1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
Formerly
95
202
7
®
91
9
95
93
2
95 2
93 90
90
7
July 27 2016
95 91
7
495 6 195
395
95 91
3
84 6
84
6
E
q
u
I
P
m
E
N
t
g
u
I
d
E
95
95
Vol. XlIX • No. 15
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Amanda Hogeboom-merritt 1-800-988-1203 Specializing in:
2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers Call for Pricing
MassDOT Project Replaces Casey Overpass With Grade-Level Road By Irwin rapoport CEG CORRESPONDENT
LEED Accredited in Waste Management
2016 EZ-Screen 1200XLS
GIVE US YOUR HAMMER! •Repairs •Rebuilds •Replacement Parts in Stock
30% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
YOUR ONE-STOP HYDRAULIC HAMMER SHOP™
New Option Separate 3 Products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!
$41,900 plus freight.
CALL 888-81-GORILLA(46745)
866-745-5828
Other Screeners Available
ArguS INduStrIAl CO. www.ez-screen.com
*Some restrictions apply
WE STOCK RUBBER TRACKS for Over 6,000 Models! A NJ, TX, WSES U WAREHO
Cat D7F
Some Used Tracks Available.
VERY NICE SHAPE
• HIGH QUALITY
Phil (413) 427-7171
• FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248 www.foleyengines.com
The $67 million Casey Overpass project replaces the Monsignor William J. Casey overpass in Boston, and is scheduled to be complete in the summer of 2018. The project also includes upgrades and new infrastructure for commuter rail service. Barletta Heavy Division Inc. (BHD) is working with the Barletta Heavy Division photo Massachusetts Department of The $67 million Casey Overpass project replaces the Monsignor William J. Casey Transportation (MassDOT), overpass in Boston, and is scheduled to be complete in the summer of 2018. the Massachusetts Bay Transportation Authority (MBTA), the city of Boston and the Department of the elevated section of Route 203 carried the Arborway over Washington and South street in the Jamaica Plain neighborConservation and Recreation (DCR). The work began in December 2014 and is being funded hood of Boston. It was located directly north of the Forest by ABP NFA. The Casey overpass was built in the 1950s — see OVErPASS page 10
Equipment East’s New Facility Remains on Schedule for Fall 2016 Grand Opening Equipment East is excited about the progress on its new facility, still on target for fall 2016 opening. Meanwhile customers are still being served from its current location, which is just next door to Equipment East’s soon-to-be new home. Nothing is changing about the company except for location and space: • 40,000 sq. ft. (3,716 sq m) facility • 5,750 sq. ft. (534 sq m) service shop with eight double bays, welding bay and wash bay • Two 10-ton (9 t) cranes spanning entire service area • more than 1,550 sq. ft. (144 sq m) of office space • 11,500 sq. ft. (1,068 sq m) parts area inside and additional outdoor storage area. see FACIlItY page 4
Equipment East is excited about the progress on its new facility, still on target for a fall 2016 opening.