Skip to main content

Texas 17, August 16, 2020

Page 1

State Supplement sponsored by:

TEXAS STATE EDITION

A Supplement to:

SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY

®

August 16 2020

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. V • No. 17

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

Your Texas Connection • Dennis Hogeboom • 1-877-877-4997 • dennishogeboom@cegltd.com

CALL 800-367-4937 *On approved credit • Financing Available

The Final Flyover: Crews Wrapping Up 290/130 Project By Irwin Rapoport CEG CORRESPONDENT

The partnership of Webber LLC and the Texas Department of Transportation has made considerable progress on the Central Texas Regional Mobility Authority 290/130 Flyovers Project in east Austin, as the second of three flyover bridges under construction, at the 290 Toll/SH130 intersection, opened to traffic on July 11. The 290/130 Flyovers Project is on track for full project completion in 2021, and also includes construction of a non-tolled flyover connecting eastbound 290 Toll to southbound SH 130. Construction Process “Webber has been working at an excellent pace throughout the course of the project,” said Lloyd Chance, senior construction project manager of the Mobility Authority. “As they’ve worked swiftly to capture the incentives, they’ve also prioritized quality, and it shows in the delivery of their work.” Chance explained the construction process for the flyovers.

Webber LLC and TxDOT are working to deliver the final flyover of the Central Texas Regional Mobility Authority 290/130 Flyovers Project in east Austin. Crews worked on the first two flyovers of the project shown here.

see FLYOVER page 10

Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas

We Have Parts For: Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case

(254) 562-7500 • www.HighTech-parts.com


Page 2 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

HEAVY CONSTRUCTION EQUIPMENT EARTHMOVING, UTILITY, MATERIAL HANDLING, DEMOLITION, SCRAP & RECYCLING

CRUSHING, SCREENING, DRILLING & WASHING MOBILE & STATIONARY EQUIPMENT

Sales - Rentals - Parts - Service

Sales - Rentals - Parts - Service

214.819-4100/800.227-6626 www.romco.com

214.819-4100/800.227-6626 www.romco.com

PAVING TEXAS CONCRETE & ASPHALT PAVING EQUIPMENT

YOUR HEAVY DUTY POWER ADVANTAGE COMPRESSORS, GENERATORS, PUMPS & LIGHT TOWERS ENGINE &

HAMMER

Sales - Rentals - Parts - Service

REBUILDS

214.819-4100/800.227-6626 www.romco.com

210.569-7068 / 800.966-4601 www.romco.com


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 3

WE HAVE YOUR NEXT OFF ROAD TRUCK Niece 8,000 gallon water tanks

installed on 40 ton Articulated Off Highway chassis. This combination is the workhorse of the dust control and water needs for quarries and large construction sites

NWT9500

The NWT9500 950 Gallon water tank mounted on articulated truck. Pictured: Deere 460E with 9,500 gallon tank. Tanks come with 6X5 pumps.

NFL3000

The NFL3000 Off Road, Fuel and Lube Bed offers 3,000 gallons of diesel fuel.

NFL10000

The NFL10000 Fuel & Lube Can be mounted on any 100,000 lb rigid frame truck. Holds 10,000 gallons of diesel. 5 additional fluid tanks. Holds up to 3,000 gallons of oil.


Page 4 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Family Values: Couples Who Dig Together, Stay Together The story of Longhorn Construction Services is built on an opportunity and a willingness to take a chance on it, according to Owners Jason and Tassa Fenn. The husband-and-wife team founded the Midland-based company nearly a decade ago after a visit to west Texas. “When the economy took a big downturn in 2008, a lot of businesses were negatively affected, including the one we had in southern Arizona,” recalled Tassa. “We made a trip to Texas to see some friends, and they told us things were booming here. Jason and I thought about it a lot and decided to make the move.” They didn’t pack up everything and fully leave Arizona right away. During the course of several months, the couple and their six children at the time – the seventh was born in Texas – made numerous trips to Midland. “We often drove through the night so the kids could sleep,” said Tassa. “In the end, it was well worth it. They saw our commitment and work ethic, and we believe those are positive ideals for them to strive for.” One of their children, Kylee, is a full-time staff member at Longhorn Construction Services, as she’s currently learning all aspects of the business. That includes office management and bookkeeping, which Tassa has

cially Jason. He grew up working in his father’s construction company, learning to move dirt and install underground sewer lines, as well as work with concrete and asphalt. “I learned a little bit of everything,” Jason recalled. “My dad modeled how to work hard, take care of customers and run a business. I developed a sense of entrepreneurship as well. I knew when I was in high school that I wanted to be in business for myself.” Two years after graduation, he started Picacho-Fenn Construction in Picacho, Ariz., where he specialized in earthwork. That eventually became Fenn Concrete with a shift away from dirt after a few years. see LONGHORN page 8

(L-R): Jason and Tassa Fenn own and operate Longhorn Construction Services, which specializes in earthwork, and their daughter, Kylee, is now a full-time member of the Midland firm.

overseen during the past decade. Their son, Brady, helps in the field and runs equipment on occasion. “The example they have set is unreal,” said Kylee of her parents. “I loved watching them build the business together. I’m very proud to be a part of it now.” Jason continues to run field operations. Key members of the approximately 15-member staff

include Superintendent Duane Walls and his son, Devon, who serves as maintenance manager. “Our focus has changed from when we started, transitioning from concrete services for residential foundations to full earthwork packages in the commercial, industrial and oilfield markets throughout the Permian Basin,” explained Jason. “Longhorn Construction

“Our focus has changed from when we started, transitioning from concrete services for residential foundations to full earthwork packages,” said Jason Fenn.

Services does everything from clearing and grubbing to finish grading. A lot of our work now involves pad, pond and road construction for oil and gas sites.” Getting Back to Where It Started Earthwork is familiar ground for the Fenns, espe-

Devon Walls, maintenance manager

A Longhorn Construction Services operator loads a truck with a Komatsu WA270-8 wheel loader.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 5


Page 6 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

TxDOT Awards Grant to Upgrade Port of Corpus Christi The Texas Department of Transportation (TxDOT) has awarded a $5.4 million safety improvement grant to the Port of Corpus Christi. The funds will be used for a project to make safety improvements to the Joe Fulton Trade Corridor and Rincon Road leading to the Rincon Industrial Complex, port officials said in a press release. The funding comes from the Port Access Program, which is designed to improve safety and fluidity of roads around Texas seaports. Significant growth in recent years along the Corpus Christi Ship Channel Inner Harbor — including additional rail infrastructure — has resulted in the need for a new frontage road south of the rail corridor that parallels the Joe Fulton Corridor to maintain vehicle safety and mobility, port officials said. The port has made significant capital investments to the Rincon Industrial Complex, one of the newest facilities targeting breakbulk cargo such as wind energy components, military cargo and steel pipe. The capex projects included the construction of 40 acres of flexible cargo storage space and 12,000 feet of rail to accommodate liquid transloading and processing of breakbulk cargo. The TxDOT improvements will enhance truck mobility, highway connectivity and safety, including the addition of intelligent transportation systems components.

The funds will be used for a project to make safety improvements to the Joe Fulton Trade Corridor and Rincon Road leading to the Rincon Industrial Complex.

“The Rincon Road and Joe Fulton Corridor improvements continue to enhance our customers' ability to move their goods to market safely and competitively,” said Sean Strawbridge, the port’s chief executive officer.

The Port of Corpus Christi is served by BNSF Railway Co., Kansas City Southern and Union Pacific Railroad, as well as a Genesee & Wyoming Inc.-operated short line and the port's own rail line, Corpus Christi Rail Terminal. 

Energy Companies Bring Solar Job Online in Nolan County 8minute Solar Energy and Duke Energy Renewables announced that the 280-MWDC Holstein solar project in Nolan County, Texas, has begun commercial operation. Holstein is 8minute’s first solar project to come online in Texas, marking a significant milestone as the company expands its operational footprint outside of California. “We are bringing our utilityscale project development expertise to forge a new energy model in Texas,” said Tom Buttgenbach, president and CEO of 8minute. “In a state with no solar mandate, and where competition is purely on price, our success with Holstein and our other Texas projects are proof positive that solar will power the future.” The Holstein Solar project contains more than 709,000 solar panels across approximately 1,300 acres in Wingate. The facility will power the equivalent of 40,000 homes. The project employed up to 400 workers during peak construction. Texas is a valuable growth market for 8minute, with four other projects in late stages of development. 8minute’s Texas projects

represent nearly 1 GW of clean energy and are expected to generate about a billion dollars of capital investment, as well as $60 million in land payments, more than $120

million in local tax revenues, more than 1,000 construction jobs and another 2,000 indirect jobs. “Texas is one of the fastest growing solar energy markets in

the country and Holstein Solar supports the state’s growth. We’re pleased to work with 8minute to add this project to our growing Texas solar energy portfolio,” said

The Holstein Solar project contains over 709,000 solar panels across approximately 1,300 acres in Wingate.

Chris Fallon, president of Duke Energy Renewables. “We’re proud to support the state’s renewable energy industry by providing lowcost, clean energy resources to meet the growing needs of Texans.” Duke Energy Renewables, a subsidiary of Duke Energy, acquired the project from 8minute in July 2019. 8minute continued to oversee all development aspects through to commercial operation and brought the EPC, operation and maintenance (O&M), hedge, tax equity and debt counterparties to the Holstein project. SunTrust provided the tax equity investment. CIT Group led a consortium of banks that provided the construction loan, letter of credit and term loan facility for the project. The energy generated from the Holstein solar project will be sold through a 12-year term hedge agreement to J. Aron & Company. The facility’s design, procurement of inverters, balance of plant systems and construction of the project were performed by Blattner Energy. First Solar Energy Services will provide O&M services for the project under a fiveyear agreement. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 7


Page 8 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Construction Company Leans on Kirby-Smith for Its Iron LONGHORN from page 4

“Longhorn’s transition to more of a dirt-focused business means we have kind of come full circle,” Tassa pointed out. “It’s really Jason’s passion. He loves it. As more and more customers saw his expertise in it, our relationships grew. They gave him more opportunities and referrals, and things really took off.” One of Longhorn Construction Services’ first big earthwork projects involved pad construction for 164 lots at an RV park in Pecos that included installation of sewer and water lines. That assignment helped launch the company into even larger undertakings, such as site work for some of the biggest sand plants in west Texas. One project consisted of moving about 140,000 yards of earth for the construction of a new rail spur. Another saw Longhorn move approximately 300,000 yards to balance the site. Service Stands Out Bigger jobs meant bigger equipment. About three years ago, Longhorn Construction Services turned to Kirby-Smith Machinery’s Odessa, Texas, branch to rent Komatsu equipment. It has since purchased several machines, working with former Territory Manager JP Cotton, who is now KirbySmith’s finance manager, as well as Rental Manager Michele McDermett for all acquisitions. “What stood out first and foremost was the customer service and how JP, Michele and Kirby helped

(L-R) Kirby-Smith Machinery Finance Manager JP Cotton meets with Longhorn Construction Services Owner Tassa and Jason Fenn as well as Maintenance Manager Devon Walls. “What stood out first and foremost was the customer service and how JP, Michele and Kirby helped us get the right machines to fit our needs,” said Jason. “They stand above the crowd.”

us get the right machines to fit our needs,” stated Jason. “They stand above the crowd. Kirby had the rental units, and if there was any issue, they were right on it, either that day or the next, in most cases. Other dealers would take a week or more to just get to us. It’s hard to justify renting something and not being able to use it.” Longhorn Construction Services uses Komatsu dozers, including

Brady Fenn compacts dirt on a pad site with a Hamm H 12i padfoot roller. “It has good visibility and is easy to run,” said Fenn.

D65EX and D155AX models, for pad and pond construction and to place caliche. Operators perform mass excavation and dig for utilities with a variety of excavators, use wheel loaders to move materials and HAMM rollers for compaction. “All the Komatsu equipment performs very well, even in the tough conditions we encounter out here in west Texas,” said Devon

Walls. “The production is outstanding, and they don’t cost us significant downtime. Nearly everything we do to them involves basic maintenance or repair of normal wear and tear items. “I track the machines with the KOMTRAX telematics system through either a tablet or phone,” Devon continued. “It’s a great fleet management tool that allows me to see hours and stay on top of servic-

Longhorn Construction Services uses Komatsu dozers, including D65EX-18 and D155AX-8 models, to push and rip during pad construction. “They are efficient and have good visibility all around,” said Superintendent Duane Walls.

es. I really like the location feature. It pinpoints where a machine is, so if I need to pick it up, I can go right to it. That saves time and travelrelated costs.” Keeping It in the Family The Fenns have established firm roots in Texas and plan to keep growing Longhorn Construction Services. For now, they also are determined to stay on the same path when it comes to the markets the company serves. “We would rather stay with the large commercial and industrial types of jobs,” said Jason. “That’s not to say we wouldn’t look at doing some residential work, but it’s really not our main objective. Economic factors will play into the future, too.” That future may hold more of the Fenn children joining Longhorn Construction Services. “Our hope is we are building something that they want to become a part of and keep it running for many years to come,” said Tassa. “We feel blessed to be here and continue to grow. The sky is the limit as far as we are concerned.” 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 9

WE FOCUS ON THE MACHINE SO Y YOU OU CAN WORK. O

Houston, TX 713-247-0066

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

713-247-0066

CLOSE TO OUR CUSTOMERS

For your su uccess uccess. ROAD AND MINERAL TECHNOLOGIES. S. The WIRTGEN GROUP owes its strength to the excellence ence of its product brands – WIRTGEN, VÖGELE, HAMM and KLEEMANN – with their unique que wealth of experience. Put your trust in the WIRTGEN GROUP P.. Find out more: www.wirtgen-gr group.com/america

Corpus Christi, TX San Benito, TX

El Paso, TX

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

956-361-0066

915-541-0066

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

San Antonio, TX

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

210-310-0066

361-576-0066

956-725-0066

713-247-0066

361-289-0066


Page 10 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Construction Partners Use Lessons From Previous Jobs FLYOVER from page 1

“The first step is to remove the grass and topsoil,” he said. “The next steps are to drill the shafts, construct columns and caps, place beams, form and pour the bridge decks, form and pour concrete rails, construct bridge approaches and retaining walls and sign and stripe the bridges. This project does not have any major excavation work or clearing of right-of-way, because it is primarily a bridge job.” Lessons learned on the first two flyovers are being applied to the final one. “We’re always looking for lessons learned and best practices to apply for future projects,” said Justin Word, the Mobility Authority’s director of engineering. “Early on in this project, we determined that major

traffic switches would be better undertaken on weekends when closure timeframes are longer and there are lower traffic volumes to manage.” The Mobile Authority and TxDOT have worked harmoniously. “We are very proud of the collaborative partnership with TxDOT that has enabled this project to be successfully implemented concurrently with their three-lane widening project on SH 130,” said Chance. “While adjacent projects can sometimes pose coordination challenges, our teams have worked cohesively to ensure that each project is a success.” Equipment & Material Crews are utilizing a Manitowoc 11000-1

crawler crane and a Kobelco CK1600G2 crawler crane to help with putting the formwork together, setting the forms, installing the reinforcing cages, placing concrete using a bucket, setting concrete beams, setting concrete panels and moving/transporting material to the bridge decks. Construction crews also are using a Link-Belt 8050 and a Manitowoc RT 890E; and lifts: Genie 65s, S-85 XCs and S-60V and JLG 460SJs. The cranes are helping with putting the formwork together, setting the forms, installing the reinforcing cages, placing concrete using a bucket, setting concrete beams, setting concrete panels and moving/transporting material to the bridge decks. Excavation operations will result in the removal of 45,000 cu. yds. of earth and rock and via demolition and 18,000 sq. yds. of concrete. New materials being brought in include 11,000 linear ft. of drill shafts, 18,000 cu. yds. of concrete structures, 60,000 linear ft. of concrete beams, 66,500 sq. ft. of MSE retaining wall, 97,000 cu. yds. of embankment, and 594,000 sq. ft/ of bridge deck. Work is moving along at a rapid pace on the final flyover and the CMTA Railroad Bridge. A couple of exit and entrance ramps,

the westbound frontage road for U.S. 290, illumination and Intelligent Transportation System (ITS), overhead sign bridges along U.S. 290, and concrete sealing on all bridge structures remain to be finished. Project Challenges Tim Burhop, Webber’s project manager, is pleased with the progress, but there have been challenges, as well. “Overall, construction of the first two flyovers was smooth and efficient,” he said. “But each project comes with its own set of challenges. In this case, our crews were actively constructing all three flyovers at once, requiring diligent traffic control coordination. We also drilled and poured several large bridge bent foundations measuring more than 90 inches in diameter. Throughout this project, we’ve incorporated templates for the monolithic drill shafts to assist with their alignment during drilling and pouring. We’ve also prioritized finishing during CRCP placements to ensure ride quality requirements are met, since some of the early placements required grinding to achieve the IRI/ride quality requirements. “Safety is always a concern on the job see FLYOVER page 18

Excavation operations will result in the removal of 45,000 cu. yds. of earth and rock and via demolition and 18,000 sq. yds. of concrete.

“Overall, construction of the first two flyovers was smooth and efficient, but each project comes with its own set of challenges.” Tim Burhop Webber LLC

New materials being brought in include 11,000 linear ft. of drill shafts, 18,000 cu. yds. of concrete structures, 60,000 linear ft. of concrete beams, 66,500 sq. ft. of MSE retaining wall, 97,000 cu. yds. of embankment and 594,000 sq. ft. of bridge deck.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 11


Page 12 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

We specialize in advanced electrical and hydraulic diagnostics, rebuilds on engines, transmissions and final drives, complete hydraulic system repair, custom fabrication, welding, and line-boring.

• • • •

Our 13,000-square foot facility includes: 11 Individual Bays Overhead crane with 10-ton lifting capacity Three 2-ton jib cranes for large component rebuilding EPA certified wash facility

16 Mechanics • 6 Field Service Trucks • 3 Lube Trucks

Established in 1982 6431 Bingle Road • Houston, Texas 77092

713-462-2200 www.gilsheavyequip.com

Maximum Reliability and pr roductivity

• 102 hp TTurbo-charged urbo-charged • Perkins TTier ier 4 Final engine • 1 .5 yd3 bucket capacity • Spacious climate controlled cab • 16’ 8” hinge pin height telescopic arm • Articulated forr operation in tight spaces • Class leading travel speed up to 2 24.9 4.9 mph

WL60T as low as

3..49% Financing for o 48 months on Wh Wheel Loaders* s

* 48 Mo. - 3.49%; 60 Mo. - 4.49%; 72 Mo. - 5.49% %. Call for full details.

Call Mickey O’Neill 405.590.4929 C

wyliesprayers.com

Abilene Lubbock Corrpus pus Christi Oklahoma City

Lamesa Munday Seminole Plainview 18-009R1 18 009R1


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 13

Bobcat of Abilene 325-673-7361 Bobcat of Amarillo 806-622-9593 Bobcat of Austin 512-251-3415

Bobcat of Corpus Christi 361-884-3959

Bobcat of Midland – Odessa 432-685-9298

Bobcat of the Rio Grande Valley 956-425-4300

Bobcat of Waco Elm Mott 254-666-1669

Bobcat of Lubbock 806-745-1322

Bobcat of San Antonio 210-337-6136

Bobcat of Victoria 361-579-0922

Ranchers ATV and Tractor Kerrville 830-315-2330

BobcatCCE.com


Page 14 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Lone Star State Construction Projects U.S. 69 Sidewalks in Jacksonville

Anderson County

• Limits: From Nacogdoches St. to Tena St. in Jacksonville • Contractor: Highway 19 Construction LLC • Cost: $507,099.00 • Anticipated Completion Date: Fall 2020 The contractor is scheduled to continue sidewalk and driveway construction.

County Road Off-System Bridge Project • Limits: Various locations in Anderson County • Contractor: Stateline Construction, LLC • Cost: $1.5 million • Anticipated Completion Date: Summer 2021 The contractor will continue work on Salt Works Rd., CR 370 bridges, and roadway elements. Expect lane closures and delays. The project includes the construction of bridges, storm sewer, guardrail, base, pavement surfaces, and pavement markings. SH 155 Pavement Repair and Overlay Project • Limits: From 0.145 mi. north of FM 315 south to 0.190 mi. south of Loop 256 • Contractor: Reynolds & Kay, LTD • Cost: $1.5 million • Anticipated Completion Date: Summer 2020 The contractor is scheduled to continue milling the northbound shoulders, and paving operations. The contract consists of planing, pavement repair, surface asphalt, guard fence, and pavement markings. U.S. 79 Super 2 Project • Limits: From 0.5 mi. northeast of Loop 256 to the Anderson/Cherokee County line • Contractor: Madden Contracting Company LLC • Cost: $14.4 million • Anticipated Completion Date: Summer 2021 The contractor is scheduled to continue work on the shoulders and driveways, and place drainage structures. The project is widening for a Super 2, including sub-grade work, surface treatment, base and surface hot-mix asphalt, widening structures, bridge rail, metal beam guard fence, signage and permanent striping. U.S. 287 Super 2 Project

Cherokee County

U.S. 79 Widening Project

FM 241 Safety Widening

• Limits: From the Neches River to 1.2 miles northeast of FM 747 • Contractor: Drewery Construction Company Inc. • Cost: $8.2 million • Anticipated Completion Date: Spring 2020 The contractor is scheduled to perform striping and project cleanup. The road is being widened to add passing lanes.

• Limits: From US 69 southeast to SH 21 • Contractor: A. L. Helmcamp Inc. • Cost: $5.5 million • Anticipated Completion Date: Summer 2021 The contractor is scheduled to install drainage improvements. The project is widening the existing roadway and incorporating safety upgrades. County Road Bridge Replacement Project • Limits: CR 2905 at Bowles Crk.; CR 2614 at Beans Crk.; CR 1504 at Turnpike Crk.; CR 3202 at Mills Crk. • Contractor: Stateline Construction, LLC • Cost: $1.9 million • Anticipated Completion Date: Winter 2020 CR 3202 at Mills Creek is closed to through traffic with the contractor scheduled to continue bridge construction. The project is replacing the existing bridges at each location with new structures. SH 204 Super-2 Widening Project • Limits: From US 79 in Jacksonville southeast to SH 110 • Contractor: Madden Contracting Company LLC • Cost: $13.7 million • Anticipated Completion Date: Summer 2021 The contractor is scheduled to continue drainage improvements and perform paving operations. The project is adding passing lanes and incorporates safety upgrades. U.S. 69 Widening Project

• Limits: From just north of FM 2419 south to 1.7 mi. north of SH 294 in Elkhart • Contractor: A.L. Helmcamp, Inc. • Cost: $6.1 million • Anticipated Completion Date: Fall 2020 The contractor is scheduled to grade ditches and place signs. The project includes base repairs, treated subgrade, surface asphalt, upgrading structures, signs, and pavement markings.

• Limits: From two mi. north of FM 1247 in Wells, south to 0.9 mi. south of FM 1247 • Contractor: Longview Bridge and Road, Ltd. • Cost: $17.6 million • Anticipated Completion Date: Spring 2020 The project is widening US 69 through Wells from two lanes to four lanes with new curb and gutter and a two-way left turn lane through town.

U.S. 79 Rehabilitation Project • Limits: From 0.16 miles east of SH 110 to the Mud Creek Relief Bridge • Contractor: Madden Contracting Company LLC • Cost: $8.2 million • Anticipated Completion Date: Fall 2020 The contractor is scheduled to perform pavement rehab on the south half of the roadway. The project is rebuilding the roadway pavement and upgrading bridge rails. FM 343/1861 Drainage Improvements • Limits: From U.S. 69 to 2.7 miles E of US 69; FM 316 E to Henderson/Van Zandt Co. line • Contractor: Highway 19 Construction LLC • Cost: $640,000.00 • Anticipated Completion Date: Spring 2020 The project will upgrade safety features on driveways and roadway cross-culverts.

Gregg County FM 3272 Restoration Project • Limits: From U.S. 80 to FM 2275 in White Oak • Contractor: Reynolds and Kay, LTD • Cost: $3.1 million • Anticipated Completion Date: September 2020 New sidewalks and drives are being constructed. The project includes pavement restoration including: milling, repair, one course surface treatment, hot mix overlay, new sidewalk on the east side, new pedestrian crossing and pavement markings. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 15

TEXAS’ PREMIER TRUCK AND TRAILER DEALER Robstown 3205 Hwy 44 East Robstown,TX 78380 361-387-5010 Fax: 361-767-5542

Superior Design, Quality, & Durability

Houston 11113 Wallisville RD Houston,TX 77013 713-670-0733 Fax: 713-671-0455 • OIL FIELD • AGGREGATE • HOPPERS

M5500-8 Load Capacity w/ 14'-1" booster: 55 Tons in 12'-0" Load Capacity w/ pin-on 4th axle: 60 Tons in 14'-0" Overall Length: 53'-0" Tractor Swing Clearance: 116" Axle Spacing: 54" or 60" Deck Width: 8'-6"

Deck Length w/ 54" axle spacing: 26'-0" Flush Deck Deck Length w/ 60" axle spacing: 25'-0" Flush Deck Loaded Deck Height: 22" w/ 6" ground King Pin Height: 50" Approximate Tare Weight: 21,000Lb

www.jbpavelkainc.com

We stock trailers of all types • TANKERS • SPECIALIZED • DUMP TRAILERS TRAILERS • DROP DECKS • HEAVY HAUL


Page 16 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Texas Asphalt Pavement Association Says 2020 Annual Meeting Canceled The Texas Asphalt Pavement Association has decided to cancel its 2020 Annual Meeting. Texas Asphalt Pavement Association President Geno Carrier IV made the following statement: Dear TXAPA Members, I come to you to share the decision of our board of directors to cancel the 2020 Annual Meeting. Perhaps you expected this, and as a fellow TXAPA member, I believe you know how very difficult a decision it was to make. We wanted to avoid a cancellation, and went through multiple scenarios that we felt might make the Annual Meeting a success. I am personally saddened that circumstances won’t allow us to meet safely and responsibly, but I am confident in knowing we’re making the right call. TXAPA members and our TxDOT partners have always championed safety. The decision to avoid assembling a large crowd of people from all over

Texas is 100 percent aligned with our declared values. Now is the right and best time for TXAPA to be a beacon, making the necessary sacrifices to keep our members, partners, employees, and association staff safe and healthy. TXAPA is a leader in the industry all across the nation. We are leading from the front to protect the people and communities we care so much about. What Happens Next? It’s a great question and one we hope to address more fully in the weeks to come. At the highest level, I can reveal that we will not be rescheduling the annual meeting or attempting to move our meeting online. Our meeting is unique in its ability to bring people together and we want to preserve that. Most likely, our path forward will be a robust schedule of TXAPA Live broadcasts throughout September featuring content from the planned meeting agenda. We also hope to mix in some fun virtual events designed to connect

Houston, TX 713-247-0066

us even at a distance. These events will tie in with the TXAPA Scholarship Program, so we can continue to support our industry-sustaining mission to change the lives of deserving students who will become innovators and leaders for Texas. The TXAPA staff and board of directors are now actively engaged in planning these alternatives and I am confident they will deliver the firstclass, value experience we have all come to expect. To close, I want to thank each TXAPA member for your support and understanding. Countless many of you have told us your own COVID-19 experiences — I know it has been a trying and yet, as an essential industry, a very rewarding time as well. Even without the Annual Meeting, there is much to be done. Please be assured that we are always working to remain aware of issues and opportunities facing the industry and that we will continue to dedicate our efforts to you and your success. 

San Antonio, TX 210-310-0066

www.nuecespower.com

The expansion is the single largest capital development program that the city has invested in at Bush Intercontinental since the airport was constructed and opened in 1969.

Airport Upgrades Bring New Jobs? Contractors are moving forward this summer on a billiondollar expansion program at George Bush Intercontinental Airport that officials said could bring construction jobs and economic growth to the region. The Houston Airport System continues its $1.3 billion capital improvement program, the IAH Terminal Redevelopment Program, despite travel decline from the ongoing coronavirus pandemic. Airport officials are pushing forward on one of the biggest parts of the program: essentially combining terminals D and E to expand the international footprint at the airport. “This is the single largest capital development program that the city has invested in at Bush Intercontinental since the airport was constructed and opened in 1969,” HAS Chief Development Officer Robert Barker said. Mark Mitchell, president of the Lake Houston Area Economic Development Partnership, said the partnership frequently leverages airport system improvements and other corporate-level expansions as incentives for new businesses to join the area. “Those are all meaningful for both national and international companies,” he said. “The proximity of the airport along with the expansions is really important to economic development because we use it as a marketing tool to try and attract companies.” In addition to general regional economic growth, the two construction projects will bring many construction-related jobs to IAH through 2024, Bernal said. “A construction this vast will bring jobs and opportunities,” Mitchell said. Data from geographic information system company Esri shows 4,625 Lake Houston-area residents, or 6.68 percent of the local workforce, work in the construction industry as of the third quarter of 2019. Esri reported a 1.4% increase in construction-related jobs in the last five years, and the company predicted a 1.6 percent increase in jobs to become available in the next year. The contractors of the two projects, Hensel Phelps and Austin Gilbane Joint Venture, will solicit personnel for the specific projects, Bernal said. Meanwhile, HAS solicits contracting jobs for numerous other airport projects at fly2houston.com/biz, Bernal said. Construction on the new Mickey Leland International Terminal will kick off in late summer with the $560 million central processor, which will be a hub located between Terminal D and Terminal E. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 17

Zero Turn for Mobiliity y,,

info@gomac g o.com m ❘ www.gomac g o.com o Long, straight runs are nice. But many of you have curb and gutter p projects with short runs, rad adii, and corners in parking lotss or tight locations. GOMACO’s Xtreme curb and gutter e machines have Zero-Turn capabilities bilities fo or maneuverabilit a y. You’ll be able to placce more curb than ever beffo ore and move your machin ne in ways you have never e moved befo ore. You’ll be aable to pour a tight radius that you could only dream of befor o e. GOMACO’’ss proprietary G+ controls makess your concrete paver smoo other and easier to operate. Have fun aving curb and gutter with your new Zero--T Turn GOMACO paver. Ourr worldwide distributor network and corpo orporate team m always stand ready to serve and assist you.

ROMCO Equipment Co.

Sierra Machinery, Inc.

www.romco.com

www.sierraelpaso.com

Buffalo, TX 903-322-5602

Ft. Worth, TX 817-626-2288

Longview, TX 903-758-5576

Carrollton, TX 214-819-4100

Houston, TX 713-937-3005

Midland, TX 432-234-9409

939 Hawkins Boulevard El Paso, TX 79915 915-772-0613

Closner Equipment Company Inc. www.closner.com San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131

Austin Branch 13800 FM 973 N Manor, TX 78653 512-272-8200


Page 18 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Cloud-Based Tool e-Builder Assists Crews With Project FLYOVER from page 10

site, particularly working near live traffic and in elevated work areas,” he added. “Our crews are diligent about wearing safety harnesses, using spotters for overhead materials and performing work behind concrete barriers and under lane closures.” “Nighttime operations are particularly busy on the project,” said Chance. “To capture the incentives and avoid the mid-day Texas heat, Webber has chosen to perform much of their work at night, such as beam setting, setting/stripping overhangs, tying reinforcing steel, setting precast bridge panels, forming/stripping column/cap forms and deck placements for structures adjacent to live traffic.” Construction of all three flyovers overlapped, but there was an increased focus on one at a time as Webber worked to reach milestones. “Since the project remains within the existing right-of-way, utilities and water have not presented challenges,” said Word. “However, we discovered some isolated soil issues during construction of the approaches and landings of the flyovers. The clay-like material held water and was pumped when proof rolling was performed prior to placement of the proposed embankment material.” The drilled shafts for the East to South flyover started in April 2019, columns started in October, and the bent caps in December. The Mobility Authority noted that all of the drilled shafts, columns and bent caps are complete; all concrete beams have been installed; and 10 out of the 25 bridge deck spans have been built. Regarding putting together form work for the columns and bent caps and tying reinforcing steel cages for columns and bent caps, large and tall structures such as columns 8 by 5 ft. and 9 by 6 ft. were used. Various types of bent caps such as inverted T, hammer heads, straddle caps and post tension straddle caps, also were utilized. The structures also are considered mass placement, which requires temperature monitoring. “We’ve engaged in detailed coordination with TxDOT’s SH 130 widening project in order to effectively tie in to southbound SH

130 just north of Blue Bluff where our projects meet,” said Chance.

Crews are utilizing a Manitowoc 11000-1 crawler crane and a Kobelco CK1600G2 crawler crane to help with putting the formwork together, setting the forms, installing the reinforcing cages, placing concrete using a bucket, setting concrete beams, setting concrete panels and moving/transporting material to the bridge decks.

“We have a very strong team dynamic. Each member brings unique skills, experience, and perspective to offer when making collective decisions.” Tim Burhop Webber LLC

All Hands on Deck Burhop has an experienced team assisting him. “We have a very strong team dynamic,” he said. “Each member brings unique skills, experience, and perspective to offer when making collective decisions. We have established great communication, respect and trust for one another, resulting in a very positive and productive work environment. Every member has a clear understanding of their roles and responsibilities, which enables us to successfully work as a team to achieve our common goal.” The concrete is being provided by Texas Concrete. The project was designed by CP&Y. The cloud-based construction management tool – e-Builder – is being used to coordinate submittals and processing of construction submittals, RFIs, notices of design change and invoicing. “e-builder has been an effective construction management tool for document control, and workflow processing, including submittals, shop drawings, and other items,” said Word. Automatic portable smart traffic monitoring system to assists with work zone traffic control, increased safety and provides timely updates to drivers is being used. This includes PCMS placed on all four main directional approaches to the project, and non-intrusive speed detectors at regular one-half to one-mile intervals approaching the work zone. “The PCMS automatically provides real-time messaging to drivers, alerting them of traffic conditions and distances to potentially slowed or stopped vehicles ahead,” said Chance. Peak days have seen 120 Webber and subcontractor employees on-site for the south to west flyover, 150 for the south to west flyover and 132 for east to south flyover. The major subcontractors are Beaird Drilling for drilled shafts; Indus Road & Bridge for concrete structures, Texas Highway Walls for MSE walls, The Levy Company for electrical, ITS, and large overhead see FLYOVER page 20


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 19

800.255.8628 www.powerscreentx.com

LARGE OR SMALL, WE WASH IT ALL Aggresand 206 Up to 5 washed and sized products. The Aggresand 206’s readily portable format makes it particularly suitable for green-field applications / contractor use / temporary planning permission sites but operators more used to static installations will still appreciate the small footprint and minimal site preparations required • Up to 3 washed aggregates & 2 washed sands • Modular design with 'plug and play' electrical connections for quick set-up • Pre-wired & pre-plumbed with single connection points • Fully automated touch screen control providing all-round plant information

Terex M1700 3 Deck Rinser Works independently or in-line.

The Terex® M 1700 Washplant is a mid-sized mobile washing plant complete with on board hydraulically folding side conveyors for up to 5 way splitting of material in applications such as coal, crushed stone, recycled materials, iron ore, sand and gravel. • High capacity, (depends on mesh sizes and material type). • Quick set up time typically under 15 minutes. • Maximum mobility with heavy duty, low ground pressure crawler tracks. • Removable heavy duty pendant remote control system. • Optional radio control system available

Crushing • Screening • Conveying • Washing • Recycling • Grinding Systems

SERVING TEXAS, OKLAHOMA, ARKANSAS & LOUISIANA 5680 West State Hwy 71 • La Grange, TX 78945 • Phone: 800.255.8628


Page 20 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Contrators Earn Incentives to Finish Job Early, On Time FLYOVER from page 18

signs; Roadway Specialties for MBGF, crash cushions and small signs; Bradco; Kyros; Flasher for striping; and Texas Materials for riprap and mowstrip (flat work). HDR is providing all construction, engineering and inspection services. Equipment-wise, Webber also is employing dozers, excavators, loaders, drill rigs, rollers, pavers and skytracks. Main wear and tear issues include hydraulic leaks, incidental dents, cooling issues and friction on parts (e.g. bucket teeth), with most items repaired within 24 hours. Webber has a mechanic that visits daily, but is not dedicated to the project. The keys for maintenance on a project like this are timeliness of reporting issues and not letting routine maintenance turn into serious problems. Most of Webber’s equipment is either owned or leased. It rents equipment from ASCO Equipment, RDO Equipment Co., United Rentals and Hunter Heavy Equipment Inc. “The project team doesn’t deal with vendors directly in relation to equipment,” said Burhop. “We have separate department within Webber that coordinate equipment vendors.” Incentivizing Construction The incentives are available for the contractor for early completion of the South to West and North to West direct connectors. Webber may earn $8,000 for each working day of early substantial completion of the South to West flyover, up to a maximum of 170 days, and $5,000 for each working day of early substantial completion of the North to West flyover, up to a maximum of 100 days. “The early completion incentives the Mobility Authority built into the contract really made a difference,” said Word. “The North to West and South to West flyovers were completed months ahead of schedule, and if conditions remain as they are, we expect the third and final flyover to be complete later this year/early next year — months ahead of the June 2021 contractual obligation. Incentives have been a valuable contract tool to provide contractors the ability to be rewarded for extraordinary performance. We have seen positive results from incorporation of incentive regimes, allowing our projects to be completed more quickly, with shorter duration of construction impacts to the traveling public.” The South to West direct connector (first) was completed and open to tolling 8 months early, and the North to West direct connector (second) was completed and open to tolling 4 months early. “Cost savings are translated to real dollars

in the form of early toll revenue receipts and reduced months of owner-funded project oversight,” said Word. “The traveling public also realizes the benefits of early completion through travel time savings and reduced impacts of the disruptions that come along with an active construction zone.” The Mobility Authority and TxDOT partnership is very satisfied with the quality of Webber’s work. Community Impact “As we see drivers returning to the roadways, it’s more important than ever that we continue to deliver forward-thinking and reliable mobility solutions,” said Bobby Jenkins, chairman of the Mobility Authority board of directors. “These connections help lay the foundation for economic recovery as we continue the fight against the COVID-19

“The early completion incentives the Mobility Authority built into the contract really made a difference,” said Justin Word, Mobility Authority’s director of engineering.

The Mobility Authority confirmed that all of the drilled shafts, columns and bent caps are complete; all concrete beams have been installed; and 10 out of the 25 bridge deck spans have been built.

pandemic. As part of our commitment to improving the reliability, safety, and connectivity of our region, the Mobility Authority is proud to deliver this second flyover, a symbol of forward progress in these difficult times.” The Mobility Authority, created in 2002 to

improve the regional transportation system in Travis and Williamson counties, noted that in early June, toll transactions on the 290 Toll Road indicated a 38.6 percent increase in average weekday traffic since the region’s stay-at-home orders went into effect. “Completion of these flyovers will help

eliminate queueing of vehicles off the southbound and northbound main lanes of SH 130,” said Word, “and are anticipated to shift approximately 67 percent of vehicles off the southbound SH 130 frontage road and onto the new flyover ramps to westbound 290 Toll.”  CEG


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 21

What can you haul in a side dump trailer? Nearly anything.

Superior Stability

Faster Cycle Times

Easier Unloading

With construction grade tires and an ability to haul dirt, rock, millings, riprap and other materials, our trailers help solve the everyday challenges of the construction industry. When we build trailers, we build solutions. 800-779-8099 • sidedump.com


Page 22 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

September 3, 2020


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • August 16, 2020 • Page 23

www.kirby-smith.com

Follow us on

Abilene

Amarillo

Dallas

Ft. Worth

Lubbock

Odessa

Waco

325.692.6334

806.373.2826

214.371.7777

817.378.0600

806.745.2112

432.333.7000

254-261-1370


Page 24 • August 16, 2020 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

True Power. At Bane Machinery, we offer Liebherr machines that are custom-engineered to perform efficiently. And we stand behind them with full service. Count on us for original parts, factorytrained technicians, and an extensive inventory of machines for your toughest jobs. We can also service your equipment to OEM standards in the shop or the field. We haven’t compromised on anything; why should you?

www.banemachinery.com

DALLAS 2449 Manana Dr. Dallas, TX 75220 Ph: (214) 734-2361

FORT WORTH 10505 North Freeway Fort Worth, TX 76177 Ph: (817) 847-5894

TYLER 3402 N. NE Loop 323 Tyler, TX 75712 Ph: (903) 597-6641

www.banemachinery.com


Turn static files into dynamic content formats.

Create a flipbook
Texas 17, August 16, 2020 by Construction Equipment Guide - Issuu