Skip to main content

Corey Barr Portfolio 2024

Page 1

Corey Barr


ArtWorks Center

NE

SE


Level 2

Level 4

Level 2

Level 4

Level 1

Level 3

Level 1

Level 3 Level 2

Level 2

Level 1

Level 1


Hotel 108


Franklinton Live/Work

COREY BARR

FRANKLINTON LIVE/WORK

1

4 2

5

3

COREY BARR

FRANKLINTON LIVE/WORK

COREY BARR MODULE TESSELLATES, MAKES PATTERN FRANKLINTON LIVE/WORK

BLOCK CUT, MAKESMAKES BOULEVARD MODULE TESSELLATES, PATTERN

BLOCK CUT, MAKES BOULEVARD

COREY BARR

FRANKLINTON LIVE/WORK MODULE TESSELLATES, MAKES PATTERN

7

6 2

5 4 3

PATTERN STACKS, MAKES BLOCK

5

A MODULE, DIMENSIONED FROM EXISITING HOMES AROUND SITE, TESSELLATES INTO A PATTERN THAT ALLOW FOR HORIZONTAL AND VERTICAL CIRCULATION AS WELL AS 7 DIRECT ACCESS TO EXTERIOR SPACE 5 4 6 FOR 8 EVERY UNIT. THE PATTERN STACKS INTO A FIVE STORY BLOCK BEFORE 1 BEING CUT TO CREATE A DIAG-3 A MODULE,BOULEVARD DIMENSIONED ONAL PEDESTRIAN FROM RICHEXISITING STREET TOHOMES THE FROM 2 PARK. AROUND SITE, TESSELLATES IT IS THEN SLICED THAT TO AL-ALLOW INTO A PATTERN LOWFOR FORHORIZONTAL TERRACING AND AND VERTI6 8 A RESPECT FOR DIFFERING CAL CIRCULATION AS7WELL AS SCALES ON SITE EDGES.

A MODULE, DIMENSIONED FROM EXISITING HOMES 1 4 AROUND SITE, TESSELLATES INTO A PATTERN THAT ALLOW FOR HORIZONTAL AND VERTI1 AS WELL AS 7 CAL CIRCULATION DIRECT ACCESS TO EXTERIOR DIRECT ACCESS TO EXTERIOR 6 SPACE FOR EVERY UNIT. SPACE FOR EVERY UNIT. 3 4 5 INTO THE PATTERN STACKS INTO THE PATTERN STACKS 1 BEFORE2 1 - LIVING 4 5A FIVE STORY BLOCK A FIVE STORY BLOCK BEFORE 1 2 2 BLOCK SLICED, MAKES SLOPE BLOCK CUT, MAKES BOULEVARD PATTERN STACKS, MAKES BLOCK DIAGRAMS 1 MODULE TESSELLATES, MAKES PATTERN 7 6 PATTERN STACKS, MAKES BLOCK BEING CUT PARTI TO CREATE A DIAG5 2 - DINING 2 BEING CUT TO CREATE A DIAG7 6 5 3BOULEVARD ONAL PEDESTRIAN BOULEVARD 7 3 - KITCHEN ONAL PEDESTRIAN 7 3 3 4 6 8 FROM RICH STREET 7 4 TO A MODULE, DIMENSIONED 56 THE FROM RICH STREET TO THE 8 64 8 4 - LAUNDRY 9 2 FROM 3PARK. 2 3 PARK.EXISITING HOMES 5 - HALF BATH 1 IT IS THEN SLICED TO ALAROUND SITE, TESSELLATES IT IS THEN SLICED TO AL6 - FULL BATH 5 LOW 5 FOR TERRACING AND INTO PATTERN THAT ALLOW LOWAFOR TERRACING AND 7 - BED ONE A RESPECT FOR DIFFERING FOR HORIZONTAL AND VERTI1 A RESPECT FOR DIFFERING 8 - BED TWO 4 1 SCALES ON SITE EDGES. CAL CIRCULATION AS WELL AS SCALES ON SITE EDGES. 4 9 - BED THREE DIRECT ACCESS TO EXTERIOR 1 SPACE FOR EVERY UNIT. 7 THE PATTERN STACKS INTO 1 6 7 A FIVE STORY BLOCK BEFORE BLOCK SLICED, MAKES SLOPE BLOCK CUT, MAKES BOULEVARD PARTI DIAGRAMS BLOCK SLICED, MAKES SLOPE PATTERN STACKS, BLOCK PARTI DIAGRAMS BEING CUT TO CREATE A DIAG6 1 - LIVING 2 ONAL PEDESTRIAN BOULEVARD 2 - DINING 7 3 - KITCHEN FROM RICH STREET TO THE 3 6 8 1 - LIVING 2 9 PARK. 4 - LAUNDRY 2 - DINING 5 HALF BATH IT IS THEN SLICED TO AL6 - FULL BATH 7 3 - KITCHEN LOW FOR TERRACING AND 3 6 8 7 - BED ONE 4 - LAUNDRY A RESPECT FOR DIFFERING 9 8 - BED TWO 5 - HALF BATHSCALES9ON SITE EDGES. - BED THREE

6 - FULL BATH 7 - BED ONE 8 - BED TWO - BED THREE BLOCK SLICED, MAKES9 SLOPE

PARTI DIAGRAMS

55 4 4 1

33 2

2 UNIT PLANS 7

7 1

1

8

8

3

3 5

5

6

6 2

2

4

4


Orton Hall Exteriors Orton Hall Southwest Entrance & Screen Between Orton & Mendenhall

2-7 8-11

2-7 8-11

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

Orton Hall PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

Cover

DS152 05.15.2023 PAGE: 1


Southwest Accessible Entrance

The southwest corner of Orton Hall is the ADA entrance, borders the South Oval, and is on a major northsouth route.

Bollards Bin

A/C

Electric

Ex. Dead A/C Bin

Cart

A C

A/C Bollards

Electric

Ex. Bollards

Relocated Dumpster

Enclosure

Ex. Bike Racks

Gate Ex. Curb/Edge New Curb/Edge

Key: New

Removed

Unaffected

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

Mechanical Screen Silhouette & Perforation

PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

DS152

Orton Hall

05.15.2023

Southwest Corner

PAGE: 2

Laser-Cut Weathering Steel Panels

<8’ >6.5’ Orton Hall

Orton Hall

The Orton Memorial Library of Geology The Orton Geological Museum School of Earth Sciences

North

West

South

East

1’ = 3/16”

East of Orton

Orton Hall Screen Design

DS152 Orton Main Entry

05.15.2023

Entry into Lab Space 7 PAGE:

Orton Hall

Mendenhall Lab

Looking South Entry

Sunken Forecourt

Towards South Oval

Accessible Entry

Equipment

Looking North

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

Rock Garden, Informal Classroom & Seating

DS152

Orton Hall

PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

05.15.2023

East Passage

PAGE: 8

Active space between Orton Hall and Mendenhall Lab

Informal Classroom

Seating Concept Permian Permian

ion

ion

all Lab Orton Hall

all Lab

Mendenh

Orton Hall

Devonian (19)

Mendenh

Permian (0)

Carboniferous (23)

Paleozoic

PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

Mendenhall Main Entry

Circulat

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

This space between Orton and Mendenhall is also a major route from north to south campus.

Towards Oval

Between the two buildings predominantly occupied by the School of Earth SciencesOrton Hall and Mendenhall Labs, sits a space of high traffic and visibility, joining the Oval with it’s southern counterpart. The following designs seek to invest in and activate this space in line with broader university initiatives.

Circulat

1’ 2’ 3’ 4’ 5’

Precambrian

Precambrian Silurian (7) Ordovician (0)

Cambrian (0) Permian

Precambrian (21)

Linear

Radial

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

Orton Hall PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

East Active Space

DS152 05.15.2023 PAGE: 10


Jennings Courtyard JENN INGS HALL COURTYARD

Area Map

Furnishings, Trellis Supports

5’

10’

18’

Key

Trellis Area - 425 SQFT

38’ - 6”

7’

Cisterns - 5 x 1000 gal, 1 x 500 gal

8’

Existing Planting Existing Short Stone Walls Existing Curbs Existing Paving Existing Interior

0

4’ 8’

16’

24’

32’

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

JENNINGS COURTYARD

DS152

PLAN

page: 3

06.23.2023

N


Facing East

6”x6” pergola post with foundation 500 gal Cistern

1000 gal Cistern

1000 gal Cistern

Existing stone walls Existing curb University standard benches

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

JENNINGS COURTYARD

DS152

RENDER

page: 9

PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

06.23.2023

Facing Southeast

500 gal Cistern

1000 gal Cistern

1000 gal Cistern

1000 gal Cistern

1000 gal Cistern

University standard table and chairs University standard bench

Existing stone walls

GRAPHIC REPRESENTATION ONLY, NOT FOR CONSTRUCTION

PLANNING, ARCHITECTURE AND REAL ESTATE DESIGN STUDIO

JENNINGS COURTYARD

DS152

RENDER

page: 8

06.23.2023


Postle Hall Massing A B C

ENT

RY

PLA

QU AD

ZA

Massing Study

SF / Floor A: 34,000 B: 8,400 C: 6,500

Total SF 136,000 42,000 26,000 204,000 Campus Context


Little Haiti Dance Center


Corey Barr ­ ­

­ ­ ­ ­ ­ ­

­

­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­ ­


Turn static files into dynamic content formats.

Create a flipbook
Corey Barr Portfolio 2024 by Corey.Barr - Issuu