State Supplement sponsored by:
1
11
THE NEW ENGLAND EDITION
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
October 28 2020 Vol. LI • No. 22
95
SAME DAY PARTS AVAILABILITY
95
®
24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Barry Equipment Opens Training, Service Facility in Webster, Mass.
Specializing in:
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2020 EZ-Screen 1200XLS
*Limited time offer. Some restrictions apply. See dealer for details.
Barry Equipment is located at 7 Harry’s Way, Webster Mass. 3 Month lease 36 AS LOW AS
$1,500* / Month Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, 25 H.P. Kohler Diesel Engine, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $46,900 plus freight. Other Screeners Available
Tibbits 508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Equipment Services, Inc. 802-479-9696 ®
KWIK KLEET ts Traction Clea
EZ-SCREEN
www.ez-screen.com
248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
Cat IT38G, 3.25cy, 7,800 Hrs, Mich Radials 67%, 3rd Valve, Owned for many years, Runs Excellent, No blow by, No leaks, Very Good ..$49,750 or bo
Phil (413) 427-7171 • Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models • Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
www.foleyengines.com
see story page 14
www.tibbitseq.com
CALL 888-81-GORILLA(46745)
Kato/IHI Names Peterson Attachments & Equipment New Dealer for New England Ron Peterson, president of Peterson Attachments & Equipment in Westborough, Mass., announced that the company has been named the Kato/IHI dealer of New England. “Kato has long been known in the United States for their high quality Japanese compact excavators,” Peterson said. “Over the last decade, they have dramatically expanded their product offering. The excavator line has been expanded to include a full range of
The Kato HD514 excavator is among the products that will be carried by Peterson Attachments & Equipment.
machines, including three fully electric compact excavators and the model HD514, a 34,000pound work horse that comes complete with a blade, dual hydraulics, an Isuzu engine, a thumb and zero tail-swing.” Peterson Attachments & Equipment built its name and reputation on the hydraulic attachments business and, in particular, hydraulic hammers. It is the hydraulic system on the Kato see PETERSON page 12
Page 2 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
2008 HAMM HDO120V
2017 JOHN DEERE 650K
2016 HAMM H11i
3110 hrs, stk# 22866, 78” drums, oscillation dealer maintained ................................$40,000
1182 hrs, cab / air, 105" blade, fully serviced and ready for work, stk# 25886 ........$115,000
1079 hrs, stk# 26511 ..........................$65,000
LEEBOY 8510B
2013 METSO MINERALS LT200HP
2016 LEEBOY 8515C
3600 Hrs, stk # 25926, new eng, 8-15’ electric screed, dual controls and spraydowns $45,000
4300 hrs, stk# 25979 ........................$325,000
2,400 Hrs, Stk# 25464, 8-15’ electric screed, poly pads..............................................$76,000
2008 JOHN DEERE 850JXLT
2012 ROADTEC RX700E-3
2005 VOGELE 1110RTB
REDUCED PRICE
2800 hrs, 158” PAT blade, 30” pads, one owner 5125 Hrs, Stk# 25590, 7’ drum, Cat engine, unit, serviced & ready to go stk#26009 $115,000 full grade controls ..............................$115,000
Cummins, 10-19’ electric screed, 70% tracks, all wear items 70%, ready to work, stk# 25947 ............................................................$25,000
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 3
New 738 M purp p pose-built p h d is tree handler BIG neews for tree care specialists s SENNEBOGEN’ N’s “game-changing” tree care hand dlers have raised the bar even higher! The T new 738 M weighs in at twice the size of 718 M and R-HD models, with more power and more reach h to take k on bigger bi j b ! jobs!
PUR RPOSE-BUIL T
The 738 M, fittted with a power grapple saw, is attached to a 75 ft. telescoping bo oom and stick to quickly fell or prune trees as high as 125 ft. to 150 ft. tall. Th hen it easily cuts, swings and stacks the wood with a single operator to co omplete the whole job.
FROM M THE GROUND O UP
As big A bi and d powerful f l as it is, i the th 738 keeps pacce with the 718 M and 718 R-HD macchines with precise handling and fast cycle times to process up to 150 trees per day. From the road dside, on embankments or in heavy wo oods, the 738 M is the new gamee-changer for all land clearing, right-of-way maintenance and heavy tree care operations. GET THE DETA AILS ON THE T HIGH EFFICIENCY SOLUTION N FOR CUSTOM TREE REMOVAL A
USTOM-ENGINEERED D TREE CARE HANDLERS H deal for all tree serrvice operators sed for woodlot thinning, harvesting wood fuell to clearing storm debris up to 48” and up to 125’ high ll wheel drive or tracked models obsite safety increased with trimming, cutting, loading and stacking operatio ons as all are done rom the confines of o the SENNEBOGEN elevating ng and tilting Maxcab
The New 738 M
ww.senneboggen-na.com | +1-704-347-4910 251 Shakker Road East Longmeadow, MA 01028 (800) 292-6351
1980 Berlin Turnpike Berlin, CT 06037 (800) 352-4473
www.tylerequipment.c t.com
Page 4 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Rochambeau Bridge Reconstruction Project Under Way
The Rochambeau Bridge carries I-84 over the Housatonic River and the reconstruction will require a work trestle and barges for work that will be done over the water.
The reconstruction of the Rochambeau Bridge, which is actually two adjoining bridges in Newtown and Southbury, Conn., began on June 15 and will continue until December 2023.
Ken Liebeskind CEG CORRESPONDENT
The reconstruction of the Rochambeau Bridge, which is actually two adjoining bridges in Newtown and Southbury, Conn., began on June 15 and will continue until December 2023. The Middlesex Corp. of Littleton, Mass., is the lead contractor in the $52.87 million job that is being financed by the Connecticut Department of Transportation (CTDOT). Andrew Walter, a Middlesex project manager, said crossovers have been completed that redirect lanes on the eastbound and westbound lanes of the current bridge and they will begin to build trestles that will precede the demolition of the bridges before they can be rebuilt. The Rochambeau Bridge carries I-84 over the Housatonic River and the reconstruction will require a work trestle and barges for work that will be done over the water. Christopher Zukowski, a CTDOT project
manager, said demolition and new construction will require a work trestle for approximately two-thirds of the structure and barges for the remaining one-third, where Christopher Zukowski, a CTDOT project manager, said demolition and new construction will require a work trestle for approximately two-thirds of the structure and barges for the remainthe water depths are greater. “We will build the trestle ing one-third, where the water depths are greater. from the shore to the water ments is required as the new substructure before we begin demolition of the first surrounding soil. “Demolition will begin on the westbound must be widened to accept the new continusuperstructure,” he said. “We are constructing an access road on the east and west sides structure once the trestle has been installed,” ous steel plate girders, which will support the of the bridge with the surplus excavated he said. “It will progress first by removing new superstructure of the bridge,” Bukowski earth generated by these roads being trans- the bituminous concrete overlay, followed said. “The new 8-inch thick concrete deck ported to a TRSA [temporary reuse stockpile by the removal of the concrete deck. This will then be formed and poured, followed by area] located on state property. By providing will be achieved through the use of a installation of a cold applied membrane. A a location for the soil to be stored on state Caterpillar 349 excavator equipped with a bituminous wearing surface will then be property, we can avoid the expense associat- slab crab bucket. The deck and parapet sec- installed.” The job will take three years and is being ed with sampling, testing and potentially tions will be snapped off with this large excavator. The supporting rebar will be torch done to maintain bridge traffic. having to dispose of the soil.” “It is a long duration project because He said the trestle will consist of multiple cut as needed.” Once the demolition is completed, both each structure is done independently, so the bents, supported by 24-in. round steel piles that are driven into the soil and tested for sections of the bridge will be reconstructed. see ROCHAMBEAU page 16 “Modification of concrete piers and abuttheir capacity based on their friction with the
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 5
Lease brand d new equipment for less than t a winter rental with p payments as low as $99 peer month* on skid steer loaders, oaders, compact track loaders, wheeel loaders, and even the revolutionary JCB Teleskid. Teleskiid. Snow rentalls only last a few months, but business doesn’t melt away when the snow does. es. Put your machine to work year-round. Your Your higher paym ments will cost less than a winter w rental and last as litttle as five months. K Keep eep the t equipment the remainder nder of the year with seven payments as low as $99*! *All applications aree subject to credit review and approval. approval Security Seecurity deposit may be required based onn applicant applicant’ss credit. credit “ON ON-SEASON SEASON” (Nov – Mar increased payment). payment) 7 “OFF OFF-SEASON SEASON” (Apr – Oct reduced payment). First payment due in advance, and must be an “ON” payment. Minimum “OFF” payment is $99 + applicable taxes. Offer valid only on specific ific models. Offer may change without prior notice, and additional terms and conditions may appply. Speak to an authorized Northland JCB representative for more details.
Page 6 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Construction Set to Begin On Bruce Street Redesign Museum Expansion in Greenwich, Conn. Construction Work to Soon Begin in Suburban Boston
Newbruce.org photo
Science and natural history will have a much larger space for both permanent and temporary installations in the New Bruce.
Greenwich, Conn.’s, Bruce Museum has scheduled an Oct. 8 groundbreaking ceremony for the beginning of construction on a three-story, 43,000-sq.-ft. addition. Following the recent success of its ongoing, communitywide fundraising effort, leaders of the “Campaign for the New Bruce” announced Sept. 29 that construction will begin in October on the centerpiece of the Bruce Museum’s transformative renovation and expansion project that will more than double the size of the museum, adding new exhibition galleries for art and science. The “New Bruce”, which is slated to be completed by the fall of 2022, also will feature the William L. Richter Art Wing for changing art exhibitions and the museum’s permanent art collection, along with a 250-seat auditorium, a restaurant, new education and community spaces, and increased capacity for the museum’s gift store and storage space. The new building also will be home to the Bruce Museum’s Steven & Alexandra Cohen Education Wing and, for the first time, significant space to show the museum’s permanent art collection in four new galleries. The entire ground floor of the new addition will be free and open to the public during museum operating hours and available for special-event use by local community groups, families and businesses. In another first for the Bruce, the new restaurant will offer both indoor and outside dining. The auditorium, equipped with ultramodern audio-visual systems, will more than double the capacity of the museum’s current lecture gallery. Perhaps most important, there will be much more room to house the Bruce’s growing collection of 25,000 works of art, natural history specimens, and scientific objects and artifacts, as well as a new study room to welcome visiting researchers to explore the collections. “This is an incredibly exciting moment for Greenwich and its hometown museum, and for the entire Fairfield-
Westchester region,” said Robert Wolterstorff, the Susan E. Lynch executive director. “I know I speak for our family of staff, members, volunteers and trustees in expressing our profound gratitude to the community for their support.” Designed by the New Orleans firm of EskewDumezRipple, the new building addition will open directly onto Bruce Park and feature a delicate striated façade of cast stone and glass inspired by the surfaces of Connecticut’s quarries and the rock outcrops of Bruce Park. Reed Hilderbrand Landscape Architects, in Cambridge, Mass., is creating a natural environment around the New Bruce that includes a sculpture trail and places to stroll and play. New York City-based Turner Construction Co. is the lead contractor of the renovation and construction project. Sitting high on a hill overlooking Greenwich Harbor, the Bruce Museum offers a changing array of exhibitions and educational programs that promote the understanding and appreciation of art and science. The museum was originally built as a private home in 1853 for lawyer, clergyman and historian Francis Lister Hawks. Five years later, it was purchased by Robert Moffat Bruce a wealthy 19th century textile merchant who deeded the property 50 years later to the Town of Greenwich, stipulating that it be used as “a natural history, historical, and art museum for the use and benefit of the public.” Over the years, the community, through its generosity, built the Bruce Museum collection to nearly 15,000 objects representing the arts and sciences. In 1992, the Bruce Museum undertook a complete renovation of its 139-year-old building. Reopened in 1993, the redesigned Bruce is an architectural model of museum quality. Five years later, the Bruce Museum received accreditation from the American Association of Museums (now the American Alliance of Museums), an honor granted to fewer than 5 percent of all museums.
Construction will begin later this fall in the suburbs west of Boston on the $31.1 million Needham/Newton Corridor Improvements, according to the Massachusetts Department of Transportation (MassDOT). The roadwork includes an overhaul of Needham Street, the portion of Winchester Street up to Massachusetts Route 9, the bridge over the Charles River and a part of Highland Avenue in Needham. The project is scheduled to finish in 2023. P. Gioioso & Sons Inc., based in Hyde Park, Mass.,, is the general contractor on the Needham/Newton Corridor upgrades. Although drivers on the Newton side of the project will feel the traffic impact in the next few months, crews are not scheduled to start updating that part of the project until next summer. “It’s the biggest road construction project to touch our region in a generation,” Newton-Needham Chamber President Greg Reibman said. “It will significantly improve the corridor for pedestrians, cyclists, motorists and buses.” It also will mean traffic, he said, while also adding the enterprise has been long in coming. According to MassDOT, the 1.7-mi. project consists of a mixed-use urban landscape of commercial and residential areas with significant traffic congestion in the Needham Street area. The corridor carries 28,000 vehicles per day. It features trail connections and includes an historic, nationally registered, stone arch bridge over the Charles River, built in 1875. For decades, local and state players have been talking about what to do to improve the corridor that stretches from Rt. 9 into Needham before landing on the idea in 2013 of making it part of an “N-squared” innovation corridor. As part of that district renovation, plans were launched to revitalize the strip along Needham Street into Newton by installing bike lanes, new sidewalks and improvements on the Charles River bridge, making it safer for pedestrians and bikers as well as cars. Construction begins in November on the Needham end of the project. Crews will then start setting up on Highland Avenue between Webster Street and Hunting Road, where they will widen the roadway to make two lanes in each direction with an exclusive left turn lane. The road also will include full-depth construction, and mill and overlay work. Installation of stormwater basins and infiltration trenches also are set for the project. In addition, a raised bike lane and sidewalk will be added and the signals at both intersections will be replaced, with two other traffic lights being brand new. By late winter, crews should be ready to tackle the Wexford Street and the Charles River sections of Highland Avenue. According to MassDOT, work will mostly take place from 7 a.m. to 3:30 p.m., Monday through Friday. During rush hours all lanes will be open, according to the contractor.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 7
Proven worldd-class Tele-craw e wlers LER TELE CRAW TH ORT N NO
1LIINNE UP
#
CA!! R CA MEER AAM
223 ft | 68m main boom 348 ft | 105m max tip height full attachment with Superior capacities winch design Ultra-wide Vision package - 4 cameras!
Ver e mont 802-658-1700 02-658-1700 Massachusetts etts 508-499-1950 Pennsylvaniia 717-795-0700 New Yoork 315-676-2008 www.woodsscrw.com
250 t | 230 mt TELESCOPIC CRAWLER
Lexington, Kentucky, USA | www.linkbelt.com
HIGHEST CAPACITY A AVAIL A ABLE IN THE MARKET!
B U Y
•
L E A S E
•
R E N T
Page 8 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
BU Offers More Land to Break Logjam Over MassPike Job Hoping to break a stalemate over the $1 billion Massachusetts Turnpike project, Boston University is offering up more of its own land for the state to fit the giant project through a constricted section of Allston. Even at only a few feet wide, additional land could help the state rebuild the highway and adjacent Soldiers Field Road without erecting a new viaduct or extending over the Charles River, two options that have generated so much opposition that state officials were forced back to the drawing board this year. “In an area where feet, and perhaps inches, may be the difference between a workable and an unworkable solution, Boston University is committed to doing the utmost to accommodate these infrastructure improvements,” BU President Robert Brown said in a letter to Massachusetts Department of Transportation (MassDOT) Secretary Stephanie Pollack. BU hopes the land from its campus would provide enough room to move construction work in-land from the river while also squeezing all the eight-lane turnpike, four-lane Soldiers Field Road, two adjacent rail lines and a riverfront recreational path at grade level, a version backed by many advocates involved in the planning and the
administration of Boston Mayor Martin J. Walsh. Brown did not say how much property the school could turn over and noted that encroachments must “not limit our ability to use and operate the buildings” on the campus. But BU spokesperson Rachel Lapal noted the state was already planning to take a strip of land 7 ft. wide, and school officials have previously told the state it could have more. The business-backed nonprofit A Better City, which has championed the idea of putting everything at-grade, said as much as 12 ft. of land in the area may be available without affecting BU facilities. The tight area behind the BU campus, nicknamed “the Throat”, has been the focus of years of debate, as officials and activists have toggled between several options to get all the infrastructure to fit. One option would replace the turnpike viaduct with a newer one; another would bring the highway to grade level but raise Soldiers Field Road on a new, smaller viaduct. Many advocates instead have long favored putting everything at grade to eliminate hulking roadways and ease direct access to the riverfront for pedestrians and cyclists. Massachusetts officials have warned this approach would be difficult to
get permitted because it may require building into or over the river. However, the state itself has already given some ground, recently saying it will now consider a design pushed by the city of Boston and A Better City to squeeze everything at grade by shrinking the width of shoulder lanes from an earlier version proposed by the state, while adding plant life to the riverfront and a boardwalk to carry the bike path. Rick Dimino, president of A Better City, said the state’s concession is “a major victory.” “I believe now the Commonwealth is poised to build a truly transformative project,” he said. “This could be Gov. Baker’s infrastructure legacy.” But this is hardly the last word, as the state continues to study other designs, including those that put the highway or Soldiers Field Road on a viaduct. “That doesn’t really change the next step in the process, which is we still have to compare the now-improved version of the all at-grade to” the other design ideas, Pollack said in an interview with the Globe Oct. 6. Pollack is expected to announce a preferred option for the $1 billion-plus project
in November, though the evaluation of other options is expected to continue even beyond that. Emily Norton, executive director of the Charles River Watershed Association, said her organization will continue to oppose elements that negatively affect the Charles. Even the version backed by A Better City and Boston requires too much construction in the river, such as boardwalk pilings, she said. “Our mission is to protect the river, and we’re going to protect the river,” Norton said. Dimino said BU’s offer of more land could further help avoid impacts to the river, as would narrowing the lanes on Soldiers Field Road. City officials also have argued the at-grade option would reduce long-term costs because it would require less maintenance than a viaduct. Earlier this year, Harvard University also called for the state to consider the all-at-grade design pitched by the city, arguing a consensus must emerge. The school is another major stakeholder in the project, though mostly more to the west, where plans to straighten the highway where it loops toward Brighton would open space for new development by the school.
UMaine to Use Much of $240M Gift for New Facilities Administrators in the University of Maine System on Oct. 7 lauded a $240 million gift that is among the largest ever in public institutes of higher education and will be used for systemwide investments in facilities, academics and athletics. Much of the funding from the Harold Alfond Foundation, one of the state’s leading philanthropic organizations, will be spent on the University of Southern Maine campus in Portland. Officials there are planning for the construction of a new graduate center and law school. “This is a combination of a year-long effort to explain the needs of the system to an organization that has been very generous in the past and an effort to come forward with new initiatives that obviously have attracted the support of the Alfonds,” said UMaine System Chancellor Dannel Malloy. “They have been very supportive of the [university system] and the University of Maine in the past, particularly in athletics, but this is really groundbreaking in its scope and its investments in Maine’s future.” The gift to UMaine is the eighth largest ever to a U.S. institution of public higher education and the largest ever in New England, according to the Chronicle of
Higher Education. At the University of Southern Maine (USM), President Glenn Cummings said the gift will help with the construction of a new graduate center and law school and expand the school’s engineering program as part of the development of a multi-university College of Engineering, Computing and Information Science. The engineering program will be led by the University of Maine in Orono and will provide for additional undergraduate and graduate programs at USM. Engineering will receive $75 million of the $240 million gift and use some of that money to further renovations of the Ferland Engineering Education and Design Center in Orono. A total of $55 million of the foundation’s gift will go toward, among other things, a new building to house the center and the University of Maine School of Law. The Maine Center building on the USM campus has an estimated cost of $70 million, up to $40 million of which will come from the Alfond gift. It would tentatively be located off Bedford Street in the vicinity of the Glickman Family Library and the Wishcamper Center and across the street from where USM is planning to break ground this spring on a $100 million resi-
dence hall and student center. Maine Law Dean Leigh Saufley said the combined graduate and law building will allow students to better access a cross-disciplinary education. It also would replace the current Maine Law building, which in 2017 was named one of the eight ugliest university buildings in the country by Architectural Digest magazine. As far as the timeline for the center, Saufley said the university is in the design phase and “my hope is in a couple of years we will see a brand-new building.” As a requirement of the gift, the system must secure $170 million in matching funds, which will be raised through private, state and federal sources. The result will be at least a $410 million total investment. The Alfond Foundation, named for philanthropist Harold Alfond, who founded the Dexter Shoe Company and died in 2007, has a 70-year history of supporting education and, specifically, athletics in Maine. Athletic facilities named for Alfond are found on six college campuses in Maine, including UMaine’s iconic ice hockey facility, opened in 1977, and its football stadium. The foundation continued with that support by earmarking $90 million of its recent donation to UMaine System athletics – the
largest single contribution for athletics at a public college in New England. It will be distributed over a 10-year period for construction of new facilities, upgrades to existing ones, and turning the Orono campus into a destination for high school state championships and other community events. “When student-athletes choose Maine, it’s not because of the facilities now,” said women’s basketball coach Amy Vachon. “It’s because of our people and our campus community. Now, to be able to add on that other piece where sometimes we lose that battle, will be so exciting.” UMaine athletics director Ken Ralph said the entirety of the Alfond Foundation gift will go toward facility improvements, not annual operating costs for the athletic department. It will be the massive cornerstone to a planned $110 million investment in athletic facilities on the Orono campus. Details of the master plan will be announced soon, Ralph said. Ralph, UMaine President Joan FerriniMundy and University of Maine System Chancellor Dannel Malloy each emphasized the gift will be used to dramatically improve practice fields, office space and game facilities for women’s athletics.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 9
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
RENT! RENT! RENT! RENT!
2015 Hyundai Robex 260 LC-9A, 3500 hours, plumbed, Excellent shape! ......$79,000
2018 LINK-BELT 210 X4, 1650 hours, Graptor Bucket & Thumb, Very Nice Machine $139,000
2012 CAT 324EL, 5500 hours, QC, thumb, aux. hydraulics ......................................$99,000
2013 Komatsu PC650 LC-8, 6600 Hours, Quick Coupler, Aux. Hydraulics, 12'6" Stick, Heavy Duty Bucket ........................................$199,000
2018 Volvo ECR355EL, 377 Hours, Quick Coupler, Aux. Hydraulics ............................................$249,000
Page 10 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
ǡ Ƭ ǤǤǤ
Acadia Gateway Center’s Phase 2 Construction Set for 2021
ϴϬϬͲϱϮϵͲϮϱϭϱ ƵƚŚŽƌŝnjĞĚ ŝƐƚƌŝďƵƚŽƌƐ &Žƌ
Z KůƐŽŶ DĨŐ͕ ͞ Ƶŝůƚ ŝŶ ƚŚĞ h^ ͕͟ ďĞůŝĞǀĞƐ ŝŶ ďƵŝůĚŝŶŐ ƚŚĞ ƐƚƌŽŶŐĞƐƚ͕ ŽǀĞƌ ĞŶŐŝŶĞĞƌĞĚ͕ ďĞƐƚ ƌŽĐŬ ĐƌƵƐŚŝŶŐ͕ ƐĐƌĞĞŶŝŶŐ͕ ƌĞĐLJĐůŝŶŐ͕ ĐŽŶǀĞLJŝŶŐ ƉŝĞĐĞ ŽĨ ĞƋƵŝƉŵĞŶƚ ŵŽŶĞLJ ĐĂŶ ďƵLJ͘
ZŽĐŬƐƚĞƌ EŽƌƚŚ ŵĞƌŝĐĂ͛Ɛ ƉƌŽĚƵĐƚ ůŝŶĞ ŝŶĐůƵĚĞƐ ƚƌĂĐŬ ŵŽƵŶƚĞĚ ŝŵƉĂĐƚ ĂŶĚ ũĂǁ ĐƌƵƐŚĞƌƐ ĂƐ ǁĞůů ĂƐ ƚƌĂĐŬĞĚ ƐƚĂĐŬĞƌƐ ĂŶĚ ƐĐƌĞĞŶŝŶŐ ĞƋƵŝƉŵĞŶƚ
^ > ^ d D ƐŬ ĂďŽƵƚ ŽƵƌ ŽŵƉĞƟƟǀĞ ZĞŶƚĂů ZĂƚĞƐ ĂŶ dƌŽŝĂŶŽ Ͳ ϮϬϯͲϱϬϲͲϯϴϲϬ ; d͕ D ͕ Z/Ϳ :ŽĞ ŽůůĂnjŽ Ͳ ϮϬϯͲϴϴϲͲϱϱϱϴ ;Ez͕ E,͕ D ͕ sdͿ
^ĞĞ ŽƵƌ ĐŽŵƉůĞƚĞ ŝŶǀĞŶƚŽƌLJ Ăƚ
ǁǁǁ͘ Yh/WͲ^ > ^͘ĐŽŵ
Located southwest of Bar Harbor, Acadia National Park is made up of 49,000 acres along Maine’s picturesque and rocky Atlantic coast. The National Park Service (NPS) is poised to start the second phase of construction of its Acadia Gateway Center, on Route 3 in Trenton, Maine, due to a $9 million infusion of cash from the federal government. Phase One of the center, completed in 2012, was a bus maintenance facility, parkand-ride lot, propane fueling station, access road and administrative offices for Downeast Transportation, the nonprofit operator of the Island Explorer shuttle bus system and countywide transit systems. Phase Two will establish a full-service intermodal facility and Acadia National Park information center. That construction is expected to cost $23 million. Planners have moved the project from concept to preliminary design. Phase Two construction is expected to take place from 2021 to 2023, according to park documents. It will include a visitor center, a pedestrian plaza, bus berths and circulation areas for Island Explorer and commercial tour buses to line up. Level 2 electric charging infrastructure will be installed for future charging stations. The location will sell park passes and provide information on the park, bus routes and schedules, recreation opportunities, as well as books and maps, and information on tourist amenities. A waiting room is designed with an expanse of glass so visitors can keep an eye out for their bus. Located southwest of Bar Harbor, Acadia National Park is made up of 49,000 acres along Maine’s picturesque and rocky Atlantic coast. The park preserves about half of Mount Desert Island, many adjacent smaller islands, and part of the Schoodic Peninsula. When completed, Acadia Gateway Center is expected to benefit local and state economies, as well as address severe transit deficiencies in the region, according to a news release from the office of Maine’s U.S. Sen. Susan Collins, which announced the
fund as part of a $10.2 million package to be administered through the FTA’s Grants for Buses and Bus Facilities Program. The project got its start in 2007, when Friends of Acadia purchased the 369-acre Crippens Creek property in Trenton and sold approximately 150 acres to the MaineDOT to carry forward the center’s construction, according to the non-profit’s website. The center sits between Ellsworth and Mount Desert Island; its location was designed to intercept traffic traveling south on Route 3 before arriving onto Mount Desert Island, according to the NPS. Overall, the Acadia Gateway Center Phase 2 project is designed to: • Provide connections to the Island Explorer and other bus services, • Add more parking for visitors and commuters, • Build administrative, light maintenance and storage facilities for Downeast Transportation Inc. in support of the Island Explorer Bus System, • Orient visitors to the Acadia region and provide visitor amenities such as restrooms and, • Protect natural and aesthetic resources, including open space. John Kelly, Acadia Gateway Center’s management assistant, told the Acadia Advisory Commission during its virtual meeting Sept. 14 that the project’s funding status was 82.6 percent secure, including $12.4 million from the Federal Transit Administration (FTA) and $5.5 million from the MaineDOT. The needed 17.7 percent of monies needed to fully pay for Phase 2 of the center were pending at that time, Kelly explained, including $4 million from the National Park Service. “The Acadia Gateway Center has moved ahead by leaps and bounds in the last year,” he said, adding “The $12.4 million from the [FTA] pushed it into reality. It’s just a matter of getting the National Park Service funding in place, which we hope to do in the next few months.”
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 11
Fit i more w work k iin few e er ho hours. s The quick cycle times, efficient design and reliable power of Doosan® excavators help you improve productivity on the job. The long carriage design of ourr DX180LC-5 provides superior stability and optimizes working width – for improved performance in heavy digging and lifting operations. And all Doosan excavators are known for operator comfor t with roomy cabs, simple controls and excellent visibility. Stop in and demo a Doosan exca avvator to oday y..
Doosan® and the Doosan logo are reg istered t r ademar k s of Doosan Cor p. in the United S t a t e s a n d v a r i o u s o t h e r c o u n t r i e s a r o u n d t h e w o r l d . 1 8 - D 0 0 3 .6
Au thor ized Doos an De aler
Equipment East
196 Manley St. • Brockton, MA 02301 • 508-484-5567 61 Silva Lane • Dracut, MA 01826 • 978-454-3320 61 Silva Lane • Dracut, MA 01826 1474 Rte 3A • Bow, NH • 603-410-5540 978-454-3320 • w w w.equipmenteast.com www.equipmenteast.com
Page 12 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Wood’s CRW Names Banks New Northern Territory Manager Wood’s CRW announced the addition of which is key to effective customer relationMark Banks as the northern New England ships.” territory manager to the crane and lift division covering Maine, New Hampshire and Vermont. He brings 22 years of sales experience in the heavy equipment industry, having worked at Beauregard Equipment and J.J. Kane Auctions. “Mark will do an excellent job in strengthening CRW’s market for LinkBelt, National Crane, ShuttleLift, Maeda and Merlo product lines in the 3 Northern States of New England,” said Sales Manager Marc Varricchione. “Mark lives in the central area of his territory, which will enable him to work out of both the Williston, Vermont, and North Oxford, Massachusetts, locations Mark Banks
Peterson Attachments Ramps Up Kato/IHI Parts Inventory PETERSON from page 1
Place Your Business Card for... 3 months 6 months 12 months
$300* $585* $1040*
only $50 an issue only $45 an issue only $40 an issue
Call now to reserve your space! 800-225-8448 * pre-payment required
excavators that caught Ron Peterson’s attention. “Every mid-sized and larger Kato excavator comes standard with dual hydraulics, which is ideal, but it’s really the hydraulic flow that got my attention. The hydraulic flow in each Kato excavator equals or exceeds every other excavator on the market, which means it cycles and hits faster and harder when equipped with a hydraulic hammer. One of the first things we will be doing is equipping some of these Kato machines with Ramfos hammers and putting them in our rental fleet.” Kato has expanded its product offering beyond excavators and is now offering tracked loaders and skid steers, which are powered by Yanmar diesel engines, have pilot controls and offer the largest cabs in their class. “Over the next few weeks, our inventory will be hitting the ground along with a substantial inventory of parts, which will allow us to support Kato/IHI customers who already own machines and are looking for parts and service support,” Peterson said. For more information, visit www.petersonattachments.com.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 13
SA AV VE NOW
SAVE V LATE T R
On New Cat Compact Equipmen q t
Take adv ad dvantage of low interestt rates along g with unmaatched product support from H.O. Pen nn.
0% Finaancing For 60 Monthss with Zero Down andd a Customer Value Agreement* CV VA Includes: 5yr/3,000hr Powertrain+Hydraulic+TTechnology echnology EPP 3yr/1,500hr Planned Maintenan nce Kit WW WW.HOPENN.COM/SAV AVE
8444-CATAT-1923 *Some restrictions may ay aap pply. y. Please P vissit dealer or see websitee ffo or details.
Page 14 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Barry Equipment Opens Second Webster, Mass., Facility from page 1
Barry Equipment has made a tremendous investment in parts for its new service center for each of the manufacturers it represents, including Doosan, Yanmar, Peterson Pacific, Dynapac, Rotobec, ASV and Brandon.
To guarantee that machines receive all of their scheduled lubrication and oil services, Barry Equipment offers on-site lubrication services.
arry Equipment Co. Inc. has recently opened a brand new 17,500-sq.-ft. facility. Located in Webster, Mass., on 7 Harry’s Way, only 2 mi. from the company headquarters, this new location will act as Barry Equipment’s service and training headquarters. The five-bay service center is equipped with state-of-theart equipment including two 10-ton bridge cranes, centralized lubrication system, diagnostic equipment and hydraulic
B
hose shop. The new location is built on a 10-acre site allowing for onsite demonstrations, testing and equipment storage. “As Barry Equipment grows and expands in the market place, we continually stay focused on customer service and support. In today’s competitive market we believe offering the highest level of support and service is what sets you apart from the competition. In addition to our new location, Barry
Equipment has added new service trucks to our fleet including a lube truck specifically focusing on scheduled fleet maintenance,” the company said. Hours of operation are Monday to Friday 7 a.m. to 5 p.m. and Saturday by appointment only. Manufacturers represented include Doosan, Yanmar, Peterson Pacific, Dynapac, Rotobec, ASV and Brandon Manufacturing. CEG
Barry Equipment’s new hydraulic hose shop is equipped to create hydraulic hoses for nearly all makes and models of equipment.
In addition to onsite service capabilities, Barry Equipment Co. Inc. operated its own transport trucks with capabilities of handling any move.
Barry Equipment continues to invest in its fleet of service trucks so whenever possible fleets can be serviced or repaired on site.
Barry Equipment new facility has room to spare for prepping and servicing machines like these two Doosan loaders, a model DL580-5 and DL280-5, being prepped for delivery.
Barry Equipment’s new Webster, Mass., facility is equipped with two 10-ton overhead cranes, making light work out of the heaviest projects.
A major investment has been made in diagnostic equipment, assuring the fastest possible turn time to get equipment back up and running.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 15
R O C K S O L I D S E RV I C E · W E C R U S H Y O U R R O C K S 140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307
LARGEST DEALER IN NEW ENGLAND Selling the most advanced Portable Crushing & Screening Plants All of our plants are designed for high productivity and easy movability Save labor, power, maintenance, plant relocation costs, time Gain productivity and profitability Ideal for applications involving hard, abrasive materials Call today for more information
1-800-53-CRUSH Over 100 Machines in Stock
W W W. P O W E R S C R E E N - N E . C O M Family Owned and Operated for over 20 years
Call for Parts Today
R O C K S O L I D S E RV I C E · W E C R U S H Y O U R R O C K S
Page 16 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Middlesex Corp. Leads Rochambeau Despite COVID, Maine Bridge Reconstruction Project in Conn. Construction Industry ROCHAMBEAU from page 4
impact to the public is minimal,” Bukowski said. “Two lanes in each direction will be maintained with lanes closed only at nights for new steel delivery.” The department of transportation is thrilled that the use of crossovers through the median are possible on
this project, he added. “This technique will reduce the impact to the traveling public by maintaining the two travel lanes in each direction through the work zone for the entire duration of the project. We understand there is a cost associated with slow or stopped traffic and try on every project to include new and
innovative ideas and techniques to reduce or eliminate delays to the public.” Subcontractors on the job include Eastern Bridge Works of Pleasant Valley, N.Y.; KTM Electrical Construction of Orange, Conn.; and Warning Lights & Scaffolding Service of Hamden, Conn. CEG
The trestle will consist of multiple bents, supported by 24-in. round steel piles that are driven into the soil and tested for their capacity based on their friction with the surrounding soil.
Crews will build the trestle from the shore to the water before they begin demolition of the first superstructure.
Remains Prosperous Despite the unprecedented economic downturn caused by the COVID-19 pandemic, Maine’s construction industry has continued with little disruption, as demand has not waned for work on long-delayed projects. With fewer cars on the road and fewer students in classrooms, it has given local contractors a chance to tackle highway and school repair jobs, according to Matt Marks, CEO of Associated General Contractors of Maine, in an interview with The Center Square earlier in October. “Maine’s construction industry amid the pandemic has been one of the bright spots,” he explained. “The Department of Homeland Security early on determined construction was an essential industry.” While Maine’s construction sector lost approximately 1,200 jobs at the outset of the pandemic, those numbers have improved and it is now up about 700 year-to-year, Marks said. “We are concerned about late 2021 and 2022,” he cautioned. “Maine people know the infrastructure backlog is big. Roads and schools need TLC. We want Maine to use this as an opportunity to get through the pandemic and the next few years.” Public projects can help make up for stalled work in the private sector, Marks explained. “We are still trying to figure that out. The state budget is going to have cuts, and we are hoping they look at appropriations to keep Mainers working. We are hoping on the private side there are some growth markets that make up for some shortfalls in hospitality.” Residential construction demand, which was already on the rise, has not slowed down, Marks said. He said the net effect is a strong outlook for construction jobs, while adding that he has received inquiries from workers in California who want to know about job prospects in Maine. “I never got those calls before,” he said. “They have a list of things making it difficult to live there, and we’re lucky to have great companies, and they can raise a family here.” Construction is getting more attention from students in Maine, as well. “We hope that parents and students can see construction as a growth market,” Marks said. “If someone wants experience in a field that’s growing, now would be the time to do it.”
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 17
Chappell Tractor 251 NH-125 454 RTE 13 391 Loudon Rd. Brentwood, NH 03833 Milford, NH 03055 Concord, NH 03301 603/642-5666 603/673-2640 603/225-3361 www.chappelltractor.com
Kahn Tractor & Equipment, Inc.
Lorusso Heavy Equipment, LLC
Quality Fleet Service, Inc.
520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com
160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com
548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com
Page 18 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX A QUICK PICK CRANE SERVICE INC ..........................12 ARGUS INDUSTRIAL COMPANY ....................................1 BULLETIN BOARD..........................................................12 EQUIP-SALE AND LEASING CORP ..............................10 EQUIPMENT EAST ......................................................1,11 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1 H O PENN MACHINERY CO INC ..................................13 HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 NEW ENGLAND MOBILE CRUSHING ..........................20 NORTHLAND JCB/ALTA EQUIPMENT ............................5 POWERSCREEN NEW ENGLAND................................15 ROGERS BROTHERS CORPORATION ........................19 SHAWMUT EQUIPMENT CO INC ..................................12 T-QUIP SALES & RENTAL INC ........................................9 THE N.I.C.E. COMPANY ..................................................9 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 WOODS CRW CORP........................................................7 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
CTDOT Outlines Its Plans for Nearly $4B in Capital Projects Connecticut’s roads and railroad lines are used every year by its approximately 3.6 million residents and millions more out-of-state workers and travelers. To keep up with the wear and tear, the state Department of Transportation (CTDOT) is constantly working on maintenance and improvement projects. The most important of those initiatives are outlined every four years in the Statewide Transportation Improvement Program (STIP). The CTDOT recently took public comments on the draft version of the latest STIP, to cover the years 2021 to 2024. The 223 projects listed in the new STIP would cumulatively be funded with approximately $3.9 billion, roughly $3.2 billion in federal money, about $684 million from the state and some $17 million from municipalities. About 60 percent of the funds would be used for highway and bridge projects, while the other 40 percent would go toward rail, bus and ride-share programs. Connecticut’s eight Metropolitan Planning Organizations and two Rural Councils of Governments contribute to the STIP’s development. “The list of projects is wide and encompassing,” said state Sen. Carlo Leone, of Stamford, co-chairman of the state Legislature’s Transportation Committee. Among them are several marquee initiatives planned across the state in the next four years. Interstate 95 Corridor On I-95, those projects include: • About $345 million would be earmarked for renovations of the Gold Star Memorial Bridge, which carries the freeway over the Thames River, between New London and Groton. The work would involve structural steel repairs and upgrades, as well as replacement of the deck for the older, northbound structure. Crews have already completed the southbound structure, • $180 million for work in Greenwich and Stamford that would include pavement improvements and bridge renovations. On the southbound side of Exit 3 in Greenwich, there would be a minor widening of the roadway to increase the length of the existing deceleration lane to improve safety and alleviate congestion, • At Exit 74 in East Lyme, $142 million will go toward improvements, including replacing the highway’s bridge over Connecticut Route 161 to address its poor condition and accommodate a widening on Rt. 161, • Another $70 million for upgrades in Norwalk and Westport. About 2 mi. of I-95 in those towns would be rebuilt between the Norwalk and Saugatuck rivers. The existing bridge over Route 33 at Exit 17 would be replaced using “accelerated construction” and minor
work would be carried out on the Westport bridges over Franklin Street and over the Saugatuck River to maintain a “state of good repair” for those structures. Other Road, Rail Projects Part of STIP The CTDOT also plans to make upgrades to the Merritt Parkway/Rt. 15 in Norwalk and New Canaan that would total about $53 million and include bridge improvements and resurfacing. The state transportation agency intends to work on a key bridge along the Metro-North Railroad. Replacement of the four-track Walk Bridge in Norwalk arguably represents the most ambitious rail project supported by the STIP. Scheduled to start in mid-2021 and take about four to five years to complete, the undertaking has an estimated total cost of $511 million. Built in 1896, the 564-ft.-long swing bridge is one of the oldest movable bridges in the region. “The Walk Bridge has outlived its intended lifespan and experienced repeated operational failures in recent years,” reads an excerpt on the CTDOT website. “It is vulnerable to damage from storm surges and high winds and requires replacement.” The STIP also makes eight-figure allocations for improvements to several other rail bridges in Norwalk, including $60 million for the East Avenue bridge, $50 million for the Fort Point Street bridge and $15 million for the Osborne Avenue bridge. Additional rail projects include New Haven line signal-system replacements, allotments that would total more than $140 million. In addition, there is an annual program to renovate stations on the New Haven line. Some more major projects planned in the next four years would include $65 million for the removal of traffic signals on Rt. 9 in Middletown, about $38 million for improvements along Rt. 85 from Montville to Salem and approximately $40 million for Rt. 82 work in Norwich, as well as statewide bus replacements. Next Steps Inclusion in Connecticut’s Statewide Transportation Improvement Program is necessary for a project to qualify for federal transportation funding. State and local government agencies then need to provide the necessary funding matches to allow projects to move forward. The CTDOT submits a capital budget request to the state Office of Policy and Management for each two-year cycle, and the General Assembly acts every two years to authorize bonding for the transportation department’s capital program. The State Bond Commission must also approve CTDOT requests for funding.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • October 28, 2020 • Page 19
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
ROGERS BROTHERS CORPORATION ALBION, PA
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
60 Shun Pike Johnston, RI 02919 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
For more than 110 years, ROGERS® trailers have stood above the rest in rugged durability, unsurpassed quality and superior design. Contact your local dealer for a quote today.
New England Mobile Crushing Services
Page 20 • October 28, 2020 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
CUSTOM HAMMERING
One of the largest hammer excavator combinations available in New England. 25,000 lb hammer paired with a 175,000 lb John Deere excavator.
SAVE TIME & MONEY VS BLASTING • Don’t pay for an oversized cut. • Eliminate lengthy and painful permitting processes • Do away with enviromental and traffic impact studys • No costly traffic management payments • Throw away those blasting mats • Material ready for crushing without further reduction follow us on Facebook
Many other hammer/excavator size combination available to meet your needs. 200 Suncook Valley Rd • Chichester, NH 03258 P: 603-961-0183 • F: 603-961-0135 www.newenglandmobilecrushing.com