TABLE OF CONTENTS
S HEADQUARTERS
P h a se 1 - Progra m Verif i cati on
DSCAPE Development P h a se 2 - Ma ster P l an n i n g & U rban D es i g n
Three Lakes and Trails
P h a se 3 - P UD | Zon i n g | E ntitl em ents & Pro j e ct D e l i ve r y
PHASE 0
PROJECT APPROACH
... The Best Ideas Win
STAKEHOLDERS
Reaching Consensus
All (3) Phases Are An Iterative & Simultaneous Design Process
PHASE 2 MASTER PLANNING & URBAN DESIGN
Our Approach is simple and humble: Expect integration and partnership where The Best Ideas Win, Not any one particular individual – No egos involved – No preconceptions brought to the table.
ALTERNATE CONCEPTS
We facilitate Interactive Work Sessions to establish Metrics for Success, create a succinct mission statement, core values and goals that are to be embraced throughout the project design.
CLIENT
ALTERNATE CONCEPTS
BUILD
PREFERRED CONCEPT PHASE 1 PROGRAM VERIFICATION
We identify clear roles and responsibilities, using timely communication. Honest dialogue is very important as not all conversations are easy to have.
ALTERNATE CONCEPTS
PHASE 3 PUD | ZONING | ENTITLEMENTS & PROJECT DELIVERY
Not all stakeholders will have the same interests – we create a detailed mapping of each element to identify the audience and understand ‘what’ success looks like. Our intent is to not politely receive input, but to actively engage the experience and creative potential of the widest possible group of contributors.
CONSULT -ANTS
Our goal in master planning your facilities, through renovation and expansion is to make space function in a fully integrated way. An alignment of program, physical resources and budget are developed early in Phase 1 Programming. Alternative program scenarios are tested in terms of cost and operational efficiency. We do the due diligence necessary, but the ‘Best Ideas’ always Win.
[
Program & Budget
Design Options
L I S T E N
] [ U N D E R S TA N D ] [
Metrics & Desired Outcomes E VA L U AT E
P R E F E R R E D
] [ C H A L L E N G E ] [ CO L L A B O R AT E ] [
CO N C E P T
Key Personnel DELIVER
]
PHASE 0
P ROJ ECT BAC KG RO U N D
Relationships
History with the Vikings - University of Minnesota Joint-Use Stadium To accommodate NCAA intercollegiate football and soccer events, Crawford Architects prepared concept designs for a new 50,000seat, on-campus, open-air stadium for shared use by the University of Minnesota and the Minnesota Vikings. The stadium was designed to be flexible and capable of expanding to 80,000 seats. Big idea strategies were developed to establish project scope, future expansion, and ancillary development. Much of our efforts focused on assisting the University of Minnesota to renew interest in their football program and garnering financial support from alumni. During the initial phases of design, preliminary GMPs were developed to serve as a basis for securing fundint from a variety of sources.
Crawford Architects also played a major role in fundraising providing design and support for negotiations with TCF Bank, the Minnesota Legislature, Minnesota Board of Regents, and Bonding Agencies. Our efforts contributed significantly to securing $239m in funding. Our work in these preliminary phases of development served as the ultimate basis for design. While the Minnesota Vikings ultimately went on to design and construct a standalone facility in the heart of downtown Minneapolis, the planning stages of this project proved to be beneficial to providing adequate facilities for the Team’s use during the NFL seasons coinciding with construction of their new stadium.
PHASE 0
P ROJ ECT BAC KG RO U N D
Relationships History with the Vikings
A successful project is not only measured in terms of on-time and on-budget. A close working relationship between Client and Architect is built alongside the construction of bricks, mortar, concrete and steel. Partnerships with our colleagues, consultants, and foremost our clients are the most important things we build. Proof of that bond extends far beyond the final punch list and ribbon cutting. Crawford Architects has been building that relationship with the Minnesota Vikings for almost two
decades. A decade prior to the inception of the TCO Performance Center Headquarters project and through ownership changes, we worked closely with the Minnesota Vikings to evaluate locations in the Twin Cities area for a new stadium, which built trust and bloomed into the design and construction of their ‘Home’ in Eagan, MN.
PHASE 0
P ROJ ECT BAC KG RO U N D
Relationships
History with the Vikings - Northern Lights The Minnesota Vikings envisioned the Northern Lights project as a 1.5-million-square-foot sports-anchored mixed-use development. It included an indoor lifestyle center, a 72,000seat retractable roof NFL stadium, corporate offices, hotels and more than 3,000 residential dwelling units.
PHASE 1
P R O G R A M V E R I F I C AT I O N
User Group Meetings Hit the Ground Running
One-on-one sit down discussions are facilitated with key designated staff and the core leadership team to determine User Needs, Program Requirements, Equipment, Operational Requirements, and Project Visioning and Objectives. We ask the tough questions; not only what works but what doesn’t work and Why. This extends beyond just functional program of space and into the realm of how each of the individuals approaches and utilizes the facilities day-to-day, beginning with when they walk out of the front door of their home and embark on the journey to the facilities, and to the ebbs and flows of daily regimine. Consider this the stage of the project to dream big, all wishes are outlined during a white page session to be prioritized during future planning stages of the project this is the large end of the ‘funnel’. An example of User Group Session breakdown includes:
›
Community Engagement and Outreach Staff
›
Marketing Staff-Fan Engagement Staff
›
Events & Hospitality Staff
›
Ticket Sales & Operations Staff
›
Security Staff
›
Player Development & Legal Counsel Staff
›
Community Relations Staff
›
Public Relations Staff
›
Information Technology Staff
›
Partnerships & Special Projects Staff
›
Corporate Development & Guest Relations Staff
›
Corporate & Technology Partnerships Staff
›
Administrative Staff
›
Human Resources Staff
›
Football Information Systems Staff
›
Football Administrative Staff
›
Football Operations Staff
›
Content & Production Staff
›
Finance & Controls Staff
›
Sports Medicine Staff
›
Equipment Management Staff
›
Public Affairs Staff
›
Food Service Operations Staff
›
Video Production Staff
›
Groundskeeping & Turf Management Staff
›
Performance & Strength and Conditioning Staff-Facilities Management Staff
PHASE 1
P R O G R A M M I N G / P R O G R A M V E R I F I C AT I O N
1. Team Qualities › What are you looking for in an Architect? › What makes a strong team? › What about our work interests you?
User Group Meetings
Goals & Objectives / Mission Statement
Our Mission To create a first-class facility that fosters champions, on and off the field.
2. Metrics for Success › What are the most important qualities associated with the Vikings Brand / Culture that should be emphasized by this project? › What are the three (3) most important ingredients to a successful project? › On opening day, what headline would you like to see? As you walk into the building, what do you want to see, hear, smell and feel?
Core Project Values Community Through Commitment Innovation Through Creativity Legacy Through Excellence Teamwork Through Collaboration
3. Benchmarking › NFL Training Facilities › Health & Human Performance › Mixed-Use Commercial Development
4. Long Term Goals / Your Legacy › › › › ›
Ownership Team Fans Community Corporate Partnerships
5. Design Goals
Goals & Objectives Create a lasting legacy for the Wilf Family Create the NFL’s best training facility Maximize value through commercial development Create an efficient, sustainable building Establish a sense of unity among all levels of team and facility operations Futureproof the design through resilient principles and timeless architecture Integrate indoor and outdoor space
› Style / Aesthetic › Resilient Design / Sustainibility › Environmental (Interior & Exterior) Space
Create a destination that is unique to Minnesota and the Vikings brand
6. Wrap Up, What Hasn’t Been Done Before?
Utilize biophilic design to create a functional and comfortable space
› Human Performance & Sports Medicine Research Partnerships › STEM / Tech Incubator › Typology of Fan Experiences › Other
Provide partnership opportunities that are impossible to resist.
PHASE 1
P R O G R A M M I N G / P R O G R A M V E R I F I C AT I O N
Inventory & Assessment Developing the Right Program On site review of existing facilties and program areas are tabulated so that they can be compared against User Needs discovered during this Phase. A side by side comparison is made between currently available space and Preferred Program and Facility Needs to create a Gap Analysis showing the amount of additional area potentially required for the facilities and also what departments and uses those gaps are associated with. A decision process begins to analyze the extent of repurposing existing areas for different uses through both extensive and intensive renovations along with alternative concepts for newly constructed areas to fulfill
these gaps. Both schedule of delivery, affects and disruption to existing operations, and budget are weighed heavily concurrent with design iterations to determine the optimal solution(s). As adjustments are required due to budget and schedule, affected elements are discussed with the core committee collectively and tracked in the tabular program document as wish-list items or add-alternates that can be integrated into the project at later stages if the market allows, or as the team chooses to integrate them later.
PHASE 1
P R O G R A M M I N G / P R O G R A M V E R I F I C AT I O N
Benchmarking
New Headquarters ‐ Minnesota Vikings | MVC LLC
FINAL
Developing the Right Program
New HQ ‐ Minnesota Vikings (GSF)
Description
to health and human performance in mind. The findings of a market analysis, economic impact, and feasibility study were overlaid with benchmarked facilities and existing facilities to establish a clear understanding of the facility’s needs, opportunities, and constraints that were unique to the Minnesota market. Summary of Enclosed Areas by Category ‐ HQ
Simultaneously, benchmarking of peer facilities was conducted to create baselines for the renovations and new construction of the team facilities. The inventory and evaluation of these peer facilities was conducted with industry best practices and emerging industry performance trends from sciences related
22 January 2016
Crawford Architects
Program Comparison
Public Areas ‐ Front Door | Valhalla
24103
Media | Press
5092
Team Suite
15991
Existing Vikings (GSF)
Description
Public Areas ‐ Front Door
980
Team Suite
5000
Seahawks | VMAC (GSF)
Description
Dallas Cowboys (GSF)
Description
Public Areas ‐ Front Door
3600
Media | Press
1500
Front Door | Retail | Team Store | Conf. Center | Network Broadcast Media | Press
Team Suite
10600
Team Suite
46869 3252 13886
Hydrotherapy
5334
Hydrotherapy
700
Hydrotherapy
2300
Hydrotherapy
Training Facilities | Medical
8718
Training Facilities | Medical
2200
Training Facilities | Medical
6400
Training Facilities | Medical
Strength & Conditioning
11436
Strength & Conditioning
5900
Strength & Conditioning
9900
Strength & Conditioning
15516
Equipment Room
7351
Equipment Room
3025
Equipment Room
6300
Equipment Room
10038
Staff Locker Rooms
6374
Staff Locker Rooms
975
Staff Locker Rooms
2800
Position Meeting Rooms
11424
Position Meeting Rooms
2750
Position Meeting Rooms
11300
Position Meeting Rooms
11220
Coaching Staff
7998
Coaching Staff
3700
Coaching Staff
5900
Coaching Staff
7100
Ownership & Consultants
9818
6040
Ownership & Consultants
8200
Finance | Human Resources | Legal
5957
7000
Finance | Human Resources | Legal
5000
Cowboys HQ Offices
64847
Marketing, Sales & Revenue Staff
12110
Winter Park Offices Olympic Place Offices (Finance | Legal | Media Work Room) 1010 Offices (Marketing, Sales & Revenue)
14600
Marketing, Sales & Revenue Staff
16000
Community | Public Relations
4244
Community | Public Relations
4600
Draft Room Suite
2289
Draft Room Suite
700
Draft Room Suite
2100
Draft Room Suite
2000
Player Personnel & Football Operations
6314
Player Personnel & Football Operations
3300
Player Personnel & Football Operations
7200
Player Personnel & Football Operations
4412
Coaching Video
4186
Video
800
Coaching Video
4800
Coaching Video
3270
Vikings Entertainment Network
1000
Information Technology
1656
Vikings Entertainment Network
11932
Quality of Life Areas
13639
Nutrition | Food Prep | Dining
11379
Nutrition | Food Prep | Dining
Facility | Operations | Maintenance
12499
Facility | Operations | Maintenance
MV Cheerleaders & Dance Academy
12858
Information Technology
2500
Production Studio
3700
Broadcast Studio
12503
Quality of Life Areas
900
Quality of Life Areas
18934
6150
Nutrition | Food Prep | Dining
8700
Nutrition | Food Prep | Dining
9540
7480
Facility | Operations | Maintenance
15000
Shared Support
26335
4198 Sub Total
204,042
Indoor Practice | Training Facility
95,080
Outdoor Stadium
89,530
Groundskeeping
7,692
Sub Total Indoor Practice | Training Facility
72,300 89,000
Sub Total Indoor Practice | Training Facility
139,300 88,000
Sub Total Indoor Practice | Training Facility Indoor Stadium Venue
Groundskeeping
3,700
IPF Storage
3,500
Groundskeeping
7,186
301,702
Cheerleaders & Dance Academy
7,802
Groundskeeping
4,180
Blue Star Imaging Center Total Possible additional program: Cheerleader | Dance Academy (stand alone) Warming House Expansion ‐ Hall of Honor Expansion ‐ IPF for Youth Football Note: Private Offices (net area) Open Offices (net area) Open Office Ratio
01/22/2016
396,344 GSF 48,229 4,359 8,000 15,000
Total
168,500
Note: Area at 1010 South 7th incudes area for staff to be relocated only.
Total Other Facilities Detroit Lions Practice Facility New York Jets
234,486 GSF 266,702 239,250
262,580 See Stadium
15,500 Total
Additional Program | Cowboys Unassigned Program | Spec Office Total Cowboys Building Area
591,764 GSF 373,689 965,453
NSF 29,010 9,080 23.84%
Pa New Headquarters ‐ Minnesota Vik 2016 Copyright Crawford Archit
PHASE 1
P R O G R A M V E R I F I C AT I O N
Vision Planning
Ideation - Brand Essence & Concept
1
2
Client Branding Materials
User Group Research/Card Game
3
Research
Key Brand Descriptors • Unifying • Innovative • Relentless
8
Every project is unique and requires a unique approach. Each project is treated not as our project, but our client’s project. As architects, it is our job to extract the essence of each project from our clients and transform that vision into a built representation of their goals, ideals and character. The Twin Cities Orthopedics Performance Center is not just a practice facility for the Minnesota Vikings. It is the Home of the Minnesota Vikings - players, coaches, ownership, staff, media, alumni, fans and community. All of these groups make up the Vikings family and are represented. US Bank Stadium is a location where the team plays 8-10 times per year; referred to as Grandma’s House. The team headquarters is where the organization calls ‘Home’ 365 days of the year. The level of thought that needs to go into creating a ‘Home’ cannot be understated. The process of bringing about the design of the TCO Performance Center involved all members of the organization, community representatives, the design team, and stretch back to the origins of the Vikings’ Heritage.
4
In-House Charrette
5
Presentation of Concept
Final Product
Unifying
Innovative
7
6
Further Refined Design Materials Guide
Relentless
Unifying
Innovative
Relentless
Unifying
Presentation of Designs (3D)
Innovative
Relentless
PHASE 1
P R O G R A M V E R I F I C AT I O N
Vision Planning
Ideation - Brand Essence & Concept
BRAND
The Minnesota Vikings had recently embarked on rebranding their entire football organization. The completion of that effort coincided with the opening of US Bank Stadium and the onset of the Viking Lakes project. Crawford Architects was provided that document, and from that document stemmed the whole of the project. Three words stand out to describe the Minnesota Vikings; Unifying, Innovative, and
Relentless. These three words became the foundation for the design and construction of the project.
THE CARD GAME
One of the tools that Crawford utilizes to kickoff concept design with its clients is by playing a Card Game. Images intended to invoke an emotional response are placed in a pile in the middle of the table. No order is assigned. The images can be specific to the project or seemingly random. Our clients are asked to select different cards in response to different questions. The goal of this game is two-fold. It
engages the client in a light-hearted and easy manner so any concerns about discussing anything are set aside. It also gives us an insight into a general sense of who our client is and what are their likes and dislikes; organized or chaotic, simple or complex, etc. For the Vikings, this process was repeated for all User Group Sessions.
PHASE 1
P R O G R A M V E R I F I C AT I O N
Vision Planning
Ideation - Brand Essence & Concept
RESEARCH
The brand statement and work sessions with the Vikings made it clear that they were not looking for a cartoon of a Viking Warrior, but were instead steeped in the tradition of the Historic Norsemen. They embraced their culture and history. Crawford Architects embraced that enthusiasm and took it upon ourselves to inject that history into the project. Research was conducted into the people, the culture, the
geography, the geology, their art, their rise and fall in Northern Europe, their exploration into the new work and their influence locally. All of this set the tone for the base of the project design.
THE CHARETTE
Crawford engaged in a several day design charette, discussing, throwing out ideas, finding precedent representations, sketching and covering our walls with all relevant material and imagery. Summary of these concepts were presented to the Vikings organization, and after much review and comment, and revision, a final statement was created to guide the process and maintain ‘true north’ throughout all phases of the
project:”The realized goal of this process will be a cohesive design that clearly states ‘this is the Home of the Minnesota Vikings.’ The completed project will display the 3 pillars of the Minnesota Vikings Brand Essence. It will unify all those that call it home; it will be innovative in its design and construction; it will be relentless in its demand for quality. These 3 things will be evident throughout every part of the building and site.
PHASE 1
Vision Planning
P R O G R A M V E R I F I C AT I O N
Ideation - Brand Essence & Concept
UNIFYING
The historical Viking people were tight knit groups of farmers and craftsmen living near the fjords of Denmark, Sweden and Norway. Families and extended families worked together to create a community of free peasants. Their location also gave them access to the sea and future exploration. The craftsmanship and art of the later ages of the Vikings (Urnes Style) is characterized with slim and stylized animals interwoven into tight patterns. It can be seen carved into their architecture, jewelry, ship details, armor and clothing.
The Unifying Shield manifests itself in the built environment as inviting materials such as wood and warm lighting. The forms and details take on the intertwining shapes that tie together like the late Viking Age designs. This shield is located at the entry of the Headquarters building where the Vikings Family greets the community and invites them in to the lobby, the VEN Studio, the auditorium, and cafeteria.
“Come together, right now, over me.” – The Beatles, Come Together.
PHASE 1
Vision Planning
P R O G R A M V E R I F I C AT I O N
Ideation - Brand Essence & Concept
INNOVATIVE
The historical Vikings were great explorers, using innovative methods to craft their longships and new techniques for navigation to places unknown to Europe at the time. The vision of a Viking longship quietly approaching the unknown, bravely gliding through the fog shrouded banks of an undiscovered land creates the picture of a people unafraid to try something new to advance their society.
This Innovative Shield takes its inspiration from that vision of the Vikings, seeking to explore. It uses the newest technologies and materials and occupies the center of the building, where the staff works to push the limits of the Vikings Football team. The marketing team, the technology department and video production team all work together to advance the team to new heights.
“Smoke on the water, a fire in the sky. Smoke on the water.” – Deep Purple, Smoke on the Water.
PHASE 1
Vision Planning
P R O G R A M V E R I F I C AT I O N
Ideation - Brand Essence & Concept
RELENTLESS
The relentless nature of the historical Vikings is seen in the geography / geology and climate in which they lived. The stone cliffs of the fjords of Scandinavia and the unrelenting glaciers moving down the mountains to the sea paint a picture of an unforgiving existence that bred strength in the Viking people. The materials are the fractured stone cliff walls; fissures, eskers and crevices; chunks of ice and massive glacial walls that crash into the sea.
The Relentless Shield is characterized by strong and solid materials, stone and iron. The details are chunky and solid, dark in color and unmoving. Subtle angles in the building throughout are reminiscent of the jagged post glacial landscape. Its location is at the football team area of the building, the players and coaches being the solid foundation of the Vikings Family.
“We come from the land of the ice and snow, from the midnight sun where the hot springs blow.” – Led Zeppelin, The Immigrant Song.
PHASE 1
P R O G R A M V E R I F I C AT I O N
Vision Planning
Ideation - Brand Essence & Concept
3 ESSENCES 3 SHIELDS 3 PILLARS The 3 Pillars of the Minnesota Vikings Brand Platform would later become the 3 distinct organizing elements of the TCO Performance Center; The Unifying Shield utilized warm and inviting materials such as wood, and the forms and architectural detailing take on the intertwining shapes that tie together. This Shield represents the entry and communal program elements of the facility; The Innovative Shield takes its inspiration from that vision of the Vikings, seeking to explore. Is utilizes the latest technologies and materials and occupies the center of the building, where the staff works to push the limits of the Football Organization. The marketing team, the technology department and video production team all work in unison to advance the team to new heights; The
Relentless Shield is characterized by strong and solid materials, stone and iron. The details are solid, forged, and dark in color and unmoving. Subtle angles in the building throughout are reminiscent of the jagged post glacial landscape. Its location is at the heart of the Football Operations, the players and coaching staff being the solid foundation of the Vikings’ Family.
RELENTLESS INNOVATIVE U N I F Y I N G
PHASE 1
P R O G R A M V E R I F I C AT I O N
The Vikings Campus Is... P O W E R F UL BOL D UNIQUE MODE R N P R OGR E S SI V E E NE R GI Z E D S OL ID F U T UR E C ONNE C T E D QU A L I T Y PA S SION IN T E NSI T Y T R A DI T ION A L HIS T OR IC RUG GE D GR E E N
INC L USI V E L O YA L P R OUD C OMMUNI T Y IN T R IC AT E A R T IS T IC SUS TA IN A BL E N AT I V E SE A SON A L E DUC AT ION A L C OL OR F UL W E L C OMING SAFE BE A U T IF UL HE A LT H Y C OMP E T I T I V E
INDIGE NOUS SUP P OR T I V E ACTIVE W OODE D R E F INE D E NG A GING T IME L E S S C ULT UR A L BR A NDE D C R E AT I V E W OR L D C L A S S OP E N SHE LT E R E D A C C E S SIBL E N AT UR A L PA S SI V E
RELENTLESS INNOVATIVE UNIFYING
PHASE 2
MASTER PLANNING & URBAN DESIGN
Place - Finding a Location Site Selection
Crawford Architects assisted the Minnesota Vikings in analyzing multiple properties surrounding the Twin Cities region, to determine feasibility, economic impact, and due diligence related to each of the site locations. Renovations to the existing facilities at Winter Park in Eden Prairie were considered, as well as new developments in Anoka, Golden Valley, and Chanhassent. Ultimately, the former site of the TWA Headquarters in Eagan, MN was selected. From there, test fits for the preferred site began. Considerations with the test fits included:
›
identifying how the training facility could leverage the highest commercial value for the entire site.
›
siting the training facility as an anchor for other uses without compromising its function and security.
›
creating the greatest economic, social, and experiential impact for the community.
›
creating degrees of flexibility in land use and phasing of development
›
infrastructure improvements with built in phasing and market flexibility
›
functional relationships between buildings and site features
PHASE 2
MASTER PLANNING & URBAN DESIGN
Due Diligence
Winter Park - Eden Prairie, MN
R E N OVAT I O N & E X PA N S I O N
VS .
N E W CO N ST R U CT I O N
PHASE 2
MASTER PLANNING & URBAN DESIGN
Minnesota FC
VISITOR/PRESS/ STAFF PARKING 145
C7 '-
Due Diligence
Joint Training Facility - Minnesota Vikings & MNUFC - Golden Valley, MN
. ..
Mi�Yit!""�"PfOC'.,,. Mi..-.fCONlic.ltlKI,..,,.,_,,
*
MINNESOTA VIKINGS SPECTATOR BERM
MINNESOTA FC SPECTATOR BERM
MINNESOTA FC TEAM AREA NATURA GRASS Fl D
ENTRY LOBBY HOF MUSEUM PUBLIC SEATING
INDOOR PRACTICE FACILITY 9Q'H£1GHT
l"f'A �EC WIOTW
Fl.Ill new rooTBALL
COVERED WALK
◊
0
◊
\
I I I -I I- -I
SIGN
MINNESOTA VIKINGS ENTRY
I I I -I I-
ii
PLAYER PARKING 190
�
PHASE 2
Due Diligence
Test Fits & Alternate Concepts Viking Lakes, Eagan, MN
MASTER PLANNING & URBAN DESIGN
scheme scheme
scheme scheme
2.3 2.5
2.4 2.6
2.5 3.0
2.6 Notes3.0
1
2.1
2.2 1
2.1 2.3
2.2 2.4
2.3 2.5
2.4 2.6
2.5 3.0
2.6
3.0
+ + −
− + −
++ ++ −+
−+ ++ −+
++ ++ +−
++ ++ ++
++ ++ −+
++ ++ ++
+ + +
+ + +
+ + b Controlled / MinimalbViewControlled of Practice/ Fields Minimal View of+Practice Fields + c Separation from Team c Entry Separation Area from Team Entry+ Area + Orientation / Natural5 Daylighting Orientation / Natural Daylighting + +
++ ++ ++ +−
++ ++ +− ++
+− +− ++ −−
+− ++ −− +−
−+ −+ +− −+
−+ ++ −+ −+
+ + − +
+ + + +
2.1
2.2 1
2.1 2.3
2.2 2.4
2.3 2.5
2.4 2.6
2.5 3.0
2.6
3.0
− + − + + + +
+− −+ +− −+ −+ +− −−
−− ++ −− ++ ++ +− ++
−− ++ −− ++ ++ −+ −+
−− ++ −− ++ ++ −− ++
−− ++ −− ++ ++ +− ++
−− ++ −− ++ ++ −+ ++
− + − + + − +
− + − + + + +
2.1
2.2 1
2.1 2.3
2.2 2.4
2.3 2.5
2.4 2.6
2.5 3.0
2.6
3.0
− + Field Locations (Proximity 2 Field to NW Locations property(Proximity line) to NW property + line) − Amount of Tree Removal 3 Amount of Tree Removal − + Impact of Shadows on 4 theImpact Practice ofFields Shadows on the Practice Fields + −
−+ +− −+ +−
++ −− ++ −−
++ −− ++ −−
++ −− ++ −−
++ −+ ++ −−
++ −+ +− −+
+ + + −
+ + − +
Office Building
Office Building
1
Practice Field Frontage 1 / Views Practice to the FieldFields Frontage / Views to the Fields
2
Flow between IPF / Team 2 Flow Area between / PracticeIPF Fields / Team Area / Practice Fields
3
Expansion Possibilities 3
Expansion Possibilities
4
Public Entry Locations 4
Public Entry Locations
a
5
Adjacency to the Lake a
Stadium 1 2 3 4 5
Adjacency to the Lake
Stadium
Test Fits & Alternate Concepts 6 7
Practice Fields 1 2 3 4
Site Layouts
1
+ Amount of Cut / Fill 2 Amount of Cut / Fill − Amount of Tree Removal 3 Amount of Tree Removal + Public Access 4 Public Access − Proximity to Public Parking 5 Proximity (in development) to Public Parking (in development) − Impact at Lake (cost,6retaining Impact walls, at Lake etc.)(cost, retaining walls,+ etc.) Cost of Seating Bowl7(S.O.G. Cost orof engineered) Seating Bowl (S.O.G. or engineered) − Stadium / Practice Fields 1 Elevation Stadium /Variance Practice Fields Elevation Variance
Practice Fields
1
scheme
scheme
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6Office 2.5Building 3.0 2.6Office Office Building 3.0 Building 2.5 2.6Parking 3.0 Parking
+ + −
− + −
+ + + + − −+
− −+ + + − −+
+ + + + + +−
+ + + + + +
+ + + + − −+
+ + + +
+ + + + + + + +−
+ + + + + +− + +
+ +− + +− + + − −
+ +− + + − − + +−
− −+ − −+ + +− − −+
3
Expansion Possibilities 3 3 Expansion Possibilities Expansion Possibilities
4
Public Entry Locations 4 4 Public Entry Locations Public Entry Locations
5
+ + c Separation from Team c c Separation Entry Areafromfrom Team Entry Area +Area Separation Team Entry Orientation / Natural 5 5Daylighting Orientation / Natural Daylighting Orientation / Natural Daylighting + a
Adjacency to theaLakea Adjacency to the Adjacency to Lake the Lake
b
Controlled / Minimal b bView Controlled of Practice / Minimal ViewView of Practice Fields Controlled /Fields Minimal of Practice Fields
Stadium 1 2 3 4 5 6 7
Stadium Stadium
2 3 4
2 3 4 5 6 7
2.2 2.4
2.3 2.5
2.4 2.6
2.5 3.0
2.6
3.0
2.6Stadium 2.6Stadium 3.03.0
Training Camp
Training Camp
1
2.1
1
2.1
− + − +− + + + 2.1
1 2.2 1
2.12.1 2.3
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6Site 2.5 Layout 2.5 3.0
+ + − −+ − −+ + +− − − + +− − −+
+ + + + + + − − − − − −+ + +
+ +− + + + + − − − − − − + +
+ +− + + + + − − − − + +− + +
a
Staff / Public Entry a a StaffStaff / Public Entry / Public Entry
b
Players / Coachesb Entry / Coaches Entry b Players Players / Coaches Entry
c
Loading / Unloading c c Loading / Unloading Loading / Unloading
+ − − −
Parking Exposure3(surface 3 Parking Parking / covered) Exposure Exposure (surface (surface / covered) / covered) a
Staff / Public Entry a a StaffStaff / Public / Public Entry Entry
b
Players / Coachesb Entry / Coaches Entry b Players Players / Coaches Entry
c
Loading / Unloading c c Loading Loading / Unloading / Unloading
Training Camp
Training Camp Training Camp
+ − − −
− − +
− − +
+ +− − −+ − −+ − −+
+ +− − −+ − − − −+
2.22.2 2.4
− −+ + + + + + +
2.32.3 2.5
− −+ + + − −+ + +
1
Highway Frontage / Visibility 1 Highway Frontage / Visibility
2.42.4 2.6Parking 2.52.5 3.0
+ + + + + +− + +
− − − − + +−
− −+ − −+ + +−
− −+ − −+ − −+
+ + + + − −
+ + + + + +−
2.6Site 2.6Site Layout Layout 3.03.0
1
− North − −Road 1 1Property North + North Line Frontage RoadRoad Property Property LineLine + −+ Frontage +Frontage 2 + NE + Drainage + Utility + 2 Easement 2 NE +Drainage NE +Drainage Utility Utility Easement Easement − 3 + Northwest + +Parkway + 3 Location 3 Northwest + Northwest + / Adjustment Parkway Parkway Location Location / Adjustment / Adjustment − 4 − Wetland − "D" − Setback − 4 4/Wetland −Impact Wetland − "D" "D" Setback Setback / Impact / Impact − 5 − Wetland − "E" − Setback − 5 5/Wetland Impact − Wetland − "E" Setback "E" Setback / Impact / Impact + 6 − Wetland − Setback Impact + Wetland "F" Setback / Impact / Impact + −+ "F" − 6 6/Wetland + "F" Setback 7 + Future + Development + + 7 7Sites Future + Future (N +Development of wetland Development "F") SitesSites (N of(Nwetland of wetland −"F") "F") 1
1 2
3
2.6Parking 3.03.0 2.6Parking
1
+ Loading Loading + Loading / Unloading Accessability Accessability + + / +Unloading + 1 1Accessability + / Unloading Proximity to Building 2 2Entry Proximity Proximity to Building to Building Entry Entry
+ +a + +b + +c
+ + + + − − + + Loading Loading / Unloading / Unloading + + / Unloading +c +cLoading
Staff / Public Entry a a StaffStaff / Public / Public Entry Entry
Players / Coaches b Entry b Players Players / Coaches / Coaches Entry Entry
+ + + + + + + + Loading Loading / Unloading / Unloading − − / Unloading +c +cLoading
Staff / Public Entry a a StaffStaff / Public / Public Entry Entry
Players / Coaches b Entry b Players Players / Coaches / Coaches Entry Entry
2.12.1 2.3
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6
2.52.5 3.0
2.62.6
3.03.0
2.2 1
− −− + ++ − −−+ + +−+− + ++ + +− + 2.1 ++ 2.3
2.1 2.3
− −− + ++ − −+−+ + +−+− + ++ − −+ − 2.2 −+ 2.4
2.2 2.4
− −− + ++ − −+−+ + +−+− + ++ − −− + 2.3 ++ 2.5
2.3 2.5
− −− + ++ − −+−+ + +−+ + ++ + +− + 2.4 ++ 2.6
2.4 2.6
− −− + ++ − −+−+ + +−+ + ++ − −+ + 2.5 ++ 3.0
2.5 3.0
− − + + − −+ + + + + − − + 2.6 +
2.6
− − + + − −+ + + + + + + + 3.0 +
+1+ 2.12.1 ++ +− +− −− −+ − 3.03.0 + 1 2.2 2.3 2.22.2 2.4 2.32.3 2.5 2.42.4 2.6 2.52.5 3.0 2.62.6 ++ ++ ++ +− +− −+ − + − −+− + ++ + −++− + ++ + −++ + ++− + + + +− + +− − −− − −− − −− − −+ − −+ + + + + − 2.2 −1+ + 2.1 ++ + 2.2 ++ + 2.3 ++ + 2.4 ++ + 2.5 +− + 2.6 + Notes − 3.0 − 2.3 2.4 2.5 2.6 3.0 +scheme +− −scheme −− −scheme −− −scheme −− −scheme −− −scheme −+ −scheme − +scheme + scheme scheme scheme scheme scheme scheme
+ +
+ +
− − −
− −+ − −+ − −+
− −+ − −− − −+
+ ++ + ++ + ++
+ ++ − −+ + ++
+ ++ + +− + ++
+ ++ + ++ + ++
+ + − − + +
+ + + + + +
− − +
− − +
− −− − −− + +−
− −+ − −+ + +−
− −+ − −+ − −+
+ ++ + ++ − −−
+ ++ + ++ + +−
+ ++ + ++ − −+
+ + + + − −
+ + + + + +
2.12.1 2.3
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6Training 2.52.5 3.0 Camp2.6Training 3.0 Camp Camp 2.6Training 3.0
1
2.1
1 2.2 1
2.12.1 2.3
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6
2.52.5 3.0
2.62.6
3.0SITE 3.0 CONCEPT 2.3
+ + − −+ − − + +
+ + + + − − + +
+ + + + − − + +
+ + + + − −+ + +
+ − + +
+ − − +
+ ++ − −+ + +− + ++
+ ++ − −+ − −− + ++
+ ++ + ++ − −− + ++
+ ++ + ++ − −− + ++
+ ++ + ++ − −+ + ++
+ ++ + ++ − −+ + ++
+ + + + + + + +
+ + + + + + + +
1
2.1
1 2.2 1
2.12.1 2.3
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6Indoor 2.5Practice 3.0 2.6 Facility Indoor (IPF) Practice 3.0Practice Facility (IPF) (IPF) 2.5 2.6Indoor 3.0 Facility
1
2.1
1 2.2 1
2.12.1 2.3
2.22.2 2.4
2.32.3 2.5
2.42.4 2.6
2.52.5 3.0
2.62.6
3.03.0
+ Orientation (Natural 2 2Daylighting) Orientation (Natural Daylighting) Orientation (Natural Daylighting) +
+ +
+ + + +
+ + + +
+ +− + +
+ +− + +−
− − + +−
− Highway − − 1 / Visibility 1 Highway + Highway Frontage / Visibility / Visibility + −+ Frontage + Frontage 2 − Orientation − (Natural Orientation + Orientation (Natural Daylighting) Daylighting) + −+ − 2 2Daylighting) + (Natural
+ +
+ ++ + ++
+ ++ + ++
+ +− + ++
+ +− + +−
− −− + +−
− −+ − −+
− − − −
+ + + +
2
Alotted Acreage 2
3
Visibility of All Fields 3 3 Visibility of AllofFields Visibility All Fields
4
Site Security
4
Acreage 2 Alotted Alotted Acreage Security 4 Site Site Security
Indoor Practice Facility Indoor (IPF) Practice Facility (IPF) Indoor Practice Facility (IPF) Highway Frontage 1 / Visibility Frontage / Visibility 1 Highway Highway Frontage / Visibility
1
PRESS BOX
NW PARKWAY
I - 494
O’NEILL DRIVE
O’NEILL DRIVE
ALT SURFACE PARKING
LOADING
PARKING GARAGE (3 LEVELS) IPF
PLAYERS/COACHES ENTRY
TEAM LOADING
SITE CONCEPT 2.6
PLAYERS/COACHES PARKING (COVERED)
IPF
PLAYERS ENTRY
GRNDS.
STAFF ENTRY
PUBLIC/MEDIA ENTRY S.
ND
GR
DINING/ VEN/ETC LOADING
PARKING GARAGE (2 LEVELS) STAFF/PUBLIC/ MEDIA ENTRY
Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113
VIKINGS HEADQUARTERS
Minnesota Vikin Site Concepts and 201
VIKINGS HEADQUARTERS
(WETLAND ‘E’)
(WETLAND ‘E’)
GRASS PRACTICE FIELDS GRASS PRACTICE FIELDS
LAKE (WETLAND ‘F’) STADIUM ARTIFICIAL SURFACE
(WETLAND ‘D’)
1 2.2 1
+ Public + + 1 1Public + Public Access + Access +Access 2 + Alotted + + 2 2Alotted + Alotted Acreage + Acreage + Acreage 3 − Visibility 3 3 Visibility + Visibility All Fields −+ of+All+Fields + of AllofFields 4 + Site + + 4 4Site + Site Security + Security + Security
FUTURE TRAINING CAMP STAGING
FUTURE EXPANSION
+ + − −+ + +− + +
1
STADIUM ARTIFICIAL SURFACE
01/19/2016
+ − − +
Access 1 Public Public Access
LAKE (WETLAND ‘F’)
I - 494
3.03.0
+ ++
GRASS PRACTICE FIELDS
Notes
+ + + SITE + CONCEPT 2.2 + + − − − − + + + +
+ ++
(WETLAND ‘E’)
FUTURE EXPANSION
PRESS BOX
− −+ + ++ + ++ − −− − −− − −+ + ++
− −+
LAKE (WETLAND ‘F’)
NW PARKWAY
2.52.5 3.0 2.62.6Crawford 3.03.0 2016 Copyright 2016 Architects Copyright Crawford Architects
− −+
VIKINGS HEADQUARTERS
S.
ND
GR
FUTURE TRAINING CAMP STAGING
+ +− + ++ + ++ − −− − −− + +− + ++
+ +−
(WETLAND ‘E’)
Minnesota Vikin Site Concepts and 201
(WETLAND ‘D’)
2.42.4 2.6
2.62.6
PLAYERS/ COACHES ENTRY STAFF/ PUBLIC/ MEDIA ENTRY
Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113
STADIUM ARTIFICIAL SURFACE
+ +− + ++ + ++ − −− − −− − −− + ++
2.52.5 3.0
STAFF/PUBLIC/ MEDIA ENTRY
PARKING GARAGE (3 LEVELS)
IPF
STAFF/PUBLIC/ MEDIA PARKING
FUTURE EXPANSION
2.1
1
GRASS PRACTICE FIELDS
2.32.3 2.5
2.42.4 2.6
SITE CONCEPT 2.5
(WETLAND ‘D’)
1
Public Access
S.
ND
GR
+ ++ + ++ + ++ − −− − −− − −+ + ++
2.32.3 2.5
WARMING HOUSE
WARMING HOUSE
LOADING
IPF
2.22.2 2.4
2.22.2 2.4
PLAYERS/ COACHES PARKING
LOADING
+ ++ − −+ − −+ + +− − −− + +− − −+
+ +−
− − −
PLAYERS/ COACHES ENTRY
2.12.1 2.3
2.12.1 2.3
O’NEILL DRIVE
O’NEILL DRIVE
1 2.2 1
1 2.2 1
WARMING HOUSE
I - 494
I - 494
+ ++ − −+ − −+ − −− + +− + +− − −+
2.1
FUTURE TRAINING CAMP STAGING
PRESS BOX
+ − − + − + −
01/19/2016
(WETLAND ‘E’)
NW PARKWAY
2.1
− − + + + + − − − − − − + +
STAFF/PUBLIC/ MEDIA ENTRY
STADIUM ARTIFICIAL SURFACE
FUTURE EXPANSION
PRESS BOX
3.0
+
Parking Exposure3 (surface 3 Parking Parking / covered) Exposure Exposure (surface (surface / covered) / covered)
+ +a + +b − −+c
1 2.2 1
+ +− − +−+ + −+−+ − +−+− − +−+ + +− − 2.2 −1−
+ − + +
1
2
− − 1 − Stadium − /−Practice − 1 Fields 1 Stadium −Elevation Stadium − / Practice /Variance Practice Fields Fields Elevation Elevation Variance Variance + + + 21 + Amount + Access of+Cut+/ 2Fill 1 2 Amount + Public Amount + ofAccess Cut of /Cut Fill/ Fill −+ Public − − 32 − Amount − Acreage of−Tree − Removal 3 2 3 Amount − Alotted Amount − of Tree of Tree Removal Removal +− Alotted Acreage + + 43 + Public + Access +All+Fields 4 3 4 Public + Visibility Public +Access Access −+ Visibility of of All Fields + + 54 + Proximity + Security +to Public + 5 Parking 5 Proximity + Site Proximity +(inSecurity development) to Public to Public Parking Parking (in development) (in development) −+ Site 4 + +− 6 − Impact 6 6retaining Impact + Impact Lake at Lake (cost, etc.)(cost, retaining retaining walls, walls, etc.) +etc.) −+ at −Lake−(cost, +atwalls, + + Indoor 7 + Practice Cost + of Seating +Facility +Bowl 7 7(IPF) (S.O.G. Cost + Practice Cost of +orSeating of engineered) Seating BowlBowl (S.O.G. (S.O.G. or engineered) or engineered) −1 Indoor Facility (IPF)
+ + − −+ − −+ − − + +− + +− − −+
Proximity to Building 2 2Entry Proximity to Building Entry Proximity to Building Entry
1
2.42.4 2.6Stadium 2.52.5 3.0
− − + + − − + + + + − − + +
+ − − + − + −
Loading / Unloading 1 Accessability / Unloading Accessability 1 Loading Loading / Unloading Accessability
3
2.32.3 2.5
Minnesota Vikin Site Concepts and 201
PLAYERS/ COACHES ENTRY
LAKE (WETLAND ‘F’)
(WETLAND ‘D’)
+ + + + + + + + + + + + + + + + CONCEPT 2.1 SITE
− − + + − − + + + + − −+ − −+
PARKING GARAGE (3 LEVELS)
Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113
(WETLAND ‘D’) Notes Notes
+ + + + + + − + + + + − +− + + −
2.22.2 2.4
2.12.1 2.3
GRASS PRACTICE FIELDS
+ ++ + ++ + ++ ++ − −++ + ++ − +−+ − +−+ −+
− − + + − − + + + + + +− + +
S.
ND
GR
(WETLAND ‘F’)
+ ++ + ++ − −++ +− − −++ − −+ + +−+ − +−+ +−
2.12.1 2.3
1 2.2 1
(WETLAND ‘E’)
+ +−+ + ++ + ++ −+ + +−+ + ++ − −+−+ + +−+ −−
1 2.2 1
IPF
IC BL PU TRY EN
+ +−+ + ++ + +−+ ++ + +−+ + +− + −++ − −−+ −+
+ +− − −+ + +− − −+ − −+ + +− − −
LOADING
SITE CONCEPT 2.4
IA ED F/M RY AF ST ENT
− +−+− + ++ − −+ −− + −++ + ++ + −+−+ + −++ +−
− + − + + + +
2.1
SITE CONCEPT 1
+ ++− + ++ − −+ −+ + −++ + ++ + −++− + −+− +−
2
DIA
E /M LIC UB ING F/P ARK P
AF ST
EXISTING DRAINAGE/ UTILITY EASEMENT
2.1 2.3
+ Practice + /Field +Unloading +Frontage 1 1Accessability Practice +/ Views Practice + Field to the Frontage Fields Frontage / Accessability Views / Views to the to Fields the +Fields −+ Loading Loading /Field Unloading + Flow +to Building Flow + Proximity Flow Area between / Practice IPFBuilding /IPF Fields Team / Team AreaArea / Practice / Practice +FieldsFields + + between +IPF2 / Team +between Proximity 2Entry to Entry 3 + Expansion +Possibilities 3 3Entry Expansion + Expansion Possibilities − − /+Public Staff / Public Entry + a Staff +a Possibilities 4 Public Locations 4 Public Public Entry Locations Locations b Entry Players /4Coaches Entry b Entry Players / Coaches Entry − − to the Adjacency to Lake the Lake − −+ac Adjacency + + / Unloading +aLake +acAdjacency +− +− Loading Loadingto/ the Unloading Controlled / 3Minimal bView Controlled Controlled of Practice / Minimal / Fields Minimal View View of Practice of+Practice Fields Fields +b Exposure + + (surface +bParking + 3 + Parking /+covered) Exposure (surface / covered) Entry Separation Area fromfrom Team Team Entry Entry Area − −+ac Separation − /−Publicfrom +cTeam +acSeparation +−Area +− Staff Entry Staff / Public Entry 5 − Orientation + / Natural 5Daylighting Orientation + Orientation Natural / Natural Daylighting Daylighting +− +− −+b Players +/5Coaches +b /Players Entry / Coaches Entry c Loading / Unloading c Loading / Unloading + + 1
2.1
2
O’NEILL DRIVE
VIKINGS HEADQUARTERS
2.2 1
3.03.0
+ + − − + + − −
1
PRESS BOX
I - 494
2.62.6
+ + − − + + − −
1
WARMING HOUSE
2.52.5 3.0
+ + − − + + − −
Parking Parking
PUBLIC/MEDIA PARKING
2.42.4 2.6
− −+ + +− − −+ + +−
Parking
FUTURE TRAINING CAMP STAGING
2.32.3 2.5
− + Field Locations (Proximity 2 2 FieldField toLocations NWLocations property (Proximity line) to NW property + line)line) − (Proximity to NW property Amount of Tree Removal 3 3 Amount of Tree Removal − + Amount of Tree Removal Impact of Shadows 4 on the Impact Practice of Shadows on the Fields + − 4 Impact ofFields Shadows on Practice the Practice Fields 1
PUBLIC PARKING
2.22.2 2.4
2.1
Field Construction 1 (sitework, 1 FieldField Construction cost, Construction settlement) (sitework, (sitework, cost,cost, settlement) settlement)
+ NE Drainage Utility 2 Easement Utility Easement − 2 NE Drainage NE Drainage Utility Easement Northwest Parkway 3 Location / Adjustment Parkway Location / Adjustment − 3 Northwest Northwest Parkway Location / Adjustment Wetland "D" Setback 4 4/Wetland Impact "D" "D" Setback / Impact − Wetland Setback / Impact Wetland "E" Setback 5 5/Wetland Impact "E" Setback / Impact + Wetland "E" Setback / Impact Wetland "F" Setback 6 6/Wetland Impact "F" Setback / Impact + Wetland "F" Setback / Impact Future Development 7 7Sites Future (N Development of wetland "F")SitesSites (N of(Nwetland −"F") "F") Future Development of wetland
STADIUM ARTIFICIAL SURFACE
PUBLIC/MEDIA ENTRY
(WETLAND ‘D’)
(WETLAND ‘D’)
2.12.1 2.3
2.32.3 2.5
SiteSite Layout Layout
(WETLAND ‘E’)
LAKE (WETLAND ‘F’)
1 2.2 1
2.22.2 2.4
North Frontage Road 1 1Property North Frontage Line RoadRoad Property LineLine North Frontage Property
IPF
GRASS PRACTICE FIELDS
LAKE (WETLAND ‘F’)
PUBLIC ENTRY
2.1
2.12.1 2.3
Site Layout 1
1
1 2.2 1
1
S.
ND
GR
(WETLAND ‘E’)
EXISTING DRAINAGE/ UTILITY EASEMENT
2.1
2.1
Practice Fields Fields Practice
PLAYERS/COACHES/ STAFF ENTRY
STAFF/MEDIA ENTRY
ING
1
+1 + 2.42.4 2.6Practice 2.52.5 3.0 Fields 2.6Practice 2.6Practice 3.0 Fields 3.0 Fields 2.1 2 Orientation (Natural2Daylighting) Orientation (Natural Daylighting) + + + + 13 + Field + Construction +Practice + 1 (sitework, 1 + Field +Construction cost, Construction settlement) (sitework, (sitework, settlement) settlement) − + Relation to Fields 3 Field Relation to Practice Fieldscost,cost, − −+ 2 − Field −+ Locations + +(Proximity 2 2 Field + Field to +Locations NW Locations property (Proximity (Proximity line) to NW to NW property property + line)line) − + + 3 + Amount +− of+Tree+ Removal 3 3 Amount − Amount − of Tree of Tree Removal Removal −1 + 2.1 − − 4 − Impact −+ of −Shadows − 4 on4Impact the + Impact Practice +of Shadows ofFields Shadows on the on Practice the Practice Fields Fields + − scheme scheme
Practice Fields 1
1
+ Amount of Cut / Fill 2 2 Amount of Cut Fill/ Fill − Amount of /Cut Amount of Tree Removal 3 3 Amount of Tree Removal + Amount of Tree Removal Public Access 4 4 Public Access − Public Access Proximity to Public 5 Parking (in development) to Public Parking (in development) − 5 Proximity Proximity to Public Parking (in development) Impact at Lake (cost, 6 6retaining Impact atwalls, Lake etc.) (cost, retaining walls, etc.) +etc.) Impact at Lake (cost, retaining walls, Cost of Seating Bowl 7 7(S.O.G. CostCost oforSeating engineered) BowlBowl (S.O.G. or engineered) − of Seating (S.O.G. or engineered) Stadium / Practice 1 Fields Elevation / Practice Fields Elevation Variance 1 Stadium Stadium /Variance Practice Fields Elevation Variance
EDIA F/M STAF RKING PA
EXISTING DRAINAGE/ UTILITY EASEMENT
2.12.1 2.3
Flow between IPF2 / Team between /between Practice IPF /IPF Fields Team / Team AreaArea / Practice Fields 2 FlowArea Flow / Practice Fields
PLAYER/COACH ENTRY
EXISTING DRAINAGE/ UTILITY EASEMENT
1 2.2 1
Practice Field Frontage 1 1 Practice / Views Field to the Field Frontage Fields Frontage / Views / Views to the to Fields the Fields Practice
PARKING GARAGE (3 LEVELS)
LOAD
Site Layout
North Frontage Road1 Property NorthLine Frontage Road Property Line
2.1
2
O’NEILL DRIVE LOADING
VIKINGS HEADQUARTERS
Site Layout
1
1
I - 494
NW PARKWAY
Field Construction (sitework, 1 Fieldcost, Construction settlement) (sitework, cost, settlement)
+ + ++ ++ ++ +− +− −+ − + 2 NE Drainage Utility Easement 2 NE Drainage Utility Easement − − −+ −+ ++ ++ ++ ++ + + New Headquarters New ‐ New Minnesota Headquarters Vikings ‐ Minnesota Vikings Vikings New Headquarters New ‐New Minnesota Headquarters Headquarters Vikings ‐ Minnesota ‐ Minnesota Vikings Vikings Headquarters ‐ Minnesota Parkway Location 3 Northwest / Adjustment Parkway Location / Adjustment −‐ DRAFT − −+ −+ ++ +++ Pro ++ + +++ ProPro + + Site Concept Layouts SiteSite ‐Concept Pros vs. Layouts Cons. Layouts ‐ DRAFT ‐ Pros vs. vs. Cons. ‐ DRAFT ‐Concept Pros Concept vs.Layouts Cons. Layouts ‐ DRAFT ‐ Pros ‐ Pros vs. vs. Cons. Cons. ‐ DRAFT + Pro Site3Concept + Northwest Concept ‐ Pros Cons. ‐ DRAFT ProSiteSite + ProLayouts 4 "D" Setback4/ Impact Wetland "D" Setback / Impact − + −− +− −− −−− Con−− − −−− ConCon− − − Con − Wetland − ConCon 5 Wetland "E" Setback5/ Impact Wetland "E" Setback / Impact + − +− −− −− −− −− −− − − 6 Wetland "F" Setback6/ Impact Wetland "F" Setback / Impact + + +− +− −+ −− +− −+ − + scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme scheme 7 Future Development7SitesFuture (N of wetland Development "F") Sites (N of wetland −1 "F") 2.1 − 1 2.2 −1+ 2.12.1 −+ ++ ++ ++ ++ + 3.03.0 + 1 2.1 1 2.2 2.12.1 2.3 2.22.2 2.4 2.32.3 2.5 2.42.4 2.6 2.52.5 3.0 2.62.6 Notes 3.03.0 Notes 2.3 2.22.2 2.4 2.32.3 2.5 2.42.4 2.6 2.52.5 3.0 2.62.6 Notes 1 Notes Office Building Office Building
MASTER PLANNING & URBAN DESIGN
PLAYERS/COACHES ENTRY
1
Office Building
Notes
EXISTING DRAINAGE/ UTILITY EASEMENT
scheme scheme
2.2 2.4
EXISTING DRAINAGE/ UTILITY EASEMENT
scheme scheme
2.1 2.3
EXISTING DRAINAGE/ UTILITY EASEMENT
scheme scheme
2.2 1
VIKINGS HEADQUARTERS
scheme scheme
2.1
EXISTING DRAINAGE/ UTILITY EASEMENT
scheme
1
LOADING
PHASE 2
scheme
STADIUM ARTIFICIAL SURFACE
LAKE (WETLAND ‘F’)
(WETLAND ‘D’)
FUTURE TRAINING CAMP STAGING
FUTURE TRAINING CAMP STAGING
PRESS BOX NW PARKWAY
ALT SURFACE PARKING
WARMING HOUSE
PRESS BOX
NW PARKWAY
WARMING HOUSE
SITE CONCEPT 3
Minnesota Vikings Training Facility Site Concepts and Alt Concepts Review 2016_0113
Minnesota Vikin Site Concepts and 201
PHASE 2
MASTER PLANNING & URBAN DESIGN
Test Fits & HEADQUARTERS AlternateVIKINGS Concepts CIRCULATION Circulation - Pedestrian & Vehicular CIRCULATION KEY
AUTOMOBILE TRAFFIC
PEDESTRIAN TRAFFIC
EMERGENCY & MAINTENANCE ROUTES
1/2 MILE LAKE TRAIL LOOP
PHASE 2
MASTER PLANNING & URBAN DESIGN
Test Fits & HEADQUARTERS AlternateVIKINGS Concepts PUBLIC VS PRIVATE SPACE Public vs. Private Realm
SPACE ALLOCATION
PUBLIC AREA
EVENT AREA PRIVATE/PUBLIC
PRIVATE AREA
EMERGENCY & MAINTENANCE ROUTES
ACCESS GATES IN FENCE
PHASE 2
MASTER PLANNING & URBAN DESIGN
VIKINGS HEADQUARTERS
EVENT PROGRAMMING TRAINING CAMP
Test Fits & Alternate Concepts
Event Programming - Site Population Zones
VIKINGS HEADQUARTERS
VIKINGS HEADQUARTERS
EVENT PROGRAMMING
EVENT PROGRAMMING
DAY TO DAY
GAMES - SPECIAL EVENTS
PHASE 2
MASTER PLANNING & URBAN DESIGN
Test Fits & HEADQUARTERS AlternateVIKINGS Concepts KEY DEVELOPMENT AREAS Key Development Areas
MINNESTOA LANDSCAPE ECO-ZONES Inspired by and celebrating iconic Minnesota Landscapes
NORTH SHORE
AGRARIAN HEDGEROW
PRAIRIE - SAVANNAH
BIG WOODS
LAKE / WETLAND
PHASE 2
Test Fits & HEADQUARTERS AlternateVIKINGS Concepts STORMWATER & DRAINAGE INFRASTRUCTURE Stormwater & Drainage
MASTER PLANNING & URBAN DESIGN
PHASE 2
MASTER PLANNING & URBAN DESIGN
Test Fits & Alternate Concepts Solar Studies
M A RC H
JUNE
9AM_March 21st Minnesota Vikings Training Facility 2016_01.22
NOON_March 21st Minnesota Vikings Training Facility 2016_01.22
5PM_March 21st Minnesota Vikings Training Facility 2016_01.22
N OVE M B E R
9AM_June 21st Minnesota Vikings Training Facility 2016_01.22
NOON_June 21st Minnesota Vikings Training Facility 2016_01.22
5PM_June 21st Minnesota Vikings Training Facility 2016_01.22
9AM_Nov. 21st Minnesota Vikings Training Facility 2016_01.22
NOON_Nov. 21st Minnesota Vikings Training Facility 2016_01.22
4PM_Nov. 21st Minnesota Vikings Training Facility 2016_01.22
PHASE 2
MASTER PLANNING & URBAN DESIGN
3
Test Fits & Alternate Concepts Programming Test Fits
FOOD PREP
SERVICE ENTRY MAIN PLAYER ENTRY
SERVERY
POSITION MEETING ROOMS
COACHING VIDEO + INFORMATION TECHNOLOGY
COACHING STAFF
DRAFT SUITE STRENGTH AND CONDITIONING
2 LOADING DOCK
EQUIPMENT
MAIN LOCKERS
FACILITY OPERATIONS / MAINTENANCE
COMMUNITY / PUBLIC RELATIONS
3
TEAM AUDITORIUM
DINING
FINANCE / HUMAN RESOURCES
OWNERSHIP + EXECUTIVE STAFF
MARKETING
SALES + REVENUE
WET AREAS
HYDROTHERAPY
ANCILLARY LOCKERS
NUTRITION
PLAYER PERSONNEL + FOOTBALL OPERATIONS
2
QUALITY OF LIFE
TRAINING + MEDICAL
PARTY ROOM
1
COMMUNITY AUDITORIUM
VIEWS OF LAKE
PARTY ROOM EQUIPMENT/ EDIT / STORAGE
VEN STUDIO
VEN VIEWING
VALHALLA VR
MEDIA ENTRY
MEDIA / PRESS
SECURITY
RECEPTION CHECK-IN
1
MAIN STAFF ENTRY
LOBBY
VALHALLA PARTY ROOM
MULTIPURPOSE MEETING ROOM
LOBBY / VESTIBULE
TEAM STORE
-1
MAIN PUBLIC ENTRY
-1 PUBLIC AREAS - FRONT DOOR SHARED - PUBLIC QUALITY OF LIFE AREAS RECEPTION AREAS PLAYER PERSONNEL AND FOOTBALL OPERATIONS PLAYERS AREA SHARED - PLAYERS / COACHES VIKINGS ENTERTAINMENT NETWORK COACHING VIDEO NUTRITION / FOOD PREP / DINING FACILITY / OPERATIONS / MAINTENANCE MARKETING / FINANCE
PROGRAM STACKING DIAGRAM
DRAFT SUITE / OWNERSHIP COACHING STAFF
MINNESOTA VIKINGS TRAINING FACILITY
2015.11.17
PHASE 2
MASTER PLANNING & URBAN DESIGN
Test Fits & Alternate Concepts Programming Test Fits
Architecture is about providing flexibility and adaptability in design. Programming is a key component of the design process to allow the client the ability to adjust to ever changing needs, without disrupting their operations. Providing them with programmatic solutions that allow the use of any one specific space that we have designed for them to be multifunctional, and the ability to transcend these difficulties. Training facilities are large buildings. Looking for commonalities in building program and ways to share space are key to providing a tight and efficient floor plan. Vertical adjacencies is just as important as horizontal adjacencies. The shortest connection is not always horizontal, especially in this facility type where there is a
lot of program adjacencies that are desired by the users. Getting this ‘right’ yields efficiency in circulation for the athletes and staff, and also capitalizes on their time spent within the facilities at the appropriate junctures vs. between point A and B.
PHASE 2
Test Fits & Alternate Concepts Programming Test Fits
The functions of a facility should transcend its users. People come and go, but what we have built needs to remain flexible enough to adapt to new philosophies. The design of training facilities are very much so influenced by coaching and team executive personnel. With a high turnover rate in the industry, these facilities have to be designed in a manner to meet the ‘must have’ requirements while maintaining enough flexibility to allow changes in use when new philosophies are applied. This is successful when this social change is allowed to occur without a great impact to the physical space. The TCO Performance Center, home of the Minnesota Vikings, was designed and constructed pre-pandemic. These same metrics for success tied to resiliency and scalability were integrated into the design of that facility. The ability of the Team to reoccupy the facility quicker than most of their other peers, and with little displacement, was a true testament to the necessity of this principle in design. The player lounge was combined with team locker space to maximize efficiency in use. This ensuite adjacency also allowed the team to continue to occupy the originally programmed locker space, converting ‘lounge’ to additional locker area while properly socially distancing. There was no need to invest in costly renovations or reconfigurations of other alternative program to accommodate this use; reconfigurations which have begun to demonstrate as being only temporary.
MASTER PLANNING & URBAN DESIGN
PHASE 2
MASTER PLANNING & URBAN DESIGN
Leveraging Commercial Value
The Deal - Partnering with Twin Cities Orthopedics (TCO)
VIKING LAKES - DESTINATION EAGAN Crawford Architects was instrumental in assisting the Vikings in their pursuit of a Naming Rights Partner for the project. Working closely with Kevin Warren, Vikings’ Chief Operating Officer, Crawford prepared multiple presentations and design collateral to attract local and regional businesses to join with the Vikings in the development of the site. Ultimately, the board of emergent local clinic, Twin Cities Orthopedics, unanimously voted to be that partner. The Vikings Headquarters became the Twin Cities Orthopedics Performance Center and the stadium became TCO Stadium. TCO also began their own process of locating an Urgent Care, Physical Therapy, Surgery Center and Sports Performance Center on site with the Vikings. Crawford Architects relationship with the Vikings grew to include the TCO team.
“”
It’s been very impressive to watch the TCO Performance Center come to life. I don’t think there is any question that the vision and the facilities that have been established here are creating a new model for the future of the NFL. – Troy Simonson, Twin Cities Orthopedics (TCO) CEO
PHASE 2
MASTER PLANNING & URBAN DESIGN
Leveraging Commercial Value
The Deal - Partnering with Twin Cities Orthopedics (TCO)
VIKING LAKES - DESTINATION EAGAN Crawford Architects was instrumental in presenting the Viking Lakes project, LiveWork-Play community to the Twin Cities Or thopedics (TCO) Board of Directors alongside representatives of the Minnesota Vikings and the City of Eagan. Prior to the presentation, the locations of existing TCO Medical Office Facilities and Orthopedics Clinics were catalogued throughout the Metro. There was a definitive need for increased presence in the Preferred Site location of Eagan, MN. This coupled with
the alignment of common values, goals, and objectives between TCO and the Minnesota Vikings presented itself as a unanimous decision to form a solid Partnership for the foreseeable future; garnering one of the largest monetary contributions associated with any NFL training facility to date in the League.
Scan here to listen to remarks from Twin Cities Orthopedics on this project.
PHASE 2
MASTER PLANNING & URBAN DESIGN
28.86%
0.00%
0.00%
24.02%
0.00%
149.60 2860000
8.15 140400
17.14 196880
28.57 424000
15.96 310000
7.92 264900
12.50 282830
1.99 40000
33.90 965600
15.04 235390
8.43 0
Parcel 2
Parcel 3
Parcel 4
Parcel 8
Parcel 9
Parcel 6
(4-6) 60' to 80'
980000
0
196880
0
0
264900
282830
0
0
235390
0
Corporate Headquarters
(2-3) 40' to 65'
240000
0
0
240000
0
0
0
0
0
0
0
Indoor Practice Facility
110' to 120'
100000
0
0
100000
0
0
0
0
0
0
0
Stadium
35' to 55'
84000
0
0
84000
0
0
0
0
0
0
0
Hotel (200 Rooms)
(5-8) 150'
80400
80400
0
0
0
0
0
0
0
0
0
Hotel | Conference Center (200 Roooms + 40K Meeting)
(5-8) 150'
190000
0
0
0
190000
0
0
0
0
0
0
(1-2) 20' to 40'
155600
0
0
0
0
0
0
0
155600
0
0
Parcel 7
Parcel 5
Parcel 10
27.03%
Multi-Family Residential Units
Retail | Restaurant
24.02% 0
0.00% 0
149.60 980000 2860000
8.15 60000 140400
17.140 196880
28.570 424000
15.96 120000 310000
7.920 264900
12.500 282830
1.99 40000 40000
33.90 760000 965600
15.040 235390
8.430 0
Total Impervious Area (SF Estimated) Total Impervious Area (Acres) Impervious Area (%) Anticipated Parking
2942446 67.55 45.15% 6875
190000 4.36 53.52% 366
192000 4.41 25.72% 151
470000 10.79 37.76% 460
310000 7.12 44.59% 1080
157967 3.63 45.76% 216
247191 5.67 45.41% 231
62000 1.42 71.52% 160
1029052 23.62 69.69% 4018
284236 6.53 43.39% 192
0 0.00 0.00% 0
0 0 0 0 0 0 0 0 160
0 0 0 0 0 0 778 200 3040
Multi-Family Residential Units Corporate Headquarters Indoor Practice Facility Stadium Hotel Hotel | Conference Center Retail | Restaurant Office above Retail Office | Medical Office
1
1.1/rm 2.0/rm 0.005 0.004 0.004
791 460 0 0 126 600 778 200 3920
0 0 0 0 126 0 0 0 240
151 0 0 0 0 0 0 0 0
0 460 0 0 0 0 0 0 0
0 0 0 0 0 600 0 0 480
216 0 0 0 0 0 0 0 0
231 0 0 0 0 0 0 0 0
192 0 0 0 0 0 0 0 0
Parcel 10
0.00% 50000
Parcel 9
0.00% 0
Parcel 8
28.86% 0
Parcel 7
27.03% 0
Parcel 6
0.00% 0
Parcel 5
0.00% 0
Parcel 4
20.09% 0
Parcel 3
0.00% 0
Parcel 2
50000
Parcel 1
(2-4) Development Scenario 2 Office above Retail 50' to 70' Proposed Comprehensive Plan Amendment (incl Retail) Vikings Headquarters | Eagan Site (3 to 15) Total Site Area (Acres) Office | Medical Office 225' Total Building Area Height (stories)
Parking
0.00%
TOTALS
Building Information
Planned Development
0.00%
TOTALS
Leveraging Commercial Value
20.09%
Height (stories)
Total Site Area (Acres) Total Building Area
0.00%
Parcel 1
Development Scenario 2 Proposed Comprehensive Plan Amendment Vikings Headquarters | Eagan Site
0 0 0 0 0 0 0 0 0
PHASE 2
MASTER PLANNING & URBAN DESIGN
Project Phasing
Successfully Building on Momentum
Phase 2
Phase 1
Phase 2
Phase 3
Phase 2
Phase 4
Phase 4
EX-5
Phasing Concept
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Meeting with Appropriate Parties
Proactive Engagement with the City of Eagan TRANSPARENCY BUILDS COMMUNITY SUPPORT Getting off on the right foot with the existing businesses and homeowners surrounding the site was critically important to the Vikings. Being a good neighbor when starting any project is a priority. Crawford prepared numerous presentations for the city of Eagan and the Vikings, attended public meetings
to engage the city, individual citizens and stakeholder businesses on discussions of what the development would become. Concerns were listened to and taken into consideration. City zoning guidelines were evaluated, and an exhaustive Planned Development plan was submitted and quickly approved.
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Zoning Analysis
ENGINEERING SURVEYING ENVIRONMENTAL PLANNING
Ensuring Compatibility in Land-Use
EVS, INC. 10025 Valley View Road, Suite 140 Eden Prairie, Minnesota 55344 Phone: 952-646-0236 Fax: 952-646-0290 www.evs-eng.com
Preliminary
Site
PROJECT
Lone Oak LOCATION
Eagan, MN SHEET
ZONING MAP
ENGINEERING SURVEYING ENVIRONMENTAL PLANNING EVS, INC. 10025 Valley View Road, Suite 140 Eden Prairie, Minnesota 55344 Phone: 952-646-0236 Fax: 952-646-0290 www.evs-eng.com
Site
Preliminary
PROJECT
Lone Oak LOCATION
Eagan, MN SHEET
ZONING MAP DATE
PROJECT #
7.29.2015 8.28.2015
p2015-108
SHEET NUMBER
EX-6
DATE
PROJECT #
7.29.2015 8.28.2015
p2015-108
SHEET NUMBER
PHASE 3
Due Diligence
Geotechnical & Environmental Investigations
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Documentation Required for Planned Development Submission; Project Narrative; Existing Site Plan; Survey Site And Context Photos Proposed Preferred Site Plan; Proposed Parking Scenarios; Sub Area Classification Diagram; Site Plan; Landscape Plan; Landscape Plant Palette; Landscape Details; Streetscape Plan; Streetscape Sections; Streetscape Elevations; Site Context Building; Massing Diagrams; Facility
Design Guidelines
Floor Plans; Facility Facade Studies & Material Palette3D Massing Images; Site Aerials; Vehicular Loading and Access Plans; Emergency Vehicle Access Plans; Pedestrian Routes & Connectivity Through Site; Landmark Details (If Any) Sustainable Development Policy; Checklist Field; Sports Lighting Illumination Analysis; Signage Plan Building & Monument Signage; Allowable Areas; Elevations
To view the full Design Guidelines Document, click here.
Integrated Standards for Each Land Use DESIGN GUIDELINES BOOKLET
BUILDING TYPE STANDARDS
For a comprehensive look into the depth of the project, a Design Guidelines book was prepared and submitted to the city for review and approval. It outlined a guide for the following: Land Use Districts, Building Type Standards, Green Infrastructure, Public Realm Guidelines, Street and Roadway Guidelines, Lighting, and Signage Guidelines.
The overall success of the Master Plan is closely linked with the quality of architecture in each of the districts. This section identified the principal building types, their defining features and the minimum requirements of their design and construction. Precedent buildings, materials, colors, design templates and lighting for buildings are meticulously laid out for the different building types. The standards are intended to complement other standards and to create a cohesive and high quality development across all districts.
LAND USE DISTRICTS
GREEN INFRASTRUCTURE
The 200-acre site is divided into seven districts:
The Viking Lakes Development complements the surrounding area and connects to the existing open space, network of trails, natural areas and wetlands. All districts within the development are designed to promote sustainable practices. The importance of cohesive public space and its impact on the people who use it and the environment it exists in is recognized and embraced. The streets will be active engaging spaces that place pedestrian safety first and vehicles second. The underlying goal of the Master Plan is to promote community, building transparency and encourage people to get outdoors and live active lifestyles.
›
District 1 – Commercial / Retail
›
District 2 – Low Density Housing
›
District 3/3A – Vikings Headquarters and TCO Campus
›
District 4 – Mixed Use Office, Retail and Hotel/Convention
›
District 5 – Medium Density Housing
›
District 6 – High Density Housing
›
District 7 – Commercial / Retail
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Design Guidelines
Integrated Standards for Each Land Use PUBLIC REALM GUIDELINES
LIGHTING GUIDELINES
The public realm is a vital aspect of the built environment that helps to give a place its identity. It primarily consists of the roadways, sidewalks, parks, plazas and other open spaces that comprise the arteries and focal points of the urban framework. It is the main space where civic interaction occurs and is often defined in contrast to private property. Green parks are woven through the fabric of the development, creating layers of pedestrian pathways and connections to the districts and lakes with minimal adjacency to vehicular traffic. The public realm, the heart of how one experiences this development is safe, sustainable and enriching.
Street lighting offers a significant opportunity to differentiate the development from surrounding developments and neighborhoods while also differentiating different districts within the development. Lighting standards that effectively light pathways, walkways, roadways and other outdoor active areas are specified. Light fixtures were selected and located to develop a district hierarchy. District lighting is environmentally sensitive to meet DSF and LEED standards, including minimizing light trespass and pollution and using minimal energy through lighting equipment selection and operation. The design of the lighting is as important as the guidelines for the architectural aesthetics.
STREET AND ROADWAY GUIDELINES
SIGNAGE GUIDELINES
The Development Plan defines a specific strategy for the layout of street and blocks. The size, type and configuration of this street hierarchy is based on a combination of projected traffic volume, existing and future road connections, level of service at intersections, adjacent land use and desired aesthetic character. The design promotes a street system that balances pedestrian and vehicular use not only providing streets that support traffic flow, but also creating safe and comfortable spaces for street-side activities, strolling promenades, pockets of green and other amenities.
A fully developed signage package was created to coordinate with the architectural guidelines, lighting standards and public realm standards. Locations, types of signs, style and size of signs that comply with the city and state standards while blending with the Viking Lakes development aesthetic serve to ensure a fully cohesive Master Plan.
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Planned Development Site Plan
New Headquarters - MVZ | Minnesota Vikings (Eagan) Phase 1 Parking
Parking Qty. Lot A Player | Coaching Staff | Ownership & Executive Staff Consultants | Full Time Staff Interns | Part Qty Time
Summary of Enclosed Areas by Category - HQ
Description
Public Areas - Front Door Media | Press Team Suite Training Facilities | Medical Strength & Conditioning Equipment Room Coaching Staff Ownership & Consultants Finance Human Resources | Legal Player Development Marketing Sales & Revenue Staff Community | Public Relations Player Personnel & Football Operations Coaching Video Information Technology VEN | Content Production Nutrition | Food Prep | Dining Facility | Operations | Maintenance MV Cheerleaders Groundskeeper - PEMB Staff Subtotals Total Staff
4
Flex Future Hire
Consultants | Full Time Staff Interns | Part Qty Time
Flex Future Hire
ADA Stalls
Parking Qty. Lot B Staff | Interns | Flex Future Hire Consultants | Full Time Staff Interns | Part Qty Time
30 50
90 5 3 4 21 7 9 5 1 42 15 28 3 6 22 12 4 4 3
5 2 6 2 3
2 2
90 5 3 4 20 5 1
30
0
0 0 0 1 2 8 5 1 41 14 26 3 6 22 12 4 4
5 0 2 6 0 3 0 2 0 4 4 0 0 0 0 0 0
0 0 0 0 0 2 2 0 15 3 2 0 3 0 0 2 0
153
56
2
2 4 6
15 3 2
1 1 2
2
132
4
Flex Future Hire
4
3
2
Parking Qty. Lot C Public | Media & Press Consultants | Full Time Staff Interns | Part Qty Time
ADA Stalls
Parking Qty. Lot D Groundskeeping PEMB
Flex Future Hire
ADA Stalls
110
32
0
5
29
0
4
7
0
80
3
0
3
0
141
245
84
8
Parking Provided (Base)
141
251
84
17
0 * No Future Parking Built-in (Delta + Future Hire)
6 * Future Parking Built-in (Delta + Flex Future Hire) =
0 35
216
Parking Provided (Optional Road)
* Future Parking Built-in (Delta + Flex Future Hire) =
* No Future Parking Built-in (Delta)
2
9 * Future Parking Built-in (Delta + Flex Future Hire) =
12
84
(29)
Parking Delta
ADA Stalls
3 3
430 Parking Delta
Flex Future Hire
30 50
3
288
Consultants | Full Time Staff Interns | Part Qty Time
0 0
* No Future Parking Built-in (Delta)
Future Expansion = 36,160 GSF Phase 1 Business GSF (78,481) / 250 Occupants = 314 GSF / 1 Occupant 36,160 / 314 = 116 Additional Occupants | Parking Required
Documentation Required for Planned Development Submission; Project Narrative; Existing Site Plan; Survey Site And Context Photos Proposed Preferred Site Plan; Proposed Parking Scenarios; Sub Area Classification Diagram; Site Plan; Landscape Plan; Landscape Plant Palette; Landscape Details; Streetscape Plan; Streetscape Sections; Streetscape Elevations; Site Context Building; Massing Diagrams; 06/14/2016
Facility Floor Plans; Facility Facade Studies & Material Palette3D Massing Images; Site Aerials; Vehicular Loading and Access Plans; Emergency Vehicle Access Plans; Pedestrian Routes & Connectivity Through Site; Landmark Details (If Any)Sustainable Development Policy; Checklist Field; Sports Lighting Illumination Analysis; Signage Plan Building & Monument Signage; Allowable Areas; Elevations
Page 1 New Headquarters - MVZ | Minnesota Vikings (Eagan) 2016 Copyright Crawford Architects
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Envelope Design + System(s) Selection BASELINE+
This simple payback analysis shows that design incentives helped reduce the incremental costs associated with the energy conservation strategy investments for the facilities, resulting in a payback of 7.7 years. We were able to utilize an energy rebate program for TCO Performance Center with that local energy provider, Xcel Energy. Working with the energy provider, the
design team developed design scenarios for the building envelopes and system(s) selection for HVAC equipment, lighting, plumbing, etc. to determine the optimal solutions; taking into considerations up front cost vs. long term cost. The simple payback analysis projected energy cost savings of over $129,000 per year in relation to the building baseline analysis with a 7.7 year payback related to the adjusted incremental construction costs.
E X A M P L E L I S T O F V E R I F I E D S T R AT E G I E S
PHASE 3
SIMPLE PAYBACK ANALYSIS PROJECTED ENERGY COST SAVINGS OVER $129K / YR 7.7 YEAR PAYBACK RELATED TO THE ADJUSTED CONSTRUCTION COST
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
IPF CIRCULATION CORE “RELENTLESS”
*
Design Development Process & Design Studies
CIRCULATION CORE “INNOVATIVE”
VERTICAL CONNECTION ‘NATURAL LIGHT TO INTERIOR OFFICES’
ORIENT VIEWS TOWARDS FIELDS OUTDOOR PRACTICE FIELDS
*
GROUND FLOOR OUTLINE STADIUM
CONNECTION WEIGHTS - STADIUM
* ORIENT VIEWS TOWARDS LAKE
VIEWS TO STADIUM | OBLIQUE VIEW TO FIELDS
CONNECTION WEIGHTS - PRACTICE FIELDS
STAFF ENTRY
OVERLAP FLOOR PLATE CREATES OVERHANG PROTECTION AT STADIUM CONCOURSE
OVERLAP FLOOR PLATE CREATES OVERHANG PROTECTION AT ENTRIES BELOW
ORIENT VIEWS TOWARDS LAKE MEZZANINE 01 OUTLINE MEZZANINE 02 OUTLINE CIRCULATION CORE “UNIFYING” LAKE PUBLIC | MEDIA ENTRY
The purpose of the design process is not simply to get an idea for a design, but to create the definitive design narrative to carry the project through completion. The design narrative is a constantly updating and growing document that is shared with the ownership and design team. It is used as a measuring stick to be constantly referenced throughout the design development and construction process. This way, everyone is on board with the concept and all members are working towards the same goal. The design narrative is as valuable on the day of presentation as it is for construction administration.
Minnesota Vikings Training Facility Plan Diagram 2016_02.16
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
A Groundbreaking to Remember On August 2, 2016, the Minnesota Vikings, along with partners Twin Cities Orthopedics (TCO), the City of Eagan, Crawford Architects, and Kraus-Anderson Construction Company, celebrated the official groundbreaking of the Twin Cities Orthopedics Performance Center and TCO Stadium - marking the first steps to developing Viking Lakes.
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Coming Home Project Completion
On June 15, 2018, the Minnesota Vikings opened the Twin Cities Orthopedics Performance Center to the visitors for the first time in a Ribbon Cutting Ceremony. Representatives from the NFL, the Ownership Group, the City of Eagan, Twin Cities Orthopedics and the Team all spoke to thank those responsible for creating the facility and to welcome their staff to their new home.
“”
We are moving into a new house today. We’re going to make this house into an incredible and special home for generations to come. – Mark Wilf, Owner / President, Minnesota Vikings
Staff continues to work tirelessly throughout the year to make sure all components are up-to-date and working. In the future there will be live broadcasts from the VEN and players and coaches working together to prep for future seasons. After decades in outdated and separate facilities, the Minnesota Vikings are finally now altogether under one roof.
“”
It’s a special place. Seeing the artwork, and remembering. This is as much about our past. Whoever you are, you are going to feel comfortable here and feel like this is home. – Kevin Warren, Big 10 Commissioner & Former Minnesota Vikings COO
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
Coming Home Project Completion
The Minnesota Vikings and Minnesota State High School League (MSHSL) announced today that the Farmington Tigers’ football team will play in the first-ever high school game at the Twin Cities Orthopedics Performance Center. The TCO Performance Center is the home of the Vikings’ new practice facility which iincludes a turf stadium that can seat up to 6,000 fans. Farmington will face off against Eagan (the home team) on Friday, Sept. 28, at 7:30 p.m.
The Vikings will host five high school games this fall. Farmington and Eagan will be the first, followed by Prior Lake and Lakeville North on Oct. 12. Three state tournament quarterfinal games will be played there as well.
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
LIVE - WORK - PLAY - SKOL Viking Lakes
Measurable Impact + Community Enhancements – Football fans from outside of Eagan, MN drove the majority of the increased economics in spending, as 93% of camp attendees came from outside the City of Eagan, MN.
Provides a best-in-class destination that transcends generations through a true live, work, play lifestyle that is uniquely ‘Minnesota’ ›
›
›
Space that inspires stakeholders, employees, residents, and fans while developing a safe, healthy and equitable state-of-the-art campus.
– 63,000 fan attendance over 17 days ›
– TCO Vikings 5K
Creates a sense of community by bringing people of different backgrounds and interests together, in one place, for the next 150 years. More than a place of business, more than a place of residence; delivers a full-service lifestyle people want to be part of. From daily health, well-being and recreational leagues and classes to professional and amateur sporting events, concerts, and farmer’s markets.
›
Attraction to other Professional Organizations | Development Growth – Version1 Minnesota Rokkr Esports calls Viking Lakes Home and USA Curling moving to Viking Lakes
›
Minnesota Vikings Training Camp – Economic Impact – Practice at Viking Lakes is now more accessible and less expensive to attend for local fans, resulting in increased fan attendance – Generated $4.9M in economic activity for the City of Eagan and it’s businesses, within one year (two week event) of hosting training camp at Viking Lakes
TCO Stadium Events – Summer Movie Nights – Market Fest – Concerts – Play 60 camps – Premier Lacrosse League – Anishinabe Baagaadowewin Demonstration – High School Games of the Week
›
Fifth Anniversary of the Development – Full build out is anticipated to be another five years away – including more than 3M SF of commercial and residential uses for the City of Eagan, MN
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
The purpose of the design process is not simply to get an idea for a design, but to create the definitive design narrative to carry the project through completion. The design narrative is a constantly updating and growing document that is shared with the ownership and design team. It is used as a measuring stick to be constantly referenced throughout the design development and construction process. This way, everyone is on board with the concept and all members are working towards the same goal. The design narrative is as valuable on the day of presentation as it is for construction administration.
“”
I can’t believe anyone in football has something like this – Sid Hartman, Sports Journalist for the Minneapolis Star Tribune
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
HEADQUARTERS PLAN The Plan of the headquarters building is organized along an east-west corridor that runs the length of the building, connecting the front of house entry to the team suite in the back. Called the “Super Highway” it is a way for people to easily orient themselves in a complicated building, get from place to place quickly and also serves to bring light into the heart of the building. The Super Highway is located between the office and the indoor practice facility. The main entry to the building is on the east, with a drop off and entry-drive parallel to the lakes. All of the public spaces look back out to the lakes and out over the stadium to the south. The concourse of the stadium creates an outdoor living area for staff when not in use for game day. The team suite is located at the west side of the building with a private entry for players and coaches. All of the player areas, weight room, training room and locker room, open directly onto four practice fields for quick access. The coaches’ and owner’s suite are above the team suite with views overlooking the practice fields and to the stadium.
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PUBLIC ENTRY The public entry of the Headquarters is on the east side. Its views are to the lakes and to the future development of Viking Lakes to the east.
Initial Concept
Visitors enter via the drop off circle to the reception desk. Their travel path takes them into what appears to be a glass enclosed entry, through waves pushed before the prow of the Viking ship above them. Staff enters on a level above that is separated by landscaped terraces. Media enters through a private, secured corridor that brings them directly to the media work room and interview spaces.
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
LOBBY Upon arriving to the facility, visitors are greeted beneath a lower ‘ice like’ volume, that sets the frame for arrival. Directly ahead lies the main lobby and gathering area. Upon entering the communal space, the ceiling rises up revealing the hull of the longship. Light penetrates this two story space from two sides, with the glass exterior envelope invoking visions of waves crashing against the ship. A set of wood cladded stairs serve as the primary route for public to access the remainder of the facility, ascending from the lower lobby to the upper lobby. The lobby also serves as both a waiting area, as well as an assembly space for cocktail functions and TCO Stadium halftime events. There is direct connection from the lobby, via tunnel, to the TCO Stadium seating bowl.
Initial Concept
3D Graphic Rendering
3D Graphic Rendering
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
NUTRITION BAR Nutrition, diet and hydration are significant factors in the health of the professional athletes. The nutrition bar is situated at the main crux of the team suite North|South wing, bisecting the East|West Super Highway. It is positioned to influence constant bi passing of the players and coaches with this node in route to the weight room, training rooms, meeting rooms, and indoor practice facility. Anyone going to the weight room, team area and indoor practice facility will pass by it. Grab-nGo stations as well as a nutritionist office and smoothie bar make this vital part of everyday activity easy and quick. The nutrition bar location is also between the staff and team area, and at the foot of the coaches’ area making is usable by everyone in the facility.
Initial Concept
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
TRAINING & HYDROTHERAPY Positioned between the weight room and the team suite, lies the state-of-the art training and hydrotherapy areas. Ample light and visibility exist within the spaces, allowing constant monitoring of activity within the training areas, not excluding sight lines from the training suite to activity on the outdoor turf. The hydrotherapy room is the jewel of the training suite. Included are three fully recessed pools, one hot plunge pool with capacity for 12–15, one cold plunge pool with capacity for 12–15, and one treadmill pool with zero entry accessibility. The Vikings also have implemented state of the art technology in regards to their whole body electric Cryotherapy Chamber. The electric cryo-chamber allows more accurate skin temperature measures to be taken, provides zero exposure to gaseous air (fresh oxygenated air), and targets the entire body vs. just partial body cooling of lower extremities.
Initial Concept
Construction
Construction
Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
THE CAFETERIA Nicknamed “The Huddle,” the cafeteria serves as the communal area for the entire Vikings Family. Located on the top level and overlooking the lakes, the cafeteria is a gathering place for all the staff, players and coaches. The cafeteria was situated on the opposite end of the building from the team suite to take advantage of the panoramic views to the lakes and surrounding development, including the TCO stadium, while encouraging interaction of ‘Team’ with ‘Team Organization’ and the Vikings Entertainment Network. The cafeteria can also be utilized as an event space as well as a location for impromptu small to large group meetings. The cafeteria can also serve as a banquet facility for outside groups and meetings.
Initial Concept
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
THE AUDITORIUM Positioned directly above the longship hull (Lobby), the Auditorium seating rake spans between the Ground Floor and the Second Level of the facility. This allows visitors and team to enter at the back of the auditorium, filtering to their seats from the public areas of the building, while coaches, players, and staff can enter from the front (secured) of the auditorium respective to their position within the facility. Direct access for the Team from position meeting rooms on the Second Floor is also possible through this configuration. The auditorium has capacity for 175 occupants, features full black-out capability, and includes an acoustic operable wall at the front of the room providing direct connection and visibility into the Vikings Entertainment Network’s Studio. This acoustic separation allows for the auditorium to not only be used for Team meetings coinciding with studio productions, but also provides flexibility of use for live-audience viewing of VEN productions such as a weekly Coach’s show.
Initial Concept
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
THE WEIGHT ROOM The weight room is the jewel at the tip of the headquarters’ team suite. It is a glassy box visible from the west, south and east. Operable overhead doors on the west side of the weight room open up to extend the training out to the exterior practice fields and training hill. The two-story volume is connected to the team suite on the main level and by a set of steep training stairs to the coach’s offices and cardio area on the mezzanine level. Its location in the west end zone of the stadium provides visitors with a view into the area where the Vikings team trains and prepares for upcoming games. As night falls, the weight room glows with a fractured purple light from the ceiling.
Initial Concept
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
THE INDOOR PRACTICE FACILITY The indoor practice facility features a full football field with generous runoff areas on all sides. The lowest part of the roof structure is 98 feet above field level allowing for all indoor kicking and punting. Translucent insulated panels low around the perimeter enhance the exterior aesthetic and provide non-glaring light to the interior necessitating minimal overhead lighting inside.
Initial Concept
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
THE LOCKER ROOM The heart of the facility and the heart of the team suite is the team locker room. The team locker room provides a respite for the athletes to relax and change. It features state-ofthe-art lockers and ventilation systems, a lounge area with fireplaces, direct access to grooming areas, showers, sauna and steam room as well as a thoughtful connection to the back-of-house areas necessary for team function such as laundry, equipment rooms, storage, warehousing and other needs. The ceiling of the locker room mimics the structure of a Viking longship, with the oars (linear lights) extending out, breaking through the water in unison and reinforcing the ‘One Team’ concept.
Locker Option Concepts
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY
TCO STADIUM TCO Stadium seats 6,000 people and is expandable in the future up to 10,000. It is a stadium designed to be used minimally by the Vikings Team (training camp, exhibitions) and to be used mostly by the community. It will host small college games, high school Friday Night Lights games, soccer games, outdoor concerts and other events. The stadium is integrated directly into the Headquarters building which overlooks the field from the north and from the Owner’s suite and abuts to the Weight Room on the west. The concourse serves as a daily outdoor seating area for staff. The east end zone opens up to the lakes. To the south, the stadium also opens up to a game day plaza, NFL Play-360 field, Vikings Hall of Fame and the Twin Cities Orthopedics facilities.
Initial Concept
3D Graphic Rendering
Construction
Nearing Completion
PHASE 3
PUD | ZONE | ENTITLEMENTS & PROJECT DELIVERY