Published Nationally ยฎ
Northeast Edition
December 31 2025 Vol. LXVII โข No. 27
โThe Nationโs Best Read Construction Newspaperโฆ Founded 1957.โ 470 Maryland Drive โข Ft. Washington, PA 19034 โข 215-885-2900 โข Toll Free 800-523-2200 โข www.constructionequipmentguide.com
Inside Staying Ahead of OSHAโs Top 10...8
USACE Works On Locks Near Pittsburgh U.S. Army Corps of Engineers Pittsburgh District contractors assemble the frame for the quality assurance/quality control lab (QAQC) at Montgomery Locks and Dam.
Huddig: From Swedish Idea to Versatile Global Solution...16
Finke Equipment Takes On Merlo Lineup...68
By Chuck MacDonald
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . .4 Attachments & Parts Section . . . . . . . . . . .32-36 Truck & Trailer Section . . . . . . . . . . . . . . . .37-40 Aggregate & Recycling Section . . . . . . . . .47-64 Business Calendar . . . . . . . . . . . . . . . . . . . . . .72 Auction Section . . . . . . . . . . . . . . . . . . . . . .76-88 Advertisers Index . . . . . . . . . . . . . . . . . . . . . . .86
CEG CORRESPONDENT
Transportation experts know that the cheapest way to move bulk goods is by water. So, the U.S. Army Corps of Engineers (USACE) has been tasked to monitor the system of dams and locks on the Ohio River. The USACE has focused on a $1.6 billion project to upgrade the Montgomery locks near Pittsburgh. Because of the complexity of the project and the need to keep river traffic flowing during construction, the job will take eight years to finish. The Corps of Engineers team is led by Chris Dening, manager of the job, and Jenna Cunningham, resident engineer. Companies rely on the river to deliver unpackaged materials like coal, rock steel, petroleum and chemicals. When the project is completed, see LOCKS page 50
John Hainesโ Vision Propels H&K Into Industry Powerhouse At 87 years old, John B. Haines IV can look back with a tremendous sense of pride at how his life and his company has progressed. see story on page 24