New England 26 2013

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

FormErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

December 18 2013

95 91

7

495 6 195

395

95 91

3

84 6

84

6

E

q

u

I

P

m

E

N

T

g

u

I

D

E

95

95

Vol. XlIX • No. 26

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection •  Kent Hogeboom 1-800-988-1203

2014 EZ-Screen 1200XL

WE STOCK RUBBER TRACKS for Over 2,500 Models! Some Used Tracks Available.

BEST PRICES! • GUARANTEED TO FIT

RIDOT Vows to Redeem Itself With White Church Bridge Replacement

• HIGH QUALITY • FAST SHIPPING

By Jay Adams 888-888-1248

New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$39,500 plus freight. Other Screeners Available

ArguS INDuSTrIAl CO.

Kraft Power Corporation

Engines, Parts & Service

800-969-6121 Woburn, MA & Syracuse, NY

Authorized Deutz Distributor

WANTED

www.ez-screen.com

CATERPILLAR EQUIPMENT

866-745-5828

Call Lou Giza

WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA (46745)

603-595-2090 Kraft Power Corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

800-969-6121 www.kraftpower.com

www.foleyengines.com

w

For more Display/Classified Ads See Page 14

CEG CORRESPONDENT

The Rhode Island Department of Transportation has learned its lesson about making sure bridges are done on time and done right. Four years ago, commuters driving across the East Bay of Rhode Island through Barrington and adjacent Warren, R.I., celebrated the opening of two new bridges, which were — through delays and defaults from the original contractor — 15 years in the making. At the time, the two original bridges along the critical north-south commute along heavily-traveled route 114, spanning both the Warren and Barrington Rivers, had been shut-off from traffic since 1997. Temporary bridges were constructed, but were only supposed to be in place four years, the duration of the contract. Yet, nearly 10 years later, the bridges were still being used. With a financial rift exposed with the original general contractors and a new contractor put in place to finish the job, it wasn’t until 2009 that the new Warren and Barrington Bridges were finished and open to traffic. The Rhode Island Department of see CHurCH page 4

Built in 1940, the White Church Bridge has surpassed its design life and is showing what RIDOT calls “signs of aggressive deterioration.”

Lorusso Keeps Ryco Inc. From Being Bogged Down Located in the heart of Massachusetts’ cranberry country means much of the work that Ryco Inc. is involved in is the creation of new and the maintenance of older cranberry bogs. “From day one, reputation has been crit-

The Liebherr loader works on a job site.

ically important to me,” said Ryan Vlaco, president of Ryco Inc. “The cranberry farmers of eastern Massachusetts are a close knit community. Your reputation needs to include a knowledge of the construction of these bogs, honest fair pricing and on time completion. We take a lot of pride in our work and as a result our business has grown nicely.” The creation of cranberry bogs produces a large amount of excess material, which Ryco then processes and sells. “We use our wheel loaders primarily to load our trucks and to see rYCO page 6


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.