Skip to main content

New England 24 November 29, 2017

Page 1

1

11

THE NEW ENGLAND EDITION

A Supplement to:

95

1

201 16 9

26

2

1 3

91

89

2

95 3

2 2 7

State Supplement sponsored by:

1

93

495

16

89 4

89

95

202

7

91

9

95

93

2

95 2

93 90

90

7

95 91

7

3

84

495 6

84

6

6

195

395

95 91

November 29 2017 Vol. L • No. 24

95

95

® FALL SPECIAL

2% financing* on

Gorilla Hydraulic Breakers “The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Your New England States Connection •  Amanda Hogeboom-Guilfoyle 1-800-988-1203

• Priced up to 50% below the competition. • Fully supported by a 75 year family business. • Shipment in 2-3 days for most carriers. Programs available for ALL buyers!*

Start

Biofiltration Plant Under Construction in Shrewsbury, Mass. stuff today!

Specializing in:

Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing & 30-115 Yd. Trailers Call for Pricing

2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041

CALL 888-81-GORILLA(46745) *On approved credit

By Jennifer Rupp

CEG CORRESPONDENT

www.jrvinagrocorp.com

LEED Accredited in Waste Management

2018 EZ-Screen 1200XLS

New Option Separate 3 Products

6’x5’ Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High

$41,900 plus freight. Other Screeners Available

EZ-SCREEN

GIVE US YOUR HAMMER!

• Repairs • Rebuilds • Replacement Parts in Stock

30% off same class Ramfos hammer with competitor’s trade in

61 Silva Lane • Dracut, MA 01826

Call Today (978) 454-3320

WE STOCK RUBBER TRACKS for Over 6,000 Models! Some Used Tracks A & GA Available. NJ, TX, WOUSES WAREH • HIGH QUALITY • FAST SHIPPING • GUARANTEED TO FIT • UNDERCARRIAGE PARTS • FLATPROOF SKIDSTEER TIRES • RUBBER PADS FOR STEEL TRACKS

248-745-5828 Cat D7F

VERY NICE SHAPE • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!

www.foleyengines.com

Vermont Developers Announce Plans for New $17M Hotel in Downtown Montpelier

888-888-1248

www.ez-screen.com

Phil (413) 427-7171

This past summer, the Shrewsbury Water and Sewer Department broke ground on New England’s largest biofiltration plant. Though the project was slated for $14.5 million, the winning bid came in at $11.5 million from Waterline Industries of Seabrook, N.H. This amount is exclusive of an additional $900,000 for engineering services and a contingency of five percent — approximately Waterline Industries’ Cat 315 excavator finishes backfill of tank walls. $575,000. The new water treating capabilities of the Home Farm system necessitating a ment plant is scheduled to be completed by Dec. 29, 2018. The town currently uses the Home Farm water system new solution. The Massachusetts Environmental Protection Agency built in 1990 by R.H. White Construction. The Home Farm system employs airstripping to remove volatile organic com- (EPA) states that the recommended water concentration limit pounds from the water. Over the last few years, however, the for lifetime exposures to manganese is 0.3 mg/L (300 parts manganese levels have risen to degrees that exceed the filtersee WATER page 18

CALL 888-81-GORILLA(46745)

MONTPELIER, Vt. (AP) Developers have announced plans to build a new hotel in downtown Montpelier. At a press conference with Republican Gov. Phil Scott and city officials, the Bashara family said that it plans to build an 89room Hampton Inn and Suites behind the Capitol Plaza Hotel, which it owns. The Capitol Plaza will continue to operate. Officials say the $17 million project will include a parking structure for up to 300 cars. Mayor John Hollar said the city and its leaders are working hard to add jobs and attract new residents. He said “this development is an important part of that effort.” Fred Bashara said the family will continue to work on its plans and permits and hopes to start construction in 2018. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Rabideau Architects photo

The Bashara family said that it plans to build an 89-room Hampton Inn and Suites behind the Capitol Plaza Hotel, which it owns.


Page 2 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

THE W.I. CLARK COMPANY Danbury, CT • Wallingford, CT • Plainfield, CT Call Mark Doty @ 203-823-2316 (4) 2011 John Deere 50D’s

2006 Komatsu PC138USLC

2013 Leeboy 8616B

2675 hrs, c/air, blade hyd thumb, 24” bucket, stk#23535..........................Starting at $32,500

2765 original hours, rubber pads, aux hyds, 36” bucket, push blade, stk#23933......$75,000

HD poly pads, slope and power crown, vibratory, 1200 hrs, Stk#21988 ..........$105,000

2016 Cat 299D XHP

2013 Cat 321DLCR

2012 Cat 305E

480 hrs, air, 90% tracks, hi flow and electrical, elec coupler, 4-1 bucket & forks, fully loaded and super clean, stk#24087 ................$85,500

c/air, hyd coupler, aux hyds, 42” bucket, super clean unit! stk#24088 ........................$195,000

c/air, rubber tracks, blade, hyd thumb and 3 buckets, great condition, stk#24089 ....$49,500

2013 Cat 420FIT

2010 Deere 710J

Deere 323E

c/air, front coupler, 4-1 bucket, pilots, ext hoe, 24” bucket, stk#24147 ........................$76,500

6K hrs, pilots, 2wd, Wain Roy cplr , bucket, rear hyds and a Tramac SC50 hyd hammer. Stk# 24039 ..........................................$52,500

Yanmar, c/air, EH Controls, 2 Speed, 18” Tracks, 78” Bucket, stk#23928 ............$43,500

See Our Complete Inventory at www.wiclark.com


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 3

!

%

%

!

!

!

!

!

!

!

% ! ! ! ! ! ! !

!

!

!

! !

!

!

!

!

!

!

!

!

!Q

!

!

!

!

!

!

! 2

! 2

! !

!

! !

!

! !

! !

%2

!

!

%

%

!

%

Q

! !

!

!

! !

!

!

!

! Q

Some companies have you choose power or fuel efficiency. You chose both. %

%

!

! ! 2

!

2

! ! !

! %

! !

%

!

! Q

%

Tyler Equipment % % Corporation %

Company y Name N

1980 Berlin Turnpike 1234CTAny Road Berlin, 06037 800.352.4473 City, ST 12345 251 Shaker Road 123.456.7890 East Longmeadow, MA 01028 800.292.6351

2

%

%

!

!

DEALER LOGO %

%

!Q !

! ! ! !

!

%%! !

!

Q !

!

!

Volv olvo developed the industry’s i first fuel efficiency guarantee so you never haavve % %on peerformance 2 to compromise or productivity. And with CareT Trrack machine %monitoring, you can % fo 2 ocus your attention on more important things — like growing your businesss. Get the details at volvoce.com/smartfuel.

2


Page 4 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Wollaston Station Closes for 20 Months in January 2018 With customer safety a top priority and to complete the project on time, the MBTA has announced that Wollaston Station will close to Red Line customers for approximately 20 months beginning Jan. 2, 2018, as part of the Wollaston Station Improvements Project. During the closure, Red Line trains will continue passing through Wollaston Station without stopping. The T also will be operating shuttle bus service to transport customers between Wollaston and North Quincy Stations in an effort to allow continuous use of Wollaston Station’s remaining parking during the construction project. In addition, to support the most efficient completion of the project, as of Nov. 12, 2017, Red Line service on Sundays through Thursdays between North Quincy and Braintree Stations will be replaced with shuttle buses from 9 p.m.

NEW ENGLAND EDITION

Founder, Publisher & CEO Northeast Publisher Editor In Chief Associate Editor Editorial Consultant Production Mgr. Controller Circulation Mgr. Director of Web Services

Edwin M. McKeon Sr. Edwin M. McKeon Jr. Craig Mongeau Christine Allen Pete Sigmund John Pinkerton Judith Nixon Cathy Printz Teddy McKeon

Main office 470 Maryland Drive

Fort Washington, PA 19034

215/885-2900 Toll Free 800/523-2200 Fax 215/885-2910

Web site www.constructionequipmentguide.com

Editorial e-mail editorial@cegltd.com

Advertising e-mail production@cegltd.com

through the end of service. The parking lot at Wollaston will remain open during the station closure, though the total number of parking spots will be reduced from 538 to 423. Customers who are unable to park at Wollaston are encouraged to instead park at the North Quincy Station overflow lot along Newport Avenue. Beginning in February 2018, Saturday and Sunday Red Line service between North Quincy and Braintree Stations also will be replaced with shuttle buses during 18 weekends over the course of approximately 24 months. Major accessibility improvements, modern safety features, and rectifying ongoing drainage and flooding issues within the station are some of the improvements to be made during the project renovating Wollaston Station. Currently the only non-ADA-accessible station on the Red Line, Wollaston will be transformed into a modern, fully accessible facility, making the entirety of the Red Line 100-percent accessible. Additional upgrades to the station include brand new elevators, additional customer paths, upgraded stairways, new bathrooms and additional lighting. New electrical, fire protection, security, flooding mitigation and site utility upgrades also will occur to support the accessible improvements. The estimated construction value of the Wollaston Station Improvements is $33 million.

For advertising rates: Contact Edwin M. McKeon Jr.

215/885-2900

Toll Free 800/523-2200 Fax 215/885-2910

e-mail tmckeon@cegltd.com

Contact Amanda Hogeboom-Guilfoyle

• New England 518/396-7659 Toll Free 800/988-1203 Fax 315/866-1379 e-mail ahogeboom-guilfoyle@cegltd.com Contact Kent Hogeboom

• New York • New England 315/866-1379 Toll Free 800/988-1203 Fax 315/823-4136 e-mail khogeboom@cegltd.com

Construction Equipment Guide Northeast Edition (ISSN 1081-7034) is published bi-weekly by Construction Equipment Guide Ltd. Advertising and Editorial Offices are located at 470 Maryland Dr., Ft. Washington, PA 19034. Toll Free 800/523-2200 or Fax 215/885-2910. Annual Subscription Rate $65.00. Call for Canadian and foreign rates. Periodicals postage paid at Ft. Washington, PA and at additional mailing offices. POSTMASTER: Send address changes to Construction Equipment Guide Northeast Edition, 470 Maryland Dr, Ft. Washington, PA 19034. Contents Copyrighted ©2017, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced(including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide's unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication. Call or write for advertising rates, publication schedule and media kit. The Construction Equipment Guide is not responsible for clerical or printer's errors, every care is taken to avoid mistakes. Photographs of equipment used in advertisements are not necessarily actual photographs of the specific machine. Similar photographs are used occasionally and every effort is taken to depict the actual equipment advertised. The right is reserved to reject any advertising.

The MBTA has already committed $911 million to Red Line South Side projects, including 252 new Red Line cars that will begin full revenue service in November 2019. The renovations at Wollaston Station are a major part of a series of signal, rail, and other infrastructure upgrades along the Red Line. Previous MBTA successes in renovation construction with station shutdowns include Government Center, Orient Heights, and Science Park Stations. For more information, visit mbta.com/projects/3004. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Gov. Scott Breaks Ground on Gold Star Memorial Gov. Phil Scott joined members of the Northfield community, Norwich University and gold star families to break ground on a new monument that will honor those families in Northfield’s Center Park. “We can never do enough to thank the men and women in our military and their families, and for those who pay the ultimate sacrifice, we’ll never be able to repay them,” said Scott. “But, it is my hope, that by honoring them and their families with this monument, we can offer some small solace and a place for reflection and recognition of that sacrifice.” The working ground breaking allowed volunteers to participate in the excavation work for the start of this project, which will erect a Gold Star Families Memorial Monument. These monuments, which are constructed in partnership with the Hershel “Woody” Williams Medal of Honor Foundation, honor gold star families — those families who lost a loved one while he or she was in service of our military. The monument will be made of four “black mist” granite monoliths and set on a Barre-granite base. The construction of the monument is supported by funds raised by Vermonters United to Help through Gov. Scott’s inaugural gala, as well as in-kind donations from local vendors. “I am so grateful to all who participated with this working ground breaking, and will make the construction of this monument possible,” said Scott. “I thank Norwich University and the town of Northfield for welcoming this monument, as well as all those who attended my inaugural gala, allowing us to support veterans’ and military causes such as this one.” The event was attended by local Gold Star Families, as well as Norwich University’s President Richard Schneider and trustee Martha Rainville; Vermont Army National Guard Survivor Outreach Services Support Coordinator Tammie Conner; Vermont Secretary of Administration Susanne Young; Rep. Maxine Grad (D-Moretown); and many members of the Northfield community. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 5


Page 6 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Rock & Recycling Equipment LLC Hosts Open House

R

ock & Recycling Equipment LLC hosted its first open house Nov. 9 in Sutton, Mass., since opening its doors as New England’s new McCloskey dealer a little more than a year ago. Brendan Fox and Shane Fleming, co-owners of Rock & Recycling bring decades of experience with McCloskey products and familiarity of the New England market to their business. “Their ambition and dedication to Rock & Recycling Equipment, New England’s this business is remarkable,” said Rock & Recycling’s open house allowed current and potential customers the oppor- exclusive McCloskey International dealer, serves all six New England states. Dawn Guillemette, marketing director tunity to get to know the company’s team while enjoying a wonderful lunch. of McCloskey International “They’re already breaking records in sales and service.” “We are dedicated to exceeding our customer’s needs,” said Fleming. “We offer both new and used equipment for rental, as well as a full line of parts for every machine we carry.” The open house provided current and potential customers with opportunities to get to know Rock & Recycling Equipment’s staff, enjoy a catered lunch spread, and view the company’s latest products. The event featured: • C44 cone crusher: this 44-in. cone and 440 hp portable (L-R): Paul Routhier, owner of Newport Materials; Brendan Fox (L) and Shane Fleming, co-owners of Stuart, parts and service support of Rock & Rock & Recycling Equipment LLC. crusher provides high material and large stock pile capacity, Lisa Recycling; Matthew Morse, supervisor of Newport making it the ideal secondary portable crusher for customers. Materials; and Jonathon Tucker, also a supervisor of • J50 jaw crusher: This McCloskey crusher is equipped Newport Materials. Located in Westford, Mass., with the largest jaw in its class — a 50-in. by 29-in. single Newport Materials is a loyal customer of Rock & Recycling and here, they stand in front of the J50 jaw tooth jaw crusher. crusher that they recently purchased from the company. • Various stackers: including the new wheeled stacker, which is designed for high capacity stockpiling; all stackers are equipped with diesel motors and large truss framed hoppers. • 516 trommel: these recycling machines accept topsoil, sand, gravel, wood chips and compost. The screen allows for flexibility in sizing while the hydraulic conveyor allows McCloskey’s new wheeled stacker caught the attention of numerous open house visitors. This ST Stacker line oversized material to be stockpiled. has a durable truss frame and large hopper, which • R155 high energy screener: equipped with the largest comes equipped with a choice of a diesel or electric screening area in its class, this machine is able to work with motor, as well as the option of a radio-controlled track difficult material, including heavy rock, boulders, clay, etc. mounted unit. • J45R recirculating jaw crusher: this combines the productivity of the J45 with the versatility of a full screening and Visitors inquire about the new McCloskey C44 cone recirculating system and allows operators to produce a crusher. crushed and screened final product with one machine. Rock and Recycling is a full-line full-service McCloskey dealer, serving Massachusetts, Connecticut, Rhode Island, New Hampshire, Vermont and Maine. “We proudly stand behind the superior McCloskey International product and their extensive line of trommel screens, stackers and crushers,” said Fox. “We work tirelessly to earn our customers’ business and will always try to surpass their expectations.” The McCloskey J45R recirculating jaw crusher comFor more information, visit www.rockandrecycling.net. bines the productivity of the J45 with the versatility of (This story also can be found on Construction Mike Conway, sales consultant of Rock & Recycling, a full screening and recirculating system, allowing Equipment Guide’s website at www.constructionequip- greeted customers as they arrived and registered them operators to produce a crushed and screened final for the event. mentguide.com.) CEG product with one machine.


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 7

N bod No b dy d work o ks har h der d to t make k your job easi e ier. Challenging jobsites don’t intimidate a Doo D san crawler excavator. Hydraulic pump performance delivers fast, class-leading cycle times, with a synchronized engine and hydraulic system that boosts efficiency. It’s designed to offer increased flotation in soft soil, while precision controls provide accuracy and power. Whether you’re digging a trench, handling boulders or dumping debris, the Doo osan crawler excavator keeps you productive no matter what. Visit us to see what Doosan equipment can do ffo or y yo ou. D o o s a n a n d t h e D o o s a n l o g o a r e r e g i s t e r e d t r a d e m a r k s o f D o o s a n C o r p. i n t h e U n i t e d S t a t e s a n d var ious other coun tr ies around the wor ld. 16 -D013

Au thor ized Doos an De aler

Equipment East 61 Silva Lane • Dracut, MA 01826 978-454-3320 • w w w.equipmenteast.com


Page 8 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

208 Holland Road Brimfield, MA 01010

Sales Contact: R.J. Poirier rjpoirier@rjpoirier.com 413-245-3882 Fax: 413-245-3522

www.rjpoirier.com

2014 CAT 988K, Low Hour, 9yd Spade Bucket, New L-5’s ..CALL 2015 CAT 980M, Low Hour, Agg Handler............................CALL 2010 CAT 988H, 9yd Spade ................................................RENT 2015 CAT 336EL, Thumb, Tool ar ........................................CALL 2011 CAT 950H, GP, Scale ..................................................CALL 2013 CAT 966K, Coupler, Or GP ..........................................CALL 2011 CAT 980H, GP Teeth, L-5's ........................................CALL 2014 CAT 980K, GP Edge, L-5's ..........................................CALL 1997 CAT 988F II, Spade, L-5's ..........................................CALL 2011 D8T, 8U, SS Ripper, New U/C ....................................CALL

Connecticut Water Celebrates Completion of $30M Rockville Water Treatment Facility Connecticut Water Company (Connecticut Water), along with state and local leaders, celebrated the recent completion of the company’s new Rockville Water Treatment Facility on Nov. 8. The new facility was constructed at a cost of more than $30 million and is part of a public drinking water system that serves 85,000 people in 10 north central Connecticut communities. “This new Rockville Facility will provide a reliable supply of safe drinking water for families, communities and for public fire protection for decades to come. We are proud of our employees and our construction partners that were able to construct this facility on time and on budget, and we value the great cooperation we had from the Connecticut Department of Public Health Drinking Water Supplies Section in

reviewing and approving plans,” said David C. Benoit, Connecticut Water president and CEO. “The construction of this facility is consistent with our strategy of delivering value and growth through investments in our systems.” “This type of infrastructure investment needs to be recognized and celebrated, as water safety and quality are essential to the people of this state,” said Gov. Dannel P. Malloy. “A private utility company willingly making an investment of more than $30 million to improve the water for 85,000 customers and the environment aligns with our draft comprehensive state water plan by preserving and ensuring the safety and quality of our natural resources. These investments result in both short-term and long-term dividends, and Connecticut Water Company should

be applauded for doing what is right.” The newly upgraded facility replaces a treatment facility that first went into service in 1970. The new facility enhances treatment, increases capacity, provides greater energy and operating efficiencies, improves reliability, and drives significant environmental benefits compared with the former plant. In addition to providing customer and environmental benefits, construction of the new facility boosted the state’s economy. About a dozen Connecticut manufacturers and service providers supplied materials or services for the construction of the new facility. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Mainers Vote ‘Yes’ at Polls on $105M Transportation Bond Mainers have approved a $105 million transportation bond issue. The proposal on the Nov. 7 ballot will bring an estimated $137 million in matching grants. The bulk of the money would be used to improve secondary roads and bridges. Money also would benefit ports, harbors, marine transportation, aviation, railroad and bicycle and pedestrian trails. A small

amount also would go to improving culverts, stream crossings and wildlife habitats. The bond proposal represented the second of three consecutive years of borrowing planned by the Maine Department of Transportation to fill highway funding gaps. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Keep Up With All the Industry News Subscribe to

Construction Equipment Guide Today! Toll Free 800/523-2200


ZZZ (PSLUH&UDQH FRP 1HZ (QJODQG 6DOHV -XVWLQ 0HOYLQ

6$/(6 3$576 6(59,&(

Generator Rentals • Rental Generators • Load Banking Services • Generator preventive maintenance agreements • We Service All Brands of Generators/Transfer switches

11 Rebel Road Hudson, NH 03051 (603) 598-9812

42 Dave’s Way Hermon, ME 04401 (207) 848-7702

www.cmdpowerrentals.com bill@cmdpowersystems.com

The Nice Company, Inc 9 Rosenfeld Drive, Hopedale, M A Toll Free# 888-717-8096 • w w w.theniceco.com

We sell NICE machines!

USED EQUIMPENT

2012 CAT 316EL, 2400 Hrs, 24� Bkt, 10’2� Stick, AC ........ ..........................$109,000

2006 CAT 315CL, 5875 Hrs, Enc. Cab, 10’2� Stick, 28� Track, 42� Bkt, Shear Hyd. ....$63,500

2003 CAT 320C U, 6000 Hrs, Plumbed, Aux. Hydraulics, Runs Good! ..............$57,000

2009 CAT D6KLGP, 5800 Hrs, Enclosed Cab, 6000 Hrs ........ ............................$99,000

2014 CAT 312EL, 1000 Hrs, Med. Stick, Plumbed, North American Machine....$109,000

2014 CAT 308E2 CR, 1450 Hrs, Enc. Cab, 5’5� Stick, 17� Rubber Block Pads, Backfill Blade, Swing Boom, CV, QC.... ............................$69,000

2013 VOLVO EC340DL, 2800 Hrs, Enclosed Cab, AC, Heater, 54� Tooth Bkt, 10’6� Stk, Aux. Hyd. Plumbing, Control Pattern Changer, 31 1/2� Track Shoes ..........................$139,000

2009 TEREX TA35 GEN 7, 4500 Hrs, Work Ready! Fairly New Front Tires, Others at 70% Plus, REDUCED TO SELL!! ...... ............................$79,000

WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT

6DOH UHQW RU 532 DYDLODEOH

WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT • WE RENT

Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 9


Page 10 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Rhode Island Opens $121M Home for Veterans in Bristol 140 Nutmeg Road South South Windsor, CT 06074

51 Veterans Drive Loudon, NH 03307

1-800-53-CRUSH or 860-627-6596 www.powerscreen-ne.com

Ron DeSiderato Jr photo

Democratic Gov. Gina Raimondo hosted the state’s Veterans Day ceremony and a traditional ribbon cutting on Nov. 11 at the home in Bristol, R.I.

PROVIDENCE, R.I. (AP) Rhode Island has unveiled a new home for veterans on Veterans Day. Democratic Gov. Gina Raimondo hosted the state’s Veterans Day ceremony and a traditional ribbon cutting on Nov. 11 at the home in Bristol, R.I. Veterans began moving in prior to the ceremony. The new 208-bed home allows veterans to live in cottages equipped with a private bedroom and bathroom. There’s a central location for social activities and the chapel, salon, coffee shop, library, medical examination area and other services. “[More than] 16 major trades have contributed to building this beautiful new home for our honored Veterans, and the pride in their work is evident in every detail,” Raimondo said. “I’m proud that Rhode Island is now leading the way in recognizing the sacrifice of those who’ve served our great nation. Our veterans deserve nothing less.” Rhode Island is one of the first states to use this new community living concept for veterans’ long-term care, said Kasim Yarn, the state’s director of veterans’ affairs, who

Call for In Stock Parts

1-800-53-CRUSH

attended the ceremony. “It dispenses with the traditional, institutional model,” he said in a statement. “This is what our veterans have advocated for. And with our veterans’ population being overwhelmingly earlier-era veterans, World War II, Korea, Vietnam, we’re ahead of the curve. They deserve nothing less.” The veterans had previously lived at a home dating back to 1955, on the same site in Bristol. U.S. Veterans Affairs Secretary David Shulkin visited the new home in May to help dedicate it. He said it sets the standard for the way the nation should be caring for veterans and praised the state and federal partnership that helped move the $121 million project forward. Construction began in 2015. Members of Rhode Island’s congressional delegation and other state officials joined Raimondo at the ribbon cutting to honor veterans. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 11

CRUSHING EQUIPMENT, PARTS & SERVICE 2017 Irock RDS-15 Closed Circuit Impactor - NEW RDS-15 horizontal impact crushing plant. As the name suggests, the RDS — rapid deployment system provides exceptional portability and rapid set-up time. Ideal for processing smaller materials such as reclaimed asphalt pavement (RAP) or Concrete demo. Powered by a Caterpillar 350hp engine, 5x14 double deck screen can process up to 350 tons per hour. The entire plant is self-contained, with on-board power supplying full plant operation. Please call if interested

30x60 Electric Stacking Conveyor - NEW Electric Radial Stacking Truss Conveyor. Super strong and over built. There conveyors are made right here in Ct. by Ace/Milroy Company Using all quality components. Come check them out!

Eagle 15x36 Jaw Plant - Used Eagle 1536 Portable Jaw Crushing Plant Model 33D4155, Vibratory Pan Feeder with Hydraulic Grizzly Dump 3 x 6 Scalping Screen,Cummins Diesel Engine Drives 50Kw Generator and Hydraulic Pump,Dual-axle, 30" Fold-up Discharge Conveyor, Rear Discharge Conveyor for Screen throughs. Low hrs, Very Good Condition! Please call if interested.

2012 Telsmith 44SBS Cone/Screen Plant - Used Low hr unit equipped with the latest Telsmith Trac 10 automation for easy adjustment. Onboard Telsmith 7x20 Tripple Deck Screen. Call today. Telsmith T300 Cone Crusher - Used low hr Telsmith T300 Cone Crusher. This cone has been designed for maximum uptime and productivity while delivering 300HP performance and a crushing capacity output range from 125 to 400 Mt/hr in tough or abrasive mining applications. Comes with full Trac 10 automation. Call for more info today!

2017 JP550 Grizzly Scalping Stand Keep the BIG nuggets from tearing your screener apart with our JP550 Scalping Stand. Custom built for your application. Back your machine in and start bailing material without worries. Call today for more information.

2015 Irock TC-20 Tracked Impactor - Used TC-20 track impact crusher combines a large feeder, high-performance four-bar impactor and heavy-duty components for exceptional efficiency, reliability and precision. The TC-20 produces a uniform, cubical product, and hydraulically adjustable aprons provide better control over sizing. The unit has the versatility to process soft to medium rock, recycled concrete and recycled asphalt. The rotor measures 40 inches by 56 inches and can process a variety of materials up to 24 inches in diameter. A 440-horsepower Caterpillar® C-13 ACERT Tier 3 engine powers the impact crusher, which can process up to 500 TPH. 800 hrs on machine, come watch it run today!

2014 Irock TS-512 Tracked Screener - Used less than 1200hrs Heavy-duty design. The unit features high portability, three hydraulic folding side conveyors allow easy transport and quick set-up. 100-horsepower CAT® C4.4 to sort up to three different product sizes at rates up to 400 TPH. Three hydraulic, folding side conveyors allow easy transport and set-up times of 10 minutes or less. 14foot hydraulic tipping grid enables simplified discarding of larger material.The heavy-duty, high-energy, two-bearing, 12-foot by 5-foot screen box offers 112 square feet of screening area.

Ace Equipment Sales, Inc. and Milroy and Company LLC 171 Tolland Turnpike (Route 74) • PO Box 535 • Willington, CT 06279

Call CJ (413) 896-0793 • (860) 429-2793 Go to www.acecrushers.com for a complete listing and description of our new and used equipment.


Page 12 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

DISPLAY ADS/ CLASSIFIEDS Hydraulic Cranes 8 to 600 Ton Daily & Hourly Services www.astrocrane.com

Fully Insured 200 Codman Hill Rd., Boxborough, MA 01719 978-429-8666

Place Your Business Card for... 3 months 6 months 12 months

$300* $585* $1040*

only $50 an issue only $45 an issue only $40 an issue

Call now to reserve your space! 800-225-8448 * pre-payment required

Classified Rates: 30 Words or Less for $40.00. Each Additional Word is $1.16. For just an additional $20 your ad can be posted on our online searchable database for 30 days. Ad runs for 2 (two) insertions - no changes in second insertion. PLEASE ENCLOSE PAYMENT WITH ORDER and mail to: 470 Maryland Drive• Fort Washington, PA 19034

215/885-2900 • Fax 215/885-2910 Toll Free 1-800/523-2200 LANDSCAPE EQUIPMENT

LOADERS

‘14 Land Pride AMF4216 Flex Mower in 9/10 Condition .. ..................................$14,000. Harter Equipment Inc. 732-446-7600

2007 Case 440, Simms Cab, Joystick Control, Mechanical Universal Coupler, Used condition, 1,551 hrs ............$25,000.

DAILY AND WEEKLY

Harter Equipment Inc. 732-446-7600

EQUIPMENT RENTALS CLOSE TO YOUR JOB SITE

RENTMACHINES.COM CATERPILLAR® GENIE® CHALLENGER® SCREEN MACHINE®

TRUCKS 2007 Sterling LT9500, T/A Tractor with Crane, 20 FRT, 46 Rears, OM460 Mercedes, 8LL, National 638E2 20 Ton, 40’ Crane, 42,264 Miles ..$68,900. A. Montano Co., Inc. 845-247-0206


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 13

NorthlandJCB.com

(88 88) 485-0383

MECHANIC SPECIAL

6 Jonspin Rd. R Wilmington, MA A 01887

230 Cherry Stt. Shrewsburyy,, MA 01545 0

3 Chalet Rd. (R Route outee 44) Middleboro, MA 02 2346

114 Hall St. Concord, NH 03301

23 Foss Rd. Lewiston, ME 04240

150 N. Plains Industrial Rd. Wallingford, W allingford, CT 06492


Page 14 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

State’s Future Loggers Benefit From New Tech Training By Emily Buenzle CEG WEB EDITOR

Good news for the logging industry: Maine college students are training for careers as loggers with new, updated machines. As he took students for some hands-on training into TA-R7, a piece of forest in Maine, Donald Burr, head coordinator of the Mechanized Logging Operators Programs, said that experience outside the classroom was getting them ready for their careers, WSAW reported. “We are giving them, as students, the very foundation of what it takes to be loggers,” said Burr. Northern Maine Community College’s 12-week mechanized Maine college students are training for careers as loggers with new, updated machines. logging program teaches students how to use the latest technology in the industry, including high-tech big it was and just being in the woods,” But King said he believes cross laminated WSAW reported. timber will help bolster the industry. machines and GPS systems. The state’s logging industry has seen its But no matter what comes next, Burr is For student Ben Tuttle, the program will help him follow in his father’s footsteps. share of struggles, according to Maine Sen. prepared to help ready Maine’s next generaTuttle said he was drawn to logging as a Angus King. It’s the digital age, King said, tion of loggers. “There’s a lot of acres, millions of acres, child, due to “the cool equipment and how that has caused a drop in demand for paper.

Mechanized Logging Operators Program photo

in wood — and that’s a lot of money, waiting for the next product,” Burr said. (This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)

Liebherr Announces New Equipment Dealer in Mass. The construction equipment division of Liebherr USA Co. introduced Boston Freightliner – New England Road Equipment as a new dealer. The new authorized dealer will be a sales, service, parts and rental provider for the full line of Liebherr earthmoving and material handling equipment in Massachusetts and Rhode Island. Boston Freightliner Inc. was founded in 1997 as a Freightliner truck dealer servicing the class 6 to 8 commercial vehicle segment. For the past 20 years, the company has been known as an established provider of quality OEM product and services in the trucking industry. Its experience in total quality service to the New England market spans 52 years, having its roots in commercial diesel and heavy duty industry inception under the former

in sales, service and parts support. We are excited to showcase all our quality product and services in the New England territory,” said Craig Sickler, vice president of operations. “We are excited about this new partnership with Boston Freightliner. Their commitment to offering quality products and providing excellent customer service and support is an enormous benefit to new and existing Liebherr customers,” said Peter Mayr, managing director of Liebherr USA Co. construction equipment division. “This opportunity allows us to expand the Liebherr brand in the northeast market.” For more information, visit www.liebherr.us. Vigor Diesel Fuel Injection. “Boston Freightliner – New England Road Equipment is proud and honored

to become part of the Liebherr dealer network that we believe shares our commitment to providing the very best

(This story also can be found on Construction Equipment Guide’s website at www.constructionequipmentguide.com.)


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 15


Page 16 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Vermont... Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison • Orleans • Franklin • Essex • Grande Isle • Washington • Windsor • Bennington • Lamoille • Windham • Chittenden • Orange • Caedonia • Addison •

‘Green Mountain State’ Highway Projects Let

The Vermont Department of Transportation received bids for transportation-related improvement projects. Following is a list of some of the projects let. County: Chittenden Town: Essex Contract ID: 13D330 Location: At the VT2A/VT289 ramp/Susie Wilson Road intersection and the VT2A/VT289 off ramp intersection. Project: Installation of new traffic signals, mast arms, road widening, cold planing, paving and additional items. Contractors and Bid Amounts: • Engineers Construction Inc. — $1,262,607 • J. Hutchins Inc. — $1,529,419 • Don Weston Excavating Inc. — $1,695,529 • G.W. Tatro Construction Inc. — $1,739,078 • J. P. Sicard Inc. — $1,862,454

County: Windsor Town: Woodstock Contract ID: 13J280 Location: On U.S. 4 approximately 0.2 mi. east of the junction with Vt. Route 106 (over Kedron Brook). Route No: TH I/U.S. 4 (Class 1), Village Principal arterial, Bridge No: BR 51. Project: Replacement of existing superstructure. Length of structure is 36.94 ft. Contractors and Bid Amounts: • Cold River Bridges LLC — $1,405,793 • Miller Construction Inc. — $1,552,667 • J. P. Sicard Inc. — $1,637,209 • CPM Constructors — $1,759,820 • Alpine Construction LLC — $2,199,444

County: Windham Towns: Guilford and Brattleboro Contract ID: 16V094 Location: Beginning at the Vermont/Massachusetts state line in Guilford at MM 0.000, and extending northerly along Interstate Route 91 in the northbound lanes approximately 12.000 mi. to 12.000 in of Brattleboro. Project: Micro-milling, surface preparation involving patching, pot hole repair, crack sealing, overlaying with a thin bituminous surface treatment, traffic markings and other highway related items. Contractors and Bid Amounts: • All States Asphalt Inc. — $3,861,896 • The Lane Construction Corporation — $3,988,558

• The Gorman Group LLC — $4,671,362 • Mitchell Sand & Gravel LLC — $5,581,444

County: Rutland Town: Wallingford Contract ID: 12C408 Location: Beginning at approximate MM 2.953 on Vt. Route 140 and extending easterly 0.258 mi. to MM 3.210. Project: Slope stabilization using soil nails, full depth roadway reconstruction, channel work and other highway related items. Contractors and Bid Amounts: • J. P. Sicard Inc. — $1,297,688 • J. A. McDonald Inc. — $1,311,852 • Markowski Excavating Inc. — $1,345,307 • Cold River Bridges LLC — $1,596,436 • The Belden Company Inc. — Irregular

County: Chittenden Town: Colchester Contract ID: 14C207 Location: On the west side of U.S. Route 2 and 7 at the intersection of Hercules Drive. Project: Reconstruction of the existing park-and-ride including a bus shelter, markings, LED lighting, traffic signal updates and EV outlets, Level 1.

Contractors and Bid Amounts: • J. Hutchins Inc. — $996,674 • G.W. Tatro Construction Inc. — $1,026,761 • J. P. Sicard Inc. — $1,037,952 • Engineers Construction Inc. — $1,047,376

County: Lamoille Town: Johnson Contract ID: 13C066 Location: Approximately 1 mi. north of the intersection of Vt. Route 15 and Vt. Route 100C. Also approximately 3.8 mi. north of the junctions of Vt. 15 and 100C. Project: Replacement of the existing decks and superstructures of both bridge 1 and bridge 2 with substructure modifications, the construction of a retaining wall and roadway approach. Also the replacement of the existing culvert with a new precast rigid frame or arch type with related approach and channel work relative to bridge 4. Contractors and Bid Amounts: • A.L. St. Onge Contractor Inc. — $2,948,950 • Engineers Construction Inc. — $3,481,470 • J. P. Sicard Inc. — $3,519,675 • CCS Constructors Inc. — $3,536,932 • Luck Brothers Inc. — $3,793,009 • Winterset Inc. — $4,913,999


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 17

Chappell Tractor Sales, Inc. 454 Route 13 South 391 Louden Road Milford, NH 03055 Concord, NH 03301 800/698-2640 603/225-3361 www.chappelltractor.com

Chappell Tractor East, LLC 251 Route 125 Brentwood, NH 03833 800/616-5666 www.chappelltractor.com

Kahn Tractor & Equipment, Inc. 520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com

Lorusso Heavy Equipment, LLC 160 Elm Street P.O. Box 857 Walpole, MA 02801 508/660-7600 www.lhequip.com


Page 18 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

NEW ENGLAND SUPPLEMENT ADVERTISER INDEX ACE EQUIPMENT SALES INC ......................................11 ARGUS INDUSTRIAL COMPANY ....................................1 ASTRO CRANE ..............................................................12 BULLETIN BOARD ........................................................12 CLASSIFIED ..................................................................12 CMD POWERSYSTEMS INC ..........................................9 CUSTOM CRUSHING CO. LLC......................................18 CONSTRUCTION EQUIPMENT GUIDE ........................15 EMPIRE CRANE LLC........................................................9 EQUIPMENT 4 RENT ......................................................8 EQUIPMENT EAST ........................................................1,7 FOLEY MARINE & INDUSTRIAL ENGINE ......................1 GORILLA HAMMERS........................................................1 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 LORUSSO HEAVY EQUIPMENT LLC..............................5 M G EQUIPMENT ............................................................1 MILTON CAT....................................................................12 NORTHLAND JCB ..........................................................13 POWERSCREEN NEW ENGLAND................................10 R J POIRIER HEAVY EQUIPMENT REP ........................8 ROGERS BROTHERS CORPORATION ........................19 SUMMIT SUPPLY LLC ......................................................1 T-QUIP SALES & RENTAL INC ......................................12 THE N.I.C.E. COMPANY ..................................................9 THE W. I. CLARK COMPANY ..........................................2 TYLER EQUIPMENT CORPORATION ............................3 WOODCO MACHINERY ................................................20 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.

Water Treatment Plant on Schedule for 2018 Completion WATER from page 1

per billion), with special concern for infants under one year. Currently, the manganese levels of the water in Shrewsbury are at 200 ppb, well within the safe limit. Everyday foods such as whole wheat bread and cooked brown rice can contain up to 1,070 ppb of manganese — a mineral that promotes proper body function. The main concern is the aesthetic quality of the water, with reports of discoloration Waterline Industries’ Cat 420, Grove Crane 770E and due to the high mineral lev- Cat 315 excavator during a recent wall pour. els. The Shrewsbury Water and Sewer Department piloted three differ- Spillane Co. of Everett for waterproofing ent systems adept at filtering high levels of the new tanks and concrete; Cenedella manganese before deciding on biological fil- Masonry of Millford for masonry work; tration. Biofiltration dates to the early 1900s Tata & Howard Engineering of when Europeans used it to filter surface Marlborough for design, and SOEP Painting water for drinking purposes. The procedure of Lawrence as the painting and coating employs natural processes rather than chem- subcontractor. Xcel Fire Protection of icals to extract contaminants from the water. Salem, N.H., for design, furnishing and The Shrewsbury plant will rank second in installation of the sprinkler system. “The project is going very well so far. size in the U.S. behind Lake Havasu, Ariz., The tanks need to be placed before the roof and the largest to date in the Northeast. According to the U.S. EPA, “Biological is set in December, so the timing is critical filters remove contaminants by three main to avoid a potential weather impact to the mechanisms: biodegradation, adsorption of schedule,” noted Josh Duchesne, Waterline micropollutants, and filtration of suspended project manager. “Everyone at the town as solids. The microbial growth attached to the well as Tata & Howard have been extremely filter media (biofilm) consumes the organic helpful in facilitating the start of this project. matter that would otherwise flow through It’s been a great team and project to be a part the treatment plant and ultimately into the of.” Waterline is running one shift with six to distribution system. The end products are carbon dioxide, water, biomass, and simpler ten crew members on site, depending on the concrete pour schedule and availability. organic molecules.” “Once the new system is in place, it will Other than minor yard piping modifications take about a year and half to completely to existing utilities, no plan changes have flush the system,” noted Robert Tozeski, occurred. (This story also can be found on Shrewsbury Water & Sewer Superintendent. The biofiltration plant will filter seven mil- Construction Equipment Guide’s website at www.constructionequipmentlion gallons of water per day. The 8,580-sq. ft. building will require guide.com.) CEG 4,000 cu. yds. of excavation — most of which will be used as backfill — and 1,200 cu. yds. of concrete. The new treatment plant will be built adjacent to the existing system. Upon completion of the biofiltration unit, the current system will be demolished by Waterline as part of the contract. Waterline has engaged a handful of Massachusetts subcontractors including PJ


Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • November 29, 2017 • Page 19

TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.

ROGERS BROTHERS CORPORATION ALBION, PA

The Ultimate in Trailers®

Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351

1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848

C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919

Avon, MA (508) 584-8484

Johnston, RI (401) 942-9191

www.cn-wood.com

www.tylerequipment.com

For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.


Page 20 • November 29, 2017 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide

Contact your local dealer:

Dealer Name City, ST 123.456.7890 City, ST Ci 123.456.7890 City, ST 123.456.7890 City, STyour local dealer: Contact 123.456.7890

WCity, OODCO MACHINERY ST 123.456.7890

140 Wales Avenue City, MA ST 02322 Avon, 123.456.7890 508.584.8484 ST 22City, North Maple Street 123.456.7890 Woburn, MA 01801 781.935.3377 City, ST 123.456.7890

Some companies s have you choose c pow wer or fuel efficiency. Yo ou chose both.

60 Shun Pike Johnson, City, ST RI 02919 401.942.9191 123.456.7890

Volv olvo developed the industry’s first fuel efficiency guarantee so you never haavve to compromise on n performance or productivity. And with CareT Trrack machine monitoring, you caan focus your attention on more important things — like growing your business. Get the details at volvoce.com/smartfuel.

DEALER LOGO www.woodcomachinery.com


Turn static files into dynamic content formats.

Create a flipbook
New England 24 November 29, 2017 by Construction Equipment Guide - Issuu