1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
Formerly
95
202
7
®
91
9
95
93
2
95 2
93 90
90
7
June 15 2016
95 91
7
495 6 195
395
95 91
3
84 6
84
6
E
q
u
I
P
M
E
N
t
g
u
I
d
E
95
95
Vol. XlIX • No. 12
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Amanda Hogeboom-Merritt 1-800-988-1203 Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers Call for Pricing
MassDOT’s Add-A-Lane Project in Needham Will Improve Traffic Flow
2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com
LEED Accredited in Waste Management
2016 EZ-Screen 1200XLS
GIVE US YOUR HAMMER! •Repairs •Rebuilds •Replacement Parts in Stock
30% off same class Ramfos hammer with competitor’s trade in
61 Silva Lane • Dracut, MA 01826
Call Today (978) 454-3320
YOUR ONE-STOP HYDRAULIC HAMMER SHOP™
New Option Separate 3 Products
6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High
New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!
$41,900 plus freight.
CALL 888-81-GORILLA(46745)
866-745-5828
Other Screeners Available
ArguS INduStrIAl CO. www.ez-screen.com
*Some restrictions apply
WE STOCK RUBBER TRACKS for Over 6,000 Models! A NJ, TX, WSES U WAREHO
Some Used Tracks Available.
• HIGH QUALITY
www.foleyengines.com
• FAST SHIPPING • GUARANTEED TO FIT
RD90B Reed Screener
• UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS
888-888-1248 w M.G. Equipment Call Phil (413) 427-7171
Barletta Heavy Division Inc. photo
The overall project has witnessed the combination of the demolition of older infrastructure, upgrading of existing infrastructure, and building of new bridges and roads.
By Irwin rapoport CEG CORRESPONDENT
Barletta Heavy Division Inc. (BHD) is more than onethird through the construction of the Massachusetts Department of Transportation’s (MassDOT) $137.6 million Needham-Wellesley I-95 Add-A-Lane project in Needham, a suburb of Boston. Construction began in January 2015, and is expected to be complete by April 25, 2019. MassDOT established an inter-
im milestone requiring a portion of the new Kendrick Street Interchange to be open to traffic on September 26, 2016. The project has been split into five major stages to minimize impacts to the traveling public. Stage 1 included the following: the widening of the northern half of the Kendrick Street Bridge; building the Kendrick Street ramp bridge to I95 northbound; starting construction of the new Highland Street Bridge; initial construction at the interchange of I-95 see NEEdHAM page 8
Gov. Shumlin Signs Transportation Bill, Provides $612M for Vermont Projects Gov. Peter Shumlin signed the FY 2017 Transportation Bill which approves $612,574,418 in infrastructure improvements and maintenance of the state’s highways, bridges, rail lines and airports along with capital and operating support for public transit systems and other programs critical to the safe and efficient movement of people and goods in Vermont. The bill includes new provisions for
increased fines for trucks that get stuck in Smugglers’ Notch, increased use of ignition interlock systems for repeat DUI offenders and an overhaul of the trespassing regulations to improve safety on Vermont’s rail lines. “Once again, the leadership of the Chairs of the Legislature’s Transportation Committees has been essential see BIll page 4