Skip to main content

John Oliver Masterplan Analysis and Concepts

Page 1

Watershed Park

58 Ave

120 St

Existing Field Sun Path

Hw y1 0

SURREY

DELTA

5AM

acis Ann Hwy

0

112 St

N2 JU

9PM

runk Rd Ladner T

C DE 21

1PM 8AM

4PM

e Hwy

Vancouver-Blain 12PM

Vancouver-B la

ine Hwy

l

Bo

un

da

ry

Sun Path

ai Bay Dyke Tr

Boundary Bay

Formal Pathway Informal Pathway Future Cycling Network (Protected Lane)

Site Context

To Watershed Park

Legend Lighting

Tr un kR

d

Agricultural Land

dn er

Vegetation

La

Noise

Active Movement

1

1

Storage/Utilities ROW

2

Parks Nursery

3

Rugby Club House

4

Pond

5

Washrooms

2 P

P

Informal Parking Parking Lot Vehicular Entrance Vehicular Circulation

Ann

Rugby

acis

3

Hwy

P

Soccer/ Flex Use

P

Agricultural Land

P

4 Soccer

5

Vehicular Movement Water Body Periodic Inundation Schedule B Stream Ditch System

Football

Undeveloped Lands Requiring ALC Approval

y a w l Rai

+HP

+HP

+HP

Hydrology

John Oliver Park Master Plan

Inventory and Analysis

Agricultural Land

y w H e n i a l B r e v Vancou

To Boundary Bay


Turn static files into dynamic content formats.

Create a flipbook
John Oliver Masterplan Analysis and Concepts by City of Delta - Issuu