Regular Public Meeting 06.08.26

Page 1


Board of Cowlitz County Commissioners

Steve Rader, Commissioner District 1

Steven L. Ferrell, Commissioner District 2

Richard R. Dahl, Commissioner District 3

Kelly Grayson, Clerk of the Board

Regular Public Meeting

June 9 , 2026, 9:00 a.m.

Board Meeting Convenes at 9:00 a.m.

 Invocation by Invitation

 Pledge of Allegiance

 Minutes of June 1-2, 2026

 Consent Agenda of June 9, 2026

o Call for Public Hearings

o Call for Bids

o Agreements/Contracts/Bid Awards

o Resolutions

o Correspondence

 Motion Items

 Public Comments

ZOOM Link KLTV Link

Phone Option: (253) 215-8782

Webinar ID: 820 1961 3917 Live Stream Print Agenda

o Citizen Participation may be anonymous. See RCW 42.30.040

Consent Agenda

Call for Public Hearings

Public Works

1. Call for Public Hearing – Adopt Three Rivers Regional Wastewater Authority Discharge and Industrial Pre-Treatment Policy scheduled for July 7, 2026, at 9:30 a.m. (14855)

2. Call for Public Hearing - Establish a County Road for Project 1859 Burma Rd Toutle Park Bypass Project scheduled for July 7, 2026, at 9:45 a.m. (14858)

3. Call for Public Hearing - Carrolls Water Association 10 Year Non-Exclusive Franchise scheduled for July 14, 2026, at 9:30 a.m. (14856)

4. Call for Public Hearing – Allender Rd Stillwater Creek Culvert Replacement Project scheduled for July 14, 2026, at 9:45 a.m. (14857)

5. Call for Public Hearing - Proposed Surplus of Vehicles and Equipment for Disposal scheduled for July 21, 2026, at 9:30 a.m. (229098)

Call for Bids

Public Works

6. Revised County Road Project No. 813 and Call for Bids for Burma Road Toutle Park Bypass Road to bypass the existing failing Toutle Park Road by building a new road from Burma Road to Toutle Park Road scheduled for June 29, 2026, at 1:30 p.m. (14854)

Regular Public Meeting

June 9, 2026, 9:00 a.m.

Agreements/Contracts/Bid Awards

Public Works

7. Change Order No. 3 for the contract with Columbia River Contractors, Inc. for the 2024 Unit Price Guardrail Installation and Repair Project to reconcile project cost overruns due to a higher amount of damaged guardrail than originally anticipated. The increase is $24,235.73 for a total of $526,316.48. (14850)

8. Supplemental Agreement No. 3 to the Consultant Agreement with WSP USA, Inc., for the South Cloverdale Road project for design changes to the footings and stem wall for the concrete box culvert. The increased amount is $12,810.00 for a total of $538,360.00. (14853)

9. Tennant Way Closed Landfill Flare Replacement Project Enclosed Flare Package move to reject all bids. (228939)

10. Possession and Use Agreement and Temporary Construction Easement from Weyerhaeuser NR Company and Weyerhaeuser Timber Holdings, Inc. for the Burma Road/Toutle Park Bypass project. (228893)

Health & Human Services

11. Agreement with Washington State Department of Social and Health Services for the Developmental Disability Program for adult employment and day services and services for children from birth to three years of age to reduce contract funds for the period July 1, 2025, through June 30, 2026. (228892)

Resolutions

Risk Management

12. Resolution to adopt the Hazard Communication Program. (229017) Correspondence

13. Letters/Notices

a. Federal Energy Regulatory Commission (FERC) Notice dated 06/01/2026 regarding the 2025 DSSMRs, Merwin, Yale, and Swift No. 1 Projects. (228889)

b. Federal Energy Regulatory Commission (FERC) Notice dated 06/01/2026 regarding the 2023 External Audit Recommendations Status Updates (228888)

c. Letter dated 6/9/26 Appointing Mike Maloney to the Fair Board. This is a 4-year term that expires 10/31/2029. (229024)

d. Letter dated 6/9/26 to Adam Smee appointing him to the Solid Waste Advisory Committee representing Small Cities - Kalama, Woodland, & Castle Rock. This is a 2-year term that expires 3/31/2028. (229025)

Vouchers

The following vouchers/warrants are approved for payment.

Regular Public Meeting

June 9, 2026, 9:00 a.m.

Motion Items

Public Works

14. Change Order No. 6 for the S. Cloverdale Road / S. Cloverdale Road - Confer Road Intersection projects to add additional days to the utility work window. The total change order amount is $229,750.23, increasing the total project cost to $7,491,883.09. (14852)

Updates

Chairman Updates

Upcoming Meetings:

 Tuesday, June 23rd @ 10 a.m. – Department of Ecology

 Tuesday, June 30th @ 10 a.m. – Board of Health

 Tuesday, July 7th @ 10 a.m. – Mount St. Helens Bullet Point Discussion Cancellations:

 Monday & Tuesday, June 15-16 – Meetings canceled

RCW 42.30.040 – Conditions to attendance not to be required. A member of the public shall not be required, as a condition to attendance at a meeting of a governing body, to register his or her name and other information, to complete a questionnaire, or otherwise to fulfill any condition precedent to his or her attendance. People may remain anonymous when logging on to Zoom by creating any name and email of their choosing. In a meeting, public comment will be received, either or both, orally (raise hand in Zoom or use *9 on phone) and by writing. Note: Written comments may be sent to the Board at any time. For oral presentations, the Board may set a time for comments and speakers.

All matters listed with the Consent Agenda were previously distributed to each Board Member for reading and study, were available for public viewing, are considered items of regular County business, and will be approved, without separate discussion, by one motion of the Board of County Commissioners. An item may be removed from the Consent Agenda and placed on the Regular Agenda for separate discussion and voting at the request of any Board Member.

The Board of Commissioners may add and take action on other items not listed on this Agenda.

 Agenda Online Address: https://www.co.cowlitz.wa.us/535/Agendas---Regular-Public-Meetings

 ZOOM Invitation Address (for all meeting days): o https://us06web.zoom.us/j/82019613917

 KLTV Live Feed Address: http://www.kltv.org

Meeting Date: 06/09/2026

RESOLUTION: Order Fixing Date of Hearing - Three Rivers Regional Wastewater Authority

Submitted For: Susan Eugenis, Public Works

Submitted By: Lynn Ruffe, Public Works Department: Public Works

Information

Subject and Summary Statement

Attached is a resolution setting a hearing to consider amending section 15.15.010 of chapter 15.15.  The new ordinance will revise the code to adopt the Three Rivers Regional Wastewater Authority Discharge and Industrial Pre-treatment policy. This policy regulates high strength discharge constituents to maintain the treatment plant's ability to properly treat the sewage.

Will Staff Attend - NAME OF STAFF or No

Yes

Department Recommendation

It is the recommendation of the Department of Public Works to adopt the resolution setting the public hearing on July 7th and publishing the Notice of Hearing in the usual manner.

Attachments

Call for Hearing  Ordinance  Notice of Hearing

Inbox

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Form Review

Reviewed By Date

Susan Eugenis

Mike Moss

06/02/2026 02:41 PM

06/02/2026 03:48 PM

Started On: 06/02/2026 02:07 PM

BEFORE THE BOARD OF COWLITZ COUNTYCOMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

In the Matter of amending section 15.15.010 ) RESOLUTION NO. _________________ Of CH. 15.15 of County Code, of Three Rivers ) Regional Wastewater Authority discharge and )

ORDER FIXING DATE OF HEARING Industrial pre-treatment policy )

WHEREAS, the Three Rivers Regional Wastewater Authority (TRRWA) is a municipal corporation organized as a Joint Municipal Services Agency pursuant to RCW 39.106, and by Agreement with Cowlitz County, the City of Longview, the City of Kelso, and Beacon Hill Water & Sewer District, to provide all necessary treatment facilities, transmission facilities, and wastewater services to receive and treat wastewater collected by its participating members within the TRRWA service area.; and

WHEREAS, Cowlitz County (County), as a participating member of TRRWA, had adopted the TRRWA’s Discharge Pretreatment Policy, as required by the Washington State Department of Ecology, as set forth under Chapter 15.15 of Cowlitz County Code (CCC); and

WHEREAS, the TRRWA recently revised its Discharge Pretreatment Policy, and County as a participating member must amend CCC 15.15.010 to incorporate those Policy changes; and

WHEREAS, County also regulates the design, acquisition, construction, management, operation and maintenance of water and sewer facilities owned and operated by Cowlitz County which are outside of the TRRWA service area under Chapter 15.14 CCC, and CCC 15.15.010 reflects this separate regulation of such area by the Department of Public Works; and

NOW, THEREFORE, IT IS HEREBY RESOLVED that a public hearing will be held on the 7th day of July, 2026 at the hour of ____ a.m., in the chambers of the Board, Third Floor, County Administration Building, 207 Fourth Avenue North, Kelso, Washington to hear all concerned in the matter of the proposed amendment to Section 15.15.010 of Chapter 15.15 of Cowlitz County Code; and,

BE IT FURTHER RESOLVED that notice be given not less than ten (10) days prior to the public hearing as required by law.

DATED this _____ day of June, 2026.

ATTEST: BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

Kelly Grayson, Clerk of Board

Richard Dahl, Chairman

Steven Ferrell, Commissioner

Steve Rader, Commissioner

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

AMENDING SECTION 15.15.010 OF CH. 15.15) OF COUNTY CODE, OF THREE RIVERS )

REGIONAL WASTEWATER AUTHORITY ) ORDINANCE NO.

DISCHARGE AND INDUSTRIAL PRE- )

TREATMENT POLICY )

WHEREAS, the Three Rivers Regional Wastewater Authority (TRRWA) is a municipal corporation organized as a Joint Municipal Services Agency pursuant to RCW 39.106, and by Agreement with Cowlitz County, the City of Longview, the City of Kelso, and Beacon Hill Water & Sewer District, to provide all necessary treatment facilities, transmission facilities, and wastewater services to receive and treat wastewater collected by its participating members within the TRRWA service area.; and

WHEREAS, Cowlitz County (County), as a participating member of TRRWA, had adopted the TRRWA’s Discharge Pretreatment Policy, as required by the Washington State Department of Ecology, as set forth under Chapter 15.15 of Cowlitz County Code (CCC); and

WHEREAS, the TRRWA recently revised its Discharge Pretreatment Policy, and County as a participating member must amend CCC 15.15.010 to incorporate those Policy changes; and

WHEREAS, County also regulates the design, acquisition, construction, management, operation and maintenance of water and sewer facilities owned and operated by Cowlitz County which are outside of the TRRWA service area under Chapter 15.14 CCC, and CCC 15.15.010 reflects this separate regulation of such area by the Department of Public Works; and

WHEREAS, theBoardofCountyCommissioners(Board)hasreviewedtherevisedTRRWA Discharge Pretreatment Policy and determined that it is in the County’s best interest to adopt said revised Policy by reference under CCC 15.15.010, and to continue to expressly provide that said Policy shall be applicable and enforced in those portions of Cowlitz County within the TRRWA service area, and not within unincorporated areas currently governed by Chapter 15.14 CCC.

NOW THEREFORE, BE IT ORDAINED by the Board of County Commissioners that:

Section 1. CCC 15.15.010 is herebyrepealedin its entirety, andamended, revisedandreplaced set forth below:

15.15.010 Discharge Pretreatment – Policy by Reference.

That certain document titled “THREE RIVERS REGIONAL WASTEWATER AUTHORITY DISCHARGE PRETREATMENT POLICY” adopted by the Three Rivers Regional Wastewater Authority (TRRWA) in January of 2026, consisting of 14 sections, and incorporated herein by this reference, is adopted as the official rules and regulations of Cowlitz County in setting forth pretreatment requirements and regulations for discharges into any wastewater system within the unincorporated portions of the TRRWA service area; and EXCEPTING those discharges into any wastewater system located within unincorporated lands which are outside of the TRRWA service area, and such separate unincorporated lands and wastewater systems remain governed by Chapter 15.14 CCC

Section 2. Codification Only Section 1, above of this Ordinance shall be codified.

Section 3. Severability. The provisions of this ordinance are declared separate and severable. If any section, paragraph, clause, or phrase of this ordinance is for any reason held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portions of this ordinance. The Board of Commissioners hereby declares that it would have passed this ordinance and each section, paragraph subsection, clause or phrase thereof irrespective of the fact that any one or more sections, paragraph subsections, clauses or phrases may subsequently be found to be unconstitutional or invalid.

Section4. Savingsclause.Chapter15.15CCCandOrdinanceNo.12-089 areherebyrepealed, amended, revised and replaced as set forth above. Such repeal, amendment, revision or replacement shall not be construed as affecting any currently existing agreement, license, right or registration acquired under ordinance or resolution, or portions thereof, nor as affecting any ongoing proceeding or enforcement instituted upon any rule, regulation, or order promulgated thereunder, nor as to any administrative action taken thereunder. Further, it is not the intention of these actions to reenact any ordinance or portions or sections of ordinances or resolutions previously replaced, repealed or amended, unless this ordinance specifically states such intent to reenact such replaced, repealed or amended ordinances and resolutions.

Section 5. Effective Date. These regulations are in the public interest and shall take effect immediately upon adoption by the Board.

PASSED IN REGULAR SESSION THIS day of____________, 2026, after a public hearing was held on , 2026, pursuant to Notice published in the Longview Daily News on , 2026.

APPROVED AS TO FORM: BOARD OF COUNTY COMMISSIONERS RYAN JURVAKAINEN, Prosecuting Attorney COWLITZ COUNTY, WASHINGTON

Douglas Jensen, Chief Civil Deputy

Richard Dahl, Chairman

ATTEST:

Kelly Grayson, Clerk of the Board

Steven Ferrell, Commissioner

Steve Rader, Commissioner

NOTICE IS HEREBY GIVEN that on the ______ day of __________, 2026, at the hour of ________ o'clock a.m., a public hearing will be held before the Board of County Commissioners of Cowlitz County, Washington, in the Chambers of the Board in the County Administration Building, third floor, 207 Fourth Avenue North, Kelso, Washington, for the purpose of consideration of amending Section 15.15.010 of Chapter 15.15 of Cowlitz County Code, adopting an industrial wastewater pre-treatment Policy.

Complete copies of the proposed ordinance are available at the office of the Board of County Commissioners at the County Administration Building, 207 Fourth Avenue North, Kelso, Washington, 98626 or the Department of Public Works at 1600 13th Avenue South, Kelso, Washington, 98626

Any person may appear to present testimony against or in favor of the proposed ordinance at the date and time given above Mail or fax your comments in advance of hearing to the attention of the Clerk of the Board, Cowlitz County Commissioners, 207 Fourth Avenue North, Kelso, Washington 98626, Fax No. 360-423-9987. Copies of the proposed ordinance are available online or by calling the Board of County Commissioners at 360-577-3020.

The County Administration Building is accessible for persons with disabilities.

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

PUBLISHED:

PUBLICATION REQUIREMENTS: To be published in one issue, not less than ten (10) days prior to the date of hearing.

BILLING INFORMATION:

1) AFFIDAVIT TO: Cowlitz County Commissioners ATTN: Clerk of the Board

2) BILL TO: Cowlitz County Department of Public Works P.O. 001055 1600 13th Avenue South Kelso, WA 98626

Meeting Date: 06/09/2026

Setting Notice of Hearing of Establishment of Sediment Rd as a County Road

Submitted For: Susan Eugenis, Public Works

Submitted By: Lynn Ruffe, Public Works Department: Public Works

Information

Subject and Summary Statement

Attached is the Engineers Report, Resolution to Set the Public Hearing, and the Notice for Hearing for establishment of the new roadway associated with Project 1859 - Burma Road Toutle Park Bypass Project. The subject properties include Parcel WK2608004, owned by William and Catherine O. Petlock, and Parcels WK2312001, WK2213002, and WK2701017, owned by Weyerhaeuser. The proposed road is necessary to bypass the ongoing erosion of Toutle Park Road caused by the Toutle River, which threatens to wash out the existing roadway and cut off access to private property owners, the Cowlitz Shooting Range, and county-owned property commonly referred to as LT1. The proposed county road would have a minimum right of way width of 50 feet and an approximate length of 2,600 feet.

Will Staff Attend - NAME OF STAFF or No

Department Recommendation

It is the recommendation of the Department of Public Works that the Board acknowledge the Engineers Report, adopt the resolution setting the public hearing to Establish a County Road for Project 1859 Burma Rd Toutle Park Bypass Project and publish in the normal manner.

Attachments

Resolution

Notice of Hearing

Engineers Report - Signed  ROW - Vicinity Map - Rd Project Plans

Inbox

Susan Eugenis

Form Review

Reviewed By Date

Lynn Ruffe Lynn Ruffe 06/03/2026 09:14 AM

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Started On: 06/02/2026 03:59 PM

BEFORE BOARD OF COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

IN THE MATTER OF: )

SETTING NOTICE OF HEARING ON ORDER ) OF ESTABLISHMENT OF SEDIMENT RD ) AS A COUNTY ROAD )

RESOLUTION NO. 26-027

WHEREAS, Resolution No. 26-027 directed the County Engineer to create and then file an Engineer Report, upon their investigation of and pursue acquisition of all necessary rights-of-way needed to be acquired; and

WHEREAS, the County Engineer has completed said Engineer Report and actions on acquisition of rights-of-way, and now recommends that it is in public's best interest to establish the new road as Sediment Rd; and

WHEREAS, said Engineer Report and all related materials have been reviewed by the Board and found appropriate for further proceedings, and that RCW 36.81.070 requires a public hearing on the Engineer Report, and RCW 36.81.080 requires a hearing on the matter of establishing a county road.

NOW THEREFORE BE IT RESOLVED that the Board of Commissioners will hold a public hearing on the County Engineer Report and proposed establishment of Sediment Rd at or after a.m. July 7,2026. The hearing will take place at the County Administration Building 207 4th Ave N, Kelso, WA 98626, Commissioner's Meeting Room; and

NOW THEREFORE BE IT FURTHER RESOLVED that the Clerk of the Board is hereby instructed to proceed with all appropriate and necessary notifications, postings, and publications as required by law.

DONE IN OPEN SESSION this 9th day of June, 2026.

ATTEST:

Kelly Grayson, Clerk of Board

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

Richard Dahl, Chairman

Steven Ferrell, Commissioner

Steve Rader, Commissioner

RESOLUTION-NOTICE OF HEARING PAGE - 1

NOTICE OF HEARING

PROPOSED ESTABLISHMENT OF COUNTY ROAD TO BE KNOWN AS SEDIMENT RD

NOTICE IS HEREBY GIVEN that the County Engineer of Cowlitz County, Washington, has made and filed with the Board of County Commissioners of Cowlitz County, their report on the proposed establishment of a county road, to be known as Sediment Rd, situated in Sections 23 and 26, Township 10 North, Range 2 West of the Willamette Meridian, more particularly described as follows:

A road right-of-way for the purpose of construction, operation, and maintenance of a roadway and utilities over, under, and across a strip of land 50.00 feet wide and 2,600 feet in length, in a portion of Sections 23 and 26, Township 10 North Range 2W, Willamette Meridian, Cowlitz County, Washington, more particularly described as:

BEGINNING at a one-inch iron pipe (as shown on survey recorded in Auditor’s File Number 3112092) marking the northwest corner of Section 26, Township 10 North, Range 2 West, Willamette Meridian; Thence, from said POINT OF BEGINNING, along the north line of said Section 26, South 88° 08' 05" East, 657.30 feet to a 5/8” rebar with yellow plastic cap marked “COWLITZ COUNTY” per Auditor’s File Number 3112092, Cowlitz County Records (hereinafter referred to as “County Monument”) marking the westerly line of that certain parcel described in volume 1113, page 99, said Cowlitz County Records; Thence, along said westerly line, North 02° 03' 32" East, 7.20 feet to a County Monument; Thence, continuing along said westerly line, North 18° 29' 24" East, 69.30 feet; Thence, leaving said westerly line, South 46° 00' 28" West, 32.62 feet; Thence South 71° 05' 25" West, 40.00 feet to a point on a line offset 36.00 feet northerly of (measured perpendicularly to) the north line of said Section 26; Thence, along said line, North 88° 08' 05" West, 51.67 feet; Thence, leaving said line, North 73° 39' 26" West, 16.00 feet, to a point on a line offset 40.00 feet northerly of (measured perpendicularly to) the north line of said Section 26; Thence, along said offset line, North 88° 08' 05" West, 303.17 feet; Thence North 42° 19' 39" West, 4.20 feet; Thence North 88° 08' 06" West, 51.35 feet to a point of 120.00 foot radius curve to the right; Thence along said curve to the right, through a central angle of 18° 53' 51" an arc distance of 39.58 feet (the chord of which bears North 78° 41' 10" West, 39.40 feet); to a point of 10.00 foot radius curve to the right; Thence along said curve to the right, through a central angle of 121° 07' 27" an arc distance of 21.14 feet (the chord of which bears North 08° 40' 32" West, 17.42 feet); Thence North 51° 53' 12" East, 36.98 feet; Thence North 38° 06' 48" West, 60.00 feet to a point that is on a line 30.00 feet offset northwesterly of (measured perpendicularly to) the design centerline of Burma Road; Thence, along said 30.00 foot offset line, the following four (4) courses:

1) South 51° 53' 12" West, 169.68 feet to a point of 1170.00-foot radius curve to the right;

2) Along said curve to the right, through a central angle of 04° 08' 58" an arc distance of 84.73 feet (the chord of which bears South 53° 57' 41" West, 84.72 feet);

3) South 56° 02' 10" West, 189.71 feet;

4) South 55° 31' 41" West, 120.74 feet to a point on the northeasterly line of that certain parcel described in Auditor’s File Number 3769273; Thence, along said northeasterly line, South 40° 30' 05" East, 10.10 feet to a point on the northwesterly right of way line of the existing Burma Road; Thence, along said right of way line, North 56° 48' 36" East, 367.68 feet to a point on the westerly line of said Section 26; Thence, along said line, North 01° 44' 35" East, 3.60 feet to said POINT OF BEGINNING.

And a tract of land lying in the northwest one-quarter of Section 26, Township 10 North, Range 2 West, Willamette Meridian, Cowlitz County, Washington and being a portion of that property described in that Statutory Warranty Deed to William Petlock and Catherine O. Petlock, recorded May 19th, 2005 in Auditor’s File Number 3258621 of Cowlitz County Records; the said tract being the north ten (10.00) feet of Lot 2 per short plat recorded in Volume 16 of Short Plats, at Page 14 (Auditor’s File Number 3395477), Cowlitz County Auditor’s Records.

AND FURTHER NOTICE IS HEREBY GIVEN that the 7th day of July 2026, at the hour of in the Board of County Commissioners Meeting Room, County Administration Building, 207 Fourth Avenue North, Kelso, Washington, has been fixed as the time and place of hearing the report of the Engineer, and at said time and place, all persons interested may appear and be heard upon such report and upon the matter of the establishment of the above described rights-of-way as a county road.

The Cowlitz County Administration Building is accessible for persons with disabilities.

DATED at Kelso, Washington, this 9th day of June 2026.

To Be Published: 06-09-2026; 06-16-2026

To Be Published: 06-16-2026; 06-23-2026

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

PUBLICATION REQUIREMENT: To be published once aweek for two (2) successive weeks noted above.

BILLING INFORMATION:

1) AFFIDAVIT TO: Cowlitz County Commissioners ATTN: Clerk of the Board

2) BILL TO: Cowlitz County Department of Public Works 1600 13th Ave. S. Kelso, WA 98626-4189

To:

From:

Date:

Re:

DEPARTMENT OF PUBLIC WORKS

16fl) - lSth Avenue South

Kelso. WA 98626

TEL G60) 577-3030

FAX (160) 636-0845

Wash ington Rela-,- Sen ice 7 l I or ( 88E ) 8ll-8611

rvwrv.co.corvl itz.wa.us/oublicworks/

The Board of Cowlitz County Commissioners

Susan Eugenis, PE, County Engineer

June 2, 7026

1859 Burma Rd Toutle Park Bypass Road

IN THE MATTER OF THE ORDER OF COWLITZ COUNTY BOARD OF COMMISSIONERS FOR THE ESTABLISHMENT OF SEDIMENT RD

TO THE BOARD OF COUNTY COMMISSIONERS:

Board of ( rlunt) (lommissioners

Stevc Rader District I

Stcven L. Fencll District 2

Richard R. Dahl District l

ENGINEER.S REPORT

l, the undersigned County Engineer of Cowlitz County, Washington, having on the 19th day of May 2026, by Resolution No. 26-027, been duly ordered to make an examination of the above road and report thereon, did in compliance with said order make such examination, and herewith submit the following report.

FIRST: This establishment is necessary to provide access for private property owners, Cowlitz Public Shooting Range, and multiple parcels owned by Cowlitz County commonly referred to as LT1, due to the Toutle River washing out Toutle Park Rd cutting off access to the above.

SECOND: Rights-of-way needed for establishment ofthe road are from ownerships of Weyerhaeuser NR Company WK2312001, Weyerhaeuser Timber Holdings, lnc WK2213002 and WK2701017 and William and Catherine O. Petlock WK2608004 and Cowlitz County WK2601003. All necessary rights-of-way has been acquired. The portion of the right-of-way owned by William and Catherine O. Petlock was purchased by warranty deed. The portion ofthe right-of-way owned by Weyerhaeuser NR Company and Weyerhaeuser Timber Holdings, lnc was acquired by County Possession and Use Agreement in lieu of condemnation.

THIRD: All acquisitions were done in accordance with County acquisition processes and policies, under the County's eminent domain authority, and pursuant to authority and obligations of RCW Title 8, noting 8.08, 8.25, and 8.26, and as set forth in Ch. 36.81 RCW - Establishment.

FOURTH: lt is hereby recommended that said roadway be established as a county road, subject to the following conditions:

1. The roadways shall be designed and constructed to meet the current County public road standards.

2. A minimum of 50 feet of right-of-way shall be deeded to Cowlitz County, including any additional right-of-way for radii and cut/fill slopes as required.

It is further recommended that:

1. This establishment shall become effective upon my certification, to the Board of County Commissioners, that the above conditions have been met.

2. The Order of Establishment shall become null and void unless the above conditions have been met and my certification has been received by June 30, 2027, ot upon such date as may have been extended by further Resolution and Order ofthe Board of County Commissioners.

I file with this report with a proposed design map, titled "Exhibit A, Sediment Road Project", which shows the road alignment, right-of-way widths, and len6h of approximately 2,600 feet or 0.49 miles.

ln my opinion, Sediment Rd should be established for the reasons noted above and is in the public's best interest.

Respectfully submitted this gth day ofJune 2026.

STA1+19,RIGHT CONSTRUCTDRIVEWAY (SEESHEET7)

CURVE#2

PI=5+92.56

Δ=46°58'57" R=100.00' L=82.00'

STA8+58.60,78.43'LT IE=104.70'

STA5+71.33,19.00LT IE=142.69'

INSTALL20.0LF OF12"CPE@S=0.0645 10 ' 12'

STA5+46.77,10.25'RT

INSTALLBEAMGUARDRAILTYPE31 NON-FLAREDTL-2TERMINAL PERWSDOTSTDPLANC-22.45

STA5+75.00 ENDCURBANDGUTTER

PVISTA:5+50.00 PVIELEV:148.00 K:28.57 LVC:200.00

HIGHPTSTA:4+50.00 HIGHPTELEV:149.00

STA7+00.00,12.25'RT

INSTALLBEAMGUARDRAILTYPE31 NON-FLAREDTL-2TERMINAL PERWSDOTSTDPLANC-22.45

STA5+46.77TOSTA7+00.00RIGHT

INSTALL162.5LFBEAMGUARDRAILTYPE31 PERWSDOTSTDPLANC-20.10

CURVE#3

INSTALL160.0LFOF72"DIA PIPE@S=0.0131FT/FT

STA8+98.66,77.24'RT IE=102.60' COWLITZCOUNTY PLAN

SEDIMENT ROAD PROJECT

VERTICAL DATUM

ELEVATION DATUM: NAVD 88 (PER OPUS AND ADJUSTMENT AS DETAIL BELOW)

BENCHMARK: CP #38 LOCATION: AS SHOWN HEREON ELEVATION: 140.10'

BASIS OF BEARINGS HORIZONTAL COORDINATES / CONTROL SCHEME WASHINGTON STATE PLANE, SOUTH ZONE (SPC 4602 WA S) SEE BELOW:

HORIZONTAL COORDINATES AND BASIS OF BEARINGS ARE WASHINGTON STATE PLANE (SOUTH ZONE) - REFERENCE FRAME: NAD83 (2011) (EPOCH:2010.0000), US SURVEY FEET. ALL DISTANCES ARE GRID, AND WERE DETERMINED FROM NGS OPUS SOLUTIONS, WHICH WERE DERIVED FROM 2 HOUR MINIMUM GPS OBSERVATIONS ON CONTROL POINTS 500, 501, AND 38 (SHOWN HEREON), UTILIZING THE FOLLOWING EXISTING BASE STATIONS:

PID DESIGNATION LATITUDE(°) LONGITUDE(°)

DN6068 GRMD GRAND MOUND CORS GRP N464743.734 W1230121.288

DK4153 P446 KELSO_AIR_WA2007 CORS GRP N460656.369 W1225333.975

DH4122 P690 MSH_SRIDGEWA2005 CORS GRP N461047.944 W1221123.469

DH5824 P702 MSH_ELKRCKWA2004 CORS GRP N461800.565 W1222044.271

DG8346 P420 FANTASYFD_WA2004 CORS GRP N463518.952 W1225158.733

CONTROL POINTS 500, 501, AND 38 WERE THEN TIED TOGETHER USING STANDARD TRAVERSE AND RTK TECHNIQUES, THE RESULTS OF WHICH WERE ADJUSTED TOGETHER IN A WEIGHTED LEAST SQUARES ADJUSTMENT, UTILIZING STARNET SOFTWARE. AN AVERAGE PROJECT COMBINED SCALE FACTOR (0.9999177147) WAS CALCULATED IN ORDER TO COMPARE RECORD (GROUND) DIMENSIONS TO MEASURED (GRID) DIMENSIONS. 1000.00' GRID = 1000.08' GROUND. THE CONVERGENCE ANGLE

ALL SURVEY MONUMENTS, EITHER FOUND OR SET, ARE SUBJECT TO THE FOLLOWING: RCW 58.09.130 MONUMENTS DISTURBED BY CONSTRUCTION ACTIVITIES--PROCEDURE--REQUIREMENTS. WHEN ADEQUATE RECORDS EXIST AS TO THE LOCATION OF SUBDIVISION, TRACT, STREET, OR HIGHWAY MONUMENTS, SUCH MONUMENTS SHALL BE LOCATED AND REFERENCED BY OR UNDER THE DIRECTION OF A LAND SURVEYOR AT THE TIME WHEN STREETS OR HIGHWAYS ARE RECONSTRUCTED OR RELOCATED, OR WHEN OTHER CONSTRUCTION OR ACTIVITY AFFECTS THEIR PERPETUATION. WHENEVER PRACTICAL A SUITABLE MONUMENT SHALL BE RESET IN THE SURFACE OF THE NEW CONSTRUCTION. IN ALL OTHER CASES PERMANENT WITNESS MONUMENTS SHALL BE SET TO PERPETUATE THE LOCATION OF PREEXISTING MONUMENTS. ADDITIONALLY, SUFFICIENT CONTROLLING MONUMENTS SHALL BE RETAINED OR REPLACED IN THEIR ORIGINAL POSITIONS TO ENABLE LAND LINES, PROPERTY CORNERS, ELEVATIONS AND TRACT BOUNDARIES TO BE REESTABLISHED WITHOUT REQUIRING SURVEYS ORIGINATING FROM MONUMENTS OTHER THAN THE ONES DISTURBED BY THE CURRENT CONSTRUCTION OR ACTIVITY.

IT SHALL BE THE RESPONSIBILITY OF THE GOVERNMENTAL AGENCY OR OTHERS PERFORMING CONSTRUCTION WORK OR OTHER ACTIVITY TO PROVIDE FOR THE MONUMENTATION REQUIRED BY THIS SECTION. IT SHALL BE THE DUTY OF EVERY LAND SURVEYOR TO COOPERATE WITH SUCH GOVERNMENTAL AGENCY OR OTHER PERSON IN MATTERS OF MAPS, FIELD NOTES, AND OTHER PERTINENT RECORDS. MONUMENTS SET TO MARK THE LIMITING LINES OF HIGHWAYS, ROADS, OR STREETS SHALL NOT BE DEEMED ADEQUATE FOR THIS PURPOSE UNLESS SPECIFICALLY NOTED ON THE RECORDS OF THE IMPROVEMENT WORKS WITH DIRECT TIES IN BEARING OR AZIMUTH AND DISTANCE BETWEEN THOSE AND OTHER MONUMENTS OF RECORD.

WAC 332-120 SURVEY MONUMENTS-REMOVAL OR DESTRUCTION

WAC 332-120-040 MONUMENT REMOVAL OR DESTRUCTION

WAC 332-120-050 APPLICATION PROCESS WAC 332-120-060 PROJECT COMPLETION-PERPETUATION AND THE ORIGINAL POSITION

VICINITY MAP
SEDIMENT RD

STA3+15,MP0.62BURMARD ENDROADWAYCONSTRUCTION SAWCUTANDMATCH EXISTINGPAVEMENT N372644.54 E1032746.59 PROTECTTREES

STA1+19BURMARD= STA0+00DRIVEWAYRT CONSTRUCTHMAAPPROACH PERSTDPLANCC-1317

EXISTINGRIGHT-OF-WAY

CURVE#2

PI=5+92.56

Δ=46°58'57"

R=100.00' L=82.00'

EXISTINGRIGHT-OF-WAY

EXISTINGRIGHT-OF-WAY

STA5+46.77,10.25'RT

INSTALLBEAMGUARDRAILTYPE31 NON-FLAREDTL-2TERMINAL PERWSDOTSTDPLANC-22.45

PETLOCKWILLIAM/CATHERINE 420BURMARD

INSTALL20.0LF OF12"CPE@S=0.0645

STA5+71.33,19.00LT IE=142.69'

STA5+75.00 ENDCURBANDGUTTER

PVISTA:5+50.00 PVIELEV:148.00 K:28.57 LVC:200.00

HIGHPTSTA:4+50.00 HIGHPTELEV:149.00

STA7+00.00 ENDHMA BEGINTOPCSBC

STA7+00.00,12.25'RT

INSTALLBEAMGUARDRAILTYPE31 NON-FLAREDTL-2TERMINAL PERWSDOTSTDPLANC-22.45

STA5+46.77TOSTA7+00.00RIGHT INSTALL162.5LFBEAMGUARDRAILTYPE31 PERWSDOTSTDPLANC-20.10

CURVE#3

INSTALL160.0LFOF72"DIA PIPE@S=0.0131FT/FT

STA8+58.60,78.43'LT IE=104.70' S65° 25' 10" E36204'

STA8+98.66,77.24'RT IE=102.60' COWLITZCOUNTY PLAN

INSTALLNEWFENCE SEESHEET10

STA11+50.00 ENDTOPCSBC BEGINHMA

STA13+15.68,36.82'LT IE=136.73'

STA12+43.61,20.04'LT IE=132.97'

STA12+80SEDIMENTROAD= STA0+00GUNRANGEENTRANCE (SEESHEET8)

INSTALL74.0LFOF12"DIA CPESTORMSEWERPIPE @S=0.0508FT/FT CURVE#4 PI=15+84.70 Δ=78°43'10" R=300.00' L=412.17'

MARSHALLJONATHAN/MICHELLE 601TOUTLEPARKRD

PVISTA:14+00.00

COWLITZCOUNTY

PVISTA:17+75.00

0.33'ofHMAClass3/8"PG58-22. 1.00'ofCrushedSurfacingBaseCourse. ConstructionGeotextileforSeparation. AdditionalStructuralFill asrequiredtostabilizesubgrade.

TypicalRoadwaySection BurmaSta0+00toSta3+15 Sta17+56toSta19+10*

0.33'ofHMAClass3/8"PG58-22. 1.00'ofCrushedSurfacingBaseCourse. ConstructionGeotextileforSeparation.

StructuralFill AdditionalStructuralFill asrequiredtostabilizesubgrade.

TypicalRoadwaySection Sta0+00toSta4+50

0.33'ofHMAClass3/8"PG58-22. 1.00'ofCrushedSurfacingBaseCourse. ConstructionGeotextileforSeparation.

StructuralFill AdditionalStructuralFill asrequiredtostabilizesubgrade.

TypicalRoadwaySection Sta4+50toSta5+75

TypicalRoadwaySection Sta7+00toSta9+50

1.33'ofCrushedSurfacingBaseCourse.* ConstructionGeotextileforSeparation. ConstructionGeotextileforStabilization

0.33'ofHMAClass3/8"PG58-22. 1.00'ofCrushedSurfacingBaseCourse. ConstructionGeotextileforSeparation.

RoadwaySection Sta5+46.30

0.33'ofHMAClass3/8"PG58-22. 1.00'ofCrushedSurfacingBaseCourse. ConstructionGeotextileforSeparation.

StructuralFill AdditionalStructuralFill asrequiredtostabilizesubgrade.

TypicalRoadwaySection Sta5+75toSta7+00

*Transitionrightlanewidth from10.0'to12.0'inCurve#2 **Transitionslopefrom1.5:1to3:1 betweenStations6+50and7+00

0.33'ofHMAClass3/8"PG58-22.* 1.00'ofCrushedSurfacingBaseCourse. ConstructionGeotextileforSeparation.

StructuralFill AdditionalStructuralFillas requiredtostabilizesubgrade

TypicalRoadwaySection Sta9+50toSta17+56 GunRangeEntrance

*FromStation7+00to11+50 additionalCrushedSurfacingBaseCourse

S65°25'10"E

BEGINDOUBLECENTERLINE (YELLOW)(NARROWPATTERN)

BURMARDCURVE

DOUBLECENTERLINE (YELLOW)(NARROWPATTERN) PERWSDOTSTDPLANM-20.10

STA2+25BURMARD =STA0+00NEWRD

STA0+15

BEGINDOUBLECENTERLINE (YELLOW)(NARROWPATTERN)

DOUBLECENTERLINE (YELLOW)(NARROWPATTERN) PERWSDOTSTDPLANM-20.10

CURVE#1

PI=0+70.07 Δ=35°01'17" R=150.00' L=91.69'

STA3+15

ENDDOUBLECENTERLINE (YELLOW)(NARROWPATTERN)

SEC23,26&27T10NR2W

ENDDOUBLECENTERLINE (YELLOW)(NARROWPATTERN)

COWLITZCOUNTY

PROTECT EXISTINGFENCE

PROTECTEXISTINGFENCE

INSTALL4FOOTGALVANIZED WELDEDWIREMESH(4"x4" OPENING)WITHT-POSTS PERWSDOTSTDPLANL-??

REMOVEEXISTINGFENCE ANDPLACEATOWNERS DIRECTION

REMOVEEXISTINGFENCE

INSTALL6FOOTGALVANIZED CHAINLINKFENCEWITHSLATS AND3ROWSBARBEDWIRE PERWSDOTSTDPLANL-??

INSTALL6FOOTGALVANIZED CHAINLINKFENCEWITHSLATS AND3ROWSBARBEDWIRE PERWSDOTSTDPLANL-??

COWLITZPUBLICSHOOTINGRANGE 1000TOUTLEPARKRD

INSTALLRELOCATEDGATE

INSTALL4FOOTGALVANIZED WELDEDWIREMESH(4"x4" OPENING)WITHT-POSTS PERWSDOTSTDPLANL-??

REMOVEEXISTINGFENCE

PROTECTEXISTINGFENCE

BOCC Agenda

Meeting Date: 06/09/2026

RESOLUTION: ORDER FIXING DATE OF HEARING - Carrolls Water Association - 10 Year Non-Exclusive Franchise

Submitted For: Susan Eugenis, Public Works

Department: Public Works

Subject and Summary Statement

Submitted By: Lynn Ruffe, Public Works

Information

The Carroll’s Water Association has submitted application for a ten (10) year, non-exclusive Franchise Agreement for their water system utility, located between Mount Pleasant Rd to Vision Dr. The Board of Cowlitz County Commissioners originally granted Carrolls Water Association Resolution 4350, a fifty (50) year franchise in 1975, with right to construct, install, operate and maintain water mains, pipelines and customer service lines, together with appurtenances thereto along Cowlitz County rights of way.

Attached is a resolution fixing the date of hearing, notice for publication and the resolution granting a non-exclusive franchise.

Will Staff Attend - NAME OF STAFF or No

Yes

Department Recommendation

It is the recommendation of the Department of Public Works that the Board move to adopt the resolution fixing the hearing date, set a hearing date a minimum of 4 weeks from the adoption of the resolution, post the notice and publish the notice in accordance with RCW 36.55 and Cowlitz County Ordinance 5378.

Attachments

Resolution 1975

Application

Vicinity Map

Call for Hearing - Notice

Inbox

Susan Eugenis

Lynn Ruffe

Lynn Ruffe

Susan Eugenis

Form Review

Reviewed By Date

Lynn Ruffe 06/02/2026 04:11 PM

Lynn Ruffe 06/03/2026 06:48 AM

Lynn Ruffe Lynn Ruffe 06/03/2026 08:27 AM

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Susan Eugenis 06/03/2026 09:17 AM

Mike Moss 06/03/2026 04:50 PM

Started On: 06/02/2026 02:44 PM

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

In the Matter of a Non-Exclusive Franchise to ) RESOLUTION NO. _____________ Carrolls Water Association, to Construct, Operate ) and Maintain a Water System Facility on ) ORDER OF INTENT AND County Rights-of-Way; setting forth conditions ) CALL FOR HEARING Accompanying a grant of a Non-Exclusive Franchise; ) And providing for County administration and ) Regulation of said Franchise. )

WHEREAS an application has been filed in the office of the Board of County Commissioners of Cowlitz County Washington by Carrolls Water Association, doing business in Cowlitz County, state of Washington, for a non-exclusive franchise for a periodof ten(10) years to use certain roads, streets, avenues, highways, alleys, rights-of-way and other county properties for the construction, operation, and maintenance of telecommunication facilities and appurtenances over, in, along, across, and under certain County Public Roads and Highways in Cowlitz County Washington; and

WHEREAS RCW 36.55 requires that a public hearing be held on said application;

NOW, THEREFORE, IT IS RESOLVED that a public hearing will be held on the ____ day of , 2026, at the hour of __:00 o'clock a.m., in the chambers of the Board, third floor, County Administration Building, 207 Fourth Avenue North, Kelso, Washington, to hear all concerned in the matter of the proposed application for a Franchise for a non-exclusive franchise to use certain roads, streets, avenues, highways, alleys, rights-of-way and other county properties for the use certain roads, streets, avenues, highways, alleys, rights-of-way and other county properties for the construction, operation, and maintenance of a water system facility and appurtenances over, in, along, across, and under certain County Public Roads and Highways in Cowlitz County Washington; and

BE IT FURTHER RESOLVED that posting and publication notice be given not less than (15) days prior to the public hearing as required by law.

DATED this day of , 2026.

ATTEST:

Kelly Grayson Clerk of the Board

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

Richard Dahl, Commission Chair

Steven L. Ferrell, Commissioner

Steve Rader, Commissioner

NOTICE IS HEREBY GIVEN that on the ____ day of _____________, 2026, at the hour of ___:00 o'clock a.m., a public hearing will be held before the Board of County Commissioners of Cowlitz County, Washington, in the Chambers of the Board in the County Administration Building, third floor, 207 Fourth Avenue North, Kelso, Washington, for the purpose of determining whether or not to approve a ten(10) year franchise between Carrolls Water Association, and Cowlitz County, Washington. The franchise would allow Carrolls Water Association, a non-exclusive franchise to use certain roads, streets, avenues, highways, alleys, rights-of-way and other county properties for the construction, operation, and maintenance of telecommunication facilities over, in, along, across, and under certain County Public Roads and Highways in Cowlitz County Washington, for the purpose of water services to:

1. Vision Dr 43510 MP 0.00 to 0.25

2. Hilltop Dr 43650 MP 0.00 to 0.32

3. Old Pacific Hwy S 41000 MP 1.33 to 2.87

4. Fishpond Rd 42050 MP 0.00 to 0.28

5. Fishpond Rd 42050 MP 0.61 to 0.86

6. Ross Rd 41970 MP 0.00 to 0.34

7. Carrolls Ave 41800 MP 0.00 to 0.20

8. Island View Ln 41770 MP 0.00 to 0.05

9. Mount Pleasant Rd 40400 MP 0.25 crossing

10. Risley Rd 41500 MP 0.00 to 0.23

Complete copies of the proposed franchise agreement are available at the office of the Board of County Commissioners, Third Floor, County Administration Building, 207 Fourth Avenue North, Kelso, WA, 98626, or the Department of Public Works, 1600 – 13th Avenue South, Kelso, WA, 98626.

Any person may appear to present testimony against or in favor of the proposed ordinance at the date and time given above. The County Administration Building is accessible for persons with disabilities.

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

POSTING AND PUBLICATION REQUIREMENTS: To be posted in three public places in the county seat at least 15 days prior to hearing and published two times, the last being not less than (5) days prior to hearing.

Affidavit of Publication To: Bill Publication Invoice To: Cowlitz County Commissioners Carrolls Water Association Attn: Clerk of the Board PO BOX 78 207 Fourth Ave North Carrolls, WA 98609 Kelso, WA 98626 cwatreasurer@yahoo.com 360-901-5265

Meeting Date: 06/09/2026

ALLENDER RD STILLWATER CREEK - Setting Hearing to Consider Condemnation Proceedings

Submitted For: Susan Eugenis

Submitted By: Lynn Ruffe Department: Public Works

Information

Subject and Summary Statement

Attached is the Engineers Report, Resolution setting a Public Hearing, and Notice for hearing for Condemnation for Right of Way Purposes for the Allender Rd Stillwater Culvert replacement project. This hearing will determine whether it is necessary to condemn “for county purposes” a portion of certain property interests on Cowlitz County Assessor Parcel No. WN0308001 owned by Dale E and Dana Bybee.

Will Staff Attend - NAME OF STAFF

Y

Department Recommendation

It is the recommendation of the Department of Public Works that the Board acknowledge the Engineers Report, adopt the resolution setting the Public Hearing for July 14, 2026 and advertise the Notice in the usual manner.

Attachments

Engineers Report

Resolution

Notice of Hearing

Exhibits A & B

Form Review

Inbox Reviewed By Date

Susan Eugenis

Lynn Ruffe (Originator)

Susan Eugenis

Lynn Ruffe 06/02/2026 04:06 PM

Lynn Ruffe (Originator) Lynn Ruffe 06/02/2026 05:00 PM

Susan Eugenis

Lynn Ruffe (Originator) Lynn Ruffe 06/03/2026 09:14 AM

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Susan Eugenis 06/03/2026 09:18 AM

Mike Moss 06/03/2026 04:50 PM

Started On: 06/02/2026 03:09 PM

sStN

DEPARTMENT OF PUBLIC WORKS

1600 l3th Avenue South

Kclso. WA 98626

TFrt- (360) 5?7-3030

FAX (360)636-0815

Washington Rela) Service 7l I or (888) 833-8633 rr rr rr co. corr I itz. rr a.u!2154!blq$ alls

Board of County Commissioners

Stc\ c Radcr l)islrict I Ste\en L. fcrrcll l)istrict l Richard R. t)ahl l)islrilt -l

To: From:

Date:

Re:

The Board of Cowlitz County Commissioners

Susan EuBenis, PE, County Engineer

)une 2,2026

Allender Rd Stillwater Culvert Replacement

COUNTY ENGINEER'S REPORT - Subiect and 5ummary Statement

The property proposed for acquisition at the subject property is for the Allender Road Stillwater Creek Fish Passage Project, which will involve replacement of a bridge and assoclated work on Allender Road.

The existing bridge is a 30' long box culvert constructed in 1958 and is approaching its natural end of service life. The bridge is used by residential traffic and log trucks that access the adjacent timber land. The bridge is currently load-restricted for 8 types of trucks. This restricts the loads on log trucks and other trucks that use this roadway. The bridge is narrow and does not meet current roadway standards.

The project will include replacing an existing box culvert with a new bridge. The structure will be constructed to meet current bridge standards, allow passaBe of large storm events and the associated debris, and correct an existing fish passage barrier.

The replacement of this bridge will allow for the unrestricted movement of legal loads through the area which benefits the economy and increases safety because otherwise legal loads that do not meet the bridge load rating standards will no longer be illegally using the bridge and increasing the damage to the structure. lf the damage reaches the point of failure there are approximately one dozen homes that would be isolated from emergency services.

The project requires the acq uisition of a 4,944 square foot portion of a parcel in fee, as well as a 26,961 sq uare foot temporary construction easement. An offer to purchase has been made to the legal owners of the parcel, and discussions with the interest holders are ongoinB. lf negotiations are not successful, condemnation will be necessary in order for the County to proceed with the project.

The associated resolution for the Commission's approval would authorize the County Engineer to proceed with publishing notice in a newspaper and providing notice of the planned final action to interest holders. Following the statutorily required notice, a second resolution will be brought before the Commission in order to approve filing a condemnation action to acquire the parcels through eminent domain.

Respectfully submitted this 9th day ofJune, 2026.

Cowlitz County Engineer

BEFORETHEBOARDOFCOMMISSIONERS OF COWLITZCOUNTY, WASHINGTON

In the Matter of Setting a Public ) Meeting Date for the Board of ) Commissioners of Cowlitz ) County, Washington: )

Notice of Meeting to Consider ) Planned Final Action as Provided ) for in RCW 8.25.290 Determining)

That It Is Necessary for County ) Purposes to Acquire Certain ) Property Interests on County ) Assessor Parcel Number )

WN0308001, Located at 221 ) Allender Road, Ryderwood, ) Washington, with ) Owner(s) of Record: Dale E. ) Bybee and Dana R. Bybee and To ) Determine Whether or Not to ) Authorize Condemnation of Said ) Property Interests for the ) Allender Road Stillwater Creek ) Culvert Replacement Project )

RESOLUTION No. ___________________

NOTICE OF MEETING TO CONSIDER PLANNED FINAL ACTION AND AUTHORIZATION TO COMMENCE CONDEMNATION PROCEEDINGS FOR ALLENDER ROAD STILLWATER CREEK CULVERT REPLACEMENT PROJECT

WHEREAS, Chapter 8.08 RCW sets forth the procedures which Cowlitz County (County) must follow in conjunction with use of eminent domain to condemn property for public use; and

WHEREAS, RCW 8.25.290 further requires, among other procedures, that the County provide at least fifteen (15) days’ notice by certified mail to each and every property owner of record as indicated on the tax rolls of the County Assessor and to the address provided in such tax rolls before “final action”, and deeming for each property or properties to be “for county purposes” and potentially subject to condemnation as provided in RCW 8.08.010, and authorization to commence condemnation proceedings; and

WHEREAS, both such notice to a property owner(s) by certified mail and such notice by publication must contain a general description of the property such as an address, lot number, or parcel number, and specify that condemnation of such property will be considered during the final action. Notice must also describe the date, time and location of the final action at which the BOCC will decide whether or not to authorize condemnation; and

WHEREAS, an offer or offers to acquire the necessary property interests for the Project were negotiated with the owner(s) of record: Dale E. and Dana Bybee; and

WHEREAS, to date, such negotiations have not been successful between the County and said owner(s) of record; NOW, THEREFORE

BE IT HEREBY RESOLVED by the Cowlitz County Board of Commissioners as follows:

1. NOTICE is hereby given pursuant to the provisions of RCW 8.25.290, that a public meeting will be held on:

July 14, 2026, at .

Commissioner’s Hearing Room County Administration Building 207 Fourth Avenue North Kelso, Washington 98626

2. PURPOSE of the public meeting will be for the BOCC, consistent with RCW 8.25.290, to (1) determine whether it is necessary to take “final action” as provided for thereunder, and determine whether it is necessary “for county purposes” to acquire certain property interests on Cowlitz County Assessor Parcel No. WN0308001; and (2) determine whether or not to authorize commencing condemnation proceedings with regard to said property interests on said Assessor Parcel No(s).

3. Consistent with RCW 8.25.290, the property interests that are the subject of this planned “final action” are portions of Cowlitz Assessor Parcel No. WN0308001, located at 221 Allender Road, Ryderwood, Washington:

(1) Fee simple acquisition of a portion of Parcel No. WN0308001, depicted and legally described in Exhibit 1 to this Resolution:

(2) Temporary construction easement over, upon, and across of a portion of Parcel No. WN0308001, depicted in Exhibit 2 to this Resolution, the terms of which are set out in Exhibit 3 to this Resolution.

4. The County Engineer and Public Works Department are hereby instructed to proceed with all necessary notifications and publications required; and then to report back when such requirements are met, at which time authorization of condemnation of said property interests for the Project will be considered, as noticed herein.

Any person may appear at the date, time and place for the meeting set forth above and observe the action(s) and final action(s) of the Board of Commissioners. For purpose of this notice, the term “final action” means a final decision on an actual vote of a majority of the BOCC upon a resolution and the matters noticed thereunder.

DONE in open session, this 9th day of June 2026.

ATTEST:

Kelly Grayson, Clerk of Board

BOARD OF COMMISSIONERS

COWLITZ COUNTY, WASHINGTON

Steve Rader, Commissioner

Steven L. Ferrell, Commissioner

Richard R. Dahl, Commissioner

NOTICE IS HEREBY GIVEN that the County Engineer of Cowlitz County, Washington, has made and filed with the Board of County Commissioners of Cowlitz County, her report on a proposed condemnation of a portion of the parcel WN0308001 for Allender Rd Culvert Replacement project:

That portion of the Northwest Quarter of the Northwest Quarter of Section 03, Township 10 North, Range 3 West, W.M., in Cowlitz County, Washington described as follows:

BEGINNING at a 2” bronze disc stamped “COWLITZ COUNTY PUBLIC WORKS PLS 41079” in the centerline of Allender Road, at Station 24+35.20 per my said Record of Survey in AFN 3708433; Thence, along said centerline, the following fo0ur (4) course: 1) South 89 34’58” West, 308.42 feet to a 2” bronze disc stamped “COWLITZ COUNTY PUBLIC WORKS PLS 41079” per my said Record of Survey (Station 27+43.61) at the beginning of a 30 00’00” degree curve to the right; 2) Along said curve right, through a central angle of 37 02’23” (the long chord of which bears North 71 53’50” West, 121.33 feet), an arc distance of 123.47 feet to a magnetic nail with a 1-1/2” metal washer marked “COWLITZ COUNTY PLS 41079” per my Record of Survey (Station 28+67.08); 3) North 53 22’39” West, 63.39 feet to a magnetic nail with a 1-1/2” metal washer marked “COWLITZ COUNTY PLS” per my Record of Survey (Station 29+30.47) at the beginning of a 50 00’00” degree curve to the right; 4) Along said curve right, through a central angle of 9 39’18” (the long chord of which bears North 48 33’00” West, 192.87 feet), an arc distance of 193.10 feet to a magnetic nail with a 1-1/2” metal washer marked “COWLITZ COUNTY PLS 41079” per ny said Record of Survey (Station 31+23.57).

AND FURTHER, NOTICE IS HEREBY GIVEN that the 14th day of July, 2026, at the hour of a.m., in the Chambers of the Board of County Commissioners of Cowlitz County, third floor, County Administration Building, 207 Fourth Avenue North, Kelso, Washington, has been fixed as the time and place of hearing the said report, and at said time and place, all persons interested may appear and be heard upon such report and upon the matter of the Allender Rd Culvert Replacement Project as hereinbefore described.

The Cowlitz County Administration Building is accessible for persons with disabilities.

DATED at Kelso, Washington, this 9th day of June , 2026

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

Published:

PUBLICATION REQUIREMENT: To be published once a week for two (2) successive weeks.

POSTING REQUIREMENT: To be posted at each end of right of way at least 20 days prior to the date of hearing.

BILLING INFORMATION:

1) AFFIDAVIT TO: Cowlitz County Commissioners ATTN: Clerk of the Board

2) BILL TO: Cowlitz County Department of Public Works P.O. 01057 1600 13th Ave South Kelso, WA 98626

Meeting Date: 06/09/2026

REVISED CRP NO. 813 and CALL FOR BIDS - Burma Road Toutle Park Road Bypass - Project No. 1859

Submitted For: Susan Eugenis, Public Works

Submitted By: Lynn Ruffe, Public Works Department: Public Works

Information

Subject and Summary Statement

Attached is revised County Road Project No. 813 and  Call for Bids for Burma Road Toutle Park Bypass Road. This project bypasses the existing failing Toutle Park Road by building a new road from Burma Road to Toutle Park Road.

At this time, staff is requesting authorization in the approximate amount of $1,500,000.

Will Staff Attend - NAME OF STAFF or No

Yes

Department Recommendation

It is the request of the Department of Public Works that the Board move to approve revised CRP No. 813, issue the Call for Bids, set the bid opening for June 29, 2026 at 1:30 p.m. and publish the Notice to Contractors in the usual manner.

Attachments

Revised CRP No. 813  Call For Bids  Notice to Contractors

Original CRP No. 813  Vicinity Map

Inbox

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Form Review

Reviewed By Date

Susan Eugenis

Mike Moss

06/02/2026 10:53 AM

06/02/2026 01:00 PM

Started On: 06/02/2026 09:46 AM

BEFORE

THE BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

In the Matter of Initiating a County Road Project Designated as C.R.P. No. 813; Project No. 1859 IT IS HEREBY RESOLVED THAT BURMA ROAD, State Road Log No. 57190 from Milepost 0.59 to Milepost 0.97 be improved as provided below: ) Arterial ( )

Extend existing road 1800 feet *during design it was determined appropriate to ) Collector ( X ) establish a new road. ) Access ( )

This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070)

IT IS FURTHER RESOLVED THAT an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown:

PURPOSE

to 36.77.060) $ 190,000.00

1,690,906.00

Contributions from Other Funds $ 00.00

COUNTY ROAD FUND ALLOCATION $ 1,690,906.00

( X ) This project is included in the officially adopted annual road program as Item . ( ) The project is hereby made a part of the officially adopted annual road program in accordance with RCW 36.81.130.

IT IS FURTHER RESOLVED THAT:

( X ) The construction is to be accomplished by contract in accordance with RCW 36.77.020. et.seq. ( ) The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18.

ADOPTED this ______ day of _________________, 2026.

BOARD OF COUNTY COMMISSIONERS ATTEST: OF COWLITZ COUNTY, WASHINGTON

Richard Dahl, Chairman

Steve Rader, Commissioner

Steven L. Ferrell, Commissioner

CALL FOR BIDS

The Board of County Commissioners of Cowlitz County, Washington will receive sealed bids until June 29, 2026, prior to 1:30 p.m., for the following work: BURMA ROAD TOUTLE PARK ROAD BYPASS PROJECT.

Work performed under this contract consists of the following:

Temporary traffic control, clearing and grubbing, shoring, roadway excavation and structural fill, installation of storm drain pipe and structures, fencing, gates, guardrail, hot mix asphalt, seeding and mulching, and associated work.

At that time all bids will be publicly opened and read in the Board's hearing room. Bids must be addressed to:

Cowlitz County Department of Public Works

Attn: County Engineer

1600 - 13th Avenue South Kelso WA 98626

Project bid documents (Plans, specifications, addenda, bid documents, bidders list and plan holders list) for this project are available online for inspection during the bidding period through the Builders Exchange of Washington (BXWA) website at www.bxwa.com. Click on Posted Projects, then Public Works, then Cowlitz County and then Projects Bidding. These documents are available for viewing, downloading and printing on your own equipment free of charge. This service is provided to Prime Bidders, Subcontractors, and Vendors bidding on this project. Bidders will need to “Register as a Bidder” through the BXWA in order to receive automatic e-mail notification of future addenda and to be placed on the Bidders List. Bidders should contact Builder’s Exchange of Washington at (425) 258-1303 for questions regarding access or registration.

It is the sole responsibility of the Bidder to obtain Addenda, if any. Addenda information will be available on the BXWA web site at www.bxwa.com. Cowlitz County accepts no responsibility or liability and will provide no accommodation to bidders who fail to check for addenda and thereby submit inadequate or incomplete responses.

Cowlitz County will not provide paper copies of the Project bid documents for this project for bidding purposes. A copy of the plans and specifications may be reviewed at the office of the Clerk of the Board of County Commissioners.

All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier’s check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish

satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to Cowlitz County.

All documents received in response to this invitation to bid will become a matter of public record and subject to the Washington public disclosure act under chapter 42.56 RCW.

Cowlitz County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

The Board reserves the right to reject any and all bids and to waive any immaterial irregularities or informalities in any bid or in the bidding.

DATED this ________ day of _______________, 2026

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

Richard R. Dahl, Chairman

Steve Rader, Commissioner

Steven L. Ferrell, Commissioner

ATTEST:

Kelly Grayson, Clerk of the Board

NOTICE TO CONTRACTORS CALL FOR BIDS

The Board of County Commissioners of Cowlitz County, Washington will receive sealed bids until June 29, 2026, prior to 1:30 p.m., for the following work: BURMA ROAD TOUTLE PARK ROAD BYPASS PROJECT.

Work performed under this contract consists of the following:

Temporary traffic control, clearing and grubbing, shoring, roadway excavation and structural fill, installation of storm drain pipe and structures, fencing, gates, guardrail, hot mix asphalt, seeding and mulching, and associated work.

At that time all bids will be publicly opened and read in the Public Works Administration Building Training Room. Bids must be addressed to:

Cowlitz County Department of Public Works

Attn: County Engineer

1600 13th Avenue South Kelso WA 98626

Project bid documents (Plans, specifications, addenda, bid documents, bidders list and plan holders list) for this project are available online for inspection during the bidding period through the Builders Exchange of Washington (BXWA) website at www.bxwa.com. Click on Posted Projects, then Public Works, then Cowlitz County and then Projects Bidding. These documents are available for viewing, downloading and printing on your own equipment free of charge. This service is provided to Prime Bidders, Subcontractors, and Vendors bidding on this project. Bidders will need to “Register as a Bidder” through the BXWA in order to receive automatic e-mail notification of future addenda and to be placed on the Bidders List. Bidders should contact Builder’s Exchange of Washington at (425) 258-1303 for questions regarding access or registration.

It is the sole responsibility of the Bidder to obtain Addenda, if any. Addenda information will be available on the BXWA web site at www.bxwa.com. Cowlitz County accepts no responsibility or liability and will provide no accommodation to bidders who fail to check for addenda and thereby submit inadequate or incomplete responses.

Cowlitz County will not provide paper copies of the Project bid documents for this project for bidding purposes. A copy of the plans and specifications may be reviewed at the office of the Clerk of the Board of County Commissioners.

All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier’s check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to Cowlitz County.

All documents received in response to this invitation to bid will become a matter of public record and subject to the Washington public disclosure act under chapter 42.56 RCW.

Cowlitz County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

The Board reserves the right to reject any and all bids and to waive any immaterial irregularities or informalities in any bid or in the bidding.

DATED this 9th day of June, 2026.

BOARD OF COUNTY COMMISSIONERS OF COWLITZ COUNTY, WASHINGTON

PUBLISHED:

PUBLICATION REQUIREMENT: To be published twice prior to June 23, 2026.

BILLING INFORMATION:

1) AFFIDAVIT TO: Cowlitz County Commissioners Attn: Clerk of the Board

2) AFFIDAVIT AND BILL TO: Cowlitz County Department of Public Works P.O. 01054 1600 – 13th Avenue South Kelso, WA 98626

BOCC Agenda

Meeting Date: 06/09/2026

CHANGE ORDER NO. 3 - 2024 Unit Price Countywide Guardrail Installation and Repair - Project No. 2216 - Columbia River Contractors, Inc.

Submitted For: Susan Eugenis, Public Works

Department: Public Works

Subject and Summary Statement

Submitted By: Lynn Ruffe, Public Works

Information

Attached is Change Order No. 3 for the contract with Columbia River Contractors, Inc. for the 2024 Unit Price Guardrail Installation and Repair Project. This change order is to reconcile project cost overruns due to a higher amount of damaged guardrail than originally anticipated. This change order increases the total contract by $24,235.73.

Will Staff Attend - NAME OF STAFF or No

Yes

Department Recommendation

It is the recommendation of the Department of Public Works that the Board move to accept Change Order No. 3 to the contract with Columbia River Contractors, Inc. for the 2024 Unit Price Guardrail Installation and Repair Project, increasing the total contract amount by $24,235.73, bringing the new contract total to $526,316.48.

Fiscal Impact

Expenditure Required $: 24,235.73

Budget Sufficient Y-N: Y

Amendment Required Y-N: N

Source of Funds - What Dept ? : Roads

Grant Y-N: N

Attachments

Change Order No. 3

Change Order No. 2

Change Order No. 1

Inbox

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Form Review

Reviewed By Date

Susan Eugenis 06/01/2026 08:13 AM

Mike Moss 06/01/2026 09:58 AM

Started On: 06/01/2026 06:48 AM

1600

13th Avenue South Kelso, WA 98626

TEL (360) 577-3030

FAX (360) 636-0845

www.co.cowlitz.wa.us/publicworks/

Change Order

Change Order Reference: Reconciliation of Cost Overruns.

Prime Contractor

Columbia River Contractors, Inc. P.O. Box 1070 Clackamas, OR 97015 (503) 722-1777

Project Engineer

Susan Eugenis, P.E. County Engineer Phone Number 360/577-3030

Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications. Change proposed by Contractor.

Approval required by Board of County Commissioners

Approval required by County Engineer

Change Order Description:

This change order reconciles cost overruns associated with the guardrail repair project.

The overruns resulted from more extensive damage to rails and posts throughout the County than originally anticipated, caused by motorists, weather conditions, and other factors outside the County’s control.

The total cost overrun for this change order is $24,235.73.

These additional costs will be paid through the respective bid items at their current unit prices.

All work, materials and measurements to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved unless stated otherwise in this document.

BOCC Agenda

Meeting Date: 06/09/2026

AGREEMENT - Supplemental Agreement No. 3 - WSP USA, Inc. - South Cloverdale Road Project Project No. 1235

Submitted For: Susan Eugenis, Public Works

Department: Public Works

Subject and Summary Statement

Submitted By: Lynn Ruffe, Public Works

Information

Attached is Supplemental Agreement No. 3 to the Consultant Agreement  with WSP USA, Inc., for the South Cloverdale Road project.  The supplemental agreement is necessary for design changes to the footings and stem wall for the concrete box culvert.  These changes are necessary to provide clearance for the City of Kalama water main. This supplemental agreement increases the amount of the consultant contract by $12,810 bringing the contract total to $538,360.

Will Staff Attend - NAME OF STAFF or No

Yes

Department Recommendation

It is the recommendation of the Department of Public Works that the Board move to approve Supplemental Agreement No. 3 with WSP USA, Inc. for the South Cloverdale Road Project and authorize the document to be executed.

Fiscal Impact

Expenditure Required $: 12,810.00

Budget Sufficient Y-N: Y

Amendment Required Y-N: N

Source of Funds - What Dept ? : Roads

Grant Y-N: N

Attachments

Supplemental Agreement No. 3

Supplemental Agreement No. 2

Supplemental Agreement No. 1

Local Agency Consultant Agreement

Inbox

Chris Andrews

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Form Review

Reviewed By Date

Chris Andrews 06/02/2026 09:51 AM

Susan Eugenis 06/02/2026 10:48 AM

Mike Moss 06/02/2026 01:00 PM

Started On: 06/02/2026 09:18 AM

Form Started By: Lynn Ruffe

Started On: 06/02/2026 09:18 AM

OriginalAgreementNumber

ProjectNumber

WSPUSA,Inc

1300SW5thAvenue Portland,OR97201

503-872-4117

1235 6/23/20 12/31/2026

ProjectTitle

SouthCloverdaleRoad

DescriptionofWork

NoChange.

538,360.00(increaseof$12,810.00)

TheLocalAgencyof desirestosupplementtheagreemententeredintowith andexecutedon

6/23/20 N/A

Thechangestotheagreementaredescribedasfollows:

Section1,SCOPEOFWORK,isherebychangedtoread:

Updatedesignanddetailsforculvertconcretestemwall,footing,temporaryheadwallandpermanentheadwall toaccommodatetallerprecastconcreteculvertfromsupplier.Thedepthofcoverovertheculvertisincreased toprovideenoughcoverforthewaterline.RefertoattachedDesignChange1.

forcompletionoftheworktoread:

NoChange

Themaximumamountpayableisincreasedfrom$525,550to$538,360.00.Thenegotiatedhourlyratesare revisedpertheattachedAcceptanceFYE2024ICR-CPAreportandtheNottoExceedBillingratetable. 3 N/A

Ifyouconcurwiththissupplementandagreetothechangesasstatedabove,pleasesignintheAppropriate

CowlitzCounty

10 March 2026

Mr. Chris Andrews, PE

Project

Cowlitz County – Department of Public Works

1600 13th Avenue South Kelso, WA 98626-4124

Subject: Local Agency Consultant Agreement

Amendment No. 3

Proposal to Provide Engineering Construction Support Services, Construction Design Change 1

South Cloverdale Road Project Cowlitz County, Washington

Dear Chris:

During the construction of the South Cloverdale Road Project, it became evident that a re-design of the substructure supporting the culvert lid at Schoolhouse Creek would be required in order to account for the extra height of the contractor’s proposed culvert lid and to accommodate the waterline being placed within the fill above the culvert lid. These re-design efforts were not in our original construction services scope of work and we are pleased to present this proposal to provide additional professional services to account for this change These services will be performed as a part of our Local Agency Consultant Agreement for the South Cloverdale Road Project, dated 25 June 2020 and will supplement work performed for this project. This letter describes the services anticipated by WSP USA. In addition, we have included a spreadsheet to present our proposed staffing and fees.

Thank you for this opportunity. If you have any questions or comments regarding this proposal, please do not hesitate to call me at 503-872-4116, or to contact me via email at tim.deboer@wsp.com.

Sincerely,

TAD:NO:tad Attachment

Mr. Chris Andrews, PE

10 March 2026

Page 2

COWLITZ COUNTY: SOUTH CLOVERDALE ROAD PROJECT

PROJECT UNDERSTANDING

During the construction of the South Cloverdale Road Project, it became evident that a re-design of the substructure supporting the culvert lid at Schoolhouse Creek would be required in order to account for the extra height of the contractor’s proposed culvert lid and to accommodate the waterline being placed within the fill above the culvert lid. These re-design services were not a part of the original project scope and are now being included via amendment.

SCOPE OF SERVICES

Task 1.0

General Activities and Project Management

This task includes project management and administrative services required to update the contract for these additional services and provide QA/QC of the updated designs

Subtask 1.1 Project Coordination

WSP will perform additional project coordination tasks as follows.

• Coordinate updates to contract-required documentation.

Clarifications

• No additional clarifications.

Deliverables

• No additional deliverables

Subtask 1.2 Quality Assurance/Quality Control

WSP will perform additional project coordination tasks as follows:

• Provide QA/QC activities for updated design.

Clarifications

• No additional clarifications.

Deliverables

• No additional deliverables.

Task 9.0 Construction Phase Services (CPS)

Subtask 9.1 Culvert and Retaining Wall CPS

Subtask 9.1.1 Construction Submittals

No additional work.

Mr. Chris Andrews, PE

10 March 2026

Page 3

Subtask 9.1.2 Requests for Information

No additional work.

Subtask 9 1 3 Site Visits

No additional work.

Subtask 9.1.4 Design Change Orders

WSP will provide structural design activities associated with the re-design of the substructure supporting the culvert lid at Schoolhouse Creek in order to account for the extra height of the contractor’s proposed culvert lid and to accommodate the waterline being placed within the fill above the culvert lid. Updated substructure details will be provided.

Design activities completed will be as follows:

1. Update design and details for the final culvert stem wall and headwall to accommodate the increased fill depth created by lowering the top of the culvert lid and to accommodate Contech’s 5’-0” rise culvert lid.

2. Update design and details for the temporary headwall to accommodate the increased fill depth created by lowering the top of the culvert lid.

3. Updated footing design for new culvert loading.

4. Update concrete and rebar quantities for stem wall, footing, headwall, and temp headwall redesign.

Clarifications

• The following information will need to be provided by the County in order for the design to be completed.

• Offset to the centerline of the waterline.

• Confirm outside diameter of the waterline, required cover over the waterline, and required clearance between the waterline and the top of culvert lid.

• Contech (concrete culvert lid provider) updated loading and geometry for stem wall.

Deliverables

• Updated design drawings in electronic format (PDF)

• Updated quantities for concrete and reinforcing (MS Excel).

LIMITATIONS

The scope of services is limited to the tasks outlined above. This proposal is valid for 30 days.

SCHEDULE

It is anticipated that supplemental work related to additional design will be completed within two weeks of receiving notice to proceed.

Mr. Chris Andrews, PE

10 March 2026

Page 4

FEE

We propose to perform the services identified in this proposal for the following professional fees, including expenses, that will be billed as incurred and will not be exceeded without written authorization.

Task 1.0: General Activities and Project Management

$3,377.62

Task 9.0: Construction Support Services $9,429.42 Total: $12,807 05

A detailed breakdown of the fee estimate and associated hours is included on the attached spreadsheet.

CRM Client: Cowlitz County Start/End Date: 5/04/2026- 7/03/2026

PM: Tim de Boer

WSP USA Inc.

999 3rd Avenue, Suite 3200 Seattle, WA 98104

Cowlitz County

TotalGeneralOverhead669,177,215(71,012,452)598,164,763102.41%

WSPUSAINC.ANDCERTAINSUBSIDIARIES-GENERALSERVICESOFFICE

STATEMENTOFDIRECTLABOR,FRINGEBENEFITS,ANDGENERALOVERHEAD(CONTINUED) FORTHEYEARENDEDDECEMBER31,2024

FARReferences

(a)31.205-6;31.205-22;31.205-27:Unallowableexecutivecompensationandadvertising,lobbying,andM&A activity.

(b)31.205-13;31.205-14:Unallowablegifts,entertainmentandrecreation

(c)31.205-14;31.205-46:Unallowableentertainment,alcoholandcostsexceedingperdiems.

(d)31.205-1;31.205-8;31.205-22:Unallowableadvertising,contributions,andlobbyingexpenses.

(e)31.205-1;31.205-22;31.205-27:Unallowablepublicrelations,lobbying,andM&Asupport.

(f)31.205-22;31.205-27;31.205-47:Unallowablelobbying,M&Asupport,andsettlementexpenses.

(g)31.205-3;31.205-20:Unallowableinterestandbankcharges.

(h)31.205-3:Unallowablebaddebts.

(i)31.205-41:DeferredStateincometaxes.

(l)31.205-41:UnallowableFederalincometaxes.

SeeaccompanyingNotestotheStatementofDirectLabor,FringeBenefits,andGeneralOverhead

ThefollowingtabulationsummarizestheallocableGeneralServiceOfficeoverheadrateas apercentageofDirectLaborfortheyearendedDecember31,2024:

STATEMENTOFDIRECTLABOR,FRINGEBENEFITS,ANDGENERALOVERHEAD FORTHEYEARENDEDDECEMBER31,2024

FringeBenefits:

PayrollTaxes11,374,31211,374,3128.64%

GroupInsurance&Workers'Compensation13,704,89813,704,89810.42% FringeSalaries12,538,60512,538,6059.53% AdditionalCompensation3,601,3203,601,3202.74% OtherEmployeeBenefits5,358,592-5,358,5924.07% TotalFringeBenefits

GeneralOverheadExpenses

OfficeRent(212,448)-(212,448)-0.16% Depreciation1,206,566-1,206,5660.92% Amortization362,846-362,8460.28% RepairsAndMaintenance19,188-19,1880.01% IndirectSalaries34,051,514(1,085,716)(a)32,965,79825.05% FringeBenefits(Administrative)13,421,652(1,257,093)(b)12,164,5599.24% Computer,Supplies,Reproduction12,184,121-12,184,1219.26% TravelAndRelatedExpenses5,200,084(652,097)(c)4,547,9873.46% RelocationAndMoving(Office)127,314-127,3140.10% Communications584,899(11,260)(e)573,6390.44% Subscriptions,Books,Fees416,650(15,273)(d)401,3770.31% ConsultantFees4,194,737(2,860,870)(e)1,333,8671.01% AdditionalCompensation4,355,841-4,355,8413.31% MiscellaneousExpenses2,958,019(1,668,239)(f)1,289,7800.98% InsuranceE&O4,923,878-4,923,8783.74% GeneralInsurance2,357,657-2,357,6571.79% State&LocalIncomeTaxes4,202,254-4,202,2543.19% Audit&Legal1,334,382(867,581)(f)466,8010.35% BidandProposals/ResearchandDevelopment6,953,880-6,953,8805.28% InterestExpense3,229,016(3,229,016)(g) BadDebts132,061(132,061)(h) BankLoans133,189(133,189)(h) Entertainment63,430(63,430)(c) StateTaxExpense(1,363,638)1,363,638(i) FederalTaxExpense5,385,879(5,385,879)(j)

TotalGeneralOverhead106,222,971(15,998,066)90,224,905

TotalFringeBenefitsandGeneralOverhead152,800,698(15,998,066)136,802,632 FacilitiesCapitalCostOfMoney(FCCM)547,672-547,672

TotalAllowableandNonAllowableOverhead$153,348,370(15,998,066) $ $137,350,304

PercentofDirectLabor116.54%-12.16%104.38%

STATEMENTOFDIRECTLABOR,FRINGEBENEFITS,ANDGENERALOVERHEAD(CONTINUED) FORTHEYEARENDEDDECEMBER31,2024

FARReferences

(a)31.205-6;31.205-22;31.205-27:Unallowableexecutivecompensationandadvertising,lobbying,andM&A activity.

(b)31.205-13;31.205-14:Unallowablegifts,entertainmentandrecreation

(c)31.205-14;31.205-46:Unallowableentertainment,alcoholandcostsexceedingperdiems.

(d)31.205-1;31.205-8;31.205-22:Unallowableadvertising,contributions,andlobbyingexpenses.

(e)31.205-1;31.205-22;31.205-27:Unallowablepublicrelations,lobbying,andM&Asupport.

(f)31.205-22;31.205-27;31.205-47:Unallowablelobbying,M&Asupport,andsettlementexpenses.

(g)31.205-3;31.205-20:Unallowableinterestandbankcharges.

(h)31.205-3:Unallowablebaddebts.

(i)31.205-41:DeferredStateincometaxes.

(l)31.205-41:UnallowableFederalincometaxes.

ThefollowingtabulationsummarizestheallocableBaseFieldoverheadrateasa percentageofDirectLaborfortheyearendedDecember31,2024:

WSP USA, Inc

1300 SW 5th Avenue, Suite 3100

Portland, OR 97201 503-872-4117 1235 6/23/20 12/31/2026

Cloverdale Road $525,550.00 (Increase of $68,992.70)

No Change.

Cowlitz County

WSP USA, Inc. 6/23/20 N/A

Additional permitting, structural design, and construction phase services as shown on the attached letter dated October 14, 2024.

Work to be completed by December 31, 2026.

The maximum amount payable is increased from $456,557.30 to $525,550. The negotiated hourly rates are revised per the attached Exhibit D-2.

August5,2024

WSPUSA,Inc.

OnePennPlaza

250West34thStreet

NewYork,NY10119

Subject:AcceptanceFYE2023ICR–CPAReport

DearChristopherKidd:

Wehaveacceptedyourfirm’sFYE2023IndirectCostRate(ICR)basedonthe“IndependentCPA Report”preparedbyDeloitte&Touche,LLPofthefollowing:

HomeOffice:141.93%ofdirectlabor(rateincludes0.48%FacilitiesCapitalCostof Money).

FieldOffice:109.63%ofdirectlabor(rateincludes0.43%FacilitiesCapitalCostof Money).

ThisratewillbeapplicableforWSDOTAgreementsandLocalAgencyContractsinWashington only.ThisratemaybesubjecttoadditionalreviewifconsiderednecessarybyWSDOT.YourICR mustbeupdatedonanannualbasis.

Costsbilledtoagreements/contractswillstillbesubjecttoauditofactualcosts,basedontheterms andconditionsoftherespectiveagreement/contract.

Thiswasnotacognizantreview.Anyotherentitycontractingwiththefirmisresponsiblefor determiningtheacceptabilityoftheICR.

Ifyouhaveanyquestions,feelfreetocontactourofficeat(360)704-6397orviaemail consultantrates@wsdot.wa.gov

Regards,

Cc: NoelaniTriggs

Meeting Date: 06/09/2026

CHANGE ORDER NO. 6 - S Cloverdale Rd / S Cloverdale Rd & Confer Rd Intersection - Project No. 1235 &1301 - Jeffries Construction

Submitted For: Susan Eugenis, Public Works

Department: Public Works

Subject and Summary Statement

Submitted By: Lynn Ruffe, Public Works

Information

Attached is Change Order No. 6 to add additional days to the utility work window and address the added costs for traffic control to the contractor due to this additional time. The total change order amount is $229,750.23, increasing the total project cost to $7,491,883.09.

Will Staff Attend - NAME OF STAFF or No

Yes

Department Recommendation

It is the recommendation of the Department of Public Works that the Board approve Change Order No. 6 for the S. Cloverdale Road / S. Cloverdale Road - Confer Road Intersection projects.

Fiscal Impact

Expenditure Required $: 229,750.23

Budget Sufficient Y-N: Y

Amendment Required Y-N: N

Source of Funds - What Dept ? : Roads

Grant Y-N: N

Attachments

Change Order No. 6  Change Order No. 5  Change Order No. 4  Change Order No. 3  Change Order No. 2  Change Order No. 1

Inbox

Susan Eugenis

Mike Moss, Public Works

Form Started By: Lynn Ruffe

Form Review

Reviewed By Date

Susan Eugenis

Mike Moss

06/02/2026 10:46 AM

06/02/2026 01:00 PM

Started On: 06/02/2026 08:44 AM

Contract Title

1600 – 13th Avenue South

Kelso, WA 98626

TEL (360) 577-3030

FAX (360) 636-0845

www.co.cowlitz.wa.us/publicworks/

Change Order

S. Cloverdale Rd & S. Cloverdale Rd. – Confer Rd. Int. Improvements.

Change Order Reference:

Contract Number 1235/TA-6740 1301/TA-8104

Extension of Utility Work Window Suspension Extension- added days.

Prime Contractor

Jeffries Construction, LLC PO Box 570 Woodland, WA 98674

Project Engineer

Susan Eugenis, P.E. County Engineer

Board of County Commissioners

County Road No 31510 & 31880

Federal Aid No. STPR-08AM(003) & STBGR08AM(004)

Phone Number

360/577-3030

Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications. Change proposed by Contractor.

Approval required by Board of County Commissioners

Approval required by County Engineer

Change Order Description:

3

Change Order No. 6

Date 4/29/26

360/952-8256

This change order is to add additional days to the change order # 5 extension of the first 4-week work suspension window for utility relocation work

Per the Contract Special Provisions Std. Specification 1-07.17 Utilities and Similar Facilities Pg. 92, "Relocations will occur during two utility work windows, each lasting 4 weeks."

Work on the project was suspended through the "Order to Suspend Work" issued on September 24, 2025. The initial 4-week work window ended on October 22, 2025. Due to delays caused by fiber optic utility companies in beginning work on moving their utilities, as well as causing other delays outside of the contractor’s control, it was determined that the work window needed to be extended. Fiber optic utility companies are still working on moving their utilities, due to the delays this has caused, an additional 12 weeks will be added to the extension shown in Change Order # 5 ending February 18, 2026.

This extends the first utility work window suspension from 4 weeks to 33 weeks, with the new ending date of the suspension window being May 13, 2026

These delays have caused an added cost of $229,750.23 in temporary traffic control (see backup documentation) as only 4 weeks was accounted for to relocate the conflicting utilities. These costs will be paid for out of existing bid items # 6 Traffic Control Supervisor and # 8 Other Traffic Control Devices.

This change order will affect the traffic control DBE subcontractor on the project but will not impact on the condition of award (see attached tracking table).

All work, materials and measurements to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved unless stated otherwise in this document.

White, Rich

From: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>

Sent: Thursday, May 28, 2026 11:56 AM

To: White, Rich

Cc: Klug, Robert; Wilson-George, Susan; Robe, Nils; Lawson, Aiko; Jones, Nina

Subject: FW: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

Hello,

OECR has reviewed the change order for the above project, and we concur. Please provide the final change order once it has been executed for our records.

Please let us know if you have any questions.

Best regards,

Tracey

ExternalCivilRightsSpecialist

SouthwestRegionandNorthwestRegion WSDOT

SWRegionOEO@wsdot.wa.gov

NWRegionOEO@wsdot.wa.gov

360-701-9823

Tracey.johnson@wsdot.wa.gov

From: Jones, Nina <nina.jones@wsdot.wa.gov>

Sent: Wednesday, May 27, 2026 4:10 PM

To: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>

Cc: WSDOT SW Region OEO <SWRegionOEO@WSDOT.WA.GOV>

Subject: RE: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

I concur

Thank you Tracey

NinaJones,ECMCA

Assistant Director of Business Diversity and Inclusion

Nina.Jones@wsdot.wa.gov | 360-947-6788

Office of Equity & Civil Rights

She/Her Pronouns

From: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>

Sent: Tuesday, May 19, 2026 8:17 AM

To: Jones, Nina <nina.jones@wsdot.wa.gov>

Cc: WSDOT SW Region OEO <SWRegionOEO@WSDOT.WA.GOV>

Subject: FW: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

Hello Nina,

I have reviewed the changes and spoken to Daybreak Construction, tra ic control for the project, and they are fine with the changes in Change Order #6.

I recommend we concur.

Best regards,

Tracey

ExternalCivilRightsSpecialist

SouthwestRegionandNorthwestRegion

WSDOT

SWRegionOEO@wsdot.wa.gov

NWRegionOEO@wsdot.wa.gov

360-701-9823

Tracey.johnson@wsdot.wa.gov

From: White, Rich <WhiteR@cowlitzwa.gov>

Sent: Thursday, May 14, 2026 2:41 PM

To: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>

Subject: RE: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

Apologies Tracey, I must have forgotten to cc you guys!

Here you go, please let me know if you need anything else or see any changes that need to be made, have a good weekend!

-Thank you.

Rich White

CowlitzCo.DepartmentofPublicWorks

ConstructionManager

Work#(360)-577-3030Ext.6537

Cell#(360)-749-6450

Email-whiter@cowlitzwa.gov

From: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>

Sent: Thursday, May 14, 2026 2:04 PM

To: White, Rich <WhiteR@cowlitzwa.gov>

Subject: FW: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

Hello Rich,

I hope you are doing well. I was reviewing my email and didn’t see the final request for the change order #6 for our review. If you have this, can you please forward it for our review?

Best regards,

Tracey

ExternalCivilRightsSpecialist

SouthwestRegionandNorthwestRegion WSDOT

SWRegionOEO@wsdot.wa.gov

NWRegionOEO@wsdot.wa.gov

360-701-9823

Tracey.johnson@wsdot.wa.gov

From: Robe, Nils <nils.robe@wsdot.wa.gov>

Sent: Tuesday, May 5, 2026 11:36 AM

To: White, Rich <WhiteR@cowlitzwa.gov>

Cc: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>; Eugenis, Susan <EugenisS@cowlitzwa.gov>; Andrews, Chris <andrewsc@cowlitzwa.gov>; Wilson-George, Susan <susan.wilson-george@wsdot.wa.gov>; Lawson, Aiko <aiko.lawson@wsdot.wa.gov>; Klug, Robert <robert.klug@wsdot.wa.gov>

Subject: RE: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

That sound good. You will still need something in writing from the DBE that says they agree to the change…..

I don’t write the rules, I just pass them on… Nils

From: White, Rich <WhiteR@cowlitzwa.gov>

Sent: Tuesday, May 5, 2026 11:04 AM

To: Robe, Nils <nils.robe@wsdot.wa.gov>

Cc: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>; Eugenis, Susan <EugenisS@cowlitzwa.gov>; Andrews, Chris <andrewsc@cowlitzwa.gov>; Wilson-George, Susan <susan.wilson-george@wsdot.wa.gov>; Lawson, Aiko <aiko.lawson@wsdot.wa.gov>; Klug, Robert <robert.klug@wsdot.wa.gov>

Subject: RE: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

Nils, how does this one sound, I notated that the DBE tra ic control sub is “a ected” but not “impacted” and I will attach the tracking table as backup documentation once I have it completed.

Rich White

CowlitzCo.DepartmentofPublicWorks

ConstructionManager

Work#(360)-577-3030Ext.6537

Cell#(360)-749-6450

Email-whiter@cowlitzwa.gov

From: White, Rich

Sent: Tuesday, May 5, 2026 9:56 AM

To: 'Robe, Nils' <nils.robe@wsdot.wa.gov>

Cc: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>; Eugenis, Susan <EugenisS@cowlitzwa.gov>; Andrews, Chris <andrewsc@cowlitzwa.gov>; Wilson-George, Susan <susan.wilson-george@wsdot.wa.gov>; Lawson, Aiko <aiko.lawson@wsdot.wa.gov>; Klug, Robert <robert.klug@wsdot.wa.gov>

Subject: RE: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

Thank you Nils, I will revise the change order to reflect and get the table filled out and attached.

Rich White

CowlitzCo.DepartmentofPublicWorks

ConstructionManager

Work#(360)-577-3030Ext.6537

Cell#(360)-749-6450

Email-whiter@cowlitzwa.gov

From: Robe, Nils <nils.robe@wsdot.wa.gov>

Sent: Tuesday, May 5, 2026 9:38 AM

To: White, Rich <WhiteR@cowlitzwa.gov>

Cc: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>; Eugenis, Susan <EugenisS@cowlitzwa.gov>; Andrews, Chris <andrewsc@cowlitzwa.gov>; Wilson-George, Susan <susan.wilson-george@wsdot.wa.gov>; Lawson, Aiko <aiko.lawson@wsdot.wa.gov>; Klug, Robert <robert.klug@wsdot.wa.gov>

Subject: RE: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

It would appear that the tra ic control items are being a ected. If that is Daybreaks item, then a DBE would be a ected. That being said, there would need to be written confirmation form the DBE accepting the change. As far as DBE impact, HQ will want to be able to see the dollar amounts . Attached is an example of a table that Vancouver used that HQ was happy with Nils

From: White, Rich <WhiteR@cowlitzwa.gov>

Sent: Tuesday, May 5, 2026 8:30 AM

To: Klug, Robert <robert.klug@wsdot.wa.gov>; Robe, Nils <nils.robe@wsdot.wa.gov>; Lawson, Aiko <aiko.lawson@wsdot.wa.gov>; Wilson-George, Susan <susan.wilson-george@wsdot.wa.gov>

Cc: Johnson, Tracey <tracey.johnson@wsdot.wa.gov>; Eugenis, Susan <EugenisS@cowlitzwa.gov>; Andrews, Chris <andrewsc@cowlitzwa.gov>

Subject: [EXTERNAL] S. Cloverdale Improvement Project No. 1235/TA-6740 & 1301/TA-8104 -- Change Order # 6 utility work window extension for review.

WARNING: This email originated from outside of WSDOT. Please use caution with links and attachments.

Nils attached for your review is change order 6 for the S. Cloverdale Rd. Project, we are continuing to deal with the utility companies delaying the relocation of their facilities within our project limits, please let me know if you have any questions.

-Thank you!

Rich White

CowlitzCo.DepartmentofPublicWorks

ConstructionManager

Work#(360)-577-3030Ext.6537

Cell#(360)-749-6450

Email-whiter@cowlitzwa.gov

Construction

*TherewouldneedtobeachangeorderthatallowedfortheCOA modification(upordown)otherwiseitshouldsaysomethingtotheeffectof "nochange"orhavetheoriginalCOAamount.

Eachindividualtablewouldgowithitsrespectivechangeorder. Notonehugetablethatencompasesallimpacts.

Cloverdale

Certified Payroll Export for South Cloverdale Road Improvement Project / South Cloverdale Road-Confer Road Intersection Improvement Project

Date Of Report: Friday,May08,20269:05:19AM

Project Name: SouthCloverdaleRoadImprovementProject/SouthCloverdaleRoad-ConferRoadIntersectionImprovementProject

Awarding Agency: COWLITZCOUNTY

Prime Contractor: JEFFRIESCONSTRUCTIONLLC

Contract Number: 1235(STPR-08AM(003))/1301(STBGR-08AM(004))

Contract Award Date: 6/3/2025

Contract Amount: $7,256,372.86

NOC Filed Date:

Apprentice Utilization Flag set to 'Yes': No

Final Apprentice % from Affidavits:

Apprentice Utilization Good Faith Effort Approved? No Project ID for Data.wa.gov: 1197525

CONSTRUCTION600500189Ballard,

12/20/2025DAYBREAK CONSTRUCTION600500189Ballard,

1/10/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor36.50

1/17/2026DAYBREAK CONSTRUCTION600500189Ballard,

1/24/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor35.50

1/31/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic

2/7/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor43.00

2/14/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor19.00

3/28/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor40.00

4/4/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor41.00

4/11/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor40.50

4/18/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor41.50

4/25/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor38.00

5/2/2026DAYBREAK CONSTRUCTION600500189Ballard, LonnieLaborersTraffic Control Supervisor46.00

Project NameS Cloverdale Rd Improvement & S Cloverdale/Confer Rd Intersection Improvement Project

Bid Opening DateMay 12, 2025

Project No.1235 & 1301 Jeffries Construction LLC POBox570

Engineer's Estimate Woodland,WA98674 (360)952-8256

ItemBidItemUnitQuantityUnitTotalUnitTotal No.PriceAmountPriceAmount

ScheduleA-SouthCloverdaleRoadMP0.13toMP0.76

1MinorChangesForceAcct120,000.0020,000.0020,000.0020,000.00

2StructureSurveyingLumpSum110,000.0010,000.0027,000.0027,000.00

3SPCCPlanLumpSum11,500.001,500.001,500.001,500.00

4TrainingHours40030.0012,000.00105.0042,000.00

5MobilizationLumpSum1500,000.00500,000.00450,000.00450,000.00

6TrafficControlSupervisorLumpSum175,000.0075,000.00100,000.00100,000.00

7FlaggersHours330075.00247,500.0058.00191,400.00

8OtherTemporaryTrafficControlDevicesLumpSum135,000.0035,000.00102,000.00102,000.00

9PortableTemporaryTrafficControlSignalLumpSum150,000.0050,000.0030,000.0030,000.00 10WorkZoneSafetyContingencyForceAcct120,000.0020,000.0020,000.0020,000.00 11ClearingandGrubbingLumpSum155,000.0055,000.0045,000.0045,000.00 12SalvagedTreePlacementEach11,500.001,500.002,000.002,000.00 13RemovalofStructuresandObstructionsLumpSum130,000.0030,000.0060,000.0060,000.00 14RoadwayExcavation,EmbankmentandDisposalIncl.HaulCY184530.0055,350.0016.5030,442.50 15RockExcavationIncludingHaulCY500150.0075,000.00100.0050,000.00 16UnsuitableFoundationExcavationIncludingHaulCY20030.006,000.0025.005,000.00 17ChannelExcavationIncludingHaulCY48035.0016,800.0020.009,600.00

18StructureExcavationClassAIncludingHaulCY500070.00350,000.0017.0085,000.00 19ShoringorExtraExcavationClassALumpSum1170,000.00170,000.00112,000.00112,000.00 20TrimmingandCleanupLumpSum14,000.004,000.005,000.005,000.00 21ConstructionGeotextileforSeparationSY66452.0013,290.001.006,645.00 22StructuralFillIncludingHaulTons3835035.001,342,250.0026.00997,100.00 23CrushedSurfacingBaseCourseTons625045.00281,250.0035.00218,750.00

24HMAClass3/8-InchPG58H-22Tons2300150.00345,000.00128.00294,400.00

25HMAClass3/8-InchPG58H-22ForApproachTons250200.0050,000.00185.0046,250.00

26HMAforPrelevelingClass3/8inch,PG58H-22Tons600200.00120,000.00153.0091,800.00

27PlaningBituminousPavementSY410040.00164,000.004.0016,400.00

28AsphaltCostPriceAdjustmentCalc1----

29ConcreteClass5000forFootings,HeadwallsandWingwallsCY7801,500.001,170,000.00940.00733,200.00

30SteelReinforcingBarforFootings,HeadwallsandWingwallsLBS870002.00174,000.003.50304,500.00

31BridgeRailingTypeChainLinkPipeRailL.F.400100.0040,000.00150.0060,000.00

32PrecastConc.BarrierTypeFUnanchoredL.F.50200.0010,000.00175.008,750.00

33PrecastConc.BarrierTypeFAnchoredL.F.175250.0043,750.00210.0036,750.00

34ContractorDesignedBuriedStructure-BybeeCreekLS1317,200.00317,200.00425,000.00425,000.00

35ContractorDesignedBuriedStructure-SchoolhouseTributaryLF1105,000.00105,000.00550,000.00550,000.00

36NarrowInfiltrationTrenchLF5060.003,000.0050.002,500.00

37WideInfiltrationTrenchLF49070.0034,300.0062.0030,380.00

38UnderdrainPipe,6-InchDiamLF49468.0033,592.005.002,470.00

39CorrugatedPolyethyleneCulv.Pipe,12-InchDiamLF11350.005,650.0075.008,475.00

40CorrugatedPolyethyleneCulv.Pipe,18-InchDiamLF16870.0011,760.00115.0019,320.00

41CorrugatedPolyethyleneCulv.Pipe,24-inchDiam.LF7890.007,020.00130.0010,140.00

42CorrugatedPolyethyleneStormSewerPipe,12-InchDiamLF74780.0059,760.0075.0056,025.00

43CorrugatedPolyethyleneStormSewerPipe,18-InchDiamLF262100.0026,200.0095.0024,890.00

44Manhole48In.Diam.Type1Each35,000.0015,000.004,200.0012,600.00

45CurbInlet,Type1LEach62,500.0015,000.003,000.0018,000.00

46DitchInletEach13,000.003,000.002,500.002,500.00

47ShoringorExtraExcavationClassBLumpSum110,000.0010,000.001,500.001,500.00

48StormwaterPollutionPreventionLumpSum175,000.0075,000.0095,000.0095,000.00

49HighVisibilitySiltFenceLF655.00325.002.00130.00

50PSIPE-2galloncontainerEach5435.001,890.0027.001,458.00

Project NameS Cloverdale Rd Improvement & S Cloverdale/Confer Rd Intersection Improvement Project

Bid Opening DateMay 12, 2025

Project No.1235 & 1301

Jeffries Construction LLC POBox570

Engineer's Estimate Woodland,WA98674 (360)952-8256

ItemBidItemUnitQuantityUnitTotalUnitTotal No.PriceAmountPriceAmount

ScheduleA-SouthCloverdaleRoadMP0.13toMP0.76

80MinorChangesForceAcct15,000.005,000.005,000.005,000.00

81SPCCPlanLumpSum1500.00500.001,500.001,500.00

82MobilizationLumpSum160,000.0060,000.0050,000.0050,000.00

83TrafficControlSupervisorLumpSum135,000.0035,000.0050,000.0050,000.00

84FlaggersHours120075.0090,000.0058.0069,600.00

85OtherTemporaryTrafficControlLumpSum115,000.0015,000.0035,000.0035,000.00

86WorkZoneSafetyContingencyForceAcct12,500.002,500.002,500.002,500.00

87ClearingandGrubbingLumpSum17,000.007,000.0010,000.0010,000.00

88RemovalofStructuresandObstructionsLumpSum13,000.003,000.007,500.007,500.00

89RoadwayExcavation,EmbankmentandDisposalIncl.HaulCY340030.00102,000.0016.5056,100.00 90RockExcavationIncludingHaulCY1200150.00180,000.00100.00120,000.00

91TrimmingandCleanupLumpSum11,000.001,000.002,500.002,500.00

92ConstructionGeotextileforSeparationSY27102.005,420.001.002,710.00

93StructuralFillIncludingHaulTons16535.005,775.0030.004,950.00 94CrushedSurfacingBaseCourseTons170045.0076,500.0033.0056,100.00 95HMAClass3/8-InchPG58H-22Tons600150.0090,000.00145.0087,000.00 96HMAClass3/8-InchPG58H-22ForApproachTons75200.0015,000.00185.0013,875.00 97HMAforPrelevelingCl.3/8"PG58H-22Tons75200.0015,000.00155.0011,625.00 98PlaningBituminousPavementSY90040.0036,000.004.504,050.00 99AsphaltCostPriceAdjustmentCalc1---100CorrugatedPolyethyleneCulv.Pipe,12-InchDiamLF7860.004,680.0075.005,850.00 101DuctileIronCulvertPipe,14-inchDiam.LF40120.004,800.00160.006,400.00 102CorrugatedPolyethyleneStormSewerPipe,12-InchDiamLF17760.0010,620.0048.008,496.00 103CurbInlet,Type1LEach12,500.002,500.002,800.002,800.00 104ShoringorExtraExcavationClassBLumpSum1500.00500.002,000.002,000.00 105StormwaterPollutionPreventionLumpSum115,000.0015,000.0020,000.0020,000.00 106SeedingandMulchingAcre0.305,000.001,500.005,800.001,740.00 107CementConc.TrafficCurbandGutterLF25550.0012,750.0033.258,478.75 108FlexibleGuidePost-guardrailmountEach480.00320.0075.00300.00 109BeamGuardrailType31-8FootLongPostsLF13545.006,075.0045.006,075.00 110BeamGuardrailType31Non-FlaredTL-2TerminalEach13,000.003,000.003,400.003,400.00 111RelocateExistingFenceLF15510.001,550.0057.008,835.00 112QuarrySpallsTons539.00195.0038.00190.00 113MailboxSupportType1Each1265.00265.00325.00325.00 114MailboxSupportType2Each2800.001,600.001,000.002,000.00 115PermanentSigningLumpSum1500.00500.001,500.001,500.00 116PaintLineLF16160.50808.000.951,535.20 117PlasticStopLineLF2525.00625.0050.001,250.00

Schedule B - South Cloverdale Road and Confer Road Intersection Improvements

DEPARTMENT OF PUBLIC WORKS

1600 – 13th Avenue South

Kelso, WA 98626

TEL (360) 577-3030

FAX (360) 636-0845

www.co.cowlitz.wa.us/publicworks/

INSPECTOR’S DAILY REPORT

Contract #: 1235 Contract Title: South Cloverdale Road Improvement Date: 4/27/26 Monday

Contractor: Jeffries Construction

Start Time: ± 7:00

Weather A.M: Overcast 49°

Quit Time: ± 5:00

Weather P.M.: Overcast 60°

Traffic Control: Checked Signing, Barricades, Flagging Time A.M : 8:30 Time P.M.: 5:00

Contractor’s Workforce

Contractor’s Workforce/Equip. Contractor’s Equipment Foreman – Kenton Nickols 1 Ram 3500 Flatbed #7-29 1 Rental Komatsu WA270 Loader

1 Operator – Kyle Bashton 1 Chevy Silverado 1500 PU # 7-28 1 Cat 430E IT loader #2-10

1 Operator/Laborer – Darrin Keane 1 Komatsu PC 138US #1-23

1 Pipe Foreman – Travis Bashton 1 F450 Service Truck # 7-34 1 Weber MT CR-8 Plate Compactor

1 Pipe Laborer – William Felts 1 Komatsu PC 88MR # 1-21 1 Komatsu PC210 LCi

1 Pipe Laborer – Andrew Sutich 1 Dynapac Roller – 4-01 1 Linkbelt 210x4 #1-25

1 Truck Driver – Shawn 1 Peterbuilt D.T. #8-07 1 TNB-151 Striker/Hammer 1 Doosan Excavator-300

Subcontractor’s Workforce

ontractor’s Equip./Workforce

1 Daybreak Flagging 1 TCS – Lonnie Ballard (w/ p/u)

1 Kafferlin Trucking

Item No. Item Description

1 Flagger – Lea Skondin

1 Automated Traffic lights ETC.

1 Flagger – Jamie Edgerly

1 Truck Driver – Jay Kafferlin 1 Kenworth Dump Truck # 15

Daily Quantities

Description of

Daily Work Activity

Quantity/Units

8:30 Lonnie is onsite with Flaggers (Lea and Jamie) and signage set up at the 13+64 cross culvert for the Jeffries pipe crew who is pulling asphalt and loading into Jay. Kyle and Darrin are down near Bybee creek welding up the HDPE for the water bypasses that will be cut in later. I met with Cody Bauer (North Sky Area Manager) here at the county yard and he is getting his crews in here to hinge ariel fiber on the poles on the south end (near the county shop) and then will work north once the PUD is done with their removing of the distribution lines (in order to allow the comes more vertical clearance for construction and alignment changes). Travis, Andrew and William are the pipe crew working on the 13+64 cross culvert with the Komatsu 88 excavator with Shawn and Jay hauling for them, they are holding traffic to work but attempting to keep holds to 10 minutes when possible. 10:00 Pipe crew has the asphalt removed from both the old pipe and new pipe locations and has the westerly section of old pipe removed at this point (traffic is passing on CSBC placed back where the asphalt was removed in the northbound lane). The PUD is near 25+00 repositioning the distribution lines on the pole, North Sky is near 41+00 getting ready to start hanging ariel fiber lines. 12:30 Kenton called me down to view the utilities across the roadway here at the 13+64 cross culvert, all utilities are in the way (I called Chris at let him know), Kenton suggested that we move the pipe down 23” to clear all of the conflicting utilities and Chris agreed that that would work in leu of moving the waterline and waiting for the other utilities to be relocated. 2:30 Crews at the cross culvert have encountered rock and are using the loader to chip it away, they will go get the 210 later. North Sky is stringing cable up to the poles from the south, PUD

Description of Daily Work Activity

has placed the new pole near Bybee Creek. 5:00 Crews have finished work for the day by using speed shore in the open excavation and plating and cold patching it to the right lane at the culvert crossing. Kyle and Darrin have the entire HDPE pipe for the Bybee creek crossing welded together and are set up to weld the pipe for the Confer intersection tomorrow. Everybody has left the jobsite, with Motorcycles use extream caution and steel plate signs in place for the culvert crossing location and the lights in control of the intersection with Cponfer and the right lane coned off.

Inspector’s Signature:

DEPARTMENT OF PUBLIC WORKS

1600 – 13th Avenue South

Kelso, WA 98626

TEL (360) 577-3030

FAX (360) 636-0845

www.co.cowlitz.wa.us/publicworks/

INSPECTOR’S DAILY REPORT

Contract #: 1235 Contract Title: South Cloverdale Road Improvement Date: 5/4/26 Monday

Contractor: Jeffries Construction

Start Time: ± 7:00 Quit Time: ± 5:00

Weather A.M: Clear 52° Weather P.M.: Sunny 76°

Traffic Control: Checked Signing, Barricades, Flagging Time A.M : 8:20 Time P.M.: 1:30

Contractor’s Workforce

Workforce/Equip. Contractor’s Equipment 1 Foreman – Kenton Nickols

Ram 3500 Flatbed #7-29

Rental Komatsu WA270 Loader 1 Operator – Kyle Bashton

Cat 430E IT loader #2-10

1 Operator/Laborer – Darrin Keane

Komatsu PC 138US #1-23 1 Pipe Foreman – Travis Bashton

F450 Service Truck # 7-34

Pipe Laborer – William Felts 1 Komatsu PC 88MR # 1-21

Pipe Laborer – Andrew Sutich

Dynapac Roller – 4-01

Weber MT CR-8 Plate Compactor

Komatsu PC210 LCi

Linkbelt 210x4 #1-25 Truck Driver – Shawn Peterbuilt D.T. #8-07

Mechanic – ???

KW Service Truck #8-03

TNB-151 Striker/Hammer

Doosan Excavator-300 Subcontractor’s Workforce

ontractor’s Equip./Workforce

ontractor’s Equip./Workforce 1 Daybreak Flagging

1 Flagger – Dawn Coburn

1 Kafferlin Trucking

TCS – Lonnie Ballard (w/ p/u)

1 Automated Traffic lights ETC.

1 Flagger – Domitilo Serrano 1 Flagger – Jamie Edgerly

1 Truck Driver – Jay Kafferlin 1 Kenworth Dump Truck # 15

Daily Quantities

Description of Daily Work Activity

8:20 Lonnie is onsite at 35+00 with flaggers in control of the right lane from 31+00 to 37+25, Travis (operating the 88) and the pipe crew are beginning the excavate (loadin into Jay) the right lane for the first temp water crossing (33+75) here before Bybee Creek. Traffic lights are in operation with the left lane past Confer coned off for Kyle and Darrin (operating the Linkbelt with the hydraulic breaker) to continue digging out the temp water crossing in the left lane at 46+00. Traffic control and lights are a bit close together but are being managed well and signage looks good throughout the project. North Sky (and Hinkles and McCoy) is working inside both closures where possible and coordinating with flaggers crews to hang the fiber optic bypass overhead. 11:00 Pipe crew has switched to the left lane and has it mostly excavated out now. Dirt crew has damaged the hydraulic breaker on the 210 and the mechanic is arriving now to check it out. 1:30 Travis has the crossing at 33+75 75% completed and Kyle has his at 46+00 about the same (except that there is rock to be chipped away for about 2’ in depth for the entirety of the right lane). 3:00 Travis is installing the bypass pipe sleeve at 33+75 now with the left lane mostly filled to road level. Kyle still has Darrin on the Linkbelt chipping away the final few high spots of rock so they can get their bypass sleeve installed. 3:30 I left the site to meet with Aaron. 6:00 Crews have left the jobsite, Kyle has placed a steel plate and cold patch (with Steel plate signs in place) on the right lane at 46+00 with the 138 in the left lane coned off with the lights in operation, and Travis has both lanes of his temp crossing filled with compacted CNBC with loose gravel signs in place.

Inspector’s Signature:

Appendix52.105ChangeOrderChecklist

ChangeOrder

No

1.Doesthechangeorderalterthetermini,character,orscopeofthework?

Ifyes,youmusthaveH&LPapprovaltobeeligibleforfederalfunds.

Ifyes,youmustsubmitarevisedPage1oftheprospectus.

2.IstheChangeOrderover$7,500.00andoutsidethescopeofwork?

Ifyes,thechangecannotbeachangeorderandmustbeanindependentwork.

3.DoestheChangeOrderdetailallitemsinvolvedwiththechange?

4.DoestheChangeOrderincludeanadjustmentinworkingdays?

Ifyes,thetimeextensionmustbestatedintheChangeOrder.

Ifyes,anindependentengineer’sestimateoftimemustbeincludedtodocumentthe extension.

Ifno,thatmustbestatedintheChangeOrder.

5.DoestheChangeOrderaltertheDBEConditionofAward?

Ifyes,youmustobtainconcurrenceformLocalPrograms.

Ifyes,youmustobtaintheDBE’ssignatureontheChangeOrder.

6.DoestheChangeOrderinvolveamaterialsubstitution?

Ifyes,youmustdetermineifamaterialcreditisappropriate.

7.IfChangeOrderworkstartedpriortoit’sexecution,priorverbalapprovalbythe ApprovingAuthoritymustbegrantedanddocumented.

8.HastheChangeOrderbeensignedbythecontractor?

9.HastheChangeOrderbeenexecutedbytheApprovingAuthority?

Ifyouarea“nonCAAgency”,youmusthavetheactingCAAuthority’sapproval.

10.Hasanindependentengineer’sestimatejustifyingthecostsandtimeextensionsbeen completedanddocumented?

11.Hasadetailedmemooutliningthechronologyofevents,basisofneed,costsand workingdaysbeenpreparedandplacedinthefileaccompanyingtheChangeOrder?