Skip to main content

Texas 17, August 15, 2021

Page 1

State Supplement sponsored by:

TEXAS STATE EDITION

A Supplement to:

SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY

®

August 15 2021

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. VI • No. 17

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

Your Texas Connection • Dennis Hogeboom • 1-877-877-4997 • dennishogeboom@cegltd.com

CALL 800-367-4937 *On approved credit • Financing Available

By Irwin Rapoport CEG CORRESPONDENT

Construction crews from Bridges and Roads LLC are making considerable progress on the $27.4 million RM 620 Roundabout project (I-35 to Deep Wood Drive) in the city of Round Rock (Williamson County). The project began on March 11, 2020, and the general contractor expects to deliver the final product at the end of 2022. A key element of the project is to build new overpasses for through traffic and frontage road lanes for local traffic to improve safety and mobility. RM 620 from I-35 to Deep Wood Drive has a high volume of traffic and congestion, and this construction project will alleviate those issues. The project was designed by Halff. “The design of this project is very unique and is the first of its kind,” said John Peters, TxDOT Georgetown area engineer. “I am not aware of any other locations that have a roundabout and a

Bridges and Roads LLC is the general contractor for the $27 million project that will feature a new roundabout and overpasses on RM 620 in Round Rock.

see ROUNDABOUT page 18

Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas

We Have Parts For: Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case

(254) 562-7500 • www.HighTech-parts.com


Page 2 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

HEAVY CONSTRUCTION EQUIPMENT EARTHMOVING, UTILITY, MATERIAL HANDLING, DEMOLITION, SCRAP & RECYCLING

CRUSHING, SCREENING, DRILLING & WASHING MOBILE & STATIONARY EQUIPMENT

Sales - Rentals - Parts - Service

Sales - Rentals - Parts - Service

214.819-4100/800.227-6626 www.romco.com

214.819-4100/800.227-6626 www.romco.com

PAVING TEXAS CONCRETE & ASPHALT PAVING EQUIPMENT

YOUR HEAVY DUTY POWER ADVANTAGE COMPRESSORS, GENERATORS, PUMPS & LIGHT TOWERS ENGINE &

HAMMER

Sales - Rentals - Parts - Service

REBUILDS

214.819-4100/800.227-6626 www.romco.com

210.569-7068 / 800.966-4601 www.romco.com


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 3

Agricultural Tractors

Dozers - Crawler

Motor Graders

Water Equipment - Trucks

2015 JOHN DEERE 6215R ..................................$139,500

2012 CATERPILLAR D11T ......................................$CALL

2019 CATERPILLAR 140M3 ....................................$CALL

2017 CATERPILLAR 773G ..........................................$539,500

(4) 2018/19 JOHN DEERE 6120M ................From $79,500

2017 CATERPILLAR D10T2, 3456 Hrs ................$995,000

2014 CATERPILLAR 140M2 VHP ............................$CALL

2013 CATERPILLAR 740B ..........................................$329,500

2018 JOHN DEERE 5125R ....................................$98,500

2011 CATERPILLAR D10T, 11,778 Hrs................$575,000

2019 CATERPILLAR 16M3 ..................................$825,000

(4) 2014-15 CATERPILLAR 725C ....................From $229,500

(2) 2017 JOHN DEERE 5085M ....................From $59,500

2018 CATERPILLAR D9T ....................................$805,000

2016 CATERPILLAR 14M VHP ............................$405,000

2017 CATERPILLAR 725C2 ........................................$339,500

(2) 2018 CATERPILLAR D8T ......................From $559,500

2007 CATERPILLAR 16H......................................$175,000

2019 FORD F750 ............................................................$95,000

2004 CATERPILLAR D8R II ..................................$125,000

2007 CATERPILLAR 14H......................................$155,000

Artic Trucks (2) 2019 CATERPILLAR 745 ..........................$465,000 Ea.

2020 CATERPILLAR D6 XL ....................................$CALL

(5) 2016-2019 CATERPILLAR 725C2 ........From $199,500

(5) 2019/20 CATERPILLAR D6 LGP ..........From $425,000

(2) 2014-15 CATERPILLAR 725C ..................$189,500 Ea.

Compactors - Padfoot/Smooth Drum 2020 CATERPILLAR 815K ......................................$CALL

(4) 2014-19 CATERPILLAR D6T XW..........From $159,500 2015 CATERPILLAR D6N XL, 3235 Hrs ..............$164,500

(4) 2017/18 CATERPILLAR CS56B ..............From $64,500

(18) 2018-20 KENWORTH T370....................From $89,500

Scrapers

VOLVO A25D ........................................................$119,500 1980 CATERPILLAR 637D......................................$59,500

Wheel Loaders

2018 CATERPILLAR D6K2XL ..............................$185,000

Skid Steers - Track

1991 CATERPILLAR 992C ......................................$CALL

Excavators - Crawlers

2014 CATERPILLAR 299D XHP ............................$45,000

2019 MOROOKA MST4000VD..............................$319,500 (2) 2018 MOROOKA MST3000VD ..............From $229,500

2017 CATERPILLAR 349FL..................................$329,500 2019 CATERPILLAR 336 ......................................$289,500 2017 CATERPILLAR 336FL, 2941 Hrs ................$215,000

2007 CATERPILLAR 966H....................................$127,500 (2) 2018 CATERPILLAR 938M..............................$169,500

(7) 2014-18 CATERPILLAR 299D2 XPS ......From $59,500 2014 CATERPILLAR 299D......................................$45,000

Miscelleneous Equipment

2016 CATERPILLAR 242D......................................$39,500

2021 ROME TRCW16................................................$CALL 2018 ROME TRCW12 ..............................................$48,500 2019 ROME TACW16 ..............................................$36,000

2014 CATERPILLAR 329EL, 4134 Hrs ................$159,500

(2) 2019 MOROOKA MST1500VD ..............From $149,500

2015 CATERPILLAR 323FL..................................$132,500

2016 CATERPILLAR 236D......................................$35,500

MOROOKA MST660VD ..........................................$89,500

(2) 2018/19 CATERPILLAR 320..................From $179,500

(5) 2021 JOHN DEERE 333G ..................................$CALL

2018 ROME TCW28 ................................................$19,750

2017 CATERPILLAR 316FL..................................$169,500

(3) 2017-19 CATERPILLAR 963K ..............From $265,000

Water Equipment - Tower/Tanks Off-Highway Trucks

(2) 2018/2019 CATERPILLAR 966M ....................$318,500

(3) 2021 CATERPILLAR 299D3................................$CALL

(4) 2018/19 MOROOKA MST2200VD ........From $179,500

Crawler Loaders

2019 CATERPILLAR 982M ..................................$439,500

(3) 2020 CATERPILLAR 299D3 XPS ......................$CALL 2017 CATERPILLAR 390FL..................................$479,500

Crawler Carriers

(16) 2018-21 PETERBILT 348 ....................From $119,500

1993 CATERPILLAR 637EII..................................$139,500

2016 CATERPILLAR D6N LGP ............................$139,500

(4) 2013-17 CATERPILLAR CS66B............From $129,500 (6) 2013-18 CATERPILLAR CP56B............From $129,500

(2) 2007/15 FREIGHTLINER M2 ........................From $49,500

2018 ROME TCW32 ................................................$23,000

(5) 2020/21 Klein KPT-120 Water Towers ....From $54,500

(4) 2009-2011 CATERPILLAR 785D ..........From $595,000

Dozers - Wheel

(2) 1995 CATERPILLAR 777C ................................$59,500

Winch

2015 CATERPILLAR 834K....................................$285,000

(2) 1991 CATERPILLAR 773B ......................From $59,500

PACCAR PA110VS245 ..............................................$7,500

Authorized dealer for


Page 4 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

McCarthy Construction Will Build Two Houston Port Jobs McCarthy Construction Cos. was recently officer, said during the port commission awarded three construction projects aimed at meeting. expanding cargo capacity at Port Houston Port Houston handled 288,127 20-ft. and the Houston Ship Channel. equivalent units in May, a 30 percent Two of the projects, totaling $99 million, increase compared to the same month in 2020. are for the port’s expansions at its Bayport McCarthy also is adding 10 acres of new Container and Barbours Cut terminals. The shipping container storage at the Barbours third is to expand a dock along the Houston Cut Terminal Container Yard 3N, the comShip Channel for a petrochemical company, pany said. The project, which also includes McCarthy said in a release. utility and road upgrades, is scheduled to be The Bayport Container Terminal project completed in 2022. at Wharf 6 includes construction of a 1,000McCarthy also was awarded a project by ft.-long wharf to allow for the latest genera- an international petrochemical bulk storage tion of container cranes, enabling larger ships to call Port Houston. Construction on Wharf 6 is scheduled to be completed in 2023. Wharf 6 at the Bayport Container Terminal is undergoing a $200 million expansion to stay ahead of the continuing growth in cargo volume, port officials said. “If you look at a wharf, it doesn’t do as much good to build a wharf if we don’t build a yard behind it, and it doesn’t do as much good to build the wharf or Two of the projects, totaling $99 million, are for the port’s the yard if we don’t buy the equip- expansions at its Bayport Container and Barbours Cut ment to run it,” Thomas J. Heidt, terminals. The third is to expand a dock along the Port Houston’s chief operating Houston Ship Channel for a petrochemical company.

McCarthy Construction recently completed projects at Bayport Container Terminal wharves 4 and 5, as well as a new container yard project at the Barbours Cut Terminal.

terminal services company located in Port Houston. McCarthy declined to name the company at this time. The petrochemical operator project is for the construction of a new unloading barge dock and the addition to an existing bulkhead wall. It

is scheduled to be completed in 2022. St. Louis-based McCarthy has worked on various projects at Port Houston over the past 30 years. The company recently completed projects at Bayport Container Terminal wharves 4 and 5, as well as a new container yard project at the Barbours Cut Terminal. 

Construction Crews Place 1.5-Million-Lbs. of Girders On I-635 Pegasus Link Constructors — the joint venture of Fluor Construction and Balfour Beatty — installed steel girders for the bridge and future replacement ramp for the existing northbound I-635 direct connector to westbound I-30. Different from the typical concrete beams used for other bridges along the project, the steel girders are used for new bridges that require longer spans or a certain curvature with fewer bents and columns. The four-girder, two-span steel girder unit extends over 492-ft. long — one spanning over the southbound I-635 frontage road and main lanes and the other girder spanning over the northbound

main lanes and frontage road. Together, the girders weigh 1.5 million lbs. of the project’s total of 38 million lbs. of structural steel. “This milestone is the first step of many to rebuilding this highly, complex four-level interchange,” Shad Gardner, director of construction for Balfour Beatty as part of the PLC joint venture, said in a statement. “Our team will continue to build bridge and roadway structures for this project, with the first direct connector opening later this year, and look to complete the entire project by late 2024.” For more information, or to follow the I-635 East construction progress, visit 635east.com. 

Crews from Fluor Construction have placed the first 1.5-million-lbs. of steel girders along I-635 for the 635 East Project in Dallas, Texas. This installation is part of construction for one of the new direct connectors located at the project’s southeast end.


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 5

AS LOW AS

0 488

% FOR R UP TO *

MONTHS

HHURRY – THESE O F F E R S E ND SOO N ! BOBC AT.COM / OFF ERS

Break new ground this season with the latest Bobcat® equipment … andd save thousands at our deal a ership. Get financing as low as 0% for 48 months*, or choose in-lieu-of-financing rebates up to $4,000 USD* on select compact track loaders, up to $ 3,000 USD* on select skid i -steer loaders or up to $ 6,000 USD* on select compact excavators.

*Of fer ends 9 / 30 / 2021. Available at par ticipating and eligible dealers only. Of fer may var y by product t ype, e, series, model and select units in dealer's current inventor y. Must take deliver y from dealer stock by 9 / 30 / 2021. Of fers available on new equipment in U S and Canada only. Some restrictions apply. Length of contract may var y. Prior purchases not eligible. See dealer for details. Financing provided on approval of credit by authorized Bobcat finance providers to well-qualified buyers. Not all customers will qualif y for delayed payment promotion. Administrative fees may apply. Of fer not available to government accounts, national accounts and municipal /utilit y bid customers. Non-commercial customers may not be eligible for low rate financing. Bobcat Company reser ves the right to ex tend or discontinue any of these programs at any time without prior notice. Bobcat®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United S tates and various other countries. ©2021 Bobcat Company. All rights reser ved.

Bobcat of Abilene 325-673-7361

Bobcat of Corpus Christi 361-884-3959

Bobcat of Midland–Odessa 432-685-9298

Bobcat of Victoria 361-579-0922

Bobcat of Amarillo 806-622-9593

Bobcat of Lubbock 806-745-1322

Bobcat of the Rio Grande Valley 956-425-4300

Bobcat of Austin 512-251-3415

Bobcat of Marble Falls 830-220-6070

Bobcat of San Antonio 210-337-6136

Bobcat of Waco Elm Mott 254-666-1669

BobcatCCE.com

Ranchers ATV and Tractor Kerrville 830-315-2330


Page 6 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

South Texas’ one stop truck and trailer source! Used Truck & New/Used Trailer Sales/Parts/Service

Trailer Service (Light up to Heavy duty) Truck Maintenance (Medium & Heavy Duty)

Laser alignments on truck and trailers (unlimited axles) Texas DOT inspection station

2022 Globe 55LB660953 55 ton with hydraulic flip axle

2021 Aspen E7500

Robstown

75 ton 3-3-2 multi axle trailer

3205 Highway 44 Robstown,TX 78380

361-387-5010 Houston 11113 Wallisville RD Houston,TX 77013

713-670-0733

2021 Viking 50DLA

www.jbpavelkainc.com

25 ton pintel hitch trailer

Full rigging shop Full fabrication shop

Reflooring Truck frame modifications

Tarp system repair/installation Field Service

Conversions Custom builds


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 7


Page 8 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

How Women Can Make Their Mark, Thrive in Construction By Irwin Rapoport CEG CORRESPONDENT

Day by day and step by step, women are taking their place in the construction industry. Whether it is at the crew level, management level, or engineering and design, the construction sector could use more women in these roles. Last March, as part of Women’s History Month, Maribel Chavez, vice president of AECOM, spoke at an event to recount her path and experiences in the construction industry. During her trailblazing career journey, Chavez climbed the ladder to become the Texas Department of Transportation’s (TxDOT) first female district engineer, setting a precedent for future generations of women in construction. She remains passionate about young women considering construction as a career and refusing to be daunted by the challenges they may encounter in a traditionally male-dominated industry. Chavez, born and raised in Texas, made history in 1992 when she became TxDOT’s first woman district engineer. She retired from the state agency after 31 years and started working for infrastructure consulting firm AECOM in 2014 as its TxDOT client account manager. Her previous experience working at TxDOT serves her well in her current role, with responsibilities including the coordination of business development

and delivery of services that the company provides for TxDOT projects and programs. Chavez graduated from the University of Texas in Austin in 1982 with a Bachelor of Science in Civil Engineering, with a focus on transportation. “I worked summers at Gulf Oil as roustabout/lease operator, while attending UT Austin,” she said. “I really enjoyed working outdoors, learning more about that industry and working with both field and office professionals. I had originally planned to work in the oil and gas industry, but in the early 1980s, there was a major downturn. I was fortunate to apply my civil engineering degree to working at TxDOT and began my career in 1983. My first assignment and work at TxDOT was inspecting construction projects, both roadway and bridge work.” The world of engineering and construction appealed to Chavez at an early age. “My early inspiration for engineering was a TV sitcom, Family Affair, where the patriarch, Uncle Bill, was a civil engineer who traveled all over the world building dams and bridges – I was fascinated by what he did,” she said. “I also was inspired by my older brothers, who studied engineering. They encouraged me to pursue an education that utilized my aptitude for math and science.” When Chavez started at TxDOT, she rapidly realized how few women, at the time, were employed by the agency and the challenges that entailed.

Maribel Chavez (fourth from L) with the AECOM team of women.

Maribel Chavez

“When I began working for TxDOT, I was typically the only female in the field,” she said. “Most of the time I was the first female that the construction personnel had ever worked with. I was the first female to serve as an area engineer and then also the first female to be named a district engineer. Oftentimes, I was challenged with establishing credibility and getting my male colleagues to at least have an open mind and give me a chance to prove myself.” It wasn’t just colleagues Chavez was tasked with convincing of her skillset and

leadership abilities. “Even outside of the agency, it was a surprise to the public that I was the one showing up to do the work – most people had not seen a female in the roles that I held,” she explained. “I remember many times when people stormed into the office or project site, demanding to speak to the person in charge, and were completely stunned to learn it was a woman. Today, most people have seen or know female engineers. There are still fewer female engineers in construction roles than, say, design and planning, but with outreach, early recruitment and a focus on STEM education, I’m hoping that will continue to shift and female engineers will be prevalent across all specialties and areas of focus.” Asked if she would suggest the construction field to young women, Chavez was crystal clear. “I would absolutely encourage young women to look at construction as a profession,” she said. “The industry thrives when we have diverse perspectives – it’s so important that we continue to encourage different ways of thinking, challenge the norms and adapt to change.” However, Chavez stresses that the construction sector must review and revamp its programs and ideas to recruit women. “The construction industry does a poor job of selling itself – it’s an ideal fit for young women interested in exploring the possibilities of our tech-driven world and advancing these concepts in an industry that has been around forever, and already adapted to so much change,” she said. “To those seeking a unique, fulfilling and innovative career and to those who want to accomplish tangible goals and be a part of extraordinarily rewarding work, construction projects can be incredibly fun and there are no shortages of opportunities.” Construction has given Chavez a career that she thoroughly enjoys and continues to give her a wealth of experiences, including being a mentor for women considering construction. “I did not set out to be any type of trailblazer, but I do appreciate that I have been allowed to share the lessons and experiences I have learned,” she noted. “I enjoy being a mentor and I feel a responsibility to guide young women in this field. I truly enjoy seeing those I mentor succeed. So many projects over the years that I had the opportunity to work on challenged me technically and allowed me to work with talented and dedicated people of various walks of life. That has been such an amazing experience. I can’t imagine myself doing anything else.” Furthermore, Chavez has no doubts that women can easily increase their numbers in construction, be it in Texas or across the see WOMEN page 16


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 9


Page 10 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 11

NPT1200

Niece Water Towers deliver reliability and durability when you need fast mobile water service. With a 12” discharge tube it fills your tanks at a rate of over 1,000 gallons per minute. Offers removable power pack for security, fifth wheel tow hitch, professionally engineered and constructed. It features (8) legs for stability . 5th wheel set up for quick “tow and go.”

FUEL AND LUBE TRUCKS

OFF ROAD WATER TRUCKS OVER THE ROAD WATER TRUCKS

FUELER TRUCKS


Page 12 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

RK Hall, TxDOT Win NAPA ‘Quality in Construction’ Award Contractor RK Hall and TxDOT’s Amarillo District and have been awarded the Quality in Construction Award by the National Asphalt Pavement Association. The award is for the I-40/U.S. 60 hot mix overlay project in Potter County, a 4.5-mi. project that featured three bridges in each direction. The project began in June 2019 and was completed in August 2019. The award presentation was held on July 30, 2021, at TxDOT’s Amarillo District Headquarters. To be eligible for that award, the project was first recognized by the Texas Asphalt Pavement Association, an honor received in September 2020. Representatives from both TxDOT and RK Hall noted that this is not an easy award to win, but that communication and teamwork played a big role in being able to celebrate the success at the award ceremony. “It starts in the pit, making the material, getting it right, hauling it to the plant, getting the design, stockpiling it, operating your plant right, keeping your tolerances down, getting it out to the road and keeping your laydown machine moving,” said Kenneth Petr, director of construction of TxDOT’s Amarillo District. “We appreciate RK Hall’s desire to win this award.” Thomas Jones, area manager of RK Hall, noted that this was a tough project to get the right materials to blend together, but teamwork and patience won out. “That communication we have from top

The RK Hall team celebrates the award for the I-40/US 60 hot mix overlay project in Potter County, a 4.5 mi.-long project that featured three bridges in each direction.

to bottom is a real asset,” Jones said. “I’m really proud of everyone and this award.” This was the second Stone Matrix Asphalt overlay project for the district. SMA is durable surfacing material used for heavilytrafficked roads. Dumas Area Engineer

“It starts in the pit, making the material, getting it right, hauling it to the plant, getting the design, stockpiling it, operating your plant right, keeping your tolerances down, getting it out to the road and keeping your laydown machine moving,” said Kenneth Petr, director of construction of TxDOT’s Amarillo District.

This was the second Stone Matrix Asphalt overlay project for the district. SMA is durable surfacing material used for heavily-trafficked roads.

Bernardo Ferrel, who served as assistant Amarillo area engineer during construction of this project, said it was one his team was looking forward to and to win this award speaks volumes to all RK Hall strives to accomplish. Ferrell attributed the project’s success to RK Hall’s Amarillo crew. “They take pride in their work from making sure that the paver keeps moving to staying on top of potential issues that could arise – that alone shows the pride that your crew has out there wanting to make sure the job gets done and that it gets done right,” Ferrel

said. About NAPA Awards NAPA’s Quality in Construction Awards recognize high-quality asphalt paving projects and are rated by independent engineers. All projects that meet benchmark scores are awarded with a Quality in Construction Award. This project will now compete with hundreds more across the nation for NAPA’s prestigious Sheldon G. Hayes Award, which recognizes the country’s highest quality highway pavements. 


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 13

CRUSH AND SCREEN ON SITE WITH CEDAR RAPIDS CRS820H Screen Plant A leader in the screen plant market.

• Adjustable screen stroke angle and stroke length • 5/16” (8mm) thick side plates and beam to beam braced decks • Patent pending low maintenance surge dampeners/ship braces • Patented triple-shaft lubrication system • Patented low maintenance 50 hp flex shaft screen drive

Crushing•Screening•Conveying•Washing•Recycling•Grinding Systems

CRH1113R Closed Circuit Impactor/Screen Plant Large screen – Wide Conveyors – Low Maintenance • TI4250 impact crusher • 6’ x 16’ 2-deck screen • 450 hp T4F Scania Diesel with hydraulic clutch crusher/generator drive • 150 kW generator • 48” x 18’ vibrating grizzly feeder with 6’ stepped 2-deck grizzly • 24” reversible conveyors can feed both screen decks to return conveyor

SERVING TEXAS, OKLAHOMA, ARKANSAS & LOUISIANA 5680 West State Hwy 71, La Grange, TX 78945 • 800-255-8628 • www.powerscreentx.com


Page 14 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

James Construction Group...

Crews Rebuild Interstate 20, Midkiff Road Interchange

James Construction Group LLC of Baton Rouge, La., won the Midkiff overpass project with a low bid of approximately $36.3 million.

A project to reconfigure the intersection of Interstate 20 and Midkiff Road is under way as construction crews are making steady progress on the job. James Construction Group LLC of Baton Rouge, La., won the Midkiff overpass project with a low bid of approximately $36.3 million. This project will demolish the existing overpass and build one that takes I-20 over Midkiff Road. The project will also reconfigure on and off ramps to improve safety and traffic flow in the area. Service road improvements and drainage improvements also will be part of the project.

This project will demolish the existing overpass and build one that takes I-20 over Midkiff Road.

Houston, TX 713-247-0066

San Antonio, TX 210-310-0066

www.nuecespower.com

The Midkiff project is adjacent to a project that is building a new intersection at I-20 and County Road 1250. The two projects will effectively have a combined construction work zone stretching from FM 1788 to 0.25 mi. east of Midkiff Road. Both overpasses will be built wide enough to accommodate the future addition of main lanes on I-20. During construction, speed limits are reduced on both projects. Every effort will be made to keep two main lanes open in both directions —though they will be offset from their existing locations. The service roads on both projects will be under construction and periodically closed to through traffic between FM 1788 and Midkiff Road. The Midkiff Road project is scheduled to be completed in winter of 2023.


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 15

The W Wor orldwide e Leader in Concrete Paving T Technolo echnology

ww ww.gomaco.com m ❘ inffo@gomac o@gomacco.com GOMACO offers the full range of concrete slipform p pavers, curb and d gutt tter machiness, placer/sp er/spreaders, texture/cure machines and bridge/ idge/canal finishing equipment. GOMACO equipment features our exclusive and proprietary G+ G ® control system, created in-house by our soffttware engineers from the wants and needs of contractors paving in the field. At the heart of GOMACO equip fie pment is our passion for concrete and our commitment to our customers. We look ffo orward to visiting with you about your upcoming paving projects and your concrete paving equipment needs.

ROMCO Equipment Co.

Sierra Machinery, Inc.

www.romco.com

www.sierraelpaso.com

Buffalo, TX 903-322-5602

Ft. Worth, TX 817-626-2288

Longview, TX 903-758-5576

Carrollton, TX 214-819-4100

Houston, TX 713-937-3005

Midland, TX 432-234-9409

939 Hawkins Boulevard El Paso, TX 79915 915-772-0613

Closner Equipment Company Inc. www.closner.com San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131

Austin Branch 13800 FM 973 N Manor, TX 78653 512-272-8200


Page 16 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Chavez and other Texas officials take part in a ribbon-cutting ceremony for the 35W Interstate project.

Industry Can Revamp Programs to Recruit More Women WOMEN from page 8

nation, and to succeed through hard work and perseverance. “The opportunities are limitless,” she said. “It’s been said many times, but we, as an industry, continue to struggle to recruit talent and get young people showing interest in this field. We need knowledgeable and experienced men and women to adequately staff our construction projects, so the opportunities to progress, grow, learn and thrive are really endless. I don’t think there are as many ‘firsts’ left for women in construction – which is a good thing! Many stereotypes have already been broken. As always, we strive for equality, and I am happy to note that I am seeing it more and more. All the ‘firsts’ who paved the path for younger generations helped prove that women can handle most types of assignments. I think it’s more the case of having a greater number of women showing interest in the field and gaining the necessary experience.” Chavez points out that continued outreach and promotion by the construction industry of the various opportunities the sector holds and the diverse skillsets needed are important elements to recruit women and give them the opportunities to achieve their goals, professionally and personally. “Internships and mentoring programs are great catalysts to begin conversations about working in construction,” she said. “But, the most important responsibility in advancing women’s careers is for people in executive

or leadership positions to step up, take personal engagement and lend their credibility to young women by actively promoting and guiding them. Showing them the ropes.” She is encouraged by the attention diversity and inclusion initiatives are receiving across industries and is looking forward to seeing these programs lead to better work environments for everyone.

“It is critical that the construction industry shows a willingness to create work environments that foster inclusion and diversity and, most importantly, respect,” she added. “Those should not just be slogans or catchy phrases, but actual actions. One of the things that excited and interested me about AECOM was the visible presence of women in leadership roles. In fact, until I started

As the district engineer for the Fort Worth district of TxDOT, Maribel Chavez (second from L) received the Preservation Leadership Award.

working for AECOM, I had never reported to or been supervised by a female. It took 31 years of my career before I was under the leadership of a female myself.” Chavez also sees the education sector play an important role in promoting construction as a career choice for women. “While role models early on are good, it is not just women who can or should serve as role models to other young women,” she said. ”All sectors must promote the industry and young women should be informed about and exposed to the opportunities and necessary skills as early as possible.” This includes how math is applied to the job in a real-life setting, something that nearly made Chavez question her career path early on. “I think it’s a myth that you must like math in order to be an engineer – you must be able to do math, but that doesn’t mean you have to like it in a classroom setting,” she said. “It wasn’t until I realized I could solve real life problems – and actually build things! – with math that it started to come together for me,” she said. “I didn’t have to be a genius at math, but I had to apply it and do the critical thinking it takes to develop solutions. That’s the fun part. Fortunately, I learned that early on before I gave up on engineering – so that’s a bit of personal observation that I like to share, just in case there are others in a similar mindset as I was back then.”  CEG


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 17

EXP PERTS SAY Y YOU CAN N ONLY FOC CUS ON N ONEE THIN NG AT A TIME. We chosse ar ticula tic l ted t dump trrucks du

Contact your loccal dealer for C more information on about the one and only, Terex e Trucks . EASTON SALES & RENT RENTAL A LLC eastonsalesandrentals rentals .com com Humble,, TX Tel: 281.441.1001 BANE MACHINER HINERY banemachinery.com ery.com Tyler y ,T TX Te el: 903.597.6641 Fort Wortth, TX Tel: 817.847.5894 Dallas , TX Te el: 214.352.2 2 468 BC EQUIPMENT bcequipment .com San Antonio, TX Tel: +1 210 447 9314 Corpus Christie, TX Tel: +1 361 289 9314 L A FERIA , TX Tel: +1 956 797 0072

w w w.TerexT e rucks .com


Page 18 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Bridges and Roads LLC Building ‘Very Unique’ Project ROUNDABOUT from page 1

railroad under a bridge.” Crews are continuing to work on the RM 620 bridge over the railway tracks, retaining wall construction around the UPRR bridge, storm sewer/inlet installation, roundabout construction and a portion of the Eastbound RM 620 frontage road, according to Jason Hudson, a TxDOT construction inspector, Austin District. To date, Bridges and Roads has installed structural concrete for the bridge over the Union Pacific Railroad tracks; has started work on the eastbound frontage road; and has made significant progress on the retaining walls near Chisholm Trail. Crews also have begun dirt work and excavation for the RM 620 EB frontage road from Briarwood Street to Chisholm Trail; detour lane shift from IH I-35 to Chisholm Trail Road to allow the construction of the UPRR bridge; and drill-shafts for the RW#9 EB RM 620 before Chisholm Trail Road.

Alignment of RM 620 with new frontage road, overpass and roundabout.

A key element of the project is to build new overpasses for through traffic and frontage road lanes for local traffic to improve safety and mobility.

TxDOT officials joined Williamson County Commissioner Terry Cook, Round Rock Mayor Craig Morgan, August Alvarado and Congressman Josh Carter’s office and others to celebrate the groundbreaking ceremony when the RM 620 Roundabout project commenced.

“The approximate dates, according to the contractor’s schedule, indicates that the UPRR bridge at Chisholm Trail and the eastbound RM 620 across the bridge should be complete in summer 2022,” said Hudson, “and westbound RM 620 will be open by spring 2023. Lake Creek Drive Spring should be complete by 2023. A detour lane shift from IH I35 to Chisholm Trail Road was done to allow for the construction of the UPRR bridge. Drill shafts for EB RM 620 before Chisholm Trail Road have also been placed.” Large excavators with various attachments are drilling the shafts, dozers are helping to clear the ground for future paving operations and rollers are flattening and leveling the surface. With no traffic in some of the work zones, crews are able to operate more freely. This is giving Bridges and Roads opportunities to maximize production. For new materials being brought in, the plans call for approximately 10,000 linear ft. of RCP and about 17,000 tons of hot-mix. The ample space at various sites can easily be accessed by local roads, so Bridges and Roads has plenty of room to store materials and give equipment operators lots of leeway to move about and perform operations. In some areas where RM 620 at Lake Creek Drive prior to construction.

ROUNDABOUT see page 22


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 19

What can you haul in a side dump trailer? Nearly anything.

Superior Stability

Faster Cycle Times

Easier Unloading

With construction grade tires and an ability to haul dirt, rock, millings, riprap and other materials, our trailers help solve the everyday challenges of the construction industry. When we build trailers, we build solutions. 800-779-8099 • sidedump.com


Page 20 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Next Issue Closes August 31, 2021 ent sponsored

State Supplem

N EDITIO STATE TEXAS

ent to:

A Supplem

®

48 HOURS SHIP WITHIN TS AVAILABILITY SAME DAY PAR PORT HNICAL SUP 24 HOUR TEC INESS A 75 YEAR BUS BACKED BY Thousands in

Service!

e. Premium

nded in 1957.” Newspaper… Fou Read Construction ltd.com “The Nation’s Best eboom@ceg dennishog • 97 -49 om • 1-877-877

June 20 2021

Vol. VI • No. 13 Connection Your Texas

by:

Affordable Pric

Service.

7-4937

CALL 800-36

le Financing Availab ed credit • *On approv

gebo • Dennis Ho

VictoerrsyNemLecahenketo Win

ROMCO Pow

torsports le Busch Mo e raced the Kyping World series rac r Nemechek ck carried the John Hunte tory in the NASCAR Cam tru The 11. and e Toyota to victor Speedway on Jun as equipment dealer for at Texas Mo o of ROMCO, the TexThis was the first win he log r, and colors and nsor of Nemechek. mary sponso utO as the pri its support while sal long-time spo with ROMC at the race. Nemechek thank the company for attendance was quick to s fans that were in 16 e pag ing the 250-plu CO ROM

from after crews San Antonio recently demolished Hansco Inc. cture. stru g stin t. PON the exi -gr oss -sq .-f CEG CORRES Th e 25 0,0 00Dolorosa St. is rsity a re at 622 on the Unive Construction tonio’s (UTSA) structufunded via fundraising and An tion, being t for support through of Texas at San the ues million Innova $161 Careers req tion Revenue Bonds and purand p shi s Tui site wa Entrepreneur CB) is expected to System. The Building (IE the site of the former UT sed from Bexar County. start soon on y Jail in downtown cha Bexar Count

rt By Irwin RapopoDENT

see ted Delao. “We star concrete,” saidone of the wings and e of , oversaw the Hansco’s owner were able to on the edg ards the center tow s ard inw d and demolition and worke ce the first wing was tornt the drawings nex e. On study some of structure (built cor n, we moved over to the gs win the dow Process Demolitionhad a triangular plans for which showed the one and so on. Once the able to 0) jail 196 the types of were dealt with, we were The former three wings – one in and nts tpri foo h the r center core wit. The concrete and floo als that were used for attack the core.”ch excavators were on each side which was between materi Two high rea with an 86-ft. the struction. steel structure,tall, was taken down con was determined to start at c- used – a Volvo 480tsu 400 with a “It stru ies ma te cre stor 8 ch6 to cess the con reach and a Ko h high rea pro wit of and tors e 10 end top ava pag the using exc see HANSCO a processor at ject ture withach excavator to crush the es. Hansco’s pro Dana Delao, Shane Hans, a high-re manager, and

s

rt Rebuilt Pa d n a d e s U Parts For: quipment

Heavy E

ipping Fast Sh Texas aco, from W

We Have • John Deere • Kobelco • Case • Komatsu Caterpillar • Hyundai • LinkBelt Hitachi m

00 (254) 562-75

s.co hTech-part • www.Hig


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 21

Kirby-Smith Machinery has one of the largest and most diverse rental fleets in the region. UÊ6>À iÌÞÊ vÊ «Ì Ã\Ê,i Ì]Ê,i ÌÊÌ Ê*ÕÀV >Ãi]Ê ÕÞÊ ÀÊ i>Ãi UÊ >À}iÊ iiÌÊ vÊVÕÀÀi ÌÊ `i ÊiµÕ « i Ì UÊ,i Ì> ÃÊ>Û> >L iÊLÞÊÌ iÊÜii ]Ê Ì Ê ÀÊ }iÀ UÊ ÜÊw > ViÊÀ>ÌiÃÊ>Û> >L iÊÜ Ì Ê >ÌÃÕÊ > V > UÊ iÜÊ> `Ê1Ãi`ÊiµÕ « i ÌÊv ÀÊÃ> i UÊ ÜÊÜii ÞÊ> `Ê Ì ÞÊÀ>Ìià Follow us on

www.kirby-smith.com

888.861.0219

Abilene

Amarillo

Dallas

Ft. Worth

Lubbock

Odessa

325.692.6334

806.373.2826

214.371.7777

817.378.0600

806.745.2112

432.333.7000

Waco

Oklahoma City

Tulsa

McAlester

Kansas City

St. Louis

254.261.1370

405.495.7820

918.438.1700

918.310.1550

913.850.6300

314.729.0125


Page 22 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

TEXAS STATE SUPPLEMENT ADVERTISER INDEX

Key Element of Project Will Have New Overpass Built

BANE MACHINERY ..................................................24 BEE EQUIPMENT SALES LTD ................................14 BOTTOMLINE EQUIPMENT LLC ............................10 CLOSNER EQUIPMENT CO INC ............................10 COMPACT CONSTRUCTION EQUIPMENT ............5 CONSTRUCTION EQUIPMENT GUIDE ..................20 GOMACO CORP ......................................................15 GORILLA HAMMERS..................................................1 HIGH TECH INDUSTRIES..........................................1 J & B PAVELKA INC....................................................6 KIRBY-SMITH MACHINERY INC..............................21 MCCOURT EQUIPMENT INC ....................................7 NIECE EQUIPMENT ................................................11 NUECES POWER EQUIPMENT - HYUNDAI ..........23 NUECES POWER EQUIPMENT - LIEBHERR ........23 NUECES POWER EQUIPMENT - LINK-BELT ........23 NUECES POWER EQUIPMENT - TAKEUCHI ........14 NUECES POWER EQUIPMENT - WIRTGEN..........23 POWERSCREEN TEXAS ........................................13 ROMCO EQUIPMENT CO..........................................2 ROMCO MATERIAL PROCESSING SYSTEMS ........2 ROMCO PAVING EQUIPMENT..................................2 ROMCO POWER SYSTEMS......................................2 SMITHCO ..................................................................19 TEREX TRUCKS/VOLVO ........................................17 TROPHY TRACTOR ..................................................3 VERMEER OF TEXAS-LOUISIANA ..........................9 WAUKESHA-PEARCE INDUSTRIES INC..................6 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

RM 620 at Deep Wood Drive prior to construction. ROUNDABOUT from page 18

road construction is taking place, large cones separate traffic from the excavated areas where the new lanes are being built. The project is a partnership between TxDOT, the city of Round Rock and Williamson County. The city and Williamson County funded development of the project, and TxDOT is funding the $27.4 million construction. "This project has come about because of the tireless efforts of our local partners, and I am excited that we are able to make these much-needed improvements a reality," said TxDOT Austin District Engineer Tucker Ferguson at the March 11, 2020, groundbreaking ceremony. “Collaboration is the key to getting the RM 620 Roundabout project off the ground,” said Williamson County Commissioner Terry Cook. “We are happy to see construction get under way and can’t wait for it to be competed in a couple of

years.” The initiative is welcomed by the public. “Improvements to RM 620 are vital for our Round Rock residents and visitors,” said Round Rock Mayor Craig Morgan. “Just as importantly, with the addition of overpasses, our emergency services will soon be able to get to St. David's Round Rock Medical Center with less delay. It is no exaggeration to say that this project will save lives." The traffic management plan is based on Texas Manual on Uniform Traffic Control Devices (TxMUTCD) and TxDOT standards. Construction is well under way in the area, which makes safety top of mind. “It’s important that the public drive with caution in the work zone, not only to keep workers safe, but for their own wellbeing,” said Diann Hodges, TxDOT Southwest Texas communications director. “We do our best to inform the public about upcoming closures and we appreciate their cooperation and patience during construction.”  CEG

For new materials being brought in, the plans call for approximately 10,000 linear ft. of RCP and about 17,000 tons of hot-mix.


5Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 15, 2021 • Page 23

WE FOCUS ON THE MACHINE SO Y YOU OU CAN WORK. O

Houston, TX 713-247-0066

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

713-247-0066

CLOSE TO OUR CUSTOMERS

For your su uccess uccess. ROAD AND MINERAL TECHNOLOGIES. S. The WIRTGEN GROUP owes its strength to the excellence ence of its product brands – WIRTGEN, VÖGELE, HAMM and KLEEMANN – with their unique que wealth of experience. Put your trust in the WIRTGEN GROUP P.. Find out more: www.wirtgen-gr group.com/america

Corpus Christi, TX San Benito, TX

El Paso, TX

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

956-361-0066

915-541-0066

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

San Antonio, TX

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

210-310-0066

361-576-0066

956-725-0066

713-247-0066

361-289-0066


Page 24 • August 15, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

True Power. At Bane Machinery, we offer Liebherr machines that are custom-engineered to perform efficiently. And we stand behind them with full service. Count on us for original parts, factorytrained technicians, and an extensive inventory of machines for your toughest jobs. We can also service your equipment to OEM standards in the shop or the field. We haven’t compromised on anything; why should you?

DALLAS 2449 Manana Dr. Dallas, TX 75220 Ph: (214) 352-2468

FORT WORTH 10505 North Freeway Fort Worth, TX 76177 Ph: P (817) 847-5894

TYLER 3402 N. NE Loop 323 Tyler, TX 75708 Ph: (903) 597-6641

www.banemachinery.com


Turn static files into dynamic content formats.

Create a flipbook
Texas 17, August 15, 2021 by Construction Equipment Guide - Issuu