Skip to main content

Texas 13, June 20, 2021

Page 1

State Supplement sponsored by:

TEXAS STATE EDITION

A Supplement to:

SHIP WITHIN 48 HOURS SAME DAY PARTS AVAILABILITY

®

June 20 2021

24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!

Vol. VI • No. 13

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Affordable Price. Premium Service.

CALL 800-367-4937

Your Texas Connection • Dennis Hogeboom • 1-877-877-4997 • dennishogeboom@cegltd.com

*On approved credit • Financing Available

Victory Lane ROMCO Powers Nemechek to Win John Hunter Nemechek raced the Kyle Busch Motorsports Toyota to victory in the NASCAR Camping World series race at Texas Motor Speedway on June 11. The truck carried the colors and logo of ROMCO, the Texas equipment dealer and long-time sponsor of Nemechek. This was the first win for Nemechek with ROMCO as the primary sponsor, and he was quick to thank the company for its support while saluting the 250-plus fans that were in attendance at the race. see ROMCO page 16

By Irwin Rapoport CEG CORRESPONDENT

Construction on the University of Texas at San Antonio’s (UTSA) $161 million Innovation, Entrepreneurship and Careers Building (IECB) is expected to start soon on the site of the former Bexar County Jail in downtown

San Antonio after crews from Hansco Inc. recently demolished the existing structure. The 250,000-gross-sq.-ft. structure at 622 Dolorosa St. is being funded via fundraising and a request for support through Tuition Revenue Bonds and the UT System. The site was purchased from Bexar County.

Demolition Process The former jail had a triangular center core with three wings – one on each side. The concrete and steel structure, which was between 6 to 8 stories tall, was taken down using excavators with high reaches. Dana Delao, Hansco’s project manager, and Shane Hans,

Hansco’s owner, oversaw the demolition and were able to study some of the drawings and plans for the structure (built in 1960) which showed the floor footprints and the types of materials that were used for the construction. “It was determined to start at the top and process the concrete structure with a processor at the end of a high-reach excavator to crush the

concrete,” said Delao. “We started on the edge of one of the wings and worked inwards towards the center core. Once the first wing was torn down, we moved over to the next one and so on. Once the wings were dealt with, we were able to attack the core.” Two high reach excavators were used – a Volvo 480 with an 86-ft. reach and a Komatsu 400 with a see HANSCO page 10

Heavy Equipment Used and Rebuilt Parts Fast Shipping from Waco, Texas

We Have Parts For: Caterpillar • Komatsu • John Deere • Kobelco Hitachi • Hyundai • LinkBelt • Case

(254) 562-7500 • www.HighTech-parts.com


Page 2 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

HEAVY CONSTRUCTION EQUIPMENT EARTHMOVING, UTILITY, MATERIAL HANDLING, DEMOLITION, SCRAP & RECYCLING

CRUSHING, SCREENING, DRILLING & WASHING MOBILE & STATIONARY EQUIPMENT

Sales - Rentals - Parts - Service

Sales - Rentals - Parts - Service

214.819-4100/800.227-6626 www.romco.com

214.819-4100/800.227-6626 www.romco.com

PAVING TEXAS CONCRETE & ASPHALT PAVING EQUIPMENT

YOUR HEAVY DUTY POWER ADVANTAGE COMPRESSORS, GENERATORS, PUMPS & LIGHT TOWERS ENGINE &

HAMMER

Sales - Rentals - Parts - Service

REBUILDS

214.819-4100/800.227-6626 www.romco.com

210.569-7068 / 800.966-4601 www.romco.com


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 3

Agricultural Tractors

Crawler Loaders

Scrapers

Water Equipment - Tower/Tanks

2015 JOHN DEERE 6215R ........................$109,500 (4) 2018/19 JOHN DEERE 6120M......From $77,500 2018 JOHN DEERE 5125R ............................$CALL (2) 2017 JOHN DEERE 5085M ......................$CALL

(2) 2017/19 CATERPILLAR 963K ....From $265,000

1993 CATERPILLAR 637EII ......................$139,500 1980 CATERPILLAR 637D ..........................$59,500

(6) 2020/21 Klein KPT-120 Water Towers .................. ............................................................From $54,500

Motor Graders

Water Equipment - Trucks

2019 CATERPILLAR 140M3 ..........................$CALL 2014 CATERPILLAR 140M2 VHP..................$CALL 2019 CATERPILLAR 16M3 ........................$825,000 2016 CATERPILLAR 14M VHP ..................$405,000 2007 CATERPILLAR 16H ..........................$175,000 2007 CATERPILLAR 14H ..........................$155,000

2017 CATERPILLAR 773G ..............................$539,500 2013 CATERPILLAR 740B ..............................$329,500 2019 FORD F750 ................................................$95,000 (2) 2007/15 FREIGHTLINER M2 ............From $49,500 (18) 2018-20 KENWORTH T370 ........From $89,500 (14) 2018/20/21 PETERBILT 348......From $159,500 VOLVO A25D ..............................................$139,500

Dozers - Crawler

2017 CATERPILLAR D10T2, 3456 Hrs......$995,000 2011 CATERPILLAR D10T, 11,778 Hrs ....$575,000 2018 CATERPILLAR D9T ..........................$805,000 (2) 2019 CATERPILLAR 745................$465,000 Ea. (2) 2018 CATERPILLAR D8T ..........From $559,500 (4) 2017-2019 CATERPILLAR 725C2 ........................ 2004 CATERPILLAR D8R II ......................$125,000 ..........................................................From $229,500 2020 CATERPILLAR D6 XL ..........................$CALL (5) 2019/20 CATERPILLAR D6 LGP From $425,000 2014 CATERPILLAR 725C ........................$189,500 (3) 2014/18-19 CATERPILLAR D6T XW .................... ..........................................................From $209,500 2015 CATERPILLAR D6N XL, 3235 Hrs....$164,500 CATERPILLAR 740 BED ................................$5,000 2016 CATERPILLAR D6N LGP ..................$139,500 2018 CATERPILLAR D6K2XL....................$185,000

Artic Trucks

Attachments

Compactors - Padfoot/Smooth Drum

2020 CATERPILLAR 815K ............................$CALL (4) 2013-17 CATERPILLAR CS66B From $129,500 (6) 2013-18 CATERPILLAR CP56B From $129,500 (4) 2017/18 CATERPILLAR CS56B ..From $64,500

Dozers - Wheel 2015 CATERPILLAR 834K ........................$285,000

(4) 2009-2011 CATERPILLAR 785D..............$CALL (2) 1995 CATERPILLAR 777C ......................$CALL (2) 1991 CATERPILLAR 773B............From $59,500 (5) 2016-19 CATERPILLAR 725C2......From $199,500 (2) 2014/15 CATERPILLAR 725C ........$189,500 Ea.

Ripper CATERPILLAR D8SS ..................................$24,500

Excavators - Crawlers

2017 CATERPILLAR 390FL ......................$479,500 2017 CATERPILLAR 349FL ......................$329,500 2019 MOROOKA MST4000VD ..................$319,500 2014 CATERPILLAR 349EL ......................$169,500 (2) 2018 MOROOKA MST3000VD ..From $229,500 2019 CATERPILLAR 336............................$289,500 (4) 2018/19 MOROOKA MST2200VD ........................ 2017 CATERPILLAR 336FL, 2941 Hrs ......$215,000 ..........................................................From $179,500 2014 CATERPILLAR 329EL, 4134 Hrs ......$159,500 (2) 2019 MOROOKA MST1500VD ..From $149,500 2015 CATERPILLAR 323FL ......................$139,500 2019 MOROOKA MST1500VDR ................$239,500 (2) 2018/19 CATERPILLAR 320 ......From $179,500 (2) MOROOKA MST660VD ..................$109,500 Ea. 2017 CATERPILLAR 316FL ......................$169,500

Crawler Carriers

Off-Highway Trucks

Wheel Loaders 1991 CATERPILLAR 992C ............................$CALL 2019 CATERPILLAR 982M ........................$439,500 (2) 2018/2019 CATERPILLAR 966M ..........$318,500 2007 CATERPILLAR 966H ........................$127,500 (2) 2018 CATERPILLAR 938M ..................$169,500

Winch PACCAR PA110VS245....................................$9,500

Skid Steers - Track 2014 CATERPILLAR 299D XHP ....................$CALL (3) 2020 CATERPILLAR 299D3 XPS ............$CALL (3) 2021 CATERPILLAR 299D3 ....................$CALL (7) 2014-18 CATERPILLAR 299D2 XPS .................... ............................................................From $59,500 2014 CATERPILLAR 299D ............................$CALL 2016 CATERPILLAR 242D ..........................$39,500 2016 CATERPILLAR 236D ..........................$35,500 (2) 2020-21 JOHN DEERE 333G ..................$CALL

Miscelleneous Equipment 2019 ROME TRCW16....................................$56,500 2018 ROME TRCW12....................................$48,500 2019 ROME TACW16 ....................................$36,000 2018 ROME TCW28 ......................................$19,750 2018 ROME TCW32 ......................................$23,000 Authorized dealer for


Page 4 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Samson Energy Project Gets Second Round of Financing Invenergy, a privately-held global developer and operator of sustainable energy solutions, recently announced the completion of construction financing for the second phase of the Samson Solar Energy Center in northeast Texas. The second phase includes 250 megawatts of the total 1,310-megawatt project, which will be the largest solar energy facility in the United States upon completion. Santander acted as admin agent, coordinating lead rranger and bookrunner and societe generale; and CaixaBank acted as joint lead arrangers for the financing, which includes a construction loan, letter of credit facility and back-leverage term loan. Construction financing for the first phase of the project was announced in January 2021. “Invenergy is proud to complete construction financing for the second phase of the Samson Solar Energy Center,” said Anneli Alers, vice president, finance and capital markets of Invenergy. “A significant step forward in the completion of the record-setting project, this milestone is a testament to Invenergy’s strong relationships and longstanding track record with our financial partners.” Located in Lamar, Red River and Franklin counties, Samson Solar is being

ply cost-effective, reliable power to three Texas municipalities through long-term power purchase agreements (PPA). Samson Solar is a $1.6 billion capital investment in Northeast Texas. Over the life of the project, Samson Solar will directly invest $450 million in the local economy through new tax revenues and lease payments to participating landowners.

Located in Lamar, Red River and Franklin counties, Samson Solar is being constructed in five phases, with each phase commencing operation upon completion.

constructed in five phases, with each phase commencing operation upon completion. The first and second phases are currently under construction, and the full project is slated to be operational in 2023. The complete 1,310-megawatt project will generate enough electricity to power 300,000 American homes. About Samson Solar Project Announced in November 2020, Samson Solar supports the sustainability objectives of five major consumer brands and will sup-

The second phase includes 250 megawatts of the total 1,310-megawatt project, which will be the largest solar energy facility in the United States upon completion.

About Invenergy Invenergy and its affiliated companies develop, own and operate large-scale sustainable energy generation and storage facilities in the Americas, Europe and Asia. Invenergy's home office is located in Chicago, and it has regional development offices in the United States, Canada, Mexico, Colombia, Japan, Poland and Scotland. Invenergy has successfully developed more than 25,000 MW of projects that are in operation, construction or contracted, including wind, solar, transmission and natural gas power generation facilities as well as advanced energy storage projects. For more information about Invenergy, visit www.invenergy.com. For more information about the Samson Solar Energy Center, visit www.SamsonSolarEnergyCenter.com.

Officials Hold Groundbreaking Ceremony for U.S 75 Bridge

Officials gathered in May to commence construction on the new pedestrian bridge over U.S. 75.

Local leaders celebrated the official groundbreaking of a bridge that will link the pedestrian and bike trails on either side of U.S. Highway 75 in Dallas. The $9.3-million project is a partnership with the city of Dallas, Dallas County, North Central Texas Council of Governments, TxDOT and Friends of Northaven Trail. The ceremony marked a significant step for the Northaven Trail Pedestrian Bridge, which will give pedestrians and bikers a safe path over U.S. 75 North Central Expressway between Northaven Trail and White Rock Creek Trail.

The $9.3-million project is a partnership with the city of Dallas, Dallas County, North Central Texas Council of Governments, TxDOT and Friends of Northaven Trail.

Expected to open in 2023, the bridge and trail expansion will not only offer a straight shot to White Rock Lake for those traveling from the western side of the central expressway, but will also connect to a patchwork of other trails, offering access to nearly any part of the city. Approximately 300 people showed up to the event, held in May at 11231 N. Central Expressway. The groundbreaking ceremony included speeches by District 11 City Councilman Lee Kleinman, who was also the master of ceremonies; Dallas Mayor Eric Johnson; Texas Department of Transportation

Many cyclists were present at the ground breaking ceremony to celebrate the new pedestrian bridge.

Commissioner Robie Vaughn; County Commissioners Theresa Daniel and J.J. Koch; District 13 City Councilwoman Jennifer Staubach Gates; Park Board President and District 13 Representative Calvert Collins-Bratton; and District 11 Park Board Representative and Friends of Northaven Trail President Jeff Kitner. “We were thrilled to break ground on the Northaven Trail bridge,” Kitner said. “It was wonderful to see so many friends and trail supporters as we get started on this project, which will significantly enhance pedestrian and bicycle connectivity for our city.”

Current and former members of the Friends of the Northaven Trail board were among the attendees, and anyone who wanted to take a photo shoveling dirt was able to do so. The bridge has been in the works since the mid-2010s. Officials at TXDOT approved construction of the bridge in late February and early March. Designs for the bridge were drafted in 2017 after land was purchased for the build earlier that year. The project will cost a little more than $9 million, according to February estimates from TxDOT. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 5


Page 6 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Transportation Commission Names New Executive Director The Texas Transportation Commission has selected Marc Williams as the Texas Department of Transportation’s new executive director. Williams, who has served as the agency’s deputy executive since 2016, began his new role on June 1, 2021. Williams has worked at TxDOT since 2012, when he joined the department as director of planning, serving in that role until 2015 when he was appointed TxDOT’s interim deputy director. Prior to joining TxDOT, Williams’ career has included leadership roles with a variety of public and private sector organizations involved with the planning, development and implementation of transportation infrastructure projects across the United States. “Marc Williams has proven himself a well-respected leader in transportation in both Texas and at the national level,” said J. Bruce Bugg Jr., chairman of the Texas

Houston, TX 713-247-0066

San Antonio, TX 210-310-0066

www.nuecespower.com

Transportation Commission. “Marc brings a wealth of knowledge and a deep understanding of the challenges and opportunities we face going forward and is an excellent person to lead the 12,000 women and men of TxDOT. TxDOT is in good hands.” “Leading this incredible department and serving the citizens of Texas is an honor,” Williams said. “I am looking forward to working side by side with the women and men of TxDOT, the Texas Transportation Commission and our transportation stakeholders as TxDOT continues its important mission of Connecting You with Texas.” Williams is a graduate of Texas A&M University with bachelor’s and master’s degrees in civil engineering. He is a registered professional engineer in Texas. Williams is the 22nd executive director for the department. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 7

Kirby-Smith Machinery has one of the largest and most diverse rental fleets in the region. UÊ6>À iÌÞÊ vÊ «Ì Ã\Ê,i Ì]Ê,i ÌÊÌ Ê*ÕÀV >Ãi]Ê ÕÞÊ ÀÊ i>Ãi UÊ >À}iÊ iiÌÊ vÊVÕÀÀi ÌÊ `i ÊiµÕ « i Ì UÊ,i Ì> ÃÊ>Û> >L iÊLÞÊÌ iÊÜii ]Ê Ì Ê ÀÊ }iÀ UÊ ÜÊw > ViÊÀ>ÌiÃÊ>Û> >L iÊÜ Ì Ê >ÌÃÕÊ > V > UÊ iÜÊ> `Ê1Ãi`ÊiµÕ « i ÌÊv ÀÊÃ> i UÊ ÜÊÜii ÞÊ> `Ê Ì ÞÊÀ>Ìià Follow us on

www.kirby-smith.com

888.861.0219

Abilene

Amarillo

Dallas

Ft. Worth

Lubbock

Odessa

325.692.6334

806.373.2826

214.371.7777

817.378.0600

806.745.2112

432.333.7000

Waco

Oklahoma City

Tulsa

McAlester

Kansas City

St. Louis

254.261.1370

405.495.7820

918.438.1700

918.310.1550

913.850.6300

314.729.0125


Page 8 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Sherry McGee : HOLT CAT From the oil fields of Alaska to the boom cities of Texas, one woman’s engineering career is on the move, with no sign of slowing down anytime soon. Growing up in Alaska, Sherry McGee dreamed of being an architect. However, while attending high school, a teacher planted the idea of an alternate career in her head. “You’d make a great engineer,” the instructor observed, and so began McGee’s journey, both professionally and geographically. McGee took her instructor’s advice to heart and pursued an engineering degree at the University of Alaska Fairbanks. But even then, the prospect of a profession linked to the construction industry seemed remote at best. “If you asked me when I graduated college, I would not have dreamed of any of this,” McGee said, adding that “being open to opportunities and alternative paths” is a key lesson she would pass on to others considering a path less followed. The opportunities that presented themselves for McGee included a stint with the Alaska Department of Transportation and an introduction to the oilfields with industry giant Shlumberger, where she worked as a field engineer. That experience opened the door for an eventual move to Texas with Baker Hughes. McGee worked there as both a field engineer and well planner before moving on to an energy company working as a drilling engineer. Today, she boasts the title of power systems engineering manager of HOLT CAT. Looking back on a 12-year career in fields she did not intend to be in, she points to four things that were critical in her growth. Keys to Success. First, inspiration can be drawn from everyone, not just female role models, McGee said. “I was so inspired by the people I worked with in the field in Alaska,” McGee said. “They were so focused on one thing … getting the job done. They were an inspiration. Not to mention that they were so willing to work with this new engineer kid.” Secondly, she maintains that as new challenges are presented, listen and then be heard. “I struggled with being heard at times,” she said of moving up in a male-dominat-

“I got a great feeling from Holt,” she said. “It starts with their valuesbased leadership, but it extends to the individual as well. They really focus on developing you as a person and a leader. I can honestly say that a great company like Holt can really contribute to a person’s success.” Finally, McGee pointed to mentors and a welldefined mentoring program as being critical to her success and to others she works with at Holt. She looked to Lori Bunger, Holt vice president of used equipment, and Guy Clumpner, president of Holt Development Services Inc., as the two most important mentor figures in her early time at Holt. Mentoring goes both ways though, and McGee said the highlight of her career so far has been growing and developing a team of engineers at Holt. “Mentoring and watching them grow and change and achieve is very satisfying,” she said of her team of seven project engineers and project managers. Currently, the team of engineers consists of one female engineer and six males, “but we have an offer going out to another female right now,” McGee said. ed industry. “I had to learn to be patient, come prepared and listen. Engineers have a bad reputation for overthinking things, so it is important not to fall into that rut.” McGee added, “perhaps most importantly, be open to looking for a company that fits.” While she has been fortunate to be associated with great companies throughout her career, McGee said there was a special feel when she was introduced to the Holt organization.

Team Effort “Here at Holt, we have a power systems division that sells generators, transmissions, pumps, etc.,” McGee said. “My team works within that division.” The group works with general contractors and electrical contractors to provide jobsite power, while also designing and installing backup power systems for hospitals, data centers and other large power consumers. The team engineered a system for the San Antonio Zoo, for example. On the diesel power side, McGee said her division can provide power for a piece of equipment, often offering a power solution for a machine someone else has manufactured. This Alaska girl has found a home, in the construction world, in Texas and at Holt. “It is just very exciting,” she said. “There are lots of challenges. The industry needs more outlooks, more ways of seeing solutions. We need both male and female perspectives.” 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 9

South Texas’ one stop truck and trailer source! Used Truck & New/Used Trailer Sales/Parts/Service

Trailer Service (Light up to Heavy duty) Truck Maintenance (Medium & Heavy Duty)

Laser alignments on truck and trailers (unlimited axles) Texas DOT inspection station

2022 Globe 55LB660953 55 ton with hydraulic flip axle

2021 Aspen E7500

Robstown

75 ton 3-3-2 multi axle trailer

3205 Highway 44 Robstown,TX 78380

361-387-5010 Houston 11113 Wallisville RD Houston,TX 77013

713-670-0733

2021 Viking 50DLA

www.jbpavelkainc.com

25 ton pintel hitch trailer

Full rigging shop Full fabrication shop

Reflooring Truck frame modifications

Tarp system repair/installation Field Service

Conversions Custom builds


Page 10 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Hansco Relies on Cat, Komastu, Volvo Excavators for Demo

In the middle of the abatement, crews found additional materials which were enclosed behind solid walls, chases and ceilings. This was due to the type of secured building that was built and were hidden in different parts.

The 250,000-gross-sq.-ft. structure at 622 Dolorosa St. is being funded via fundraising and a request for support through Tuition Revenue Bonds and the UT System. The site was purchased from Bexar County.

Crews from Hansco Inc. demolished the former Bexar County Jail in downtown San Antonio to make room for the University of Texas at San Antonio’s (UTSA) $161 million Innovation, Entrepreneurship and Careers Building (IECB), which is expected to commence construction later this summer. HANSCO from page 1

96-ft. reach. Also utilized on-site was a Cat 330 Track loader and a various Cat skid steers. The high reaches were placed on pads, built up by using debris, to extend their range to access the upper floors. There were few challenges. “It was a very uniform structure from top-to-bottom,” said Hans. “The higher floors were a little more of a challenge then the lower floors, but all went well and it was pretty much the same thing for each floor. We first demolished some of the lower structures that branched off from the some of the wings to secure the debris for the pads. On the top there was also a penthouse where all the elevator equipment was place, which was challenging. The top area also contained some outdoor facilities with gates and fencing. We safely brought that material down.” While there was no basement level, there was a 4-to-5-ft. crawl space under the jail, built on piers, that had utilities running through it. This area was filled using some of the concrete debris. Before the demolition could begin, though, the site had to undergo an asbestos abatement operation, along with the shutting down of the gas and electric services. “We worked with the county and the City Public Service to get the electricity and gas disconnected and with the general contractor hired by the county, Sundt Construction Inc., to isolate the water and provide a connection for water for dust control,” said Hans. “It took about a month of coordinating and scheduling to get all the prep work done and to prepare the equipment,” said Delao. “It also gave us time to move forward with the asbestos abatement that was required before demolition. It was throughout the building. It was a difficult operation. We

A Volvo 480 with an 86-ft. reach and a Komatsu 400 with a 96-ft. reach were used on the job. Crews also utilized a Cat 330 Track loader and various Cat skid steers.

were contracted to do a survey of the asbestos and other materials because one had not been done in years. “Considering the type of building that it was, it was awfully hard to get access to a lot of the areas,” he added. “In the middle of the abatement, we found additional materials which were enclosed behind solid walls, chases and ceilings. This was due to the type of secured building that was built and were hidden in different parts. We ended see HANSCO page 16


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 11

Powerscreen turning heads with new line of Orbital Conveyors Powerscreen LL75 Orbital Stacking and conveying made easy

• 75 long stacker for excellent stockpiling • Up to 600 tons per hour • 360 degree stockpiling capability • Eliminates the need for wheeled loaders to create stockpiles • Eliminates the need for handling material multiple times

Crushing•Screening•Conveying•Washing•Recycling•Grinding Systems

Powerscreen HL75 Orbital Reduce on-site material handling

• Proven Chieftain® feeder system means loading directly from wheel loader

• Self-powered diesel hydraulic tracked feeder conveyor can be used alone or with other Powerscreen mobile crushing and screening equipment

• Containerised shipping means low cost transport

SERVING TEXAS, OKLAHOMA, ARKANSAS & LOUISIANA 5680 West State Hwy 71, La Grange, TX 78945 • 800-255-8628 • www.powerscreentx.com


Page 12 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 13

B O B C A T. C O M

®

3 WA AYS YS TO OB BRING A BOB BCA CATT HOME B UY IT

REN T IT

LEASE IT

We have a machine for every reason and a solution tion for every ever customerr.. Finance with 0% for 60 months on select equipment, lease with low lease rates, or rent the equipment and attachments you need for those one-time jobs. Try out the latest in Bobcat® compacct track loaders, skid-steer loaders, and excavators from TTexas’ exas’ compact equipment experts. Visit our website our call your local branch for our latest deals.

Bobcat of Abilene 325-673-7361

Bobcat of Corpus Christi 361-884-3959

Bobcat of Midland–Odessa 432-685-9298

Bobcat of Victoria 361-579-0922

Bobcat of Amarillo 806-622-9593

Bobcat of Lubbock 806-745-1322

Bobcat of the Rio Grande Valley 956-425-4300

Bobcat of Austin 512-251-3415

Bobcat of Marble Falls 830-220-6070

Bobcat of San Antonio 210-337-6136

Bobcat of Waco Elm Mott 254-666-1669

BobcatCCE.com Bobcat®, the Bobcat logo and the colors of the Bobcat machine are registered trademarks of Bobcat Company in the United States and various other countries. ©2021 Bobcat Company. All rights reserved. 12252280

Ranchers ATV and Tractor Kerrville 830-315-2330

www.bobcat.com


Page 14 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Summer Improvement Projects Keeping Contractors Busy There are a number of road construction improvements under way in the Lone Star State. Contractor crews will be busy this summer working to make crucial improvements throughout the state. Some of those project include:

Amarillo Road to Zero Safety Improvement Project A project that will add turn lanes and lighting on U.S. 60 from FM 2590 to FM 1062 has begun. J. Lee Milligan Inc. is the contractor on this $4.1 million project, made possible through TxDOT’s 2021 Road to Zero funding commitment. The projected completion date is January 2022. Part of the project includes removing the crossover in front of TxDOT’s Canyon Maintenance Section on U.S. 60. Officials said this is to comply with the agency’s spacing requirements between crossovers. Crews started at the southwest end of the project, closing the right lane at the split for the addition of a turn lane. As work progresses, expect left lane closures while crews work in the median areas. “The traveling public can expect various crossovers to be closed while this work is underway,” said Amarillo Area Engineer Corky Neukam. “The crossovers will be worked on so that two are closed consecutively followed by one open, and so on — to help minimize the impact on the traveling public and allow for reasonable access.”

Atlanta SH 49 Resurfacing East of Mount Pleasant A section of State Highway 49 will receive a new riding surface during the next coming year according to plans approved in April by the Texas Department of Transportation (TxDOT). “We will be resurfacing a 1.3-mile section of the highway from Business 271 (South Jefferson Avenue) to the Mount Pleasant city limits east of town,” said Tommy Bruce, area engineer for TxDOT in Mount Pleasant. “The old pavement will be removed, the base materials strengthened and then the entire roadway will be repaved.” East Texas Bridge of Longview was awarded the contract for the construction project with a bid of $3.7 million. Work on the project should begin in July and take approximately one year to complete, Bruce said. I-20 Bridge Repairs Maintenance repairs will be made to six bridges on Interstate 20 in western Harrison County during the coming year, according to plans approved in May by TxDOT. “We will be making repairs to the concrete decking, making necessary repairs to the structures and replacing bridge railing as needed,” said Wendy Starkes, area engineer of TxDOT in Marshall. “Bridges scheduled for this work are at BNSF Railroad, Mason Creek and Clarks Creek.” DBI Services of Hazelton, Pa., was awarded the contract

for the construction projects. Work on the projects should begin in July and take approximately 10 months to complete, Starkes said. New Sidewalks in Marshall New sidewalks will be constructed along Johnson Street and Five Notch Road in Marshall during the coming year, according to plans approved in May by the Texas Department of Transportation (TxDOT). “Federal money is providing much of the funding for the new sidewalks and TxDOT will be overseeing the construction work,” said Starkes. “The new sidewalks will be constructed on the south side of Johnson Street from Garrett Street to Five Notch Road then down the west side of Five Notch Road to Positive Place.” The sidewalks will be 6-ft. wide and will include wheel chair ramps to make them meet all Americans with Disabilities Act requirements. Blackstone Concrete Ventures of Lubbock was awarded the contract for the construction project.

Lubbock Lubbock’s 2021 Program More than 372 mi. of state roadways are scheduled for preventative maintenance work throughout the month of June. The roads are part of the Lubbock District’s 2021 sealcoat program. “Work is about to begin on TxDOT’s annual road maintenance summer project,” said Mike Wittie P.E., TxDOT Lubbock area engineer. “Seal coating provides a variety of benefits to the roadway, including a waterproof surface that prevents moisture from entering and weakening the roadbed. Seal coating also reduces deterioration and cracking of the asphalt surface, which prolongs the life of the pavement.” Other roadway benefits include an improved non-skid surface in wet or icy conditions and an anti-glare and increased reflective surface for night and wet weather driving, Wittie noted. Contractor Ronald R. Wagner & Co. LP, of Kendalia, Texas, is scheduled to begin sealcoat operations on the $13.55 million project to various locations on roadways in Dawson County (FM 829 and FM 1210), before moving onto roads in Crosby County. Other roadways included in the 2021 seal coat program are: Castro: U.S. 385 and FM 145; Cochran: FM 1585, FM 1780, SH 125, SH 114; Crosby: FM 651 and FM 836; Dawson: FM 829 and FM 1210; Floyd: U.S. 62 and FM 689; Gaines: FM 1780, FM 303, FM 403, FM 1067 and FM 1066; Garza: FM 669 and FM 651; Hale: FM 2284, FM 1424, FM 788 and FM 37; Hockley: SH 114, FM 1585 and FM 41; Lamb: FM 303, SL 430 and FM 168; Lubbock: FM 2378, FM 179, FM 1264, FM 2641 and Loop 289 frontage roads; Lynn: FM 3112 and U.S. 380c; Parmer: FM 1731; Swisher: U.S. 87, FM 1318 and FM 400; Terry: FM 211; and Yoakum: FM 1780. Two crews will conduct sealcoat operations at various U.S. roadways through the end of June. Motorists can expect lane closures and a pilot car to guide traffic

through the work zone, and are asked to drive with caution through the work zone, be on the lookout for workers and avoid distractions for their own safety and the safety of the workers. Work will take place weather permitting.

Odessa New Overpass, Interchange at CR 1250 A project to build an overpass and new intersection on Interstate 20 over County Road 1250 began in late May. Pulice Construction of Houston won the project with a low bid of approximately $59.1 million. When completed, I-20 will go over County Road 1250. CR 1250 will be extended south beneath the overpass to connect the two service roads. The overpass will be built wide enough to accommodate the future addition of main lanes on I-20 planned (no timeline available right now). New ramps will be built to accommodate the new intersection and nearby ramps will be reconfigured to improve safety. Work on the frontage roads between West Loop 250 and FM 1788 is also included in this project. By late June, segments of the frontage roads will be under construction and closed to through traffic. The first segment is on the south frontage road beginning 1.9 mi. east of FM 1788 and ending at the Loop 250/SH 158 exit ramp. The project is scheduled to be completed in spring of 2023. A second project is scheduled to begin later this summer at the I-20 intersection with Midkiff Road, where the existing overpass will be demolished and a new overpass taking I-20 over Midkiff Road will be built.

Paris I-30 Extension TxDOT officials announced that a project to improve traction on the pavement surface of I-30 in Hopkins County. Contractor R.K. Hall LLC was granted 118 working days, weather permitting, to complete this project valued at more than $10.8 million. The target completion date for this project is October 2021, officials said. The project will extend along I-30 from State Loop 301 in Hopkins County to the Franklin-Titus County line and will also include various roadways in Franklin County. The contractor will apply a permeable friction course to the existing pavement surface, to improve traction in rainy and wet conditions, officials said. Motorists who travel regularly in these areas should pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. Additionally, TxDOT has begun a $23.2 million bridge replacement project on I-30 in Hunt County at FM 2642. The 3.9-mile project runs from the Rockwall County line to FM 1565. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 15

WE FOCUS ON THE MACHINE SO Y YOU OU CAN WORK. O

Houston, TX 713-247-0066

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

713-247-0066

CLOSE TO OUR CUSTOMERS

For your su uccess uccess. ROAD AND MINERAL TECHNOLOGIES. S. The WIRTGEN GROUP owes its strength to the excellence ence of its product brands – WIRTGEN, VÖGELE, HAMM and KLEEMANN – with their unique que wealth of experience. Put your trust in the WIRTGEN GROUP P.. Find out more: www.wirtgen-gr group.com/america

Corpus Christi, TX San Benito, TX

El Paso, TX

Corpus Christi, TX

San Benito, TX

El Paso, TX

San Antonio, TX

956-361-0066

915-541-0066

361-289-0066

956-361-0066

915-541-0066

210-310-0066

Victoria, TX

Laredo, TX

San Antonio, TX

Victoria, TX

Laredo, TX

Houston, TX

361-576-0066

956-725-0066

210-310-0066

361-576-0066

956-725-0066

713-247-0066

361-289-0066


Page 16 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Contractor Demolishes Former Jail for New UTSA Site HANSCO from page 10

recycling and directing truck traffic in and out of up getting a change order to remove the additional the construction site. materials, which went fine.” “The guys put in an excellent effort,” said Hans. The abatement operations followed all standard “Some of them have been with the company for safety procedures, such as a full containment with 15 to 20 years and we put a lot of faith in their negative air pressure and decontamination workmanship. Relations with the county were real units. good. We worked with them on several major The abatement operations were conducted via projects and have a good rapport with them.” day shifts, as was the demolition itself, and the All the concrete and steel was sent to recycling asbestos and other materials were transported centers for processing. to one of the two landfill sites authorized to “The only thing that went into the landfill was a accept asbestos materials. minimal amount of soft trash,” said Hans, who “The prep work was pretty minimal,” said noted that the glass and other interior materials Delao. “The city handled all of the disconnections. were not removed prior to the demolition. “As We divided the project into phases – the environmaterial came down, we did everything we could contractor encountered a 4-to-5-ft. crawl space under the jail, built on to remove large pieces of steel that we could get mental phase and the demolition phase, which The piers, that had utilities running through it. Crews were able to fill it using took about four months.” off the debris piles and place in trucks and dumpsome of the concrete debris. “Hansco was introduced to this project through sters. Once the main structure was down to the our working relationship with Sundt Construction on the San foundation, we were able to process the concrete and take Pedro Creek project,” said Delao. “We are working under out the fine, smaller pieces of metal.” Hansco purchases and rents equipSundt-Davila to perform demolition services for some Material was at times placed in dumpsters before being ment from HOLT bridges and several buildings being affected with the creek transferred to dump trucks. The steel was sent to a recycling CAT in San Antonio work. This creek project is a multi-year project which facility about a mile away and the concrete to a facility about and Romco involves upgrading a naturally spring fed creek, which runs 15 miles away. Equipment for through downtown. This creek, through the downtown Equipment repairs were dealt with rapidly, as Hansco had Volvo machinery. portion of it, has served more of a drainage system than what an on-site mechanic. is normally thought of as a creek. The project involves “There’s a lot of challenges with high reach equipment turning the creek into a lineal type walking path park. and all the different multiple points of contact as far as hoses “The project also gave the city an opportunity to upgrade and hydraulic leaks that we had to deal with,” said Hans, road bridges, sidewalks and utilities that crossed the creek,” “and the wear and tear on the processor teeth, which was to he added. “Part of this project runs just adjacent to the east be expected.” of the jail building demolition with two road bridges underThe jail was only 15 miles away from Hansco’s ofiice going replacement during some of the jail and yard, which helped to ensure that repairs could be demolition. This creek project is a collaboration of the done rapidly and that sending equipment to the site precity of San Antonio, Bexar County and the San Antonio sented no problems. Only the high-reach excavators had to River Authority, which oversee our water ways through San be disassembled for transport. Antonio..” The jail, Hans pointed out, was very solidly constructed. Hans noted that the crews had had plenty of space to con“You always change means and methods when taking on duct their operations, including sites for debris, field offices see HANSCO page 20 and equipment. “On one side there was a historic structure, the Casa Navarro House, originally constructed in the 1950's – a rock home with a rock wall, [which was built over time to match the rock on the house], around it about 25 to 30 feet away.” Dust and noise issues were handled efficiently and rapidly. “It was a little challenging at times with the dust due to windy days,” said Delao. “We had water jets on the high reaches, close to the processor. This let us spray water all the way down to the base. Noise was not much of an issue. Hansco constructed a wooden wall against and over the rock wall to aid in deflecting any possible debris from hitting the rock wall. The Casa Navarro House is a tourist attraction, and they vacated this site during the demolition just to be safe and to avoid the noise and dust situations.” In addition to Hans and Delao, who have managed many projects together, there were seven crew members on-site. The subcontractors consisted of multiple heavy and light After John Hunter Nemechek’s victory in the Camping World Truck series race at Texas Motor Speedway, ROMCO machine operators with many years of experipersonnel joined Nemechek to celebrate the win in victory lane. (L-R) are: Jorge Rivera, Frank Valdez, Grant Davis, ence for safely demolishing the structure and Robert Mullins, John Hunter Nemechek, David Fitch, Kevin Connor, Jerry Robertson, Ordy Izay and Dimitri Kolijn. various labor to aid with processing metals for

ROMCO Visits Victory Lane at TMS


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 17

NPT1200

Niece Water Towers deliver reliability and durability when you need fast mobile water service. With a 12” discharge tube it fills your tanks at a rate of over 1,000 gallons per minute. Offers removable power pack for security, fifth wheel tow hitch, professionally engineered and constructed. It features (8) legs for stability. 5th wheel set up for quick “tow and go.”

FUEL AND LUBE TRUCKS

OFF ROAD WATER TRUCKS OVER THE ROAD WATER TRUCKS

FUELER TRUCKS


Page 18 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

AEDF Announces Heavy Equipment Maintenance Degree The AED Foundation (AEDF) has announced the accreditation of the Del Mar College (DMC) Associate in Applied Science (AAS) degree in Heavy Equipment Maintenance Technician offered through its Diesel Applied Technology Program. Located in Corpus Christi, Del Mar College joins South Plains College in Levelland as The AED Foundation’s second accredited school in Texas. AEDF also announced TulosoMidway High School, located in Corpus Christi, as the first AEDF Recognized High School in Texas. “We are pleased that Del Mar College has chosen to demonstrate its commitment to academic excellence and continuous improvement through the process of accreditation,” stated AED Foundation Executive Vice President and COO Jason Blake said, “Your accreditation signifies to equipment industry stakeholders that your college has met rigorous industry-specific national construction equipment technical standards. It further signifies to current

Foundation Executive Vice President and COO Jason Blake said, “Your accreditation signifies to equipment industry stakeholders that your college has met rigorous industryspecific national construction equipment technical standards.

and prospective students that your program provides the best in diesel-equipment technical education as defined by the industry it serves.” Dan Korus, dean of DMC workforce programs and corporate services, added, “Del Mar College is excited about receiving AEDF accreditation and the employment

Del Mar College’s term of AEDF Accreditation is five years, which began in March and will run through March 2026.

opportunities this certification will provide our students earning their AAS degree to become maintenance technicians for heavy equipment. AEDF is one of the nation’s premier heavy equipment dealer certifications, and the College believes this credential will help us meet workforce demands within our regional economy.”

Del Mar College’s term of AEDF Accreditation is five years, which began in March and will run through March 2026. The AED Foundation is dedicated to developing and improving construction equipment industry partnerships that meet local dealers, manufacturers and technical colleges' mutual needs. The AED Foundation is

proud to be affiliated with Del Mar College through this accreditation and is committed to the ongoing success of DMC’s Diesel Applied Technology Program and its Heavy Equipment Maintenance Technician degree program in the Department of Architecture, Aviation and Automotive. Davis Merrell, dean of the industry and public services division, which is one of three DMC academic divisions, added, “Gaining AED accreditation will allow students completing the program’s course material to show prospective employers that they are following industry standards based not only on the curriculum but also new or updated trends as they develop. The program will truly benefit from this accreditation, and it will enable our faculty to maintain rigorous coursework and show relevance to future students and their employers because program accreditation such as this is a very important designation that our graduates can put on their resumes.” 

Overseas Company Will Build Pipe Mill in Sinton, Texas Caparo Bull Moose subsidiary Bull Moose Tube Company has announced plans to build a 350,000 ton per year high-speed steel (HSS) and sprinkler pipe mill. The mill will be built on Steel Dynamics’ new Sinton, Texas, flat-rolled campus. BMT is partnering with SMS Group for the innovative design, automation and implementation of the mill. Company officials said they anticipate an early 2023 mill start-up.The company plans to set up the plant at Sinton and it is expected to go into production by early 2023. Caparo Chairman Swraj Paul said that the proposed Texas plant would be its seventh in the United States and the eighth in North America. “There is likely to be a $200 to $250 million investment in the plant,” the 90-year-old UK-based entrepreneur said. The formal announcement of the plant was made on June 4. “The construction of the new plant is an excellent project for BMT [Bull Moose Tube], and is a tribute to my late son who was born June 4,” Swraj Paul said. “I look forward to the future growth and success of BMT at our new Texas location and planning to be there for the groundbreaking, depending on the travel during

Company officials said the plan is to get the plant to go into production by early 2023.

The mill will be built on Steel Dynamics’ new Sinton, Texas, flat-rolled campus. BMT is partnering with SMS Group for the innovative design, automation and implementation of the mill.

[COVID] pandemic by that time,” Paul said. Original Equpment Manufacturer Typical applications for Bull Moose Tube include construction, transportation, fire protection, lawn and garden equipment and many other engineering and household products.

Caparo, which has close to $1 billion turnover, has a strong presence in India as well where the group operates several companies as original equipment manfacturer to auto makers. It was one of the many ancillary companies which had proposed to set up a plant at Singur in West Bengal in eastern India with

the Tata Nano plant. Paul said he continued to believe in the India growth story and will expand business in the future. Tom Modrowski, president and CEO of BMT, said the new mill will be transformational and “will expand our geographic footprint and allow us to better serve customers not only in the Southwest, West Coast and Mexico markets, but across the entire business. “Expanding our capacity, capabilities and flexibility will increase BMT’s market share in large HSS [high-speed steel] sizes and ensure our continued and expanded leadership position in the sprinkler pipe market,” he added. 


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 19


Page 20 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Officials Allocate Millions Duke Energy Announces Start of of Dollars for Airport Fixes Construction in Navarro County Congressman Filemon Vela announced that $4,398,021 in grant funding has been awarded to several airports located in Texas’ 34th District by the U.S. Department of Transportation Federal Aviation Administration (FAA). The Brownsville South Padre Island International Airport, Valley International Airport, Beeville Municipal Airport, Kenedy Regional Airport, Kleberg County Airport, Port Isabel-Cameron County Airport, and Weslaco MidValley Airport have received funds for COVID-19 relief. These FAA funds are part of the Coronavirus Response and Relief Supplemental Appropriations (CRRSA) Act, which was included in the Consolidated Appropriations Act of 2020, and provides nearly $2 billion in federal grant funding to support airports affected by the COVID-19 pandemic. “For nearly a year, airports have suffered substantial revenue losses due to the ongoing COVID-19 pandemic,” said Congressman Vela. “It is important that they receive this much needed assistance to ease the financial burden they have endured. These funds will also provide the resources needed for travelers to have a safe and sanitary experience when traveling. I will continue working with federal and local entities in order to ensure airports receive the necessary support they need throughout this public health crisis.” A list of the amount each airport received is below: Beeville Municipal Airport: $9,000; Brownsville South Padre Island International Airport: $1,524,594; Kenedy Regional Airport: $9,000; Kleberg County Airport: $9,000; Port Isabel-Cameron County Airport: $13,000; Valley International Airport: $2,833,427; Weslaco Mid-Valley Airport: $13,000. 

Duke Energy Sustainable Solutions has announced that construction has started on its 250MW Pisgah Ridge solar project in Navarro County, Texas. Engineering and construction are being carried out by Moss, while Duke Energy Sustainable Solutions will own and operate the park, which is expected to reach commercial operation by the end of 2022. A 15-year virtual power purchase agreement (VPPA) for 102MW of the Engineering and construction are being carried out by while Duke Energy Sustainable Solutions will plant has been signed with pharmaceutical Moss, own and operate the park, which is expected to reach company Charles River Laboratories commercial operation by the end of 2022. International, as it aims to source 100% renewable electricity globally by 2030. A solar portfolio, which will provide additional enerfurther two corporations have signed separate 15- gy resources for the citizens of Texas to help meet year VPPAs for the remaining 148MW of capacity. their growing demand and need for a more diverse Duke Energy Sustainable Solutions was energy infrastructure,” said Chris Fallon, president launched earlier this year as a new commercial of Duke Energy Sustainable Solutions. brand that unifies products and services offered by Last year saw Duke Energy Renewables start several subsidiaries of utility Duke Energy, includ- operations at its 100MW Lapetus solar plant, ing Duke Energy Renewables, REC Solar and 280MWdc/200MWdc Holstein solar farm and its Duke Energy One. In Texas, it currently operates 200MWac Rambler solar project in Texas. 500MW of solar and a 36MW battery storage facilAs part of efforts to become net zero by 2050, ity. Duke Energy is aiming to reach 16GW of installed “We’re excited to continue to grow our Texas renewables capacity by 2025. 

Demolition Makes Way for $161M Facility in San Antonio HANSCO from page 16

a project,” he said. “There is nothing that is atypical in this industry. You can formulate a game plan, but during the execution of it, you may vary off the original plan depending on what’s working and what is not.” Hansco purchases and rents equipment from HOLT CAT in San Antonio and Romco Equipment for Volvo machinery. “We use a lot of Volvo and Cat equipment,” said Hans. “Almost all of equipment is under warranty.” Building Background The IECB, according to the university, “is a critical element in the university’s strategic plan, connecting the Downtown Campus and School of Data Science to private business and technology entrepreneurs downtown. The building also will support programs that enhance the development of marketable skills of students in work settings as a part of the Classroom to Career Initiative, preparing them for careers in business, technology and its applications, and independent small business development. The IEC Building will put student innovators and entrepreneurs in the heart of the city’s technology corridor and provides a collision

space with mentors, coaches and other creative thinkers in the ecosystem. The downtown incubator and accelerator will be uniquely positioned to provide access to UTSA research and academic assets, and to community innovation and entrepreneurship mentors, capital and business developers.” The eight-story jail, which housed up to 600 prisoners, sat on a 2.6 acre site. The demolition operation lasted from October 2020 to last February. Until 2019, the building was owned by the CEO Group, which ran a correctional facility that had, since 1987, housed federal pretrial inmates. In addition, the UTSA held a virtual groundbreaking ceremony for the $90 million School of Data Science and National Security Collaboration Center (SDS– NSCC) on Jan. 25 for the first new building of several that will be part of its Downtown Campus expansion. The 167,000-sq.-ft, six-story structure on 506 Dolorosa St. will sit along San Pedro Creek east of IH-35 and anchor the university to San Antonio’s prospering high-tech corridor. The plan is for the campus to serve as a catalyst for economic and community investment in the San Pedro Creek area.

This building at 506 Dolorosa, expected to achieve substantial completion in July 2022, is on the property to the east of the jail site that the UTSA purchased from the city of San Antonio. The construction projects advances the university’s goal to secure national recognition as a research-intensive institution and bolster San Antonio’s national standing as Cyber City USA. “For more than 20 years UTSA has been a pioneer in cybersecurity and also now offers best-in-class programs in data science, cyber manufacturing, cloud computing and artificial intelligence,” said UTSA President Taylor Eighmy. “This new transdisciplinary building, which is deeply connected to the economic well-being of San Antonio and will house the first School of Data Science in Texas, will enable UTSA to prepare students for the high tech jobs of the future and to grow its ecosystem of government, industry and academic partners tackling society’s grand security challenges.” The SDS–NSCC will have nearly 86,000 sq. ft. of classroom, laboratory and research space for the 6,500 data science students. The UTSA expects that students will be

attending classes in the building in 2022. It will be home to 70-plus faculty members in cybersecurity, cloud computing, data analytics and artificial intelligence and the university’s computer science, computer engineering, statistics and data sciences, and information systems and cybersecurity departments, as wells its Open Cloud Institute. The SDS–NSCC is being funded via $75 million from The University of Texas System Permanent University Fund and a $15 million gift from San Antonio business leader Graham Weston. “The UTSA School of Data Science will be at the heart of the thrust of new innovation over the coming decades,” said Weston. “We can be a national leader in this field — one of the few schools that really separates itself from the pack. This is going to change the face of what UTSA is, and my prediction is UTSA is going to be famous around the country and the world in data science and cybersecurity. Whiting-Turner | Jacobs | Overland designed the SDS–NSCC and is constructing it. Last December, Whiting-Turner began removing the parking lot at the property.  CEG


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 21

EXP PERTS SAY Y YOU CAN N ONLY FOC CUS ON N ONEE THIN NG AT A TIME. We chosse ar ticula tic l ted t dump trrucks du

Contact your loccal dealer for C more information on about the one and only, Terex e Trucks . EASTON SALES & RENT RENTAL A LLC eastonsalesandrentals rentals .com com Humble,, TX Tel: 281.441.1001 BANE MACHINER HINERY banemachinery.com ery.com Tyler y ,T TX Te el: 903.597.6641 Fort Wortth, TX Tel: 817.847.5894 Dallas , TX Te el: 214.352.2 2 468 BC EQUIPMENT bcequipment .com San Antonio, TX Tel: +1 210 447 9314 Corpus Christie, TX Tel: +1 361 289 9314 L A FERIA , TX Tel: +1 956 797 0072

w w w.TerexT e rucks .com


Page 22 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

Next Issue Closes July 7, 2021


Construction Equipment Guide • Texas State Supplement • www.constructionequipmentguide.com • June 20, 2021 • Page 23

The W Wor orldwide e Leader in Concrete Paving T Technolo echnology

ww ww.gomaco.com m ❘ inffo@gomac o@gomacco.com GOMACO offers the full range of concrete slipform p pavers, curb and d gutt tter machiness, placer/sp er/spreaders, texture/cure machines and bridge/ idge/canal finishing equipment. GOMACO equipment features our exclusive and proprietary G+ G ® control system, created in-house by our soffttware engineers from the wants and needs of contractors paving in the field. At the heart of GOMACO equip fie pment is our passion for concrete and our commitment to our customers. We look ffo orward to visiting with you about your upcoming paving projects and your concrete paving equipment needs.

ROMCO Equipment Co.

Sierra Machinery, Inc.

www.romco.com

www.sierraelpaso.com

Buffalo, TX 903-322-5602

Ft. Worth, TX 817-626-2288

Longview, TX 903-758-5576

Carrollton, TX 214-819-4100

Houston, TX 713-937-3005

Midland, TX 432-234-9409

939 Hawkins Boulevard El Paso, TX 79915 915-772-0613

Closner Equipment Company Inc. www.closner.com San Antonio Main Branch 21910 FM 2252 Schertz, TX 78154 210-732-2131

Austin Branch 13800 FM 973 N Manor, TX 78653 512-272-8200


Page 24 • June 20, 2021 • www.constructionequipmentguide.com • Texas State Supplement • Construction Equipment Guide

True Power. At Bane Machinery, we offer Liebherr machines that are custom-engineered to perform efficiently. And we stand behind them with full service. Count on us for original parts, factorytrained technicians, and an extensive inventory of machines for your toughest jobs. We can also service your equipment to OEM standards in the shop or the field. We haven’t compromised on anything; why should you?

DALLAS 2449 Manana Dr. Dallas, TX 75220 Ph: (214) 352-2468

FORT WORTH 10505 North Freeway Fort Worth, TX 76177 Ph: P (817) 847-5894

TYLER 3402 N. NE Loop 323 Tyler, TX 75708 Ph: (903) 597-6641

www.banemachinery.com


Turn static files into dynamic content formats.

Create a flipbook
Texas 13, June 20, 2021 by Construction Equipment Guide - Issuu