Skip to main content

Texas 25, December 3, 2023

Page 1

State Supplement sponsored by:

TEXAS STATE EDITION

A Supplement to:

SHIP WITHIN 48 HOURS

®

December 3 2023

SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. VIII • No. 25

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

Your Texas Connection • Dennis Hogeboom • 1-877-877-4997 • dennishogeboom@cegltd.com

CALL 800-367-4937 *On approved credit • Financing Available

Allen Butler, Webber Lead ‘Top Priority’Amarillo Job Crews from Allen Butler Construction Inc. (ABCI) and Webber LLC are working hard to complete sections of the Texas Department of Transportation’s (TxDOT) Loop 335 project in the city of Amarillo, an initiative that has spent $210 million so far to upgrade aging highway infrastructure, improve traffic flow and safety. SL 335 has been divided into four main segments: Southeast-Segment A, Southwest-Segment B, NorthwestSegment C and Northeast-Segment D. SL 335, which circles Amarillo, connects motorists to national and regional corridors, along with local arterials. “The main point of the State Loop that’s going to be circling around the city is to relieve traffic and freight congestion on Interstate 40, one of the most well-traveled interstates in the state of Texas,” said TxDOT Public Information Officer Jason Britsch. ABCI is responsible for four elements, two of which are ongoing and two have been completed this past year. ABCI completed the $42.4 million I-27 at S SL 335 interchange work, which began in 2018, and the $50.6 million SL 335 from S FM 2590 to I-40, which began in 2019. Crews currently are working on the $26 million Coulter Street to Soncy Road section, which is expected to be completed next summer; and the $50.6 million IH-40 West Interchange to SW 9th Ave. section, which is expected to be open to traffic in early 2024 and be completed in the spring. Another element, the West SL 335/I-40 interchange, is being done in two phases. Phase I deals with the I-40 2ndlevel bridge and SL 335 frontage roads and should be completed next summer. Phase II, unfunded, will cover the SL 335 3rd-level bridge and direct connectors. “We are glad to see that progress continues to move forward on SL 335,” said Joe Chappell, TxDOT Amarillo’s Area engineer. “We appreciate the public’s patience on this project while we continue to build and maintain safe roadways around the city.”

By Irwin Rapoport

CEG CORRESPONDENT

see LOOP page 10

TxDOT photo

SL 335 has been divided into four main segments: Southeast-Segment A, Southwest-Segment B, Northwest-Segment C and Northeast-Segment D. SL 335, which circles Amarillo, connects motorists to national and regional corridors, along with local arterials.

Aguire & Fields photo

Allen Butler Construction Inc. and Webber are leading the $210 million Loop 335 project in Amarillo, which will improve and upgrade the highway that will eventually circle the city as a key connection point.

Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas

We Have Parts For:

Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case

(254) 562-7500 • www.HighTech-parts.com


Page 2 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

HEA AV VY CONSTRUCTTION

PAVING TEXAS

Sales - Rentals - Parts - Service

Sales - Rentals - Parts - Service

214.819-4100/800.227 7-6626 www.romco.com m

214.819-4100/800.227 7-6626 www.romco.com m

CRUSHING, SCREENING, DRILLING & WASHING

Sales - Rentals - Parrts - Service 214.819-4100/800.2 227-6626 www.romco.c com

PORTTA ABLE POWER & COMP CO OMPACT EQUIPMEN NT

Sales - Re entals - Parts - Service 210.569-7068 / 800.966-4601 ww ww.romco.com


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 3

Agricultural Tractors

Crawler Carriers

Dozers - Wheel

Water Equipment - Tower/Tanks

2015 JOHN DEERE 6215R ........................$139,500 2020 JOHN DEERE 6130M ......................$115,000 (5) 2018-2021 JOHN DEERE 6120M ......From $79,500 2018 JOHN DEERE 5125R ........................$98,500 2022 JOHN DEERE 5125M ......................$139,500 (2) 2021-2022 JOHN DEERE 5100M................$CALL (2) 2017 JOHN DEERE 5085M ............From $59,500

(2) 2019-2020 MOROOKA MST4000VD From $269,500

2015 CATERPILLAR 834K ........................$285,000

(7) 2020-2023 KLEIN KPT-120 WATER TOWERS ........ ..................................................From $62,500

Artic Trucks (2) 2016 CATERPILLAR 745C ............From $269,500 (2) 2019 CATERPILLAR 745 ................$409,500 Ea. (2) 2019 CATERPILLAR 740GC......................$CALL (3) 2017-2019 CATERPILLAR 725C2 ......From $289,500 (2) 2022 CATERPILLAR 725 ........................$CALL (2) 2023 ROKBAK RA40 ..............................$CALL (3) 2023 ROKBAK RA30 ..............................$CALL

Attachments (3) CATERPILLAR LIFTS ........................$5,000 Ea. CATERPILLAR D6 ANGLE BLADE ..................$7,500 CATERPILLAR D8T ANGLE BLADE ................$7,500 CATERPILLAR D10T SS RIPPER ....................$CALL CATERPILLAR ANGLE BLADE ......................$7,500 CATERPILLAR WINCH ................................$CALL 2018 NPK GH15 HAMMER ..........................$CALL 2022 NPK GH18 HAMMER ..........................$CALL PACCAR PA56 WINCH ................................$CALL PACCAR PA140-316V WINCH ......................$CALL PACCAR PA110VS245 WINCH ......................$7,500

Crawler Loaders (2) 2022 CATERPILLAR 963 ........................$CALL (4) 2017-2021 CATERPILLAR 963K......From $265,000

(2) 2018 MOROOKA MST3000VD........From $165,000 (3) 2018-2019 MOROOKA MST2200VD From $139,500 2020 MOROOKA MST660VD ......................$79,500

Compactors - Padfoot/Smooth Drum 2020 CATERPILLAR 815K ............................$CALL 2007 CATERPILLAR 815F 2..........................$CALL 2017 CATERPILLAR CS66B ......................$119,500 (6) 2016-2022 CATERPILLAR CP56B....From $125,000 (9) 2017-2022 CATERPILLAR CS56B....From $119,500 (2) 2013-2021 HAMM H13I ................From $87,500 2020 HAMM H12I......................................$CALL

Dozers - Crawler 2023 CATERPILLAR D10T2 ....................$2,050,000 (3) 2019-2022 CATERPILLAR D8T ......From $650,000 (2) 2020 CATERPILLAR D6 ..............From $329,500 2020 CATERPILLAR D6 XL ......................$375,000 (8) 2019-2022 CATERPILLAR D6 LGP ..From $309,500 2019 CATERPILLAR D6T XW ....................$325,000 2018 CATERPILLAR D6N XL ........................$CALL 2014 CATERPILLAR D6K2 LGP ..................$85,000 2012 CATERPILLAR D6K XL ....................$125,000 2023 CATERPILLAR D5 LGP ........................$CALL 2019 CATERPILLAR D5K2............................$CALL 2023 CATERPILLAR D4 ..........................$275,000 2022 CATERPILLAR D3 ..............................$CALL 2017 KOMATSU D61EXi-24 ..........................$CALL 2021 KOMATSU D71PX-24 ......................$319,500 (6) 2023 KOMATSU D71PXi-24 ....................$CALL

Excavators - Crawlers 2019 CATERPILLAR 390FL ......................$935,000 (2) 2019-2020 CATERPILLAR 374FL ..............$CALL 2020 CATERPILLAR 352 ..........................$465,000 (2) 2017-2019 CATERPILLAR 349FL ....From $279,500 (4) 2021-2022 CATERPILLAR 349 ......From $525,000 (3) 2019 CATERPILLAR 336 ..............From $199,500 2018 CATERPILLAR 336FL ......................$239,500 (2) 2023 CATERPILLAR 330-07 ....................$CALL 2020 CAT 326-07 ......................................$CALL 2018 CATERPILLAR 320 ..........................$172,500 2017 CATERPILLAR 316FL ......................$149,500 2013 CATERPILLAR 6030 ......................$1,250,000

Off-Highway Trucks

Water Equipment - Trucks (3) 2022-2023 CATERPILLAR 740GC ..............$CALL 2013 CATERPILLAR 740B ........................$329,500 2022 CATERPILLAR 730-04..........................$CALL (2) 2022-2023 CATERPILLAR 725-04 ......From $575,000 (3) 2021-2022 CATERPILLAR 725 ......From $550,000 2015 FREIGHTLINER M2 ..........................$85,000 (19) 2018-2021 KENWORTH T370 ........From $89,500 2023 INTERNATIONAL HV507 4X4..............$169,500 (4) 2022-2024 INTERNATIONAL HV607............$CALL (7) 2022 INTERNATIONAL MV607 ......From $115,000 (2) 2024 PETERBILT 548 ............................$CALL (18) 2018-2022 PETERBILT 348 ........From $149,500

1982 CAT 773B Rigid Frame Truck ................$CALL

Wheel Loaders

Motor Graders

2023 CATERPILLAR 980..............................$CALL

(2) 2022 CATERPILLAR 16 ....................$1,345,000 (2) 2020-2023 CATERPILLAR 150 ......From $399,500 (2) 2017-2019 CATERPILLAR 140M3 ..............$CALL

2020 CATERPILLAR 950M........................$339,500

2019 CATERPILLAR 966M ................From $329,500 (2) 2018 CATERPILLAR 938M ............From $179,500

Skid Steers - Track

Miscelleneous Equipment

(7) 2020-2021 JOHN DEERE 333G ........From $64,500 (3) 2020-2022 CATERPILLAR 299D3 XPS..From $49,500 (2) 2021 CATERPILLAR 299D3 ......................$CALL

2022 ROME AG-12 ..................................$10,500 2023 ROME OT-12 PLOW ............................$CALL 2019 ROME TACW16 ..............................$36,000 2023 ROME TAW-20S ..............................$45,000 2018 ROME TCW28 ................................$19,750 (3) 2022 ROME TRCW-12 ..................From $67,500 2022 ROME TRCW-16 ..............................$79,500

Authorized dealer for


Page 4 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

PTR Celebrates Fort Worth Facility With Two-Day Event Premier Truck Rental (PTR) hosted a ribbon-cutting ceremony to celebrate its new facility in Fort Worth. The grand opening ceremony was a two-day event that took place on Nov. 8-9 that featured local Fort Worth officials, facility tours, a vendor expo with equipment demos and an invite-only concert. With a focus on customer appreciation and “Uniting the Forts,” this event provided a platform for national commercial construction and utility organizations to connect and learn more about PTR’s custom fleet rental offerings. The new Texas location spans 84,187 sq. ft over 14.4 acres and includes 18 EV stations, four overhead cranes, a wash bay and a body shop with a paint booth large enough for a Class VIII truck. “We are thrilled to open our second facility in Fort Worth and expand our presence in the region,” said Adriene Horn, president of PTR. “This facility will allow us to better serve our customers and we look forward to continuing to grow in this thriving market.” Throughout the event, attendees experienced an array of activities, including hands-on equipment demonstrations from key equipment vendors, in-depth facility tours highlighting our manufacturing capabilities and a country concert. “We’re pleased with the positive response to our grand opening celebration,” said Rob Troxel, CEO of PTR. “This is the first time

we’ve ever done a private event to this scale and we believe that the connections made and knowledge shared will have a lasting impact on the industry.” This event was supported by some of PTR’s vendor partners: Knapheide, RC Industries, FillRite, Bedrock Truck Beds, Vanair, Miller Electric, Weatherguard, STI and Fleet Complete. Their contributions enhanced the grand opening celebration while supporting the immense growth of the equipment rental industry. This facility is expected to bring more than 100 new-to-market jobs in the area, having both automotive technician and administrative roles available. Premier Truck Rental’s (PTR) leadership team cuts a ribbon alongside a Fort Worth Chamber of Commerce representative, celebrating the opening of their DFW facility.

PTR’s Texas location is expected to create 100 jobs in the area, with administrative and technician positions available.

With a focus on customer appreciation and “Uniting the Forts,” this event provided a platform for national commercial construction and utility organizations to connect and learn more about PTR’s custom fleet rental offerings.

The new Texas location spans 84,187 sq. ft over 14.4 acres and includes 18 EV stations, four overhead cranes, a wash bay and a body shop with a paint booth large enough for a Class VIII truck.

About Premier Truck Rental Being selected as one of NAFA’s Top 100 Commercial Fleets in America, Premier Truck Rental works with customers to make sure that they have the best units for your job and industry, providing customers with truck, trailer and equipment rentals that can be upfit specifically for the demands and requirements of construction projects. It is a family owned and operated business with more than 35 years of equipment rental experience. Serving all 50 states, PTR has the exact units to add to your fleet to kickstart your next construction project. For more information about PTR, visit https://rentptr.com.  (All photos courtesy of Premier Truck Rental.)

The Grand Opening ceremony for PTR’s Fort Worth location was a two-day celebration that took place on Nov. 8-9.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 5

Hurry to your dealer for limited-time savings on Bobca c t® low as 0% for 36 months* $12,000 USD* on select compact track a loaders or up to $8,500 USD* on select compact excavators.

0 3 36

AS LOW AS

LAST CHANCEE FOR BIG YEAR-END D SA AV VING GS

% FOR R

UP TO O

MONTHS*

G E T M O V ING TO G E T S A V I N G. BOBCA ATT.COM/OFFERSS *Of fer ends 12 /31/2023. Available at par ticipating and eligible dealers only. Of fer mayy var y by product t ype,, series, model and select units in dealer’s current inventor y. Must take deliver y from dealer stock by 12 /31/2023. Of fers available on new equipment '&%$ #%"&!% "&"!"% & %# % ' ' & %" % & % % & " %"&!% " % " % " % & % " & % % % "& % ' % " %& % ' ' %# %! " % %! "' % '&"& '& % '! !% &%" " % % !' % %" ' !% " % &"& % '! % % " ' !% % % &"& % " %"&!% " %" % % % &" %" " % % %" ' " % " % &"& % '! %"&!%" % % % "& %" %"& % ' % ' %& ' % ! '&' " ' % % " %" % %& %" "' " % % & & %" & % national accounts and municipal /utilit y bid customers. Bobcat Company reser ves the right to ex tend or discontinue any of these programs at any time without prior notice. Bobcat®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. ©2023 Bobcat Company. All rights reser ved.

Bobcat of Abilene 325-673-7361

Bobcat of Lubbock 806-745-1322

Bobcat of Pleasanton 830-580-4020

Bobcat of Victoria 361-579-0922

Bobcat of Amarillo 806-622-9593

Bobcat of Marble Falls 830-220-6070

Bobcat of Waco 254-488-7004

Bobcat of Austin 512-251-3415

Bobcat of Marion 830-420-9020

Bobcat of the Rio Grande Valley 956-425-4300

Bobcat of Corpus Christi 361-884-3959

Bobcat of Midland–Odessa 432-685-9298

Bobcat of San Antonio 210-337-6136 Bobcat of Temple 254-523-4900

Bobcat of Wichita Falls 940-285-7777 Ranchers ATV and Tractor Kerrville 830-315-2330


Page 6 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

TTC Approves Historic $345M Investment for 83 Projects New sidewalks, bikeways and other types of infrastructure will help improve safety and enhance quality of life in Texas communities with approval by the Texas Transportation Commission of more than $345 million for projects across the state. The funding will go toward 83 projects that will improve access while providing safety enhancements and mobility options to schools, jobs, public transit and local

destinations. This historic investment in bicycle and pedestrian infrastructure is more than six times as much funding compared to the last transportation alternatives call for projects when it was $55 million in 2021. “This is a major investment in communities across the state that will help make it safer and easier to get around on foot or a bike,” Texas Transportation Commissioner Robert “Robie” Vaughn said. “This optionality supports

The funding will go toward 83 projects that will improve access while providing safety enhancements and mobility options to schools, jobs, public transit and local destinations.

safety, active lifestyles, health and wellness and can provide alternatives to traveling by vehicle.” Unfortunately, Texas is seeing a rising trend of pedestrian and bicyclist fatalities. In 2022 there were 830 pedestrians and 92 bicyclists killed, and over the last five years both have risen nearly 30 percent These projects will help improve safety for people walking, biking, or using wheelchairs, including 24 projects that will go in areas with a high pedestrian crash history. “People who walk and bike make up about one out of every five deaths on roadways here in Texas,” Texas Transportation Commissioner Alvin New said. “These projects will help the state move closer toward the goal of zero deaths by giving people a place to walk and bike separate from traffic.” Some of the projects approved include sidewalks connecting to schools and transit options, shared-use paths benefiting both pedestrians and cyclists, new pedestrian bridges, and 15 planning studies. All projects were selected after a competitive call for projects from cities and counties across the state. The Transportation Alternatives program supports local projects that enhance bicycle and pedestrian amenities for people of all ages and levels of ability. These projects improve safe access to multimodal options and connect important community destinations like schools, jobs, downtowns, commercial areas, and medical facilities for Texans who walk, use a wheelchair, or bike. For more information, visit txdot.gov 

Connector Ramp Closes as Construction Set to Start Up As part of the ongoing Texas Clear Lanes project at I-610 /Cambridge Street, the Texas Department of Transportation will have a continuous closure at the north and southbound State Highway 288 connector ramp to I-610 South Loop eastbound until Feb. 19, 2024, at 5 a.m. Crews will be constructing new SH 288 connector ramps to the I-610 eastbound mainlanes. Motorists can take the I-610 westbound connector ramp to the I-610 westbound mainlanes, then take the exit ramp to Buffalo Speedway, make a U-turn at Buffalo Spdwy to access the I-610 eastbound frontage road, then continue along the I-610 EBFR to the Buffalo Spdwy entrance ramp onto the I-610 eastbound mainlanes. This closure and detour information can be found at the I610/Cambridge project website. As one of six (6) Texas Clear Lanes projects in the Houston area, it is designed to improve traffic flow and connectivity, reduce congestion, add capacity, create better connectivity with SH 288, and improve overall mobility in the surrounding area. Situated in South-Central Houston, the project prioritizes better connectivity between the Medical Center, major event venues such as NRG Stadium,

Houston Central Business and Museum districts, Historic Third Ward, and multiple colleges and universities. The $117 million project includes reconstruction of mainlanes, frontage roads, and the addition of a freeway overpass with eight direct connect tie-ins at I-610/SH 288. The eight direct connect tie-ins will

complete and link the partially completed connector ramps already built as a part of the SH 288 Express Toll Lane project, completed in July 2022. Completion is expected in mid to late 2025. Motorists may experience significant delays during the closure and should

The State Highway 288 connector ramp to I-610 South Loop eastbound will be closed until Feb. 19, 2024.

consider any alternate routes. Additional closure information can be found at Houston TranStar Closures are subject to change due to adverse weather. For more information, contact TxDOT Public Information Officer Bambi Hall at 713/802-5072.  (All photos courtesy of TxDOT.)

Crews will be constructing new SH 288 connector ramps to the I-610 eastbound mainlanes.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 7

25 XPL X

• CAPACITY A : 50,00 00 lbs. • 25 Ton o Tri-Axle, r Air Brakes • 8 Degree Loa ading Angle Low Profille

with * Shown Optional Hydraullic Ramps • Trailer r We eight: 11,720 lbs. • Overall Wiidth: 102", Len ngth: 34'4" • Deck Length: 22' Flat, 6' 6 Beaver tail • Deck Height: 34"

• Ramps: 72" Long x 36” Wide • Tires: i Tw welve 215/75R17.5 (H) • Brakes: Air (Full ABS System) • Lighting: 100% Sealed Wiring harness h and L.E.D. Lights

Standardd Features on 255 X XPL Easy sy Loaders ONE PIECE CAST LUNETTE EYE Teested @ 275,000# 275 000# and wrap around n ose plate. Standard on all trailers.

AIR LIFT FRONT AXLE COMPAC-TRAC SUSPENSION Ultra lift design requires no frame modification,maximum lift and ground clearance.

HIGH TENSILE MAIN RAIL

ADJUSTABLE A 3-LEAF SUSPENSION Standard on all 15-25 Toon trailers.

One piece and cold formed.

CROSS MEMBERS pierced through Main Beam for lowest possible deck height and more unitized frame. APITONG/COMPOSITE DECK Durable Composite Decking is fastened to the crossmembers with bolts and deck washers making it easier to replace decking when required.

ALL WHEEL ABS with Spring p g Brakes on all axles. Standard on all air brake trailers.

98” WIDTH

Eager Beaver WIDE TRACK AXLES: 98”

92” WIDTH

Some Competition - 92”

77

SUMITOMO BRAND TIRES National Dealer Supported. HUB PILOTED WHEELS Outboard brake drums for easier maintenance.

th

ANNIVERSAR RY Y

1946-2023

For a quote on any model model, pplease call 800-257-8163

> EagerBeaverT >> rBeaverTrailers Trailers.co com


Page 8 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

AECOM to Lead $700M Design-Build Project in Texas Construction, engineering and industry consulting firm AECOM recently said it has been named lead designer for Lone Star Constructors’ $700 million design-build contract for the Interstate (I)-35 Northeast Expansion (NEX) South project in San Antonio (Bexar County), Texas. Lone Star Constructors, which is comprised of Fluor (Irving, Texas) and Austin Bridge & Road (Coppell, Texas), will also maintain the project area’s pavement; structures; drainage facilities; and earthworks, embankments and cutting for 15 years under an $18.7 million general maintenance contract with the Texas Department of Transportation (TxDOT). Under the design-build contract for the 4mi. project, Lone Star will build three elevated express lanes — two general purpose and one HOV (high-occupancy vehicle) — along I-35 in each direction. The NEX South project is one of three that make up the multibillion, 16-mi. I-35 NEX. Part of the statewide Texas Clear Lanes program meant to ease highway congestion, I-35 NEX will see the addition of non-tolled express lanes, new interchanges, access to and from I-35 main lanes and other related work along the project corridor.

The first two contracts for the full project, according to the TxDOT, are design-build — one with Lone Star Constructors and the other with Ferrovial subsidiaries Ferrovial Construction and Webber. The $1.5 billion I35 NEX central project will see Ferrovial carry out a scope of work similar to Lone Star's but along 9.5 mi. of the highway. That work is underway. “We are proud to extend our relationship with the Texas Department of Transportation on this important project that will provide

the transportation infrastructure needed to support the dynamic San Antonio and Austin regions,” said Lara Poloni, AECOM president. “Our teams will deploy their unrivalled technical expertise and local knowledge to complete these ambitious improvements, expanding our record of delivering transformative transportation projects across Texas," Poloni said. Recently, AECOM announced that it had been named lead designer for the

Washington State Department of Transportation's $605 million (legislative funding) I-405, Brickyard to SR 527 improvement project in Seattle-area Bothell, Washington. Skanska USA Civil is the contractor. The 4.5-mi. project will see the expansion of the dual express toll lane (ETL) system, according to Skanska, and includes new lanes, direct access ramps, interchange improvements, bus rapid transit infrastructure and new fish passage culverts. 

TxDOT photo

Under the design-build contract for the 4-mi. project, crews will build three elevated express lanes — two general purpose and one HOV (high-occupancy vehicle) — along I-35 in each direction.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 9

NPT1200 Niece Water Towers deliver reliability and durability when you need fast mobile water service. With a 12” discharge tube it fills your tanks at a rate of over 1,000 gallons per minute. Offers removable power pack for security, fifth wheel tow hitch, professionally engineered and constructed. It features (8) legs for stability . 5th wheel set up for quick “tow and go.”

FUEL AND LUBE TRUCKS

OFF ROAD WATER TRUCKS OVER THE ROAD WATER TRUCKS

FUELER TRUCKS


Page 10 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Crews Perform Upgrades On Loop 335 Project in Segments LOOP from page 1

Webber is working on Sub-Segment C-1, 5.8 mi. from SW 9th Avenue to FM 1719. Phase I, SW 9th Avenue to FM 1719, has crews working on frontage roads. Phase II, unfunded, SW 9th Avenue to FM 1719, will cover mainlanes and grade separations at arterials. Work began in 2023 and delivery is expected in late 2026. “We’re very happy with the work that Webber has done and continues to do on the SL 335 project. This project is progressing ahead of schedule and drivers expect safe, highquality roadways here in Amarillo standards and that’s what we aim to give them,” said Joe Chappell, Amarillo area engineer. “The TxDOT Amarillo District and the Amarillo MPO have identified SL 335 as a top priority, transportation project candidate with the goal of upgrading the entire loop to a controlled-access roadway consisting of mainlanes, ramps, one-way frontage roads with bicycle and pedestrian accommodations, and four multi-level interchanges [I-40 east, I-40 west, I-27 south and US 87 north],” states the project web page. Construction Details The SL 335 Corridor Development study, adopted by the Amarillo MPO in October 2014, noted that the majority of the loop could be “upgraded to a freeway by generally following the existing alignment except a portion of Segment B TxDOT photo referred to as B-2. Sub-Segment B-2 will generally be con- Another element of the project is the West SL 335/I-40 interchange being done in two phases. Phase I deals with structed on a new location alignment to re-route the loop the I-40 2nd-level bridge and SL 335 frontage roads and should be completed next summer. Phase II, unfunded, around an existing portion of the loop which has evolved will cover the SL 335 3rd-level bridge and direct connectors. into an urban arterial [Soncy Road]. Right-of-Way acquisitions/relocations and utility relocations are expected on each Completed Construction Upcoming Construction segment. Construction of Phase I — mainlanes, frontage roads and Segments A-3 (from FM 1541, Washington Street, to SE “The SL 335 B-2 Sub-segment required right-of-way the I-40 2nd-level bridge — was completed in 2022. Phase 34th Avenue) and A-4, are still in the planning stage. A-3, 9.6 acquisition from the Amarillo Helium Plant property located II, which has not been funded, will include the SL 335 3rd- mi., will construct mainlanes, frontage roads and grade sepat Helium Road and Amarillo Boulevard,” it added. “The level bridge and direct connectors. arations at arterials through phased construction. Helium Plant was previously determined eligible for listing Sub-section 1-A, from I-27 to Georgia Street; and A-2, Segment B (Bell Street to Southwest 9th Avenue) is in the National Register of Historic Places for its association from Georgia Street to FM 1541 (Washington Street); cov- approximately 9.9 mi. It includes a multi-level interchanges with the federal government’s helium program as the head- ered 3.8 mi. and were completed in 2018 and 2019. J. Lee at I-27 south and I-40 west. A new location sub-segment quarters and primary research laboratory. A Section 4[f] Net Milligan Construction delivered A-1 mainlanes, frontage with mainlanes, ramps, frontage roads, grade separations and Benefit determination was executed based on a roads, grade separations at arterials; and A-2, done by arterials is part of the work. The existing alignment is fourMemorandum of Agreement between TxDOT, Texas Webber, dealt with frontage roads and a BNSF railroad lane rural highway from Bell Street to FM 2590 and then a Historical Commission, and Advisory Council on Historic bridge. new location section along Helium Road to SW 9th Avenue. Preservation prior to TxDOT’s acquisition of C-2, FM 1719 (Western Street) to Echo a portion of the property.” Street (4 mi.), has not started yet. The work Segment A covers Bell Street to Southeast will cover mainlines and grade separations 3rd Ave. It involves approximately 15.5 mi. of and arterials. Planning is ongoing for the improvements that include a multi-level North SL 335/U.S. 87 interchange work, Interchange at I-40 east, mainlanes, ramps, which will be done in two phases, covering frontage roads, grade separations at arterials the U.S. 87 2nd-level bridge and SL 335 and railroad crossings. The existing alignment frontage roads and theSL 335 3rd-level from Bell Street to Washington Street bridge and direct connectors. (Segments A-1 and A-2) is four divided mainSegment D (8.3 mi.), from Echo Street to lanes, two-lane frontage roads, ramps and SE 3rd Avenue, is still being planned. The grade separations at Bell, Western and work will include mainlanes, ramps, Georgia streets, as well as BNSF Railroad. frontage roads, grade separations at highFrom Washington Street to Potter County ways, arterials and railroad crossings. The Line is a two-lane rural highway switching to existing alignment is a four-lane divided four-lane divided to I-40 east. From I-40 east highway from Echo Street to U.S. 60 and to SE 3 rd Avenue is an existing four-lane then a four-lane undivided roadway to SE undivided roadway. The work for the East SL 335/I-40 inter3rd Street. change runs from SE 34th Avenue to SE 3rd The various segments were designed by TxDOT photo Avenue (2.1 mi.) and includes the I-40 east ABCI is responsible for four elements, two of which are ongoing and two have been HNTB, JMT, HDR and Huitt Zollars.  five-level interchange. completed this past year. CEG


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 11

g

KIRBYUSED.COM

“One of the largest sources of used Komatsu equipment in North America”

2017 Komatsu PC490LC-11

2017 Komatsu PC490LC-11

HYD KM17166M $217,000 6,595 hrs.

HYD KM17181M $238,500 5,875 hrs.

2019 Komatsu PC360LC-11

2020 Komatsu PC360LC-10 2019 Komatsu PC290LC-11

2019 Komatsu PC240LC-11

2012 Komatsu PC88MR-8 HYD, Roadliner Blade, QC, BKT KM12603X $47,500 10,213 hrs.

2019 Komatsu D39PX-24

2018 Komatsu HM400-5

Pat, Drawbar K191511M $102,500 2,637 hrs.

40T & Tailgate KM18095M $261,000 8,949 hrs.

2018 Takeuchi TL10V2-CRR 2017 Takeuchi TL12V2-CRR

2022 Terramac RT-7R

2020 Terramac RT-6

Cab, Rubber Tracks, Ride Control TL18108 $46,000 2,836 hrs.

Crawler High Lift Gate Bed TM22000 $259,000 464 hrs.

Track Carrier Flat Bed TM20015 $138,500 988 hrs.

QC, 42” BKT K20715U $249,500 2,830 hrs.

K191558X $174,000 4,277 hrs.

2018 Komatsu WA500-8

2016 Komatsu D61PX-24

2011 Komatsu WA380-6

Turbo KM18209 $199,500 12,352 hrs.

PAT, Drawbar KM16928M $162,500 3,977 hrs.

40T & Tailgate KM18817M $250,000 10,039 hrs.

HYD, Thumb, BKT K181312X $190,500 4,735 hrs.

K191561X $125,000 6,703 hrs.

HYD K19047M $228,500 2,751 hrs.

2018 Komatsu HM400-5

2018 Komatsu PC360LC-11

KM11525X $59,500 10,549 hrs.

Cab, Rubber Tracks, Ride Control TL17017 $54,000 3,338 hrs.

CONTACT US TODAY - (888) 460-6717 I WWW.KIRBYUSED.COM All sales are subject to availability at time of order. Prices do not include taxes or other applicable fees. Kirby-Smith Machinery, Inc., doesn’t engage in exports to embargoed countries. Sold as-is, where-is.


Page 12 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

South Texas’ one stop truck & trailer source! Robstown

Houston

Burnet

3205 Highway 44 Robstown,TX 78380

11113 Wallisville RD Houston,TX 77013

1103 S. Water St. Burnet, TX 78611

361-387-5010

713-670-0733

512-234-8178

www.jbpavelkainc.com

NEW Travis Aerolite XLT End Dump Trailers

NEW Thunder Creek Fuel/ Used Truck & New/Used Trailer • Lube Trailers Fuel/Lube/ Sales/Parts/Service NO HAZAT NEEDED Trailers • Full rigging shop • Full fabrication shop • Reflooring • Truck frame modifications • Tarp system repair/ installation • Field Service • Conversions

• Custom builds • Trailer Service (Light up to Heavy duty) • Truck Maintenance (Medium & Heavy Duty) • Laser alignments on truck & trailers (unlimited axles) • Texas DOT inspection station


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 13

THE DOER’S DREAM Loved for the features. Trusted for the performance.

WE FOCUS ON THE MACHINE SO Y YO OU CAN WORK. O

Hyundai wheel loaders have the power and performance — not to mention top-notch interiors, accurate onboard weighing system, unique bucket design for better load retention, clear sight lines, and handy tech — that make life on the jobsite easier. So you can do more without feeling like

See the Hyundai difference yourself at your local dealer or hceamericas.com.

Corpus Christi, TX San Benito, TX

El Paso, TX

361-289-0066

956-361-0066

915-541-0066

Victoria, TX

Laredo, TX

San Antonio, TX

361-576-0066

Corpus Christi, TX 361-289-0066

Victoria, TX

361-576-0066

956-725-0066

San Benito, TX

713-247-0066

210-310-0066

El Paso, TX

956-361-0066

915-541-0066

Laredo, TX

Houston, TX

956-725-0066

Houston, TX

713-247-0066

San Antonio, TX 210-310-0066

Corpus Christi, TX 361-289-0066

Victoria, TX

361-576-0066

San Benito, TX

El Paso, TX

956-361-0066

915-541-0066

Laredo, TX

Houston, TX

956-725-0066

713-247-0066

San Antonio, TX 210-310-0066


Page 14 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Williams Brothers Begins Clear Lanes Project in Houston The Texas Department of Transportation was joined by Texas Transportation Commissioner Robert C. Vaughn, Houston City Councilwoman Carolyn Evans-Shabazz and other elected officials, local leaders, community members and TxDOT staff to celebrate the beginning of the Texas Clear Lanes project at State Highway 35 from Griggs Road to Interstate 45/Spur 5. The project was awarded to Williams Brothers Construction in March 2023 for $93.9 million. Current TxDOT projects in the southeast Houston area have a total investment of $995 billion. As part of the Texas Clear Lanes program and to accommodate continued population growth, the project will construct a new eight lane freeway including 12-ft. mainlanes with ramps and four direct connectors; and also widen the existing bridge to increase capacity, reduce congestion and improve overall traffic flow — particularly during hurricane evacuations. “The improvements we’re making here in Houston and other metro areas are the governor’s vision to clear traffic logjams and get Texans — and Texas products — moving quickly again on our state’s roads,” said Vaughn. “Getting the traveling public through safer and faster is the goal and, since 2015, the Texas Clear Lanes program has $64 billion of non-tolled projects that are completed, under construction, or planned.” The average daily traffic of the project limits, a 1.81-mi. segment, is more than 102,000 vehicles per day and in the next 10 years, it is projected to increase to more than 142,000. An important corridor, it serves as an alternate artery connecting the SH 35 corridor to I-45 and SH 288 for people traveling between southeast Houston and the Houston Central Business District, University of Houston, Texas Southern University, the Historic Third Ward and William P. Hobby Airport. Situated along the railroad corridor on the west side of the railroad, the project will improve linkage between major corridors in southeast Houston, including four roadways on the National Highway System: I-610, U.S. 90A — Alternate 90, I-45, and SH 288. “The State Highway 35 acknowledges the continued population growth in our city and our responsibility to provide robust infrastructure that can accommodate this growth,” said Shabazz. “It will serve to better connect major corridors in southeast Houston making it an invaluable artery in our city’s transportation network.” The SH 35 project also crosses main line BNSF and Union Pacific railroads near the roadway intersection of Mykawa Road, Long Drive and Griggs Road. This triangular roadway intersection is complex due to at-grade rail crossings with these railroads. The project will provide access ramps immediately north of the triangular intersection as well as provide a grade separated route for north-south traffic. The SH 35 project began in April 2023 and is expected to be complete by fall 2026. Road closure information will be posted at For more information about the project, contact TxDOT Houston District Public Information Officer Kristina Hadley at 713/802-5076. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 15


Page 16 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Beyond the Road Program...

Construction of New Wildlife Crossings Making Area Safer

mhl 375 F -SERIES

NED-Texas Houston 8111 Mills Road Houston, TX 77064 800-234-5007 281-807-9777

STRONG. RELIABLE. E EFFICIENT. Discover Morre Fuchs World- Class Material Handlers

Dallas 5524 West Ledbetter Drive Dallas, TX 75236 866-270-1700 214-388-1700

© 2019 Terex Corporation. Fuchs is a trademark owned by Terex Corporation or its subsidiaries.

TxDOT has been constructing animal crossings under highways in critical areas to help protect all Texans safe, both people and animals — including endangered species, like the ocelots who live in South Texas near the Mexico border. These crossings provide a path to get across a roadway away from traffic, preventing crashes that hurt both animals and drivers. TxDOT has built 32 animal crossings across the state and at 21 locations in South Texas specifically to protect ocelots. In Aug. 2023, TxDOT applied for federal grant funding from the Wildlife Crossings Pilot Program for two more locations related to protecting ocelots. The program is part of the $1.2 trillion Infrastructure Investment and Jobs Act that made $350 million available over five years for construction of wildlife crossings. And the crossings, most of which are concrete tunnels connecting existing wildlife paths under highways, have had success. And not just for ocelots. “TxDOT has been monitoring results and found that the crossings are successful in allowing multiple wildlife species to cross our roads,” said TxDOT Environmental Specialist John Young Jr. “As many as 26 different species have been documented using TxDOT wildlife crossings, including mountain lion, alligator, ocelot, bobcat, coyote, Texas indigo snake, striped skunk, racoon, beaver, bridled weasel to name a few.” Ocelots, which look like miniature leopards and about the size of a bobcat, were once found all across Texas. They’d also appear in Arkansas and Louisiana and even down as far south as Argentina. But their habitat in the United States has shrunk greatly over the past 100 years and more. Now, the only population in the country is in deep South Texas. TxDOT hopes to construct more animal crossings around the state — 13 more are currently planned in the Pharr area. TxDOT hopes to construct more as funds become available — to help keep ocelots, other animals and humans safe. Projects like this are apart of TxDOT’s Beyond the Road program, telling the story of TxDOT’s environmental responsibilities. Every day, teams of archeologists, historians and environmental scientists work with engineers to plan around the state’s natural, historical and community resources before building roads and bridges. About Wildlife Crossing Program The Wildlife Crossings Pilot Program (WCPP) is a competitive grant program with the goal of reducing Wildlife Vehicle Collisions (WVCs) while improving habitat connectivity for terrestrial and aquatic species. In creating the WCPP, Congress found that there are more than 1,000,000 WVCs annually, which present a danger to human safety and wildlife survival, cost over $8 billion, and result in approximately tens of thousands of serious injuries and hundreds of fatalities on U.S. roadways. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 17

The Worldwide Leader in Concrete Paving Technology

www.gomaco.com ❘ info@gomaco.com GOMACO offers the full range of concrete slipform pavers, curb and gutter machines, trimmers, placer/spreaders, texture/cure machines and bridge/canal finishing equipment. GOMACO equipment features our exclusive and proprietary G+® control system, created in-house by our software engineers from the wants and needs of contractors paving in the field. At the heart of GOMACO equipment is our passion for concrete and our commitment to our customers. We look forward to visiting with you about your upcoming paving projects and your concrete paving equipment needs. Our worldwide distributor network and our corporate team always stand ready to serve and assist you.

ROMCO Equipment Co. www.romco.com

Sierra Machinery, Inc. www.sierraelpaso.com

Buffalo, TX 903-322-5602

Ft. Worth, TX 817-626-2288

Longview, TX 903-758-5576

Carrollton, TX 214-819-4100

Houston, TX 713-937-3005

Midland, TX 432-234-9409

939 Hawkins Boulevard El Paso, TX 79915 915-772-0613

Closner Equipment Company Inc. www.closner.com

San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131

Austin Branch 13800 FM 973 N Manor, TX 78653 512-272-8200


Page 18 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 19

sa and d or pr producing oducing in the mo modular/mini/ dular/mini//mobile ffrac rac sand m mining sspace. pace UP TO

2200

STPH washed h d andd drip free frac sand

2 modes m

produce d allll 100 1 0meshh frac f sand, d or 100 1 and 200mesh frac sand concurrently

1 weekk

quick i k assembly bl and a d small footprintt

Unrivaalled

support & parts networkk based in La Grange and DFW

Serving TTeexas, Oklahoma, Arkaansas & Louisiana 5680 West State Hwy 7 1, La Grange, T X 78945 | 800 800-2555-862 55 8628 | www.powerrscreent x .com


Page 20 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Construction Starts On Texas A&M Animal Research Center Texas A&M AgriLife Research hosted leaders from across The Texas A&M University System in a groundbreaking ceremony of the new Animal Reproductive Biotechnology Center at Texas A&M-RELLIS, a 2,400-acre applied research campus in Bryan. The $13 million facility is a joint construction project of AgriLife Research and the Texas A&M College of Agriculture and Life Sciences Department of Animal Science, with completion expected in 2025. The center will be integral to new opportunities for advancing collaborative research, teaching and outreach in the department while supporting an overarching vision of leading the science around animal pregnancy and development. “The beginning of this construction is another step in carrying out the land-grant mission across The Texas A&M University System,” said Chancellor John Sharp. “This technologically advanced facility will keep Texas A&M at the forefront in advancements in animal expertise and propel innovative, science-based solutions that lead the industry in overcoming challenges.” “Innovations in livestock reproduction are crucial to agriculture in Texas, and this building will be an important part of the big ‘ecosystem’ of agriculture and life sciences at Texas A&M,” said Jeffrey W. Savell, vice chancellor and dean of Agriculture and Life Sciences. “This new facility will move research forward and will help train producers and students to carry on this work into the future.” The new center will be fundamental to increased understanding of ruminant reproduction at molecular, cellular and

G. Cliff Lamb, director of AgriLife Research, speaks during the groundbreaking ceremony for the new Animal Reproductive Biotechnology Center at Texas A&M-RELLIS.

(L-R): Jeffrey W. Savell, vice chancellor, dean of Agriculture and Life Sciences; John Sharp, chancellor of The Texas A&M University System; G. Cliff Lamb, director of AgriLife Research; Clay Mathis, head of the Department of Animal Science; Ky Pohler, associate professor in the Department of Animal Science; and David DeLeon, director of facilities and construction.

whole-animal levels while continuing work to address known reproductive issues. It will serve to advance innovation and collaboration through industry-partnered research focusing on the latest techniques and technologies that optimize reproductive efficiency and minimize economic loss for producers. G. Cliff Lamb, director of AgriLife Research, said the new center dovetails with a string of advancements across the

Houston, TX 713-247-0066

state research agency that contributed to a near doubling of competitive awards in fiscal year 2023. He also cited the establishment of several interdisciplinary initiatives to solve overarching challenges facing Texas commodities. “This facility will be a major boost to translational research for sustainable livestock systems,” Lamb said. “It is critically important that we generate science our partners can trust and apply, and which nourish healthy lives, livelihoods and economies.” The center will house labs, educational spaces, office space and animal holding and handling areas separated by size and ruminant type. Designated areas for each group will include chutes for specimen collection, stanchion space for hands-on instruction and preparation and recovery spaces for small ruminants. These workspaces will be supported by load-out areas, holding pens and alleyway circulation. “It is exciting to envision what we can discover, and the lives we will improve, as a result of the work at this new facility,” said Clay Mathis, head of the Department of Animal Science. “This facility will further empower our exceptional team of experts to make new discoveries and open up new experiences for students.” “It’s an exciting day to be an Aggie, a faculty member and a student at Texas A&M,” said Ky Pohler, associate professor of the Department of Animal Science. “This one-of-akind space brings together the latest reproductive technologies under one roof to support research and hands-on teaching. There is no other space like this that exists in the U.S.”  (All photos courtesy of Texas A&M.)

San Antonio, TX 210-310-0066

www.nuecespower.com

Rendering of the new faclility


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 21


Page 22 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

TEXAS STATE SUPPLEMENT ADVERTISER INDEX

TxDOT Awards Extra Mile Honor to Pair of Employees

AIR COMPRESSOR SOLUTIONS INC ..........................18 BANE MACHINERY ........................................................24 BAYONET-RECS ............................................................14 BEE EQUIPMENT SALES LTD ......................................18 BOTTOMLINE EQUIPMENT LLC ..................................18 CLOSNER EQUIPMENT CO INC ..................................12 COMPACT CONSTRUCTION EQUIPMENT ..................5 EAGER BEAVER TRAILERS............................................7 GOMACO CORP ............................................................17 GORILLA HAMMERS........................................................1 HIGH TECH INDUSTRIES................................................1 J & B PAVELKA INC ......................................................12 JCB TEXAS - TRIANGLE DEALERS..............................23 KIRBY-SMITH MACHINERY INC ..................................11 NATIONAL EQUIPMENT DEALERS (NED) ..................16 NIECE EQUIPMENT ........................................................9 NUECES POWER EQUIPMENT ..............................13,20 POWERSCREEN TEXAS ..............................................19 ROKBAK ..........................................................................21 ROMCO EQUIPMENT CO................................................2 TROPHY TRACTOR INC. ................................................3 VERMEER OF TEXAS-LOUISIANA ..............................15 WAUKESHA-PEARCE INDUSTRIES INC........................8 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

TxDOT photo

Presidio Assistant Maintenance Supervisor Jesus Hernandez (L), seven years at TxDOT; and Crew Chief Jose Ruben Hernandez, 20 years at TxDOT.

The Texas Department of Transportation (TxDOT) awarded the Extra Mile Awards at their annual Texas Transportation Short Course in College Station. The Extra Mile Award recognizes employees who have acted heroically to help a fellow Texan in need. An employee who receives this award has saved someone’s life or attempted to save another life while on the job or on the employee’s own time or acted in a heroic manner to prevent injury to another person or to diminish a life-threatening situation. This year recipients included Presidio Assistant Maintenance Supervisor Jesus Hernandez (seven years at TxDOT) and Crew Chief Jose Ruben Hernandez (20 years at TxDOT). The pair rescued a stranded motorist in a low water crossing. The crew received the call for assistance from the Presidio County’s Sheriff’s Office about 9 p.m. May 27 and were not surprised, both had been working low water crossings and were expecting that same creek to run in the middle of the night, so they left the section maintainer stationed on that creek. The Terneros Creek, as it is called is one of the biggest low water crossings in the Presidio section of FM 170. The plan was simple: get the maintainer, drive in, load the stranded motorist and drive back out — all while remaining safe. As they drove deeper into the water, they

noticed the water was running rapidly, easily three feet deep and was rising. They also noticed the stranded motorist was a Border Patrol Agent. Ruben drove up beside the agent’s truck as close as he could without contacting the machine and the agent’s truck. Jesus climbed out in front of the maintainer’s front section and stood on the moldboard. Ruben rotated the moldboard towards the agent’s truck as Jesus reached out for her. The agent grabbed Jesus’ hand and he helped her onto the machine and secured her. Without the assistance of the TxDOT team, the agent would have remained in grave danger potentially being swept away. “These employees embody the selfless, caring, responsive demeanor we strive to achieve every day in our roles to serve others,” said TxDOT El Paso District Engineer Tomas Treviño. “They didn’t think twice about stopping to render aid and this was especially important in such a remote area of our District.” The first Extra Mile Award was presented in 1983. Recipients are recognized publicly and receive a plaque. This is not the first time staff from the TxDOT El Paso District have been recognized. Staff members were recognized in 2008, 2015, 2018 and 2022. This is the third Extra Mile Award for Jose Ruben Hernandez. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • December 3, 2023 • Page 23

Tough to beat for performance, safety, comfort and easZ of use.

3744 S East Loop 410 San Antonio, TX 78222 210-610-8100

11211 North Freeway Rd. Houston, TX 77037 281-982-9030

16449 N Interstate 35 Frontage Rd Austin, TX 78660 512-960-8400

monkjcb.com

bossjcb.com

JCBNA

@JCBNA

JCBNORTHAMERICA

JCBNA

Better? It’s something we all strive for. But to be better you must be efficient. Be productive. Be versatile. Be dependable. And you need equipment that supports you every step of the way, no matter how big or small the task. Because good enough is never good enough. Check out our full line of JCB products at your local dealer or visit JCB.com today.

1690 E Hwy 121 Lewisville, TX 75056 844-599-8728

4851 Blue Mound Road Fort Worth TX 76106 866-677-7753

southstartxjcb.com

www.jcb.com


Page 24 • December 3, 2023 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

True Power. At Bane Machinery, we offer Liebherr machines that are custom-engineered to perform efficiently. And we stand behind them with full service. Count on us for original parts, factorytrained technicians, and an extensive inventory of machines for your toughest jobs. We can also service your equipment to OEM standards in the shop or the field. We haven’t compromised on anything; why should you?

DALLAS 2449 Manana Dr. Dallas, TX 75220 Ph: (214) 352-2468

FORT WORTH 10505 North Freeway Fort Worth, TX 76177 Ph: (817) 847-5894

TYLER 3402 N. NE Loop 323 Tyler, TX 75708 Ph: (903) 597-6641

www.banemachinery.com


Turn static files into dynamic content formats.

Create a flipbook
Texas 25, December 3, 2023 by Construction Equipment Guide - Issuu