New England 12 2016

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

1

93

495

16

89 4

89

Formerly

95

202

7

®

91

9

95

93

2

95 2

93 90

90

7

June 15 2016

95 91

7

495 6 195

395

95 91

3

84 6

84

6

E

q

u

I

P

M

E

N

t

g

u

I

d

E

95

95

Vol. XlIX • No. 12

“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection •  Amanda Hogeboom-Merritt 1-800-988-1203 Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers Call for Pricing

MassDOT’s Add-A-Lane Project in Needham Will Improve Traffic Flow

2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

www.jrvinagrocorp.com

LEED Accredited in Waste Management

2016 EZ-Screen 1200XLS

GIVE US YOUR HAMMER! •Repairs •Rebuilds •Replacement Parts in Stock

30% off same class Ramfos hammer with competitor’s trade in

61 Silva Lane • Dracut, MA 01826

Call Today (978) 454-3320

YOUR ONE-STOP HYDRAULIC HAMMER SHOP™

New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

New Hydraulic Hammers. Remanufactured Hammers. Hammer repairs/rebuilding with free area pickup. Hammer toolbits delivered to your site!

$41,900 plus freight.

CALL 888-81-GORILLA(46745)

866-745-5828

Other Screeners Available

ArguS INduStrIAl CO. www.ez-screen.com

*Some restrictions apply

WE STOCK RUBBER TRACKS for Over 6,000 Models! A NJ, TX, WSES U WAREHO

Some Used Tracks Available.

• HIGH QUALITY

www.foleyengines.com

• FAST SHIPPING • GUARANTEED TO FIT

RD90B Reed Screener

• UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

888-888-1248 w M.G. Equipment Call Phil (413) 427-7171

Barletta Heavy Division Inc. photo

The overall project has witnessed the combination of the demolition of older infrastructure, upgrading of existing infrastructure, and building of new bridges and roads.

By Irwin rapoport CEG CORRESPONDENT

Barletta Heavy Division Inc. (BHD) is more than onethird through the construction of the Massachusetts Department of Transportation’s (MassDOT) $137.6 million Needham-Wellesley I-95 Add-A-Lane project in Needham, a suburb of Boston. Construction began in January 2015, and is expected to be complete by April 25, 2019. MassDOT established an inter-

im milestone requiring a portion of the new Kendrick Street Interchange to be open to traffic on September 26, 2016. The project has been split into five major stages to minimize impacts to the traveling public. Stage 1 included the following: the widening of the northern half of the Kendrick Street Bridge; building the Kendrick Street ramp bridge to I95 northbound; starting construction of the new Highland Street Bridge; initial construction at the interchange of I-95 see NEEdHAM page 8

Gov. Shumlin Signs Transportation Bill, Provides $612M for Vermont Projects Gov. Peter Shumlin signed the FY 2017 Transportation Bill which approves $612,574,418 in infrastructure improvements and maintenance of the state’s highways, bridges, rail lines and airports along with capital and operating support for public transit systems and other programs critical to the safe and efficient movement of people and goods in Vermont. The bill includes new provisions for

increased fines for trucks that get stuck in Smugglers’ Notch, increased use of ignition interlock systems for repeat DUI offenders and an overhaul of the trespassing regulations to improve safety on Vermont’s rail lines. “Once again, the leadership of the Chairs of the Legislature’s Transportation Committees has been essential see BIll page 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.