State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
December 25 2019 Vol. L • No. 26
SAME DAY PARTS AVAILABILITY
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
LEED Accredited in Waste Management
2020 EZ-Screen 1200XLS 36 Month lease AS LOW AS
$1,500* / Month Authorized Doosan Dealer
978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $44,900 plus freight. Other Screeners Available
EZ-SCREEN
www.ez-screen.com
CALL 800-367-4937 *On approved credit • Financing Available
Atlantic Street Bridge Completion Caps Multi-Year Project in Stamford CEG CORRESPONDENT
Call for Pricing
Optional 3 Product Conveyor
Affordable Price. Premium Service.
By Ken Liebeskind
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking
*Limited time offer. Some restrictions apply. See dealer for details.
WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES
The completion of the Stamford Atlantic Street bridge is the culmination of a multi-year project that began with the widening of Atlantic Street that was followed by the reconstruction of the Atlantic Street bridge, which requires only Metro North Railroad (MNR) track work for completion. The project was completed in two segments with Yonkers Contracting/Yonkers, N.Y., as the lead contractor on the first segment and Halmer International/Nanuet, N.Y., the lead contractor on the second segment. Crews tunnel under the five live tracks to construct abutment #1. State-funded costs of $36.5 million for Phase 1 and $74.8 million for Phase 2 make the Atlantic Street underpass was originally constructed in 1896. “The purpose of this project is to improve the horizontal total for the project more than $110 million. When the project was announced in 2013, the Connecticut and vertical geometry for Atlantic Street at the bridge, to State Department of Transportation (CTDOT) stated that the see STAMFORD page 14
• RUBBER PADS FOR STEEL TRACKS
888-888-1248
248-745-5828
FHWA Issues Emergency Relief Funds to Vermont for Flood-Ravaged Roads VTrans photo
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
95
95
CALL 888-81-GORILLA(46745)
The Federal Highway Administration issued $500,000 in “quick release” Emergency Relief or ER funds to the Vermont Agency
of Transportation (VTrans) on Nov. 20 to help cover the cost of repairing roads damaged by heavy rains, high winds and flooding from a storm that lasted from Oct. The FHWA issued $500,000 to VTrans on 31 through Nov. 1. That follows a similar Nov. 20 to help cover the cost of repairing roads damaged by heavy rains, high $500,000 ER payment to winds and flooding from a storm that lasted from Oct. 31 through Nov. 1.
see FUNDS page 18