Skip to main content

Texas 15 July 21, 2019

Page 1

State Supplement sponsored by:

TEXAS STATE EDITION

A Supplement to:

SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY

®

24 HOUR TECHNICAL SUPPORT

July 21 2019

BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. IV • No. 15

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

CALL 800-367-4937

Your Texas Connection • Dennis Hogeboom • 1-877-877-4997 • dennishogeboom@cegltd.com

*On approved credit • Financing Available

Hettinger Comes Out of Retirement, Builds New Company Some folks count the days until they’re able to retire, while others retire and then count the days until they can go back to work again. Mark Hettinger, co-owner of M&G Contractors of New Braunfels, Texas, fits firmly into the second category. After selling a company that he founded in Gillette, Wyo., and grew to be one of the largest pipeline contractors in the west, Hettinger planned to do what most people would — retire and move south. He and his wife chose the San Antonio area as their retirement destination, but the retirement was short lived. “I just couldn’t do it,” Hettinger said. “I couldn’t stay home every day, and I didn’t want to play golf.”

Mark Hettinger (L) has found new life in Texas after selling his successful Wyoming pipeline company, Hettinger Welding (later Hettinger LLC). Hettinger said Chris May (R) and the entire Texas VermeerLouisiana team have been a huge asset for his new company, M&G Contractors.

Boredom soon set in and he decided to start all over. Fast forward just a couple of years: Hettinger and partner Gary Harlow run an excavation and pipeline company that is a force to be reckoned with in the Austin and San Antonio markets. Hettinger has chosen to build his new company around the Vermeer brand, with help from Vermeer Texas-Louisiana, the local dealer for the trenching/drilling line. M&G has 40 employees and continues to grow. Time will tell whether M&G reaches the heights of Hettinger’s former company in Wyoming which had 1,000 employees and $200 million in annual revenues at its peak. see HETTINGER page 16

Vermeer D40x55DR Solves Big Problem When the discovery of flint rock threatened a gas pipeline project outside of San Antonio, Texas, M&G Contractors turned to Vermeer’s D40x55DR S3 Navigator horizontal directional drill (HDD) to complete the job. “We were running a month past due,” recalled Mark Hettinger, M&G president. “The flint rock just under the surface was slowing us down and ripping up teeth on our Vermeer T855 trencher at a very expensive rate.” After the rock chewed up $3000 worth of teeth in about five minutes, the contractor looked at options. They had drilled other portions — primarily under huge oak trees — of the 4-mi. line with the Vermeer D60x90 directional drill, but the flint, nearly as hard as granite, created problems with steering for the machine. “Chris May of Vermeer Texas-Louisiana had been telling

me that their new dual rod D40x55DR would perform well in this type of environment, so I asked him to bring one out,” Hettinger said. “The machine did exactly what he said it would do, so it will help get us back on schedule.” On one 500-ft. stretch through granite, Hettinger figured it would have taken eight days trenching and $20,000 worth of teeth. The D40x55DR drilled the distance in about 10 hours. “The D40x55DR features dual rod technology that uses an inner rod to provide torque to the drill bit, while the outer rod offers steering capability and rotational torque for reaming,” said May. “We’ve seen it perform well in a variety of conditions.” Although about 75 percent of the 4-mi. line was cut with the Vermeer T855, the remainder had to be drilled, either due to the trees or because of the flint. see ROCK page 16

Vermeer’s D40x55DR horizontal drill was the solution to hard flint rock in the Texas Hill Country.

Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas

We Have Parts For: Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case

(254) 562-7500 • www.HighTech-parts.com


Page 2 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Equipment Operated Rentals OVERLOADED & NEED TO CATCH UP? Volvo A40G Articulated Truck & Self Loading K-tec 37 cyd Scraper with Operator

No need to hire personnel 7UDLQHG FHUWL¿HG TXDOLW\ RSHUDWRUV z 0D[ SURGXFWLRQ IURP VWDUW z F\G DQG F\G VFUDSHUV DYDLODEOH z 2SWLRQ WR SXOO GRXEOH WUDLQV WRWDOLQJ F\GV

CRUSHING, SCREENING, DRILLING & WASHING MOBILE & STATIONARY EQUIPMENT

z z

281.677-4544/info@romco.com

PAVING TEXAS Concrete and Asphalt Paving Equipment

Sales - Rentals - Parts - Service 214.819-4100/800.966-4601 www.romco.com

YOUR HEAVY DUTY POWER ADVANTAGE Compressors, Generators, Pumps, & Light Towers ENGINE &

HAMMER

Sales - Rentals - Parts - Service

REBUILDS

214.819-4100/800.966-4601 www.romco.com

210.569-7068 / 800.966-4601 www.romco.com


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 3

We offer a cost-effective alternative to the purchase of new equipment. Our high quality used equipment has been inspected, repaired if needed and brought back to new equipment

specifications by our factory trained technicians. We specialize in the Rental and Sale of loaders, dozers, excavators, graders, haul trucks with a special emphasis on water equipment.

Over 100 Work-Ready Machines in Inventory

RENTALS

SALES


Page 4 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

I-35 News Notice of Availability of FONSI for I-35E in Ellis County

Officials break ground on the I-35 at Ronald Reagan Boulevard project in Williamson County.

Construction Starts on I-35 at Ronald Reagan Boulevard TxDOT representatives joined local elected officials, including U.S. Representative John Carter’s office, State Representative Terry Wilson, Williamson County Judge Bill Gravell Jr., Williamson County Commissioner Valerie Covey and Jarrell Mayor Larry Bush to break ground on the I-35 at Ronald Reagan Boulevard project in Williamson County. The new project will replace the existing two-way bridge at I-35 and Ronald Reagan Boulevard with two new one-way east and westbound bridges. “This $13.6 million construction project addresses safety and mobility by replacing the narrow Ronald Reagan Boulevard bridge over I-35 with two new one-way bridges, and realigning an important crossing in Williamson County,” said Bobby Ramthun, TxDOT Georgetown Area engineer. “These much-needed improvements will make it safer and easier for all modes of transportation in a growing area of Williamson County.” In addition to rebuilding Ronald Reagan Boulevard over I-35, the project will realign the road with CR 311 in order

to connect to the newly constructed bridges. Bicycle and pedestrian enhancements will also be made as part of the project. “These overpass improvements will continue to make Williamson County an amazing and safe place to live,” said Gravell. Project development was funded by the Williamson County Road Bond Program. Construction is funded by TxDOT and the Capital Area Metropolitan Planning Organization. “The I-35 at Ronald Reagan Boulevard project is a crucial link in Williamson County’s long-range transportation plan,” said Covey. “It is vital to the safety and mobility of a fast-growing area within the county.” The project is expected to be complete mid-2021, weather permitting. The contractor is Dan Williams Company. To learn more about this project and others under construction, visit www.My35Construction.org.

Webber Wins $63.8M I-35 Expansion Project Webber LLC was the low bidder for the Texas time and give the improved roads back to the traveling Department of Transportation project on IH 35 in Comal public sooner.” County. The project was bid at $63.8 million and will be The project is scheduled to begin September 2019 and built in 25 months. with substantial completion The project consists on the expected in the Fall of reconstruction of 6.2 mi. of IH 2021. 35 and its frontage roads on the north side of New Braunfels, About Webber LLC Texas. The project will include Founded in 1963, two overpass bridges over Webber is one of the Conrad Lane/Kohlenberg Road largest general contractors and another one over Parkway. in Texas and known for its The project also will include award-winning projects in 143,000 sq. ft. of MSE retaining transportation, waterworks walls and 135,000 sq. ft. of temand commercial construcporary retaining wire walls. tion. Webber also special“This was another great win izes in environmentally for Webber that is a testament to friendly and recycled conour business concept,” said Josh The $63.8 million project consists on the recon- struction materials that Goyne, president of the Webber struction of 6.2 mi. of IH 35 and its frontage roads eliminate the use of about Heavy Civil division. on the north side of New Braunfels, Texas. 1.5 million cu. yds. of “Collaboration between our estilandfill space annually mating, procurement, operations and engineering services while supplying contractors with quality recycled and locally to bid smart with innovative ideas that condense our proj- sourced materials. ect schedule, allowing Webber to finish a project in less For more information, visit wwebber.com. 

This notice is to advise the public that TxDOT has issued a Finding of No Significant Impact (FONSI) for the proposed interchange improvements on I-35E from U.S. 77 South to U.S. 77 North in Waxahachie, Ellis County, Texas. The proposed I-35E Frontage Roads project would reconstruct and widen the existing frontage roads; convert all two-way operations to one-way operations; and make all of the frontage roads continuous along the entire project. The proposed frontage roads would include a 12-ft. inside lane; a 14-ft outside shared-use lane with 2-ft. offsets to the face of curb; provide 6-ft. sidewalks throughout; and provide new pedestrian bridges along U.S. 287 east and west of I35E. Additional improvements would include new I-35E overpasses at Lofland Drive, Butcher Road (Farm-toMarket [FM] 387), Sterrett Road; a new interchange at Hotel Drive at FM 664 (Ovilla Road) and improvements to FM 66 and FM 1446. All of the cross-street improvements also would include left- and right-turn bays along with U-Turns. This project also proposes to build two direct connectors (in the peak hourly direction) at the U.S. 287/I-35E interchange to relieve the current congestion at this interchange. The project would require the acquisition of approximately 33.2 acres of new right of way (ROW) and 1.1 acres of permanent drainage easements; 1.3 acres of temporary construction easements would also be required to accommodate the proposed roadway improvements. To avoid noise impacts that may result from future development adjacent to a proposed highway project, a traffic noise analysis is included in the final environmental assessment (EA), which includes predicted noise impact contours for currently undeveloped areas. These impact contours are intended as a general guide to assist local planning officials and developers plan and construct new activities in locations that would not result in traffic noise impacts. On the date of approval/clearance of an EA/FONSI (including the traffic noise analysis) for a proposed highway project, TxDOT is no longer responsible for providing noise abatement for new development. Additionally, as TxDOT does not provide retroactive (retrofit) abatement (known as a Type II program), this project area would not be eligible for potential noise abatement until the next major highway improvement project. Memorandum of Understanding The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carriedout by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 5

5 )& & 26* 1 .& /5 4 61 1 035 : 06 /& & % /0 ." 5 5 & 3 8)& 3& 5 )& + 0#4 * 5 & 5 ",& 4 : 06 * S W J O H %B M M B T ' P S U 8P S U I

3 P V O E 3 P D L " V T U J O

V C C P D L " NB S J M M P 4 F M NB 4 B O " O U P O J P

" M B NP & M N .P U U 8B D P

.J E M B O E 0E F T T B $Z Q S F T T )P V T U P O

, J M H P S F $P S Q V T $ I S J T U J # B U P O 3 P V H F " 7 & 3 .& & 3 5 & 9 " 4 $ 0. ]


Page 6 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Port of Corpus Christi...

New Pipelines to Connect U.S. Rockies, Cushing to Port On June 10, 2019, Phillips 66 announced two separate 50/50 joint ventures to proceed with construction of two new pipelines, the Liberty Pipeline (with Bridger Pipeline LLC) and the Red Oak Pipeline (with Plains All American Pipeline). “The [Liberty] Pipeline adds to our integrated infrastructure network that serves the key shale oil producing regions with connectivity to major Gulf Coast market centers,” said Greg Garland, chairman and chief executive officer of Phillips 66. “The [Red Oak] Pipeline provides a competitive outlet for shippers to access the key market centers along the Texas Gulf Coast from Cushing and the Permian.” The 24-in. Liberty Pipeline will provide crude oil transportation service from the Rockies and Bakken production areas to Cushing, Okla. The 30-in. Red Oak Pipeline system will carry multiple grades of crude oil through Cushing — the main thoroughfare for Central U.S. crude production — and the Permian Basin to Corpus Christi, marking the first non-Texas crude production connecting to the Port of Corpus Christi.

“These newly announced pipelines are pivotal developments in establishing the Port of Corpus Christi as the preferred gateway for U.S. crude exports.” Sean Strawbridge Port of Corpus Christi

“Red Oak represents a capital-efficient industry solution that will utilize existing assets and provide pull-through benefits to our systems,” said Willie Chiang, chief executive officer of Plains All American. Pending the permitting process, service on both pipelines could begin as early as the first quarter of 2021. “These newly announced pipelines are

pivotal developments in establishing the Port of Corpus Christi as the preferred gateway for U.S. crude exports. These lines will add new North American crude slates such as Bakken, Niobrara/DJ Basin, SCOOP & STACK to our already high-quality Permian and Eagle Ford barrels,” said Sean Strawbridge, chief executive officer of the Port of Corpus Christi. “The discerning

Asian and European crude customer will certainly appreciate the expanded menu of options Corpus Christi provides when buying American crude oil.” The Port of Corpus Christi is forecasting exports of nearly $15 billion of crude oil in 2019. As the third largest port in the United States in revenue tonnage, the Port is engaged in a 10-year, over $1 billion capital expansion program with the expectation that U.S. energy exports will triple or quadruple as demand for U.S. production continues to increase. About Port Corpus Christi As a leader in U.S. Crude Oil export ports and a major economic engine of Texas and the nation, Port Corpus Christi is the 3rd largest port in the United States in total revenue tonnage. Strategically located on the western Gulf of Mexico with a 36-mi., soon to be 54 ft. (MLLW) deep channel, Port Corpus Christi is a major gateway to international and domestic maritime commerce. For more information, visit portcorpuschristi.com/. 

Google Plans Office Space, Data Center in Midlothian Austin has been home to Google for more than a decade and the company is extending its commitment to the state with a new data center in Midlothian, and the lease of two new buildings for its Austin workforce. These new commitments are part of a larger $13 billion investment in offices and data centers across the United States, which was announced earlier in 2019. Breaking Ground at New Midlothian Data Center Google is investing $600 million to develop the Midlothian site, which will create a number of full-time jobs, as well as hundreds of construction jobs to build the new data center. As part of this investment, Google also is making a $100,000 grant to the Midlothian Independent School District to support the continued growth and development of the region’s STEM programs in schools. “In Austin, we already have more than 1,100 employees working across Android, G Suite, Google Play, Cloud, staffing and recruiting, people operations, finance and marketing. As we continue to grow, we’ve leased additional office space at Block 185 and Saltillo — located in downtown Austin and east Austin, respectively — to accommodate our short and long-term growth,” the

Google is investing $600 million to develop the Midlothian site, which will create a number of full-time jobs, as well as hundreds of construction jobs to build the new data center.

company said. Google will maintain its presence at its current downtown Austin office on W 2nd Street while expanding to new locations at Saltillo and Block 185.

“The Lone Star state has become a hub for tech innovation and we’ve been fortunate to be a part of its growth from the very beginning. It’s the amazing talent and spirit of work and play that brought us to Texas 12

years ago and it’s what keeps us here today. We look forward to meeting our new neighbors in the Midlothian-Dallas Metro area and we’re excited to be a part of these communities for many years to come.” 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 7

THREE WA WAY YS TO SA AV VE BIG. 15,000

U SD*

PLUS A 2-YEAR/2,000-HOUR STTANDARD ANDARD WARRANTY

OR

$

4299

U SD* / MONTH

PLUS A 3-YEAR/3,000-HOUR FULL WARRANTY* WARRANT TY*

0% FINANCING OR

FOR

UP TO

$

A S LO W A S

L E A SE

REBATES

60 MONTHS*

PLUS A 2-YEAR/2,000-HOUR STTANDARD ANDARD WARRANTY

CHECK OUT BOBCAT.COM/ SUMMERSA AV VINGS19 FOR MORE DE TTA AILS, OR VISIT US TO SEE CURRENT INVENTORY. Bobcat of Amarillo 806-622-9593

Bobcat of Lubbock 806-745-1322

Bobcat of San Antonio 210-337-6136

Bobcat of Waco 254-666-1669

Bobcat of Austin 512-251-3415

Bobcat of Midland – Odessa 432-685-9298

Bobcat of the Rio Grande Valley 956-425-4300

Ranchers ATV and Tractor Kerrville 830-315-2330

Bobcat of Corpus Christi 361-884-3959

BobcatCCE.com *Offer expires 9/30/19. Available at participating and eligible dealers only. Offer may vary by product type, series, model and select units in dealer’s current inventory. M Must take delivery from dealer stock by 9/30/19. Offers available on new equipment in U.S. and Canada only. Some restrictions apply. Length of contract may vary. Prior purchases not eligible. See dealer for details. Financing provided on approval of credit by authorized Bobcat finance providers to well-qualified buyers. Administrative fees may aapply. Offer not available to government accounts, national accounts and municipal/utility bid customers. Noncommercial customers may not be eligible for low-rate financing. Bobcat Company reserves the right to extend or discontinue any of these programs at any time without prior notice. Bobcat ®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. | 19-B2440


Page 8 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

ExxonMobil Expands Beaumont Plant, Increases Capacity By Lori Tobias CEG CORRESPONDENT

The U.S. Energy Information Administration (EIA) is predicting United States crude oil production will average 11.7 billion barrels per day in 2019, putting it on track to surpass the previous record of 9.6 million b/d in 1970. More than half of that is expected to be produced in the Permian Basin in western Texas and eastern New Mexico. According to the report, the EIA expects Permian regional production to average 3.9 million b/d in 2019. Favorable geology combined with technological and operational improvements have contributed to the Permian region becoming one of the more economically favorable regions for crude oil production in the United States. 

ExxonMobil has begun construction on a new crude unit at its Beaumont, Texas, refinery that will increase capacity by more than 65 percent, or 250,000 barrels a day. “This project is part of ExxonMobil’s larger ‘Growing the Gulf’ initiative, a series of refining and chemical expansion projects across Texas and Louisiana,” said Emily Russell, ExxonMobil public and government affairs advisor. “Production growth in the Permian Basin in West Texas and New Mexico is driving the expansion project in Beaumont.” The project will create up to 1,850 construction jobs and between 40 and 60 permanent jobs upon completion, slated for 2022. CEG ExxonMobil’s integrated operations in Beaumont include a 366,000 barrel-per-day capacity refinery, as well as chemical, lubricants and polyethylene plants. The facility has approximately 2,100 employ- Favorable geology combined with technological and operaees in the Beaumont area and its operations account tional improvements have contributed to the Permian region for approximately one in every seven jobs in the becoming one of the more economically favorable regions for region. crude oil production in the United States. The Beaumont refinery currently processes 366,000 barrels of crude oil per day and produces 2.8 billion is spread over 2,315 acres and is the eighth largest refinery in gallons of gasoline annually, according to the ExxonMobil the United States. Other “Growing the Gulf” projects include expansion of website. The Beaumont chemical plant produces buildingblock chemicals such as ethylene and propylene, synthetic Beaumont’s polyethylene capacity by 65 percent, a new unit fluids and lubricant base-stocks, and more than 25 different in Beaumont that increases production of ultra-low sulfur types of zeolite catalyst. The Beaumont lubricant blending fuels, and a new 1.5 million ton-per-year ethane cracker at and packaging plant manufactures lube oil, greases, includ- the company’s integrated Baytown chemical and refining ing those used in the wind turbine industry, and is the only complex in Texas. ExxonMobil and SABIC also have creatmanufacturer of Mobil aviation greases. Mobil 1, a leading ed a new joint venture to advance development of the Gulf synthetic motor oil, is manufactured and packaged in Coast Growth Ventures project, a 1.8 million ton ethane The project will create up to 1,850 construction jobs cracker currently planned for construction in San Patricio and between 40 and 60 permanent jobs upon compleBeaumont. Built in 1903 on the banks of the Neches River, the facility County, Texas. tion, slated for 2022.

Archer Western Tops Out AMLI Fountain Place in Dallas Archer Western and AMLI Residential achieved a construction milestone and performed its final concrete pour atop AMLI Fountain Place, a new residential high-rise on the north side of downtown Dallas. The new 45-story apartment community resides next to the highly regarded Fountain Place, designed by the late, famed architect I.M. Pei. The new AMLI Fountain Place stands 562 ft. tall and will contain 367 luxury high-end apartment units averaging 1,250 sq. ft. Designed by Page Sutherland Page, the tower serves as a complement to its neighbor and features a reflective green glass facade, floor-to-ceiling windows, unique layouts, plus an expansive roof deck. A topping out ceremony was attended by project leaders to commemorate the milestone and observe as the tower crane hoisted the project’s final bucket of concrete. AMLI Fountain Place is the tallest building to The Walsh Group photo be constructed in downtown Dallas in more than A topping out ceremony was attended by project leaders to commemorate the mile- 30 years, and construction is anticipated to be comstone. plete in early 2020. 

The Walsh Group photo

The project’s final bucket of concrete is hoisted to the top of AMLI Fountain Place, the tallest building to be constructed in downtown Dallas in more than 30 years.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 9

800.255.8628 www.powerscreentx.com

Once you switch, you’ll never look back The CBI Magnum Force 6800CT Horizontal Grinder has been engineered to surpass every horizontal grinder that came before it. Once land clearing and wood waste professionals switch to CBI grinders for their ultimate production, performance, and durability, they never look back. This is the best horizontal grinder on the market.

Komptech Nemus 2700 Mobile Drum Screen With the Nemus 2700, Komptech is launching a new generation of mobile hydraulic drum screens. The large hopper in the design of the Cribus, the screen drum with its improved material feed and the onepiece corrugated edge fines discharge belt harmonize perfectly with the proven, robust diesel-hydraulic drive. Redesigned controls make operation easier, and the extended discharge belts included as standard equipment give more flexibility in use. Practical details like the easy-cleaning two-stage radiator induction screen, larger material intake support wheels and the new low-wear collecting conveyor scraper reflect customer experience.

SERVING TEXAS, OKLAHOMA, ARKANSAS & LOUISIANA 5680 West State Hwy 71 • La Grange, TX 78945 • Phone: 800.255.8628


Page 10 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Houston Spaceport Celebrates Phase 1 Ground Breaking What began as a concept four years ago edge innovations needed to take commercial took its official first steps toward concrete space travel and aviation into the sub-sonic, reality with a ground-breaking ceremony on super-sonic and hyper-sonic realm,” said June 26, 2019, to celebrate work on Phase 1 Mario Diaz, Houston Aviation director. of the Houston Spaceport at Ellington Phase 1 of the Houston Spaceport project Airport. offers potential tenants and partners a unique Representatives from the Houston Airport environment in which to collaborate as well System, Houston City Council, the Federal as an operational platform to achieve critical Aviation Administration and community and business objectives. By housing organizaproject partners were on hand to celebrate tions from across several industries and disthe beginning of work on the development ciplines on one campus, the “innovation of 154 acres in Phase 1. incubator” concept will foster and accelerate The first new construction since June key aerospace engineering activities, includ2015 when the FAA approved the application for the 10th commercial spaceport license in the United States, work already is under way. The project scope includes providing streets, water, wastewater, electrical power distribution facilities and fiber optic and communications facilities necessary to attract future development. “When complete, Phase 1 will provide the ground The Houston Spaceport will become a focal point in the work to support the compa- region for aerospace research, manufacturing and commernies that produce the cutting- cial space operations.

Officials celebrated the beginning of work on the development of 154 acres in Phase 1 of the Houston Spaceport at Ellington Airport.

ing: • Component and composite development and fabrication; • space vehicle assembly; • zero-gravity scientific and medical experiments; • microsatellite deployment; • astronaut training and development; and

• space tourism. Eventually, when all 450 acres at Ellington Airport available to the project are fully developed, the Houston Spaceport will become a focal point in the region for aerospace research, manufacturing and commercial space operations. For more information, visit fly2houston.com/spaceport. 

Port of Brownsville Reaches Milestone in Deepening Project The Port of Brownsville is closer to deepening the Brownsville Ship Channel after receiving a key permit June 6 from the U.S. Army Corps of Engineers (USACE) to advance the Brazos Island Harbor Channel Improvement Project (BIH) to its construction phase. The USACE permit is the latest milestone in the port’s effort to deepen the ship channel from 42 to 52 ft., resulting in significant navigational safety improvements for commercial shipping in South Texas. “Today we find ourselves on the verge of a new economic era for the Rio Grande Valley and the channel deepening is essential for our continued progress and success,” said John Reed, Brownsville navigation district chairman. “These crucial infrastructure projects solidify our presence in the global market and create better economic opportunities for our local workforce.” When complete, the Port of Brownsville will be among the deepest ports on the Gulf of Mexico, enhancing its competi-

tiveness by closely aligning with the design features of the expanded Panama Canal. Planning to deepen the ship channel from 42 ft. began in 2007 with a project feasibility study. In 2014, the USACE completed the feasibility study recommending deepening the channel to 52 ft. Two years later the U.S. Congress authorized the channel deepening project, making the BIH eligible to receive federal funding. The project may cost upwards of $350 million, with construction expected to commence in 2020. The port expects to pay for the project with a combination of public, private and federal funds. Demonstrating confidence in the public-private partnership (P3) strategy, NextDecade Corporation, owner of the proposed Rio Grande LNG natural gas liquefaction plant at the port, announced a landmark agreement with the BND April 24th, agreeing to pay 100 percent of the deepening project from the western boundary of its lease site along the ship channel to the chan-

allowing existing companies at the port to further expand their services. In addition, the port will be able to accommodate deeper draft cargo vessels carrying heavier loads, which translates to a greater economic impact per vessel for the region.

The U.S. Army Corps of Engineers permit is the latest milestone in the Port of Brownsville’s effort to deepen the ship channel from 42 to 52 ft., resulting in significant navigational safety improvements for commercial shipping in South Texas.

nel’s offshore origin (more than 9 miles) — or more than half of the deepening project. NextDecade’s part includes perhaps the most challenging and costly portions. Other proposed port projects are

expected to join the P3, sharing the costs and benefits of deepening the channel. Completion of the channel deepening is important in attracting new business opportunities and

About the Port of Brownsville The Port of Brownsville is the only deep-water seaport directly on the U.S.-Mexico border, and the largest land-owning public port authority in the nation with 40,000 acres of land. It transships more steel into Mexico than any other U.S. port. With more than $40 billion worth of projects currently in the works, the Port of Brownsville is transforming the Rio Grande Valley by creating positive investment opportunities and jobs. Activity at the port is responsible for adding more than $2 billion to the regional economy, $3 billion to the Texas economy, and for the creation of more than 44,000 jobs statewide. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 11

WE FOCUS ON THE MACHINE SO Y YOU OU CAN WORK. O

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

361-289-0066

956-361-0066

915-541-0066

210-310-0066

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

Houston, TX

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

713-247-0066

361-576-0066

956-725-0066

713-247-0066

CLOSE TO OUR CUSTOMERS

For your su uccess uccess. ROAD AND MINERAL TECHNOLOGIES. S. The WIRTGEN GROUP owes its strength to the excellence ence of its product brands – WIRTGEN, VÖGELE, HAMM and KLEEMANN – with their unique que wealth of experience. Put your trust in the WIRTGEN GROUP P.. Find out more: www.wirtgen-gr group.com/america

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

361-289-0066

956-361-0066

915-541-0066

210-310-0066

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

Houston, TX

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

713-247-0066

361-576-0066

956-725-0066

713-247-0066


Page 12 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Link-Belt Cranes Work Overtime in Wolfcamp Shale Wolfcamp and Bone Spring Formations of the Permian Basin in west Texas and New Mexico hold oil and gas reserves estimated at 46.3 billion barrels of oil. According to a fourth quarter 2018 U.S. Geological Society report, full production estimates through 2025 predict that by 2021 one in every six barrels of oil, globally, will come from the Permian Basin. Wirelining in Permian Basin Entrec Crane and Heavy Hauling Inc.’s purchase of multiple Link-Belt HTC-86100s and a TCC-1100 comes in large part due to the growing demand of the recovery process in this region. A common application for the 100-ton (90-t) hydraulic truck is “wirelining,” a process that refers to the cabling used in the industry to lower equipment or measure devices already drilled in a drilled hole shaft. The HTC-86100 lifts a suspended

drum of cable, which is composed of 20,000 ft. (6,096 m) of 9/32 in. (7.1 mm) steel wire. “To assemble components together over the wellhead to wireline it, I have to have it exactly on a perfect radius. I use the whip line for that, to get components to the exact same location,” said operator Tyler Doll, Entrec Crane and Heavy Hauling Inc. The crane can be in the same position for weeks at a time, checking logistics of the well head thru wirelining. When done on one location, the 100-ton rig will move to another well head location. “Out here, we stand a lot of pipes, running three functions at one time and it’s fairly easy and maneuverable with the double joy sticks, the tight controls, and adjustable swings. I use them when I need more maneuverability over speed. I tighten down the controls to get more accurate

precision, because on the day to day operation, we have to drop the lubricator precisely on the wellhead without any variance,” explained Doll. Additional Work Required Bo Beckner, another HTC-86100 operator, works another 100-ton Link-Belt truck crane to off-load mud pumps that weigh 96,000 lbs. (43,544 kg) as a tandem lift. The pump box measures about 15 ft. (4.5 m) high, almost 13 ft. (3.9 m) wide and more than 40 ft. (12.1 m) long. Each crane will be lifting about 50,000 lbs. (22,679 kg) rigged

with a 20 ft. (6.0 m) radius at a 60-degree boom angle and 70 ft. (21.2 m) of boom extended in the EM5 mode. Beckner considers the responsive controls on the crane easy to run, and visibility very good for lifting or traveling around the job site. “They are self-contained and do not require a support vehicle. Also, this crane has a strong chart for a hundred-ton machine. It really does,” said Tommy Patterson, operations manager of the Texas Entrec office. For more information, visit www.linkbelt.com. 

Entrec Crane and Heavy Hauling Inc.’s purchase of multiple Link-Belt HTC86100s and a TCC-1100 comes in large part due to the growing demand of the recovery process in this region. When done on one location, the 100-ton rig will move to another well head location.

“To assemble components together over the wellhead to wireline it, I have to have it exactly on a perfect radius. I use the whip line for that, to get components to the exact same location,” said operator Tyler Doll, Entrec Crane and Heavy Hauling Inc.


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 13

DĐ ŽƵƌƚ Θ ^ŽŶƐ ƋƵŝƉŵĞŶƚ͕ /ŶĐ͛͘Ɛ ƉƌŽǀŝĚĞƐ Crushing, Scr S eening, Co C nveying, Wash hing and Recyclling equipment for th following ap a plications: Aggregates and Mineral Processing, Sa S nd & Gravel, Concrete Recycle, Washing, Highway Contractors, Organics ʹ Compost, Topsoil, Mulch h, Landfill Mining, Environ nmental Cleanup, Specialized and Industrial Sands, and Energy ʹ Oil, Wind.


Page 14 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Infrastructure, Energy Announce Wind Contracts

NEXT ISSUE CLOSES August 8, 2019

Infrastructure and Energy Alternatives Inc. (“IEA” or the “Company”), a leading infrastructure construction company with specialized energy and heavy civil expertise, announced two new wind energy project awards valued at approximately $150 million. One award is for construction of the Las Majadas Wind Farm in Willacy County, southern Texas. This is an approximate 272-megawatt project that is expected to provide enough energy to power up to 77,000 average Texas homes. This is equivalent to avoiding nearly 280,000 metric tons of carbon (CO2) emissions annually. The power generated by the project’s planned 125 Vestas turbines will be delivered into the Texas electrical grid. Construction on the Las Majadas project is scheduled to begin in July with full operation by October 2020. The second award is for construction of the Coyote Wind Farm in Scurry County, Texas, which is about 260 miles west of Dallas. This is an approximate 242-megawatt project, whose 59 Siemens Gamesa turbines are expected to power up to 65,500 homes. The power generated by Coyote Wind also will be delivered into the Texas electrical grid. Construction on Coyote Wind is slated to begin in July and finish in September 2020. EDF Renewables North America is the lead developer on both projects. The company is a market leading independent power producer and service provider with over 30 years of expertise in renewable energy. The company delivers gridscale power: wind (onshore and offshore), solar photovoltaic, and storage projects; distributed solutions: solar, solar+storage, EV charging and energy management; and asset optimization: technical, operational, and commercial skills to maximize performance of generating projects. EDF Renewables’ North American portfolio consists of 16 GW of developed projects and 10 GW under service contracts. The scope of IEA’s work on both Las Majadas and Coyote Wind will include wind turbine installation, public road maintenance and repairs, turbine access roads and MV collection system installation. The U.S. wind power industry increased its overall capacity by eight percent in 2018 to 96,433 megawatts. That more than doubled the capacity level at the start of this decade and is enough to power more than 30 million homes, according to American Wind Energy Association data. Additionally, as the cost of developing renewable energy continues to decline, new-build wind capacity is projected to become cost-competitive with existing conventional energy plants in the next decade, according to a 2019 McKinsey & Company analysis. As such, McKinsey forecasts continued growth in renewable energy investments, including wind, for several years: The share of renewables in global power generation could grow from around 25 percent today to 50 percent by 2035 and 75 percent by 2050. For more information, visit IEA’s website at iea.net. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 15

Zero Turn for Mobility, A Fun New Spin for Pavers

info@gomaco.com ❘ www.gomaco.com Long, straight runs are nice. But many of you have curb and gutter projects with short runs, radii, and corners in parking lots or tight locations. info@gomaco.com ❘ www.gomaco.com GOMACO’s Xtreme curb and gutter machines have zero-turn capabilities for maneuverability. You’ll be able to place more curb than ever before and move your machine in ways you have never moved before. You’ll be able to pour a tight radius that you could only dream of before. GOMACO’s proprietary G+ controls makes your concrete paver smoother and easier to operate. So, if you want a Zero-Turn GOMACO Paver for your next paving season, you’d better call now. Our worldwide distributor network and our corporate team always stand ready to serve and assist you.

ROMCO Equipment Co.

Sierra Machinery, Inc.

www.romco.com

www.sierraelpaso.com

Buffalo, TX 903-322-5602

Ft. Worth, TX 817-626-2288

Carrollton, TX 214-819-4100

Houston, TX 713-937-3005

Longview, TX 903-758-5576

939 Hawkins Boulevard El Paso, TX 79915 915-772-0613

Closner Equipment Company Inc. www.closner.com San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131

Austin Branch 13800 FM 973 N Manor, TX 78653 512-272-8200


Page 16 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

As Company Grows, Hettinger, Vermeer Form Relationship HETTINGER from page 1

The first year was tough, Hettinger recalls. “No one knew who we were. Even though we’d done $100 million projects in the Rockies, that didn’t carry much weight down here.” Vermeer Partnership Hettinger credits his success in Wyoming in part to a strong part-

nership with one brand of equipment, and he is applying that formula with M&G. “The best piece of equipment you can buy is the worst piece of equipment you’ll ever own if you don’t get the service,” said Hettinger, explaining his choice to drill with Vermeer products. “With Vermeer we get that service, and that’s why we buy Vermeer.” Vermeer Texas-Louisiana also

An M&G crew performs routine maintenance on a Vermeer 855 trencher. Mark Hettinger, M&G president, chose to build his pipeline company in Central Texas around the Vermeer line of equipment.

offered solutions to the challenges Hettinger faced as a startup. “We talked to the other guys too. We asked about The Vermeer 855 is the workhorse on many of M&G’s pipeline jobs. finance options for new comHettinger’s company currently has eight Vermeer machines in its fleet. panies coming up. They said,

‘We don’t do that,’” he recalled. “Now they send a salesman around and I say ‘why would I want to kick the dog that’s licking my hand.’ If you have that attitude with me when I needed your help, I’m not going to be around when I

don’t need your help.” Vermeer offered the sort of help M&G was looking for in procuring financing for equipment. Additionally, M&G has had to learn the geological nature of Central and South Texas, much different from what Hettinger experienced in Wyoming. Vermeer Texas-Louisiana has been a big help in that process as well, he said. “Wyoming doesn’t have this kind of rock like the Austin/San Antonio area. It takes a different drilling technique. We’ve had to go to people that understand, and for us that was Vermeer. Both Kevin Keith [sales manager] and Chris May, our sales representative have been great.” In addition to pipeline and directional drilling work, M&G also does excavation, demolition, land clearing utilities and industrial painting. The company recently completed drilling and trenching 25,000 ft. for a gas pipeline to a new residential neighborhood outside of New Braunfels.  CEG

Flint Rock Proves to Be No Match for Vermeer D40x55DR

Hydraulic hoses for the kelly and rack and pinion systems are kept safe by Vermeer’s hose keeper assembly. ROCK from page 1

The contract was for a 4-in. high-pressure gas main that would run approximately 4 mi. along FM 3009 and would ultimately serve two new subdivisions and a limestone quarry that is being developed by Vulcan Materials. TXDOT required the line be 6 ft. below road ditch level, so M&G cut at 6.5 ft. in most sections but had to bore as deep as 18

Vermeer utilizes Digital Control Inc.’s Falcon F5 locator system (L) which offers pinpoint drill bit location accuracy along with 3D imaging to assist in steering. Fluid levels and machine performance are monitored in real time on the LCD display (R).

ft. under the oaks. Hettinger said they bored a 6-in. pilot with the D40x55DR and would ream it back with the larger D60x90 machine. They would pull back at a 12-in. diameter to accommodate the poly sleeve that will envelope the steel pipe. The contractor praised Vermeer TexasLouisiana for its onsite support during the transition to the new machine.

When the discovery of flint rock threatened a gas pipeline project outside of San Antonio, Texas, M&G Contractors turned to Vermeer’s D40x55DR S3 Navigator horizontal directional drill (HDD) to complete the job.

“Those guys are out here with me. They know how expensive it is for equipment to be sitting idle,” he said. M&G’s fleet includes these Vermeer machines: • a D36x50 S3 Navigator drill; • a D60x90 S3 Navigator drill; • a D23x30 S3 Navigator drill; • a D24x40 S2 Navigator drill • the new D40x55DR dual rod machine;

• two hydro-vacs; and • a R250C Reclaimer “Vermeer’s equipment is good. Their service is good. Their parts are good,” said Hettinger, the father of teenaged triplet girls. “This will end up saving me time and money. So, if I’m going to spend another half a million or so dollars on equipment, I’d prefer to spend it with them. Just don’t tell my wife.”  CEG


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 17


Page 18 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Texas Highway Project Lettings

Project: ACP overlay and add shoulders. Location: Bucks Bayou to 3.66 mi. north of FM 1468. Estimate: $7,750,820 Contractors and Bid Amounts: • Durwood Greene Construction Company — $7,279,318 • Hunter Industries LTD. — $7,363,691 • Angel Brothers Holdings Corporation — $7,833,360 • James Construction Group LLC — $8,280,871

The Texas State Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Hill Project ID: NH 2019(834) Project: Widen, grade, STRS and surface. Location: IH 35W to the Ellis County line. Estimate: $121,792,371 Contractors and Bid Amounts: • Sacyr Construction USA LLC — $133,117,085 • James Construction Group LLC — $134,741,100 • Sundt Construction Inc. — $141,642,095 • Webber LLC — $143,720,998 • Austin Bridge & Road Services LP — $146,275,309 • Flatiron Construction Corporation — $147,287,445 • Johnson Bros. Corporation, A Southland Company — $148,506,637 • Mario Sinacola & Sons Excavating Inc. — $149,855,833 • J.D. Abrams LP — $150,430,636 • Zachry Construction Corporation — $152,029,126 • Balfour Beatty Infrastructure Inc. — $152,464,203 • OHL USA Inc. — $172,932,587 County: Stephens Project ID: STP 2019(921) Project: Pavement, structure, ditch repair and safety TRTsealcoat. Location: U.S. 180 to Young County line. Estimate: $5,348,242 Contractors and Bid Amounts: • Peachtree Construction Ltd. — $5,063,902 • Jay Mills Contracting Inc. — $5,515,198 • A. L. Helmcamp Inc. — $6,042,709 County: Fort Bend Project ID: STP 2019(918) Project: Shoulders, base repair, o/l, bridge and pavement markings. Location: SH 36 to FM 1994. Estimate: $7,095,364 Contractors and Bid Amounts: • Durwood Greene Construction Company — $7,225,989 • Angel Brothers Holdings Corporation — $7,657,119

• James Construction Group LLC — $7,823,733 County: Culberson Project ID: C 1158-6-6 Project: Roadway rehabilitation. Location: RM 652 intersection to 6.19 mi. south of RM 652. Estimate: $9,408,524 Contractors and Bid Amounts: • International Eagle Enterprises Inc. — $11,896,484 • FNF Construction Inc. — $18,914,399 County: Colorado Project ID: BR 2019(850) Project: Construct one way bridge and approaches. Location: At Colorado River Bridge. Estimate: $8,536,798 Contractors and Bid Amounts: • Harper Brothers Construction LLC — $8,244,674 • ISI Contracting Inc. — $8,479,275 • James Construction Group LLC — $8,968,167 • Earth Builders LP — $14,671,505 County: Matagorda Project ID: STP 2019(759)

County: Galveston Project ID: C 912-73-183 Project: Construct new roads. Location: Within Galveston Island State Park. Estimate: $5,816,585 Contractors and Bid Amounts: • Angel Brothers Holdings Corporation — $6,676,661 • Durwood Greene Construction Company — $7,163,856 • Sterling Delaware Holding Company Inc.— $8,182,306 • Texas Gulf Construction Company Inc.— $8,468,238 County: Nueces Project ID: C 1558-1-19 Project: Restoration of existing roadway. Location: SH 44 to FM 1833. Estimate: $4,218,584 Contractors and Bid Amounts: • Tierra Lease Service LLC — $4,592,254 • J. Carroll Weaver Inc. — $4,799,565 • Haas-Anderson Construction Ltd. — $4,896,368 • Bay Ltd. — $5,121,169 • Ray Faris Inc. — $5,391,400 • Salinas Construction Technologies Ltd. — $6,408,238 County: Nolan Project ID: STP 2018(628)HES Project: Safety treatment ends and widen pavement. Location: CR 152 to FM 2319. Estimate: $2,676,115 Contractors and Bid Amounts: • Salinas Construction Technologies Ltd. — $4,261,779 • A. L. Helmcamp Inc. — $4,344,373


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • July 21, 2019 • Page 19

Maximum Reliability and pr roductivity

• 102 hp TTurbo-charged urbo-charged • Perkins TTier ier 4 Final engine • 1 .5 yd3 bucket capacity • Spacious climate controlled cab • 16’ 8” hinge pin height telescopic arm • Articulated forr operation in tight spaces • Class leading travel speed up to 2 24.9 4.9 mph

WL60T as low as

3..49% Financing for o 48 months on Wh Wheel Loaders* s

FTX300 Clear the Way With FFecon Mulching Equipmeent

* 48 Mo. - 3.49%; 60 Mo. - 4.49%; 72 Mo. - 5.49% %. Call for full details.

Call Mickey O’Neill 405.590.4929 C

wyliesprayers.com

Abilene Lubbock Corrpus pus Christi Oklahoma City

Lamesa Munday Seminole Plainview 18-009R1 18 009R1

DURABILITY -- PERFORMANCE --- VERSA ATILITY TILITY fecon com fecon.com

855 576.3419 855.576.3419

Lewisville Dam...

USACE Awards Granite $39M Project in Texas Granite (GVA) has been awarded a $39 million contract by the U.S. Army Corps of Engineers (USACE) for modifications to the Lewisville Dam in Lewisville, Texas. Granite will book the project into its second quarter 2019 backlog. Scope of work includes the construction of upstream embankment modifications, crest road improvements, conduit filter, waterline relocations, seepage collection systems, improved roadway system and associated work. This project is the next step in the USACE’s program at the Lewisville Lake Dam to continue safe and effective functionality of the dam’s authorized capacity. Granite has a 40year working relationship with the USACE and is currently constructing the $75 million Addicks and Barker Dams project near Houston. Construction is scheduled to begin in summer 2019 and be complete in spring 2021. For more information, visit graniteconstruction.com. 

Houston, TX 713-247-0066

San Antonio, TX 210-310-0066

www.nuecespower.com


Page 20 • July 21, 2019 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

True Power. At Bane Machinery, we offer Liebherr machines that are custom-engineered to perform efficiently. And we stand behind them with full service. Count on us for original parts, factorytrained technicians, and an extensive inventory of machines for your toughest jobs. We can also service your equipment to OEM standards in the shop or the field. We haven’t compromised on anything; why should you?

www.banemachinery.com

DALLAS 2449 Manana Dr. Dallas, TX 75220 Ph: (214) 734-2361

FORT WORTH 10505 North Freeway Fort Worth, TX 76177 Ph: (817) 847-5894

TYLER 3402 N. NE Loop 323 Tyler, TX 75712 Ph: (903) 597-6641


Turn static files into dynamic content formats.

Create a flipbook
Texas 15 July 21, 2019 by Construction Equipment Guide - Issuu