of the weight room open up to extend the training out to the exterior practice fields and training hill. The two-story volume is connected to the team suite on the main level and by a set of steep training stairs to the coach’s offices and cardio area on the mezzanine level. Its location in the west end zone of the stadium provides visitors with a view into the area where the Vikings team trains and prepares for upcoming games. As night falls, the weight room glows with a fractured purple light from the ceiling.

Initial Concept

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

THE INDOOR PRACTICE FACILITY The indoor practice facility features a full football field with generous runoff areas on all sides. The lowest part of the roof structure is 98 feet above field level allowing for all indoor kicking and punting. Translucent insulated panels low around the perimeter enhance the exterior aesthetic and provide non-glaring light to the interior necessitating minimal overhead lighting inside.

Initial Concept

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

THE LOCKER ROOM The heart of the facility and the heart of the team suite is the team locker room. The team locker room provides a respite for the athletes to relax and change. It features state-ofthe-art lockers and ventilation systems, a lounge area with fireplaces, direct access to grooming areas, showers, sauna and steam room as well as a thoughtful connection to the back-of-house areas necessary for team function such as laundry, equipment rooms, storage, warehousing and other needs. The ceiling of the locker room mimics the structure of a Viking longship, with the oars (linear lights) extending out, breaking through the water in unison and reinforcing the ‘One Team’ concept.

Locker Option Concepts

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY

TCO STADIUM TCO Stadium seats 6,000 people and is expandable in the future up to 10,000. It is a stadium designed to be used minimally by the Vikings Team (training camp, exhibitions) and to be used mostly by the community. It will host small college games, high school Friday Night Lights games, soccer games, outdoor concerts and other events. The stadium is integrated directly into the Headquarters building which overlooks the field from the north and from the Owner’s suite and abuts to the Weight Room on the west. The concourse serves as a daily outdoor seating area for staff. The east end zone opens up to the lakes. To the south, the stadium also opens up to a game day plaza, NFL Play-360 field, Vikings Hall of Fame and the Twin Cities Orthopedics facilities.

Initial Concept

3D Graphic Rendering

Construction

Nearing Completion


PHASE 3

PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY


Turn static files into dynamic content formats.

Create a flipbook
Viking Lakes Case Study by Crawford Architects LLC - Issuu