Skip to main content

NewEngland #25,2012

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

FormErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

December 5 2012

95 91

7

495 6 195

395

95 91

3

84 6

84

6

E

q

u

i

P

M

E

N

T

g

u

i

D

E

95

95

Vol. XliX • No. 25

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England states connection •  kent Hogeboom 1-800-988-1203

kraft Power corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

2013 EZ Screen 1200XL New option separate 3 Products

800-969-6121 www.kraftpower.com

WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA (46745)

Kraft Power Corporation

Engines, Parts & Service

800-969-6121 Woburn, MA & Syracuse, NY

Authorized Deutz Distributor

MULTI MACHINE INC. BEsT WE sTock PricEs ruBBEr TrAcks for over 2,500 Models! some used Tracks Available.

• GUARANTEED TO FIT • HIGH QUALITY • FAST SHIPPING

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$39,500 plus freight. other screeners Available

Argus iNDusTriAl co. www.ez-screen.com

866-745-5828

WANTED

Photo courtesy of RIDOT

CATERPILLAR EQUIPMENT

During closure, crews performed a number of repairs including replacing concrete railing in-kind, installing new crash tested railing and replacing entire superstructure (joint elimination).

Call Lou Giza

New Smithfield Viaduct Opens Weeks Ahead of Schedule, Well Within Budget

603-595-2090

888-888-1248 Auctioneering & Liquidation

ITL Auctioneering

www.itlauctions.us Justin Lyerla (508) 824-3262

www.foleyengines.com

w

By Jay Adams CEG CORRESPONDENT

The Rhode Island Department of Transportation (RIDOT) successfully opened the new Smithfield Viaduct five weeks ahead of schedule and well within budget because of the decision to close off the entire bridge to allow crews to work much more quickly. “It wasn’t just accelerated construction that got this done early. The fact that we closed the bridge was the biggest factor,” said Heidi Gundmunson, spokesperson of RIDOT. “We chose this option rather than building it in phases. The accelerated bridge component was that all of the rails were precast. Much of the rest of the bridge was cast in place through conventional construction methods.”

“This is a rebuilding of an historic 1932 concrete span bridge. And it is basically a complete replica, modern technology of the old bridge,” said DOT Director Michael Lewis in mid-October in a ceremony to reopen the 80-year-old structure. According to DOT, the bridge opened five weeks ahead of schedule due to completely closing down the area to work on it. Incentives of $10,000 Per Day Through a $9.4 million contract with Northern Construction Services of Palmer and Weymouth, Mass., RIDOT made use of pre-cast components wherever possible and placed a $10,000-per-day incentive clause in the contract see ViADucT page 6


Page 2 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316

2008 Deere 524K

2004 Case 321D

c/air, hi lift, hi- vis hyd coupler w/2.75 yd bucket, radials

c/air, hyd coupler, aux hyds, fully serviced, 80% rubber

2011 Deere 244J

2006 Deere 544J

c/air, r/c, 1.4 yd bucket, hyd cplr, 3rd valve hyds, R20’s, like new condition

A/C, RC, 3rd valve hyds, JRB hyd cplr and 3 yd bucket

stk# 20889 ........................$110,500

stk# 20830 ..........................$35,000

stk# 21173 ..........................$69,500

stk# 21348 ........................$127,500

2007 Deere 50D

1998 Deere 410E

New Holland L190

2005 Hitachi ZX225USLC

ROPS, 890 hours, hydraulic thumb

stk# 20936 ..........................$42,500

c/heat, 4x4, std hoe, 2000 original hours

stk# 21372 ..........................$47,500

2003 New Holland LS180 2008 Komatsu PC45MR-3 c/heat, gp bucket, 80% rubber, great snow machine

stk# 21417 ............................$22,000

c/air, hydraulic coupler, 2090 original hours, fully serviced and ready for work

OROPS, hi-flow, 2 spd travel, new rubber and bucket, serviced and ready to go

stk#21404 ............................$26,000

stk# 21153 ........................$108,500

2006 Deere 450JLGP

2009 Carlson CP-90

c/air, 24" bucket, hyd thumb, 880 hrs

c/air, 2400 hrs, 115” blade, very good condition

Cat engine, 8-15’ electric screed, 416 demo hours, excellent condition

stk# 21314 ............................$42,500

stk# 20503 ..........................$51,500

stk# 20713 ........................$124,500

WHEEL LOADERS 1990 CAT IT28B, C/HEAT, 3RD VALVE HYDS, HYD COUPLER, 2.5 YD BKT, 10,600 HRS ONE OWNER MACHINE, STK# 21338 ......................................................................................$35,000 2004 CASE 321D, C/AIR, HYDRAULIC COUPLER, 80% RUBBER, STK# 20830 ........................................................$35,000 2011 DEERE 244J, C/AIR, R/C 3 VALVE HYDS, 1 YD BUCKET WITH HYD CPLR, EXCELLENT CONDITION, STK# 22179 .......... ......................................................................................$72,500 2008 DEERE 344J, A/C, RC, 3RD VALVE HYDS, HYD COUPLER, 920 HRS, STK#20274 ........................................$98,500 SKID STEERS 2010 TAKEUCHI TL250, C/AIR, PILOT CONTROLS, HI-FLO HYDS AND 80" BUCKET, STK# 21233 ..........................$43,500

DOZER – CRAWLER 1984 DEERE 450D, 6 WAY BLADE, GOOD CONDITION, STK# 21370............................................................................$17,000 2005 DEERE 750J, S/N TO750JX110563, C/AIR, PAT BLADE, RECENT SERVICE, CLEAN MACHINE, STK# 19345 ....$131,500 2007 DEERE 1050J, A/C, 24" PADS, 159" SEMI-U BLADE, MS RIPPER, NEW PAINT, STK#20688 ..............................$315,000 EXCAVATOR – CRAWLER 2005 HITACHI ZX225LC, C/AIR, HYDRAULIC COUPLER, EXCELLENT CONDITION, 2090 HRS, STK# 21153 ....$108,500 MOTOR GRADER 1988 DEERE 570B, C/HEAT, 12’ BLADE, FRONT SCARIFIER, 80% REAR RUBBER, 833 ORIGINAL HOURS, FULLY SERVICED, STK# 21413 ........................................................$65,000

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 3

1987 MORBARK HURRICANE 18, Stk# 12089, 448 Hrs, Call Tom Tyler, VP at 203-509-0967 ............................$30,000 2002 Volvo EC35, Stk# 12257, 3,475 Hrs. 12" And 24" Volvo Q/F Excavator Bucket, Dipper Arm 55", Rubber Tracks, 12", Full Cab, Rops, Fops & Tops, Heated..$26,000

1990 OLATHE 986, Stk# 11957; 2,309 Hrs, 12" Brush Chipper w/ Ford BSD444 60 hp Dsl Eng, 42" dia., 1-1/2" thick hot-rolled steel w/ paddle type fan blades welded on, includes Operator's Manual & Parts List. Has all details on service and parts notes. If interested, Call Tom Tyler, VP at 203509-0967..............................Only $5,000!

2010 Volvo Hydraulic Hammer HB1100, 2300 ft/lb hammer, w/S6 Manufacturer Plate, New Hoses Chisel Point. 6 Month Manufacturer Warranty................$33,500

20 TON ROGERS #12292, 20 Ton, 22’Level Deck with 6’ Beavertail and Ramps, 215 Tires, Tool Box, Very Good Condition with Fair Deck $14,000

2005 Volvo EC240BLC, Stk# 12231, 3,900 hrs, A/C, 32" Track Pads, Std Roller Guard, Hammer/Shear Piping w/1 Pump, Q/C Piping, Boom 19'8", Arm, 9'9", Std Counterwieght 11,690 lbs., S2 Quick Coupler, Foot Pedal Control ........$97,500

1985 Akerman 200 Wheeled Excavator, Stk# 8260; 24,370 Hrs; 39" 1.1 Cu.Yd. Q/F Bkt, 8'2" Bulldozer Blade, 15'3" Boom, 9'2" Dipper Arm, One Way Hammer Hydraulics Only, Additional Tilt Hyd. Circuit. Quick-Fit Device w/ Bkt, Counterweight (5,842 Lbs.) 9/4/12 Price Just Reduced From $25k To $21k!

VOLVO CONSTRUCTION EQUIPMENT

u SALES u PARTS u SERVICE u RENTALS u CUSTOMER SUPPORT u

www.tylerequipment.com

MAIN OFFICE-MASS 251 Shaker Road East Longmeadow, MA 01028 1-800-292-6351 Parts Department: 877-255-6351

CONNECTICUT 1980 Berlin Turnpike Berlin, CT 06037 1-800-352-4473 Parts Department: 860-356-0848


Page 4 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Tufts Inc. Increases Scope Beyond Snow Removal Doosan Wheel Loaders Help Company Expand Business, Keep Busy All Year For the first 20 years Frank Spinosa was in the snow removal business, he typically followed the same routine — hire and train a group of new employees in the fall, let them all go at the end of the snow season and start all over again the next fall. Some of his crew (usually construction workers) would come back; others would not. “Five years ago I decided I was getting tired of looking for qualified help and having to train new people every year,” said Frank Spinosa, the owner of Tufts Inc., in Medford, Mass. “Having full-time, year-round employees was a complete change in how the company was going to operate. The challenge was finding enough work to keep the staff busy after the snow was gone.” Spinosa purchased additional equipment and began adding services in order to maintain a permanent staff of 12 to 15 employees. “So far things have turned out for the better,” he said. “Full-time employees are more dependable and do a better job of operating and maintaining the equipment.”

The DL250 keeps employees busy with a variety of construction and utility projects in the spring, summer and fall.

NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Asst. Circulation Mgr. Main office

Toll Free Fax Web site Editorial e-mail Advertising e-mail

For advertising rates: Contact

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Reckner Pete Sigmund John Pinkerton Tom Weinmann Rolf Krog Cathy Printz

470 Maryland Drive Fort Washington, PA 19034 215/885-2900 800/523-2200 215/885-2910 www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com

Edwin M. McKeon Jr.

215/885-2900 800/523-2200 215/885-2910 e-mail tmckeon@cegltd.com

Toll Free Fax

Kent Hogeboom •New York •New England 315/823-7668 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2012, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

Tufts owner Frank Spinosa.

Snowfall Drives Revenue Snow removal is still the most important business for the company. “If there is enough snow, it could account for up to 60 percent of our business,” said Spinosa, as he closed out the busy 2010 to 2011 winter season working for dozens of large clients throughout the Boston area. At one time snow removal accounted for 100 percent of his income. Among the equipment he added when building up the year-round business were two powerful Doosan wheel loaders purchased from Bobcat of Boston. Both machines — a DL200 and DL250 High Lift — were originally brought on board for snow removal, but Spinosa immediately saw how valuable they would be in other applications. “This is the type of equipment I can use and make money with throughout the year,” he said. “Besides generating income, I was looking for wheel loaders that were reliable, could handle a variety of jobs and had strong dealer service and support.” see TUFTS page 13


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 5

We’ve become attached to your machines.

Where can you go to get high performance boom-mounted attachments? Allied Construction Products, LLC

b Sandvik (Rammer) E-Series hydraulic impact hammers

Sandvik (Rammer) G-Series hydraulic impact hammers t

( t

o

For over 65 years, we’ve developed many attachments that are legendary in the construction and demolition industries that demand high performance. Names like Ho-Ram, Hy-Ram®, Rammer, Ho-Pac® and Pedestal Breaker System™ are names that equal: Ê UÊSimple, proven design (Our attachments have high resale or trade-in value) Reliable performance (If you purchased you’re probably AR Series™ an Allied attachment, U Reliable performance (If you purchased an Allied attachment, you’re probably still using it) hydraulic impact hammers still using it) U Superior productivity (Compare AEM– formerly CIMA– ratings, our attachments get the job done faster) attachments get the job done faster) And, now Allied adds to that great family background with the Sandvik (Rammer) and AR Series™ hammers. Allied’s attachments don’t take a back seat to any competitor. In particular, our Sandvik (Rammer) product features a long-stroke design, all oil operation and ProControl. All of our high performance boom-mounted attachments are supported by the most respected parts and service organization in North America. Customer satisfaction is job one at Allied. Great products supported by people who know the industry and its customers. To put a high performance Allied attachment on your machine, call the Tyler Equipment Corporation office nearest you. We’ve become attached to your machines.

®

Tyler Equipment Corporation

Pedestal Breaker System™ stationary boom systems

Ho-Pac vibratory compactor/drivers

Main Office MAIN OFFICE: 251251 Shaker Road Shaker Road East Longmeadow, East Longmeadow,MA MA 01028 01028 1-800-292-6351

Tel: 413-525-6351

Prospect, CT CT LOCATION: NEW 1980 Berlin Turnpike Tel: 203-758-3925 Berlin, CT 06037 1-800-352-4473

www.tylerequipment.com

Contractor’s Mechanical Grapple material and waste handling systems

Sandvik (Rammer) S-Series hydraulic impact hammers © 2008 Allied Construction Products, LLC

www.cor-equip.com

“The Rubble Master RM100GO! has many great features including the new MS100GO! mesh screen box. The RM100GO! has increased my production and lowered my operating costs for a crusher. The low fuel consumption and ease of operation of this closed circuit plant is simply amazing.” Blake Luciani Crushing operations manager, West Rock Materials, Woodbridge, CT

Crush Concrete/Asphalt/Rock • Produce a 3/4” Minus in One Pass Mobilizes in One Load • Low Fuel Consumption • Eliminate Dumping Fees

Blake Luciani

Warren Luciani

Sales • Parts • Service • Rentals 226 Selleck St. Suite C • Stamford, CT 06902

(203) 569-0339


Page 6 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Decision to Close Bridge Completely Decreased Work Time VIADUCT from page 1

for every day ahead of schedule the bridge was open to traffic (maximum of 30 days). Additionally, RIDOT coordinated closely with the community on the decision to close the bridge so work could be accelerated. Originally, RIDOT considered phased construction that would have kept the bridge partially open to traffic, but would have taken years to complete. The decision to close the area came in March 2012. By mid-October, work was complete. The 80-year-old bridge carries Rte. 116 (George Washington Highway) over the Woonasquatucket River/Stillwater Reservoir. RIDOT completely replaced the superstructure, made sub-structure repairs and performed minor concrete repairs to the bridge’s arches. The replacement structure is the same width as the existing bridge, with sidewalks on both sides. “We chose to expedite the repairs by closing the bridge to traffic through a single-phase construction project. Construction took about seven months versus the projected three to four years,” said Gundmunson. “We couldn’t keep the bridge open without limiting access for heavy trucks, buses, etc. We would have had to post the bridge (put a weight restriction on it) that would have been even more of a hardship to the community.” Gundmunson added that the community was grateful to be involved throughout the design and construction project. “The area has a lot of commercial businesses,” she explained. “There also is a heavily used recreational area/walking trail under the bridge that had to be closed during construction. We kept businesses open but had to close the trail during construction. Detour routes were designed especially to accommodate large trucks. The average daily traffic crossing the bridge in Smithfield is 10,000 vehicles. The bridge marked 80 years of operation in 2012. It is 450 ft. (137 m) long with 11 huge spans underneath it. These proportions were kept exactly the same after construction, including the two 12-ft. (3.6 m) lanes in each direction. There are two 8-ft. (2.4 m) shoulders and two 4.59-ft. (1.3 m) sidewalks on each side. There are 10 approach spans and one main arch span of 119-ft. (36.2 m) underneath the Stillwater Viaduct. During closure, crews performed the following repairs:· • Replaced concrete railing in-kind • Installed new crash tested railing • Replaced entire superstructure (joint elimination) • Replaced bearings • Replaced concrete bent caps and spandrel column caps • Repaired pier bents • Repaired arch columns repairs • also made other minor concrete repairs and resurfacing improvements. “We precast the concrete elements: the beams, column caps, deck panels and pier/bent caps,” added Gundmunson. “There was significant concrete deterioration, spalling, cracking, ice and salt penetration — from salting roads/ice and snow) see VIADUCT page 10

Photo courtesy of RIDOT

This is a rebuilding of an historic 1932 concrete span bridge and it is basically a complete replica, modern technology of the old bridge.

Photo courtesy of RIDOT

There also is a heavily used recreational area/walking trail under the bridge that had to be closed during construction.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 7

A

STRONGCO Company

Chadwick-BaRoss, Inc. 15 Katrina Road • Chelmsford, Massachusetts (800) 804-0775 • (978) 256-9571 Fax: (978) 256-8802 www.chadwick-baross.com • www.cbused.com

Takeout can eat up your savings.

A.T. Equipment, Inc.

Pack your own lunch instead of going out. $6 saved a day x 5 days 6% interest = $19,592.

www.atequipment.com

• Hydraulic hammer rental and sales 100 ft lb to 20,000 ft lb

That could be money in your pocket. Small

• Complete hydraulic hammer rebuilds (all makes)

changes today. Big bucks tomorrow. Go for free savings tips.

Sales and Rentals

(508) 523-8852

• Heavy equipment rental and sales

a week x 10 years x

to feedthepig.org

Office

(508) 865-0400

• Authorized Yanmar Mini Excavators and construction equipment dealer

The “It’s Only Another Beer” Black and Tan 8 oz. pilsner lager 8 oz. stout lager 1 frosty mug 1 icy road 1 pick-up truck 1 10-hour day 1 tired worker A few rounds with the guys Mix ingredients. Add 1 totalled vehicle. Never underestimate ‘just a few.’ Buzzed driving is drunk driving.

Pictured above is the NEW 20,000 ft. lb. hammer available for purchase today!! 81 Worcester Providence Turnpike, Sutton, MA 01590

®


Page 8 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

The N.i.c.e. Company Northeast International Construction Equipment Co., Inc. “Your Newest Source for Quality Equipment”

I Buy Machines

1999 Cat 950G, runs good, command control, 16K hours..............................................................$57,500

Cat 420DIT, very nice machine! ................$38,500 Also in stock 420E, 420EIT

GET YOUR LOADERS NOW 2002 2000 2003 2008

WA180, bucket/forks..................................$59,000 Bobcat 863, cab, heat ............................$15,500 F750 Dump Truck, low miles ................$28,500 C3500, plow, sander, diesel ......................$35,000

Now Off 495 in Franklin!!! 76 Grove St., Franklin, MA

508-966-4888 508-966-4887

Call Bryn Smith at:

Fax:

Email: brynsmith@thenicecompany.com

See all of my machines at www.thenicecompany.com

Maximum Output

A tthe At he lowest low we t west ccost ost p per er ton! Clean Chips. Microchips. Biomasss. Land Clearing. For 30 yearss, Petterrson on chippers havve led tthe ZD\³ \³ ÀQG RXW PRUH DW www ww ww.p pettersoncorp.ccom y q p 30 Birch Island Road, Webster, MA PH: 508.949.0005 www.barryequipment.com 800-269-6520 • www.petersoncorp.com • PO BOX 40490 • Eugene, OR 97404


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 9

A A

Company Company A

Serving Servin ng All Of New England As authorized Terex® From Five Locations!

ACompany A A

Company Company Company

Your Y our partner parttner t ffor portable porrtable t bl Finlay Distributors... crushing and screening!

Jaw, IImpact mpact & C Cone one C Crushers rushers hers

2 & 3 Deck I nclined & Horizontal Screens

Heavy Duty Screens

Sales, Rentals, Parts and an nd Service Serrvice

Complete Modular Washing Systems

Chadwick-BaRoss has formed a team of specialists to provide sales and service to its screening and crushing customers throughout the six-state territory. For more information contact:

Bangor, ME 800-698-4838

Caribou, ME 800-270-2547

Chelmsford MA 800-804-0775

Concord, NH 800-477-4063 Or follow follow us:

Visit Our NEW Website

w www.chadwick-baross.com ww.chadwick-baross.com www.cbused.com w ww.cbused.com

Westbrook, ME 800-262-5714


Page 10 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Officials Praise RIDOT, Northern Construction Services

Photo courtesy of RIDOT

The clear roadway width between curbs is 40 ft. (12 m). There is approximately 3 in. (7.6 cm) of bituminous concrete overlay on a concrete deck slab. The two concrete sidewalks have concrete decorative railings. VIADUCT from page 6

— rebar deterioration, as well as a failure of some of the elements, such as the sidewalks. The bridge main span is an open spandrel, reinforced concrete three-ribbed arch, spanning 80 ft. (24 m). The concrete approach spans vary in length, and are supported on 10 concrete post bents consisting of three square columns. Materials used in the project included: • Asphalt: 1,105 tons (1,003 t) • Base: 182 tons (165 t) • Binder: 175 tons (158 t) • I-1: 748 tons (678 t) • C.I.P. Concrete: 867 cu. yds. (622 cu m) • End Posts: 23 cu. yds. (17.5 cu m) • Approach Slabs: 55 cu. yds. (42 cu m) • Backwalls: 21 cu. yds. (16 cu m) • Bridge Deck: 523 cu. yds. (399 cu m) • Bridge Sidewalk: 112 cu. yds. (85 cu m) • Columns/Spandrel Walls: 37 cu. yds. (28 cu m) • Diaphragms: 94 cu. yds. (71 cu m) The Viaduct is eligible for listing on the National Register of Historic Places for its historical association with the massive bridge building campaign initiated by the state in the 1920s and 1930s, and as an important local example of an open spandrel arch bridge. The clear roadway width between curbs is 40 ft. (12 m). There is approximately 3 in. (7.6 cm) of bituminous concrete overlay on a concrete deck slab. The two concrete sidewalks have concrete decorative railings. “We are definitely pleased with the results and it was gratifying to put the bridge back into service five weeks early and rightfully return it to the community,” Gundmunson stated. “We are fortunate to have had such an accomplished team, with our staff, design consultant — VHB, and contractor — Northern Construction Services. They were responsible for performing the work and securing the neces-

sary subcontractors and vendors to complete the work in accordance with contract documents. “We relied on them to get issues resolved out in the field promptly. They also were extremely cooperative in making modifications and changes necessary to keep the job moving forward,” said Gundmunson. Northern, an Impressive Company According to its site, Northern Construction Service LLC is a Massachusetts-based general contractor specializing in bridge construction, site work, marine construction, concrete work and utilities. Northern has completed hundreds of projects throughout New England and New York. John L. DiVito and John N. Rahkonen founded Northern in 1993. Since then, the company has experienced steady growth, along with a reputation for quality workmanship. Northern’s impressive list of clients includes federal, state and municipal agencies as well as private industrial and utility organizations. The company employs upwards of 80 to 100 people and is pre-qualified with the Massachusetts Highway Department and the Connecticut Department of Transportation. Northern’s numerous projects in seven states include rebuilding historic covered bridges, keystone arch bridges as well as concrete decks and steel spans. They also have repaired many dams, both privately and publicly owned. The company has completed salt marsh and pond restorations, replaced culverts, installed New England’s first airport EMAS barrier on Cape Cod and relocated a historic lighthouse, among other seawall construction work. Accelerating Bridges in Rhode Island RIDOT has witnessed great success with other bridge projects using accelerated construction methods. In late 2010, RIDOT replaced the Round Top Bridge in Burrillville in just 41 days. More recently, this past August, the Department reopened the Frenchtown Brook Bridge in East

Greenwich in only 33 days. All future bridge projects will be evaluated to determine the feasibility of using accelerated construction methods. Not all bridges can be rehabilitated in this way, the RIDOT stated. The impact to traffic (the use of these techniques often calls for a total road closure), the complexity of utility relocations and the amount of work that is needed to be accomplished in the project must be taken into consideration. Similar approaches are planned for the replacement of larger bridge structures in the next two years including the East Shore Expressway Bridge in East Providence, which carries traffic from Interstate195 East onto Exit 7 (Route 114) and over Warren Avenue, and the Barton Corner Bridge, which carries Interstate 95 over Route 2 (Quaker Lane) on the Warwick/West Warwick line. “We have used value engineering for several years to get the best value for the State’s taxpayers. Accelerated bridge techniques are relatively new to RIDOT, but with the recent successes we have had, we plan to use similar techniques on future projects where we can,” said Gundmunson.

Positive Reinforcement Local officials were very pleased with the new bridge on the day of the opening in October. “This is great,” Michael J. Flynn, president of the Smithfield Town Council told Smithfield Patch. “This is a major linkage, (it) links the two sections of Smithfield together. Without it, we’re fractured. The constituents and the Council are really very happy to see this put together, into operation.” “This needed a lot of work. In 2005, I was able to earmark, or as I like to say, Congressionally direct spending so that this bridge could be built, it was specifically targeted for this bridge,” said U.S. Senator Jack Reed (D-R.I.) It will reopen Route 116 and provide safe and convenient transportation for the residents of this wonderful community. And, most important, at this juncture, it put people to work.” Sen. John J. Tassoni, Jr. (D-Smithfield, North Smithfield) joined officials in praising the completion of the Stillwater Viaduct bridge project in Smithfield. “The DOT and its project contractor, Northern Construction Services of Massachusetts, deserve our thanks and compliments for a job well done, and ahead of schedule,” said Senator Tassoni. “The importance of the bridge to the community, to local businesses in the area, cannot be overstated. Early completion of the project is great news and the DOT, by doing such an efficient job on this project, has provided great service to the community. “This shows clearly how, with good planning, local-state cooperation and efficient construction techniques, a major project such as this can be done well. It will serve Rhode Islanders well for years to come.” The bridge is formally known as the Samuel A. Engdahl Bridge, named after former RIDOT bridge engineer who served Rhode Island over a 48-year career. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 11

DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $30.00. Each Additional Word is 95¢. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion.

Hydraulic Cranes 6-365 Ton

Bijur Automatic Lubrication Systems VEI Wheel Loader Scales West Springfield, MA 01089-3850 (413) 788-LUBE

Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Lubrication Engineers High Performance Lubricants Professional Lubrication Management

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448

E ATS

STA RT E

D SH OO TI NG HEA HO O ON LTH I P S WITH S ER A CONSI ND DERIN S KI PS D SS ERT G CH E ANG Y” ING ADD NAM E TO “ BUFF D

* pre-payment required

Would you like your company featured in Construction Equipment Guide?

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 AIR COMPRESSORS

GENERATORS & GEN SETS

Compressors

Generators & Gen Sets

AIRMAN COMPRESSORS

For Sale or Rent

Eagle Power & Equipment

All Makes and Models

Montgomeryville PA 215/699-587

Modern Equipment Sales & Rental 800/445-4381

New Castle DE 302/652-3028

HYDRAULIC HAMMERS

Eagle PA 610/458-7054

Hydraulic Breakers

ASPHALT EQUIPMENT Asphalt Pavers 2002 Blaw Knox PF4410, rebuilt and painted, 8-16’ screed w/electic heat, excellent condition, 7700 hours .. ....................................Call 301-589-9490 ATTACHMENTS Forks Major 48’’ Utility Forks, 72’’ carriage, fits Volvo style coupler, fair ..............$1000. 800-222-8798 Grapples 2007 Allied Heavy Duty Grapple, E07107, fair ........ ..............................$11,299. 800-222-8798

If so, please contact us:

CHAIN-LINK & WOOD FENCE PRODUCTS

470 Maryland Drive Fort Washington, PA 19034

Galvanized & Vinyl Chainlink Fence Galvanized & Vinyl Fence Pipe Cedar Picket & Board Wood Fence Galvanized & Vinyl Fence Hardware Huge Inventory Available at Wholesale Prices Call Today Delivery For Pricing... Available

editorial@cegltd.com TAKE A SMALL STEP TO GET HEALTHY. Get started at www.smallstep.gov

PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

Mid-City Steel Fence 190 State Rd. (Rte 6) Westport, MA Ask for Paul J. Aguiar

Office: (508) 646-9800 Cell: (508) 951-6092 Fax: (508) 676-5400

ALLIED SALES/RENTALS Eagle Power & Equipment Montgomeryville PA 215/699-587 New Castle DE 302/652-3028 Eagle PA 610/458-7054 2008 Rammer / Allied BR4511, Rammer 12,000 ft lb hammer, mounting bracket for Kobelco SK485, good condition ..............$59,900. 800-222-8798

NEW REPLACEMENT PARTS FOR CRANES, DRAGLINES, SHOVELS, BACKHOES, EXCAVATORS, TRACTORS AND ELEVATING SCRAPERS Undercarriage and upper parts, all makes and models, in stock, lowest prices anywhere

A.C.R. PARTS DIVISION 19615 Nottingham Rd., Cleveland OH 44110 Phone: 216-531-8000 • Fax: 216-531-8852 E-MAIL: acrequipment@cs.com • www.acrequipment.com

=========== DAILYAND AND WEEK DAILY WEEKLY

EQUIPMENT RENT EQUIPMENT RENTALS CLOSE YOUR JOB CLOSE TOTO YOUR JOB SITE

RENTMACHINES.COM RENTMACHINES.CO

® CATERPILLAR CATERPILLAR ® GENIE GENIE® ® CHALLENGER CHALLENGER ® SCREEN MACHINE SCREEN MACHI


Page 12 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • Massachusetts... Monterey • Nantucket • Hampden • North Adams • Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • West • Monterey • Nantucket • Hampden • North Adams • Essex • Bristol • Franklin • Plymouth • Worcester • Middlesex • Norfolk • Dukes • Barnstable • Suffolk • Hampshire • Chilmark • Amherst • West • Monterey • Nantucket • Hampden • North Adams • Essex • Bristol • Franklin • Plymouth • Bristol • Franklin • Plymouth • Worcester • Middlesex

‘Bay State’ Highway Projects Let

MassHighway received bids for transportation-related improvement projects. Following is a list of some of the projects let. Location: Southbridge Document Number: 605338 Project: Roadway reconstruction and related work (including bridge demolition) North Woodstock Road (Route 169) over the abandoned CSX Railroad Line (ABP). Low Bidder: E.T. & L Corporation Bid Amount: $1,471,001 Completion Date: July 19, 2013 Location: Concord to Lincoln Document Number: 602984 Project: Roadway reconstruction and related work (including 1 bridge and 14 retaining walls) along a section of Route 2 (Crosbys Corner Interchange) FAP#s CM002S(311), HSI-002S(311) & STP-002S(311). Low Bidder: D.W. White Construction Inc. Bid Amount: $42,228,757 Completion Date: May 27, 2016 Location: Burlington to Tyngsborough Document Number: 606152 Project: Roadway repairs, improvements and related work along a section of Route 3 (North). Low Bidder: P.J. Albert Inc. Bid Amount: $2,382,017 Completion Date: June 13, 2014 Location: Leominster Document Number: 605391 Project: Intersection improvements and related work (including traffic signals) Merriam Avenue at Lindell Avenue FAP# STP-002S(376)X. Low Bidder: UEL Contractors Inc. Bid Amount: $487,333 Completion Date: May 26, 2013 Location: District 4 Document Number: 606590 Project: Roadway repairs at various locations. Low Bidder: Brox Industries Inc. Bid Amount: $271,510 Completion Date: June 15, 2014 Location: Sturbridge to Spencer Document Number: 606451 Project: Resurfacing and related work on Route 49 (Podunk Pike) FAP# STP-002S(380)X. Low Bidder: J.H. Lynch & Sons Inc. Bid Amount: $2,145,268 Completion Date: March 26, 2013 Location: Somerville Document Number: 605219

Project: Roadway reconstruction and related work (including streetscape enhancements) on a section of Broadway FAP# HP-002S(344)X. Low Bidder: A.R. Belli Inc./A.R. Equipment Corp. Bid Amount: $7,917,175 Completion Date: Oct. 27, 2014 Location: Wellesley to Lexington Document Number: 604937 Project: Traffic sign replacement along a section of Interstate 95 FAP# STP-095-2(116). Low Bidder: RoadSafe Traffic Systems Inc. Bid Amount: $4,429,570 Completion Date: July 12, 2014 Location: Districts 1 and 2 Document Number: 606278 Project: Drainage mitigation and improvements at various locations FAP# STP-002S(383)X. Low Bidder: C & A Construction Company Inc. Bid Amount: $2,471,867 Completion Date: June 22, 2014 Location: Longmeadow-West Springfield Document Number: 605442 Project: Guide and traffic sign replacement along a section of Interstate 91 FAP#s HSI-091-1(166) & STP-091-1(166). Low Bidder: Liddell Brothers Inc. Bid Amount: $3,569,118 Completion Date: Sept. 1, 2013 Location: South Hadley Document Number: 606471 Project: Resurfacing and related work on a section of Route 202 (Granby Road) FAP# STP-002S(389)X. Low Bidder: Palmer Paving Corporation

Bid Amount: $771,219 Completion Date: April 6, 2013 Location: Warren — West Brookfield Document Number: 606487 Project: Resurfacing and related work on sections of Route 67 FAP# STP-002S(388)X. Low Bidder: Palmer Paving Corporation Bid Amount: $1,694,765 Completion Date: March 21, 2013 Location: Westford Document Number: 605586 Project: Resurfacing and related work on a section of Interstate 495 FAP# IM-495-6(159). Low Bidder: Brox Industries Inc. Bid Amount: $3,134,430 Completion Date: April 18, 2013 Location: Ashfield Document Number: 606411 Project: Retaining Wall repairs at two locations along Route 116 (Conway Road) FAP#s SOF-002S(378)X & STP-002S(378)X. Low Bidder: Northern Construction Service LLC Bid Amount: $1,677,621 Completion Date: Sept. 22, 2013 Location: Bellingham to Milford Document Number: 606169 Project: Resurfacing and related work along a section of Interstate 495 FAP# IM-495-5(081). Low Bidder: Brox Industries Inc. Bid Amount: $12,088,472 Completion Date: Sept. 10, 2014


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 13

160 Elm St. Unit 1 Walpole, MA 02081 (508) 660-7600 Fax: (508) 660-7614

www.lhequip.com

Doosan Equipment Allows Crews to Work More Efficiently TUFTS from page 4

The DL200 was originally brought on board for snow removal.

This past winter he also used a third wheel loader, another DL200 which was leased with an option to buy. The Doosan wheel loaders were stationed at three of his larger commercial accounts. At these locations the snow has to be hauled away to an asphalt lot where it eventually melts. “These machines, equipped with snow pushers, allow us to complete our work really fast,” Spinosa said. “Each wheel loader takes the place of two pickup trucks with plows. Matching the right equipment to the requirements of the site allows us to price the job correctly. That’s the key to a successful snow removal business.” Once the snow is plowed off to the side, the pusher attachment is replaced with a 3-yd. bucket on the DL200 machines and a 3½yd. bucket on the DL250. The snow is loaded into trucks and hauled away. “The DL250 High Lift machine allows us to fill trucks faster and to heap the snow higher,” Spinosa said. “It lifts 1½ feet higher than the previous brand of wheel loader we used. I no longer have to worry about damage to our trucks.” Spinosa said his operators really like the wheel loaders. “The machines are easy to use, the cab is spacious and visibility is excellent,” he said. “I like the fact that I am getting a better machine for a better price. They are very good machines and a very good value.” You can read more about Doosan wheel loaders by visiting www.DoosanEquipment.com. There you will find a complete list of Doosan wheel loaders, including product specifications. This article was reprinted with permission from DoMORE Magazine, Spring 2011 Issue.


Page 14 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX A T EQUIPMENT INC ......................................................7 ACR EQUIPMENT ..........................................................11 ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................11 BARRY EQUIPMENT CO..................................................8 CHADWICK BAROSS MA..............................................7,9 CLASSIFIED ..................................................................11 CONTRACTOR’S CORNER ..........................................11 COR EQUIPMENT SALES ..............................................5 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS ......................................................1 ITL AUCTIONEERING ......................................................1 J R VINAGRO CORPORATION ......................................1 KRAFT POWER CORP ....................................................1 LORUSSO HEAVY EQUIPMENT LLC ..........................13 LOU GIZA EQUIPMENT....................................................1 LUBRICATION TECHNOLOGIES INC ..........................11 MID CITY STEEL CO ......................................................11 MILTON CAT ....................................................................11 MULTI MACHINE INC ......................................................1 ROGERS BROTHERS ....................................................15 THE N.I.C.E. COMPANY ..................................................8 TYLER EQUIPMENT CO ..............................................3,5 W I CLARK CO..................................................................2 WOODCO MACHINERY ................................................16 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Wright Express Releases Construction FCI Results Wright Express Corporation in collaboration with IHS released results of its Wright Express Construction Fuel Consumption Index (FCI), which indicated a decrease of 0.8 percent in September versus its level the previous year. The Wright Express Construction FCI measures national fuel consumption statistics for the construction industry, which provides an accurate and up-to-date indication of construction activity in the United States. “The decline in the year-over-year results, combined with the first monthly uptick seen in recent reports, serves as another reminder that the U.S. construction industry has yet to forge a clear path to recovery,” said Rick Pomerleau, vice president, corporate development at Wright Express. Wright Express worked with IHS to capture and analyze transaction data from its closed loop network of more than 180,000 fuel and vehicle maintenance locations, including more than 90 percent of the domestic retail fuel locations and 45,000 vehicle maintenance locations. With this data, the Wright Express Construction FCI can be used to identify emerging trends within the construction industry and the national economy. The indicators were tested at monthly, quarterly, and annual frequencies, with the greatest insights produced using the yearover-year percent change of the monthly data. For September 2012, the Wright Express Construction FCI reported that fuel consumption by U.S. construction companies increased 0.7 percent versus the previous month and decreased by 0.8 percent versus September 2011. Last month’s Wright Express Construction FCI corresponded with decreased construction spending levels evident in most of the government’s subsequent construction data releases, which reinforced the short-term picture of a weak construction market. Construction spending excluding improvements — a good measure of activity — declined by 0.4 percent in August, while private residential construction showed positive growth of 3.0 percent. August housing permit statistics mirrored the declining fuel consumption index by falling 1.0 percent in August to an annual

rate of 803,000. Housing starts did climb to their second highest level since October 2008 with an increase of 2.3 percent in August. Total construction put-in-place decreased by 0.6 percent in August. IHS Analysis According to the IHS analysis, the mild rise in the Wright Express Fuel Consumption Index in September coincides with recent housing statistics, which suggests modest improvement. Existing home

“ The decline in the year-over-year results ... serves as another reminder that the U.S. construction industry has yet to forge a path to recovery.” Rick Pomerleau Wright Express

sales jumped 7.8 percent in August, which is the best figure since May 2010. Although there were some larger increases in 2009 and 2010, those were boosted by tax credits, while increased home sales in August were driven by economic fundamentals including an improving economy, low interest rates, and a drop in home sales cancellation rate. Normal economic conditions are still at least a couple of years away even though the housing market is expected to see some improvement this year. The rise of home prices in recent months is due to a rising demand by investors, low interest rates, and a drop in the proportion of distressed sales. Any gain in prices is good news because the price gains reduce the number of homeowners with “underwater” mortgages. The housing market will continue to improve, as long as the economy is creating jobs. The current economic outlook, however, is for a modest recovery that lasts three to four years, not the sharp upswing that characterizes most housing recoveries. The Wright Express Construction FCI for September 2012 is available at www.wrightexpress.com/fci.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • December 5, 2012 • Page 15

Tyler Equipment

C.N. Wood Co., Inc.

Joseph Equipment Company

251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351

200 Merrimac St. Woburn, MA 01801 (781) 935-1919

300 Gay Street Manchester, NH 03103 603-641-8608

Avon, MA (508) 584-8484

www.josephequipment.com

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848

www.tylerequipment.com

Johnston, RI (401) 942-9191

www.cn-wood.com


Page 16 • December 5, 2012 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

140 Wales Avenue Avon, MA 02322 508-584-8484

www.woodcomachinery.com

22 North Maple Street Woburn, MA 01801 781-935-3377

60 Shun Pike Johnston, RI 02919 401-942-9191


Turn static files into dynamic content formats.

Create a flipbook