New England 22 2013

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

ForMErly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

October 23 2013

95 91

7

495 6 195

395

95 91

3

84 6

84

6

E

q

u

I

P

m

E

N

T

g

u

I

D

E

95

95

Vol. XlIX • No. 22

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection •  Kent Hogeboom 1-800-988-1203

2013 EZ-Screen 1200XL

WE STOCK RUBBER TRACKS for Over 2,500 Models! Some Used Tracks Available.

BEST PRICES! • GUARANTEED TO FIT

Lee Kennedy, W.L. French Join Forces to Build $297M Winsor School Complex

• HIGH QUALITY • FAST SHIPPING

By Jay Adams 888-888-1248

New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$39,500 plus freight. Other Screeners Available

Kraft Power Corporation

Engines, Parts & Service

800-969-6121 Woburn, MA & Syracuse, NY

Authorized Deutz Distributor

WANTED

www.ez-screen.com

CATERPILLAR EQUIPMENT

866-745-5828

Call Lou Giza

ArguS INDuSTrIAl CO.

603-595-2090 WANTS YOUR HAMMER REPAIR CALL 888-81-GORILLA (46745)

Kraft Power Corporation Perkins Master Service Dealer NJ, MA & NY Engines, Parts & Service

800-969-6121 www.kraftpower.com

www.foleyengines.com

w

For More Display/Classified Ads See Page 12

CEG CORRESPONDENT

It takes two companies with a combined 75 years of experience to tackle a project this big. Lee Kennedy Company of Quincy, Mass., celebrating its 35th anniversary this year, is the builder and designer. W.L. French Excavating Corporation of North Billerica, Mass., celebrating its 40th anniversary this year, is the site contractor hired to do the complete site package. Working jointly, the two wellrespected Boston-area contractors have begun phase one of a two-year, potential $297 million project that will expand and rebuild The Winsor School complex, all of the infrastructure and roads leading to it and all of the utilities that dot those roads. Thomas Dion, executive vice president of W. L. French Excavating Corporation, estimated timetable for phase one of the project is May of this year through March 15, 2015. “Work on the interim parking lot started at the end of May 2013. This work consisted of demolition of the existing tennis courts and construction of an interim parking lot for students and faculty displaced by the CPAW construction project,” said Jon Shattuck According to The Boston Redevelopment Authority News Web site, the private investment and total cost of this project is nearly $300 million of heavy iron excavating, building, septic and utility work see WINSOr page 4

Thomas Dion, executive vice president of W. L. French Excavating Corporation, estimated timetable for phase one of the project is May of this year through March 15, 2015.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
New England 22 2013 by Construction Equipment Guide - Issuu