1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
Formerly
95
202
7
®
91
9
95
93
2
95 2
93 90
90
7
August 26 2015
95 91
7
495 6 195
395
95 91
3
84 6
84
6
E
q
u
I
p
m
E
N
t
G
u
I
d
E
95
95
Vol. XLIX • No. 17
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Amanda Hogeboom-merritt 1-800-988-1203
Millennium Tower Will Rise to Give Boston’s Skyline an Updated Look By Jay Adams CEG CORRESPONDENT
2015 EZ-Screen 1200XLS
WE WANT YOUR HAMMER!! • Repairs • Rebuilds • Replacement Parts in Stock
25% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
WE STOCK RUBBER TRACKS for Over 6,000 Models! A NJ, TX, WSES U WAREHO
Some Used Tracks Available.
• HIGH QUALITY • FAST SHIPPING
New Option Separate 3 products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
$41,900 plus freight.
• GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248
Other Screeners Available
ArGuS INduStrIAL CO. www.ez-screen.com
866-745-5828 Buy or Rent
YOUR ONE-STOP HYDRAULIC HAMMER SHOP™
Cat D5C Dozer M.G. Equipment Call Phil
(413) 427-7171
New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!
CALL 888-81-GORILLA(46745) *Some restrictions apply
www.foleyengines.com
Of all the many examples of Boston changing its skyline, the most symbolic is the Millennium Tower, shooting up from a big hole in the ground that was once the Filene’s Basement building. In the shadow of the big dig, at the end of the nation’s economic collapse in 2008, Boston was a maze of crumbled bridges, cracked highways and decrepit buildings, decaying and empty in gritty back streets. According to the Boston Redevelopment Authority (B.R.A.) about 70 construction projects are just finishing, are ongoing or starting in Boston — including the Boston Landing New Balance headquarters developments, one of the biggest and important new buildings erected in the city in Of all the many examples of Boston changing its skyline, the most symbolic is the Millennium Tower, shooting up from a big hole in the ground that was once the decades. As B.R.A. Director Brian Filene’s Basement building. Golden recently said to WBUR, a major media outlet in the heart of downtown, “We’re going and new corporate headquarters, such as the greatly-anticithrough what is arguably the biggest building boom in the pated Millennium Tower, rising from what Golden called a huge scar in Boston’s earth. history of the city of Boston.” “The heart of downtown Boston had a gargantuan crater in it for years and that vexed city hall and the B.R.A. tremenDowntown Projects The irony is not lost on Golden or his colleagues at the dously,” said Golden. “So, to see one of the tallest buildings B.R.A. Boston has always had the reputation as one of the in Boston growing from that site is a really important sign of most difficult cities to traverse — with no logic in its road Boston’s economic resiliency and recovery. That really removed a psychological wound and sent a signal…that we plan, narrow, one-way boulevards and no parking. What is gratifying to Golden and other members of his were back and better than before.” group is that more than a dozen projects are centered in the Unexpected Community Advantages downtown and other core neighborhoods — 14 in South When the economy collapsed at the end of 2008, projects Boston and the waterfront or seaport districts. These projects include high-rise, high-end housing com- defaulted and lost financing. The B.R.A. said the permitting plexes, housing for middle income people in the workforce see SKYLINE page 4
Page 2 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
THE W.I. CLARK COMPANY Brookfield, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316
2009 Vogele 5103-2
2013 Leeboy 8616 Paver
2012 Weiler P385
Cummins, Carlson EZ-IV Electric Screed, Grade & Slope, and Auto Lube, Full Wear Item Rebuild and Complete Service with 0 hrs, stk# 21896 ..................................................$195,500
530 hrs, Kubota, HD poly pads, power crown, grade and slope. stk# 21988................$185,000
555 hrs, Cat diesel, 8-16’ electric screed, 14” augurs, poly pads, like new condition. stk# 22341...................................................$117,500
2012 Bobcat A770
2012 Deere 244J
2000 IR DD-28HF
c/air, 4 wheel steer, fully loaded, 84” bucket, great condition. stk# 22562 ..................$49,500
490 hrs, c/air, 3rd valve hyds, hyd coupler, 1 yd bucket, loaded up and Deere Certified Used. stk# 22458 ............................................$73,500
ROPS, Kubota diesel, 47” drums, psi water system, ready for work. stk#22342........$21,500
2010 Deere 544K
2010 Deere 326D
1999 Wirtgen 1900DC
REDUCED PRICE 6100 hrs, c/air, hi lift boom,ride control, 3 yd bucket, new rubber, stk# 22304 ..........$105,000
Front door, 72” bucket, foot controls. Nice shape. stk# 22441 .................................$29,500
New Mercedes diesel with 500 Hrs, 6’5” drum and discharge conveyor @ 75%, 70% undercarriage, stk# 22383 ......$105,000 $95,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 3
Purpose-built
from the ground up by Material handlers from SENNEBOGEN – 444,000 4,000 llbs. bs. tto o 75 7750,000 0,000 llbs. bs. Simple S imple design… design… Lift Lift more. morre. Mov Movee faster.. Save Save fuel. fuel. Run Run longer.
www.tylerequipment.com 251 Shaker Road East Longmeadow, MA 01028 800.292.6351
1980 Berlin Turnpike Berlin, CT 06037 800.352.4473
Page 4 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Development Boom Brings Big Changes to Boston’s Skyline
Boston Globe photo Campion and Company photo
Projects include high-rise, high-end housing complexes, housing for middle income people in the workforce, and new corporate headquarters, such as the greatly-anticipated Millennium Tower.
NEW ENGLAND EDITION Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Main office
Toll Free Fax Web site Editorial e-mail Advertising e-mail
Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Tom Weinmann Cathy Printz
470 Maryland Drive Fort Washington, PA 19034 215/885-2900 800/523-2200 215/885-2910 www.constructionequipmentguide.com editorial@cegltd.com production@cegltd.com
For advertising rates: Contact
Edwin M. McKeon Jr.
215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910 e-mail tmckeon@cegltd.com Amanda Hogeboom-Merritt • New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail amerritt@cegltd.com Contact
Kent Hogeboom • New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com Contact
“To see one of the tallest buildings in Boston growing from that site is a really important sign of Boston’s economic resiliency and recovery. That really removed a psychological wound and sent a signal…that we were back and better than before,” said Brian Golden, B.R.A. director. Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2015, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.
SKYLINE from page 1
process never really stopped — that builders had enough vision to see the cycles that drive the real estate market, the city and the overall economy. There were other unexpected advantages as well. “The boom in development has allowed us to engage with the community in ways we weren’t afforded during the development lull. This is perhaps one of the greatest opportunities for us; to get feet on the ground and to introduce ourselves to Boston residents,” said Colin Smith, assistant director of media and public relations of B.R.A. “With new leadership in place here at the B.R.A., it’s important that we meet with neighborhoods and reinforce the importance of collaboration through a public process. “To underscore what a difference a few years makes, at the end of 2009 there were 4.5 million square feet of projects under construction. Today, nearly 13 million square feet are being developed,” said Smith. “Despite the impacts of the recession on construction in Boston, we were still approving a significant volume of projects during the down years.” Those who have underestimated Boston’s ability to come back have been proven wrong going back to the American Revolution and Bunker Hill. “People understand that the market goes through cycles, but Boston is a growing and desirable city. It was only a matter of time before the projects approved during the recession started to take off, and that’s what we’ve seen the past couple of years as developers have had an easier time attracting financing,” said Smith. Smith and Golden credit robust public engagement and a streamlined development review process outlined in Article 80 for accelerating the approval, permitting and execution of see SKYLINE page 8
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 5
STRONGCO Company
CHADWICK-BAROSS 15 Katrina Road Chelmsford, Massachusetts Call Dan Rott 1-978-479-5192 www.chadwick-baross.com www.cbused.com
THE N.I.C.E. COMPANY 9 Rosenfeld Drive, Hopedale, MA Toll Free# 888-717-8096 • www.theniceco.com
We sell NICE machines! RENT ME!!
2014 KOMATSU PC138: AS NEW, only 340 hours, JRB coupler, plumbed $144,500 ONLY $139,000
NEW 2014 CASE CX210C LR EXCAVATOR: Brand New w/Long Reach, 50’ Front, No Bucket $139,000
RENT ME!!
NEW 2014 Hyundai Robex R140LC-9A EXCAVATOR: Brand New, Equipped w/Factory Plumbing, AC, Bucket w/Teeth, Quick Coupler $115,000 $109,000
RENT ME!!
NEW DOOSAN 225LC: with Factory Plumbing. Only $149,000 $139,000
RENT ME!!
2009 CAT 319DLN: 42k Lbs, QC,
2012 VOLVO EC340DLC:
Plumbed, 3300 hours. Only $109,000
only 2400 hour! Plumbed $159,000
RENT ME!!
2011 Doosan DX255LC: QC, tilt-
2008 Terex TA35: 4,200 hours,
ing, digging buckets, 6K hours. Marked Down! Only $139,000
very nice. $139,000 $119,000 or rent for $9,000 per month
RENT ME!!
2007 KOMATSU PC158: 2013 Cat 305E: Plumbed, Trenching Bucket $47,500
4200 Hrs, Plumbed, Quick Coupler, Hard to Find These Machines with Fairly Low Hours! $79,000
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
A
WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT
Page 6 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 7
WHEEL LOADER MANIA
Special 0% s on Select Model
Rental Purchas Programs & Lea e Programs Availa se ble
DOOSAN HAMMER, 5000 Lb Hammer Brand New! Rent Me!
1979 HANOMAG 44C, 2.5 yard, New rear end, new drive shaft, new main hydro pump, new water pump,new block heater, new valve cover gaskets, new manifold gaskets, one new manifold ..........................................................$14,900
2006 CAT TH360B, Aux hyd, canopy, Perkins 4cyl engine, hyd self leveling, Machine is clean and runs well. 6,600lb capacity., Hours: 3,100, Stock Number: CS2311............................$36,000
2008 KOBELCO SK210 LC-8 ACERA, Nice clean running machine, HD Esco bucket with new teeth, Ice cold AC, Radio. 51,000lb machine, Hours: 2,603, Stock Number: CS2300 ....$79,000
2014 KAWASAKI 42ZV-2, Hydraulic quick connect bucket, 3rd spool hydraulics, AC, Radio, machine ready to go, qualifies for low rate programs, Hours: 359, Horse Power: 45..$63,000
2007 KAWASAKI 70TMV-2, Stk #: CS2117, 3.2 yard bucket, quick coupler, radials. Clean tight machine ready to go, Hours: 5,814, Horse Power: 174 ..............................................$85,000
1982 CASE 1450B, Nice running machine, ready to be worked., Hours: 2,652, Stock Number: CS2305 ....................................................$35,000
2011 KAWASAKI 45ZV-2, Stk #: CS1315; Kawasaki 45ZV-2 wheel loader 2011, 479 hours, hydrostatic, hydraulic quick couper, bucket. Machine has AC., Hours: 479, Horse Power: 61 .. ................................................................$75,900
1996 KAWASAKI 65Z IV, S/N: 65J20405, Previous town loader, tires 6 months old, newer paint, solid running loader, Hours: 12,000$48,000
1995 KAWASAKI 65Z IV, S/N: 65J2-0522, This loader has been gone through from front to back. New Factory Transmission, New Bucket, New Rubber 20.5 x 25 Bias, New, Hours: 27,000 ........ ..................................................................$49,000
2013 KAWASAKI 65ZV-2, 3rd spool, ride control, JRB hyd coupler, Radials, low hours, Hours: 933, Horse Power: 149 ..................................$139,000
2012 KAWASAKI 65ZV-2, High Reach, 3rd spool, Ride control, 3.2 yard bucket, Bias ply rubber, low hour nice machine, Hours: 684, Horse Power: 149..............................................$128,000
2012 KAWASAKI 65ZV-2, Just off snow rent. 20.5 rubber Bias ply, quick coupler, oversize bucket, High lift arm reach, extra light package., Hours: 620, Horse Power: 149................$124,900
2014 KAWASAKI 67Z7, Low hour machine, Radials, ride control, JRB quick coupler, Hours: 371 ..............................................................CALL
2014 KAWASAKI 67Z7, Low hour, Radials, Ride control, 3rd spool hydraulics, Interchange coupler, Hours: 402 ..................................................CALL
2002 SCHAEFF SKL824, Super clean, two speed hydro, 4-1 bucket, quick coupler, AC, Heat, radio, ready to work, Hours: 747..............$38,900
YANMAR C30R Rent Me! Will Go Anywhere!
NEW KAWASAKI 70Z7
2013 CAT 312E, Very clean 312E, hyd coupler, Aux hyd, low hours, Brand new Fleco HD 42" bucket. Machine ready to go to work, Hours: 1,037, Stock Number: CS2312 ..............$119,000
2006 HYUNDAI HL760XTD-7, Good running machine, extended reach arms, 4.25 yard bucket., Hours: 6,300 ......................................$59,000
Call us.
391 Loudon Road • Concord, NH 03301
(800) 358-6007 (603) 225-3361 • Fax: (603) 225-4918 www.ewsleeper.com Serving Construction Contractors & Municipalities Since 1964
Page 8 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Onward, Upward: Boston Expanding With New Skyline SKYLINE from page 4
a multitude of projects of significant size. In 1996, the Boston Redevelopment Authority adopted Article 80 to provide clear guidelines for the development review process relating to large projects, adding more than 50,000 sq. ft. (4,645 sq m); small projects, greater than 20,000 sq. ft. (1,858 sq m); planned development areas; new overlay zoning districts for project areas larger than one acre; and institutional master plans, projects relating to academic and medical campuses. Article 80 was adopted because the parameters of these unique projects rarely fit neatly within the existing zoning code, and a more predictable review process was needed. The Article 80 process may include, but is not limited to, review of a project’s impacts on transportation, public realm, the environment and historic resources. B.R.A. project managers assist developers in navigating the Article 80 process. Public input is encouraged throughout a project’s review timeline. “A big part of development review is the public process. We advertise community meetings and have an extensive set of outreach tools, like an online calendar, weekly newsletters and an optimized social media presence,” said Smith. “This ensures that neighborhoods stay informed and engaged, and that development teams remain accountable to the communities they serve.” With the city’s configurations and dimensions set decades ago and 70 projects in the pipeline, it may be possible for Boston to expand even further. “We’re asking ourselves that question now. The first citywide plan in 40 years recently launched, Imagine Boston 2030 [www.ImagineBoston.gov] and a consultant was just chosen to lead the charge,” said Smith. In an interview with WBUR’s “Morning Edition,” David Carlson, deputy director of Urban Design of B.R.A. said, “The city has been described as a city on a hill, but as for design, it’s a city on many hills. Boston has always been about innovation, not easily categorized as a city with a single vision. “…[We have an opportunity to] rise up and catch the
More than a dozen projects are centered in the downtown and other core neighborhoods — 14 in South Boston and the waterfront or seaport districts.
[development] wave and [ride] it as far as we can, using that force of development to infill the areas where the city could use some better treatment. The tougher places are the ones you could advocate for when [there is a]…boom like the one we’re experiencing,” said Carlson. “Growing up [instead of expanding outward] could be very healthy for the city. In general, cities are all about density and a concentration of people coming
together. We have tried quite deliberately to push for taller buildings and have a near 700-foot tower [Dalton Street] in development,” said Carlson. Regarding Boston’s character and culture, Carlson said, “Boston has very strong bones. What you experience when you come to Boston is the nature of Boston, [which is] not just the physical fabric of Boston; and so both are going to endure.” For more information, visit www.bostonredevelopmentauthority.org. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.) CEG
industrytap photo
Developers credit robust public engagement and a streamlined development review process outlined in Article 80 for accelerating the approval, permitting and execution of a multitude of projects of significant size.
archpaper rendering
A rendering of the New Balance headquarters.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 9
WE WANT YOUR HAMMER!! Turn in your competitor’s brand hammer (no inspection required) and receive at least 25% off *(trade in value) toward a new “same class” RAMFOS Hammer.
Customers can rely on our Ramfos factory trained team to provide hammer parts and rebuild with original parts as quickly as possible, so no jobs suffer from down time. At Equipment East we understand that downtime is a waste of money. We will not waste your time.
Designed for Noise sensitive areas
Dual speed control system
Extreme performance and low maintenance
www.equipmenteast.com SALES • RENTALS • PARTS • SERVICE
61 Silva Lane Dracut, MA 01826 (978) 454-3320 Fax: (978) 454-3325
Page 10 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
DOOSAN DELIVERS
The Doosan lineup of heavy equipment offers strong performance in the areas that matter most — from powerful bucket forces on excavators to superior payload capacities on articulated dump trucks and exceptional lifting capabilities on wheel loaders. And with our unbeatable warranty, dedicated dealer support and versatile attachment selection, one thing is certain: Doosan delivers. Call or visit your local authorized dealer today and see the Doosan difference. Authorized Doosan Dealers
Equipment East, LLC 61 Silva Lane • Dracut, MA 01826 • 978-454-3320 • www.equipmenteast.com
Barry Equipment Co., Inc. 30 Birch Island Road • Webster, MA 01570 • 508-949-0005 • www.barryequipment.com
F&W Equipment 164 Boston Post Road • Orange, CT 06477 • 203-795-0591 • www.fwequip.com
Central Equipment Company 45 Dempsey-Greaves Lane • Stillwater, ME 04489 • 207-827-6193 • www.centralequipmentco.com
Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. 15-D008
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 11
A VERSATILE AND AFFORDABLE SNOW REMOVAL PACKAGE
Chappell Tractor has been putting together snow removal packages for New England Winters for almost as long as we’ve been around. This Hyundai equipped with the one of a kind Kage snow removal system combines the best features of a snow pusher and a traditional plow. Learn more at hceamericas.com.
CALL FOR DEMO AND PRICING
Milford, NH 800.698.2640
Brentwood, NH 800.616.5666
www.chappelltractor.com
Page 12 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
DISPLAY ADS/ CLASSIFIEDS Classified Rates: 30 Words or Less for $30.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034
Hydraulic Cranes 8 to 600 Ton
Local Dealer For Kundel Trench Boxes & Road Plates
Daily & Hourly Services
100% AmericAn mAde
Locations in: Millis, MA & Tamworth, NH www.northeastshoring.com (888) 422-4343 “We’ll help keep the trench, & OSHA…Off your back!”
215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 CRANES
Mini Excavators
Crane Inspections
2014 Terex TC20, Mini Excavator / Backhoe, Rubber tracks, 20'' bucket with hitch, New condition, 8 hrs ..$32,000.
FLAT RATE INSPECTIONS
www.astrocrane.com
Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666
All Types, Any Model Cranes OSHA Inspected and Certified Certified OSHA and ANSI Full-Time Inspectors
FOR SALE
1994 Thunderbird 840 TB Material Handler 62 ft. reach, 3 yd. clam shell bucket w/360 degree turn, 3.5’ undercarriage Call Vito for Pricing: 516-746-4535
PLACE YOUR BUSINESS CARD HERE!
We’ll design your ad for free!
Dielectric Testing Call 800-325-6455 Stephenson Equipment Visit our website: www.stephensonequipment.com ALL TYPES OF CRANES INSPECTED AND CERTIFIED Accredited by the US Dept. of Labor Under 29CFR Part 1919 and Accredited by CALOSHA Call 215-639-2579 Atlantic Crane Inspection Services Visit us at www.atlanticcrane.com
EXCAVATORS Hydraulic Excavators
Place Your Business Card for... 3 months
$300*
only $50 an issue
6 months
$585*
only $45 an issue
12 months
$1040*
only $40 an issue
Call now to reserve your space! 800-225-8448 * pre-payment required
2010 Doosan DX350LC, s/n 5981 w/ Genesis LXP300 Shear Jaw (s/n 320161), 4,221 hours ..................Accepting Offers. Elcor Inc. 201-997-8810 dl@elcorinc.com 2006 CAT 330DL, Cab w/ Air, Double Acting Aux Hydraulics., Hydraulic thumb, Good condition, 8901 hours........$118,500.
Buckeye Equipment Sales 330-612-6623
LOADERS Backhoe Loaders 1999 John Deere 410E, Cab AC, 4 x 4 Ext-A-Hoe, Good condition, 6,400 hrs ........$32,500. Road Builders Machinery & Supply 913-915-1607
Skid Steer Loaders 2014 Terex TSV90, New Skid Steer, Cab, heater, 72'' bucket, New condition ............$53,000. Buckeye Equipment Sales 330-612-6623
MATERIAL HANDLERS Material Handlers Sennebogen 825M-C, S/N 825-0-589, Fair condition, 3,481 hours ..........................$60,000. Gibson Machinery 440-439-4000
=========== DAILY AND WEEKLY
Groff Tractor & Equipment Inc. 717-766-7671
EQUIPMENT RENTALS
2008 Kobelco SK170, Long undercarriage, 8'10'' wide tracks, Diesel engine, 17'1'' standard boom, 10'2'' standard arm & mechanical thumb, 4,398 hrs ..............................$87,500.
RENTMACHINES.COM
Martin Implement Sales 708-349-8430
CLOSE TO YOUR JOB SITE
CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 13
800..3 358.60 007 603..2 225.33 361
Is Your Screen-All Worn Out?
Designed for a wide variety of applications such as gravel & sand pits, landscaping, top soil and compost producers.
Can Load with 1/2 yard to 5 yard Bucket
Available models: SCM 27 - SCM-40 - SCM-75
NorthlandJCB.com
New & Rental Sales
Page 14 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc •Maine... Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc • Somerset • Waldo • Washington • York • Androscoggin • Aroostook • Cumberland • Franklin • Hancock • Kennebec • Knox • Lincoln • Oxford • Penobscot • Piscataquis • Sagadahoc
‘Pine Tree State’ Highway Projects Let
The Maine Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Sagadahoc Contract ID: 020324.00 Location: Woolwich — on Route 1 beginning at the southern intersection of Main Street and Route 127 and extending northerly on Route 1 for 0.71 mi. to the bridge over Back River Creek. Project: Pavement milling and hot mix asphalt overlay. Contractors and Bid Amounts: • Pike Industries Inc. — $1,148,000 • Lane Construction Corporation (The) — $1,196,864 • Crooker Construction LLC aka Harry C Crooker & Sons Inc. — $1,262,539 County: York Contract ID: 022540.00 Location: Saco — located on Route 5 beginning 0.18 miles north of intersection of Pine Street, extending northerly 2.64 mi., ending 0.21 mi. north of the intersection of New County Road, Boom Road and Louden Road. Project: Pavement milling, hot mix asphalt overlay with drainage improvements. Contractors and Bid Amounts: • Shaw Brothers Construction Inc. — $784,193 • Pike Industries Inc. — $784,298 County: Hancock Contract ID: 020499.00 Location: Orland — on Acadia Highway/Route 1/3/15 over the Narramissic River approximately 0.4 mi. easterly of Route 175 junction. Project: Narramissic bridge deck replacement. Contractors and Bid Amounts: • T Buck Construction Inc. — $1,094,100 • Scott Construction Corporation — $1,182,410 County: Lincoln Contract ID: 018036.00 Location: Jefferson & Pittston — Route 126. Project: Hot mix asphalt overlay. Contractors and Bid Amounts: • Hagar Enterprises Inc. — $1,026,979 • Pike Industries Inc. — $1,038,342 • Crooker Construction LLC aka Harry C Crooker & Sons Inc. — $1,055,388 • Lane Construction Corporation (The) — $1,079,912 • All States Asphalt Inc. — $1,119,477 County: Aroostook Contract ID: 020445.00 Location: Caribou, Woodland & New Sweden — beginning 0.01 mi. north of the intersection of Sweden Street and Woodland Road on Route 161B and extending northwesterly for 1.61 mi. then continuing northwesterly on Route 161 for 6.14 mi. to 0.92 mi. north of New SwedenWoodland town line. Project: Hot mix asphalt overlay with drainage improve-
ments. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $2,063,781 • Steelstone Industries Inc. $2,107,065 County: York Contract ID: 020288.00 Location: Biddeford — 020288.00 is located on Adams Street from Main Street to Jefferson Street/020306.00 is located on Jefferson Street from Main Street to Alfred Street. Project: Pavement milling, hot mix asphalt overlay with drainage improvements. Contractors and Bid Amounts: • Glidden Excavating & Paving Inc. — $201,115 • Pike Industries Inc. — $270,547 • Shaw Brothers Construction Inc. — $287,409 County: Statewide Contract ID: 021162.15 Location: Brunswick — at 107 Bath Road (Route24). Project: Horizontal directional boring. Contractors and Bid Amounts: • Enterprise Trenchless Technology Inc. — $50,988 • Shaw Earthworks — $198,900 County: Southern region Contract ID: 020273.00 Location: South Portland — on State Route 703. Project: Pavement milling, hot mix asphalt overlay with drainage and safety improvements. Contractors and Bid Amounts: • Shaw Brothers Construction Inc. — $2,649,949
• Pratt & Sons Inc. — $2,882,248 • Pike Industries Inc. — $3,157,091 County: Androscoggin Contract ID: 019104.00 Location: Mechanic Falls & Oxford — on Route 26. Project: Hot mix asphalt overlay with drainage and safety improvements. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $771,765 • Glidden Excavating & Paving Inc. — $861,095 • Pike Industries Inc. — $863,076 • F R Carroll Inc. — $926,337 • All States Asphalt Inc. — $949,634 County: Androscoggin Contract ID: 008850.31 Location: Lewiston — on Route 196. Project: Highway reconstruction and mill and fill. Contractors and Bid Amounts: • Lane Construction Corporation (The) — $2,247,488 • Pratt & Sons Inc. — $2,309,529 • Pike Industries Inc. — $2,658,450 County: Aroostook Contract ID: 012780.00 Location: Caribou — on Route 161. Project: Highway reconstruction. Contractors and Bid Amounts: • Soderberg Company Inc. — $4,677,954 • Ed Pelletier & Sons Company — $4,946,717 • Mcgillan Inc. — $5,721,798 • Sargent Corporation — $5,942,100
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 15
h ual 36t Ann
2015
The
New England
Public Works
Expo Sponsored by
September 17th
September September 2233rd
September 8 a.m. - 3 p p.m. .m.
18th
September September 2244th 8 a.m. - 2 p p.m. .m.
H Holiday oliday IInn nn Boxborough, B oxborough, MA tt 0 WWFS WFOEPST TIPXDBTJOH UIFJS FS WFOEPST TIPXDBTJOH UIFJS Q QSPEVDUT BOE TFSWJDFT SPEVDUT BOE TFS WJDFT t &EVDBUJPOBM 4FNJOBST &EVDBUJPOBM 4FNJOBST t 3BĒFT 3BĒFT t Co omplimentary mplimentar y B BBQ BQ t $PNQMJNFOUBSZ "ENJTTJPO $PNQMJNFOUBS Z "ENJTTJPO t "OUJRVF &RVJQNFOU %JTQMBZT "OUJRVF &RVJQNFOU %JTQMBZT
www.nepublicworksexpo.org
NHDOT Works Toward Project to Eliminate Erosion at Bridge CORNISH, N.H. (AP) The New Hampshire Department of Transportation hopes to start work next year on a project to eliminate erosion around supports of a historic covered bridge connecting the state to Vermont. The Eagle Times reports state officials met with the Cornish Selectboard and residents during a public hearing on the $2 million project. Officials say the flood-related erosion, known as scour, is critical at the 149-yearold Cornish-Windsor Bridge.
The project calls for the removal of vegetation around the abutment on the New Hampshire side. It would be replaced with stone to create a smooth surface on the downstream side. The Vermont abutment will receive the same treatment, but on the upstream side. Officials hope to start the project in September 2016. (This story also can be found on Construction Equipment Guide’s Web site at www.constructionequipmentguide.com.)
Keep Up With All the Industry News Subscribe to
Construction Equipment Guide Today! Toll Free 800/523-2200
Page 16 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Vermont... Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison •
‘Green Mountain State’ Highway Projects Let
The Vermont Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Rutland Towns: Fair Haven and West Rutland Contract ID: 13B062 Location: Fair Haven — Bridge 5E over Vt. 22A and Bridge 5W over Vt. 22A. West Rutland — Bridge 13E over Clarendon Pittsford Railroad and Castleton River and Bridge 15E over Vt. 133. Project: Removing and replacing the sheet membrane waterproofing and bituminous concrete pavement on the bridge and its approaches along with minor related work. Contractors and Bid Amounts: • Peckham Road Corporation — $852,692 • Cold River Bridges LLC — $1,067,329 • Kubricky Construction Corporation — $1,245,300 • Parent Construction Inc. — $1,619,345
County: Chittenden Town: Colchester Contract ID: 95J298 Location: The TH27 crossing over the Indian Brook on the north end of Mill Pond Road and adjacent to the Mill Pond Dam. The bridge is 0.4 mi. south of the Vermont 2A and TH27 intersection. Project: Replacement of Bridge No. 12 including approach roadway and channel work. Contractors and Bid Amounts: • A.L. St. Onge Contractor Inc. — $988,641 • Parent Construction Inc. — $1,141,942 • S. D. Ireland Concrete Construction Corporation — $1,156,355 • Cold River Bridges LLC — $1,284,565
County: Windsor Town: Cavendish Contract ID: 11G368 Location: GMRC mi. post 21.059 in Cavendish on Cavendish Gulf Road, Town Highway 32. Project: Cleaning stone box culvert under railroad bridge, and embankment and approach stabilization with the installation of precast concrete retaining wall. Contractors and Bid Amounts: • Cold River Bridges LLC — $437,955 • J. P. Sicard Inc. — $677,738 • CCS Constructors Inc. — $763,843
County: Washington Town: Middlesex Contract ID: 10C220 Location: On Vt. 12, beginning at a point 0.53 mi. north of the Montpelier-Middlesex town line and
extending in a northerly direction. Project: Replacement of the existing structure with related approach and channel work. Contractors and Bid Amounts: • A.L. St. Onge Contractor Inc. — $934,674 • Austin Construction Inc. — $950,948 • Winterset Inc. — $1,021,417 • Blow & Cote Inc. — $1,026,138 • CCS Constructors Inc. — $1,123,000 • Cold River Bridges LLC — $1,192,732 • Miller Construction Inc. — $1,198,435 • Parent Construction Inc. — $1,216,100
County: Windsor Town: Bridgewater Contract ID: 13B110 Location: Bridges 35, 39, 40 and 42 over Ottauquechee River. Project: Removing and replacing the sheet membrane waterproofing and bituminous concrete pavement on the bridge and its approaches along with minor related work. Contractors and Bid Amounts: • Cold River Bridges LLC — $902,211 • Miller Construction Inc. — $960,723 • Parent Construction Inc. — $1,199,917 • J. P. Sicard Inc. — $1,218,802 • Kubricky Construction Corporation — Irregular
County: Windsor Town: Andover Contract ID: 12B140 Location: Beginning on Vt. 11 approximately 4.0 mi. east of the intersection of Vt. 11 and Vt. 121 and extending westerly along Vt. 11 for 0.024 mi.. Project: Removal and replacement of deck and superstructure with minor substructure repairs, related roadway approach and channel work. Contractors and Bid Amounts: • Renaud Brothers Inc. — $909,587 • Cold River Bridges LLC — $1,125,800 • Miller Construction Inc. — $1,133,230 • Casella Construction Inc. — $1,136,698 • CCS Constructors Inc. — $1,185,297 • Parent Construction Inc. — $1,235,693
County: Addison Town: New Haven Contract ID: 13G522 Location: On Vermont rail line (northern section). The culvert is located north of the overpass of Lime Kiln Road (Th 8) over the railway. Project: Installation of temporary railway bridge to maintain service, removal and replacement of existing box culvert, rail approach, and channel improvements. Contractors and Bid Amounts: • Engineers Construction Inc. — $2,425,000 • CCS Constructors Inc. — $2,456,000
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 17
CONSTRUCTION AUCTION DAVIS AUCTIONS, INC.
SAT., SEPTEMBER 26, 2015 • 9:00 A.M. LOCATION: 210 CHESHIRE ROAD, RT. 68 PROSPECT, CT
THINK SUNSHINE!!!
Davis Auctions, Inc. will be conducting our next auction of utility and construction equipment and related supplies on September 26, 2015. This auction will consist of excess equipment in exceptional condition from a large contractor, along with equipment from power companies and municipalities, to be sold in absolute.
Early Consignments:
EQUIPMENT Wheel Loader Backhoe: 1998 JOHN DEERE 610C; JOHN DEERE 310SG, EROPS, air/heat, Extendahoe, 4x4; CASE 590 Turbo, 4x4; Dozers: DRESSER TD8, w/6 way blade, rebuilt undercarriage; Articulating Grader: GEHL MG747, w/scarifier & front blade, dsl; Wheel Loader: CAT 920, EROPS; Wheel Tractor: KUBOTA GF1800, w/mower, dsl, 4x4; KUBOTA L35, w/loader & backhoe, 4x4; JOHN DEERE 650, s/loader, 4x4; JOHN DEERE 445, w/loader & mower; JOHN DEERE; Boom Lift: GENIE S40 40’; Scissorlift: UPRIGHT LX31, 4wd Platform Lift: (2) 2009 BRAVIISOL/AEUP IAWP-9.6, Electric; Wood Chippers: WOODCHUCK W/C 16A; 2007 ALTEC DC217, Cat dsl; 2004 WOODCHUCK Hyroller 1200, Cat dsl; Forklifts: DATSUN 5000; Clark GCS15; Paver: CAT AP-200B, Hatz dsl; Sweeper: 1994 ELGIN Pelican Series SE; Attachment: Sweeper Unit; BOBCAT Backhoe; Miscellaneous: 2010 RHM GF6+LM Towable Backhoe, gas; TORO STX-26 Stump Grinder; Hyd. Power Unit, Cat dsl; (2) TIRE SHARK Tire crushing Machines; Quick Attach Brush Grapple Bucket; Trailer Mounted 6” Water Pump; ERA Snow Blower; Antique Backhoe Bucket;
INSPECTION: FRIDAY, SEPTEMBER 25, 2015 Call for more information: DAVIS AUCTIONS, INC. (203) 758-4087 or 1-800-201-4368 www.davisauctionsinc.com
VEHICLES Bucket Truck: 2003 FORD F750 Ext. Cab, w/Holan 45’ MC bucket; 2002 FORD F450, w/MTI A28 telescopic bucket & enclosed utility body; Tractor: 2001 STERLING LT9500 Tandem Axle; Crane Truck: 2006 INT’L 7500, w/Manitowoc National 500E 70’ 18 ton Crane; Dump Truck: 1985 MACK; Flatbed Truck: 1990 CHEV. 2500; Box Trucks: 2005 FORD E350; Utility Trucks: (2) 2003 FORD F350XL SD, w/Reading utility body’; 1992 FORD F350, w/Reading utility body; Pickups: (2) 2009 GMC Sierra K1500 Ext. Cabs, w/tonneau cover, 4x4; 2007 CHEV. Colorado, w/tonneau cover, 4x4; (2) 2006 DODGE Dakota Ext. Cabs, w/truck tool box, 4x4; 2006 DODGE Dakota Club Cab, 4x4; 2005 FORD F350XL SD, w/lift gate, 4x4; 2004 FORD Ranger Ext. Cab, 4x4; 2003 CHEV. Silverado; 1997 FORD F150; SUV/Vans: 2011 FORD E-Series Cargo, flex fuel; 2009 GMC Savanna, AWD; 2006 FORD E250; 2005 FORD E250; 2009 FORD Escape; 2005 DODGE Caravan; 2003 DODGE Caravan; 2003 SATURN Vue; 2001 NISSAN Pathfinder; 1999 GMC Yukon; 1999 GMC Safari; Cars: 2005 HYUNDAI Sonata; 2003 NISSAN Altima; 2000 CHRYSLER Sebring Convertible; 2000 OLDSMOBILE Alero; 1996 VOLVO 850 Series; Trailers: 2015 TOPLINE TH18, 16’ flat, 2’ dovetail; SAUBER 4502 Galvanized Steel Pole; 1989 KENSINGTON KV3; Miscellaneous: JOHN DEERE LT155 Lawn Tractor; JOHN DEERE LA125 Lawn Tractor; FISHER Stainless Steel; Concrete Saw; Generators; Air Compressors; Insulation; This is our early tentative list. We accept consignments up thru WEDNESDAY prior to sale. We never know what will be consigned at the last minute – so come to our inspection and find out!
This is when/where you find out what is really here!!! For Online Bidding, Visit Realtimebid.com
TERMS: CASH OR GOOD CHECKS WITH IDENTIFICATION.
ABSENTEE BIDS ACCEPTED.
Website list frequently updated. If you don't see what you want here, visit www.davisauctionsinc.com for updates.
9:00 A.M. – 5:00 P.M. Auctioneer: Reginald Lussier Lyndonville, VT 05851 NH License# 2413
Page 18 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO................................................15 BULLETIN BOARD..........................................................12 C N WOOD CO INC ........................................................20 CHADWICK BAROSS MA ................................................6 CHAPPELL TRACTOR SALES ......................................11 CLASSIFIEDS..................................................................12 DAVIS AUCTIONS INC ..................................................17 DOOSAN NORTHERN NEW ENGLAND ......................10 E W SLEEPER CO ......................................................7,13 EQUIPMENT EAST ......................................................1,9 FOLEY MARINE & INDUSTRIAL......................................1 GORILLA HAMMERS........................................................1 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT ............................................................1 MASSACHUSETTS HIGHWAY ......................................15 MILTON CAT....................................................................12 NORTHLAND JCB ..........................................................13 ROGERS BROTHERS ....................................................19 SUMMIT SUPPLY LLC/MULTI MACHINE ........................1 THE N.I.C.E. COMPANY ..................................................6 THE W I CLARK CO ........................................................2 TYLER EQUIPMENT CO ..................................................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
South Coast Improvement Welcomes Dave Baldwin South Coast Improvement Company (SCI), a designbuild general contractor serving New England and the Mid-Atlantic states, recently announced the hiring of Dave Baldwin as a senior project manager. Baldwin comes to the Marion, Mass.-based contractor after serving as director of construction at the Nova Hotel Renovation and Construction Company of Clearwater, Fla. A construction veteran with more than 25 years’ experience, Baldwin will work out of SCI’s corporate headquarters as senior project manager on several cur- South Coast Improvement Company announced the rent South Coast hiring of Dave Baldwin as a senior project manager. Improvement projects, while enhancing the company’s presence in the the country during the course of his career. In areas of retail, restaurant and hospitality con- his previous time with SCI, he managed multiple projects in the New England and struction. “Dave has managed some complex con- Mid Atlantic regions. “I loved my time with SCI and am happy struction projects over the course of his career, including some for us when he to be back,” said Baldwin. “The company worked with us on a contract basis a few has grown quite a bit since I last worked with years ago,” said Tom Quinlan, president of them. I’m looking forward to being part of South Coast Improvement Inc. “I’ve always SCI’s future growth up and down the East known Dave as a guy unafraid to roll up his Coast.” For more information, call 508/748-6545 sleeves and get the job at hand done. We’re delighted to bring him north to be a leader on or visit www.southcoastimprovement.com. (This story also can be found on our team.” Baldwin has worked as a contractor for Construction Equipment Guide’s Web site at his own firm and several others throughout www.constructionequipmentguide.com.)
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • August 26, 2015 • Page 19
Tyler Equipment
C.N. Wood Co., Inc.
Joseph Equipment Company
251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 (800) 292-6351 Parts: (877) 255-6351
200 Merrimac St. Woburn, MA 01801 (781) 935-1919
300 Gay Street Manchester, NH 03103 603-641-8608
Avon, MA (508) 584-8484
www.josephequipment.com
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 (800) 352-4473 Parts: (860) 356-0848
www.tylerequipment.com
Johnston, RI (401) 942-9191
www.cn-wood.com
Page 20 • August 26, 2015 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Contact your local dealer:
Dealer Name City, ST 123.456.7890 City, ST 123.456.7890 City, ST 123.456.7890 City, ST 123.456.7890 Contact your local dealer: City, ST
C.N. WOOD CO., INC. 123.456.7890 Woburn, City, ST MA 781.935.1919 123.456.7890 Johnston, City, ST RI 401.942.9191 123.456.7890 Whately, City, ST MA 413.665.7009 123.456.7890
You only trust one name for keeping your facility productive and profitable.
Avon, City, STMA 508.584.8484 123.456.7890
If waste handling is your business, you know V Volv olvo. No other name offers you the most comprehensive waste management equipment on the market, with a full line of wheel loaders and excaavvators backed by our unmatched Fuel Efficiency Guarantee You’ll ou’ll push your productivity higher than and free 6-year subscription to CareT Track®. Y you everr thought possible. T Talk alk to us u today, or visit volvoce.com/smartwaste.
DEALER LOGO
Smart works.