Indigo – start of the subsoil drains Albert Street view of the heritage façade retained at Indigo

Advertisement
Indigo Hotel and Apartments have fired up with our drainage works well under way, after we managed to escape New Zealand’s longest COVID-19 lock down to date. Construction has recommenced under Level 3 in September after enduring a full lock down on Level 4 for 5 weeks prior, in response we are strictly following the governments COVID-19 protocols on-site.
As the project is still in the design phase, we were able to crack on working from home with client Icon, the design team and our engaged Hydraulic Services Consultants (HSCNZ Ltd - Director Pete Downey). We have a great relationship with these guys, having worked closely on both Pacifica Apartments and Bunnings Westgate in the past.
The lock down period has allowed me to work closely with the hydraulic designers and consultants and gain valuable insight into many aspects of hydraulic design implementing best practices. HSC are well known in the New Zealand Hydraulic Design industry and I have been privileged to work alongside Pete and his team who have a real passion for the industry and strive to provide the best possible hydraulic design solution.
I look forward to delivering this project for Icon and taking part in the construction of yet another build that will impact Auckland’s amazing city skyline.
Gary Moore Project Manager